PROPOSED FILL FOR THE CONSTRUCTION OF THE GEISMAR INDUSTRIAL PARK IN ASCENSION PARISH
NAME OF APPLICANT: Shriver Construction, c/o D & S Environmental Services, Inc., P.O. Box 510, French Settlement, Louisiana 70733.
LOCATION OF WORK: Section 63, T9S-R2E, at the junction of LA Hwy 30 and LA Hwy 73 in Geismar, Louisiana, in Ascension Parish, within the Lake Maurepas Basin in hydrologic unit (HUC 08070204), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate, and deposit fill to construct and maintain the Geismar Industrial Park to include four (4) office/warehouse buildings with parking and sidewalks, a 91 space Boat and RV parking lot, two storm water management areas with pertinent outfalls, a sewer treatment plant, and ingress/ egress. Approximately 8,567 cubic yards of native earthen fill material, lime treated base, limestone, and concrete will be required to achieve grade elevation requirements. The proposed project is situated on an approximate 8-acre tract that has jurisdictional forested wetlands, uplands, and jurisdictional “other waters of the US” included within its boundaries. The applicant proposes to permanently impact 1.48 acres of forested jurisdictional wetlands, and 0.04 acre of “other waters of the US”. It is anticipated that the proposed action would have minimal impact on adjacent wetlands.
The applicant has stated that they designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable and any further reduction would limit usage of the property and, therefore function, deeming the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.