Construct two well pads and install appurtenant structures to drill brine wells in Assumption Parish
BOARDWALK LOUISIANA MIDSTREAM, LLC
c/o PROVIDENCE ENGINEERING AND ENVIR
1201 MAIN STREET
BATON ROUGE, LA 70802
Attn: Regina Staten
LOCATION:
Assumption Parish, LA; POB - proposed freshwater pipeline at existing pump station @ Lat. 30-00-42.22N / Long. -91-08-01.33W; POB - proposed brine return pipeline at existing manifold @ Lat. 30-00-41.07N / Long. -91- 07-57.19W; POE - proposed freshwater pipeline and proposed brine return pipeline at proposed Brine Well #2 @ Lat. 30-00-10.99N / Long. -91-07-30.65W; Proposed Brine Well #1 @ Lat. 30-00-16.43N / Long. -91-07-28.94W
(see plats for additional coordinates); Section 41, T12S-R13E; Section 46, T12S-R13E; near Belle Rose, LA. Proposed activities within the existing ring levee are located with a Fastland.
DESCRIPTION:
Proposed installation of two brine wells, one 12 inch freshwater line (±5,400 feet in length), one 12 inch brine return line (±5,300 feet in length), overhead powerline/communication lines, and access roads. Additionally, twenty-four concrete sleepers will be installed to support portions of the pipelines that will not be buried, seven corrugated steel pipes (±574 feet in length) will be installed beneath the road bed for drainage, and ninety-six rig support piles will be needed for the two well pads. Approximately 1,725 cubic yards of native material will be excavated and placed on site, approximately 132,507 cubic yards of sand material, approximately 4,734 cubic yards of rock material and approximately 2 cubic yards of concrete will be required for project construction. Approximately 1.13 acres of upland habitat, approximately 0.35 acres of non-vegetated waterbottoms, and approximately 12.04 acres of vegetated wetlands may be impacted as a result of this proposed activity.