Home

New York District

Run scraper

The New York City Police Department (NYPD) Launch Repair Shop-Marina is located on the northwestern corner of Randalls Island

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The New York City Police Department (NYPD) Launch Repair Shop-Marina is located on the northwestern corner of Randalls Island, immediately north of the Harlem River span of the Triborough Bridge. The rectangular-shaped marina requires maintenance dredging to restore the basin to an operational depth of six (6) feet below Mean Low Water (MLW) (-8.41 feet North American Vertical Datum of 1988 (NAVD 88)). The marina is used to dock, fuel, maintain and repair NYPD and various New York City and State agency vessels, including the New York Fire Department, New York State Parks, and the New York City Department of Environmental Protection. The operational area of the facility is approximately 33,000 square feet, with 24,000 square feet of open water. Approximately 1,500 cubic yards of material is proposed for removal with subsequent 1 to 2 year maintenance cycles not to exceed 2,400 cubic yards per operation including 1-foot of over depth allowance. The total area of in-water work will be less than 24,000 square feet.

The New York City Police Department (NYPD) Launch Repair Shop-Marina is located on the northwestern corner of Randalls Island, immediately north of the Harlem River span of the Triborough Bridge. The rectangular-shaped marina requires maintenance dredging to restore the basin to an operational depth of six (6) feet below Mean Low Water (MLW) (-8.41 feet North American Vertical Datum of 1988 (NAVD 88)). The marina is used to dock, fuel, maintain and repair NYPD and various New York City and State agency vessels, including the New York Fire Department, New York State Parks, and the New York City Department of Environmental Protection. The operational area of the facility is approximately 33,000 square feet, with 24,000 square feet of open water. Approximately 1,500 cubic yards of material is proposed for removal with subsequent 1 to 2 year maintenance cycles not to exceed 2,400 cubic yards per operation including 1-foot of over depth allowance. The total area of in-water work will be less than 24,000 square feet.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas