You can copy from here when filling out the rest of the page.
LETTER OF PERMISSION: The City of Appleton proposes to reconstruct CTH JJ from Ballard Road (CTH E) to a point located approximately 700 feet east of Lightening Drive.
PROJECT DESCRIPTION AND PURPOSE: The City of Appleton proposes to reconstruct CTH JJ from Ballard Road (CTH E) to a point located approximately 700 feet east of Lightening Drive. The project includes reconstructing the roadway as an urban section with 12-foot lanes, a 4-foot bike lane, a 10-foot trail south of CTH JJ, a 5-foot sidewalk north of CTH JJ, and a raised median. Lightening Drive would also be extended approximately 600 feet north of CTH JJ and a new roundabout would be constructed at the intersection of Lightening Drive and CTH JJ. The purpose of the proposed project is to improve motor vehicle and pedestrian safety along CTH JJ and to provide access to future developments to the north.
Information for File # MVP-2016-02584-NTD
Applicant: City of Appleton
Corps Contact: Nick Domer
Address:
U. S. Army Corps of Engineers
Suite 216, Old Fort Square
211 North Broadway, Suite 221
Green Bay, Wisconsin 54303
E-Mail: nicholas.t.domer@usace.army.mil
Phone: (651) 290-5855
Primary County: Outagamie
Location: The project is located in Section 6, T. 21N., R. 18E., Outagamie County, Wisconsin.
Information Complete On: 11-8-2016
Posting Expires On: 12-23-2016
Authorization Type: Section 404 Letter of Permission
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbor Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 07-01. We have made a preliminary
determination that the aquatic resources that would be impacted by the proposed project are
regulated by the Corps of Engineers under Section 404 of the Clean Water Act. Our
jurisdictional review and final jurisdictional determination could result in modifications to the
scope of the project's regulated waterbody/wetland impacts and compensatory mitigation
requirements identified below. A preliminary or approved jurisdictional determination will be
made prior to reaching a permit decision. If an approved determination is made, it will be posted
on the St. Paul District web page at http://www.mvp.usace.army.mil/.
PROJECT DESCRIPTION: The City of Appleton proposes to reconstruct CTH JJ from Ballard
Road (CTH E) to a point located approximately 700 feet east of Lightening Drive. The project
includes reconstructing the roadway as an urban section with 12-foot lanes, a 4-foot bike lane, a
10-foot trail south of CTH JJ, a 5-foot sidewalk north of CTH JJ, and a raised median.
Lightening Drive would also be extended approximately 600 feet north of CTH JJ and a new
roundabout would be constructed at the intersection of Lightening Drive and CTH JJ.
PROJECT PURPOSE: The purpose of the proposed project is to improve motor vehicle and
pedestrian safety along CTH JJ and to provide access to future developments to the north.
NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO
LOSS: The proposed project involves the permanent discharge of dredged or fill material into
0.76 acre of fresh (wet) meadow wetlands.
1
ALTERNATIVES CONSIDERED: The proposed alternative (Alternative 1) is described above.
The applicant also considered and dismissed the following alternatives:
Shift the north leg of Lightening Drive (Alternative 2): If the north leg of Lightning Drive is
shifted to the east to avoid the wetlands, it would result in an offset from the south leg of
Lightning Drive. Two intersections instead of one would increase conflict points and decrease
the safety and capacity of CTH JJ. This does not meet the project purpose and need, therefore
the applicant eliminated this option from further consideration.
Shift north and south legs of Lightning Drive (Alternative 3): If the north leg of Lightning Drive
is shifted to the east far enough to avoid the wetlands and the south leg is reconstructed to match
the revised location of Lightning Drive, then the project would encroach significantly on
property owned by Appleton Area School District (AASD) at the southeast corner of Lightning
Drive and CTH JJ. AASD was approached by the City of Appleton early in the project design to
determine potential availability of AASD-owned land for the project. AASD indicated they
cannot afford to lose land to this project, as it would likely render their remaining site unable to
meet their development needs for a future school. For these reasons, the applicant eliminated
this option from further consideration.
No-build alternative (Alternative 4): The no-build alternative would avoid impacts to wetlands;
however the alternative was eliminated by the applicant because it failed to address safety and
capacity issues along the CTH JJ corridor. This alternative was also dismissed by the applicant
because it did not provide access or connectivity within the Evergreen Commons development or
380 acres of undeveloped land north of CTH JJ.
Reconstruct CTH JJ but no north leg of Lightning Drive (Alternative 5): This option would
reduce wetland impacts but not avoid them; however, the required median would significantly
reduce access from properties located on the north side of the roadway. Eliminating Lightning
Drive to the north does not provide needed access or connectivity within the Evergreen
Commons development or an additional 380 acres of undeveloped land north of CTH JJ.
According to the City of Appleton, Lightning Drive to the north is needed to provide necessary
emergency vehicle access to the Evergreen Commons development.
Move the north south access road (Lightning Drive to the north) east to line up with Mary Martin
Drive (Alternative 6A): Moving the north south connection to line up with Mary Martin Drive
would result in a larger environmental impact because the floodplain and wetlands of Apple
Creek are much wider at that location. The City of Appleton constructed a flood storage area at
this location in 2012 and the roadway would result in significant loss of flood storage and would
increase floodplain and wetland.
Move the north south access road (Lightning Drive to the north) east, halfway between the south
leg of Lightning Drive and Mary Martin Drive (Alternative 6B): Similar to Alternative 2, if the
north leg of Lightning Drive is shifted to the east to avoid the wetlands, it would result in an
offset from the south leg of Lightning Drive. Two intersections instead of one would increase
conflict points and decrease the safety and capacity of CTH JJ. This does not meet the project
purpose and need, therefore, the applicant eliminated this option from further consideration.
COMPENSATORY MITIGATION: To compensate for permanent unavoidable adverse impacts
to wetlands, the applicant proposes to purchase 1.10 advance wetland credits from the Wisconsin
Wetland Conservation Trust (WWCT) in-lieu fee program. The proposed replacement ratio is
1.45:1 (1.45 credits purchased for every 1 acre impacted).
2
HISTORIC PROPERTIES: During our initial review of the project no archaeological sites were
identified within the planned construction area.
ENDANGERED SPECIES: The potential for federally listed threatened or endangered species
to occur within or near the project area was evaluated through a review of the U.S. Fish and
Wildlife Service's (USFWS) county distribution list. None are known to exist in the project area;
however, the following listed species are known to occur in Outagamie County.
Northern Long-Eared Bat (Myotis septentrionalis);
Snuffbox (Epioblasma triquetra)
DRAWINGS: The attached figures include an overview of the proposed project, wetland
locations, and corresponding wetland impacts.
3