You can copy from here when filling out the rest of the page.
DREDGING OPERATIONS AND PIPELINE INSTALLATION IN VERMILION PARISH
NAME OF APPLICANT: Hilcorp Energy Company, c/o Tim Morton and Associates, Inc., 730 E. Kaliste Saloom Road, Lafayette, Louisiana 70508.
LOCATION OF WORK: Near Freshwater Bayou Canal, located in the North Freshwater Bayou Field, approximately 9.2 miles southwest of Intracoastal City, in Vermilion Parish, Louisiana, as shown on the enclosed drawings. Hydrologic Unit Code: 08080202 – Mermentau Basin
Location of Dredging: POB: Latitude: 29°39ʹ57.60ʺ N / Longitude: -92°15ʹ30.26ʺ W,
POE: Latitude: 29°41ʹ51.68ʺ N / Longitude: -92°15ʹ16.97ʺ W
Location of Pipelines: POB: Latitude: 29°40ʹ33.80ʺ N / Longitude: -92°15ʹ58.87ʺ W,
POE: Latitude: 29°39ʹ57.60ʺ N / Longitude: -92°15ʹ30.26ʺ W
CHARACTER OF WORK: Conduct hydraulic dredging operations in an approximately 160-foot wide by 12,703-foot long existing slip, install two 4-inch flowlines, a well head protector, and appurtenant structures, and place a drilling barge on location and approximately 118,197 cubic yards of dredged fill material within a 1,100-foot wide by 1,410-foot long area, all to drill the Lola Prospect well. Approximately 20.29 acres of jurisdictional waterbottoms would be temporarily impacted and 35.14 acres of marsh would be created via project implementation. The applicant agrees to compensate for wetland impacts by purchasing credits at a Department of the Army approved mitigation bank, should mitigation be required.