Home

Alaska District

Run scraper

Mr. Stephen Ribuffo's (Municipality of Anchorage Port of Anchorage) stated purpose is to improve the navigational conditions for Terminal 3 and to create a safe and stable area that will support Port operations while also maximizing the area available for future use on the North Extension. The project site is located within Section 7

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Mr. Stephen Ribuffo's (Municipality of Anchorage Port of Anchorage) stated purpose is to improve the navigational conditions for Terminal 3 and to create a safe and stable area that will support Port operations while also maximizing the area available for future use on the North Extension. The project site is located within Section 7, T. 13 N., R. 3 W., Seward Meridian; USGS Quad Map Anchorage A-8; Latitude 61.245461º N., Longitude 149.882944º W.; in Anchorage, Alaska. PROPOSED WORK: The Municipality of Anchorage through its Port of Anchorage Department (POA) proposes the reconfiguration and realignment of the shoreline within the North Extension (area north of the existing general cargo Terminal 3 that was authorized under Department of the Army (DA) permit POA-2003-502-2). The North Extension Stabilization (NES) project would be completed in two distinct steps, NES-Step 1 and NES-Step 2, separated by multiple years. This Public Notice addresses NES-Step 1. Please contact Ms. Amanda Whittier at (907) 753-5582, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Amanda.L.Whittier@usace.army.mil if further information is desired concerning this notice.

Mr. Stephen Ribuffo's (Municipality of Anchorage Port of Anchorage) stated purpose is to improve the navigational conditions for Terminal 3 and to create a safe and stable area that will support Port operations while also maximizing the area available for future use on the North Extension. The project site is located within Section 7, T. 13 N., R. 3 W., Seward Meridian; USGS Quad Map Anchorage A-8; Latitude 61.245461º N., Longitude 149.882944º W.; in Anchorage, Alaska. PROPOSED WORK: The Municipality of Anchorage through its Port of Anchorage Department (POA) proposes the reconfiguration and realignment of the shoreline within the North Extension (area north of the existing general cargo Terminal 3 that was authorized under Department of the Army (DA) permit POA-2003-502-2). The North Extension Stabilization (NES) project would be completed in two distinct steps, NES-Step 1 and NES-Step 2, separated by multiple years. This Public Notice addresses NES-Step 1. Please contact Ms. Amanda Whittier at (907) 753-5582, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Amanda.L.Whittier@usace.army.mil if further information is desired concerning this notice. POA-2003-502-M10, Knik Arm_PN POA-2003-502-M10, Knik Arm_PN_Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas