You can copy from here when filling out the rest of the page.
The applicant proposes to decommission-in-place an existing 34.21-mile-long, 8-inch-diameter oil pipeline.
Full Public NoticeProject Plans
PROJECT DESCRIPTION: The applicant proposes to decommission-in-place an existing 34.21-mile long, 8-inch-diameter oil pipeline. The pipeline was originally installed in 1992 by Texaco Pipeline Company but the Department of the Army permit number is unknown. The applicant states that due to the depth of the pipeline below the seafloor, removal would cause significant disturbance and ecological damage to the sea bottom and removal of the line introduces unnecessary safety risks to the dive and removal crew.
In accordance with the Bureau of Safety and Environmental Enforcement (BSEE) 30 CFR 250.1750 pipeline decommissioning requirements, the applicant proposes to: 1. Disconnect from previously serviced platform and subsea tie-in connection, 2. Flush by pigging, and filling with seawater to equalize the line pressure, 3. Plug each end of the pipeline; and 4. Confirm depth of cover at the pipeline ends, and cover endpoints with protective concrete mats. The BSEE project number is Segment 9412.