INSTALL AND MAINTAIN FILL AND CULVERTS FOR A RAILSPUR IN DERIDDER, LOUISIANA IN BEAUREGARD PARISH
NAME OF APPLICANT: Ingevity, Attn: Daniel Kyle, 400 Crosby Road, DeRidder, Louisiana 70634.
LOCATION OF WORK: Located at 400 Crosby Road, in DeRidder, Louisiana, in Beauregard Parish, as shown on the enclosed drawings (Latitude 30.827449 N Longitude -93.289370 W). This project is located in USGS Hydrologic Unit Code (HUC) 08080204 Lower Mississippi Region.
CHARACTER OF WORK: The applicant is proposing to install and maintain a railspur to connect the existing facility’s north railspur to the existing Kansas City Southern railline. Installation of a 95-foot wide x 8,360 feet long railspur will require clearing, excavation and fill placement in jurisdictional wetlands of the US. Approximately 9,304 cubic yards of hauled in fill material will be placed, impacting 0.8 acre of forested wetlands and 0.2 acre of herbaceous wetlands. (2) 72-inch culverts will be placed within a jurisdictional unnamed tributary of Palmetto creek at the railspur crossing to maintain site hydrology. Best management practices (BMPs) will be implemented during construction to control erosion and sedimentation. Silt fences, haybales or other stormwater management control devices will be installed around the perimeter of the construction area to minimize potential runoff into the adjacent drainage features. Temporary construction areas will be located outside of wetlands. Compensatory mitigation for wetland impacts will be completed through the purchase of mitigation bank credits at a Corps approved mitigation bank.