SHIP SHOAL GATE INSTALLATIONS FOR EXISTING 22” PIPELINE PROTECTION IN TERREBONNE PARISH
NAME OF APPLICANT: SHELL PIPELINE COMPANY, Attn: Sheila Mitchell, Post Office Box 2648, OSP 41082B, Houston, Texas 77252.
LOCATION OF WORK: Bayou Goreau (29.200011, -91.088508); Hellhole Bayou (29.223430, -91.077619); Bay Junop (29.234533, -91.070144); Fiddlers Lake (29.273213, -91.054283); Buckskin Bayou (29.296219, -91.042566); and Eagle Lake (29.321066, -91.026891), in Terrebonne Parish, as shown on the enclosed drawings, within Hydrologic Unit Code 08090302, West Central Louisiana Coastal.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to install and maintain pilings for the installation of seven (7) gates across six (6) waterways, all to protect the existing Shell 22” Ship Shoal Pipeline. No dredging or fill is required for the proposed gate installations. No special aquatic sites will be affected by this project and no mitigation is anticipated.