Changes to: STANDARD OPERATING PROCEDURE FOR DETERMINATION OF MITIGATION RATIOS
INTRODUCTION: This informational public notice announces updates to a procedure for determining compensatory mitigation requirements as required for processing of Department of the Army (DA) permits under section 404 of the Clean Water Act, section 10 of the Rivers and Harbors Act, and section 103 of the Marine Protection, Research, and Sanctuaries Act.
Changes to:
STANDARD OPERATING PROCEDURE FOR DETERMINATION OF MITIGATION RATIOS
CORPS CONTACTS:
Los Angeles District: Daniel P. Swenson (213) 452-3414 (Daniel.P.Swenson@usace.army.mil)
San Francisco District: Bryan Matsumoto (415) 503-6786 (Bryan.T.Matsumoto@usace.army.mil)
Albuquerque District: Deanna Cummings (505) 342-3280 (Deanna.L.Cummings@usace.army.mil)
Sacramento District: Will Ness (916) 557-5268 (William.W.Ness@usace.army.mil)
South Pacific Division: Tom Cavanaugh (415) 503-6674 (Thomas.J.Cavanaugh@usace.army.mil)
INTRODUCTION: This informational public notice announces updates to a procedure for determining compensatory mitigation requirements as required for processing of Department of the Army (DA) permits under section 404 of the Clean Water Act, section 10 of the Rivers and Harbors Act, and section 103 of the Marine Protection, Research, and Sanctuaries Act.
ANNOUNCING: Several corrections, enhancements, and clarifications have been made to this Corps Quality Management System (QMS) procedure:
1) 12501-SPD.01 (checklist in Word format), .02 (instructions), .03 (examples), .05 (training presentation) and .06 (checklist in Excel format): Step 2 of checklist modified and additional step added to update how ratios for preservation are determined.
2) 12501-SPD.03 (examples): Step 2 adjustment in example 7 changed from -3 to -2 to match instructions, following calculations also corrected. Added 5 new examples for preservation. All examples converted to Excel format.
3) 12501-SPD.06 (checklist in Excel format): corrected equation in “required mitigation” cells. Also revised “final ratio” cells to ensure the resulting ratio always has a denominator of 1, even if negative adjustments are made.
AVAILABILITY: This procedure is part of the U.S. Army Corps of Engineers Quality Management System (QMS) and may be updated periodically. The most recent version of these documents is available here: http://www.spd.usace.army.mil/Missions/Regulatory/PublicNoticesandReferences.aspx.
Example 1
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 5/17/2010
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Tullay Creek
riverine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
4
Mitigation site location:
Net loss of aquatic resource
surface area:
Ratio adjustment:
0
PM justification: impact and mitigation would be within the
same watershed
Ratio adjustment:
1
Ratio adjustment:
PM justification:
5
Ratio adjustment:
0
PM justification: impact and mitigation would be within the
same watershed
Ratio adjustment:
0
PM justification: establishment
PM justification: enhancement
PM justification:
2.a Qualitative impact-mitigation
comparison:
6
Type conversion:
7
Risk and uncertainty:
8
Temporal loss:
9
Final mitigation ratio(s):
SPL-2010-XYZ
ORM Resource Type:
Impact area :
Tullay Creek
establishment
stream
riverine
intermittent
1.0 : 1.0
0.0
1.00 : 1.00
see Table 1
:
: 1.00
Project Manager:
stream
0.3
Column B
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
John Doe
Hydrology:
Impact distance:
Column C
Mitigation Site Name:
Juniper Wetland Bank
Mitigation Type:
enhancement
ORM Resource Type:
non-tidal wetland
Cowardin/HGM type:
palustrine
Hydrology:
saturated
1.0 : 1.0
Starting ratio:
3.0
Ratio adjustment:
4.00 : 1.00
Baseline ratio:
see Table 1
PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
: 1.00
Baseline ratio:
acres
0
Ratio adjustment:
PM justification: n,n: no difference between impact and
mitigation types
Ratio adjustment:
PM justification:
3
Ratio adjustment:
PM justification: a: No planned delay, impact and
mitigation constructed simultaneously. b: Both include
mature willow canopy, +3 to account for time to achieve
full functions.
Baseline ratio from 2.a, b or c:
1.00 :
1.00
Total adjustments (3-8):
3.30
Final ratio:
4.30 : 1.00
Proposed impact (total):
0.3
acres
870
linear feet
to Resource type:
stream
Cowardin or HGM:
riverine
intermitten
t
Hydrology:
Ratio adjustment:
PM justification:
Required Mitigation*:
of Resource type:
Cowardin or HGM:
Hydrology:
1.29
3741.0
stream
riverine
intermittent
acres
linear feet
0
linear feet
1.0 : 1.0
1.00 : 1.00
see Table 1
:
: 1.00
Ratio adjustment:
Ratio adjustment:
0
PM justification: intermittent riparian (willow woodland) and
depressional wetlands not substantially different in terms of
relative value.
0.3
Ratio adjustment:
Ratio adjustment:
0
PM justification: +0.1 for permittee-responsible mitigation, PM justification: mitigation bank, uncertainty factors
+0.2 as mitigation site did not formerly support target
generally not applicable.
aquatic resource.
Ratio adjustment:
PM justification: bank, generally no delay
intermittent
870
Ratio adjustment:
PM justification:
Baseline ratio from 2.a, b or c:
4.00 :
1.00
Total adjustments (3-8):
1.00
Final ratio:
5.00 : 1.00
Remaining impact:
0.23
acres
668
linear feet
to Resource type:
stream
Cowardin or HGM:
riverine
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
stream
riverine
Hydrology:
intermittent
Hydrology:
intermittent
Required Mitigation*:
1.15
acres
3338.4
linear feet
non-tidal wetland
palustrine
saturated
Required Mitigation:
#VALUE!
#VALUE!
0
0
0
of Resource type:
Cowardin or HGM:
Hydrology:
of Resource type:
Cowardin or HGM:
Hydrology:
acres
linear feet
Proposed Mitigation**:
10
0.30
acres
Proposed Mitigation**:
acres
Proposed Mitigation**:
acres
870
linear feet
linear feet
linear feet
Impact Unmitigated:
77
%
Impact Unmitigated:
%
Impact Unmitigated:
%
0.23
acres
acres
acres
Additional PM comments: *Applicant proposed alternate, Additional PM comments: Applicant originally proposed 0.6 Additional PM comments:
off-site mitigation to account for difference between
acre of off-site enhancement via bank. Through checklist,
proposed (0.3 acre establishment, 1:1) and Corps
I've determined requirement should be 1.15 acre.
assessment using checklist (1.29 acre establishment,
Applicant has agreed to provide 1.15 acre of wetland
4.3:1). 0.99 acre of Corps assessment not met =
enhancement credit at Juniper bank.
0 99/1 29*100 = 77% 77% of impact unmitigated = 0 23
Final requirement is for 0.3 acre (900 linear feet) of on-site riverine-intermittent stream (realignment of Tullay Creek, mature willow woodland) and 1.15 acre of off-site enhancement of
depressional wetland through the XYZ mitigation bank.
Final compensatory mitigation
Current
requirements:
Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 12
Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom).
Functions (Column A)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
moderate
moderate
moderate
moderate
moderate
low
low
moderate
moderate
Mitigation site
moderate
moderate
moderate
moderate
moderate
low
low
moderate
moderate
Function (Column B)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
moderate
moderate
moderate
moderate
moderate
low
low
moderate
moderate
Mitigation site
no gain
no gain
no gain
no gain
no gain
no gain
no gain
low
low
Function (Column C)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Mitigation site
Adjustment:
0
PM Justification: impact and mitigation are
within the same water body, habitat type,
etc., so functional gain and loss would be
equal.
Adjustment:
PM Justification: Functional loss is greater
than functional gain since in this case, there
is total functional loss and only gain of
selected functions via enhancement
(invasive vegetation removal).
Adjustment:
PM Justification:
Instructions:
1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be
2. Note: alternate lists of functions may be used.
3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)
Example 2
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20100524
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Placer 530
depressional
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
4
Mitigation site location:
Net loss of aquatic resource
surface area:
Ratio adjustment:
1
PM justification: Mitigation will occur outside of the
watershed
Ratio adjustment:
0
Ratio adjustment:
PM justification:
5
Ratio adjustment:
1
PM justification: Mitigation will occur outside of the
watershed
Ratio adjustment:
0
6
Type conversion:
Ratio adjustment:
PM justification: mitigation will be in-kind
7
Risk and uncertainty:
0.4
Ratio adjustment:
Ratio adjustment:
0.4
PM justification: +0.2 for permittee-responsible mitigation, PM justification: +0.2 for permittee-responsible mitigation,
+0.2 for difficult to replace resources
+0.2 for difficult to replace resources
Ratio adjustment:
PM justification:
8
Temporal loss:
1
Ratio adjustment:
PM justification: mitigation will occur at time of impact,
herbaceous species
Ratio adjustment:
1
PM justification: mitigation will occur at time of impact,
herbaceous species
Ratio adjustment:
PM justification:
9
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
1.20 :
1.00
Total adjustments (3-8):
2.40
Final ratio:
3.60 : 1.00
Proposed impact (total):
1.5
acres
linear feet
0
to Resource type:
non-tidal wetland
Cowardin or HGM:
depressional
Hydrology:
seasonally flooded
Baseline ratio from 2.a, b or c:
1.30 :
1.00
Total adjustments (3-8):
2.40
Final ratio:
3.70 : 1.00
Remaining impact:
0.75
acres
0
linear feet
to Resource type:
non-tidal wetland
Cowardin or HGM:
depressional
Hydrology:
seasonally
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
Hydrology:
0.00 :
1.00
0.00
0.00 : 1.00
0.00
acres
0
linear feet
non-tidal wetland
depressional
seasonally
Required Mitigation*:
Required Mitigation:
0.00
0.0
0
0
0
2.a Qualitative impact-mitigation
comparison:
SPL-2010-XYZ
ORM Resource Type:
Impact area :
Direct Impact - 1.5 ac
Limnanthes Ranch
re-establishment
non-tidal wetland
depressional
seasonally flooded
1.0 : 1.0
0.2
1.20 : 1.00
see Table
:
: 1.00
PM justification: re-establishment
John Doe
Hydrology:
acres
Impact distance: N/A
Indirect Impact - 0.75 ac Column C
Mitigation Site Name:
Limnanthes Ranch
Mitigation Type:
re-establishment
wetlands adj to non-RPWs ORM Resource Type:
Cowardin/HGM type:
depressional
Hydrology:
seasonally-flooded
1.0 : 1.0
Starting ratio:
0.3
Ratio adjustment:
1.30 : 1.00
Baseline ratio:
see Table PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
: 1.00
Baseline ratio:
PM justification: re-establishment
0
Ratio adjustment:
PM justification: mitigation will be in-kind
5.40
acres
0.0
linear feet
non-tidal wetland
depressional
seasonally flooded
Required Mitigation*:
of Resource type:
Cowardin or HGM:
Hydrology:
2.78
acres
0.0
linear feet
wetlands adj to non-RPWs
depressional
seasonally-flooded
Proposed Mitigation**:
5.40
Proposed Mitigation**:
2.78
0
0.00
Additional PM comments: Total direct impacts
acres
linear feet
%
acres
seasonally flooded
0
linear feet
1.0 : 1.0
1.00 : 1.00
see Table 1
:
: 1.00
Ratio adjustment:
PM justification:
0
of Resource type:
Cowardin or HGM:
Hydrology:
Impact Unmitigated:
10 Final compensatory mitigation
requirements:
Project Manager:
non-tidal wetland
2.25 (combined)
Column B
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
Ratio adjustment:
PM justification:
of Resource type:
Cowardin or HGM:
Hydrology:
acres
Proposed Mitigation**:
linear feet
Impact Unmitigated:
0
%
Impact Unmitigated:
0.00
acres
Additional PM comments: Remaining 0.75 acre of impacts Additional PM comments:
are indirect impacts to vernal pool habitat
acres
linear feet
acres
linear feet
%
acres
Final compensatory mitigation requirement for this impact site is 8.18 acres of vernal pool habitat at the proposed off-site location. The applicant proposed to mitigate direct impacts at a
1.3:1 ratio and indirect impacts at a 1:1 ratio through permittee-responsible re-establishment in the adjacent watershed (2.7 acres of mitigation). The applicant underestimated the
mitigation ratio. The required mitigation is an increase of 5.48 acres over the 2.7 acres proposed.
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom).
Functions (Column A)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Function (Column B)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Impact site
Mitigation site
Adjustment:
0.2
PM Justification: Due to differences between
vernal pool inoculum in the different locations,
the mitigation site is not expected to maintain
the range of plant and animal communities
(habitat functions) provided by the pre-project
impact site.
Mitigation site
Adjustment:
0.3
PM Justification: Indirectly impacted vernal
pools are expected to have an approximately
50% decline in functions. Due to differences
between vernal pool inoculum in the different
locations, the mitigation site is not expected to
attain the range of plant and animal communities
provided by the pre-project impact site (less than
50% gain in habitat functions expected).
Maintenance of plant and animal communities
Function (Column C)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Mitigation site
Adjustment:
PM Justification:
Instructions:
1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be
2. Note: alternate lists of functions may be used.
3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)
Example 3
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20100517
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
SF Impacted Wetland
palustrine - emergent
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
4
Mitigation site location:
5
Net loss of aquatic resource
surface area:
Ratio adjustment:
0
PM justification: impact and mitigation would be within the
same watershed
Ratio adjustment:
0
6
Type conversion:
7
Risk and uncertainty:
8
Temporal loss:
2.a Qualitative impact-mitigation
comparison:
:
: 1.00
Project Manager:
non-tidal wetland
0.4
Column B
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
0.0
Ratio adjustment:
SPL-2010-XYZ
ORM Resource Type:
Impact area :
Permittee-Responsible
Project site
establishment
non-tidal wetland
palustrine - emergent
seasonally flooded
1.0 : 1.0
0.0
1.00 : 1.00
see Table
Final mitigation ratio(s):
Ratio adjustment:
0
PM justification: impact and mitigation would be within the
same watershed
Ratio adjustment:
0
PM justification:
Ratio adjustment:
PM justification: bank, no delay
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Baseline ratio from 2.a, b or c:
1.00 :
1.00
Total adjustments (3-8):
1.65
Final ratio:
2.65 : 1.00
Proposed impact (total):
0.4
acres
linear feet
0
to Resource type:
non-tidal wetland
Cowardin or HGM:
palustrine - emergent
seasonally
flooded
Hydrology:
Baseline ratio from 2.a, b or c:
1.00 :
1.00
Total adjustments (3-8):
0.00
Final ratio:
1.00 : 1.00
Proposed impact (total):
0.40
acres
#VALUE!
linear feet
to Resource type:
non-tidal wetland
Cowardin or HGM:
palustrine - emergent
seasonally
flooded
Hydrology:
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
Required Mitigation*:
Required Mitigation*:
Required Mitigation:
acres
linear feet
%
acres
Additional PM comments: Proposed 0.4 acres of
mitigation leaves 0.25 acres of impact unmitigated.
Impact Unmitigated:
0.00
0
of Resource type:
Cowardin or HGM:
Hydrology:
0.40
acres
#VALUE!
linear feet
non-tidal wetland
palustrine - emergent
seasonally flooded
0.40
acres
linear feet
0
%
0.00
acres
Additional PM comments: Mitigation bank (as an
alternative mitigation option).
:
: 1.00
Ratio adjustment:
Ratio adjustment:
PM justification:
1.06
acres
0.0
linear feet
non-tidal wetland
palustrine - emergent
seasonally flooded
1.0 : 1.0
1.00 : 1.00
see Table 1
Ratio adjustment:
PM justification:
PM justification: establishment
0
seasonally flooded
0
linear feet
Ratio adjustment:
Ratio adjustment:
0
PM justification: no difference between impact and
mitigation types
Ratio adjustment:
0
PM justification: mitigation bank, uncertainty factors not
applicable.
Proposed Mitigation**:
Final compensatory mitigation
requirements:
0.0
PM justification: establishment
of Resource type:
Cowardin or HGM:
Hydrology:
10
Hydrology:
acres
Impact distance: N/A
Mitigation Bank
Column C
Mitigation Site Name:
SF Bank
Mitigation Type:
establishment
ORM Resource Type:
non-tidal wetland
Cowardin/HGM type:
palustrine - emergent
Hydrology:
seasonally flooded
1.0 : 1.0
Starting ratio:
0.0
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see Table PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
: 1.00
Baseline ratio:
0
Ratio adjustment:
PM justification: no difference between impact and
mitigation types
0.4
Ratio adjustment:
PM justification: +0.1 for permittee-responsible mitigation,
+0.2 as mitigation site did not formerly support target
aquatic resource, +0.1 for planned vegetation
maintenance
1.25
Ratio
adjustment:
PM justification: Delay of 5 months between impact and
mitigation construction, mitigation = herbaceous.
9
John Doe
Hydrology:
of Resource type:
Cowardin or HGM:
Hydrology:
Proposed Mitigation**:
Proposed Mitigation**:
Impact Unmitigated:
Impact Unmitigated:
0.00 :
1.00
0.00
0.00 : 1.00
0.00
acres
#VALUE!
linear feet
non-tidal wetland
palustrine - emergent
seasonally
flooded
0.00
#VALUE!
0
0
0
acres
linear feet
acres
linear feet
%
acres
Additional PM comments:
The impact to 0.4 acre of fill in a shallow seasonal wetland can be mitigated by either on-site wetland establishment, OR by purchasing credits in a wetland establishment bank in the
same watershed/service area. The final requirement for permittee-responsbile on-site mitigation would be 1.06 acres. The final requirement for off-site wetland bank credits is 0.4 acre
of establishment credits. After further communication with applicant, the final requirement will be for 0.4 acre of off-site establishment through a mitigation bank.
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom).
Functions (Column A)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Function (Column B)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Function (Column C)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Mitigation site
Adjustment:
0
PM Justification: impacts and mitigation
sites are the same habitat type, so functional
gain and loss would be equal.
Mitigation site
Adjustment:
0
PM Justification: impacts and mitigation
sites are the same habitat type, so functional
gain and loss would be equal.
Mitigation site
Adjustment:
PM Justification:
Instructions:
1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be
2. Note: alternate lists of functions may be used.
3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)
Example 4
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20100602
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Unnamed wash
riverine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
4
Mitigation site location:
Ratio adjustment:
PM justification:
5
Net loss of aquatic resource
surface area:
Ratio adjustment:
Ratio adjustment:
0
PM justification: impact and mitigation would be within the PM justification:
same watershed
Ratio adjustment:
Ratio adjustment:
0
6
Type conversion:
7
2.a Qualitative impact-mitigation
comparison:
Project Manager:
River/stream
0.3
Column B
Mitigation Site Name:
Powers Butte ILF site
Mitigation Type:
re-establishment
ORM Resource Type:
River/stream
Cowardin/HGM type:
riverine
intermittent
Hydrology:
1.0 : 1.0
Starting ratio:
-0.5
Ratio adjustment:
1.00 : 1.50
Baseline ratio:
see Table PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
:
: 1.00
Baseline ratio:
SPL-2010-XYZ
ORM Resource Type:
Impact area :
0.0
PM justification: The mitigation is re-establishment of the
aquatic resources
0
Ratio adjustment:
PM justification: Neither site supports highly valuable or
rare habitat types.
Jane Dough
acres
1.0 :
1.00 :
:
:
Hydrology:
Impact distance:
Column C
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
1.0
Starting ratio:
Ratio adjustment:
1.00
Baseline ratio:
see Table PM justification:
Ratio adjustment from BAMI
procedure (attached):
1.00
Baseline ratio:
linear feet
1.0 : 1.0
1.00 : 1.00
see Table 1
:
: 1.00
Ratio adjustment:
PM justification:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Risk and uncertainty:
0
Ratio adjustment:
Ratio adjustment:
PM justification: Uncertainty for in-lieu fee programs has
PM justification:
already been factored in to the ILF Program proposal and
the cost per acre of credits.
Ratio adjustment:
PM justification:
8
Temporal loss:
0
Ratio adjustment:
PM justification: Mitigation would occur prior to impacts.
Much of the vegetation at the mitigation site has already
begun to be established.
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
9
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
1.00 :
1.50
Total adjustments (3-8):
0.00
Final ratio:
0.67 : 1.00
Proposed impact (total):
0.3
acres
1276
linear feet
to Resource type:
River/stream
Cowardin or HGM:
riverine
Hydrology:
ephemeral
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact:
Required Mitigation*:
Required Mitigation*:
of Resource type:
Cowardin or HGM:
0.20
acres
850.7
linear feet
River/stream
riverine
Hydrology:
intermittent
Proposed Mitigation**:
0.30
10 Final compensatory mitigation
requirements:
ephemeral
1,276
0.00 :
1.00
0.00
0.00 : 1.00
acres
0
linear feet
River/stream
riverine
ephemeral
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
Hydrology:
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
River/stream
riverine
ephemeral
Required Mitigation:
of Resource type:
Cowardin or HGM:
#VALUE!
0.0
0
0
of Resource type:
Cowardin or HGM:
#VALUE!
#VALUE!
0
0
Hydrology:
0
Hydrology:
0
to Resource type:
Cowardin or HGM:
Hydrology:
acres
linear feet
acres
linear feet
acres
Proposed Mitigation**:
acres
Proposed Mitigation**:
acres
linear feet
linear feet
linear feet
Impact Unmitigated:
%
Impact Unmitigated:
%
Impact Unmitigated:
%
acres
acres
acres
Additional PM comments: The calculated ratio came out
Additional PM comments:
Additional PM comments:
as 0.67:1, but without a functional assessment, 1:1 is the
minimum ratio allowed under the 2008 mitigation rule.
The final compensatory mitigation requirement for this impact site is 0.3 acre of re-establishment at the Powers Butte in-lieu fee program site. Although the calculated ratio was 0.67:1, a
1:1 ratio was used, as step 2 b was not completed (no functional/condition assessment).
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom).
Functions (Column A)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
low
low
low
low
low
low
low
low
low
Function (Column B)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Function (Column C)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Mitigation site
high
high
high
moderate
high
moderate
moderate
high
high
Adjustment:
-0.5
PM Justification: Mitigation site is a riparian
gallery with cottonwood, willows and adjacent
wetlands (re-established from uplands). The
mitigation site would provide more functional lift
than the expected functional loss at the impact
site (total loss of ephemeral wash). Therefore
the adjustment was set at -0.5.
Mitigation site
Adjustment:
PM Justification:
Mitigation site
Adjustment:
PM Justification:
Instructions:
1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be
2. Note: alternate lists of functions may be used.
3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)
Example 5
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20100617
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Yowza Fen
palustrine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
4
Mitigation site location:
Ratio adjustment:
PM justification:
5
Net loss of aquatic resource
surface area:
Ratio adjustment:
Ratio adjustment:
0
PM justification: impact and mitigation would be within the PM justification:
same watershed
Ratio adjustment:
Ratio adjustment:
1
6
Type conversion:
7
Risk and uncertainty:
8
9
2.a Qualitative impact-mitigation
comparison:
Project Manager:
non-tidal wetland
0.26
Column B
Mitigation Site Name:
Ski Area Filled Fen
Mitigation Type:
rehabilitation
ORM Resource Type:
non-tidal wetland
Cowardin/HGM type:
palustrine
Hydrology:
saturated
1.0 : 1.0
Starting ratio:
2.0
Ratio adjustment:
3.00 : 1.00
Baseline ratio:
see Table PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
:
: 1.00
Baseline ratio:
SPL-2010-123-JBD
ORM Resource Type:
Impact area :
Jane B. Doe
acres
1.0 :
1.00 :
:
:
Hydrology:
Impact distance: N/A
Column C
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
1.0
Starting ratio:
Ratio adjustment:
1.00
Baseline ratio:
see Table PM justification:
Ratio adjustment from BAMI
procedure (attached):
1.00
Baseline ratio:
saturated
0
linear feet
1.0 : 1.0
1.00 : 1.00
see Table 1
:
: 1.00
Ratio adjustment:
PM justification: rehabilitation
PM justification:
PM justification:
0
Ratio adjustment:
PM justification: no difference between impact and
mitigation types
0.4
Ratio adjustment:
PM justification: +0.1 for permittee-responsible mitigation,
+0.3 mitigation site difficult-to-replace resource.
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Temporal loss:
1.4
Ratio adjustment:
PM justification: Delay of 8 months +0.4, herbaceous, +1.
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
3.00 :
1.00
Total adjustments (3-8):
2.80
Final ratio:
5.80 : 1.00
Proposed impact (total):
0.26
acres
linear feet
0
to Resource type:
non-tidal wetland
Cowardin or HGM:
palustrine
Hydrology:
saturated
Baseline ratio from 2.a, b or c:
0.00 :
1.00
Total adjustments (3-8):
0.00
Final ratio:
0.00 : 1.00
Remaining impact:
0.22
acres
0
linear feet
to Resource type:
non-tidal wetland
Cowardin or HGM:
palustrine
Hydrology:
saturated
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
Hydrology:
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
non-tidal wetland
palustrine
saturated
Required Mitigation*:
Required Mitigation:
#VALUE!
#VALUE!
0
0
0
1.51
acres
0.0
linear feet
non-tidal wetland
palustrine
saturated
Required Mitigation*:
of Resource type:
Cowardin or HGM:
Hydrology:
Proposed Mitigation**:
0.26
Proposed Mitigation**:
Impact Unmitigated:
83
0.22
Additional PM comments:
10
Final compensatory mitigation
requirements:
acres
linear feet
%
acres
of Resource type:
Cowardin or HGM:
Hydrology:
Impact Unmitigated:
Additional PM comments:
0.00
0.0
0
0
0
acres
linear feet
of Resource type:
Cowardin or HGM:
Hydrology:
acres
linear feet
%
acres
Proposed Mitigation**:
Impact Unmitigated:
acres
linear feet
acres
linear feet
%
acres
Additional PM comments:
Final requirement is for compensatory mitigation for this impact site is 1.51 acres. Applicant will rehabilitate 1.51 acres of fen wetland previously filled within the resort area. After
completing the checklist and after discussing the results with the applicant, the project manager has determined the final mitigation ratio to be 5.8:1 for the fen impacts. After consultation
with the applicant, the applicant agreed to rehabilitate an additional 0.91 acre of fen wetland for a total of 1.51 acres of rehabilitation within the ski resort area to offset impacts.
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom).
Functions (Column A)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Function (Column B)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Function (Column C)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Mitigation site
Adjustment:
2
PM Justification: impact and mitigation are
within the same watershed, habitat type, etc.,
but rehabilitation would result in partial functional
gain compared with total functional loss at
impact site, so functional loss would be greater
than functional gain.
Mitigation site
Adjustment:
PM Justification:
Mitigation site
Adjustment:
PM Justification:
Instructions:
1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be
2. Note: alternate lists of functions may be used.
3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)
Example 6
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20120604
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Haunted Wash
riverine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
4
Mitigation site location:
Ratio adjustment:
PM justification:
5
Net loss of aquatic resource
surface area:
Ratio adjustment:
Ratio adjustment:
0
PM justification: impact and mitigation would be within the PM justification:
same watershed
Ratio adjustment:
Ratio adjustment:
0
6
Type conversion:
7
Risk and uncertainty:
8
9
2.a Qualitative impact-mitigation
comparison:
Project Manager:
River/stream
0.46
Column B
Mitigation Site Name:
Realigned Ditch
Mitigation Type:
establishment
ORM Resource Type:
River/stream
Cowardin/HGM type:
riverine
Hydrology:
ephemeral
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see Table PM justification:
1
Ratio adjustment from BAMI
procedure (attached):
2.4 : 1.0
: 1.00
Baseline ratio:
SPL-2012-345-IJ
ORM Resource Type:
Impact area :
Indiana Jones
acres
1.0 :
1.00 :
:
:
Hydrology:
Impact distance:
Column C
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
1.0
Starting ratio:
Ratio adjustment:
1.00
Baseline ratio:
see Table PM justification:
Ratio adjustment from BAMI
procedure (attached):
1.00
Baseline ratio:
ephemeral
13,579
linear feet
1.0 : 1.0
1.00 : 1.00
see Table 1
:
: 1.00
Ratio adjustment:
PM justification: establishment
PM justification:
PM justification:
0
Ratio adjustment:
PM justification: no difference between impact and
mitigation types
0.3
Ratio adjustment:
PM justification: +0.1 permittee responsible; +0.2
mitigation site did not support aquatic resource
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Temporal loss:
0
Ratio adjustment:
Ratio adjustment:
PM justification: no temporal loss, as mitigation site would PM justification:
be built before impacts and all functions aside from biotic
would be replaced.
Ratio adjustment:
PM justification:
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
2.35 :
1.00
Total adjustments (3-8):
0.30
Final ratio:
2.65 : 1.00
Proposed impact (total):
0.46
acres
linear feet
13579
to Resource type:
River/stream
Cowardin or HGM:
riverine
Hydrology:
ephemeral
Baseline ratio from 2.a, b or c:
0.00 :
1.00
Total adjustments (3-8):
0.00
Final ratio:
0.00 : 1.00
Remaining impact:
0.00
acres
-11
linear feet
to Resource type:
River/stream
Cowardin or HGM:
riverine
Hydrology:
ephemeral
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
Hydrology:
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
River/stream
riverine
ephemeral
Required Mitigation*:
Required Mitigation:
#VALUE!
#VALUE!
0
0
0
1.22
acres
35984.4
linear feet
River/stream
riverine
ephemeral
Required Mitigation*:
of Resource type:
Cowardin or HGM:
Hydrology:
Proposed Mitigation**:
1.22
Proposed Mitigation**:
Impact Unmitigated:
0
0.00
Additional PM comments:
10
acres
linear feet
%
acres
of Resource type:
Cowardin or HGM:
Hydrology:
Impact Unmitigated:
0.00
0.0
0
0
0
acres
linear feet
of Resource type:
Cowardin or HGM:
Hydrology:
acres
linear feet
%
acres
Additional PM comments:
Proposed Mitigation**:
Impact Unmitigated:
acres
linear feet
acres
linear feet
%
acres
Additional PM comments:
Final requirement is for this impact site is 1.22 acres. Applicant will establish 1.22 acre of ephemeral streambed.
Final compensatory mitigation
requirements:
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Step 3: Before-After-Mitigation-Impact (BAMI) procedure
(CRAM example)
ImpactBefore
ImpactAfter Impactdelta MitigationBefore MitigationAfter
Mitigationdelta
Functions/conditions
4.1 Buffer and Landscape Context
4.1.1 Landscape Connectivity
3
0
-3
3
3
0
4.1.2 Percent of AA with Buffer
9
0
-9
9
9
0
4.1.3 Average Buffer Width
6
0
-6
6
6
0
4.1.4 Buffer Condition
12
0
-12
12
12
0
RAW SCORE
12.4
0.0
-12
12.4
12.4
0
FINAL SCORE
51.7
0.0
-52
51.7
51.7
0
4.2 Attribute 2: Hydrology
4.2.1 Water Source
9
0
-9
0
9
9
4.2.2 Hydroperiod or Channel Stability
12
0
-12
0
3
3
4.2.3 Hydrologic Connectivity
12
0
-12
0
12
12
RAW SCORE
33.0
0.0
-33
0.0
24.0
24
FINAL SCORE
91.7
0.0
-92
0.0
66.7
67
4.3 Attribute 3: Physical Structure
4.3.1 Structural Patch Richness
3
0
-3
0
3
3
4.3.2 Topographic Complexity
3
0
-3
0
3
3
RAW SCORE
6.0
0.0
-6
0.0
6.0
6
FINAL SCORE
25.0
0.0
-25
0.0
25.0
25
4.4 Attribute 4: Biotic Structure
4.4.1 Number of Plant Layers
6
0
-6
0
0
0
4.4.2 Co-Dominant Species
3
0
-3
0
0
0
4.4.3 Percent Invasion
12
0
-12
0
0
0
4.4.4 Interspersion/Zonation
6
0
-6
0
0
0
4.4.5 Vertical Structure
3
0
-3
0
0
0
Quotient=ABS(M/I)deltas
RAW SCORE
16
0
-16
0
0
0
23/54
Baseline ratio:
FINAL SCORE
44.5
0.0
-45
0.0
0.0
0
OVERALL SCORE
54.0
0.0
-54
13.0
36.0
23
2.35 : 1.0
Instructions:
1. Choose functional method. Acceptable functional assessment methods must be aquatic resource-based, standardized, comparable from site to
site, peer-reviewed, and must be approved by the applicable Corps District.
2. List functions/condition categories in leftmost column.
3. Utilize Before-After-Mitigation-Impact (BAMI) procedure above to calculate function deltas.
4. Obtain absolute value (ABS*) of quotient of mitigation-delta over impact-delta for overall score (if method has no overall score, use median of
quotients for function categories or individual functions). *Absolute value is the nonnegative number for any real number, so if your quotient is
negative, simply drop the negative sign to get the ABS. For example: the ABS of -9/3 = 3.
5. To get baseline ratio: If quotient (Q) is less than 1, baseline ratio = 1/Q : 1; if quotient is greater than 1, baseline ratio = 1 : Q.
6. Input Step 2.b baseline ratio into the checklist document.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.4-SPD Mitigation Ratio Checklist - CRAM Example
Page 1 of 1
Example 7
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20120531
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
SPL-2012-TK
Highland Stormdrain
ORM Resource Type:
riverine
Impact area :
Column A
Mitigation Site Name:
San Ramon Bank
Mitigation Type:
re-establishment
ORM Resource Type:
river/stream
Cowardin/HGM type:
riverine
Hydrology:
intermittent
1.0 : 1.0
Starting ratio:
-2.0
Ratio adjustment:
1.00 : 3.00
Baseline ratio:
PM justification: Functional gain would be substantially
more than the expected functional loss (see table 1).
Ratio adjustment from BAMI
procedure (attached):
:
: 1.00
Baseline ratio:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
4
Mitigation site location:
Ratio adjustment:
PM justification:
5
Net loss of aquatic resource
surface area:
Ratio adjustment:
Ratio adjustment:
0
PM justification: impact and mitigation would be within the PM justification:
same watershed
Ratio adjustment:
Ratio adjustment:
0
6
Type conversion:
Ratio adjustment:
PM justification: mitigation is in-kind
7
Risk and uncertainty:
0
Ratio adjustment:
PM justification: mitigation bank, uncertainty factors not
applicable.
8
9
2.a Qualitative impact-mitigation
comparison:
PM justification: re-establishment
Project Manager:
river/stream
2.46
Column B
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Takeshi Kitano
acres
Hydrology:
Impact distance: 3814
Column C
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see Table 1 PM justification:
:
: 1.00
intermittent
0
linear feet
1.0 : 1.0
1.00 : 1.00
see Table 1
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
:
: 1.00
Ratio adjustment:
PM justification:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Temporal loss:
0
Ratio adjustment:
Ratio adjustment:
PM justification: mitigation bank with most credits released PM justification:
and performance standards met, assuming no delay.
Ratio adjustment:
PM justification:
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
1.00 :
3.00
Total adjustments (3-8):
0.00
Final ratio:
0.33 : 1.00
Proposed impact (total):
2.46
acres
0
linear feet
to Resource type:
river/stream
Cowardin or HGM:
riverine
intermitten
t
Hydrology:
Baseline ratio from 2.a, b or c:
0.00 :
1.00
Total adjustments (3-8):
0.00
Final ratio:
0.00 : 1.00
Remaining impact:
0.00
acres
0
linear feet
to Resource type:
river/stream
Cowardin or HGM:
riverine
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
river/stream
riverine
Hydrology:
intermittent
Hydrology:
intermittent
Required Mitigation*:
Required Mitigation*:
0.00
0.0
0
0
0
Required Mitigation:
#VALUE!
#VALUE!
0
0
0
0
of Resource type:
Cowardin or HGM:
Hydrology:
2.46
acres
0.0
linear feet
river/stream
riverine
intermittent
Proposed Mitigation**:
2.46
of Resource type:
Cowardin or HGM:
Hydrology:
acres
linear feet
of Resource type:
Cowardin or HGM:
Hydrology:
acres
Proposed Mitigation**:
acres
Proposed Mitigation**:
linear feet
linear feet
0
%
Impact Unmitigated:
%
Impact Unmitigated:
0.00
acres
acres
Additional PM comments: *Calculated ratio is 1:3 (or
Additional PM comments:
Additional PM comments:
0.33:1), but without functional assessment, 1:1 is min ratio
allowed under 2008 mitigation rule
Final requirement is for this impact site is the purchase of mitigation bank credit for the re-establishment of 2.46 acres of riparian stream habitat (1:1 ratio).
Impact Unmitigated:
10 Final compensatory mitigation
requirements:
acres
linear feet
acres
linear feet
%
acres
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom).
Functions (Column A)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
small loss
small loss
small loss
small loss
small loss
no loss
no loss
moderate loss
small loss
Mitigation site
large gain
large gain
large gain
large gain
large gain
large gain
large gain
large gain
large gain
Function (Column B)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Mitigation site
Function (Column C)
Short- or long-term surface water storage
Subsurface water storage
Moderation of groundwater flow or discharge
Dissipation of energy
Cycling of nutrients
Removal of elements and compounds
Retention of particulates
Export of organic carbon
Maintenance of plant and animal communities
Impact site
Adjustment:
-2
PM Justification: Functional gain would be
substantially more than the expected
functional loss
Adjustment:
PM Justification:
Mitigation site
Adjustment:
PM Justification:
Instructions:
1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be
2. Note: alternate lists of functions may be used.
3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)
Example 8
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20120531
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Highland Stormdrain
riverine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
4
Mitigation site location:
Ratio adjustment:
PM justification:
5
Net loss of aquatic resource
surface area:
Ratio adjustment:
Ratio adjustment:
0
PM justification: impact and mitigation would be within the PM justification:
same watershed
Ratio adjustment:
Ratio adjustment:
0
6
Type conversion:
Ratio adjustment:
PM justification: mitigation is in-kind
7
Risk and uncertainty:
0
Ratio adjustment:
PM justification: mitigation bank, uncertainty factors not
applicable.
8
9
2.a Qualitative impact-mitigation
comparison:
SPL-2012-TK
ORM Resource Type:
Impact area :
San Ramon Bank
re-establishment
river/stream
riverine
intermittent
1.0 : 1.0
1.00 : 1.00
1.0 : 4.4
: 1.00
PM justification: re-establishment
Project Manager:
river/stream
2.46
Column B
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
Takeshi Kitano
acres
Hydrology:
Impact distance: N/A
Column C
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see Table 1 PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
: 1.00
Baseline ratio:
intermittent
0
linear feet
1.0 : 1.0
1.00 : 1.00
see Table 1
:
: 1.00
Ratio adjustment:
PM justification:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Temporal loss:
0
Ratio adjustment:
Ratio adjustment:
PM justification: mitigation bank with most credits released PM justification:
and performance standards met, assuming no delay.
Ratio adjustment:
PM justification:
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
1.00 :
4.40
Total adjustments (3-8):
0.00
Final ratio:
0.23 : 1.00
Proposed impact (total):
2.46
acres
linear feet
0
to Resource type:
river/stream
Cowardin or HGM:
riverine
intermitten
t
Hydrology:
Baseline ratio from 2.a, b or c:
0.00 :
1.00
Total adjustments (3-8):
0.00
Final ratio:
0.00 : 1.00
Remaining impact:
0.00
acres
0
linear feet
to Resource type:
river/stream
Cowardin or HGM:
riverine
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
river/stream
riverine
Hydrology:
intermittent
Hydrology:
intermittent
Required Mitigation*:
0.00
0.0
0
0
0
Required Mitigation:
#VALUE!
#VALUE!
0
0
0
0.56
acres
0.0
linear feet
river/stream
riverine
intermittent
Required Mitigation*:
of Resource type:
Cowardin or HGM:
Hydrology:
Proposed Mitigation**:
0.00
Proposed Mitigation**:
Impact Unmitigated:
0
0.00
Additional PM comments:
10 Final compensatory mitigation
requirements:
0
acres
linear feet
%
acres
of Resource type:
Cowardin or HGM:
Hydrology:
Impact Unmitigated:
Additional PM comments:
acres
linear feet
of Resource type:
Cowardin or HGM:
Hydrology:
acres
linear feet
%
acres
Proposed Mitigation**:
Impact Unmitigated:
acres
linear feet
acres
linear feet
%
acres
Additional PM comments:
Final requirement is for this impact site is the purchase of mitigation bank credit for the re-establishment of 0.56 acres of riparian stream habitat.
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Step 3: Before-After-Mitigation-Impact (BAMI) procedure
(CRAM example)
ImpactBefore
ImpactAfter Impactdelta MitigationBefore MitigationAfter
Mitigationdelta
Functions/conditions
4.1 Buffer and Landscape Context
4.1.1 Landscape Connectivity
3
3
0
9
9
0
4.1.2 Percent of AA with Buffer
3
3
0
9
9
0
4.1.3 Average Buffer Width
3
3
0
9
9
0
4.1.4 Buffer Condition
3
3
0
9
9
0
RAW SCORE
6.0
6.0
0
18.0
18.0
0
FINAL SCORE
25.0
25.0
0
75.0
75.0
0
4.2 Attribute 2: Hydrology
4.2.1 Water Source
6
6
0
9
9
0
4.2.2 Hydroperiod or Channel Stability
6
6
0
9
9
0
4.2.3 Hydrologic Connectivity
3
3
0
3
9
6
RAW SCORE
15.0
15.0
0
21.0
27.0
6
FINAL SCORE
41.7
41.7
0
58.4
75.0
17
4.3 Attribute 3: Physical Structure
4.3.1 Structural Patch Richness
6
3
-3
0
9
9
4.3.2 Topographic Complexity
3
3
0
0
12
12
RAW SCORE
9.0
6.0
-3
0.0
21.0
21
FINAL SCORE
37.5
25.0
-13
0.0
87.5
88
4.4 Attribute 4: Biotic Structure
4.4.1 Number of Plant Layers
6
3
-3
9
9
0
4.4.2 Co-Dominant Species
6
3
-3
12
12
0
4.4.3 Percent Invasion
6
3
-3
9
9
0
4.4.4 Interspersion/Zonation
6
3
-3
6
12
6
4.4.5 Vertical Structure
3
3
0
6
12
6
Quotient=ABS(M/I)deltas
RAW SCORE
15
9
-6
22
34
12
4 3/8
Baseline ratio:
FINAL SCORE
41.7
25.0
-17
61.2
94.5
33
OVERALL SCORE
37.0
30.0
-8
49.0
83.0
35
1 : 4.4
Instructions:
1. Choose functional method. Acceptable functional assessment methods must be aquatic resource-based, standardized, comparable from site to
site, peer-reviewed, and must be approved by the applicable Corps District.
2. List functions/condition categories in leftmost column.
3. Utilize Before-After-Mitigation-Impact (BAMI) procedure above to calculate function deltas.
4. Obtain absolute value (ABS*) of quotient of mitigation-delta over impact-delta for overall score (if method has no overall score, use median of
quotients for function categories or individual functions). *Absolute value is the nonnegative number for any real number, so if your quotient is
negative, simply drop the negative sign to get the ABS. For example: the ABS of -9/3 = 3.
5. To get baseline ratio: If quotient (Q) is less than 1, baseline ratio = 1/Q : 1; if quotient is greater than 1, baseline ratio = 1 : Q.
6. Input Step 2.b baseline ratio into the checklist document.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.4-SPD Mitigation Ratio Checklist - CRAM Example
Page 1 of 1
Example 9
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20160607
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Unnamed road crossing
riverine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
4
Mitigation site location:
Ratio adjustment:
0
PM justification: Same 8-digit HUC watershed
Ratio adjustment:
0
PM justification: Same 8-digit HUC watershed
Ratio adjustment:
PM justification:
5
Net loss of aquatic resource
surface area:
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
2.a Qualitative impact-mitigation
comparison:
Project Manager:
stream
0.35
Column B
Mitigation Site Name:
Golden Valley
Mitigation Type:
Preservation
ORM Resource Type:
Stream
Cowardin/HGM type:
Riverine
Hydrology:
Ephemeral
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
1.00 : 1.00
Baseline ratio:
SPL-2013-NNN
ORM Resource Type:
Impact area :
9.0
1
PM justification: Preservation results in net loss.
Joe Regulator
Hydrology:
Impact distance:
Column C
Mitigation Site Name:
Golden Valley
Mitigation Type:
Preservation
ORM Resource Type:
Upland buffer
Cowardin/HGM type:
Riverine
Hydrology:
Ephemeral buffer
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
1.00 : 1.00
Baseline ratio:
acres
11.0
Ratio adjustment:
1
PM justification:
Ratio adjustment:
1
PM justification: Impacted ephemeral stream more
valuable than preserved upland buffer.
Ratio adjustment:
0
PM justification: n/a since preservation.
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification: n/a since preservation.
Ratio adjustment:
PM justification:
6
Type conversion:
Ratio adjustment:
PM justification: Same stream types.
0
7
Risk and uncertainty:
Ratio adjustment:
PM justification: n/a since preservation.
0
8
Temporal loss:
Ratio adjustment:
PM justification: n/a since preservation.
0
9
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
1.00 :
1.00
Total adjustments (3-8):
10.00
Final ratio:
11.00 : 1.00
Proposed impact (total):
0.35
acres
275
linear feet
to Resource type:
stream
Cowardin or HGM:
riverine
Hydrology:
ephemeral
Baseline ratio from 2.a, b or c:
1.00 :
1.00
Total adjustments (3-8):
13.00
Final ratio:
14.00 : 1.00
Remaining impact:
0.19
acres
150
linear feet
to Resource type:
stream
Cowardin or HGM:
riverine
Hydrology:
ephemeral
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
Hydrology:
Required Mitigation*:
Required Mitigation*:
Required Mitigation:
of Resource type:
Cowardin or HGM:
Hydrology:
2.67
acres
2100.0
linear feet
Upland buffer
Riverine
Ephemeral buffer
Proposed Mitigation**:
2.67
Proposed Mitigation**:
Impact Unmitigated:
0
0.00
of Resource type:
Cowardin or HGM:
Hydrology:
Proposed Mitigation**:
Impact Unmitigated:
Additional PM comments:
10
3.85
3025.0
Stream
Riverine
Ephemeral
acres
linear feet
1.75
2200
55
0.19
acres
linear feet
%
acres
acres
linear feet
%
acres
Additional PM comments:
linear feet
1.0 : 1.0
1.00 : 1.00
see tab 2 or 3
:
: 1.00
Ratio adjustment:
PM justification: Preservation results in net loss.
0
ephemeral
275
Ratio adjustment:
PM justification:
of Resource type:
Cowardin or HGM:
Hydrology:
0.00 :
1.00
0.00
0.00 : 1.00
acres
linear feet
0.00
0
stream
riverine
ephemeral
0.00
0.0
0
0
0
Impact Unmitigated:
acres
linear feet
acres
linear feet
%
acres
Additional PM comments:
Final requirement is for preservation of 1.75 acre of ephemeral stream and 2.67 acre of ephemeral stream buffer.
Final compensatory mitigation
requirements:
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 2: Starting and base ratio determination for preservation (instructions at bottom).
Steps (Column A)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Steps (Column B)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Steps (Column C)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Baseline ratio (5:1, 3:1, or 1:1):
Results
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Criteria
Baseline ratio (5:1, 3:1, or 1:1):
PM Justification
1:1 Impacts to low-functioning aquatic resource
Moderately high aquatic resource functions, high
3 quality ephemeral
3 Medium due to maintenance costs
3 Restrictive covenant
9
Results
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
1:1
5
3
3
11
PM Justification
Impacts to low-functioning aquatic resource
Least high aquatic resource functions, upland
buffer to high quality ephemeral
Medium due to maintenance costs
Restrictive covenant
PM Justification
0
Example 10
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20160607
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Bay wetland 1
paulstrine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
4
Mitigation site location:
5
Net loss of aquatic resource
surface area:
2.a Qualitative impact-mitigation
comparison:
Project Manager:
non-tidal wetland
1.27
Column B
Mitigation Site Name:
Hatty Smith Marsh
Mitigation Type:
preservation
ORM Resource Type:
tidal marsh
Cowardin/HGM type:
estuarine
Hydrology:
permanently flooded
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
3.00 : 1.00
Baseline ratio:
SPL-2013-NNN
ORM Resource Type:
Impact area :
7.0
acres
1.0 :
1.00 :
:
:
Hydrology:
Impact distance:
Column C
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
1.0
Starting ratio:
Ratio adjustment:
1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
1.00
Baseline ratio:
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
0
PM justification: Same 8-digit HUC watershed
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
PM justification: Preservation results in net loss.
PM justification:
PM justification:
-2
Ratio adjustment:
PM justification: Tiidal wetlands more rare in watershed
than seasonal wetlands.
0
Ratio adjustment:
PM justification: n/a since preservation.
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
1
6
Type conversion:
7
Risk and uncertainty:
8
Temporal loss:
Ratio adjustment:
PM justification: n/a since preservation.
9
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
3.00 :
1.00
Total adjustments (3-8):
6.00
Final ratio:
9.00 : 1.00
Proposed impact (total):
1.27
acres
0
linear feet
to Resource type:
non-tidal wetland
Cowardin or HGM:
paulstrine
seasonally
flooded
Hydrology:
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact:
Required Mitigation*:
Required Mitigation*:
of Resource type:
Cowardin or HGM:
Hydrology:
Proposed Mitigation**:
Impact Unmitigated:
Additional PM comments:
10
Jane Regulator
0
11.43
acres
0.0
linear feet
tidal marsh
estuarine
permanently flooded
acres
linear feet
%
acres
to Resource type:
Cowardin or HGM:
Hydrology:
of Resource type:
Cowardin or HGM:
Hydrology:
Proposed Mitigation**:
Impact Unmitigated:
Additional PM comments:
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
non-tidal wetland
paulstrine
seasonally
flooded
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
#VALUE!
#VALUE!
0
0
0
Required Mitigation:
acres
linear feet
Hydrology:
of Resource type:
Cowardin or HGM:
Hydrology:
acres
linear feet
%
acres
seasonally flooded
linear feet
1.0 : 1.0
1.00 : 1.00
see tab 2 or 3
:
: 1.00
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
non-tidal wetland
paulstrine
seasonally
flooded
#VALUE!
#VALUE!
0
0
0
Proposed Mitigation**:
Impact Unmitigated:
acres
linear feet
acres
linear feet
%
acres
Additional PM comments:
Final requirement is for preservation of 11.43 acres of tidal marsh.
Final compensatory mitigation
requirements:
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 2: Starting and base ratio determination for preservation (instructions at bottom).
Steps (Column A)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Steps (Column B)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Steps (Column C)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
3:1
1
5
1
7
PM Justification
Impact to moderate quality seasonal wetlands
high quality tidal marsh
low threat
conservation easement
PM Justification
0
PM Justification
0
Table 2 (Steps 2.c and 3) instructions:
A. Baseline ratio based on expected functional loss at impact site (1:1 low; 3:1 Moderate; 5:1 high). Copy to step 2.c in checklist.
Example 11
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20160607
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
g
Vernal Pool A
paulstrine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
4
Mitigation site location:
5
Net loss of aquatic resource
surface area:
2.a Qualitative impact-mitigation
comparison:
Project Manager:
non-tidal wetland
0.74
Column B
Mitigation Site Name:
Williams Meadow
Mitigation Type:
Preservation
ORM Resource Type:
Non-tidal wetland
Cowardin/HGM type:
Palustrine
Hydrology:
Seasonally flooded
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
5.00 : 1.00
Baseline ratio:
SPL-2013-NNN
ORM Resource Type:
Impact area :
7.0
Joe Regulator
acres
1.0 :
1.00 :
:
:
Hydrology:
Impact distance:
Column C
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
1.0
Starting ratio:
Ratio adjustment:
1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
1.00
Baseline ratio:
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
0
PM justification: Same 8-digit HUC watershed
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
PM justification: Preservation results in net loss.
PM justification:
PM justification:
0
Ratio adjustment:
PM justification: Impact and mitigation sites both high
quality vernal pools.
0
Ratio adjustment:
PM justification: n/a since preservation.
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
1
6
Type conversion:
7
Risk and uncertainty:
8
Temporal loss:
Ratio adjustment:
PM justification: n/a since preservation.
9
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
5.00 :
1.00
Total adjustments (3-8):
8.00
Final ratio:
13.00 : 1.00
Proposed impact (total):
0.74
acres
0
linear feet
to Resource type:
non-tidal wetland
Cowardin or HGM:
paulstrine
seasonallyflooded
Hydrology:
Baseline ratio from 2.a, b or c:
0.00 :
1.00
Total adjustments (3-8):
0.00
Final ratio:
0.00 : 1.00
Remaining impact:
0.00
acres
0
linear feet
to Resource type:
non-tidal wetland
Cowardin or HGM:
paulstrine
seasonallyflooded
Hydrology:
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
Required Mitigation*:
Required Mitigation*:
Required Mitigation:
of Resource type:
Cowardin or HGM:
Hydrology:
9.62
acres
0.0
linear feet
Non-tidal wetland
Palustrine
Seasonally flooded
Proposed Mitigation**:
9.62
Proposed Mitigation**:
Impact Unmitigated:
0
0.00
Additional PM comments:
10
0
acres
linear feet
%
acres
of Resource type:
Cowardin or HGM:
Hydrology:
Impact Unmitigated:
Additional PM comments:
0.00
0.0
0
0
0
acres
linear feet
Hydrology:
of Resource type:
Cowardin or HGM:
Hydrology:
acres
linear feet
%
acres
seasonally-flooded
linear feet
1.0 : 1.0
1.00 : 1.00
see tab 2 or 3
:
: 1.00
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
non-tidal wetland
paulstrine
seasonallyflooded
#VALUE!
#VALUE!
0
0
0
Proposed Mitigation**:
Impact Unmitigated:
acres
linear feet
acres
linear feet
%
acres
Additional PM comments:
Applicant initially proposed lesser amount, then agreed to higher ratio. Final requirement is for preservation of 9.62 acres of high quality vernal pool.
Final compensatory mitigation
requirements:
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 2: Starting and base ratio determination for preservation (instructions at bottom).
Steps (Column A)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Steps (Column B)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Steps (Column C)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
5:1
1
5
1
7
PM Justification
Impact to high quality vernal pool
high quality vernal pool
low threat
conservation easement
PM Justification
0
PM Justification
0
Table 2 (Steps 2.c and 3) instructions:
A. Baseline ratio based on expected functional loss at impact site (1:1 low; 3:1 Moderate; 5:1 high). Copy to step 2.c in checklist.
Example 12
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20160607
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Badlands Stream
riverine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
4
Mitigation site location:
5
Net loss of aquatic resource
surface area:
2.a Qualitative impact-mitigation
comparison:
Project Manager:
stream
4.2
Column B
Mitigation Site Name:
Charate Wash
Mitigation Type:
Preservation
ORM Resource Type:
stream
Cowardin/HGM type:
riverine
Hydrology:
perennial
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
3.00 : 1.00
Baseline ratio:
SPL-2013-NNN
ORM Resource Type:
Impact area :
9.0
Jane Regulator
acres
1.0 :
1.00 :
:
:
Hydrology:
Impact distance:
Column C
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
1.0
Starting ratio:
Ratio adjustment:
1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
1.00
Baseline ratio:
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
0
PM justification: Same 8-digit HUC watershed
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
PM justification: Preservation results in net loss.
PM justification:
PM justification:
-3.5
Ratio adjustment:
PM justification: Perennial stream mitigation site higher
value than ephemeral, unvegetated stream to be
0
Ratio adjustment:
PM justification: n/a since preservation.
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
Ratio adjustment:
PM justification:
1
ephemeral
11,200
linear feet
1.0 : 1.0
1.00 : 1.00
see tab 2 or 3
:
: 1.00
6
Type conversion:
7
Risk and uncertainty:
8
Temporal loss:
Ratio adjustment:
PM justification: n/a since preservation.
9
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
3.00 :
1.00
Total adjustments (3-8):
6.50
Final ratio:
9.50 : 1.00
Proposed impact (total):
4.2
acres
11200
linear feet
to Resource type:
stream
Cowardin or HGM:
riverine
Hydrology:
ephemeral
Baseline ratio from 2.a, b or c:
0.00 :
1.00
Total adjustments (3-8):
0.00
Final ratio:
0.00 : 1.00
Remaining impact:
0.00
acres
0
linear feet
to Resource type:
stream
Cowardin or HGM:
riverine
Hydrology:
ephemeral
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
Hydrology:
0.00 :
1.00
0.00
0.00 : 1.00
acres
#VALUE!
linear feet
stream
riverine
ephemeral
Required Mitigation*:
Required Mitigation*:
Required Mitigation:
#VALUE!
#VALUE!
0
0
0
acres
linear feet
of Resource type:
Cowardin or HGM:
Hydrology:
39.90
106400.0
stream
riverine
perennial
Proposed Mitigation**:
39.90
Impact Unmitigated:
0
0.00
acres
linear feet
%
acres
Additional PM comments:
10
0
of Resource type:
Cowardin or HGM:
Hydrology:
Proposed Mitigation**:
Impact Unmitigated:
0.00
0.0
0
0
0
acres
linear feet
of Resource type:
Cowardin or HGM:
Hydrology:
acres
linear feet
%
acres
Additional PM comments:
Proposed Mitigation**:
Impact Unmitigated:
acres
linear feet
acres
linear feet
%
acres
Additional PM comments:
Applicant agreed to higher ratio. Final requirement is for preservation of 58.8 acres of high quality vernal pool.
Final compensatory mitigation
requirements:
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 2: Starting and base ratio determination for preservation (instructions at bottom).
Steps (Column A)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Steps (Column B)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Steps (Column C)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
3:1
3
3
3
9
PM Justification
Impact: Ephemeral badland streams, either no or
upland vegetation only
Preservation: Moderately high-functioning perennial
wash with riparian vegetation
moderate threat
restrictive convenant
PM Justification
0
PM Justification
0
Example 13
Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet)
1
Date: 20160607
Impact Site Name:
Impact Cowardin or HGM type:
2.b Quantitative impact-mitigation
comparison:
2.c Preservation (Table 2, step A)
Corps File No.:
Hollybell Creek
riverine
Column A
Mitigation Site Name:
Mitigation Type:
ORM Resource Type:
Cowardin/HGM type:
Hydrology:
Starting ratio:
Ratio adjustment:
Baseline ratio:
PM justification:
Ratio adjustment from BAMI
procedure (attached):
Baseline ratio:
3
Preservation (Table 2, step E)
Ratio adjustment:
4
Mitigation site location:
Ratio adjustment:
0
PM justification: Same 8-digit HUC watershed
Ratio adjustment:
0
PM justification: Same 8-digit HUC watershed
Ratio adjustment:
PM justification: Same 8-digit HUC watershed
0
5
Net loss of aquatic resource
surface area:
Ratio adjustment:
Ratio adjustment:
Ratio adjustment:
1
2.a Qualitative impact-mitigation
comparison:
Project Manager:
stream
1.66
Column B
Mitigation Site Name:
Skyway Ranch
Mitigation Type:
preservation
ORM Resource Type:
stream
Cowardin/HGM type:
riverine
Hydrology:
ephemeral
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
1.00 : 1.00
Baseline ratio:
SPL-2013-NNN
ORM Resource Type:
Impact area :
11.0
1
Jane Regulator
Hydrology:
Impact distance:
Column C
Mitigation Site Name:
Skyway Ranch
Mitigation Type:
preservation
ORM Resource Type:
upland stream buffer
Cowardin/HGM type:
uplands
Hydrology:
n/a
1.0 : 1.0
Starting ratio:
Ratio adjustment:
1.00 : 1.00
Baseline ratio:
see tab 2 PM justification:
Ratio adjustment from BAMI
procedure (attached):
:
1.00 : 1.00
Baseline ratio:
acres
11.0
Ratio adjustment:
1
ephemeral
1,560
linear feet
Skyway (vernal pool)
Preservation
non-tidal wetland
palustrine
seasonally flooded
1.0 : 1.0
1.00 : 1.00
see tab 2 or 3
:
1.00 : 1.00
7.0
Ratio adjustment:
PM justification: Preservation results in net loss.
PM justification: Preservation results in net loss.
PM justification: Preservation results in net loss.
0
Ratio adjustment:
PM justification: Impact and mitigation sites both
ephemeral streams.
0
Ratio adjustment:
PM justification: n/a since preservation.
Ratio adjustment:
1.5
PM justification: Impacted ephemeral stream more
valuable than preserved upland buffer.
Ratio adjustment:
0
PM justification: n/a since preservation.
Ratio adjustment:
-3
PM justification: Impacted ephemeral stream much less valuable
than preserved vernal pool.
Ratio adjustment:
0
PM justification: n/a since preservation.
Ratio adjustment:
PM justification: n/a since preservation.
Ratio adjustment:
PM justification: n/a since preservation.
6
Type conversion:
7
Risk and uncertainty:
8
Temporal loss:
Ratio adjustment:
PM justification: n/a since preservation.
9
Final mitigation ratio(s):
Baseline ratio from 2.a, b or c:
1.00 :
1.00
Total adjustments (3-8):
12.00
Final ratio:
13.00 : 1.00
Proposed impact (total):
1.66
acres
1560
linear feet
to Resource type:
stream
Cowardin or HGM:
riverine
Hydrology:
ephemeral
Baseline ratio from 2.a, b or c:
1.00 :
1.00
Total adjustments (3-8):
13.50
Final ratio:
14.50 : 1.00
Remaining impact:
1.47
acres
1379
linear feet
to Resource type:
stream
Cowardin or HGM:
riverine
Hydrology:
ephemeral
Baseline ratio from 2.a, b or c:
Total adjustments (3-8):
Final ratio:
Remaining impact (acres):
Remaining impact (linear feet):
to Resource type:
Cowardin or HGM:
Hydrology:
Required Mitigation*:
Required Mitigation*:
Required Mitigation:
of Resource type:
Cowardin or HGM:
Hydrology:
21.28
acres
19999.5
linear feet
upland stream buffer
uplands
n/a
of Resource type:
Cowardin or HGM:
Hydrology:
4.09
acres
3842.6
linear feet
non-tidal wetland
palustrine
seasonally flooded
Proposed Mitigation**:
11.40
Proposed Mitigation**:
4.09
Impact Unmitigated:
46
0.68
Impact Unmitigated:
0
0.00
acres
linear feet
of Resource type:
Cowardin or HGM:
Hydrology:
21.58
20280.0
stream
riverine
ephemeral
Proposed Mitigation**:
2.50
Impact Unmitigated:
88
1.47
acres
linear feet
%
acres
Additional PM comments:
10
Final compensatory mitigation
requirements:
0
Additional PM comments:
0
acres
linear feet
%
acres
0
1.00 :
1.00
5.00
6.00 : 1.00
acres
linear feet
0.68
640
stream
riverine
ephemeral
acres
linear feet
%
acres
Additional PM comments:
Final requirement is for Applicant initially proposed only preservation of ephemeral stream and buffer. Supplemented proposal with additional preservation of vernal pool. Final
requirement is for preservation of 2.5 acres of ephemeral stream, 11.4 acres of upland buffer (of ephemeral stream), and 4.09 acres of vernal pool.
*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed.
**Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.
Current Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
SPD QMS 12501.6-SPD Regulatory Program Mitigation Ratio Setting Checklist 1 of 11
Table 2: Starting and base ratio determination for preservation (instructions at bottom).
Steps (Column A)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Baseline ratio (5:1, 3:1, or 1:1):
Results
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Steps (Column B)
A. (for step 2.c)
B.
C.
D.
E. (for step 3)
Criteria
Results
Baseline ratio (5:1, 3:1, or 1:1):
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
Steps (Column C)
A. (for step 2.c)
Criteria
Baseline ratio (5:1, 3:1, or 1:1):
B.
C.
D.
E. (for step 3)
Results
Functions adjustment (5, 3, or 1):
Threat adjustment (5, 3, or 1):
Degree of protection adjustment (5, 3, or 1):
Total adjustment (add steps B-D):
Supporting information:
Impacted aquatic resource(s):
Preserved aquatic resource(s)/site(s):
Threat:
Protection type:
PM Justification
1:1 Impact: Ephemeral stream, unvegetated
Preservation: ephemeral stream, unvegetated,
5 within high quality habitat parcel
3 moderate threat
3 restrictive convenant
11
1:1
5
3
3
11
PM Justification
Impact: Ephemeral stream, unvegetated
Preservation: upland buffer of ephemeral stream
moderate threat
restrictive convenant
PM Justification
1:1 Impact: Ephemeral stream, unvegetated
Preservation: high quality vernal pool (high aquatic
1 resource functions)
3 moderate threat
3 restrictive convenant
7
12501-SPD
REGULATORY PROGRAM
STANDARD OPERATING PROCEDURE
FOR DETERMINATION OF
MITIGATION RATIOS
South Pacific
Division
Table of Contents
1.0 Purpose
2.0 Applicability
3.0 References
4.0 Related Procedures
5.0 Definitions
6.0 Responsibilities
7.0 Procedures
8.0 Records & Measurements
9.0 Attachments
10.0 Flow Chart
______________________________________________________________________________
1.0 Purpose. The purpose of this document is to outline the process for determining
compensatory mitigation requirements as required for processing of Department of the Army
(DA) permits under Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors
Act, and Section 103 of the Marine Protection, Research, and Sanctuaries Act. .
2.0 Applicability. This process applies to the Regulatory Program within South Pacific
Division (SPD), including its four subordinate districts, Albuquerque District (SPA), Sacramento
District (SPK), Los Angeles District (SPL),and San Francisco District (SPN). Subordinate
offices or organizations shall not modify this procedure to form a specific procedure. This
procedure is applicable for all "new" (not requests to re-verify or modify previously-issued
permits) permit applications received after 20 April 2011. For NWPs re-verification requests
where the mitigation ratio checklist was not completed previously, use of the checklist is
required in order to ensure minimal impacts (including consideration of compensatory
mitigation), to ensure compliance with the 2008 Mitigation Rule (33 CFR Part 332), and to
comply with this new QMS procedure designed to ensure compensatory mitigation is sufficient
to offset authorized impacts. For individual permits (SIP and LOP), if the original application
predates this QMS procedure (effective 20 April 2011), the checklist would not be required for
subsequent modification requests (time extension or activity modifications), unless the requested
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version
resides on the SPD QMS SharePoint Portal.
SPD QMS
12501-SPD Regulatory Program - Determining Mitigation Ratios
1 of 8
modification includes a substantial increase in impacts. In addition, in cases where
compensatory mitigation has already been constructed or where the applicant can otherwise fully
demonstrate substantial resources have been expended or committed in reliance on previous
guidance governing compensatory mitigation for DA permits, the checklist would not be
required.
3.0 References.
Compensatory Mitigation for Losses of Aquatic Resources (33 C.F.R. Part 332).
Smith, R. D., D. R., A. Ammann, C. Bartoldus, M. M. Brinson. 1995. An Approach for
Assessing Wetland Functions Using Hydrogeomorphic Classification, Reference Wetlands, and
Functional Indices., Wetlands Research Program Technical Report WRP-DE-9. U.S. Army
Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi.
Cowardin, L. M., V. Carter, F. C. Golet, E. T. LaRoe. 1979. Classification of wetlands
and deepwater habitats of the United States. U. S. Department of the Interior, Fish and Wildlife
Service, Washington, D.C. Jamestown, ND: Northern Prairie Wildlife Research Center Home
Page. http://www.npwrc.usgs.gov/resource/1998/classwet/classwet.htm (Version 04DEC98).
Collins, J.N., E.D. Stein, M. Sutula, R. Clark, A.E. Fetscher, L. Grenier, C. Grosso, and
A. Wiskind. 2008. California Rapid Assessment Method (CRAM) for Wetlands. Version 5.0.2.
151 pp.
4.0 Related Procedures.
None.
5.0 Definitions.
Compensatory mitigation - The restoration (re-establishment or rehabilitation), establishment
(creation), enhancement, and/or in certain circumstances preservation of aquatic resources for the
purposes of offsetting unavoidable adverse impacts which remain after all appropriate and
practicable avoidance and minimization has been achieved.
Condition - The relative ability of an aquatic resource to support and maintain a community of
organisms having a species composition, diversity, and functional organization comparable to
reference aquatic resources in the region.
Enhancement - The manipulation of the physical, chemical, or biological characteristics of an
aquatic resource to heighten, intensify, or improve a specific aquatic resource function(s).
Enhancement results in the gain of selected aquatic resource function(s), but may also lead to a
decline in other aquatic resource function(s). Enhancement does not result in a gain in aquatic
resource area.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version
resides on the SPD QMS SharePoint Portal.
SPD QMS
12501-SPD Regulatory Program - Determining Mitigation Ratios
2 of 8
Establishment (creation) - The manipulation of the physical, chemical, or biological
characteristics present to develop an aquatic resource that did not previously exist at an upland
site. Establishment results in a gain in aquatic resource area and functions.
Functions - The physical, chemical, and biological processes that occur in ecosystems.
Impact - Adverse effect.
In-kind - A resource of a similar structural and functional type to the impacted resource.
In-lieu fee program - A program involving the restoration, establishment, enhancement, and/or
preservation of aquatic resources through funds paid to a governmental or non-profit natural
resources management entity to satisfy compensatory mitigation requirements for DA permits.
Similar to a mitigation bank, an in-lieu fee program sells compensatory mitigation credits to
permittees whose obligation to provide compensatory mitigation is then transferred to the in-lieu
program sponsor. However, the rules governing the operation and use of in-lieu fee programs are
somewhat different from the rules governing operation and use of mitigation banks. The
operation and use of an in-lieu fee program are governed by an in-lieu fee program instrument.
Mitigation bank - A site, or suite of sites, where resources (e.g., wetlands, streams, riparian
areas) are restored, established, enhanced, and/or preserved for the purpose of providing
compensatory mitigation for impacts authorized by DA permits. In general, a mitigation bank
sells compensatory mitigation credits to permittees whose obligation to provide compensatory
mitigation is then transferred to the mitigation bank sponsor. The operation and use of a
mitigation bank are governed by a mitigation banking instrument.
Out-of-kind - A resource of a different structural and functional type from the impacted
resource.
Permittee-responsible mitigation - An aquatic resource restoration, establishment,
enhancement, and/or preservation activity undertaken by the permittee (or an authorized agent or
contractor) to provide compensatory mitigation for which the permittee retains full
responsibility.
Preservation - The removal of a threat to, or preventing the decline of, aquatic resources by an
action in or near those aquatic resources. This term includes activities commonly associated with
the protection and maintenance of aquatic resources through the implementation of appropriate
legal and physical mechanisms. Preservation does not result in a gain of aquatic resource area or
functions.
Re-establishment - The manipulation of the physical, chemical, or biological characteristics of a
site with the goal of returning natural/historic functions to a former aquatic resource. Reestablishment results in rebuilding a former aquatic resource and results in a gain in aquatic
resource area and functions.
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version
resides on the SPD QMS SharePoint Portal.
SPD QMS
12501-SPD Regulatory Program - Determining Mitigation Ratios
3 of 8
Rehabilitation- The manipulation of the physical, chemical, or biological characteristics of a site
with the goal of repairing natural/historic functions to a degraded aquatic resource.
Rehabilitation results in a gain in aquatic resource function, but does not result in a gain in
aquatic resource area.
Restoration - The manipulation of the physical, chemical, or biological characteristics of a site
with the goal of returning natural/historic functions to a former or degraded aquatic resource. For
the purpose of tracking net gains in aquatic resource area, restoration is divided into two
categories: reestablishment and rehabilitation.
Temporal loss - The time lag between the loss of aquatic resource functions caused by the
permitted impacts and the replacement of aquatic resource functions at the compensatory
mitigation site. Higher compensation ratios may be required to compensate for temporal loss.
When the compensatory mitigation project is initiated prior to, or concurrent with, the permitted
impacts, the district engineer may determine that compensation for temporal loss is not
necessary, unless the resource has a long development time.
Watershed - A land area that drains to a common waterway, such as a stream, lake, estuary,
wetland, or ultimately the ocean.
6.0 Responsibilities.
Regulatory Project Managers (PMs): For any actions where the PM determines compensatory
mitigation is necessary to offset unavoidable impacts to aquatic resources, he/she must follow the
procedures provided herein to determine the amount of compensatory mitigation to replace lost
aquatic resource functions, to the extent practicable. PMs must also complete the mitigation
ratio checklist and include it in the administrative record.
7.0 Procedures.
Historically, the South Pacific Division (SPD) Regulatory Program has lacked a standardized
process or guidance for determining compensatory mitigation ratios as required for processing of
Department of the Army (DA) permits under Section 404 of the Clean Water Act, Section 10 of
the Rivers and Harbors Act, and Section 103 of the Marine Protection, Research, and Sanctuaries
Act. In addition, the 2008 mitigation rule (33 C.F.R. Part 332) does not provide a detailed
process for determining compensatory mitigation ratios. However, it does provide some general
guidelines and requires that the rationale for the required replacement ratio must be documented
in the administrative record for the permit action. To address this long-standing need, a multidistrict Project Delivery Team (PDT) was formed to develop a regional process for determining
and documenting compensatory mitigation ratios, as well as accompanying guidance for
Regulatory project managers. The purpose of this new, regional process is to reduce
inconsistency between project managers, offices, and districts in determining compensatory
mitigation requirements, to incorporate current scientific understanding of mitigation concepts,
and to require documentation of these key decisions, thereby reducing uncertainty on behalf of
the regulated community regarding compensatory mitigation requirements. In addition, this new
process incorporates recommendations of various outside reports/studies calling for greater
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version
resides on the SPD QMS SharePoint Portal.
SPD QMS
12501-SPD Regulatory Program - Determining Mitigation Ratios
4 of 8
consistency and documentation in how mitigation ratios are determined.
7.1 A PM receives a complete permit application, including a statement describing how
impacts to waters of the United States are to be compensated for (hereinafter referred to as a
"compensatory mitigation proposal") or a statement explaining why compensatory mitigation
should not be required for the proposed impacts. At the applicant's discretion, he/she may
provide a conceptual mitigation plan as part of the permit application.
7.2 Upon evaluation of the permit application, a PM may determine compensatory mitigation
is necessary to offset unavoidable impacts to aquatic resources, and shall review the
compensatory mitigation proposal or plan, if provided (or request a proposal or plan for review,
if none was provided). If the compensatory mitigation proposal or plan does not contain
sufficient information to complete the checklist, or the proposed mitigation is not appropriate,
the PM will request a revised compensatory mitigation proposal or plan (such plan being
conceptual, detailed or draft, as appropriate, for general permits (GP), and draft for standard
individual permits).
7.3 The PM will complete the mitigation ratio checklist using the applicant's compensatory
mitigation proposal or plan.
· A separate checklist shall be used for each impact site/type.
· Each mitigation site/type shall be entered into separate columns on the checklist.
· Additional mitigation shall be assessed if the compensatory mitigation proposal or plan
does not sufficiently account for project impacts.
· PMs must enter a separate justification for each adjustment within the checklist.
7.3.1 For each impact site/type with one mitigation site/type, complete column "A."
7.3.2 For each impact site/type with multiple mitigation sites/types, complete columns for each
mitigation site/type (columns A-B or A-C, for two or three mitigation site/types, respectively).
· The PM will complete the checklist for the first proposed mitigation site/type, using
column "A", to determine the required compensatory mitigation ratio.
· The PM will then use column "B" to compare any remaining, unmitigated impact with a
second mitigation site/type:
If a second site/type has been proposed by the applicant, or;
If the required ratio from column A is greater than that proposed by the applicant
· The PM will then use column "C" to compare remaining, unmitigated impact with a third
mitigation site/type:
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version
resides on the SPD QMS SharePoint Portal.
SPD QMS
12501-SPD Regulatory Program - Determining Mitigation Ratios
5 of 8
If a third mitigation site/type has been proposed by the applicant, or;
If the required ratio from column B is greater than that proposed by the applicant
7.3.3 If any impact remains unmitigated or more than three mitigation site/types have been
proposed, complete additional checklists.
7.4 The PM will notify the applicant of the mitigation ratio determination. If the ratio(s) is
(are) different than those proposed by the applicant, the applicant may either (a) agree to the
Corps' mitigation ratio and submit a revised, draft mitigation plan that addresses the entire
amount of compensatory mitigation for the Corps' review and approval; or (b) submit an
alternative compensatory mitigation proposal/plan for evaluation by the PM. In the event the
applicant elects option "b," the PM will prepare a new checklist.
7.5 Once a final mitigation ratio has been determined, the PM will then review and comment
on the adequacy of the mitigation plan in accordance with 33 C.F.R. 332.4(c) and any
subsequent mitigation and monitoring guidelines.
7.6 The final ratio must be included in the final mitigation plan, the decision document, and
by special condition in the permit/final verification letter.
7.6.1 Some states within SPD's AOR contain over appropriated basins, which make it very
difficult to obtain an adequate water right to secure site hydrology. In some SPD states the
authority responsible for managing water rights may impose a 1:1 area-based limit on
compensatory mitigation projects. In these situations the PM is still required to determine a
compensation ratio using the mitigation checklist. If adequate water rights are not available to
support an establishment or re-establishment ratio greater than a 1:1, the PM will consider
options such as non-consumptive enhancement/rehabilitation projects, preservation, buffer
establishment/restoration and protection, and restoration of floodplain connectivity, to obtain
appropriate and practicable compensatory mitigation.
Note: The process outlined herein can also be used for determining compensatory mitigation
requirements for unauthorized activities for which the Corps is the lead enforcement agency..
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version
resides on the SPD QMS SharePoint Portal.
SPD QMS
12501-SPD Regulatory Program - Determining Mitigation Ratios
6 of 8
8.0 Records and Measurements.
8.1 All documents listed above will be filed in the corresponding project files in accordance with
ES-QMS140, Records Management.
Type
R
Description
Mitigation Ratio
Checklists
Responsible
Office
Regulatory
Divisions within
SPD
Districts/Field
Offices
Location
Project file folders in
filing cabinets
Regulatory Divisions
within SPD Districts;
Electronic Checklists
in ORM Database
Record
Media
P/E
Retention
7 years
Disposition
Send to records
holding
8.2 A Mitigation Ratio Checklist shall be completed for each permit application and included in
the administrative record.
8.3 The SPD Regulatory Program Manager and District Regulatory Division management shall
periodically inspect project files to ensure compliance with this guidance.
9.0 Attachments.
9.1 12501.1-SPD Mitigation Ratio Checklist
9.2 12501.2- SPD Instructions for Preparing Mitigation Ratio Setting Checklist
9.3 12501.3-SPD Mitigation Ratio Checklist Examples
9.4 12501.4-SPD Before/After-Mitigation-Impact Spreadsheet Step 3 BAMI
9.5 12501.5-SPD Mitigation Ratio Training Presentation
9.6 12501.6-SPD Mitigation Ratio Checklist in Excel format
Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version
resides on the SPD QMS SharePoint Portal.
SPD QMS
12501-SPD Regulatory Program - Determining Mitigation Ratios
7 of 8
10.0 Flow Chart.
7.1: Application
includes
statement that
no mitigation is
necessary
Start
no
7.2: Is
mitigation
necessar
7.2: PM
requests new
or revised
proposal/plan.
ye
no
7.2: Is
proposal/pla
n
appropriate
and does it
7.2: PM
reviews
compensatory
mitigation
7.1: PM
receives
permit
yes
7.1: Application
includes
compensatory
mitigation
proposal/plan
7.3: PM
completes
mitigation
ratio
checklist(s).
7.4:
Required
ratio(s)
different
yes
7.4: Applicant
decides to
accept PMdetermined
ratio?
7.5: PM
reviews all
no other
aspects of
mitigation
plan.
yes 7.4: PM
requests
revised
mitigation
7.6: For SIP:
PM
approves
final
mitigation
plan.
7.6: PM
makes permit
decision.
Ratio(s)
included in
permit/FVL
7.6: For GP:
PM
approves
final
mitigation
plan.
End
7.4:
Applicant
submits
alternative
no
SPD QMS
Current Approved Version: 1/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal.
12501-SPD Regulatory Program - Determining Mitigation Ratios
8 of 8