Changes to: STANDARD OPERATING PROCEDURE FOR DETERMINATION OF MITIGATION RATIOS INTRODUCTION: This informational public notice announces updates to a procedure for determining compensatory mitigation requirements as required for processing of Department of the Army (DA) permits under section 404 of the Clean Water Act

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Changes to: STANDARD OPERATING PROCEDURE FOR DETERMINATION OF MITIGATION RATIOS

INTRODUCTION: This informational public notice announces updates to a procedure for determining compensatory mitigation requirements as required for processing of Department of the Army (DA) permits under section 404 of the Clean Water Act, section 10 of the Rivers and Harbors Act, and section 103 of the Marine Protection, Research, and Sanctuaries Act.

Changes to: STANDARD OPERATING PROCEDURE FOR DETERMINATION OF MITIGATION RATIOS

CORPS CONTACTS: Los Angeles District: Daniel P. Swenson (213) 452-3414 (Daniel.P.Swenson@usace.army.mil) San Francisco District: Bryan Matsumoto (415) 503-6786 (Bryan.T.Matsumoto@usace.army.mil) Albuquerque District: Deanna Cummings (505) 342-3280 (Deanna.L.Cummings@usace.army.mil) Sacramento District: Will Ness (916) 557-5268 (William.W.Ness@usace.army.mil) South Pacific Division: Tom Cavanaugh (415) 503-6674 (Thomas.J.Cavanaugh@usace.army.mil)

INTRODUCTION: This informational public notice announces updates to a procedure for determining compensatory mitigation requirements as required for processing of Department of the Army (DA) permits under section 404 of the Clean Water Act, section 10 of the Rivers and Harbors Act, and section 103 of the Marine Protection, Research, and Sanctuaries Act. ANNOUNCING: Several corrections, enhancements, and clarifications have been made to this Corps Quality Management System (QMS) procedure: 1) 12501-SPD.01 (checklist in Word format), .02 (instructions), .03 (examples), .05 (training presentation) and .06 (checklist in Excel format): Step 2 of checklist modified and additional step added to update how ratios for preservation are determined. 2) 12501-SPD.03 (examples): Step 2 adjustment in example 7 changed from -3 to -2 to match instructions, following calculations also corrected. Added 5 new examples for preservation. All examples converted to Excel format. 3) 12501-SPD.06 (checklist in Excel format): corrected equation in “required mitigation” cells. Also revised “final ratio” cells to ensure the resulting ratio always has a denominator of 1, even if negative adjustments are made. AVAILABILITY: This procedure is part of the U.S. Army Corps of Engineers Quality Management System (QMS) and may be updated periodically. The most recent version of these documents is available here: http://www.spd.usace.army.mil/Missions/Regulatory/PublicNoticesandReferences.aspx.

Example 1

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 5/17/2010 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Tullay Creek riverine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

4

Mitigation site location:

Net loss of aquatic resource surface area:

Ratio adjustment: 0 PM justification: impact and mitigation would be within the same watershed Ratio adjustment: 1

Ratio adjustment: PM justification:

5

Ratio adjustment: 0 PM justification: impact and mitigation would be within the same watershed Ratio adjustment: 0 PM justification: establishment

PM justification: enhancement

PM justification:

2.a Qualitative impact-mitigation comparison:

6

Type conversion:

7

Risk and uncertainty:

8

Temporal loss:

9

Final mitigation ratio(s):

SPL-2010-XYZ ORM Resource Type: Impact area : Tullay Creek establishment stream riverine intermittent 1.0 : 1.0 0.0 1.00 : 1.00 see Table 1 : : 1.00

Project Manager: stream 0.3 Column B Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: Ratio adjustment from BAMI procedure (attached): Baseline ratio:

John Doe Hydrology: Impact distance: Column C Mitigation Site Name: Juniper Wetland Bank Mitigation Type: enhancement ORM Resource Type: non-tidal wetland Cowardin/HGM type: palustrine Hydrology: saturated 1.0 : 1.0 Starting ratio: 3.0 Ratio adjustment: 4.00 : 1.00 Baseline ratio: see Table 1 PM justification: Ratio adjustment from BAMI procedure (attached): : : 1.00 Baseline ratio: acres

0 Ratio adjustment: PM justification: n,n: no difference between impact and mitigation types

Ratio adjustment: PM justification:

3 Ratio adjustment: PM justification: a: No planned delay, impact and mitigation constructed simultaneously. b: Both include mature willow canopy, +3 to account for time to achieve full functions. Baseline ratio from 2.a, b or c: 1.00 : 1.00 Total adjustments (3-8): 3.30 Final ratio: 4.30 : 1.00 Proposed impact (total): 0.3 acres 870 linear feet to Resource type: stream Cowardin or HGM: riverine intermitten t Hydrology:

Ratio adjustment: PM justification:

Required Mitigation*: of Resource type: Cowardin or HGM: Hydrology:

1.29 3741.0 stream riverine intermittent

acres linear feet

0

linear feet

1.0 : 1.0 1.00 : 1.00 see Table 1 : : 1.00

Ratio adjustment:

Ratio adjustment: 0 PM justification: intermittent riparian (willow woodland) and depressional wetlands not substantially different in terms of relative value. 0.3 Ratio adjustment: Ratio adjustment: 0 PM justification: +0.1 for permittee-responsible mitigation, PM justification: mitigation bank, uncertainty factors +0.2 as mitigation site did not formerly support target generally not applicable. aquatic resource. Ratio adjustment: PM justification: bank, generally no delay

intermittent 870

Ratio adjustment: PM justification:

Baseline ratio from 2.a, b or c: 4.00 : 1.00 Total adjustments (3-8): 1.00 Final ratio: 5.00 : 1.00 Remaining impact: 0.23 acres 668 linear feet to Resource type: stream Cowardin or HGM: riverine

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM:

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet stream riverine

Hydrology:

intermittent

Hydrology:

intermittent

Required Mitigation*:

1.15 acres 3338.4 linear feet non-tidal wetland palustrine saturated

Required Mitigation:

#VALUE! #VALUE! 0 0 0

of Resource type: Cowardin or HGM: Hydrology:

of Resource type: Cowardin or HGM: Hydrology:

acres linear feet

Proposed Mitigation**:

10

0.30 acres Proposed Mitigation**: acres Proposed Mitigation**: acres 870 linear feet linear feet linear feet Impact Unmitigated: 77 % Impact Unmitigated: % Impact Unmitigated: % 0.23 acres acres acres Additional PM comments: *Applicant proposed alternate, Additional PM comments: Applicant originally proposed 0.6 Additional PM comments: off-site mitigation to account for difference between acre of off-site enhancement via bank. Through checklist, proposed (0.3 acre establishment, 1:1) and Corps I've determined requirement should be 1.15 acre. assessment using checklist (1.29 acre establishment, Applicant has agreed to provide 1.15 acre of wetland 4.3:1). 0.99 acre of Corps assessment not met = enhancement credit at Juniper bank. 0 99/1 29*100 = 77% 77% of impact unmitigated = 0 23 Final requirement is for 0.3 acre (900 linear feet) of on-site riverine-intermittent stream (realignment of Tullay Creek, mature willow woodland) and 1.15 acre of off-site enhancement of depressional wetland through the XYZ mitigation bank.

Final compensatory mitigation Current requirements:

Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 12

Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom). Functions (Column A) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site moderate moderate moderate moderate moderate low low moderate moderate

Mitigation site moderate moderate moderate moderate moderate low low moderate moderate

Function (Column B) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site moderate moderate moderate moderate moderate low low moderate moderate

Mitigation site no gain no gain no gain no gain no gain no gain no gain low low

Function (Column C) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Mitigation site

Adjustment:

0 PM Justification: impact and mitigation are within the same water body, habitat type, etc., so functional gain and loss would be equal.

Adjustment: PM Justification: Functional loss is greater than functional gain since in this case, there is total functional loss and only gain of selected functions via enhancement (invasive vegetation removal).

Adjustment: PM Justification:

Instructions: 1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be 2. Note: alternate lists of functions may be used. 3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)

Example 2

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20100524 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Placer 530 depressional Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: 1 Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

4

Mitigation site location:

Net loss of aquatic resource surface area:

Ratio adjustment: 1 PM justification: Mitigation will occur outside of the watershed Ratio adjustment: 0

Ratio adjustment: PM justification:

5

Ratio adjustment: 1 PM justification: Mitigation will occur outside of the watershed Ratio adjustment: 0

6

Type conversion:

Ratio adjustment: PM justification: mitigation will be in-kind

7

Risk and uncertainty:

0.4 Ratio adjustment: Ratio adjustment: 0.4 PM justification: +0.2 for permittee-responsible mitigation, PM justification: +0.2 for permittee-responsible mitigation, +0.2 for difficult to replace resources +0.2 for difficult to replace resources

Ratio adjustment: PM justification:

8

Temporal loss:

1 Ratio adjustment: PM justification: mitigation will occur at time of impact, herbaceous species

Ratio adjustment: 1 PM justification: mitigation will occur at time of impact, herbaceous species

Ratio adjustment: PM justification:

9

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 1.20 : 1.00 Total adjustments (3-8): 2.40 Final ratio: 3.60 : 1.00 Proposed impact (total): 1.5 acres linear feet 0 to Resource type: non-tidal wetland Cowardin or HGM: depressional Hydrology: seasonally flooded

Baseline ratio from 2.a, b or c: 1.30 : 1.00 Total adjustments (3-8): 2.40 Final ratio: 3.70 : 1.00 Remaining impact: 0.75 acres 0 linear feet to Resource type: non-tidal wetland Cowardin or HGM: depressional Hydrology: seasonally

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM: Hydrology:

0.00 : 1.00 0.00 0.00 : 1.00 0.00 acres 0 linear feet non-tidal wetland depressional seasonally

Required Mitigation*:

Required Mitigation:

0.00 0.0 0 0 0

2.a Qualitative impact-mitigation comparison:

SPL-2010-XYZ ORM Resource Type: Impact area : Direct Impact - 1.5 ac Limnanthes Ranch re-establishment non-tidal wetland depressional seasonally flooded 1.0 : 1.0 0.2 1.20 : 1.00 see Table : : 1.00

PM justification: re-establishment

John Doe Hydrology: acres Impact distance: N/A Indirect Impact - 0.75 ac Column C Mitigation Site Name: Limnanthes Ranch Mitigation Type: re-establishment wetlands adj to non-RPWs ORM Resource Type: Cowardin/HGM type: depressional Hydrology: seasonally-flooded 1.0 : 1.0 Starting ratio: 0.3 Ratio adjustment: 1.30 : 1.00 Baseline ratio: see Table PM justification: Ratio adjustment from BAMI procedure (attached): : : 1.00 Baseline ratio:

PM justification: re-establishment 0

Ratio adjustment: PM justification: mitigation will be in-kind

5.40 acres 0.0 linear feet non-tidal wetland depressional seasonally flooded

Required Mitigation*: of Resource type: Cowardin or HGM: Hydrology:

2.78 acres 0.0 linear feet wetlands adj to non-RPWs depressional seasonally-flooded

Proposed Mitigation**:

5.40

Proposed Mitigation**:

2.78

0 0.00 Additional PM comments: Total direct impacts

acres linear feet % acres

seasonally flooded 0 linear feet

1.0 : 1.0 1.00 : 1.00 see Table 1 : : 1.00

Ratio adjustment: PM justification:

0

of Resource type: Cowardin or HGM: Hydrology:

Impact Unmitigated:

10 Final compensatory mitigation requirements:

Project Manager: non-tidal wetland 2.25 (combined) Column B Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: 1 Ratio adjustment from BAMI procedure (attached): Baseline ratio:

Ratio adjustment: PM justification:

of Resource type: Cowardin or HGM: Hydrology:

acres Proposed Mitigation**: linear feet Impact Unmitigated: 0 % Impact Unmitigated: 0.00 acres Additional PM comments: Remaining 0.75 acre of impacts Additional PM comments: are indirect impacts to vernal pool habitat

acres linear feet

acres linear feet % acres

Final compensatory mitigation requirement for this impact site is 8.18 acres of vernal pool habitat at the proposed off-site location. The applicant proposed to mitigate direct impacts at a 1.3:1 ratio and indirect impacts at a 1:1 ratio through permittee-responsible re-establishment in the adjacent watershed (2.7 acres of mitigation). The applicant underestimated the mitigation ratio. The required mitigation is an increase of 5.48 acres over the 2.7 acres proposed. *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom). Functions (Column A) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Function (Column B) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon

Impact site

Mitigation site Adjustment:

0.2 PM Justification: Due to differences between vernal pool inoculum in the different locations, the mitigation site is not expected to maintain the range of plant and animal communities (habitat functions) provided by the pre-project impact site.

Mitigation site Adjustment: 0.3 PM Justification: Indirectly impacted vernal pools are expected to have an approximately 50% decline in functions. Due to differences between vernal pool inoculum in the different locations, the mitigation site is not expected to attain the range of plant and animal communities provided by the pre-project impact site (less than 50% gain in habitat functions expected).

Maintenance of plant and animal communities Function (Column C) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Mitigation site Adjustment: PM Justification:

Instructions: 1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be 2. Note: alternate lists of functions may be used. 3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)

Example 3

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20100517 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: SF Impacted Wetland palustrine - emergent Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: 1 Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

4

Mitigation site location:

5

Net loss of aquatic resource surface area:

Ratio adjustment: 0 PM justification: impact and mitigation would be within the same watershed Ratio adjustment: 0

6

Type conversion:

7

Risk and uncertainty:

8

Temporal loss:

2.a Qualitative impact-mitigation comparison:

: : 1.00

Project Manager: non-tidal wetland 0.4 Column B Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: 1 Ratio adjustment from BAMI procedure (attached): Baseline ratio:

0.0

Ratio adjustment:

SPL-2010-XYZ ORM Resource Type: Impact area : Permittee-Responsible Project site establishment non-tidal wetland palustrine - emergent seasonally flooded 1.0 : 1.0 0.0 1.00 : 1.00 see Table

Final mitigation ratio(s):

Ratio adjustment: 0 PM justification: impact and mitigation would be within the same watershed Ratio adjustment: 0

PM justification:

Ratio adjustment: PM justification: bank, no delay

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Baseline ratio from 2.a, b or c: 1.00 : 1.00 Total adjustments (3-8): 1.65 Final ratio: 2.65 : 1.00 Proposed impact (total): 0.4 acres linear feet 0 to Resource type: non-tidal wetland Cowardin or HGM: palustrine - emergent seasonally flooded Hydrology:

Baseline ratio from 2.a, b or c: 1.00 : 1.00 Total adjustments (3-8): 0.00 Final ratio: 1.00 : 1.00 Proposed impact (total): 0.40 acres #VALUE! linear feet to Resource type: non-tidal wetland Cowardin or HGM: palustrine - emergent seasonally flooded Hydrology:

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM:

Required Mitigation*:

Required Mitigation*:

Required Mitigation:

acres linear feet % acres Additional PM comments: Proposed 0.4 acres of mitigation leaves 0.25 acres of impact unmitigated. Impact Unmitigated:

0.00 0

of Resource type: Cowardin or HGM: Hydrology:

0.40 acres #VALUE! linear feet non-tidal wetland palustrine - emergent seasonally flooded

0.40 acres linear feet 0 % 0.00 acres Additional PM comments: Mitigation bank (as an alternative mitigation option).

: : 1.00

Ratio adjustment:

Ratio adjustment: PM justification:

1.06 acres 0.0 linear feet non-tidal wetland palustrine - emergent seasonally flooded

1.0 : 1.0 1.00 : 1.00 see Table 1

Ratio adjustment: PM justification:

PM justification: establishment

0

seasonally flooded 0 linear feet

Ratio adjustment:

Ratio adjustment: 0 PM justification: no difference between impact and mitigation types Ratio adjustment: 0 PM justification: mitigation bank, uncertainty factors not applicable.

Proposed Mitigation**:

Final compensatory mitigation requirements:

0.0

PM justification: establishment

of Resource type: Cowardin or HGM: Hydrology:

10

Hydrology: acres Impact distance: N/A Mitigation Bank Column C Mitigation Site Name: SF Bank Mitigation Type: establishment ORM Resource Type: non-tidal wetland Cowardin/HGM type: palustrine - emergent Hydrology: seasonally flooded 1.0 : 1.0 Starting ratio: 0.0 Ratio adjustment: 1.00 : 1.00 Baseline ratio: see Table PM justification: Ratio adjustment from BAMI procedure (attached): : : 1.00 Baseline ratio:

0 Ratio adjustment: PM justification: no difference between impact and mitigation types 0.4 Ratio adjustment: PM justification: +0.1 for permittee-responsible mitigation, +0.2 as mitigation site did not formerly support target aquatic resource, +0.1 for planned vegetation maintenance 1.25 Ratio adjustment: PM justification: Delay of 5 months between impact and mitigation construction, mitigation = herbaceous.

9

John Doe

Hydrology:

of Resource type: Cowardin or HGM: Hydrology:

Proposed Mitigation**:

Proposed Mitigation**:

Impact Unmitigated:

Impact Unmitigated:

0.00 : 1.00 0.00 0.00 : 1.00 0.00 acres #VALUE! linear feet non-tidal wetland palustrine - emergent seasonally flooded 0.00 #VALUE! 0 0 0

acres linear feet

acres linear feet % acres

Additional PM comments:

The impact to 0.4 acre of fill in a shallow seasonal wetland can be mitigated by either on-site wetland establishment, OR by purchasing credits in a wetland establishment bank in the same watershed/service area. The final requirement for permittee-responsbile on-site mitigation would be 1.06 acres. The final requirement for off-site wetland bank credits is 0.4 acre of establishment credits. After further communication with applicant, the final requirement will be for 0.4 acre of off-site establishment through a mitigation bank. *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom). Functions (Column A) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Function (Column B) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Function (Column C) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Mitigation site Adjustment:

0 PM Justification: impacts and mitigation sites are the same habitat type, so functional gain and loss would be equal.

Mitigation site Adjustment: 0 PM Justification: impacts and mitigation sites are the same habitat type, so functional gain and loss would be equal.

Mitigation site Adjustment: PM Justification:

Instructions: 1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be 2. Note: alternate lists of functions may be used. 3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)

Example 4

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20100602 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Unnamed wash riverine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: 1 Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

4

Mitigation site location:

Ratio adjustment: PM justification:

5

Net loss of aquatic resource surface area:

Ratio adjustment: Ratio adjustment: 0 PM justification: impact and mitigation would be within the PM justification: same watershed Ratio adjustment: Ratio adjustment: 0

6

Type conversion:

7

2.a Qualitative impact-mitigation comparison:

Project Manager: River/stream 0.3 Column B Mitigation Site Name: Powers Butte ILF site Mitigation Type: re-establishment ORM Resource Type: River/stream Cowardin/HGM type: riverine intermittent Hydrology: 1.0 : 1.0 Starting ratio: -0.5 Ratio adjustment: 1.00 : 1.50 Baseline ratio: see Table PM justification: 1 Ratio adjustment from BAMI procedure (attached): : : 1.00 Baseline ratio: SPL-2010-XYZ ORM Resource Type: Impact area :

0.0

PM justification: The mitigation is re-establishment of the aquatic resources 0 Ratio adjustment: PM justification: Neither site supports highly valuable or rare habitat types.

Jane Dough acres

1.0 : 1.00 :

: :

Hydrology: Impact distance: Column C Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: 1.0 Starting ratio: Ratio adjustment: 1.00 Baseline ratio: see Table PM justification: Ratio adjustment from BAMI procedure (attached): 1.00 Baseline ratio:

linear feet

1.0 : 1.0 1.00 : 1.00 see Table 1 : : 1.00

Ratio adjustment:

PM justification:

PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Risk and uncertainty:

0 Ratio adjustment: Ratio adjustment: PM justification: Uncertainty for in-lieu fee programs has PM justification: already been factored in to the ILF Program proposal and the cost per acre of credits.

Ratio adjustment: PM justification:

8

Temporal loss:

0 Ratio adjustment: PM justification: Mitigation would occur prior to impacts. Much of the vegetation at the mitigation site has already begun to be established.

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

9

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 1.00 : 1.50 Total adjustments (3-8): 0.00 Final ratio: 0.67 : 1.00 Proposed impact (total): 0.3 acres 1276 linear feet to Resource type: River/stream Cowardin or HGM: riverine Hydrology: ephemeral

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact:

Required Mitigation*:

Required Mitigation*:

of Resource type: Cowardin or HGM:

0.20 acres 850.7 linear feet River/stream riverine

Hydrology:

intermittent

Proposed Mitigation**:

0.30

10 Final compensatory mitigation requirements:

ephemeral 1,276

0.00 : 1.00 0.00 0.00 : 1.00 acres 0 linear feet River/stream riverine ephemeral

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM: Hydrology:

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet River/stream riverine ephemeral

Required Mitigation:

of Resource type: Cowardin or HGM:

#VALUE! 0.0 0 0

of Resource type: Cowardin or HGM:

#VALUE! #VALUE! 0 0

Hydrology:

0

Hydrology:

0

to Resource type: Cowardin or HGM: Hydrology:

acres linear feet

acres linear feet

acres Proposed Mitigation**: acres Proposed Mitigation**: acres linear feet linear feet linear feet Impact Unmitigated: % Impact Unmitigated: % Impact Unmitigated: % acres acres acres Additional PM comments: The calculated ratio came out Additional PM comments: Additional PM comments: as 0.67:1, but without a functional assessment, 1:1 is the minimum ratio allowed under the 2008 mitigation rule. The final compensatory mitigation requirement for this impact site is 0.3 acre of re-establishment at the Powers Butte in-lieu fee program site. Although the calculated ratio was 0.67:1, a 1:1 ratio was used, as step 2 b was not completed (no functional/condition assessment). *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom). Functions (Column A) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site low low low low low low low low low

Function (Column B) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Function (Column C) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Mitigation site high high high moderate high moderate moderate high high

Adjustment:

-0.5 PM Justification: Mitigation site is a riparian gallery with cottonwood, willows and adjacent wetlands (re-established from uplands). The mitigation site would provide more functional lift than the expected functional loss at the impact site (total loss of ephemeral wash). Therefore the adjustment was set at -0.5.

Mitigation site Adjustment: PM Justification:

Mitigation site Adjustment: PM Justification:

Instructions: 1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be 2. Note: alternate lists of functions may be used. 3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)

Example 5

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20100617 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Yowza Fen palustrine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: 1 Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

4

Mitigation site location:

Ratio adjustment: PM justification:

5

Net loss of aquatic resource surface area:

Ratio adjustment: Ratio adjustment: 0 PM justification: impact and mitigation would be within the PM justification: same watershed Ratio adjustment: Ratio adjustment: 1

6

Type conversion:

7

Risk and uncertainty:

8

9

2.a Qualitative impact-mitigation comparison:

Project Manager: non-tidal wetland 0.26 Column B Mitigation Site Name: Ski Area Filled Fen Mitigation Type: rehabilitation ORM Resource Type: non-tidal wetland Cowardin/HGM type: palustrine Hydrology: saturated 1.0 : 1.0 Starting ratio: 2.0 Ratio adjustment: 3.00 : 1.00 Baseline ratio: see Table PM justification: 1 Ratio adjustment from BAMI procedure (attached): : : 1.00 Baseline ratio: SPL-2010-123-JBD ORM Resource Type: Impact area :

Jane B. Doe acres

1.0 : 1.00 :

: :

Hydrology: Impact distance: N/A Column C Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: 1.0 Starting ratio: Ratio adjustment: 1.00 Baseline ratio: see Table PM justification: Ratio adjustment from BAMI procedure (attached): 1.00 Baseline ratio:

saturated 0

linear feet

1.0 : 1.0 1.00 : 1.00 see Table 1 : : 1.00

Ratio adjustment:

PM justification: rehabilitation

PM justification:

PM justification:

0 Ratio adjustment: PM justification: no difference between impact and mitigation types 0.4 Ratio adjustment: PM justification: +0.1 for permittee-responsible mitigation, +0.3 mitigation site difficult-to-replace resource.

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Temporal loss:

1.4 Ratio adjustment: PM justification: Delay of 8 months +0.4, herbaceous, +1.

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 3.00 : 1.00 Total adjustments (3-8): 2.80 Final ratio: 5.80 : 1.00 Proposed impact (total): 0.26 acres linear feet 0 to Resource type: non-tidal wetland Cowardin or HGM: palustrine Hydrology: saturated

Baseline ratio from 2.a, b or c: 0.00 : 1.00 Total adjustments (3-8): 0.00 Final ratio: 0.00 : 1.00 Remaining impact: 0.22 acres 0 linear feet to Resource type: non-tidal wetland Cowardin or HGM: palustrine Hydrology: saturated

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM: Hydrology:

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet non-tidal wetland palustrine saturated

Required Mitigation*:

Required Mitigation:

#VALUE! #VALUE! 0 0 0

1.51 acres 0.0 linear feet non-tidal wetland palustrine saturated

Required Mitigation*:

of Resource type: Cowardin or HGM: Hydrology: Proposed Mitigation**:

0.26

Proposed Mitigation**:

Impact Unmitigated:

83 0.22

Additional PM comments:

10 Final compensatory mitigation requirements:

acres linear feet % acres

of Resource type: Cowardin or HGM: Hydrology:

Impact Unmitigated: Additional PM comments:

0.00 0.0 0 0 0

acres linear feet

of Resource type: Cowardin or HGM: Hydrology: acres linear feet % acres

Proposed Mitigation**: Impact Unmitigated:

acres linear feet

acres linear feet % acres

Additional PM comments:

Final requirement is for compensatory mitigation for this impact site is 1.51 acres. Applicant will rehabilitate 1.51 acres of fen wetland previously filled within the resort area. After completing the checklist and after discussing the results with the applicant, the project manager has determined the final mitigation ratio to be 5.8:1 for the fen impacts. After consultation with the applicant, the applicant agreed to rehabilitate an additional 0.91 acre of fen wetland for a total of 1.51 acres of rehabilitation within the ski resort area to offset impacts. *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom). Functions (Column A) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Function (Column B) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Function (Column C) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Mitigation site Adjustment:

2 PM Justification: impact and mitigation are within the same watershed, habitat type, etc., but rehabilitation would result in partial functional gain compared with total functional loss at impact site, so functional loss would be greater than functional gain.

Mitigation site Adjustment: PM Justification:

Mitigation site Adjustment: PM Justification:

Instructions: 1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be 2. Note: alternate lists of functions may be used. 3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)

Example 6

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20120604 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Haunted Wash riverine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: 1 Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

4

Mitigation site location:

Ratio adjustment: PM justification:

5

Net loss of aquatic resource surface area:

Ratio adjustment: Ratio adjustment: 0 PM justification: impact and mitigation would be within the PM justification: same watershed Ratio adjustment: Ratio adjustment: 0

6

Type conversion:

7

Risk and uncertainty:

8

9

2.a Qualitative impact-mitigation comparison:

Project Manager: River/stream 0.46 Column B Mitigation Site Name: Realigned Ditch Mitigation Type: establishment ORM Resource Type: River/stream Cowardin/HGM type: riverine Hydrology: ephemeral 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see Table PM justification: 1 Ratio adjustment from BAMI procedure (attached): 2.4 : 1.0 : 1.00 Baseline ratio: SPL-2012-345-IJ ORM Resource Type: Impact area :

Indiana Jones acres

1.0 : 1.00 :

: :

Hydrology: Impact distance: Column C Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: 1.0 Starting ratio: Ratio adjustment: 1.00 Baseline ratio: see Table PM justification: Ratio adjustment from BAMI procedure (attached): 1.00 Baseline ratio:

ephemeral 13,579

linear feet

1.0 : 1.0 1.00 : 1.00 see Table 1 : : 1.00

Ratio adjustment:

PM justification: establishment

PM justification:

PM justification:

0 Ratio adjustment: PM justification: no difference between impact and mitigation types 0.3 Ratio adjustment: PM justification: +0.1 permittee responsible; +0.2 mitigation site did not support aquatic resource

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Temporal loss:

0 Ratio adjustment: Ratio adjustment: PM justification: no temporal loss, as mitigation site would PM justification: be built before impacts and all functions aside from biotic would be replaced.

Ratio adjustment: PM justification:

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 2.35 : 1.00 Total adjustments (3-8): 0.30 Final ratio: 2.65 : 1.00 Proposed impact (total): 0.46 acres linear feet 13579 to Resource type: River/stream Cowardin or HGM: riverine Hydrology: ephemeral

Baseline ratio from 2.a, b or c: 0.00 : 1.00 Total adjustments (3-8): 0.00 Final ratio: 0.00 : 1.00 Remaining impact: 0.00 acres -11 linear feet to Resource type: River/stream Cowardin or HGM: riverine Hydrology: ephemeral

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM: Hydrology:

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet River/stream riverine ephemeral

Required Mitigation*:

Required Mitigation:

#VALUE! #VALUE! 0 0 0

1.22 acres 35984.4 linear feet River/stream riverine ephemeral

Required Mitigation*:

of Resource type: Cowardin or HGM: Hydrology: Proposed Mitigation**:

1.22

Proposed Mitigation**:

Impact Unmitigated:

0 0.00

Additional PM comments:

10

acres linear feet % acres

of Resource type: Cowardin or HGM: Hydrology:

Impact Unmitigated:

0.00 0.0 0 0 0

acres linear feet

of Resource type: Cowardin or HGM: Hydrology: acres linear feet % acres

Additional PM comments:

Proposed Mitigation**: Impact Unmitigated:

acres linear feet

acres linear feet % acres

Additional PM comments:

Final requirement is for this impact site is 1.22 acres. Applicant will establish 1.22 acre of ephemeral streambed. Final compensatory mitigation requirements: *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Step 3: Before-After-Mitigation-Impact (BAMI) procedure (CRAM example) ImpactBefore ImpactAfter Impactdelta MitigationBefore MitigationAfter Mitigationdelta Functions/conditions 4.1 Buffer and Landscape Context 4.1.1 Landscape Connectivity 3 0 -3 3 3 0 4.1.2 Percent of AA with Buffer 9 0 -9 9 9 0 4.1.3 Average Buffer Width 6 0 -6 6 6 0 4.1.4 Buffer Condition 12 0 -12 12 12 0 RAW SCORE 12.4 0.0 -12 12.4 12.4 0 FINAL SCORE 51.7 0.0 -52 51.7 51.7 0 4.2 Attribute 2: Hydrology 4.2.1 Water Source 9 0 -9 0 9 9 4.2.2 Hydroperiod or Channel Stability 12 0 -12 0 3 3 4.2.3 Hydrologic Connectivity 12 0 -12 0 12 12 RAW SCORE 33.0 0.0 -33 0.0 24.0 24 FINAL SCORE 91.7 0.0 -92 0.0 66.7 67 4.3 Attribute 3: Physical Structure 4.3.1 Structural Patch Richness 3 0 -3 0 3 3 4.3.2 Topographic Complexity 3 0 -3 0 3 3 RAW SCORE 6.0 0.0 -6 0.0 6.0 6 FINAL SCORE 25.0 0.0 -25 0.0 25.0 25 4.4 Attribute 4: Biotic Structure 4.4.1 Number of Plant Layers 6 0 -6 0 0 0 4.4.2 Co-Dominant Species 3 0 -3 0 0 0 4.4.3 Percent Invasion 12 0 -12 0 0 0 4.4.4 Interspersion/Zonation 6 0 -6 0 0 0 4.4.5 Vertical Structure 3 0 -3 0 0 0 Quotient=ABS(M/I)deltas RAW SCORE 16 0 -16 0 0 0 23/54 Baseline ratio: FINAL SCORE 44.5 0.0 -45 0.0 0.0 0 OVERALL SCORE 54.0 0.0 -54 13.0 36.0 23 2.35 : 1.0 Instructions: 1. Choose functional method. Acceptable functional assessment methods must be aquatic resource-based, standardized, comparable from site to site, peer-reviewed, and must be approved by the applicable Corps District. 2. List functions/condition categories in leftmost column. 3. Utilize Before-After-Mitigation-Impact (BAMI) procedure above to calculate function deltas. 4. Obtain absolute value (ABS*) of quotient of mitigation-delta over impact-delta for overall score (if method has no overall score, use median of quotients for function categories or individual functions). *Absolute value is the nonnegative number for any real number, so if your quotient is negative, simply drop the negative sign to get the ABS. For example: the ABS of -9/3 = 3. 5. To get baseline ratio: If quotient (Q) is less than 1, baseline ratio = 1/Q : 1; if quotient is greater than 1, baseline ratio = 1 : Q. 6. Input Step 2.b baseline ratio into the checklist document.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.4-SPD Mitigation Ratio Checklist - CRAM Example Page 1 of 1

Example 7

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20120531 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: SPL-2012-TK Highland Stormdrain ORM Resource Type: riverine Impact area : Column A Mitigation Site Name: San Ramon Bank Mitigation Type: re-establishment ORM Resource Type: river/stream Cowardin/HGM type: riverine Hydrology: intermittent 1.0 : 1.0 Starting ratio: -2.0 Ratio adjustment: 1.00 : 3.00 Baseline ratio: PM justification: Functional gain would be substantially more than the expected functional loss (see table 1). Ratio adjustment from BAMI procedure (attached): : : 1.00 Baseline ratio:

Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

4

Mitigation site location:

Ratio adjustment: PM justification:

5

Net loss of aquatic resource surface area:

Ratio adjustment: Ratio adjustment: 0 PM justification: impact and mitigation would be within the PM justification: same watershed Ratio adjustment: Ratio adjustment: 0

6

Type conversion:

Ratio adjustment: PM justification: mitigation is in-kind

7

Risk and uncertainty:

0 Ratio adjustment: PM justification: mitigation bank, uncertainty factors not applicable.

8

9

2.a Qualitative impact-mitigation comparison:

PM justification: re-establishment

Project Manager: river/stream 2.46 Column B Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification:

Takeshi Kitano acres

Hydrology: Impact distance: 3814 Column C Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see Table 1 PM justification:

: : 1.00

intermittent 0

linear feet

1.0 : 1.0 1.00 : 1.00 see Table 1

Ratio adjustment from BAMI procedure (attached): Baseline ratio:

: : 1.00

Ratio adjustment:

PM justification:

PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Temporal loss:

0 Ratio adjustment: Ratio adjustment: PM justification: mitigation bank with most credits released PM justification: and performance standards met, assuming no delay.

Ratio adjustment: PM justification:

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 1.00 : 3.00 Total adjustments (3-8): 0.00 Final ratio: 0.33 : 1.00 Proposed impact (total): 2.46 acres 0 linear feet to Resource type: river/stream Cowardin or HGM: riverine intermitten t Hydrology:

Baseline ratio from 2.a, b or c: 0.00 : 1.00 Total adjustments (3-8): 0.00 Final ratio: 0.00 : 1.00 Remaining impact: 0.00 acres 0 linear feet to Resource type: river/stream Cowardin or HGM: riverine

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM:

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet river/stream riverine

Hydrology:

intermittent

Hydrology:

intermittent

Required Mitigation*:

Required Mitigation*:

0.00 0.0 0 0 0

Required Mitigation:

#VALUE! #VALUE! 0 0 0

0

of Resource type: Cowardin or HGM: Hydrology:

2.46 acres 0.0 linear feet river/stream riverine intermittent

Proposed Mitigation**:

2.46

of Resource type: Cowardin or HGM: Hydrology:

acres linear feet

of Resource type: Cowardin or HGM: Hydrology:

acres Proposed Mitigation**: acres Proposed Mitigation**: linear feet linear feet 0 % Impact Unmitigated: % Impact Unmitigated: 0.00 acres acres Additional PM comments: *Calculated ratio is 1:3 (or Additional PM comments: Additional PM comments: 0.33:1), but without functional assessment, 1:1 is min ratio allowed under 2008 mitigation rule Final requirement is for this impact site is the purchase of mitigation bank credit for the re-establishment of 2.46 acres of riparian stream habitat (1:1 ratio). Impact Unmitigated:

10 Final compensatory mitigation requirements:

acres linear feet

acres linear feet % acres

*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 1: Qualitative comparison of functions (functional loss vs. gain) (instructions at bottom). Functions (Column A) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site small loss small loss small loss small loss small loss no loss no loss moderate loss small loss

Mitigation site large gain large gain large gain large gain large gain large gain large gain large gain large gain

Function (Column B) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Mitigation site

Function (Column C) Short- or long-term surface water storage Subsurface water storage Moderation of groundwater flow or discharge Dissipation of energy Cycling of nutrients Removal of elements and compounds Retention of particulates Export of organic carbon Maintenance of plant and animal communities

Impact site

Adjustment:

-2 PM Justification: Functional gain would be substantially more than the expected functional loss

Adjustment: PM Justification:

Mitigation site Adjustment: PM Justification:

Instructions: 1. Describe amount of functional loss (impact) and gain (mitigation) in each respective column. Gain and loss can be 2. Note: alternate lists of functions may be used. 3. Note: a single adjustment should be used to account for all functions combined (see example 7 in attachment 12501.3)

Example 8

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20120531 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Highland Stormdrain riverine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

4

Mitigation site location:

Ratio adjustment: PM justification:

5

Net loss of aquatic resource surface area:

Ratio adjustment: Ratio adjustment: 0 PM justification: impact and mitigation would be within the PM justification: same watershed Ratio adjustment: Ratio adjustment: 0

6

Type conversion:

Ratio adjustment: PM justification: mitigation is in-kind

7

Risk and uncertainty:

0 Ratio adjustment: PM justification: mitigation bank, uncertainty factors not applicable.

8

9

2.a Qualitative impact-mitigation comparison:

SPL-2012-TK ORM Resource Type: Impact area : San Ramon Bank re-establishment river/stream riverine intermittent 1.0 : 1.0 1.00 : 1.00

1.0 : 4.4 : 1.00

PM justification: re-establishment

Project Manager: river/stream 2.46 Column B Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: Ratio adjustment from BAMI procedure (attached): Baseline ratio:

Takeshi Kitano acres

Hydrology: Impact distance: N/A Column C Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see Table 1 PM justification: Ratio adjustment from BAMI procedure (attached): : : 1.00 Baseline ratio:

intermittent 0

linear feet

1.0 : 1.0 1.00 : 1.00 see Table 1 : : 1.00

Ratio adjustment:

PM justification:

PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Temporal loss:

0 Ratio adjustment: Ratio adjustment: PM justification: mitigation bank with most credits released PM justification: and performance standards met, assuming no delay.

Ratio adjustment: PM justification:

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 1.00 : 4.40 Total adjustments (3-8): 0.00 Final ratio: 0.23 : 1.00 Proposed impact (total): 2.46 acres linear feet 0 to Resource type: river/stream Cowardin or HGM: riverine intermitten t Hydrology:

Baseline ratio from 2.a, b or c: 0.00 : 1.00 Total adjustments (3-8): 0.00 Final ratio: 0.00 : 1.00 Remaining impact: 0.00 acres 0 linear feet to Resource type: river/stream Cowardin or HGM: riverine

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM:

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet river/stream riverine

Hydrology:

intermittent

Hydrology:

intermittent

Required Mitigation*:

0.00 0.0 0 0 0

Required Mitigation:

#VALUE! #VALUE! 0 0 0

0.56 acres 0.0 linear feet river/stream riverine intermittent

Required Mitigation*:

of Resource type: Cowardin or HGM: Hydrology: Proposed Mitigation**:

0.00

Proposed Mitigation**:

Impact Unmitigated:

0 0.00

Additional PM comments:

10 Final compensatory mitigation requirements:

0

acres linear feet % acres

of Resource type: Cowardin or HGM: Hydrology:

Impact Unmitigated: Additional PM comments:

acres linear feet

of Resource type: Cowardin or HGM: Hydrology: acres linear feet % acres

Proposed Mitigation**: Impact Unmitigated:

acres linear feet

acres linear feet % acres

Additional PM comments:

Final requirement is for this impact site is the purchase of mitigation bank credit for the re-establishment of 0.56 acres of riparian stream habitat.

*At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Step 3: Before-After-Mitigation-Impact (BAMI) procedure (CRAM example) ImpactBefore ImpactAfter Impactdelta MitigationBefore MitigationAfter Mitigationdelta Functions/conditions 4.1 Buffer and Landscape Context 4.1.1 Landscape Connectivity 3 3 0 9 9 0 4.1.2 Percent of AA with Buffer 3 3 0 9 9 0 4.1.3 Average Buffer Width 3 3 0 9 9 0 4.1.4 Buffer Condition 3 3 0 9 9 0 RAW SCORE 6.0 6.0 0 18.0 18.0 0 FINAL SCORE 25.0 25.0 0 75.0 75.0 0 4.2 Attribute 2: Hydrology 4.2.1 Water Source 6 6 0 9 9 0 4.2.2 Hydroperiod or Channel Stability 6 6 0 9 9 0 4.2.3 Hydrologic Connectivity 3 3 0 3 9 6 RAW SCORE 15.0 15.0 0 21.0 27.0 6 FINAL SCORE 41.7 41.7 0 58.4 75.0 17 4.3 Attribute 3: Physical Structure 4.3.1 Structural Patch Richness 6 3 -3 0 9 9 4.3.2 Topographic Complexity 3 3 0 0 12 12 RAW SCORE 9.0 6.0 -3 0.0 21.0 21 FINAL SCORE 37.5 25.0 -13 0.0 87.5 88 4.4 Attribute 4: Biotic Structure 4.4.1 Number of Plant Layers 6 3 -3 9 9 0 4.4.2 Co-Dominant Species 6 3 -3 12 12 0 4.4.3 Percent Invasion 6 3 -3 9 9 0 4.4.4 Interspersion/Zonation 6 3 -3 6 12 6 4.4.5 Vertical Structure 3 3 0 6 12 6 Quotient=ABS(M/I)deltas RAW SCORE 15 9 -6 22 34 12 4 3/8 Baseline ratio: FINAL SCORE 41.7 25.0 -17 61.2 94.5 33 OVERALL SCORE 37.0 30.0 -8 49.0 83.0 35 1 : 4.4 Instructions: 1. Choose functional method. Acceptable functional assessment methods must be aquatic resource-based, standardized, comparable from site to site, peer-reviewed, and must be approved by the applicable Corps District. 2. List functions/condition categories in leftmost column. 3. Utilize Before-After-Mitigation-Impact (BAMI) procedure above to calculate function deltas. 4. Obtain absolute value (ABS*) of quotient of mitigation-delta over impact-delta for overall score (if method has no overall score, use median of quotients for function categories or individual functions). *Absolute value is the nonnegative number for any real number, so if your quotient is negative, simply drop the negative sign to get the ABS. For example: the ABS of -9/3 = 3. 5. To get baseline ratio: If quotient (Q) is less than 1, baseline ratio = 1/Q : 1; if quotient is greater than 1, baseline ratio = 1 : Q. 6. Input Step 2.b baseline ratio into the checklist document.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.4-SPD Mitigation Ratio Checklist - CRAM Example Page 1 of 1

Example 9

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20160607 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Unnamed road crossing riverine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

4

Mitigation site location:

Ratio adjustment: 0 PM justification: Same 8-digit HUC watershed

Ratio adjustment: 0 PM justification: Same 8-digit HUC watershed

Ratio adjustment: PM justification:

5

Net loss of aquatic resource surface area:

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

2.a Qualitative impact-mitigation comparison:

Project Manager: stream 0.35 Column B Mitigation Site Name: Golden Valley Mitigation Type: Preservation ORM Resource Type: Stream Cowardin/HGM type: Riverine Hydrology: Ephemeral 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): : 1.00 : 1.00 Baseline ratio: SPL-2013-NNN ORM Resource Type: Impact area :

9.0

1

PM justification: Preservation results in net loss.

Joe Regulator Hydrology: Impact distance: Column C Mitigation Site Name: Golden Valley Mitigation Type: Preservation ORM Resource Type: Upland buffer Cowardin/HGM type: Riverine Hydrology: Ephemeral buffer 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): : 1.00 : 1.00 Baseline ratio: acres

11.0

Ratio adjustment:

1

PM justification:

Ratio adjustment: 1 PM justification: Impacted ephemeral stream more valuable than preserved upland buffer. Ratio adjustment: 0 PM justification: n/a since preservation.

Ratio adjustment: PM justification:

Ratio adjustment: PM justification: n/a since preservation.

Ratio adjustment: PM justification:

6

Type conversion:

Ratio adjustment: PM justification: Same stream types.

0

7

Risk and uncertainty:

Ratio adjustment: PM justification: n/a since preservation.

0

8

Temporal loss:

Ratio adjustment: PM justification: n/a since preservation.

0

9

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 1.00 : 1.00 Total adjustments (3-8): 10.00 Final ratio: 11.00 : 1.00 Proposed impact (total): 0.35 acres 275 linear feet to Resource type: stream Cowardin or HGM: riverine Hydrology: ephemeral

Baseline ratio from 2.a, b or c: 1.00 : 1.00 Total adjustments (3-8): 13.00 Final ratio: 14.00 : 1.00 Remaining impact: 0.19 acres 150 linear feet to Resource type: stream Cowardin or HGM: riverine Hydrology: ephemeral

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM: Hydrology:

Required Mitigation*:

Required Mitigation*:

Required Mitigation:

of Resource type: Cowardin or HGM: Hydrology:

2.67 acres 2100.0 linear feet Upland buffer Riverine Ephemeral buffer

Proposed Mitigation**:

2.67

Proposed Mitigation**:

Impact Unmitigated:

0 0.00

of Resource type: Cowardin or HGM: Hydrology: Proposed Mitigation**: Impact Unmitigated: Additional PM comments:

10

3.85 3025.0 Stream Riverine Ephemeral

acres linear feet

1.75 2200 55 0.19

acres linear feet % acres

acres linear feet % acres

Additional PM comments:

linear feet

1.0 : 1.0 1.00 : 1.00 see tab 2 or 3 : : 1.00

Ratio adjustment:

PM justification: Preservation results in net loss.

0

ephemeral 275

Ratio adjustment: PM justification:

of Resource type: Cowardin or HGM: Hydrology:

0.00 : 1.00 0.00 0.00 : 1.00 acres linear feet

0.00 0 stream riverine ephemeral 0.00 0.0 0 0 0

Impact Unmitigated:

acres linear feet

acres linear feet % acres

Additional PM comments:

Final requirement is for preservation of 1.75 acre of ephemeral stream and 2.67 acre of ephemeral stream buffer. Final compensatory mitigation requirements: *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 2: Starting and base ratio determination for preservation (instructions at bottom). Steps (Column A) A. (for step 2.c) B. C. D. E. (for step 3)

Steps (Column B) A. (for step 2.c) B. C. D. E. (for step 3)

Steps (Column C) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Baseline ratio (5:1, 3:1, or 1:1):

Results

Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type: Criteria Baseline ratio (5:1, 3:1, or 1:1):

PM Justification 1:1 Impacts to low-functioning aquatic resource Moderately high aquatic resource functions, high 3 quality ephemeral 3 Medium due to maintenance costs 3 Restrictive covenant 9

Results

Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type: Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

1:1 5 3 3 11

PM Justification Impacts to low-functioning aquatic resource Least high aquatic resource functions, upland buffer to high quality ephemeral Medium due to maintenance costs Restrictive covenant

PM Justification

0

Example 10

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20160607 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Bay wetland 1 paulstrine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

4

Mitigation site location:

5

Net loss of aquatic resource surface area:

2.a Qualitative impact-mitigation comparison:

Project Manager: non-tidal wetland 1.27 Column B Mitigation Site Name: Hatty Smith Marsh Mitigation Type: preservation ORM Resource Type: tidal marsh Cowardin/HGM type: estuarine Hydrology: permanently flooded 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): : 3.00 : 1.00 Baseline ratio: SPL-2013-NNN ORM Resource Type: Impact area :

7.0

acres

1.0 : 1.00 :

: :

Hydrology: Impact distance: Column C Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: 1.0 Starting ratio: Ratio adjustment: 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): 1.00 Baseline ratio:

Ratio adjustment:

Ratio adjustment:

Ratio adjustment: 0 PM justification: Same 8-digit HUC watershed

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

PM justification: Preservation results in net loss.

PM justification:

PM justification:

-2 Ratio adjustment: PM justification: Tiidal wetlands more rare in watershed than seasonal wetlands. 0 Ratio adjustment: PM justification: n/a since preservation.

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

1

6

Type conversion:

7

Risk and uncertainty:

8

Temporal loss:

Ratio adjustment: PM justification: n/a since preservation.

9

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 3.00 : 1.00 Total adjustments (3-8): 6.00 Final ratio: 9.00 : 1.00 Proposed impact (total): 1.27 acres 0 linear feet to Resource type: non-tidal wetland Cowardin or HGM: paulstrine seasonally flooded Hydrology:

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact:

Required Mitigation*:

Required Mitigation*:

of Resource type: Cowardin or HGM: Hydrology: Proposed Mitigation**: Impact Unmitigated: Additional PM comments:

10

Jane Regulator

0

11.43 acres 0.0 linear feet tidal marsh estuarine permanently flooded acres linear feet % acres

to Resource type: Cowardin or HGM: Hydrology:

of Resource type: Cowardin or HGM: Hydrology: Proposed Mitigation**: Impact Unmitigated: Additional PM comments:

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet non-tidal wetland paulstrine seasonally flooded

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM:

#VALUE! #VALUE! 0 0 0

Required Mitigation:

acres linear feet

Hydrology:

of Resource type: Cowardin or HGM: Hydrology: acres linear feet % acres

seasonally flooded linear feet

1.0 : 1.0 1.00 : 1.00 see tab 2 or 3 : : 1.00

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet non-tidal wetland paulstrine seasonally flooded #VALUE! #VALUE! 0 0 0

Proposed Mitigation**: Impact Unmitigated:

acres linear feet

acres linear feet % acres

Additional PM comments:

Final requirement is for preservation of 11.43 acres of tidal marsh. Final compensatory mitigation requirements: *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 2: Starting and base ratio determination for preservation (instructions at bottom). Steps (Column A) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

Steps (Column B) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

Steps (Column C) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

3:1 1 5 1 7

PM Justification Impact to moderate quality seasonal wetlands high quality tidal marsh low threat conservation easement

PM Justification

0

PM Justification

0

Table 2 (Steps 2.c and 3) instructions: A. Baseline ratio based on expected functional loss at impact site (1:1 low; 3:1 Moderate; 5:1 high). Copy to step 2.c in checklist.

Example 11

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20160607 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

g Vernal Pool A paulstrine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

4

Mitigation site location:

5

Net loss of aquatic resource surface area:

2.a Qualitative impact-mitigation comparison:

Project Manager: non-tidal wetland 0.74 Column B Mitigation Site Name: Williams Meadow Mitigation Type: Preservation ORM Resource Type: Non-tidal wetland Cowardin/HGM type: Palustrine Hydrology: Seasonally flooded 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): : 5.00 : 1.00 Baseline ratio: SPL-2013-NNN ORM Resource Type: Impact area :

7.0

Joe Regulator acres

1.0 : 1.00 :

: :

Hydrology: Impact distance: Column C Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: 1.0 Starting ratio: Ratio adjustment: 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): 1.00 Baseline ratio:

Ratio adjustment:

Ratio adjustment:

Ratio adjustment: 0 PM justification: Same 8-digit HUC watershed

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

PM justification: Preservation results in net loss.

PM justification:

PM justification:

0 Ratio adjustment: PM justification: Impact and mitigation sites both high quality vernal pools. 0 Ratio adjustment: PM justification: n/a since preservation.

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

1

6

Type conversion:

7

Risk and uncertainty:

8

Temporal loss:

Ratio adjustment: PM justification: n/a since preservation.

9

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 5.00 : 1.00 Total adjustments (3-8): 8.00 Final ratio: 13.00 : 1.00 Proposed impact (total): 0.74 acres 0 linear feet to Resource type: non-tidal wetland Cowardin or HGM: paulstrine seasonallyflooded Hydrology:

Baseline ratio from 2.a, b or c: 0.00 : 1.00 Total adjustments (3-8): 0.00 Final ratio: 0.00 : 1.00 Remaining impact: 0.00 acres 0 linear feet to Resource type: non-tidal wetland Cowardin or HGM: paulstrine seasonallyflooded Hydrology:

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM:

Required Mitigation*:

Required Mitigation*:

Required Mitigation:

of Resource type: Cowardin or HGM: Hydrology:

9.62 acres 0.0 linear feet Non-tidal wetland Palustrine Seasonally flooded

Proposed Mitigation**:

9.62

Proposed Mitigation**:

Impact Unmitigated:

0 0.00

Additional PM comments:

10

0

acres linear feet % acres

of Resource type: Cowardin or HGM: Hydrology:

Impact Unmitigated: Additional PM comments:

0.00 0.0 0 0 0

acres linear feet

Hydrology:

of Resource type: Cowardin or HGM: Hydrology: acres linear feet % acres

seasonally-flooded linear feet

1.0 : 1.0 1.00 : 1.00 see tab 2 or 3 : : 1.00

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet non-tidal wetland paulstrine seasonallyflooded #VALUE! #VALUE! 0 0 0

Proposed Mitigation**: Impact Unmitigated:

acres linear feet

acres linear feet % acres

Additional PM comments:

Applicant initially proposed lesser amount, then agreed to higher ratio. Final requirement is for preservation of 9.62 acres of high quality vernal pool. Final compensatory mitigation requirements: *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 2: Starting and base ratio determination for preservation (instructions at bottom). Steps (Column A) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

Steps (Column B) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

Steps (Column C) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

5:1 1 5 1 7

PM Justification Impact to high quality vernal pool high quality vernal pool low threat conservation easement

PM Justification

0

PM Justification

0

Table 2 (Steps 2.c and 3) instructions: A. Baseline ratio based on expected functional loss at impact site (1:1 low; 3:1 Moderate; 5:1 high). Copy to step 2.c in checklist.

Example 12

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20160607 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Badlands Stream riverine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

4

Mitigation site location:

5

Net loss of aquatic resource surface area:

2.a Qualitative impact-mitigation comparison:

Project Manager: stream 4.2 Column B Mitigation Site Name: Charate Wash Mitigation Type: Preservation ORM Resource Type: stream Cowardin/HGM type: riverine Hydrology: perennial 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): : 3.00 : 1.00 Baseline ratio: SPL-2013-NNN ORM Resource Type: Impact area :

9.0

Jane Regulator acres

1.0 : 1.00 :

: :

Hydrology: Impact distance: Column C Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: 1.0 Starting ratio: Ratio adjustment: 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): 1.00 Baseline ratio:

Ratio adjustment:

Ratio adjustment:

Ratio adjustment: 0 PM justification: Same 8-digit HUC watershed

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

PM justification: Preservation results in net loss.

PM justification:

PM justification:

-3.5 Ratio adjustment: PM justification: Perennial stream mitigation site higher value than ephemeral, unvegetated stream to be 0 Ratio adjustment: PM justification: n/a since preservation.

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

Ratio adjustment: PM justification:

1

ephemeral 11,200

linear feet

1.0 : 1.0 1.00 : 1.00 see tab 2 or 3 : : 1.00

6

Type conversion:

7

Risk and uncertainty:

8

Temporal loss:

Ratio adjustment: PM justification: n/a since preservation.

9

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 3.00 : 1.00 Total adjustments (3-8): 6.50 Final ratio: 9.50 : 1.00 Proposed impact (total): 4.2 acres 11200 linear feet to Resource type: stream Cowardin or HGM: riverine Hydrology: ephemeral

Baseline ratio from 2.a, b or c: 0.00 : 1.00 Total adjustments (3-8): 0.00 Final ratio: 0.00 : 1.00 Remaining impact: 0.00 acres 0 linear feet to Resource type: stream Cowardin or HGM: riverine Hydrology: ephemeral

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM: Hydrology:

0.00 : 1.00 0.00 0.00 : 1.00 acres #VALUE! linear feet stream riverine ephemeral

Required Mitigation*:

Required Mitigation*:

Required Mitigation:

#VALUE! #VALUE! 0 0 0

acres linear feet

of Resource type: Cowardin or HGM: Hydrology:

39.90 106400.0 stream riverine perennial

Proposed Mitigation**:

39.90

Impact Unmitigated:

0 0.00

acres linear feet % acres

Additional PM comments:

10

0

of Resource type: Cowardin or HGM: Hydrology: Proposed Mitigation**: Impact Unmitigated:

0.00 0.0 0 0 0

acres linear feet

of Resource type: Cowardin or HGM: Hydrology: acres linear feet % acres

Additional PM comments:

Proposed Mitigation**: Impact Unmitigated:

acres linear feet

acres linear feet % acres

Additional PM comments:

Applicant agreed to higher ratio. Final requirement is for preservation of 58.8 acres of high quality vernal pool. Final compensatory mitigation requirements: *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 2: Starting and base ratio determination for preservation (instructions at bottom). Steps (Column A) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria

Results

Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

Steps (Column B) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

Steps (Column C) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

3:1 3 3 3 9

PM Justification Impact: Ephemeral badland streams, either no or upland vegetation only Preservation: Moderately high-functioning perennial wash with riparian vegetation moderate threat restrictive convenant

PM Justification

0

PM Justification

0

Example 13

Attachment 12501.6 - SPD Mitigation Ratio Setting Checklist (See 12501-SPD for Revisions Sheet) 1

Date: 20160607 Impact Site Name: Impact Cowardin or HGM type:

2.b Quantitative impact-mitigation comparison: 2.c Preservation (Table 2, step A)

Corps File No.: Hollybell Creek riverine Column A Mitigation Site Name: Mitigation Type: ORM Resource Type: Cowardin/HGM type: Hydrology: Starting ratio: Ratio adjustment: Baseline ratio: PM justification: Ratio adjustment from BAMI procedure (attached): Baseline ratio:

3

Preservation (Table 2, step E)

Ratio adjustment:

4

Mitigation site location:

Ratio adjustment: 0 PM justification: Same 8-digit HUC watershed

Ratio adjustment: 0 PM justification: Same 8-digit HUC watershed

Ratio adjustment: PM justification: Same 8-digit HUC watershed

0

5

Net loss of aquatic resource surface area:

Ratio adjustment:

Ratio adjustment:

Ratio adjustment:

1

2.a Qualitative impact-mitigation comparison:

Project Manager: stream 1.66 Column B Mitigation Site Name: Skyway Ranch Mitigation Type: preservation ORM Resource Type: stream Cowardin/HGM type: riverine Hydrology: ephemeral 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): : 1.00 : 1.00 Baseline ratio: SPL-2013-NNN ORM Resource Type: Impact area :

11.0

1

Jane Regulator Hydrology: Impact distance: Column C Mitigation Site Name: Skyway Ranch Mitigation Type: preservation ORM Resource Type: upland stream buffer Cowardin/HGM type: uplands Hydrology: n/a 1.0 : 1.0 Starting ratio: Ratio adjustment: 1.00 : 1.00 Baseline ratio: see tab 2 PM justification: Ratio adjustment from BAMI procedure (attached): : 1.00 : 1.00 Baseline ratio: acres

11.0

Ratio adjustment:

1

ephemeral 1,560

linear feet

Skyway (vernal pool) Preservation non-tidal wetland palustrine seasonally flooded 1.0 : 1.0 1.00 : 1.00 see tab 2 or 3 : 1.00 : 1.00 7.0

Ratio adjustment:

PM justification: Preservation results in net loss.

PM justification: Preservation results in net loss.

PM justification: Preservation results in net loss.

0 Ratio adjustment: PM justification: Impact and mitigation sites both ephemeral streams. 0 Ratio adjustment: PM justification: n/a since preservation.

Ratio adjustment: 1.5 PM justification: Impacted ephemeral stream more valuable than preserved upland buffer. Ratio adjustment: 0 PM justification: n/a since preservation.

Ratio adjustment: -3 PM justification: Impacted ephemeral stream much less valuable than preserved vernal pool. Ratio adjustment: 0 PM justification: n/a since preservation.

Ratio adjustment: PM justification: n/a since preservation.

Ratio adjustment: PM justification: n/a since preservation.

6

Type conversion:

7

Risk and uncertainty:

8

Temporal loss:

Ratio adjustment: PM justification: n/a since preservation.

9

Final mitigation ratio(s):

Baseline ratio from 2.a, b or c: 1.00 : 1.00 Total adjustments (3-8): 12.00 Final ratio: 13.00 : 1.00 Proposed impact (total): 1.66 acres 1560 linear feet to Resource type: stream Cowardin or HGM: riverine Hydrology: ephemeral

Baseline ratio from 2.a, b or c: 1.00 : 1.00 Total adjustments (3-8): 13.50 Final ratio: 14.50 : 1.00 Remaining impact: 1.47 acres 1379 linear feet to Resource type: stream Cowardin or HGM: riverine Hydrology: ephemeral

Baseline ratio from 2.a, b or c: Total adjustments (3-8): Final ratio: Remaining impact (acres): Remaining impact (linear feet): to Resource type: Cowardin or HGM: Hydrology:

Required Mitigation*:

Required Mitigation*:

Required Mitigation:

of Resource type: Cowardin or HGM: Hydrology:

21.28 acres 19999.5 linear feet upland stream buffer uplands n/a

of Resource type: Cowardin or HGM: Hydrology:

4.09 acres 3842.6 linear feet non-tidal wetland palustrine seasonally flooded

Proposed Mitigation**:

11.40

Proposed Mitigation**:

4.09

Impact Unmitigated:

46 0.68

Impact Unmitigated:

0 0.00

acres linear feet

of Resource type: Cowardin or HGM: Hydrology:

21.58 20280.0 stream riverine ephemeral

Proposed Mitigation**:

2.50

Impact Unmitigated:

88 1.47

acres linear feet % acres

Additional PM comments:

10 Final compensatory mitigation requirements:

0

Additional PM comments:

0

acres linear feet % acres

0

1.00 : 1.00 5.00 6.00 : 1.00 acres linear feet

0.68 640 stream riverine ephemeral

acres linear feet % acres

Additional PM comments:

Final requirement is for Applicant initially proposed only preservation of ephemeral stream and buffer. Supplemented proposal with additional preservation of vernal pool. Final requirement is for preservation of 2.5 acres of ephemeral stream, 11.4 acres of upland buffer (of ephemeral stream), and 4.09 acres of vernal pool. *At PM's discretion, if applicant's proposed mitigation is less than checklist requirement and additional mitigation type(s) proposed, complete additional columns as needed. **Only enter proposed mitigation into spreadsheet if accepting applicant's lower (than required ratio) proposal.

Current Approved Version: MM/DD/YYYY. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501.6-SPD Regulatory Program ­ Mitigation Ratio Setting Checklist 1 of 11

Table 2: Starting and base ratio determination for preservation (instructions at bottom). Steps (Column A) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Baseline ratio (5:1, 3:1, or 1:1):

Results

Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

Steps (Column B) A. (for step 2.c) B. C. D. E. (for step 3)

Criteria Results Baseline ratio (5:1, 3:1, or 1:1): Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

Steps (Column C) A. (for step 2.c)

Criteria Baseline ratio (5:1, 3:1, or 1:1):

B. C. D. E. (for step 3)

Results

Functions adjustment (5, 3, or 1): Threat adjustment (5, 3, or 1): Degree of protection adjustment (5, 3, or 1): Total adjustment (add steps B-D): Supporting information: Impacted aquatic resource(s): Preserved aquatic resource(s)/site(s): Threat: Protection type:

PM Justification 1:1 Impact: Ephemeral stream, unvegetated Preservation: ephemeral stream, unvegetated, 5 within high quality habitat parcel 3 moderate threat 3 restrictive convenant 11

1:1 5 3 3 11

PM Justification Impact: Ephemeral stream, unvegetated Preservation: upland buffer of ephemeral stream moderate threat restrictive convenant

PM Justification 1:1 Impact: Ephemeral stream, unvegetated Preservation: high quality vernal pool (high aquatic 1 resource functions) 3 moderate threat 3 restrictive convenant 7

12501-SPD REGULATORY PROGRAM STANDARD OPERATING PROCEDURE FOR DETERMINATION OF MITIGATION RATIOS South Pacific Division

Table of Contents 1.0 Purpose 2.0 Applicability 3.0 References 4.0 Related Procedures 5.0 Definitions 6.0 Responsibilities 7.0 Procedures 8.0 Records & Measurements 9.0 Attachments 10.0 Flow Chart ______________________________________________________________________________ 1.0 Purpose. The purpose of this document is to outline the process for determining compensatory mitigation requirements as required for processing of Department of the Army (DA) permits under Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act, and Section 103 of the Marine Protection, Research, and Sanctuaries Act. . 2.0 Applicability. This process applies to the Regulatory Program within South Pacific Division (SPD), including its four subordinate districts, Albuquerque District (SPA), Sacramento District (SPK), Los Angeles District (SPL),and San Francisco District (SPN). Subordinate offices or organizations shall not modify this procedure to form a specific procedure. This procedure is applicable for all "new" (not requests to re-verify or modify previously-issued permits) permit applications received after 20 April 2011. For NWPs re-verification requests where the mitigation ratio checklist was not completed previously, use of the checklist is required in order to ensure minimal impacts (including consideration of compensatory mitigation), to ensure compliance with the 2008 Mitigation Rule (33 CFR Part 332), and to comply with this new QMS procedure designed to ensure compensatory mitigation is sufficient to offset authorized impacts. For individual permits (SIP and LOP), if the original application predates this QMS procedure (effective 20 April 2011), the checklist would not be required for subsequent modification requests (time extension or activity modifications), unless the requested Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501-SPD Regulatory Program - Determining Mitigation Ratios 1 of 8

modification includes a substantial increase in impacts. In addition, in cases where compensatory mitigation has already been constructed or where the applicant can otherwise fully demonstrate substantial resources have been expended or committed in reliance on previous guidance governing compensatory mitigation for DA permits, the checklist would not be required. 3.0 References. Compensatory Mitigation for Losses of Aquatic Resources (33 C.F.R. Part 332). Smith, R. D., D. R., A. Ammann, C. Bartoldus, M. M. Brinson. 1995. An Approach for Assessing Wetland Functions Using Hydrogeomorphic Classification, Reference Wetlands, and Functional Indices., Wetlands Research Program Technical Report WRP-DE-9. U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. Cowardin, L. M., V. Carter, F. C. Golet, E. T. LaRoe. 1979. Classification of wetlands and deepwater habitats of the United States. U. S. Department of the Interior, Fish and Wildlife Service, Washington, D.C. Jamestown, ND: Northern Prairie Wildlife Research Center Home Page. http://www.npwrc.usgs.gov/resource/1998/classwet/classwet.htm (Version 04DEC98). Collins, J.N., E.D. Stein, M. Sutula, R. Clark, A.E. Fetscher, L. Grenier, C. Grosso, and A. Wiskind. 2008. California Rapid Assessment Method (CRAM) for Wetlands. Version 5.0.2. 151 pp. 4.0 Related Procedures. None. 5.0 Definitions. Compensatory mitigation - The restoration (re-establishment or rehabilitation), establishment (creation), enhancement, and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse impacts which remain after all appropriate and practicable avoidance and minimization has been achieved. Condition - The relative ability of an aquatic resource to support and maintain a community of organisms having a species composition, diversity, and functional organization comparable to reference aquatic resources in the region. Enhancement - The manipulation of the physical, chemical, or biological characteristics of an aquatic resource to heighten, intensify, or improve a specific aquatic resource function(s). Enhancement results in the gain of selected aquatic resource function(s), but may also lead to a decline in other aquatic resource function(s). Enhancement does not result in a gain in aquatic resource area.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501-SPD Regulatory Program - Determining Mitigation Ratios 2 of 8

Establishment (creation) - The manipulation of the physical, chemical, or biological characteristics present to develop an aquatic resource that did not previously exist at an upland site. Establishment results in a gain in aquatic resource area and functions. Functions - The physical, chemical, and biological processes that occur in ecosystems. Impact - Adverse effect. In-kind - A resource of a similar structural and functional type to the impacted resource. In-lieu fee program - A program involving the restoration, establishment, enhancement, and/or preservation of aquatic resources through funds paid to a governmental or non-profit natural resources management entity to satisfy compensatory mitigation requirements for DA permits. Similar to a mitigation bank, an in-lieu fee program sells compensatory mitigation credits to permittees whose obligation to provide compensatory mitigation is then transferred to the in-lieu program sponsor. However, the rules governing the operation and use of in-lieu fee programs are somewhat different from the rules governing operation and use of mitigation banks. The operation and use of an in-lieu fee program are governed by an in-lieu fee program instrument. Mitigation bank - A site, or suite of sites, where resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by DA permits. In general, a mitigation bank sells compensatory mitigation credits to permittees whose obligation to provide compensatory mitigation is then transferred to the mitigation bank sponsor. The operation and use of a mitigation bank are governed by a mitigation banking instrument. Out-of-kind - A resource of a different structural and functional type from the impacted resource. Permittee-responsible mitigation - An aquatic resource restoration, establishment, enhancement, and/or preservation activity undertaken by the permittee (or an authorized agent or contractor) to provide compensatory mitigation for which the permittee retains full responsibility. Preservation - The removal of a threat to, or preventing the decline of, aquatic resources by an action in or near those aquatic resources. This term includes activities commonly associated with the protection and maintenance of aquatic resources through the implementation of appropriate legal and physical mechanisms. Preservation does not result in a gain of aquatic resource area or functions. Re-establishment - The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/historic functions to a former aquatic resource. Reestablishment results in rebuilding a former aquatic resource and results in a gain in aquatic resource area and functions.

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501-SPD Regulatory Program - Determining Mitigation Ratios 3 of 8

Rehabilitation- The manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural/historic functions to a degraded aquatic resource. Rehabilitation results in a gain in aquatic resource function, but does not result in a gain in aquatic resource area. Restoration - The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/historic functions to a former or degraded aquatic resource. For the purpose of tracking net gains in aquatic resource area, restoration is divided into two categories: reestablishment and rehabilitation. Temporal loss - The time lag between the loss of aquatic resource functions caused by the permitted impacts and the replacement of aquatic resource functions at the compensatory mitigation site. Higher compensation ratios may be required to compensate for temporal loss. When the compensatory mitigation project is initiated prior to, or concurrent with, the permitted impacts, the district engineer may determine that compensation for temporal loss is not necessary, unless the resource has a long development time. Watershed - A land area that drains to a common waterway, such as a stream, lake, estuary, wetland, or ultimately the ocean. 6.0 Responsibilities. Regulatory Project Managers (PMs): For any actions where the PM determines compensatory mitigation is necessary to offset unavoidable impacts to aquatic resources, he/she must follow the procedures provided herein to determine the amount of compensatory mitigation to replace lost aquatic resource functions, to the extent practicable. PMs must also complete the mitigation ratio checklist and include it in the administrative record. 7.0 Procedures. Historically, the South Pacific Division (SPD) Regulatory Program has lacked a standardized process or guidance for determining compensatory mitigation ratios as required for processing of Department of the Army (DA) permits under Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act, and Section 103 of the Marine Protection, Research, and Sanctuaries Act. In addition, the 2008 mitigation rule (33 C.F.R. Part 332) does not provide a detailed process for determining compensatory mitigation ratios. However, it does provide some general guidelines and requires that the rationale for the required replacement ratio must be documented in the administrative record for the permit action. To address this long-standing need, a multidistrict Project Delivery Team (PDT) was formed to develop a regional process for determining and documenting compensatory mitigation ratios, as well as accompanying guidance for Regulatory project managers. The purpose of this new, regional process is to reduce inconsistency between project managers, offices, and districts in determining compensatory mitigation requirements, to incorporate current scientific understanding of mitigation concepts, and to require documentation of these key decisions, thereby reducing uncertainty on behalf of the regulated community regarding compensatory mitigation requirements. In addition, this new process incorporates recommendations of various outside reports/studies calling for greater Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501-SPD Regulatory Program - Determining Mitigation Ratios 4 of 8

consistency and documentation in how mitigation ratios are determined. 7.1 A PM receives a complete permit application, including a statement describing how impacts to waters of the United States are to be compensated for (hereinafter referred to as a "compensatory mitigation proposal") or a statement explaining why compensatory mitigation should not be required for the proposed impacts. At the applicant's discretion, he/she may provide a conceptual mitigation plan as part of the permit application. 7.2 Upon evaluation of the permit application, a PM may determine compensatory mitigation is necessary to offset unavoidable impacts to aquatic resources, and shall review the compensatory mitigation proposal or plan, if provided (or request a proposal or plan for review, if none was provided). If the compensatory mitigation proposal or plan does not contain sufficient information to complete the checklist, or the proposed mitigation is not appropriate, the PM will request a revised compensatory mitigation proposal or plan (such plan being conceptual, detailed or draft, as appropriate, for general permits (GP), and draft for standard individual permits). 7.3 The PM will complete the mitigation ratio checklist using the applicant's compensatory mitigation proposal or plan. · A separate checklist shall be used for each impact site/type. · Each mitigation site/type shall be entered into separate columns on the checklist. · Additional mitigation shall be assessed if the compensatory mitigation proposal or plan does not sufficiently account for project impacts. · PMs must enter a separate justification for each adjustment within the checklist. 7.3.1 For each impact site/type with one mitigation site/type, complete column "A." 7.3.2 For each impact site/type with multiple mitigation sites/types, complete columns for each mitigation site/type (columns A-B or A-C, for two or three mitigation site/types, respectively). · The PM will complete the checklist for the first proposed mitigation site/type, using column "A", to determine the required compensatory mitigation ratio. · The PM will then use column "B" to compare any remaining, unmitigated impact with a second mitigation site/type: If a second site/type has been proposed by the applicant, or; If the required ratio from column A is greater than that proposed by the applicant · The PM will then use column "C" to compare remaining, unmitigated impact with a third mitigation site/type: Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501-SPD Regulatory Program - Determining Mitigation Ratios 5 of 8

If a third mitigation site/type has been proposed by the applicant, or; If the required ratio from column B is greater than that proposed by the applicant 7.3.3 If any impact remains unmitigated or more than three mitigation site/types have been proposed, complete additional checklists. 7.4 The PM will notify the applicant of the mitigation ratio determination. If the ratio(s) is (are) different than those proposed by the applicant, the applicant may either (a) agree to the Corps' mitigation ratio and submit a revised, draft mitigation plan that addresses the entire amount of compensatory mitigation for the Corps' review and approval; or (b) submit an alternative compensatory mitigation proposal/plan for evaluation by the PM. In the event the applicant elects option "b," the PM will prepare a new checklist. 7.5 Once a final mitigation ratio has been determined, the PM will then review and comment on the adequacy of the mitigation plan in accordance with 33 C.F.R. 332.4(c) and any subsequent mitigation and monitoring guidelines. 7.6 The final ratio must be included in the final mitigation plan, the decision document, and by special condition in the permit/final verification letter. 7.6.1 Some states within SPD's AOR contain over appropriated basins, which make it very difficult to obtain an adequate water right to secure site hydrology. In some SPD states the authority responsible for managing water rights may impose a 1:1 area-based limit on compensatory mitigation projects. In these situations the PM is still required to determine a compensation ratio using the mitigation checklist. If adequate water rights are not available to support an establishment or re-establishment ratio greater than a 1:1, the PM will consider options such as non-consumptive enhancement/rehabilitation projects, preservation, buffer establishment/restoration and protection, and restoration of floodplain connectivity, to obtain appropriate and practicable compensatory mitigation. Note: The process outlined herein can also be used for determining compensatory mitigation requirements for unauthorized activities for which the Corps is the lead enforcement agency..

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501-SPD Regulatory Program - Determining Mitigation Ratios 6 of 8

8.0 Records and Measurements. 8.1 All documents listed above will be filed in the corresponding project files in accordance with ES-QMS140, Records Management.

Type R

Description Mitigation Ratio Checklists

Responsible Office Regulatory Divisions within SPD Districts/Field Offices

Location Project file folders in filing cabinets Regulatory Divisions within SPD Districts; Electronic Checklists in ORM Database

Record Media P/E

Retention 7 years

Disposition Send to records holding

8.2 A Mitigation Ratio Checklist shall be completed for each permit application and included in the administrative record. 8.3 The SPD Regulatory Program Manager and District Regulatory Division management shall periodically inspect project files to ensure compliance with this guidance. 9.0 Attachments. 9.1 12501.1-SPD Mitigation Ratio Checklist 9.2 12501.2- SPD Instructions for Preparing Mitigation Ratio Setting Checklist 9.3 12501.3-SPD Mitigation Ratio Checklist Examples 9.4 12501.4-SPD Before/After-Mitigation-Impact Spreadsheet ­ Step 3 BAMI 9.5 12501.5-SPD Mitigation Ratio Training Presentation 9.6 12501.6-SPD Mitigation Ratio Checklist in Excel format

Current Approved Version: 01/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. SPD QMS 12501-SPD Regulatory Program - Determining Mitigation Ratios 7 of 8

10.0 Flow Chart.

7.1: Application includes statement that no mitigation is necessary

Start

no 7.2: Is mitigation necessar

7.2: PM requests new or revised proposal/plan.

ye

no

7.2: Is proposal/pla n appropriate and does it

7.2: PM reviews compensatory mitigation

7.1: PM receives permit

yes

7.1: Application includes compensatory mitigation proposal/plan 7.3: PM completes mitigation ratio checklist(s).

7.4: Required ratio(s) different

yes 7.4: Applicant decides to accept PMdetermined ratio?

7.5: PM reviews all no other aspects of mitigation plan.

yes 7.4: PM

requests revised mitigation

7.6: For SIP: PM approves final mitigation plan.

7.6: PM makes permit decision. Ratio(s) included in permit/FVL

7.6: For GP: PM approves final mitigation plan.

End

7.4: Applicant submits alternative

no

SPD QMS

Current Approved Version: 1/11/2017. Printed copies are for "Information Only." The controlled version resides on the SPD QMS SharePoint Portal. 12501-SPD Regulatory Program - Determining Mitigation Ratios 8 of 8

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas