You can copy from here when filling out the rest of the page.
EIP III Credit Co. (EIP) has submitted a Mitigation Plan to the Huntington District Corps and the other members of the WV IRT to develop and operate a stream mitigation bank to be known as the Crow Run Mitigation Bank.
PUBLIC NOTICE: The District Engineer has received a mitigation plan to establish a wetland and/or stream compensatory mitigation bank for Federal and State permits as described in this Public Notice. Issuance of a public notice regarding proposed mitigation banks is required pursuant to the “Compensatory Mitigation for Losses of Aquatic Resources; Final Rule,” (Rule) as published in the April 10, 2008, Federal Register, Vol. 73, No. 70, Pages 19594-19705 (33 CFR Parts 332). The purpose of this Public Notice is to inform you of the proposed mitigation bank and to solicit your comments and information to better enable us to make a reasonable decision on factors affecting the public interest. We hope you will participate in this process.
INTERAGENCY REVIEW TEAM: As indicated in the U.S. Army Corps of Engineers (Corps) regulations [33 CFR 332.8(b)], the District Engineer has established an Interagency Review Team (IRT) to review documentation for the establishment and management of mitigation banks and in-lieu fee programs. The primary role of the IRT is to facilitate the establishment of mitigation banks and/or in-lieu fee programs through the development of mitigation banking or in-lieu fee program instruments. The Corps Huntington District (Regulatory Division) is the lead district for the state of West Virginia (WV) and chairs (or leads) the WV IRT. The WV IRT consists of the following federal and state resource agencies: Corps Huntington and Pittsburgh Districts, U.S. Environmental Protection Agency (USEPA), U.S. Fish and Wildlife Service (USFWS), U.S. Department of Agriculture’s Natural Resource Conservation Service (NRCS), WV Department of Environmental Protection (WVDEP) and WV Division of Natural Resources (WVDNR).
TO WHOM IT MAY CONCERN: The Corps is soliciting comments from the public, Federal, state, and local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate this proposed mitigation bank.
BANK SPONSOR: EIP III Credit Co.
2002 Clipper Park Road, Suite 201
Baltimore, Maryland 21211
LOCATION: The proposed mitigation bank site is located on an approximately 243-acre parcel along Crow Run and unnamed tributaries of Crow Run, south of Reader, Wetzel County, West Virginia. The mitigation bank site includes Crow Run and unnamed tributaries to Crow Run, adjacent floodplains and upland corridors. Crow Run is a tributary to Fishing Creek. Fishing Creek is a direct tributary to the Ohio River.
DESCRIPTION OF THE PROPOSED WORK: The Sponsor, EIP III Credit Co. (EIP), received approval for their Umbrella Mitigation Banking Instrument (UMBI) on July 15, 2015 (LRH-2013-01017-GUY). Under the UMBI, the Corps also approved three mitigation banks: Copperas (LRH-2013-01071-GUY); Lower Dempsey (LRH-2013-00374-GUY); and Marytown (LRH-2013-01072-TUG). As defined in 33 CFR 332.8, an umbrella mitigation banking instrument is a single mitigation banking instrument which provides for future authorization of additional mitigation bank sites. As additional sites are selected, they must be included in the mitigation banking instrument as modifications. Therefore, the current proposal is considered a modification to the EIP’s UMBI.
EIP has submitted a Mitigation Plan to the Huntington District Corps and the other members of the WV IRT to develop and operate a stream mitigation bank to be known as the Crow Run Mitigation Bank. The purpose of the mitigation bank is to provide off-site compensatory mitigation for projects that result in unavoidable impacts (including the discharges of fill material) to streams within the specified service area. The proposed bank will involve the enhancement, restoration and preservation of streams and their associated riparian buffers.
Mitigation banks are defined as a site, or suite of sites, where resources (e.g. wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced, or preserved streams (or wetlands) are expressed as “credits” which may be subsequently withdrawn to offset “debits” incurred at a project development site. The Corps is responsible for authorizing the use of a particular mitigation bank on a project-specific basis and determining the number and availability of credits required to compensate for proposed impacts. Decisions rendered by the Corps will fully consider all comments submitted as part of the permit evaluation process. In areas where a functional or condition assessment or other suitable metric is not available, a minimum one-to-one acreage (for wetlands) or linear foot (for streams) compensation ratio must be applied in order to achieve a federally mandated “no net loss of aquatic resources.” Wetland credits would correlate with wetland acreage and classification (i.e. emergent, scrub-shrub and forested). Stream credits would correlate with linear feet (lf) or acceptable forms of assessments and classification of streams. Acceptable forms of assessments would include those based upon best available science that can be measured or assessed in a practicable manner.
The Crow Run Mitigation Bank would implement restoration measures and conserve the aquatic environment and upland buffer areas in an effort to provide ecological benefits, including improvements to water quality, fish and wildlife habitat, erosion control, and flood conveyance and storage within the watershed. The primary Geographic Service Area (GSA) would be the Middle Ohio North Watershed as defined by the 8-digit Hydrologic Unit Code (HUC) No. 05030201. The sponsor has also proposed three (3) secondary GSA’s: Upper Ohio South Watershed (HUC 05030106); Monongahela Watershed (HUC 05020003); West Fork Watershed (HUC 05020002); Little Kanawha Watershed (HUC 05030203); and the Middle Ohio South Watershed (HUC 05020005).
The goal of the Bank is to restore and preserve self-sustaining, functional stream corridors to replace the functions and values lost due to unavoidable adverse impacts to streams from past land use (i.e., agricultural), gas infrastructure, and unimproved roads. The Bank is anticipated to include the channel of Crow Run, unnamed tributaries to Crow Run, and riparian buffers. Some of the targeted functions include improvements to wildlife habitat, water quality, flood conveyance and storage, and erosion control through the implementation of natural channel design and the reestablishment of riparian buffers. The Bank Sponsor proposes to meet the Bank’s goals through the restoration and preservation of contributing perennial, intermittent and ephemeral streams as summarized below:
Restoration: Restoration is proposed for 5,591 linear feet (lf) of stream channel. Restoration modifications may include, but are not limited to, natural channel design, channel cross section and pattern alterations, bank stabilization and bioengineering techniques, grade control and in-stream structures, reconnection of contributing streams to the main channel, establishment of forested riparian buffers, and removal of detrimental land use activities (i.e. timbering) in appropriate riparian corridors. The restoration of dimension, pattern and profile of these reaches is proposed to improve the overall channel condition, stabilize channel banks, and re-establish hydraulic connectivity to flood prone areas.
Enhancement: The Bank Sponsor proposes to enhance approximately 11,100 lf of stream channel. Enhancement activities may include, but are not limited to, natural channel design techniques, bank stabilization and bioengineering techniques, grade control and in-stream structures, and establishment of forested riparian buffers.
Establishment: The Bank Sponsor proposes to establish approximately 2,773 lf of stream in areas impacted by past/current land use activities. Establishment activities may include, but are not limited to, natural channel design techniques, channel cross section and pattern establishment, bank stabilization and bioengineering techniques, grade control and in-stream structures, connection of contributing streams to the main channel, and establishment of forested riparian buffers.
Preservation: The Bank Sponsor proposes to preserve approximately 10,668 lf of stream and 0.070 acre of wetland, along with riparian buffers.
Figure 1 of 4 shows the location of the proposed mitigation bank, Figure 2 of 4 shows the proposed service area for the proposed mitigation bank, Figure 3 of 4 shows the Crow Run watershed layout of the proposed mitigation bank, and Figure 4 of 4 shows the proposed resource development of proposed mitigation bank.
In accordance with the Rule, performance standards and success criteria, established by the application of conditional assessments and/or suitable metrics, would be outlined and implemented as requirements. The full Mitigation Plan is available for review upon request.
WATER QUALITY CERTIFICATION: In accordance with Nationwide Permit No. 27 [under the February 21, 2012 Federal Register, Reissuance of Nationwide Permits (77 FR 10184)], a general Section 401 Water Quality Certification with special conditions applies. Prior written approval is required from the WVDEP Division of Water and Waste Management in concurrence with the WVDNR.
HISTORIC AND CULTURAL RESOURCES: This project must be reviewed to determine any potential effects to properties that may be eligible for or listed in the National Register of Historic Places (NRHP), in accordance with Section 106 of the National Historic Preservation Act. The National Register of Historic Places (NRHP) has been consulted and it has been determined there are no historic properties currently listed on the National Register within the area to be affected by the project. The Bank Sponsor provided a letter (FR# 16-400-WZ) from the WV Division of Culture and History (WVDCH) requesting a Phase 1 survey be conducted. The Bank Sponsor indicated a Phase I report has been submitted to the WVDCH (regarding the presence of archaeological or architectural resources that may be listed or eligible for listing in the NRHP within the site).
The Corps is soliciting comments from the public, Federal, state, and local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the potential effects on historic properties. If you wish to provide comments or objections regarding the effect of the proposed project on historic properties, please provide this information to our office prior to the close of the comment period.
THREATENED & ENDANGERED SPECIES: This Public Notice will serve as coordination with the USFWS concerning threatened or endangered species, pursuant to Section 7 of the Endangered Species Act of 1972 (as amended). Three (3) federally listed endangered species, the Indiana bat (Myotis sodalis), snuffbox mussel (Epioblasma triquetra), and eastern cougar (Felis concolor cougar), and one (1) federally threatened species, the northern long-eared bat (Myotis septentrionalis) may occur within the proposed project area.
The project would involve stream restoration and preservation work performed within forested areas as well as the restoration and protection of stream-side riparian corridors. No known Indiana bat or northern long-eared bat hibernacula exists within the work areas. The project would involve the removal of approximately 11 acres of timber; however, approximately 24 acres, including areas that are non-forested, would be replanted with native tree species. The proposed activities would be expected to result in stream and riparian corridor improvements. Based on the nature of the project, this office has determined the proposed project may affect (in a positive aspect), but would not likely adversely affect either the Indiana bat or the northern long-eared bat.
The project would be located approximately 0.5 miles upstream from Fishing Creek, which is known to contain federally endangered mussels. The Bank Sponsor would implement best management practices to ensure stormwater management activities would prevent the downstream export of sedimentation due to temporary in-stream construction activities. Therefore, the proposed project may affect, but would not likely adversely affect the snuffbox mussel.
No critical habitat for the eastern cougar has been identified within the state of WV. Any stream restoration activities would not be expected to disrupt or alter the habitat or mobility of the eastern cougar. Therefore, this office has determined the proposed project would have no effect on the eastern cougar.
This Public Notice serves as a request to the USFWS for any additional information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended).
PUBLIC INTEREST REVIEW AND COMMENT: Any person who has an interest that may be adversely affected by the approval of this mitigation bank may request a public hearing. The request must be submitted in writing to the District Engineer on or before the expiration date of this notice and must clearly set forth the interest which may be adversely affected and the manner in which the interest may be adversely affected by the activity. This application will be reviewed in accordance with 33 CFR 320-332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Interested parties are invited to state any objections they may have to the proposed work. The decision whether to approve this mitigation bank will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; of those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. Any person may submit cumulative impact information, which is substantive and specifically associated with the proposed action. In addition, the evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, USEPA, under the authority of Section 404(b) of the Clean Water Act. Written statements on these factors received in this office on or before the expiration date of this public notice will become a part of the record and will be considered in the final determination.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, Federal, state, and local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate this proposed mitigation bank. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any comments received will be considered by the Corps to determine whether to approve, modify, condition or deny this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one of this Public Notice. If no comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to:
U.S. Army Corps of Engineers
ATTN: CELRH-RD-E Public Notice No. LRH-2017-00049-OHR
502 Eighth Street
Huntington, West Virginia 25701-2070.
Please note the comments received in response to this Public Notice become part of our administrative record and, as such, are available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our Nation's water resources. If you have any questions concerning this Public Notice, please contact Mr. Justin Elkins at the above address, by telephone at (304) 399-5271, or by email at justin.m.elkins@usace.army.mil.