SPECIAL PUBLIC NOTICE: FEDERAL REGISTER NOTICE ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS
SPECIAL PUBLIC NOTICE: FEDERAL REGISTER NOTICEANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS
Public Notice
ISSUED: January 24, 2017
SUBJECT:
FINAL 2017 Nationwide
Permit Issuance
SECTIONS: 404 Clean Water Act
& 10 Rivers and Harbors Act
PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE
ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS
On January 6, 2017, the U.S. Army Corps of Engineers (Corps) published the notice in the Federal
Register announcing the reissuance of all 50 existing nationwide permits (NWPs), general conditions, and
definitions with some modifications. The Corps also issued two new NWPs, one new general condition,
and five new definitions. The 2017 NWPs will go into effect on March 19, 2017, and will expire on
March 18, 2022. Enclosed is an index of the final NWPs, general conditions, and definitions. The January
6, 2017, Federal Register notice is available for viewing through the Corps Headquarters Regulatory
Home Page at www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/NationwidePer
mits.aspx. As an alternative, interested parties can access the January 6, 2017, final rule published in the
Federal Register through the U.S. Government Printing Office at
www.gpo.gov/fdsys/browse/collection.action?collectionCode=FR .
With the publication of the January 6, 2017, Federal Register notice, the St. Paul District has begun
finalizing regional conditions for the new and reissued NWPs. Corps Division Engineers are authorized to
add regional conditions to take into account regional differences in aquatic resource functions and
services across the country and to restrict or prohibit the use of NWPs to protect those resources. Regional
conditions will provide additional protection for the aquatic environment, and will help ensure that the
NWPs authorize only those activities with no more than minimal adverse environmental effects. Regional
conditions will help ensure protection of waters in Wisconsin and Minnesota.
From the date of this public notice begins a 90-day period for the States of Minnesota and Wisconsin,
Grand Portage Chippewa, Fond du Lac Band of Lake Superior Chippewa, Bad River Band of Lake
Superior Chippewa, Lac du Flambeau Band of Lake Superior Chippewa, Sokaogon Chippewa
Community, and the Environmental Protection Agency (EPA) to complete their water quality certification
(WQC) processes for the NWPs. This 90-day period for WQC will end on April 24, 2017. If states,
Tribes, or the EPA, as applicable, do not complete their WQC processes before the 2017 NWPs go into
effect on March 19, 2017, the use of a new or reissued NWP to authorize a discharge into waters of the
United States, including NWP use for activities that do not require a preconstruction notification (PCN) to
the Corps, is contingent upon obtaining individual WQC or a case-specific WQC waiver. However, the
St. Paul District will to continue to rely on the current suite of regional general permits already in place
for Wisconsin, Minnesota and federally-recognized American Indian tribes until the 90-day WQC review
period has concluded.
Page 1 of 4
From the date of this public notice also begins the 90-day period for the states of Minnesota and
Wisconsin to complete their Coastal Zone Management Act (CZMA) consistency determination
processes. The 90-day period for CZMA consistency determinations will end on April 24, 2017. If coastal
states do not complete their CZMA consistency determination processes before the 2017 NWPs go into
effect on March 19, 2017, the use of a new or reissued NWP to authorize a regulated activity within, or
outside, a state's coastal zone that will affect land or water uses or natural resources of that state's coastal
zone, including NWP use for activities that do not require a PCN to the Corps, is contingent upon
obtaining an individual CZMA consistency determination, or a case-specific presumption of CZMA
concurrence. As previously indicated, the St. Paul District will to continue to rely on the current suite of
regional general permits already in place for Wisconsin, Minnesota and federally-recognized American
Indian tribes until the 90-day CZMA consistency determination period has concluded.
The Corps has also issued final decision documents for the new and reissued NWPs. These documents are
available at https://www.regulations.gov at docket number COE-2015-0017. Furthermore, the national
NWP decision documents will be supplemented by Division Engineers to address decisions concerning
the addition of regional conditions to the NWPs. After Division Engineers approve the Regional
Conditions for Minnesota and Wisconsin, the St. Paul District will issue a public notice to announce the
final Regional Conditions for the two states, including any finalized WQC/CZMA regional conditions.
Please be advised, activities authorized by the 2012 NWPs remain authorized by those NWPs until March
18, 2017. An activity completed under the authorization provided by a 2012 NWP continues to be
authorized by that NWP (see 33 CFR part 330.6(b)). Activities authorized by the 2012 NWPs that have
commenced or are under contract to commence by March 18, 2017, will have one year (i.e., until March
18, 2018) to complete those activities under the terms and conditions of the 2012 NWPs (see 33 CFR
section 330.6(b)). Activities previously authorized by the 2012 NWPs that have not commenced or are
not under contract to commence by March 18, 2017, will require reauthorization under the 2017 NWPs,
provided those activities qualify for authorization under the 2017 NWPs. If those activities no longer
qualify for NWP authorization because they do not meet the terms and conditions of the 2017 NWPs
(including any regional conditions), the project proponent will need to obtain an individual permit, or
seek authorization under a regional general permit, if such a general permit is available in the applicable
Corps district and can be used to authorize the proposed activity.
Page 2 of 4
Index of Nationwide Permits, Conditions, District Engineer's Decision, Further Information, and Definitions
Nationwide Permits
1. Aids to Navigation
2. Structures in Artificial Canals
3. Maintenance
4. Fish and Wildlife Harvesting, Enhancement, and
Attraction Devices and Activities
5. Scientific Measurement Devices
6. Survey Activities
7. Outfall Structures and Associated Intake Structures
8. Oil and Gas Structures on the Outer Continental
Shelf
9. Structures in Fleeting and Anchorage Areas
10. Mooring Buoys
11. Temporary Recreational Structures
12. Utility Line Activities
13. Bank Stabilization
14. Linear Transportation Projects
15. U.S. Coast Guard Approved Bridges
16. Return Water From Upland Contained Disposal
Areas
17. Hydropower Projects
18. Minor Discharges
19. Minor Dredging
20. Response Operations for Oil or Hazardous
Substances
21. Surface Coal Mining Activities
22. Removal of Vessels
23. Approved Categorical Exclusions
24. Indian Tribe or State Administered Section 404
Programs
25. Structural Discharges
26. [Reserved]
27. Aquatic Habitat Restoration, Establishment, and
Enhancement Activities
28. Modifications of Existing Marinas
29. Residential Developments
30. Moist Soil Management for Wildlife
31. Maintenance of Existing Flood Control Facilities
32. Completed Enforcement Actions
33. Temporary Construction, Access, and Dewatering
34. Cranberry Production Activities
35. Maintenance Dredging of Existing Basins
36. Boat Ramps
37. Emergency Watershed Protection and
Rehabilitation
38. Cleanup of Hazardous and Toxic Waste
39. Commercial and Institutional Developments
40. Agricultural Activities
41. Reshaping Existing Drainage Ditches
42. Recreational Facilities
43. Stormwater Management Facilities
44. Mining Activities
45. Repair of Uplands Damaged by Discrete Events
46. Discharges in Ditches
47. [Reserved]
48. Commercial Shellfish Aquaculture Activities
49. Coal Remining Activities
50. Underground Coal Mining Activities
51. Land-Based Renewable Energy Generation
Facilities
52. Water-Based Renewable Energy Generation Pilot
Projects
53. Removal of Low-Head Dams
54. Living Shorelines
Page 3 of 4
18. Endangered Species
19. Migratory Bird and Bald and Golden Eagle
Permits
20. Historic Properties
21. Discovery of Previously Unknown Remains and
Artifacts
22. Designated Critical Resource Waters
23. Mitigation
24. Safety of Impoundment Structures
25. Water Quality
26. Coastal Zone Management
27. Regional and Case-by-Case Conditions
28. Use of Multiple Nationwide Permits
29. Transfer of Nationwide Permit Verifications
30. Compliance Certification
31. Activities Affecting Structures or Works Built by
the United States
32. Pre-Construction Notification
General Conditions
1. Navigation
2. Aquatic Life Movements
3. Spawning Areas
4. Migratory Bird Breeding Areas
5. Shellfish Beds
6. Suitable Material
7. Water Supply Intakes
8. Adverse Effects from Impoundments
9. Management of Water Flows
10. Fills Within 100-Year Floodplains
11. Equipment
12. Soil Erosion and Sediment Controls
13. Removal of Temporary Fills
14. Proper Maintenance
15. Single and Complete Project
16. Wild and Scenic Rivers
17. Tribal Rights
District Engineer's Decision
Further Information
Definitions
Best management practices (BMPs)
Compensatory mitigation
Currently serviceable
Direct effects
Discharge
Ecological reference
Enhancement
Ephemeral stream
Establishment (creation)
High Tide Line
Historic property
Independent utility
Indirect effects
Intermittent stream
Loss of waters of the United States
Navigable waters
Non-tidal wetland
Open water
Ordinary high water mark
Perennial stream
Practicable
Pre-construction notification
Preservation
Protected tribal resources
Re-establishment
Rehabilitation
Restoration
Riffle and pool complex
Riparian areas
Shellfish seeding
Single and complete linear project
Single and complete non-linear project
Stormwater management
Stormwater management facilities
Stream bed
Stream channelization
Structure
Tidal wetland
Tribal lands
Tribal rights
Vegetated shallows
Waterbody