Home

Jacksonville District

Run scraper

Florida DEP Water Management

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

All Florida Counties. You are invited to a webinar on the Federal Supplement to Florida Joint Application form at 2 pm, March 1, 2017. Please fill in and include the form when submitting the Joint Application Form 62-330.060(1) (JA) to the Florida Department of Environmental Protection, Water Management District or delegated local program (DEP/WMD). Absence of the Supplement may cause us to pause review of your application to ask for this information.

Please fill in and include the enclosed Supplemental Information for Federal Permitting (Supplement) when submitting the Joint Application Form 62-330.060(1) (JA) to the Florida Department of Environmental Protection, Water Management District or delegated local program (DEP/WMD). The Supplement provides federal-only information fields not found in the JA. Absence of the Supplement may cause us to pause review of your application to ask for this information. Please keep the Supplement separate from the rest of the JA (electronically or hardcopy) so the DEP/WMD can easily forward to us the Supplement along with the applicable portions of the JA.

You are invited to a webinar on this topic at 2 pm, March 1, 2017 (flyer enclosed).

The Supplement is designed to provide, in combination with certain fields in the JA, the information required at 33 CFR 325.1(d) Content of application. Absence of this information may delay our issuing the Public Notice and/or coordination letters that are among our initial review steps toward determining whether to issue a Standard Permit (SP) or Letter of Permission (LOP). If you are seeking verification under a specific Nationwide Permit (NWP) or Regional General Permit (RGP), note that the terms and conditions of that NWP/RGP may require information not found on the Supplement and some fields may not be applicable.

If you transmit directly to the Corps your request for a Department of Army authorization, you must use the APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT ENG Form 4345 if seeking an SP or LOP. For a NWP or RGP, we strongly encourage you use the ENG Form 4345 (because the standardized format speeds our initial processing steps) but note the specific NWP/RGP may require information not found on ENG Form 4345 and some fields may not be applicable. Enclosed are our mailing and electronic addresses.

If you fill in and include the ENG form 4345 when submitting either the Request for Verification of an Exemption, Form 62-330.050(1), or Notice of Intent to Use an Environmental Resource General Permit, Form 62-330.402(1), then the DEP/WMD will forward to us. That information will speed our initial review processes.

We welcome any questions or comments on the above. Please send them Jacksonville District, Regulatory Division, PO Box 4970, Jacksonville, Florida 32232, Attn: Bob Barron; by phone number at 904-232-2203, or by email at robert.b.barron@usace.army.mil.

SUPPLEMENTAL INFORMATION FOR FEDERAL PERMITTING PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. Federal authorization for activities in, on, under, or over wetlands or other surface waters is often required in addition to State of Florida authorization. Information on the federal program in Florida is available at the US Army Corps of Engineers (Corps), Jacksonville District, Regulatory Division home page (http://www.saj.usace.army.mil/Missions/Regulatory.aspx). The following information is necessary to facilitate the federal review of work affecting waters of the United States, including wetlands, and should be submitted in conjunction with Section A of the Joint Application for Individual and Conceptual Environmental Resource Permit/Authorization to Use State-Owned Submerged Lands/Federal Dredge and Fill Permit. 1.

In addition to the information provided in Section A of the application, for all projects: a. Identify the project purpose. (Describe the purpose and need for the proposed project. Why are you proposing the work? How will you use the proposed structure(s); and/or, how will the proposed fill area(s) be used?) Include a description of any related activities that may be developed as a result of the proposed project. Provide the approximate dates you plan to both begin and complete all work:

b. List all other certificates or approvals/denials received or pending from federal, state, or local agencies for work affecting wetlands and/or other surface waters encompassed by the overall project site: (You need not have obtained all other permits before applying for a Corps permit.) Agency

Action Type

Supplemental Information for Federal Permitting

ID Number

Date Applied

Date Approved/Denied

Page 1 of 5

c. Is any portion of the work already completed: Yes No If YES, describe the completed work (Provide any background information on any part of the proposed project that has already been completed. Describe any area already developed, structures completed, and any dredged or fill material already discharged, including the type of material, volume in cubic yards, acres or square feet filled, and/or any wetland or other waterbody affected. If the work was done under an existing Corps permit, please identity the file number of the authorization if possible. Please note that the receipt of a permit from the Florida Department of Environmental Protection or any Water Management District does not eliminate the requirement for obtaining a Corps permit prior to commencing the proposed work.)

2.

Please be advised, the extent of federal jurisdiction and State of Florida jurisdiction may be different. In addition to the information provided in Section C of the application, for projects proposing the discharge of dredge or fill material in, on, or over wetlands or other surface waters: a. Was the extent of waters of the United States, including wetlands, identified within the proposed project site determined in accordance with the Corps of Engineers Wetland Delineation Manual (1987) and the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0)? YES NO (1)

If YES: Please provide the name and contact information for the person(s) who performed the proposed delineation; and, submit a copy of the data sheets and any other information gathered in support of the proposed delineation.

(2) If NO: Please provide the basis for any delineation submitted; and, be advised that the extent of aquatic resources under federal jurisdiction may need to be determined before any evaluation of work proposed can commence.

Information on the documents referenced above may be reviewed at the U.S. Army Corps of Engineers, Jacksonville District, Regulatory Division Internet site. b. Identify the specific reason/need for the proposed discharge (What will the discharge be used for and why? Include activities that are linked to or reasonably related to the discharge)

Supplemental Information for Federal Permitting

Page 2 of 5

c. Identify the surface area (square feet or acres) of waters of the United States, including wetlands, (as identified by federal regulations) that would be affected by the proposed discharge of fill material; and, differentiate any temporary work area(s) from permanent work area(s). If more space is needed, use additional sheets as necessary. Square feet /

Acres of

temporary

permanent work

Square feet /

Acres of

temporary

permanent work

Square feet /

Acres of

temporary

permanent work

d. Identify the type of material that would be discharged and the amount (cubic feet or cubic yards) of each type of material: (Please be sure this description agrees with your illustrations. Discharge materials could include, but are not limited to, soil, rock, sand, clay, concrete, etc.) Type: Amount:

Type: Cubic ft /

Cubic yds

Amount:

Cubic ft /

Cubic yds

e. Describe measures to avoid, minimize, and compensate any work affecting waters of the United States, including wetlands. Use additional sheets as necessary. (Information regarding compensatory mitigation requirements may be viewed on the Regulatory Division home page, within the Source Book, under the heading Compensatory Mitigation; and, includes a copy of the Final Compensatory Mitigation Rule (April 10, 2008) and Regulatory Guidance Letter 08-03: Minimum Monitoring Requirements for Compensatory Mitigation Projects Involving the Restoration, Establishment, and/or Enhancement of Aquatic Resources):

Supplemental Information for Federal Permitting

Page 3 of 5

For your information: Part 332, § 325.1, and Subpart J "Compensatory Mitigation for Losses of Aquatic Resources" were added to 33 CFR and 40CFR Part 230, respectively, on April 10, 2008 (see Federal Register, Volume 73, No. 70, Pages 19594 through 19705 at: http://water.epa.gov/lawsregs/guidance/wetlands/upload/2008_04_10_wetlands_wetlands_mitigat ion_final_rule_4_10_08.pdf and http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/Mitigation/wetlands_mitigati on_final_rule_4_10_08.pdf). Part 332 and § 230.94(c) describe information that is to be in any compensatory mitigation plan pursuant to Section 404 of the Clean Water Act.t. To avoid potential future conflicts between any issued ERP permit and the corresponding federal permit, it is recommended that applicants submitting a mitigation plan for an ERP permit design the plan to meet the requirements of Part 332 and § 230.94(c). This will also avoid the need to modify the issued ERP permit to comply with any associated compensatory mitigation requirements subsequently imposed by the Corps. It is highly recommended that applicants conduct pre-application meetings with both state and Corps staff to discuss mitigation requirements prior to submitting an application for a permit. f. Provide the complete names and full correct mailing address of the owners (public and private) of properties contiguous to the overall project site where the work is proposed. Use additional sheets as necessary. (This information may be obtained from your County Property Appraiser Office, which is typically accessible on the Internet; this information is needed so that, if required, the contiguous owners may be notified of the proposed activity (for example, through a public notice.) 1. Name: Mailing Address: City, State, Zip Code: 2. Name: Mailing Address: City, State, Zip Code: 3. Name: Mailing Address: City, State, Zip Code: 4. Name: Mailing Address: City, State, Zip Code: 5. Name: Mailing Address: City, State, Zip Code: 6. Name: Mailing Address: City, State, Zip Code: g. Provide a set of project drawings that meet the requirements of the Corps of Engineers Standards for Permit Application Drawings, attached.

Supplemental Information for Federal Permitting

Page 4 of 5

Corps of Engineers Standards for Permit Application Drawings

1. Location Map: a. Show north arrow. b. Project location must be clearly marked. c. Show key landmarks and adjacent local roadways. 2. Plan View: a. Show north arrow. b. Show the dimensions of the applicant's property. c. Show the dimensions of the work; dimensions of pier, length of bulkhead or shoreline stabilization, dimensions of dredge area, dimensions of disposal area, dimensions of fill areas, including bulkhead backfill. d. Clearly show location and extent of all areas potentially meeting the criteria for waters of the U.S., including special aquatic sites (e.g., wetlands, sanctuaries and refuges, mudflats, vegetated shallows, and riffle and pool complexes), and/or navigable waters. Each type of boundary (for example, ordinary high water mark, mean high water, wetlands or other special aquatic sites, and high tide line) must be clearly annotated and/or symbolized to ensure they are differentiable on the map. e. Show the total plan of development for projects involving fill of wetlands. This includes the proposed use of uplands as well as wetlands. f. Show the location and dimensions of existing bulkheads and/or shoreline stabilization on adjacent properties and if applicable, how the proposed work will tie into existing structures. g. Show any existing structures (piers) in waters immediately adjacent to the activity and indicate the distance the proposed work will be from existing structures. h. Show the distance between the proposed activity and the nearest edge of Federal or other navigation channels. If within 100' of a Federal navigation channel, X,Y coordinates of the most waterward point utilizing NAD83 are required. See the Corps website at http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/other_permitting_factors/S etbackGuidance-final_Revised_Dec2013.pdf for more information on structures adjacent to the Atlantic Intracoastal Waterway. i. Show the width of the waterway at the work site. j. Show the location of culverts under road crossings. k. Indicate the relationship of the proposed work site to waters of the U.S., i.e., adjacent wetlands, tidally influenced through culverts, etc. l. Show legend for any relevant items (e.g. wetlands and/or other water types including the area, project construction footprint (e.g., impacts to water of the U.S. fill versus excavation). m. Indicate the location of cross-sectional views. n. Show date prepared and name of preparer. 3. Cross-Sectional View a. Show the high tide line and mean high water elevations or the ordinary high water mark in nontidal areas. b. Show the existing contours and the proposed contours indicating existing and proposed elevations. c. Show the depth at the waterward end of pier. d. Show the dimensions of work. e. Show the disposal area including retention dikes and overflow. f. Show the finished top elevation of the disposal site. g. Show the top width, bottom width, and side slopes of road crossings. Include bottom and invert elevations of culverts and the finished top elevation.

Supplemental Information for Federal Permitting

Page 5 of 5

Addresses for Submission of Permit Applications in Florida to the Regulatory Division, Jacksonville District, U.S. Army Corps of Engineers Holmes

Jackson

Santa Rosa Okaloosa Pensacola

Walton

Nassau

Gadsden Leon Bay

Hamilton

Madison

Liberty

Wakulla

Suwannee Taylor

Gulf

Jacksonville District Web Page http://www.saj.usace.army.mil/Missions/Regulatory/

Franklin

Mailing Address

Telephone:, Facsimile and Email* Address

Pensacola

Pensacola Permits Section 41 North Jefferson Street, Suite 301 Pensacola, FL 32502 5644

Telephone:: (850) 4393474 Facsimile: (850) 4338160 Email: CorpsjaxregNL@usace.army.mil Click on this box to open a new email with your default mail client

Cocoa

Gainesville Putnam

Gilchrist

Office

Panama City Permits Section 1002 West 23rd Street, Suite 350 Panama City, FL 324053648

Telephone:: 8507630717 Facsimile: (850) 8720231s Email: CorpsjaxregNP@usace.army.mil Click on this box to open a new email with your default mail client

Jacksonville Permits Section P.O. Box 4970 Jacksonville, FL 322320019

Telephone:: (904) 2323286 Facsimile: (904) 2321904 Email: corpsjaxreg@usace.army.mil Click on this box to open a new email with your default mail client

Cocoa Permits Section 400 High Point Drive, Suite 600 Cocoa, FL 329266662

Telephone: (321) 5043771 Facsimile: (321) 5043803 Email: northbranchapps@usace.army.mil Click on this box to open a new email with your default mail client

Clay

Bradford

Permit Office locations and their geographic responsibilities shown by the map.

Jacksonville

Duval

Union Lafayette

Dixie

Panama City

Jacksonville Baker

Panama City

Alachua

Flagler

Levy Marion Volusia Citrus

Lake Seminole

Sumter Hernando

Tampa

OSsceola

Polk

Indian River Manatee

Hardee St. Lucie Highlands

Sarasota

DeSoto Martin

Tampa Permits Section 10117 Princess Palm Drive, Suite 120 Tampa, FL 336108302

Telephone:: (813) 7697073 Facsimile: (813) 7697061 Email: Tampareg@usace.army.mil Click on this box to open a new email with your default mail client

Gainesville

Gainesville Regulatory Office 2833 NW 41st St, Unit 130 Gainesville, FL 326066987

Telephone:: (352) 2647672 Facsimile: (352) 2647733 Email: Tampareg@usace.army.mil Click on this box to open a new email with your default mail client

Ft Myers

Fort Myers Permits Section 1520 Royal Palm Square Boulevard Suite 310 Ft Myers, FL 339191036

Telephone: (239) 3341975 Facsimile: (239) 3340797 Email: SF.New.Applications@usace.army.mil Click on this box to open a new email with your default mail client

Palm Beach Gardens

Palm Beach Gardens Permit Section 4400 PGA Boulevard, Suite 500 Palm Beach Gardens, FL 334106557

Telephone:: (561) 4723504 Facsimile: (561) 6266791 Email: Applicationsp@usace.army.mil Click on this box to open a new email with your default mail client

Miami

Miami Permits Section 9900 SW 107th Ave., Suite 203 Miami, FL 331762785

Telephone:: (305) 5267181 Facsimile: (305) 5267184 Email: SEAPPLS@usace.army.mil Click on this box to open a new email with your default mail client

*For some offices, there may be a different email address for use by a particular agency to implement an applicable agreement.

Palm Beach Gardens

Glades

Charlotte

Tampa

Cocoa

Orange

Pasco

Ft. Myers Hendry

Palm Beach

Lee

Collier

Broward

Miami

Miami-Dade

Map version February 8, 2017

Join us for a webinar! Streamlining the Process: Using the Supplemental Information for Federal Permitting Form

March 1, 2017, 2-3 pm The Florida Department of Environmental Protection, Florida's five water management districts, and the US Army Corps of Engineers (Corps) have worked together to create a "Supplemental Information for Federal Permitting" form to be used in conjunction with the ERP joint application. Use of this form when submitting ERP applications will help ensure that the Corps gets the information that they need to process federal permits. Including this information is expected to reduce the amount of additional information the Corps must request to process federal permits. Please join us as we discuss the form, where to find it, and how to submit it using the state agencies' electronic application portals. Register here: https://attendee.gotowebinar.com/register/47130946354593026 The Supplemental Information for Federal Permitting Form may be found at: http://www.dep.state.fl.us/water/wetlands/erp/forms.htm

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas