The applicant proposes to discharge dredged and/or fill material into two separate areas, one within Killbuck Creek and the other along an old railroad bed on an unnamed tributary to Killbuck Creek, in order to repair the dike breaches and to restore a portion of the Big Spring wetland area.
TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army Permit (DA) under the provisions of Section 404 of the Clean Water Act. This notice serves as the United States Army Corps of Engineers’ (Corps) request to the Ohio Environmental Protection Agency (OEPA) to act on the Section 401 Water Quality Certification for the following Application.
APPLICANT: Ohio Department of Natural Resources, Division of Wildlife (ODNR)
2045 Morse Road, Building G
Columbus, Ohio 43229
LOCATION: As depicted on the attached Project Location Map (Sheet 1), the proposed project is located in Killbuck Creek, an unnamed tributary to Killbuck Creek, and an adjacent wetland in the Killbuck Marsh Wildlife Area in Franklin Township, Wayne County, Ohio (40.674756° N, -84.959620° W).
DESCRIPTION OF THE PROPOSED WORK: The applicant proposes to discharge approximately 82 cubic yards of dredged and/or fill material into two separate areas, one within Killbuck Creek and the other along an old railroad bed on an unnamed tributary to Killbuck Creek, in order to repair the dike breaches and to restore a portion of the Big Spring wetland area. The dike breaches occurred in 2007 due to large flooding events and have allowed sediment to accumulate within the Big Spring wetland basin.
The dike breach along Killbuck Creek measures 18’ long x 7’ deep x 12’ wide and would be repaired with locally-sourced clay and armored with rock channel protection, totaling 72 cubic yards. The second dike breach along the abandoned rail road bed and the unnamed tributary to Killbuck Creek measures 13’ long x 1.5’ deep x 12’ wide and would be repaired with locally sourced clay, totaling 10 cubic yards. An Agri-drain water control structure would be installed in the railroad dike breach with the intent to more effectively manage the water level and to limit the spread of invasive species within the wetland.
In order to access the two dike breach areas, 44 cubic yards of dredged and/or fill material, in the form of timber mats and culverts, would be temporarily discharged within approximately 0.01 acre of an unnamed tributary to Killbuck Creek and abutting wetland for an equipment crossing. The construction equipment would be operated from an adjacent abandoned railroad bed. The temporarily discharged fill material would be removed once the project is complete and the affected aquatic resource restored to its approximate pre-disturbance condition.
Additionally, once the dike breaches are repaired, the Big Spring wetland basin would be dredged in order to restore it to pre-2007 conditions. The dredging would encompass three acres of wetland and would result in the removal of three feet or approximately of 14,520 cubic yards of accumulated silt and sediments. Also, 735 linear feet of perennial stream, in the form of a spring fed channel, would be converted to wetland habitat as a result of the dredging activity. The goal of the dredging activity is to convert the current seasonally saturated emergent wetland back to its original permanently inundated submergent aquatic vegetated wetland. The dredged materials would be disposed of in an upland field located approximately 850 feet southwest of the dredged area. Plans for the proposed project are attached to this Public Notice.
ALTERNATIVE ANALYSIS: A total of three acres of wetland would be dredged and 735 linear feet of perennial stream would be converted to marsh wetland as a result of the proposed project. In addition, approximately 0.01 acre of wetland would be permanently filled as part of the dike repairs and approximately 0.01 acre of wetland and stream would temporarily filled for an access and equipment crossing. The project does not require access or proximity to, or siting within, the wetlands to fulfill its basic purpose and is considered a non-water dependent activity. The Section 404(b)(1) Guidelines state that for non-water dependent activities in special aquatic sites, practicable alternatives that do not involve wetlands are presumed to be available, unless clearly demonstrated otherwise. The applicant is required to provide an alternative analysis that must overcome that presumption prior to receiving authorization for the discharge of fill material into the wetlands. The applicant has submitted the required alternatives analysis. A complete copy of the applicant’s alternatives analysis can be reviewed by appointment at the above address. No permit will be issued until our review of the alternatives analysis clearly shows that upland alternatives are not available to achieve the project purpose.
AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the United States, consideration must be given to avoiding impacts on these sites. If waters of the United States cannot be avoided, then impacts must be minimized. Approximately 835 linear feet of perennial stream (Killbuck Creek and an unnamed tributary to Killbuck Creek) and 54 acres of wetland subject to Section 404 Clean Water Act regulation exist within the proposed project area. According to the applicant, alternative plans were considered. Avoidance and minimization efforts were incorporated into the proposal to reduce the footprint of the proposed project to the minimum necessary to repair the dike breaches. These efforts have resulted in the avoidance of the discharge of dredged and/or fill material into the remaining resources on site (51 acres of wetlands (94%) and 100 linear feet of perennial stream (12%)). Best management practices for sediment and erosion controls would be followed for the duration of this project. Construction activities would avoid high water flows and potential fish spawning periods. All disturbed areas would be seeded and mulched.
COMPENSATORY MITIGATION PLAN: To compensate for the losses of waters of the United States associated with the proposed wetland restoration project, 8,725 linear feet of perennial spring fed drainage would be reconnected to the Big Spring wetland. A water control structure would be installed in the railroad dike breach area to help manage water levels within the marsh and to control the spread of invasive species. This wetland restoration project is expected to dramatically improve wildlife habitat available within the Killbuck Creek Marsh ecosystem and result in greater overall aquatic resource functions. The current Ohio Rapid Assessment Method (ORAM) wetland score is 57.5, which makes it a category 2 wetland. By repairing the dike breaches and removing the accumulated sediment, the ORAM score is predicted to improve to a category 3 wetland. Ecological lift would be represented by the improvement of ORAM wetland scores. The wetland area would be monitored for six years.
WATER QUALITY CERTIFICATION: A Section 401 Water Quality Certification is required for this project. It is the applicant’s responsibility to obtain certification from the OEPA. Based on the application, the applicant has applied for the required Section 401 Water Quality Certification from the OEPA.
HISTORIC AND CULTURAL RESOURCES: This project must be reviewed to determine any potential effect to properties that may be eligible for or listed on the National Register of Historic Places (NRHP), in accordance with Section 106 of the National Historic Preservation Act. The NRHP has been consulted and it has been determined that there are no properties currently listed on the NRHP that would indirectly or directly affected by the proposed work. A Phase I Cultural Resources Management Survey of a .4ha (1a.) Borrow Area and a 1,630m (5,350ft) Long Access Road in the Killbuck Wildlife Area in Franklin Township, Wayne County, Ohio has been performed on the project area. The report was submitted to the Ohio State Historic Preservation Office on December 7, 2015. In a letter dated December 21, 2015 (2015-HOL-32366), the Ohio State Historic Preservation Office stated that no further coordination is necessary unless the project changes or archaeological remains are discovered during the course of the project. Based on the submitted information, the Corps has determined the proposed project would have no effect on historic properties eligible or potentially eligible for listing on the NRHP.
THREATENED & ENDANGERED SPECIES: The project is located within the known or historic range of the following threatened and endangered species: endangered Indiana bat (Myotis sodalis), threatened northern long-eared bat (Myotis septentrionalis), threatened eastern prairie fringed orchid (Platanthera leucophaea), and threatened eastern massasauga rattlesnake (Sistrurus catenatus). The Corps has consulted the most recently available information, and based on the implementation of seasonal tree clearing restriction, the project may affect but is not likely to affect the Indiana bat and the northern long-eared bat. Based on the lack of suitable habitat within the project area, the Corps has determined the project will not affect the eastern prairie fringed orchid. Based on information submitted by the ODNR, no eastern massasauga rattlesnakes were encountered during any of the wetland field investigations and none were encountered during recent intensive surveys conducted by a certified herpetologist within the Killbuck Marsh Wildlife Area. The Corps has determined the project will not affect the eastern massasauga rattlesnake.
Based on the nature of the proposed project, this office has determined the proposed project may affect (in a positive aspect), but would not likely adversely affect the continued existence of any endangered species or threatened species, or result in the destruction or adverse modification of habitat of such species which has been determined to be critical. This Public Notice serves as a request for concurrence from the United States Fish and Wildlife Service pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended).
PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECT: This application will be reviewed in accordance with 33 CFR 320-332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Interested parties are invited to state any objections they may have to the proposed work. The decision whether to approve the mitigation bank will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activities on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit that reasonably may be expected to accrue from the proposals must be balanced against their reasonably foreseeable detriments. All factors that may be relevant to the proposals will be considered including the cumulative effects thereof; of those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, the Federal, state, and local agencies and officials, the Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.
CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one of this Public Notice. If no comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to:
United States Army Corps of Engineers
Huntington District
ATTN: CELRH-RD-N (Public Notice No. LRH-2013-776-WAL)
502 Eighth Street
Huntington, West Virginia 25701-2070.
Please note names and addresses of those who submit comments in response to this Public Notice become part of our administrative record and, as such, are available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation's water resources. If you have any questions concerning this Public Notice, please contact Nicole Marisavljevic of the North Branch by telephone at (330) 365-4273 or via email at nicole.marisavljevic@usace.army.mil.