The applicant has proposed a project that would consist of the establishment of a new barge mooring area in the Ohio River to offload aggregate material at the facility and maintenance dredging within the Ohio River to facilitate the barge unloading activities. The primary purpose of the proposed project is to facilitate the offloading of aggregate material via barge at the St. Mary’s Plant #14.

TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army Permit under the provisions of Section 10 of the Rivers and Harbors Act. This notice serves as the Corps of Engineers’ request to the West Virginia Department of Environmental Protection to act on any needed Section 401 Water Quality Certification for the following application.

APPLICANT: Kelly Paving, Inc. 3570 South River Road P.O. Box 1585 Zanesville, Ohio 43701

LOCATION: The proposed project would be located at the existing St. Mary’s Plant #14 along the left descending bank of the Ohio River, 148.7 miles downstream of Pittsburgh, Pennsylvania, near St. Mary’s, in Pleasants County, West Virginia (See Sheets 1-2 of 3).

DESCRIPTION OF PROPOSED WORK: Kelly Paving, Inc. proposes to conduct work within navigable waters of the United States (U.S.) in association with the waterfront facility at the St. Mary’s Plant #14. The proposed project would consist of establishment of a new barge mooring area in the Ohio River to offload aggregate material at the facility and maintenance dredging within the Ohio River to facilitate the barge unloading activities. The primary purpose of the proposed project is to facilitate the offloading of aggregate material via barge at the St. Mary’s Plant #14.

Barge Unloading: The proposed project would involve the mooring of barges to unload aggregate material at the St. Mary’s Plant #14. The barges, which measure approximately 195 feet in length and 35 feet in width, would be moored in a single line parallel to the shoreline, no more than 3 barges at a time (See Sheet 2 of 3). It is estimated that a total of approximately 100 barges per year would be unloaded at the facility, with an estimated 1,600 tons of material unloaded per barge. The maximum riverward extent of the moored barges would be 145 feet from the normal pool shoreline. The barges would be anchored to existing deadmen located above the ordinary high water mark of the Ohio River.

Dredging: The applicant also proposes to dredge an area 50 feet wide and 500 feet in length parallel to the shoreline, not to exceed 110 feet riverward of the shoreline at the normal pool elevation of 602.0 feet. Approximately 2,800 cubic yards of material would be removed to a depth of 3 feet below the river bottom using a long arm excavator or clam bucket from the shore as needed (See Sheet 3 of 3). The purpose of the proposed maintenance dredging is to facilitate the mooring of barges for the off-loading of aggregate material at the waterfront facility of the St. Mary’s Plant #14. Dredged material would be permanently disposed of in a contained upland area to dewater. The material would then be processed in an on-site screen plant for disposal within existing upland stockpiles on the St. Mary’s Plant #14 property.

The applicant would be required to notify this office prior to the commencement of any dredging activities to allow a “Notice to Navigation” to be provided to the appropriate navigation interests. If approved, maintenance dredging would be authorized for a period of ten (10) years.

AVOIDANCE AND MINIMIZATION: Avoidance and minimization efforts were incorporated into the proposal. The application has reflected the mooring arrangement has the smallest footprint that would accomplish the project purpose. The proposed dredging is limited to areas where accumulated material impedes access. Dredged material would be transported to an upland disposal area as mentioned above.

COMPENSATORY MITIGATION PLAN: The applicant has indicated compensatory mitigation should not be required by the Corps due to the nature of the proposed activities. Additionally, there would be no loss of waters of the United States.

WATER QUALITY CERTIFICATION: A Section 401 Water Quality Certification may be required for this project. If required, it is the applicant’s responsibility to obtain the certification from the West Virginia Department of Environmental Protection.

HISTORIC AND CULTURAL RESOURCES: The National Register of Historic Places (NRHP) has been consulted and it has been determined there are no properties currently listed on the NRHP which would be indirectly or directly affected by the proposed work. Given this and the limited nature of the project, the Corps has determined the proposed project has no potential to affect historic properties. A copy of this public notice will be sent to the State Historic Preservation Office for their review. Comments concerning archaeological sensitivity of the project area should be based on collected data.

THREATENED AND ENDANGERED SPECIES: The proposed project is located within the known or historic range of the following threatened (T) or endangered (E) species:

eastern cougar (E), Felis concolor cougar Indiana bat (E), Myotis sodalis northern long-eared bat (T), Myotis septentrionalis clubshell mussel (E), Pleurobema clava fanshell mussel (E), Cyprogenia stegaria pink mucket mussel (E), Lampsilis abrupta sheepnose mussel (E), Plethobasus cyphyus snuffbox mussel (E), Epioblasma triquetra

According to information obtained from the United States Fish and Wildlife Services (USFWS) concerning the distribution of federally listed threatened and endangered species in West Virginia, habitat for the eastern cougar exists throughout the state. However, this species may be extinct or extirpated and there have been no documented, verified occurrences in West Virginia in over 100 years. The Corps has consulted the most recently available information and information provided by the applicant, and has determined the proposed project does not provide suitable habitat for the Indiana bat or northern long-eared bat. Based on this information, the Corps has determined the proposed project will have no effect on the eastern cougar, Indiana bat, or northern long-eared bat.

Phase 1 and Phase 2 mussel surveys were conducted within the project area from July 30, 2016 to August 16, 2016. The mussel surveys resulted in the collection of a total of 2,045 individuals of 19 species from the survey area. No live federally endangered freshwater mussel species, including the clubshell mussel, fanshell mussel, pink mucket mussel, sheepnose mussel, and snuffbox mussel, were observed during the survey effort. The applicant has indicated dredging activities would occur after fish spawning season and after mussel relocation. Based on this information, the Corps has determined the proposed project may affect, but is not likely to adversely affect the continued existence of any endangered or threatened mussel species, or result in the destruction or adverse modification of habitat of such species which has been determined to be critical. This public notice serves as a request to the United States Fish and Wildlife Service for any additional information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended).

PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320‑332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; among those factors are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, Federal, state and local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.

CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one of this Public Notice. If no comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to:

United States Army Corps of Engineers ATTN: CELRH-RD-S Public Notice: LRH-2014-573-OHR 502 Eighth Street Huntington, WV 25701-2070

Please note names and addresses of those who submit comments in response to this Public Notice become part of our administrative record and, as such, are available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation’s water resources. If you have any questions concerning this Public Notice, please contact Emma Kist of the South/Transportation Branch, at 304-399-5710, by mail at the above address, or by email at emma.k.kist@usace.army.mil.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas