ATCHAFALAYA MITIGATION BANK IN AVOYELLES PARISH
NAME OF APPLICANT: Headwaters, Inc., Attn: Clay Cromwell, Post Office Box 2836, Ridgeland, Mississippi, 39158.
LOCATION OF WORK: The site is located to the north and west of the Atchafalaya River and north of Simmesport, Louisiana in Avoyelles Parish, as shown on enclosed drawings (Latitude: 30.997817 N, Longitude:–91.791590 W). The Project is located within the Atchafalaya Watershed, Hydrologic Unit 08080801.
CHARACTER OF WORK: Wetland Mitigation Strategies L.L.C. proposes to fill or plug multiple agricultural drains and furrows as well as restore the natural elevations of the site. These activities are to be conducted for the purpose of enhancing and restoring traditional surface hydrology in the construction of a mitigation bank.
JOINT PUBLIC NOTICE
February 20, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, LA. 70118
State of Louisiana
Department of Environmental Quality
Post Office Box 4313
Baton Rouge, La. 70821-4313
Attn: Water Quality Certifications
(504) 862-1280/ FAX (504) 862-2574
Brandon.D.Gaspard@usace.army.mil
Project Manager
Brandon Gaspard
Permit Application Number
MVN-2015-00373-MG
(225) 219-3225/FAX (225) 325-8250
elizabeth.hill@la.gov
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 151216-01
Interested parties are hereby notified that a prospectus and permit application has been
received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ X ]
Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or
[ X ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, for a
Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana
Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
ATCHAFALAYA MITIGATION BANK IN AVOYELLES PARISH
NAME OF APPLICANT: Headwaters, Inc., Attn: Clay Cromwell, Post Office Box 2836,
Ridgeland, Mississippi, 39158.
LOCATION OF WORK: The site is located to the north and west of the Atchafalaya River and
north of Simmesport, Louisiana in Avoyelles Parish, as shown on enclosed drawings (Latitude:
30.997817 N, Longitude:91.791590 W). The Project is located within the Atchafalaya
Watershed, Hydrologic Unit 08080801.
CHARACTER OF WORK: Wetland Mitigation Strategies L.L.C. proposes to fill or plug multiple
agricultural drains and furrows as well as restore the natural elevations of the site. These
activities are to be conducted for the purpose of enhancing and restoring traditional surface
hydrology in the construction of a mitigation bank.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 30 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
JOINT PUBLIC NOTICE
February 20, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, LA. 70118
State of Louisiana
Department of Environmental Quality
Post Office Box 4313
Baton Rouge, La. 70821-4313
Attn: Water Quality Certifications
(504) 862-1280/ FAX (504) 862-2574
Brandon.D.Gaspard@usace.army.mil
Project Manager
Brandon Gaspard
Permit Application Number
MVN-2015-00373-MG
(225) 219-3225/FAX (225) 325-8250
elizabeth.hill@la.gov
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 151216-01
Interested parties are hereby notified that a prospectus and permit application has been
received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ X ]
Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or
[ X ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, for a
Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana
Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
ATCHAFALAYA MITIGATION BANK IN AVOYELLES PARISH
NAME OF APPLICANT: Headwaters, Inc., Attn: Clay Cromwell, Post Office Box 2836,
Ridgeland, Mississippi, 39158.
LOCATION OF WORK: The site is located to the north and west of the Atchafalaya River and
north of Simmesport, Louisiana in Avoyelles Parish, as shown on enclosed drawings (Latitude:
30.997817 N, Longitude:91.791590 W). The Project is located within the Atchafalaya
Watershed, Hydrologic Unit 08080801.
CHARACTER OF WORK: Wetland Mitigation Strategies L.L.C. proposes to fill or plug multiple
agricultural drains and furrows as well as restore the natural elevations of the site. These
activities are to be conducted for the purpose of enhancing and restoring traditional surface
hydrology in the construction of a mitigation bank.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 30 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
-2-
Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the
address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership
and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and
local agencies and officials, Indian Tribes, and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the
U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit
for this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and other public
interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data.
Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated
as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of N/A acre(s) of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
-3-
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed
activity will not violate applicable water quality standards will be required from the Department of
Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application complies
with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources
Program. The Department of the Army permit will not be issued unless the applicant received
approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interested in the matter.
Martin S. Mayer
Chief, Regulatory Branch
Enclosure
PROSPECTUS
ATCHAFALAYA RIVER MITIGATION BANK
AVOYELLES PARISH, LOUISIANA
MVN-2015-00373 MG
Prepared for
U.S. Army Corps of Engineers
New Orleans District
7400 Leake Ave.
New Orleans, Louisiana 70118
Submitted by
Atchafalaya River Holdings, LLC
One American Place, Suite 820
Baton Rouge, LA 70825
Prepared by
Headwaters, Inc.
P.O. Box 2836
Ridgeland, MS 39158
www.headwaters-inc.com
_____________________________________________________________________________________
ATCHAFALAYA RIVER MITIGATION BANK
AVOYELLES PARISH, LOUISIANA
December 2016
Table of Contents
Introduction...................................................................................................................................... 1
1.0
1.1
Bank Sponsor and Owner ......................................................................................................... 1
1.2
Site Location ............................................................................................................................... 1
Driving Directions ................................................................................................................... 2
1.3
2.0
Project Goals and Objectives ....................................................................................................... 2
3.0
Ecological Suitability of the Site ................................................................................................... 3
3.1
Historic Site Conditions ............................................................................................................. 3
3.2
Summary of Current Site Conditions ....................................................................................... 3
3.2.1
Current Land Uses ............................................................................................................. 3
3.2.2
Current Vegetation ............................................................................................................. 4
3.2.3
Current Hydrology .............................................................................................................. 5
3.2.4
Historic Hydrology .............................................................................................................. 7
3.2.5
Mapped Soil Types ............................................................................................................ 8
3.2.6
Property Encumbrances .................................................................................................... 8
3.2.7
Zoning and Adjacent Property Development ................................................................. 9
3.2.8
Preliminary Jurisdictional Determination......................................................................... 9
3.3
Water Rights and Hydrological Influences ........................................................................... 10
3.3.1
Water Rights ..................................................................................................................... 10
3.3.2
General Watershed Characteristics .............................................................................. 10
3.4
Water Quality ............................................................................................................................ 11
4.0
Wildlife Values .............................................................................................................................. 11
5.0
Bank Establishment ..................................................................................................................... 12
5.1
Management Summary ........................................................................................................... 12
5.1.1.
Hydrologic Restoration .................................................................................................... 12
5.1.2
Soil Preparation ................................................................................................................ 14
5.1.3
Vegetative Plantings ........................................................................................................ 15
5.1.4
Invasive/Noxious Species Control ................................................................................. 17
5.1.5
Monitoring .......................................................................................................................... 17
5.2
Proposed Service Area ........................................................................................................... 18
_____________________________________________________________________________________
Prospectus
Atchafalaya River Mitigation Bank
5.2.1
Primary Service Area ....................................................................................................... 18
5.3
General Bank and Need and Technical Feasibility ............................................................. 18
5.4
Future Ownership and Long-Term Management Strategy ................................................ 18
5.4.1
Sponsor/Operations Manager/Long-Term Management ........................................... 18
5.4.2
Landowner/Long-Term Ownership ................................................................................ 19
5.4.3
Agent .................................................................................................................................. 19
5.4.4
Perpetual Site Protection Mechanism ........................................................................... 19
5.4.5
Sponsor Qualifications..................................................................................................... 19
6.0
Conclusion ..................................................................................................................................... 20
7.0
References .................................................................................................................................... 20
FIGURES:
Figure 1: Vicinity Map
Figure 2: Topographic Site Map
Figure 3: Aerial Site Map
Figure 4: Watershed Location Map
Figure 5: Historical Aerial Photograph
Figure 6: Current Hydrology Map
Figure 7: Historic Hydrology Map
Figure 8: Soils Location Map
Figure 9: Current Land Use Map
Figure 10: Louisiana Black Bear Habitat Map
Figure 11: Hydrological Work Plan Map
Figure 11A: Cross Section A-A'
Figure 11B: Cross Section B-B'
Figure 11C: Cross Section C-C'
Figure 11D: Cross Section D-D'
Figure 11E: Cross Section E-E'
Figure 11F: Cross Section F-F'
Figure 11G: Cross Section G-G'
Figure 11H: Cross Section H-H'
Figure 12: Estimated Bankline (All)
Figure 13: Mitigation Plan Map
Figure 14: Service Area Map
Appendix A: Survey Plat Map
Appendix B: Jurisdictional Determination
_____________________________________________________________________________________
Prospectus
Atchafalaya River Mitigation Bank
Prospectus
Atchafalaya River Holdings, LLC
Atchafalaya River Mitigation Bank
Avoyelles Parish, Louisiana
1.0 Introduction
Atchafalaya River Holdings, LLC (hereinafter the Sponsor) submits this prospectus to the U.S.
Army Corps of Engineers, New Orleans District (New Orleans District), and the Interagency
Review Team (IRT) to initiate evaluation of the proposed Atchafalaya River Mitigation Bank
(ARMB) in accordance with 33 CFR 332.8(d)(2). The ARMB is being proposed as a first phase
of an umbrella bank as the Sponsor expects to have additions that would be located abutting,
adjacent or nearby to the proposed bank site. The details pertaining to the use and operation of
this site as a mitigation bank will be specified within the subsequent Mitigation Banking Instrument
(MBI).
1.1 Bank Sponsor and Owner
Atchafalaya River Holdings, LLC is the Sponsor of the ARMB. The land is owned in fee simple
by Dupuy Land Co. who will assume long term ownership and management of the ARMB.
Atchafalaya River Holdings, LLC will remain as the bank Sponsor assisting with establishment
and long term management of the bank.
1.2 Site Location
ARMB is being presented as a possible phased project with Phase I of the ARMB to include
approximately 393.1 total acres providing approximately 237.0 acres of bottomland hardwood
(BLH) Re-Establishment, approximately 51.7 acres of BLH Preservation, 42.4 acres of BLH
Upland Buffer Re-Establishment and 29.1 acres of BLH Upland Buffer Preservation. The ARMB
Phase I is located on a tract owned by Dupuy Land Co. in southeast Avoyelles Parish near the
City of Simmesport, 35 miles north of Opelousas and 53 miles northwest of Baton Rouge,
Louisiana (Figure 1). The ARMB Phase I is located at latitude 30.997817 and longitude 91.791590 within Sections 5 and 6, Township 1 South, Range 7 East, Avoyelles Parish, Louisiana
(Figure 2).
The ARMB Phase I is bordered to the east by the Atchafalaya River with agricultural fields
bordered to the south and west and undeveloped forestland to the north and west. The City of
Simmesport is located in close proximity to the south divided by Bayou des Glaises along the
southwest corner of the Bank property. B Cutoff road is located along the west boundary of the
Bank Property and is the primary point of access from the City of Simmesport. Lower Old River
and the Mississippi River are located in close proximity to the east (Figure 3).
ARMB is located in the Atchafalaya Vermillion basin HUC 080801 and the Atchafalaya
watershed HUC 08080101. The ARMB is located within the West Atchafalaya Floodway with a
general drainage area of +\-21,000 acres extending west to Bayou Des Glaises, north to Bayou
Natchitoches and east to Bayou Des Sot. Bayou Des Sot converges with Bayou Courville just
north of the ARMB before converging with the Atchafalaya River within the ARMB property. The
1
ARMB is located within the Atchafalaya-Vermillion basin recognized by the 6 digit Hydrologic Unit
Code (HUC) 080801 (Figure 4).
Much of the upper portions of Avoyelles Parish and the Atchafalaya River drainage basin
consisted historically of bottomland hardwoods, bald cypress sloughs and scrub/shrub swamp
hardwoods. However, as with many floodplains much of this area was deforested and converted
to agricultural uses. This region also represents an important flyway for migratory bird species,
such as, waterfowl and neotropical migrants, as well as threatened and endangered species, such
as, the Louisiana Black Bear.
1.3 Driving Directions
·
·
·
·
·
·
·
·
·
·
Proceed on I-10 West from Baton Rouge.
Merge onto LA-1 N via Exit 153 towards Port Allen.
Travel approximately 4.5 miles and merge onto US-190 W/LA 1.
Travel approximately 15.1 miles and then turn right on Wye Rd/LA-1.
Travel approximately 12.6 miles and then turn left onto Hospital Rd/LA-1.
Travel approximately 1.8 miles and then turn left onto Morganza Hwy LA-1/LA-10.
Travel approximately 30.5 miles and then turn right onto Laurel St.
Travel approximately 0.4 miles and then turn right onto Main St.
Travel approximately 0.5 miles and then turn left onto B Cutoff.
Travel less than 0.5 miles before entering the ARMB property.
2.0 Project Goals and Objectives
As described, ARMB has been designed in a phase approach with Phase I located within the
northern portion of the Dupuy Land Co. property. The ARMB Phase I is located abutting the
Atchafalaya River along the east boundary of Phase I allowing the Sponsor to begin the BLH
restoration project abutting the river bank extending the riparian buffer zone to the west. Phase I
is also abutting the existing BLH forest to the north and west allowing the Sponsor to remove
agricultural fields/practices and restore the forestland to the south and along the banks of the
Atchafalaya River and Bayou Courville. The existing BLH forest stretches almost 26 miles to the
far side of the Richard K. Yancey Wildlife Management Area. The Phase I project will extend the
forestland to the existing BLH habitats present within the central portion of the ARMB property
providing connectivity to these habitats and reducing the overall forest fragmentation along the
River. Phase II of the planned project would potentially further extend the riparian buffer zone
south and connect the fragmented forestland (agriculture) to the Atchafalaya River. The ARMB
project would remove the ongoing agricultural row crop activities within the Bank property and
restore the Bank property to its historic BLH ecosystem within the Atchafalaya River watershed
(Figure 5). Historical imagery depict the Bank property has forestland in 1952.
The goal of the ARMB Phase I is the Re-Establishment of approximately 237.0 acres and
Preservation of approximately 51.7 acres of BLH habitat. The ARMB Phase I will also provide
Upland Buffer Re-Establishment of approximately 42.4 acres and Upland Buffer Preservation of
approximately 29.1 acres of BLH habitat.
2
Table 1: Current Habitat Types and Land Uses for ARMB Phase I
Habitat Type
PC Farmland
Section 404 Waters
Section 404 Wetlands
Forested Uplands
CRP
Total
Land Use
Agriculture
Waters
Wetlands
Forestland
Agricultural
-
Acreage
289.3
12.5
52.9
29.1
9.3
393.1
Table 2: Proposed Mitigation Bank Habitat Types for ARMB Phase I
Present Habitat
Type
PC Farmland
PC Farmland
Section 404
Wetlands
Upland
Section 404
Waters
Proposed Habitat
Type
BLH
BLH
BLH
Acreage
Mitigation Type
237.0
42.4
51.7
Re-establishment
Upland Re-establishment
Preservation
BLH
N/A
29.1
12.5
Wildlife Openings
Access Roads
7.0
13.4
393.1
Upland Preservation
Section 404 Waters (NonMitigation)
Non-Mitigation
Non-Mitigation
Total
3.0 Ecological Suitability of the Site
3.1 Historic Site Conditions
ARMB lands are located in Simmesport, Avoyelles Parish, Louisiana. Historically, BLH
forests existed throughout the Parish, but large portions of the land were cleared for
silviculture, livestock grazing and agricultural uses. As described, historic photography
indicates that the ARMB property was forestland around 1952. The ARMB lands are
currently, and have been historically, used for agricultural activities.
3.2 Summary of Current Site Conditions
3.2.1
Current Land Uses
The vast majority of the ARMB property is utilized for agricultural row crop
production purposes. The exception would include the existing riparian buffers
along the east boundary of ARMB Phase I and abutting the Atchafalaya River.
Alterations to the historic landscape would also include interior roadways and
drainage improvements in support of the agricultural activities. Two (2) dredge
disposal sites are also present within the ARMB property, which were utilized by
the U.S. Army Corps of Engineers (USACE) in the early 1900's when improving
3
portions of the Atchafalaya River system. One (1) dredge disposal site is located
within southeast portion of the ARMB property south of the Phase I boundary. The
second dredge disposal site is located along the east boundary of the ARMB
Phase I property along the immediate bank of the Atchafalaya River. Each dredge
disposal site has been removed from the ARMB Phase I proposal and may be
considered as a part of future phases to the Bank following cancellation of USACE
servitudes.
With the exception of the agricultural production activities prevalent within the
ARMB, smaller portions of the property remain in undeveloped forestlands. The
forestland has been managed for timber production and utilized for recreational
use over time.
3.2.2
Current Vegetation
Prior Converted Farmlands- As discussed, the subject property is predominately
occupied by an open field habitat type that has historically been utilized for
agricultural row crop production purposes. Due to the topography, natural
drainage patterns of the site and the overall property location, the preponderance
of the open field complex has hydric (soils and hydrology) characteristics
throughout. Given this, it was determined that the significance of the open field
habitat present within the subject property would be considered as a prior
converted cropland habitat. Consultation with the Natural Resource Conservation
Service (NRCS) confirmed that the open fields within the subject property are
considered as prior converted and in some cases farmed wetlands.
The soils matrix color within the open field habitats ranges from 4/15/1 (dark
gray/gray), 4/2-5/2 (dark grayish-brown/grayish-brown) to 5/3 (brown) on the 10YR
Munsell Soil Color chart. A matrix color of 5/1 (gray), 4/3-4/4 (reddish-brown), 4/6
(yellowish red) also appears on the 5YR Munsell soil color chart. There is a soil
mottling present (~10% - 40%) with a soil mottle color of 3/4-4/6 (dark yellowishbrown) to 5/6 (yellowish-brown) on the 10YR chart. Also, there is a soil mottle
color of 4/6-5/8 (strong brown) on the 7.5YR Munsell soil color chart and a 3/4
(dark reddish-brown), 4/4 (reddish-brown) on the 5YR Munsell soil color chart.
Depending on soil type, hydrologic indicators were limited to redox formations and
mottling within the upper soil horizon. The drainage improvements and overall
property management has increased storm water flows away from the open fields.
As a result, hydrologic indicators are currently limited due to property
improvements.
Forested Wetlands The identified forested wetland habitats are directly
associated with the presence of the Atchafalaya River and its associated tributaries
that transect portions of the property. This complex located along the east, south
and north boundaries of the property provides a riparian buffer to the Atchafalaya
River containing the "first levee" along the river bank and the "first flat" or floodplain
as you progress away from the river. Forested habitats observed within the
northern portion of the site and interspaced throughout low-lying areas were also
4
considered as forested wetlands and natural depressions. These habitats are
believed to perform functions vital to the prominent streams, including water
control, groundwater recharge, soil enrichment and erosion control as they are
typically located along the banks of the prominent stream and drainages
throughout the site. The forested wetlands are primarily occupied by sweetgum,
overcup oak, willow oak, hackberry, American sycamore, bald cypress and
American elm. Primary midstory components consist of red maple, box elder,
willow oak, water oak and green ash. The primary understory components include
swamp privet, switch cane, palmetto, deciduous holly, cinnamon fern, buttonbush,
polygonum spp. and juncus spp.
The soils matrix color within the forested wetland area ranges from 10YR 5/1-6/1
(gray) to 5/2 (grayish brown) on the Munsell Soil Color Chart. Soil mottle color of
4/4 (dark yellowish brown) to a 5/6 (yellowish-brown) on the 10YR chart is also
represented. Hydrologic indicators within this area include inundation, soil
saturation in the upper 12 inches, sulfuric odor, fluted trunks, drift deposits, water
stained leaves, water marks and oxidized root channels. As described, the
forested habitats are generally located along the perimeter of the open fields and
subject property. The drainage improvements observed within the open fields
were in most cases directed to convey storm water flows into the adjacent
forestlands.
Conservation Reserve Program (CRP) Consultation with the landowner and
with the Sponsor revealed the presence of an area enrolled in the Conservation
Reserve Program (CRP). With respect to ARMB Phase I, the CRP area is located
in the northeast portion of the Dupuy property along the perimeter of the open
agricultural fields. The CRP is considered grassland CRP and is a riparian buffer
along the agricultural fields. The CRP included in Phase I is managed like the PC
land and will be included as part of the Re-establishment mitigation work plan. All
CRP contracts would be closed or terminated prior to approval.
The soils matrix color within the CRP area ranges from 10YR 5/1-6/1 (gray) to 5/2
(grayish brown) on the Munsell Soil Color Chart. Soil mottle color of 4/4 (dark
yellowish brown) to a 5/6 (yellowish-brown) on the 10YR chart is also represented.
Hydrologic indicators within this area include inundation, soil saturation in the
upper 12 inches and oxidized root channels.
3.2.3
Current Hydrology
The Bank Property is generally split with a portion of the storm water flows
conveyed through unnamed tributaries of Bayou Courville and Bayou Des Glaises
located to the east and west, respectfully. Bayou Courville and Bayou Des Glaises
flow generally southeast into the Atchafalaya River, located along the south and
east boundaries of the Bank property. Bayou Des Glaises flows into the River
along the south west boundary of the Bank property while Bayou Courville
converges with the River in the northeast corner of the Bank property. Fish Bayou,
being a tributary of Bayou Courville, also extends through the north portion of the
5
Bank Property. Given the current land use, agricultural drains can be found within
the confines of the agricultural fields. Agricultural drains were constructed to
convey surface water across the property during rain events. The excavated
drains were designed and constructed connecting to larger conveyances within
and along the perimeter of the Bank Property. In most cases, the spoil that was
excavated was placed along the top banks of each channel or land planed back
within the agricultural fields.
As described, current hydrology has been altered from the historical hydrologic
regime through property improvements that have been completed over time in
association with the agricultural land use. Each property improvement was
generally completed to increase surface water runoff away from agricultural fields
and associated row crops. No impoundments are present within the limits of the
Bank Property. It was determined that 15,197.1 linear feet of agricultural drains
are present within the limits of the Phase I ARMB. The agricultural drains can be
described as shallow furrows located within the open agricultural fields. These
drains convey storm water away from the agricultural row crops and towards
intermittent drains located along field edges or wood lines. The larger agricultural
drains located along field edges and wood lines are also regularly maintained to
convey storm water away from the fields towards Bayou Courville and Fish Bayou
(Section 404 Waters). Spoil material, consisting of earthen material, excavated
from the construction of the agricultural drains can be found along the top bank of
two (2) primary drains located within the central portion of the Bank Property.
However, in each instance, the presence of the spoil material does not adversely
affect the storm water runoff across the site. Storm water flows were found to flow
to the east and northeast away from the spoil material. Further, evidence of
ponding or reduced runoff was not noted adjacent to the spoil areas and
agricultural drains. Earthen material excavated as a part of other drain
improvements is believed to have been land planed within the agricultural fields.
The current hydrology patterns, locations of agricultural drains and Section 404
Waters are depicted on Figure 6.
As described, historically, the natural storm water runoff was conveyed via
overland flows to the east and northeast across the Bank Property. Storm water
runoff was conveyed through the unnamed tributaries and natural drainage
patterns in wetland systems historically present. Property improvements have
altered the historic drainage patterns to concentrate and convey storm water runoff
through the unnamed tributaries throughout the Bank Property. The current
topography continues to convey storm water runoff east and northeast through the
Bank Property towards Fish Bayou, Bayou Courville and the River. During periods
of high rainfall and backwater events, flooding events would also extend flood
waters from the Atchafalaya River across large portions of the Bank Property. The
presence of the agricultural drains throughout the Bank Property have altered
these flows to minimize or maximize storm water sheet flows across the Bank
Property. To support the re-establishment of BLH forestlands within the Bank
Property, approximately 1,194.1 linear feet of agricultural drains will be
filled/graded and approximately 8,855.5 linear feet of agricultural drains will be
6
plugged returning the sheet flow of storm water across the Bank Property. All spoil
materials would be graded and tilled to minimize spoil concentrations and promote
the restoration of the historic hydrology regime within the Bank Property. In many
cases, spoil material previously excavated would be utilized to fill/grade and plug
the drains. This would also reduce the additional fill materials present along the
top banks of the drainages further restoring the connectivity of the drains and their
riparian buffer zones.
3.2.4
Historic Hydrology
The Bank Property is divided into two (2) drainage basins with a portion of the
storm water flows conveyed through unnamed tributaries of Bayou Courville and
Bayou Des Glaises located to the north and west, respectfully. Bayou Courville
and Bayou Des Glaises flow south and southeast into the Atchafalaya River,
located along the east boundary of the Bank Property. Bayou Des Glaises
converges with the Atchafalaya River along the south west boundary of the Bank
Property while Bayou Courville converges with the River in the northeast corner of
the Bank Property. Fish Bayou is also present within the north portion of the Bank
Property, which flows into Bayou Courville before converging with the Atchafalaya
River. The drainage area for each drainage system is collectively approximately
21,000 acres that, as described, flow through the Bank Property prior to the
convergence with the Atchafalaya River, abutting the east and south boundary of
the Bank Property. The historic hydrology of the Bank Property and the adjacent
properties are depicted in Figure 7.
The historic hydrology within the Bank Property has been altered through the
original conversion from BLH to open agricultural land and common agricultural
practices during the 1950-60's. Excavation and realignment of drainage features
within the interior limits of the Bank Property has altered historic overland sheet
flow and confined it to the primary drainages located along the perimeter of the
Bank Property, previously described. Improvements to agricultural fields included
intermittent drains throughout the Bank Property increasing storm water runoff
away from the Bank Property into adjacent conveyances. The historic hydrology
and drainage patterns were determined through the use of available topographic
maps and LIDAR remote sensing technology to determine elevations within the
Bank Property and the adjacent properties located in the drainage area of the Bank
Property.
The Bank Property was delineated in April of 2015 by Headwaters, Inc. Through
consultation with the New Orleans District, a preliminary jurisdictional
determination was issued on November 18, 2015 referenced as MVN-201501027-SB. The determination concluded that Section 404 wetlands are present
within the riparian buffer zones adjacent the open agricultural fields. The
agricultural fields were determined to be Prior Converted (PC); therefore, these
areas are not jurisdictional. A copy of the preliminary jurisdictional determination
has been included within the Appendices of this report.
7
3.2.5
Mapped Soil Types
Soils As evidenced by the Soil Survey for Avoyelles Parish Louisiana, published
in September 1986 by the USDA - Soil Conservation Service [now Natural
Resources Conservation Service (NRCS)], the soils on the subject property
primarily consist of Tensas-Sharkey clay with other soils present such as Moreland
silt loam, Moreland clay, Roxana very fine sandy loam and Convent very fine sandy
loam.
The Tensas-Sharkey complex, overwash, undulating, occasionally flooded series
consists of undulating, poorly drained to somewhat poorly drained soil on natural
levees on the Atchafalaya River. The soil is subject to occasional flooding for brief
to very long periods. Slopes range from 0 to 5 percent.
The NRCS, Avoyelles Parish, Louisiana, has categorized the significance of the
open agricultural fields as "Prior Converted Farmland" (PC). PC is defined by the
Soil Conservation Service (Section 512.15 of the National Food Security Act
Manual, August 1988) as wetlands which were both manipulated (drained or
otherwise physically altered to remove excess water from the land) and cropped
before 23 December 1985, to the extent that they no longer exhibit important
wetland values.
The normal circumstances for PC Farmlands generally do not support a
prevalence of hydrophytic vegetative components and, as such, are not subject to
regulation under Section 404 of the Clean Water Act. In most cases, because of
the magnitude of hydrological alterations that have most often occurred on PC
Farmlands, such farmland minimally, if at all, meet the hydrology requirements as
described within the 1987 Corps of Engineers' Wetlands Delineation Manual.
Given this, "waters of the United States" do not include PC farmland.
Notwithstanding the determination of an area's status as PC farmland by any other
Federal Agency, for the purpose of the Clean Water Act, the final authority
regarding Clean Water Act jurisdiction remains with the Environmental Protection
Agency (EPA).
If PC farmland is abandoned (512.17 National Food Security Act Manual as
amended, June 1990) and wetland conditions return, then the area will be subject
to regulation under Section 404 of the Clean Water Act. An area will be considered
abandoned if for five (5) consecutive years there has been no cropping,
management or maintenance activities related to agricultural production. In this
case, positive indicators of all mandatory wetlands criteria, including hydrophytic
vegetation, hydrology and hydric soils must be observed. The soil survey for the
Bank property is included as Figure 8.
3.2.6
Property Encumbrances
Two (2) servitudes are presently found on the Dupuy Land Co. property. One (1)
servitude calculated as +\- 334 acres and is located within the south-central portion
8
of the bank property. The second servitude is calculated as +\- 25 acres and is
located within the east central portion of the bank property. The servitudes are
depicted on the survey plat map included within Appendix A of this prospectus
document. The servitudes were placed on the property as a part of the dredging
activities within the Atchafalaya River and the placement of dredged spoil material
within the Dupuy Land Co. property. The servitudes encompass the spoil
placement areas dating back to the early 1900's. At this time, both the Operations
and Engineering divisions of the USACE New Orleans District and Vicksburg
District have agreed to cancel the servitudes.
The presence of the two (2) servitudes have been excluded from the current ARMB
Phase I proposal. Once the servitudes are canceled and market conditions dictate,
those properties may be proposed under future phases of the ARMB.
3.2.7
Zoning and Adjacent Property Development
ARMB and adjacent property is within unincorporated land and is absent of zoning
regulations. ARMB is connected to and primarily surrounded by natural tributaries
and forested wetland areas, including large forestlands located north and
northwest of the site that are known to be occupied by Louisiana Black Bears and
considerable other wildlife. As described, Bayou Des Glaises, Fish Bayou and
Bayou Courville being direct tributaries of the Atchafalaya River are the primary
conveyances of storm water runoff from within the Bank property. When
considering a one (1) mile radius around the Phase I Bank property, the current
land use type consists of 36% BLH forest, 34% cultivated cropland, 13%
developed, 12% water, 3% scrub-shrub/Cutover and 2% Pasture/Open Field
(Figure 9). The agricultural lands are generally concentrated along the banks of
the primary drainages where fertile soils are located. The forestlands are
concentrated to the north and northwest with the Atchafalaya River located along
the east and south boundary.
The ARMB is positioned within the center of the agricultural fields and its reestablishment will reduce the current forestland fragmentation restoring and
preserving a wildlife corridor. The project will also reduce non-point source
pollution through the elimination of agricultural production and the removal of
improved drainage features directly abutting the River. Further, the position of the
mitigation site along the convergence of three primary tributaries of the Atchafalaya
River, as well as the Atchafalaya River itself, will provide non-point source pollution
filtration increasing water quality downstream from the project site. Figure 10
depicts the Louisiana Black Bear Designated Critical Habitat and its relation to the
Bank property. The entirety of the property falls within Designated Critical Habitat.
3.2.8
Preliminary Jurisdictional Determination
The ARMB property was delineated in April of 2015 by Headwaters, Inc. A copy
of the wetland delineation report was submitted to the USACE, New Orleans
District and has been assigned project number MVN-2015-01027-SB. A copy of
9
the preliminary jurisdictional determination is included within the Appendices of this
report.
3.3
Water Rights and Hydrological Influences
3.3.1
Water Rights
Louisiana Civil Code, Article 490, treats water resources under the theory of
absolute ownership and rule of capture, provided capture does not result in harm
to neighbors.
3.3.2
General Watershed Characteristics
3.3.2.1 Water Sources and Losses
The sources of water to the project area are currently direct precipitation
and surface flow from adjacent land from the west and north. Additionally,
overland flooding from the Atchafalaya River provides a source of surface
water during normal seasonal flooding events. Storm water flows across
the site generally via overland flows into agricultural drainages
interconnected to unnamed tributaries of Bayou Courville and Bayou Des
Glaises, located in the northeast and southwest portions of the property,
respectively. Additionally, a portion of the flows is also believed to flow
generally south directly into the Atchafalaya River.
Avoyelles Parish is located in the east-central part of Louisiana. Marksville,
the parish seat, is near the center of the parish and is about 30 miles
southeast of Alexandria. The Red River forms part of the northern and
eastern boundaries of the parish. It flows into the Atchafalaya River, which
serves as the southeastern boundary of the parish. Other important
streams are Bayou Choctaw, Bayou de Lac, Bayou Boeuf, Bayou des
Glaises, Petite Riviere, La Vieille Riviere, Bayou Natchitoches and West
Atchafalaya Diversion Canal. The Atchafalaya complex, Lac aux Perles,
and Saline Lake are the largest lakes in the parish. Parish wide, about 52
percent of the land is cultivated cropland and pasture and 34 percent is
woodland.
The total annual average precipitation is 61.25+\- inches. Of this, 30
inches, or 50 percent, usually falls in April through September which
includes the growing season for most crops.
3.3.2.2 Hydroperiod
Hydric soils indicate that the site is either currently inundated or saturated
in the upper soil profile for at least 14 consecutive days per year or was
subject to these conditions prior to conversion of the site to agriculture.
This site is comprised primarily of Tensas-Sharkey complex soils which, in
10
this area, typically have a seasonal high water table between the surface
and 36 inches below the surface during the months of December and April.
3.4
Water Quality
The Atchafalaya River Basin is located in the south-central part of Louisiana. The
Atchafalaya River is a distributary of the Red, Black and Mississippi Rivers, presently
carrying about 30% of the Mississippi's flow. The basin is well-defined by a system of
levees which surround it on the north, east, and west. The entire basin serves as a major
floodway for Mississippi River floodwaters. It encompasses approximately 1,806 square
miles and is predominantly wooded lowland and cypress-tupelo swamp with some fresh
water marshes in the lower distributary area. It constitutes the largest contiguous fresh
water swamp in the United States.
The ARMB project area is located in the drainage area sub segment LA010101_00, being
the upper reaches of the Atchafalaya River Basin. The designated uses for subsegment
LA010101_00 are Secondary Contact Recreation (SCR), Fish and Wildlife Propagation
(FWP) and Primary Contact Recreation (PCR).
The removal of irrigated and non-irrigated crop production, filling of drainage features and
planting of trees for this project will result in overall water quality improvements due to
increased filtration and plant uptake, reduction of agricultural pesticides and herbicides,
reduction of use of nitrogenous or phosphorous fertilizers, and minimization of
sedimentation/siltation as well as TSS and turbidity (i.e., nonpoint source pollution
prevention).
4.0 Wildlife Values
Bottomland hardwood forests provide important ecosystem functions, including maintenance of
water quality, habitat for fish and wildlife species, regulation of flooding and stream recharge. In
addition to the many species present in BLH forests, the ARMB seems properly sited to add to
habitat and corridors of and for the Louisiana Black Bear. The area was previously designated
Critical Habitat by the U.S. Fish & Wildlife Service for the Louisiana Black Bear. The Louisiana
Department of Wildlife and Fisheries (LDWF) also identified Avoyelles Parish as falling within the
current range of Louisiana Black Bears in its Rare Animals of Louisiana publication. The ARMB
is uniquely located within previously designated Critical Habitat, adjacent to the Atchafalaya River
and on the southern edge of a major BLH complex which includes several state wildlife
management areas and federal national wildlife refuges. Bottomland hardwoods extend north
from the ARMB all of the way to Acme on the north, Deer Park on the northeast and Marksville
on the west. Within these connecting forestlands are Richard K. Yancey Wildlife Management
Area (comprised of the former Three Rivers and Red River Wildlife Management Areas), Bayou
Cocodrie National Wildlife Refuge, Lake Ophelia National Wildlife Refuge, Grassy Lake Wildlife
Management Area and Pomme de Terre Wildlife Management Area. Reforestation of this
property will undoubtedly serve the purpose of increasing habitat and reducing fragmentation and
as an interconnecting corridor habitat for the Louisiana Black Bear. The rehabilitation of the forest
will also provide wintering habitat for neotropical migrants (Figure 10).
11
5.0
Bank Establishment
5.1
Management Summary
5.1.1. Hydrologic Restoration
The Sponsor proposes to re-establish 237.0 acres of BLH forested wetlands from
open agricultural fields by ceasing intensive agricultural practices for row crop
production and restoring the relic hydrologic regime and planting desirable species
of native BLH vegetation. In addition, the Sponsor proposes to preserve 51.7
acres of BLH forested wetlands existing within the Bank Property. Further, the
Sponsor proposes to re-establish 42.4 acres of BLH forested upland buffer and
preserve 29.1 acres of BLH forested uplands located along the top bank regions
of the Atchafalaya River. The mitigation work plan will provide the opportunity to
restore and protect 360.2 acres of BLH habitat within the Atchafalaya River
watershed (Figure 11).
1. The initial hydrology restoration work plan will include the filling and grading, to
as close as practicable, agricultural drains located within the Bank Property.
One (1) agricultural drain approximately 1,194.1 linear feet in length and located
along the west boundary will be filled and graded with spoil material located
along the top bank of the drain. The drain will be graded to an elevation
comparable to the forestlands to the west and the existing open agricultural
fields to the east, restoring the natural sheet flow of storm water runoff across
the Bank Property. The agricultural drain was constructed along the wood line
and field boundary to further convey storm water runoff from the open
agricultural fields. Storm water currently conveys storm water to the north
towards a tributary of Fish Bayou and to the south towards a tributary of Bayou
Courville. Figure 11 depicts the location of the agricultural drain to be filled and
graded as a part of the mitigation work plan. A cross sectional view,
representing the agricultural drain, has been prepared and is included within the
appendices of this report.
2. As a part of the hydrology restoration work plan, it is also planned to place
thirteen (13) earthen plugs within agricultural drains located throughout portions
of the Bank Property. The earthen plugs will degrade approximately 8,855.5
linear feet of agricultural drains within the Bank Property. Earthen plugs will be
used to reduce the sheet flow and conveyance across the agricultural fields
restoring sheet flow across the Bank Property. Each earthen plug will be placed
within the agricultural drains and filled to, as close as practicable, the surface
elevation of the adjacent properties or riparian buffers depending on the location
of the agricultural drain. The concept is to reduce sheet flow through each
agricultural drain and restore the connectivity of sheet flow to the adjacent Bank
Property. As described, each agricultural drain extends across portions of the
open agricultural fields and were constructed to direct storm water away from
agricultural crops.
As described, the Bank Property is positioned adjacent to the Atchafalaya River
with a substantial drainage basin associated with tributaries of Bayou Courville,
Fish Bayou and Bayou Des Glaise. Adjacent properties to the west and south
12
of the current Bank Property (Phase I) will remain in agricultural production.
Portions of the adjacent agricultural fields drain storm water through the Bank
Property via unnamed tributaries of Fish Bayou and Bayou Courville. To
maintain this drainage and not impede flows within the adjacent agricultural
fields, it is planned to maintain two (2) agricultural drains totaling 5,147.5 linear
feet. One (1) drain flows west to east along the north and central portions of
the Bank Property. Again, this drain contributes to the current storm water
runoff from open agricultural fields to the west of the Bank Property. One (1)
drain is also located in the central portion of the Bank Property flowing south to
north through the Bank Property. This drain connects the ARMB Phase I and
II. This drain is also located parallel to the primary interior at-grade access road.
As a part of the hydrologic work plan, the re-establishment of BLH habitat within
the Bank Property, it is specifically proposed to construct four (4) earthen plugs
within natural low lying swales along the west side of the south to north drain to
remain. The earthen plugs will be placed along the west bank of the south to
north drain to remain within the natural swales to reduce storm water runoff from
the Bank Property to the west of the drain. The implementation of the earthen
plugs is expected to restore the hydrologic regime within this region of the Bank
Property and thus not allow the interior drain to remain to adversely affect the
success of the mitigation work plan. The natural gradient east of the interior
drain flows storm water runoff to the east towards Bayou Courville. Given this,
no additional earthen plugs are proposed along the east side of the drain.
Earthen material will be obtained from existing spoil material located adjacent
to the previously excavated drains or from an approved location within the Bank
Property. Figure 11 depicts the location of each earthen plug and its
juxtaposition to the agricultural drains as a part of the mitigation work plan. A
cross sectional view, representing the existing agricultural drain and planned
earthen plug, has been prepared and is included within the appendices of this
report.
3. As a part of the Bank Property design, the Landowner will maintain 18,060.6
linear feet (13.4 acres) of at-grade access roads located throughout the Bank
Property. The at-grade access roads have been maintained as a part of the
current land use for agricultural purposes. Each at-grade access road depicted
on Figure 11 and Figure 13 will be maintained as a part of the mitigation work
plan and utilized for access, completion of the mitigation work plan, monitoring
and maintenance of the Bank Property. The at-grade access roads will be
maintained by bush hogging, clipping, etc. The presence of the at-grade access
roads will not impede sheet flow across the Bank Property as they are located
along natural ridges or wood lines. A cross sectional view, representing the atgrade access road located along the south boundary of the Bank Property has
been prepared and is included within the appendices of this report.
4. The Sponsor will also maintain two (2) culvert crossings and three (3) low water
crossings located along the existing at-grade access road. The culvert
crossings are located along the primary internal at-grade access road and within
agricultural drains that will remain as a part of the hydrologic work plan. The
13
Sponsor will maintain the two (2) existing culverts and prevent the accumulation
of drift/debris within the agricultural drains. The culverts are necessary to
provide access to the interior portions of the Bank Property. The three (3) low
water crossings will be maintained along larger stream channels, similarly
providing access throughout portions of the Bank Property. Figure 11 depicts
the location of the culvert and low water crossings as a part of the mitigation
work plan.
5. Reaches of Bayou Courville, Fish Bayou and associated tributaries, all
considered as Section 404 Waters, totaling 16,601.9 linear feet (12.5 acres) will
be preserved and maintained as a part of the hydrology work plan. No channel
improvements are proposed as a part of the hydrology work plan. In fact, each
stream reach is located within the confines of the BLH preservation located
within the northeast portion of the Bank Property.
The Hydrologic Work Plan developed for ARMB Phase I is depicted as Figure
11.
6. Upon review of the historic imagery available for the ARMB and the general area
along the Atchafalaya River system, it was revealed that the downstream
movement of water or river's current has changed course over the years.
Review of the 1952 aerial photograph indicated that the west bank of the River
was, on average, 250 feet to the east of the current bankline boundary within
the northern portion of the ARMB or Phase I. Consequently, review of the 1952
aerial photograph indicated that the west bank of the River was also within, what
is currently forestland, within the southern portion of the ARMB or potential
Phase II. The dynamics of the Atchafalaya River system have caused erosion
to occur along the east boundary of the ARMB while accretions have occurred
along the south boundary of the ARMB. Following the 1973 flood, the U.S.
Army Corps of Engineers completed a bank stabilization project along the east
boundary of the ARMB. The U.S. Army Corps of Engineers placed concrete
mats along the Atchafalaya River bank to stabilize the embankment and slow
further erosion. Aerial photography since the completion of the bank
stabilization project further indicate that only minimal erosion has occurred since
the completion of the project in 1975. Given the current stability of the ARMB
boundary, future erosion along the ARMB boundary would not be expected to
the extent that would adversely affect the planned project. Figure 12 depicts
the estimated bank line digitized for 1952, 1981, 2005 and 2013. The proposed
conservation servitude boundary for the ARMB will follow the estimated 2013
bank line.
5.1.2
Soil Preparation
Following the degradation of agricultural furrows present within the Bank property,
agricultural drainages will be plugged in specific locations through the Bank
property. Following the initial hydrologic restoration work plan, the Sponsor will
mechanically prepare soils in the fields for vegetative plantings. Deep-ripping may
14
be used to alleviate soil compaction and encourage air and water pore space for
root growth. Herbicides may be used where necessary.
5.1.3
Vegetative Plantings
Re-establishment Work Plan
1. It is planned to re-establish 237.0 acres of BLH forested wetlands and 42.4
acres of BLH forested uplands (buffer) within the Bank Property. The reestablishment work plan for each habitat will be accomplished by preparing the
site as needed (ripping, disking, tilling, mowing, etc.) during the fall prior to
planting and by planting an appropriate species mixture indicative of BLH
ecosystems during the non-growing season of 2017 (Table 3). As list of plant
species to be planted appears in Table 3.
2. The restoration areas will be planted using a mixture of hard mast and soft
mast species during the non-growing season (i.e., December March). Prior
to planting, site preparation will be conducted using mechanical and chemical
means, such as, mowing, disking, ripping, shredding and herbicidal
application. Invasive and undesirable species control will be conducted
throughout the entire project area over the life of the Bank.
3. The Sponsor does not anticipate degrees of soil settlement requiring planting
deferment. The site will be prepared in such a manner that soil disturbance
will be avoided or minimized to the maximum extent practicable, and site
preparation has been planned such that favorable conditions for planting will
be established and maintained throughout the preparation activities. Site
preparation activities will be documented with digital photographs and provided
to the IRT during times in which these activities take place.
4. Planting procedures will adhere to the following specifications:
a. One (1) to two (2) year old bare-root seedlings obtained from a registered
licensed regional nursery grower and of a regional eco-type species
properly stored and handled to ensure viability will be planted at the Bank
during the period December 15 through March 15 (planting season).
Events, such as, spring flooding may warrant storage of trees with planting
in late spring or early summer. If seedlings listed are not available, then
substitutions may be made if they are approved by the IRT. The anticipated
schedule for planting is the non-growing season of 2017. The Sponsor will
plant appropriate species in such a manner to ensure adequate species
diversity and to ensure that monotypic tree rows will not be established;
b. Seedlings will be planted following a 10' x 10' spacing to achieve an initial
stand density of, at minimum, 432 seedlings per acre;
c. Species selected for planting will be planted in a random mixture as
dictated by terrain and edaphic conditions. The species selected will be
site appropriate in terms of habitat design, soil-moisture regime and
species diversity. Ten or more species may be represented in the planting
15
assemblage to insure adequate species diversity. The exact species and
quantities for planting will be determined by the availability of such species
from commercial nurseries providing localized ecotype seedlings.
Seedlings would certainly be mixed upon plantings so that areas are not
comprised of a single species. The distribution of stems will create a
mosaic of hard and soft mast species that will provide seasonally available
forages for a wide range of indigenous wildlife including the Louisiana black
bear. The availability of soft mast species is important during the summer
and hard mast is critical in the fall and early winter for the buildup of fat
reserves in black bears preparing for denning. Single species plantings will
generally be avoided;
d. The Bank will be maintained, on an as-needed basis, by the use of
mechanical or chemical control or some combination thereof in order to
control noxious/exotic species colonization or other plant competition; and
e. Sponsor will use all prudent efforts (physical, chemical, and/or mechanical)
to remove and control Chinese tallow tree and any other existing
noxious/exotic vegetation from the Bank Property to the nearest seed
sources for colonization by these species. The Bank will be monitored to
prevent infestation by noxious/exotic vegetation.
Noxious/exotic
vegetation stem density will be controlled to five (5) percent or less of the
total stem density on an acre-by-acre basis. Sponsor may use disking
and/or herbicide application during the first three (3) years of growth to
reduce competition for seedlings (i.e., disking or mowing between planted
rows of trees or chemical applications to encourage survival and growth of
desirable plant species).
16
Table 3: Plant Species Proposed for the Bank Property:
Bottomland Hardwood Plantings
Common Name
Scientific Name
Percent Composition
Nuttall oak*
Quecus nuttalli
20%
willow oak
Quercus phellos
15%
water oak
Quercus nigra
10%
Baldcypress*
Taxodium distichum
10%
Sweet pecan
Carya illionensis
5%
overcup oak*
Quercus lyrata
5%
green ash
Fraxinus pennsylvanica
5%
Drummond red maple
Acer rubrum var. drummondii
5%
sweetgum
LiquidARMBar styraciflua
5%
common persimmon
Diospyros virginiana
5%
sugarberry
Celtis laevigata
5%
American elm
Ulmus Americana
5%
mayhaw
Crataegus opaca
2.0%
Buttonbush*
Cephalanthus occidentalis
1.0%
Water hickory*
Carya aquatica
1.0%
Box elder
Acer negundo
1.0%
*Species to be concentrated within natural low-lying swales and contours.
The Mitigation Work Plan developed for ARMB Phase I is depicted as Figure 13.
For a given planting, a minimum of 250 seedlings/saplings per acre will be present
(with a 60 to 40 hard mast to soft mast ratio) at the end of the fourth year (i.e. Year
5) following successful attainment of the one-year survivorship criteria. Trees
established through natural recruitment may be included in this tally, however, no
less than 125 hard mast-producing seedlings per acre must be present.
5.1.4
Invasive/Noxious Species Control
Invasive and noxious plant species, such as, Chinese tallow tree (Triadica
sebifera) will be removed using various techniques which may include pre-and
post-emergent herbicide applications, direct application by spray and/or injection,
mowing and any other successful technique during initial planting. The percent
cover of invasive plants will be monitored during short-term and long-term success
monitoring and appropriate action taken, if needed. (Please reference 5.1.3.
Vegetative Plantings 4.e.)
5.1.5
Monitoring
Monitoring shall commence immediately following plantings such that a baseline
is established for the ARMB. Monitoring will then occur within the spring of years
1, 3 and 5. Following year 5 or achieving short term success critiera, monitoring
shall then occur every 3 years until a minimum average canopy coverage of 80%
is established.
17
If it is determined at any time that the ARMB is not progressing at the rate at which
it should, monitoring will then begin to occur yearly until, at a minimum, the
established interim success criteria are met. Once the long-term success criteria
have been met, require d thinning may occur following surveying. Surveying shall
also be performed following thinning events.
5.2
Proposed Service Area
5.2.1
Primary Service Area
The primarily service area for the ARMB is the Atchafalaya Watershed Cataloguing
Unit 08080101. Use beyond this area will be determined on a case-by-case basis
as deemed appropriate by the New Orleans District (Figure 14).
The current District boundary between the USACE New Orleans and Vicksburg
District traverses the upper portion of the approximate 1,156.31 acre ARMB
property. The District line traverses the ARMB property in a northeast to southwest
orientation with the Vicksburg District to the north and the New Orleans District to
the south. It is our understanding that the District line is arbitrarily depicted
following the approximate drainage basins. It is our experience that the entire
ARMB Phase I, as well as the ARMB property in its entirety, drains into the
Atchafalaya River and its immediate tributaries and thus the New Orleans District.
5.3
General Bank and Need and Technical Feasibility
ARMB is proposed to provide compensatory mitigation for New Orleans District approved
projects within the Hydrologic Unit Code (HUC) 08080101 (Atchafalaya). Projects located
outside the HUC 08080101 would be evaluated on a case by case basis by the District.
In addition to providing mitigation for activities associated with continued population
growth, the proposed service area has a history of oil and gas exploration and production,
including the development of the Tuscaloosa Marine Shale formation, federal water control
projects and considerable linear activities, including transportation, power transmission
and pipelines.
5.4
Future Ownership and Long-Term Management Strategy
5.4.1
Sponsor/Operations Manager/Long-Term Management
Atchafalaya River Holdings, LLC
One American Place, Suite 820
Baton Rouge, LA 70825
POC: Mr. Andrew J. Harrison, Jr., Managing Member
18
5.4.2
Landowner/Long-Term Ownership
Dupuy Land Company
P.O. Box 9
Marksville, LA 71351
POC: Mr. Dirk Dupuy, Manager
5.4.3
Agent
Headwaters, Inc.
P.O. Box 2836
Ridgeland, MS 39158
www.headwaters-inc.com
POC: Mr. Clay Cromwell
5.4.4
Perpetual Site Protection Mechanism
ARMB will be protected in perpetuity by Conservation Servitude, pursuant to
Louisiana Revised Statute 9:1271, et seq. The Conservation Servitude will be held
by a conservationoriented 501(c)(3) organization to be determined, and will inure
and run with the property title.
The Conservation Servitude will prohibit activities, such as, clear cutting, fill
discharges, cattle grazing or other commercial surface development that would
diminish the quality or quantity of restored wetlands.
5.4.5
Sponsor Qualifications
Atchafalaya River Holdings, LLC, managed by Mr. Andrew J. Harrison, Jr., will be
the primary operator for bank land management and office operations. Mr.
Harrison holds B.S. and M.S. degrees in wildlife management from Louisiana Tech
University (1981) and Louisiana State University (1984). He previously managed
wetland properties for Williams, Inc. focusing on multiple use opportunities and
winter waterfowl habitat management. Mr. Harrison later attained a J.D. (1990)
and an LL.M. (environmental law) (1991) from Loyola University School of Law and
the George Washington University National Law Center, respectively. Following
law school, he was assistant regional counsel at the U.S. Environmental Protection
Agency, Region IV, for four years and spent an additional year on detail to the
Environmental Enforcement Section of the Lands and Natural Resources Division
of the U.S. Department of Justice. In 1996, Mr. Harrison commenced working on
mitigation banks, including counseling, establishing, operating and, for some,
managing the business of banks. Since then, Mr. Harrison has worked on a
number of mitigation banks and permittee responsible mitigation projects (PRMs)
in the New Orleans (NOD) and Vicksburg (VKD) Districts. Through a company
named Wetlands Mitigation Strategies, LLC, Mr. Harrison currently operates some
or all aspects of five (5) mitigation banks, four (4) in VKD and one (1) in NOD.
19
Mr. Harrison and Atchafalaya River Holdings will be supported by Mr. Clay
Cromwell and others of Headwaters who have considerable experience in
mitigation banking in VKD and the Mobile District.
6.0
Conclusion
In summary, the ARMB Phase I has the potential to re-establish approximately 237.0 acres of
BLH habitat and preserve approximately 51.7 acres of BLH habitat. The bank will also reestablish 42.4 acres of BLH upland buffer and preserve 29.1 acres of BLH upland buffer habitat.
These lands will be protected and maintained by Conservation Servitude in perpetuity. More
detailed information regarding financial assurances, monitoring provisions, and credit release
schedules will be provided in the subsequent draft MBI and will reflect current standards within
the New Orleans District.
7.0
References
Code of Federal Regulations, Title 33, Parts 325 and 332 and Title 40, Part 230, as published
on pages 19594-19704 in the Federal Register dated 10 April 2008.
United States Department of Agriculture Natural Resources Conservation Service, Web Soil
Survey, Avoyelles Parish, Louisiana.
http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx
United States Department of Agriculture Soil Survey of Avoyelles Parish, Louisiana, issued
September 1986.
http://soils.usda.gov/survey/online_surveys/louisiana/avoyellesLA1986/Avoyelles.pdf
Louisiana Department of Environmental Quality, Louisiana Water Quality Inventory:
Integrated Report (305(b)/303(d)).
http://www.deq.louisiana.gov/portal/DIVISIONS/WaterPermits/WaterQualityStandardsAsses
sment/WaterQualityInventorySection305b/2012IntegratedReport.aspx
http://www.deq.louisiana.gov/portal/Portals/0/planning/305b/2012/12%20IR1%20Appendix%
20A%20Text%20and%20Maps%20FINAL%201-25-13.pdf
National Wetland Plant List, Version 3.2. U.S. Army Corps of Engineers, 2014.
http://wetland_plants.usace.army.mil/
The Natural Communities of Louisiana. Louisiana Department of Wildlife and Fisheries
Louisiana Natural Heritage Program 2009.
http://www.wlf.louisiana.gov/sites/default/files/pdf/page_wildlife/6776are%20Natural%20Co
mmunities/ LA_NAT_COM.pdf
20
Figures
21
WWW.HEADWATERS-INC.COM
Phase I Conservation Servitude Area (393.1 ac)
Figure 1 - Vicinity Map
Sec. 5, 6, 7 & 8 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
0
31,000
Feet
ESRI World Topography Basemap
15,500
1:200,000
N
12/15/2016 JDL
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN,
GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo,
MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
Legend
WWW.HEADWATERS-INC.COM
Figure 2 - Site Location Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
0
900
1:12,000
N
1,800
Feet
12/15/2016 JDL
Phase I Conservation Servitude Area (393.1 ac)
USGS Big Bend/Simmesport (LA) Quad
Legend
WWW.HEADWATERS-INC.COM
Figure 3 - Site Location Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
0
Legend
USDA NAIP 2013
900
1:12,000
N
1,800
Feet
12/15/2016 JDL
Phase I Conservation Servitude Area (393.1 ac)
WWW.HEADWATERS-INC.COM
Figure 4 - Watershed Location Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
080801
_
^
Atchafalaya-Vermillion Watershed
Atchafalaya River Mitigation Bank
0
240,000
Feet
ESRI World Topography Basemap
120,000
1:1,500,000
N
12/15/2016 JDL
Sources: Esri, DeLorme, USGS, NPS, Sources: Esri, USGS, NOAA
_
^
Legend
WWW.HEADWATERS-INC.COM
Figure 5 - Historical Imagery Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
0
900
1:12,000
N
1,800
Feet
12/15/2016 JDL
Phase I Conservation Servitude Area (393.1 ac)
1952 USGS Aerial Photography
Legend
"
6!
°
!
°
!
"
6
"
6
"
6
J
"
°
!
!
"
6"
6
!
"
6
"
6
!
!
"
6!
"
6
!
5
!
!
5
!
!
!
"
6!
!
!
"
6!
"
6
Figure 6 - Current Hydrology Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
!
!
!
J
"
°
WWW.HEADWATERS-INC.COM
!
!
!
!
!
!
!
!
!
!
!
°
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
°
!
!
!
!
°
!
!
!
!
°
!
°
!
!
!
°
°
°
J
"
0
Legend
Drainage Direction
!
Agricultural Drains to Remain
Section 404 Waters
Agricultural Drains to be Plugged
LIDAR (LSU Atlas)
1,100
1:14,000
N
Low : 27.4593
High : 65.4396
Elevation (ft)
!
!
Plugs
"
6
!
Low Water Crossing (3)
J
"
2,200
Feet
12/15/2016 JDL
Phase I Conservation Servitude Area (393.1 ac)
Agricultural Drain to be Filled/Graded
Culverts to Remain (2)
!
5
°
!
!
WWW.HEADWATERS-INC.COM
Figure 7 - Historic Hydrology Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
0
8,750
1:113,000
N
17,500
Feet
12/15/2016 JDL
Phase I Conservation Servitude Area (393.1 ac)
Drainage Area (±21,000 ac)
USGS Big Bend/Simmesport (LA) Quad
Legend
Sh
Mt
Mr
WWW.HEADWATERS-INC.COM
Cu
Ts
Figure 8 - NRCS Soil Survey Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
Mt
Mr
Rx
0
Legend
Ts
900
N
1:12,000
USDA NAIP 2013
W - Water
Ts - Tensas-Sharkey Complex
1,800
Feet
Rx - Roxana Very Fine Sandy Loam
Mt - Moreland Clay
Mr - Moreland Silt Loam
Cu - Convent Very Fine Silt Loam
Cu
12/15/2016 JDL
Phase I Conservation Servitude Area (393.1 ac)
W
Te
WWW.HEADWATERS-INC.COM
Figure 9 - Current Land Use Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
0
USDA NAIP 2013
2,800
1:36,000
N
Water (±12%)
Scrub/Shrub/Cutover (±3%)
Pasture/Open Field (±2%)
Developed (±13%)
Cultivated Crops (±34%)
Bottomland Forest (±36%)
5,600
Feet
12/15/2016 JDL
Phase I Conservation Servitude Area (393.1 ac)
Land Use Within One Mile
Legend
WWW.HEADWATERS-INC.COM
Figure 10 - Louisiana Black Bear Critical Habitat
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
0
7,500
1:100,000
N
15,000
Feet
12/15/2016 JDL
Louisiana Black Bear Designated Critical Habitat
Phase I Conservation Servitude Area (393.1 ac)
USGS Big Bend/Simmesport (LA) Quad
Legend
!
!
!
!
!
5!
!
!
!
!
!
!
C
!
!
!
!
5
!
5
!
5!
Plugged
!
D!
d
gge
Plu
!
!
5
!
5
J
"
!
!
D'
!
5!
5
!!
!
5!
ed 5
gg !
Plu
!
!
!
5
!
!
!
!
5
!
Fish Bayou
H'
H
!
u
Pl
!
5!
ed
gg
!
!
5
!!
!
5
Figure 11 - Hydrological Work Plan Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
!
C'
J
"
Remain
WWW.HEADWATERS-INC.COM
!
Phase I Conservation Servitude Area (393.1ac)
Section 404 Waters (16,601.9 lf/12.5 ac)
At-Grade Road (18,060.6 lf/13.4 ac)
Agricultural Drain - To Remain (5,147.5 lf)
Agricultural Drain - To Be Plugged (8,855.5 lf)
Agricultural Drain - To Be Filled/Graded (1,194.1 lf)
B'
!
!
!
!
!
!
Low Water Crossing (3)
!
!
Culverts to Remain (2)
!
J
"
!
!
Agricultural Drain Plug Locations (13)
!
!
!
!
!
!
!
!
!
!
!
!
!
B
!
!
!
!
A
!
F'
!
!
5
!
5
!
!
!
!
F
E'
G'
!
Legend
G
!
Filled/Graded
E
!
!
A'
J
"
0
u
yo
Ba
C
1,000
N
1:13,000
2,000
Feet
Atchafalaya River
USDA NAIP 2013
ille
rv
ou
12/15/2016 JDL
Elevation (ft)
Elevation (ft)
36
37
38
39
40
41
42
36
37
38
39
40
41
42
2
1
2
3
4
5
Distance (ft)
6
Water Furrow
7
8
3
5
Distance (ft)
6
7
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
4
Wetland Re -Establishment
8
PC Farmland
9
10
11
11
12
12
Figure 11A: Typical Cross Section A-A'
9
Existing water furrow to
be plugged
10
Existing water furrow
Typical Cross Section A - A' Proposed Conditions
Existing Grade Grade
1
WWW.HEADWATERS-INC.COM
0
0
Existing Grade Grade
PC Farmland
Typical Cross Section A - A' Existing Conditions
Elevation (ft)
Elevation (ft)
30
32
34
36
38
40
42
44
30
32
34
36
38
40
42
44
2
3
1
2
3
4
5
6
7
8
Distance (ft)
9
10
Agricultural Drain
11
12
13
4
5
7
8
Distance (ft)
9
10
11
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
6
Wetland Re-Establishment
12
13
14
14
16
17
15
16
17
Existing Ag. Drain to be
plugged
15
Existing Ag. Drain Grade
PC Farmland
18
18
Figure 11B: Typical Cross Section B-B'
Typical Cross Section B - B' Proposed Conditions
Existing Grade Grade
1
WWW.HEADWATERS-INC.COM
0
0
Existing Grade Grade
PC Farmland
Typical Cross Section B - B' Existing Conditions
Elevation (ft)
Elevation (ft)
25
27
29
31
33
35
37
39
25
27
29
31
33
35
37
39
2
3
1
2
3
4
5
6
7
8
Distance (ft)
9
10
Agricultural Drain
11
12
13
14
4
5
7
8
Distance (ft)
9
10
11
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
6
Wetland Re-Establishment
12
13
16
17
15
16
17
Existing Ag. Drain to be
plugged
15
Existing Ag. Drainrade
PC Farmland
18
18
Figure 11C: Typical Cross Section C-C'
14
Typical Cross Section C - C' Proposed Conditions
Existing Grade Grade
1
WWW.HEADWATERS-INC.COM
0
0
Existing Grade Grade
PC Farmland
Typical Cross Section C - C' Existing Conditions
Elevation (ft)
30
32
34
36
38
40
42
1
WWW.HEADWATERS-INC.COM
0
2
Existing Grade Grade
PC Farmland
3
4
5
7
Distance (ft)
8
9
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
6
Agricultural Drain
10
11
13
14
15
Existing Improved Ag.
DrainGrade
PC Farmland
16
Figure 11D: Typical Cross Section D-D'
12
Typical Cross Section D - D' Existing Conditions
Elevation (ft)
Elevation (ft)
30
32
34
36
38
40
42
30
32
34
36
38
40
42
2
1
2
Existing Grade Grade
1
WWW.HEADWATERS-INC.COM
0
0
Existing Grade Grade
PC Farmland
4
5
6
7
Distance (ft)
8
9
10
11
12
3
4
5
7
Distance (ft)
8
9
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
6
Wetland Re -Establishment
10
11
14
15
13
14
15
Existing Improved Ag.
Drain to be plugged
13
Existing Improved Ag.
DrainGrade
PC Farmland
16
16
Figure 11E: Typical Cross Section E-E'
12
Typical Cross Section E - E' Proposed Conditions
3
Agricultural Drain
Typical Cross Section E - E' Existing Conditions
Elevation (ft)
Elevation (ft)
32
34
36
38
40
42
32
34
36
38
40
42
2
1
2
3
4
5
Distance (ft)
6
Agricultural Drain
7
8
3
5
Distance (ft)
6
7
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
4
Wetland Re -Establishment
8
PC Farmland
9
10
11
11
12
12
Figure 11F: Typical Cross Section F-F'
9
Existing Improved Ag.
Drain to be plugged rade
10
Existing Improved Ag.
Drainrade
Typical Cross Section F - F' Proposed Conditions
Existing Grade Grade
1
WWW.HEADWATERS-INC.COM
0
0
Existing Grade Grade
PC Farmland
Typical Cross Section F - F' Existing Conditions
Elevation (ft)
Elevation (ft)
34
36
38
40
34
36
38
40
2
1
2
3
4
5
Distance (ft)
6
Agricultural Drain
7
8
9
3
5
Distance (ft)
6
7
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
4
Wetland Re-Establishment
8
10
11
11
12
12
Figure 11G: Typical Cross Section G-G'
9
Existing Improved Ag.
Drain to be plugged
10
Existing Improved Ag.
DrainGrade
PC Farmland
Typical Cross Section G- G' Proposed Conditions
Existing Grade Grade
1
WWW.HEADWATERS-INC.COM
0
0
Existing Grade Grade
PC Farmland
Typical Cross Section G- G' Existing Conditions
50
48
46
44
42
40
38
36
34
32
30
50
48
46
44
42
40
38
36
34
32
30
Elevation (ft)
Elevation (ft)
60
Existing GradeGrade
20
80
Distance (ft)
100
120
Existing at-grade 12' wide Road
140
40
60
Distance (ft)
100
120
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
80
Proposed50' maintained
right-of-way
140
180
180
200
200
Figure 11H: Typical Cross Section H-H'
160
Wetland Rehabilitation
160
Section 404 Wetlands
Typical Cross Section H-H' Proposed Conditions
40
Wetland Re-Establishment
20
WWW.HEADWATERS-INC.COM
0
0
Existing GradeGrade
PC Farmland
Typical Cross Section H-H' Existing Conditions
WWW.HEADWATERS-INC.COM
Figure 12 - Estimated Bankline Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
0
Legend
USDA NAIP 2013
900
1:12,000
N
1,800
Feet
12/15/2016 JDL
Phase I Conservation Servitude Area (393.1 ac)
Digitized 2013 Bankline
Digitized 2005 Bankline
Digitized 1981 Bankline
Digitized 1952 Bankline
WWW.HEADWATERS-INC.COM
Wildlife Openings - Non-Mitigation (7.0 ac)
Bottomland Hardwood Upland Buffer Preservation (29.1 ac)
Bottomland Hardwood Upland Buffer Re-Establishment (42.4 ac)
Bottomland Hardwood Preservation (51.7 ac)
Bottomland Hardwood Re-Establishment (237.0 ac)
Section 404 Waters (16,601.9 lf/12.5 ac)
Access Roads - Non-Mitigation (18,060.6 lf/13.4 ac)
Phase I Conservation Servitude Area (393.1 ac)
Legend
Figure 13 - Mitigation Plan Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
Atchafalaya River Mitigation Bank
0
USDA NAIP 2013
900
N
1:12,000
1,800
Feet
12/15/2016 JDL
12040201
Sabine Lake
08080204
Whisky Chitto
08080203
Upper Calcasieu
08040301
Lower Red
08080103
Vermilion
08060204
Coles Creek
08080101
Atchafalaya
08070300
Lower Grand
Figure 14 - Service Area Map
Sec. 5 & 6 - T 1 S - R 7 E
Avoyelles Parish, Louisiana
08070204
Lake Maurepas
08070203
Tickfaw
08080101
8-Digit HUC
0
240,000
Feet
ESRI World Topography Basemap
120,000
1:1,500,000
N
12/15/2016 JDL
Sources: Esri, DeLorme, USGS, NPS, Sources: Esri, USGS, NOAA
08090301
East Central Louisiana Coastal
08090100
Lower Mississippi-New Orleans
08090203
Eastern Louisiana Coastal
08090202
Lake Pontchartrain
08090201
Liberty Bayou-Tchefuncta
03180004
Lower Pearl
Atchafalaya River Mitigation Bank
03180005
Bogue Chitto
_
^
Legend
08070205
Tangipahoa
08090302
West Central Louisiana Coastal
08070202
Amite
08070100
Lower Mississippi-Baton Rouge
08070201
Bayou Sara-Thompson
08040306
Bayou Cocodrie
08060100
Lower Mississippi-Natchez
_
^
08040305
Black
08050003
Tensas
Atchafalaya River Mitigation Bank
08080102
Bayou Teche
08040304
Little
08080201
Mermentau Headwaters
08080202
Mermentau
11140207
Lower Red-Lake Iatt
WWW.HEADWATERS-INC.COM
08080206
Lower Calcasieu
08080205
West Fork Calcasieu
12010005
Lower Sabine
12010004
Toledo Bend Reservoir
Appendices
22