Home

Tulsa District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to replace the existing bridge (a concreteTee-Beam structure constructed in 1943) over Little Greenleaf Creek.

The applicant proposes to replace the existing bridge (a concrete Tee-Beam structure constructed in 1943) over Little Greenleaf Creek. The undertaking includes replacing the existing structurally deficient 28-foot wide bridge with a 40-foot wide structure. The old bridge piers would be removed as well. ODOT proposes an offset alignment on the west side of SH 10 at a minimal distance and extent to allow construction of the proposed bridge while keeping traffic open at all times. The offset alignment to the west would aid traffic flow for the bridge to the south and the entrance to Greenleaf State Park. In addition, keeping traffic open would provide reliable southern transportation route for the Camp Gruber Training Center. No work is proposed for the bridge to the south of the Greenleaf State Park entrance. SH 10 would be gradually widened beginning south of the entrance to Greenleaf State Park and reaching the apex at the new bridge crossing of the backwater creek and then gradually narrowing back into SH 10 north of Elm Grove Road (E 0960). Approximately 85,500 cubic yards of rock fill material over 4.54-acre would be deposited into Little Greenleaf Creek, a backwater of the McClellan-Kerr Arkansas River Navigation System. Also the new bridge would be at a higher grade elevation to allow small boats to travel under.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas