You can copy from here when filling out the rest of the page.
Polk County. Florida Department of Transportation (FDOT) - District 1, Bartow, Florida.
PROJECT PURPOSE:
Basic: The basic project purpose is linear transportation.
Overall: The overall project purpose is to improve the existing State Road (SR) 60 roadway over the CSX railroad in order to facilitate a constant flow of traffic, without disruption at the railroad crossing, as truck traffic and rail use increases due to projected traffic and train transport demands within this region of Polk County.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Florida Department of Transportation (FDOT) - District 1
Attn: Mr. Brent Setchell
801 N. Broadway Avenue
Bartow, Florida 33830
WATERWAY AND LOCATION: The project would affect waters of the United States associated with Peace Creek Drainage Canal. The project site is located along SR 60, and extends approximately 1 mile in length, in Sections 1 and 6, Township 30 South, Ranges 26 and 27 East, Bartow, Polk County, Florida.
Directions to the site are as follows: From the intersection of US 98 and SR 60 in Bartow, head east on SR 60. Arrive at the beginning of the project in approximately 10.8 miles.
APPROXIMATE CENTRAL COORDINATES: Latitude 27.904348°
Longitude - 81.663141°
PROJECT PURPOSE:
Basic: The basic project purpose is linear transportation.
Overall: The overall project purpose is to improve the existing State Road (SR) 60 roadway over the CSX railroad in order to facilitate a constant flow of traffic, without disruption at the railroad crossing, as truck traffic and rail use increases due to projected traffic and train transport demands within this region of Polk County.
EXISTING CONDITIONS: The following information regarding existing site conditions is provided by the applicant: The project area is approximately 64.39 acres. Approximately 47.55 acres are currently owned by FDOT. Minor right-of-way (ROW) acquisition to accommodate the improvements will be required. The major land use within the existing ROW is Transportation (810) at approximately 26%. The next highest land use is Hardwood Conifer Mixed (434) at 45% due to the proposed stormwater management facility (SMF) parcels. Although Residential (110) land use is mapped in both the proposed and existing ROW, this land use is historic and the land area is currently vacant with no buildings on-site. There are no residential relocations. Wetlands and surface waters occurring within the project area include disturbed herbaceous and shrubby wetlands located along roadside drainage ditches that function as conveyance for SR 60. The Peace Creek Drainage Canal is ultimately connected to the Peace River to the west. The existing land use Florida Land Use, Cover and Forms Classification System (FLUCFCS) codes within the proposed project boundaries, as mapped by Southwest Florida Water Management District (SWFWMD), are as follows:
Residential Low Density < 2 acres Dwelling Units (110): 5.44 acres in existing ROW (8%)
Industrial (150): 2.18 acres in existing ROW (3%)
Tree Crops (220): 0.79 acre in existing ROW (1%)
Other Open Lands (260): 0.31 acre in existing ROW (1%)
Pine Flatwoods (411): 1.74 acres in existing ROW (3%)
Hardwood Conifer Mixed (434): 29.60 acres in existing ROW (45%)
Streams and Waterways (510): 2.80 acres in existing ROW (4%)
Mixed Wetland Hardwoods (617): 0.68 acre in existing ROW (1%)
Freshwater Marshes (641): 1.73 acres in existing ROW (4%)
Wet Prairies (643): 0.76 acre in existing ROW (1%)
Transportation (810): 16.96 acres in existing ROW (26%)
Utilities (830): 1.40 acres in existing ROW (3%)
The resources the applicant used to evaluate aquatic resource areas for this project included background research of literature, GIS data, U.S. Geological Survey (USGS) topographic maps, and current and historic aerials. Land use was mapped using FLUCFCS and GIS data layers from SWFWMD, and soils were mapped using GIS data layers from the Natural Resources Conservation Service (NRCS) for Polk County. Additionally, the National Wetland Inventory (NWI) GIS data layers were used as a reference. The applicant identified four wetlands that are proposed to be impacted by the project. Three are along the mainline (WL 2377 L, WL2380 L, and WL 2413 R), and one is within the limits of a SMF/pond (SFM E WL 1). Other identified wetlands were included in the descriptions below because of their proximity to the potential work; however, during design the wetlands were avoided.
WL 2377 L: FLUCFCS Code: 641 (freshwater marsh)/USFWS Classification: PEM1C (palustrine, emergent, persistent, seasonally flooded): This wetland is a small depressional, herbaceous wetland north of SR 60 at Station 2377 Left (L) and west of the Peace Creek Drainage Canal. Its total size is 0.03 acre with approximately 0.02 acre occurring within the ROW. Dominant vegetation is soft rush (Juncus effusus). Some invasive species are present, and disturbance by cattle grazing and hog rooting was noted. The wetland is seasonally flooded. This wetland meets the criteria for wood stork (Mycteria americana) suitable foraging habitat (SFH) and is classified as a Class 2 hydroperiod wetland (inundated for 60‐120 days per year). Soils in this area are mapped as Pamona fine sand (non‐hydric); however, on‐site soil conditions indicate hydric soils. Seasonal high water and normal pool elevations were set in this area. (Impacts are proposed to occur as a result of fill for the new sidewalk on the north and the reconfigured roadway design to allow for the frontage road to the south. Federal mitigation is proposed for impacts to wetland value and function and wood stork SFH impacts.)
WL 2380 L: FLUFCS Code: 641 (freshwater marsh)/USFWS Classification: PEM1C (palustrine, emergent, persistent, seasonally flooded): Wetland 2380 L is a small depressional, herbaceous wetland north of SR 60 at Station 2380 L and west of the Peace Creek Drainage Canal. Its total size is 0.25 acre, all occurring with the ROW. Dominant groundcover vegetation is saw grass (Cladium jamaicense) and dollarweed (Hydrocotyle umbellata). Laurel oak (Quercus laurifolia) provides scattered overstory. Some invasive species are present. The wetland is seasonally flooded. Evidence of hog rooting was noted which left open areas of disturbed soil throughout the wetland. This wetland provides SFH for the wood stork and is classified as a Class 2 hydroperiod wetland (inundated for 60‐120 days per year). Soils in this area are mapped as Felda fine sand and Pamona fine sand (non‐hydric); however, on‐site soil conditions indicate hydric soils. Seasonal high water and normal pool elevations were set in this area. (Impacts are proposed to occur as a result of fill from the mainline and dredging for Pond 1. Federal mitigation is proposed for impacts to wetland value and function and wood stork SFH impacts.)
WL 2413 R: FLUCFCS Code: 641 (freshwater marsh)/USFWS Classification: PEM1Cx (palustrine, emergent, persistent, seasonally flooded, excavated): Wetland 2413 R is a herbaceous, ditched edge of a larger wetland that is located south of SR 60 and east of CSX railroad tracks at Station 2413 Right (R). The wetland is approximately 5.5 acres in size with 0.26 acre occurring within the ROW. Within the ROW, the wetland is routinely mowed and has been disturbed by the incorporation of a swale for roadside drainage. Dominant herbaceous vegetation includes Bahia grass (Paspalum notatum), vasey grass (Paspalum urvillei), carpet grass (Axonopus sp.), and dollarweed. Just offsite, the wetland becomes shrubby and is vegetated with Carolina willow (Salix caroliniana) and primrose willow (Ludwigia peruviana). The wetland is seasonally flooded. No evidence of wildlife utilization was noted during field reviews. This wetland may occasionally provide SFH for the wood stork and is classified as a Class 2 hydroperiod wetland (inundated for 60‐120 days per year). Soils in this area are mapped as Kaliga muck (hydric) and Pamona fine sand (non‐hydric). Seasonal high water and normal pool elevations were set in this area. (Impacts are proposed to occur as a result fill for the roadway mainline slope. Federal mitigation is proposed for impacts to wetland value and function and wood stork SFH impacts.)
SMF E WL 1: FLUCFCS Code: 641 (freshwater marsh)/USFWS Classification: PEM1C (palustrine, emergent, persistent, seasonally flooded): This area is located within the limits for SMF Pond 3, east of the CSX railroad tracks and north of SR 60. The total size is 0.11 acre with 0.09 acre occurring within the ROW. Soils in this area are mapped as Pamona fine sand (non‐hydric). The area is a deep depression with a few Carolina willow and duckweed (Lemna minor) in a layer over the ground. At the time of the review no water was present. Substantial dumping has occurred here including tires and plastic debris. Wildlife observation consisted of tree frog species. This wetland provides occasional SFH for the wood stork and is classified as a Class 3 wetland (inundated for 120‐180 days per year). (Impacts are proposed to occur as a result of fill to accommodate the berm around SMF Pond 3. Federal mitigation is proposed for impacts to wetland value and function, and wood stork SFH impacts.)
SMF W WL 1: FLUCFCS Code: 641 (freshwater marsh)/USFWS Classification: PEM1Cx (palustrine, emergent, persistent, seasonally flooded, excavated): This area is located within existing ROW north of SR 60 and west of the Peace Creek Drainage Canal. The total size is 0.38 acre. The wetland is within the area evaluated for SMF Pond 1. However, the SMF was located elsewhere, and impacts to this wetland were avoided. Historically fill has been removed from this area which resulted in a lower ground elevation than the surrounding area, and wetland conditions have developed. Soils in this area are mapped as Pamona fine sand (non‐hydric); however, on‐site soil conditions indicate hydric soils. A long man‐made ditch provides a connection to the Peace Creek Drainage Canal to the east. Dominant ground cover vegetation includes carpet grass, blue maidencane (Amphicarpum muhlenbergianum), soft rush, and beakrushes (Rhynchospora spp.). Minimal invasive species were present. The wetland is seasonally flooded. No evidence of wildlife utilization was noted during field reviews. This wetland meets the definition of wood stork SFH. (No impacts are proposed for this location.)
SMF W WL 2: FLUCFCS Code: 641 (freshwater marsh)/USFWS Classification: PEM1Cx (palustrine, emergent, persistent, seasonally flooded, excavated): This herbaceous wetland area is located within existing ROW north of SR 60 and west of the Peace Creek Drainage Canal. The total size is 0.18 acre. The wetland is within the area evaluated for SMF Pond 1. However, the SMF was located elsewhere, and impacts to this wetland were avoided. Historically fill has been removed from this area which resulted in a lower ground elevation than the surrounding area, and wetland conditions have developed. Soils in this area are mapped as Pamona fine sand (non‐hydric); however, on‐site soil conditions indicate hydric soils, and dried algae mats were noted during one field inspection (June 2015). Dominant ground cover vegetation includes an overstory of scattered slash pine (Pinus elliottii), beakrushes, blue maidencane, red top grass (Panicum rigidulum), viviparous spike rush (Eleocharis vivipara), and milkwort (Polygala nana). The wetland is seasonally flooded. Evidence of feral hogs was noted. This wetland meets the definition of wood stork SFH. (No impacts are proposed for this location.)
SMF W WL 3: FLUCFCS Code: 627 (slash pine swamp forest)/USFWS Classification: PFO4Cx (palustrine, forested, needle‐leaved evergreen, seasonally flooded, excavated): This herbaceous wetland area is located within existing ROW north of SR 60 and west of the Peace Creek Drainage Canal. The total size is 0.59 acre. The wetland is within the area evaluated for SMF Pond 1. However, the SMF was located elsewhere, and impacts to this wetland were avoided. Historically fill has been removed from this area which resulted in a lower ground elevation than the surrounding area, and wetland conditions have developed. Soils in this area are mapped as Pamona fine sand (non‐hydric); however, on‐site soil conditions indicate hydric soils, and dried algae mats were noted during one field inspection (June 2015). Dominant ground cover vegetation includes an overstory of slash pine, carpet grass, camphor‐weed (Pluchea rosea), beakrushes. The wetland is seasonally flooded. Nuisance species included some blackberry (Rubus spp.) and tropical soda apple (Solanum viarum). Evidence of feral hogs was noted. This wetland meets the definition for wood stork SFH. (No impacts are proposed for this location.)
SMF W WL 4: FLUCFCS Code: 641 (freshwater marsh)/USFWS Classification: PEM1Cx (palustrine, emergent, persistent, seasonally flooded, excavated): This herbaceous wetland area is located within existing ROW north of SR 60 and west of the Peace Creek Drainage Canal. The total size is 1.19 acres. The wetland is within the area evaluated for SMF Pond 1. However, the SMF was located elsewhere, and impacts to this wetland were avoided. Historically fill has been removed from this area which resulted in a lower ground elevation than the surrounding area, and wetland conditions have developed. Soils in this area are mapped as Pamona fine sand (non‐hydric); however, on‐site soil conditions indicate hydric soils. Dominant ground cover vegetation includes soft rush, duck potato (Sagittaria lancifolia), pickerel weed (Pontederia cordata), viviparous spikerush, and peat moss (Sphagnum spp). Clusters of slash pine and occasional black gum (Nyssa sylvatica biflora) are also present. The wetland is seasonally flooded. Evidence of feral hogs was noted; frogs were present, and a white‐eyed vireo (Vireo griseus) was audible. No nuisance species were observed. This wetland provides SFH for the wood stork. (No impacts are proposed for this location.)
SW 2392 L: FLUCFCS Code: 510 (streams and waterways)/USFWS Classification: PEM1Cx (palustrine, emergent, persistent, seasonally flooded, excavated): This ditch is located on the north side of SR 60 and west of the CSX railroad track at Station 2392 L. It was excavated from hydric soil (Holopaw fine sand, depressional) and is entirely vegetated by Cogon grass (Imperata cylindrica). No water was evident at the time of the field review. This area does not provide SFH for the wood stork given the 100% coverage by nuisance species and dry conditions. (This ditch is proposed to be filled as a result of the reconfigured roadway alignment. Federal mitigation is proposed.)
SW 2399 L: FLUCFCS Code: 510 (streams and waterways)/USFWS Classification: PEM1Cx (palustrine, emergent, persistent, seasonally flooded, excavated): This ditch is located on the north side of SR 60 and west of the CSX railroad track at Station 2399 L. It was excavated from hydric soil (Holopaw fine sand, depressional) and is vegetated by Carolina willow, Cogon grass along the banks, primrose willow, and cattails (Typha sp.). Standing water was present at the time of the field review. This area does not provide SFH for the wood stork given the excessively steep sided banks and deep water depth. (This ditch is proposed to be filled as a result of the reconfigured roadway alignment. Federal mitigation is proposed.)
SW 2419 L: FLUCFCS Code: 510 (streams and waterways)/USFWS Classification: PEM1Cx (palustrine, emergent, persistent, seasonally flooded, excavated): This is a small depression at a mitered end section on the north side of SR 60, east of the CSX railroad tracks, near a driveway at Station 2419 L. It is excavated from Zolfo fine sand (non‐hydric). Vegetation includes the nuisance species cattails and may provide SFH for the wood stork due to ponding. No water was present at the time of the field review although hydric indicators were present. This wetland is classified as a Class 2 wetland (inundated for 60‐120 days per year). (This sump area is proposed to be filled as a result of the reconfigured roadway alignment. Federal mitigation will be provided.)
SW 1 (Peace Creek Drainage Canal bridge) and SMF E SW 1 (Peace Creek Drainage Canal/Pond 3 outfall): FLUCFCS Code: 510 (streams and waterways)/USFWS Classification: R2UB3Hx (riverine, lower perennial, mud, permanently flooded, excavated): Both areas are locations in the Peace Creek Drainage Canal. The canal is a man‐made feature with spoil along the banks, mature pines and oaks, and flows to the south. At the crossing at SR 60 where the proposed bridges will be constructed, the vegetation includes smartweed (Polygonum hydropiperoides), paragrass (Brachiaria mutica), and Peruvian primrose willow. At times during the year, the water levels are very low and the littoral shelf and areas within the channel are exposed. (Impacts are proposed at this location as a result of permanent fill for the new bridge structures including piles and rubble rip rap. Temporary impacts will also occur as a result of construction vehicles needed to construct the bridge. Cranes will be used during construction, and potential crane paths will cause temporary impacts along the banks of the canal. Following construction, the banks will be returned to existing grade. All impacts have been assessed as “permanent” for mitigation requirements.) The bridge area of the canal provides SFH for the wood stork and is classified as a Class 4 wetland. Wood storks, Great Blue Herons (Ardea herodias), and other wading birds have been observed foraging in the shallow areas of the Peace Creek Drainage Canal near the bridge location. At the Pond 3 outfall location, which is about 880 feet north of the existing SR 60 bridge, the banks are very steep, and no permanent vegetation is present. Given the steep sided banks and deep water depths, this area is not considered SFH. (Impacts related to the outfall for Pond 3 are the result of a lateral ditch extending from Pond 3. The open ditch from the pond will terminate and outflow into the canal. Permanent fill impacts will occur from the placement of rubble rip rap within the limits of the canal at the end of the ditch. Federal mitigation for impacts to aquatic habitat and wood stork SFH are proposed for impacts at the bridge location.)
PROPOSED WORK: The applicant seeks authorization to discharge dredged and/or fill material into waters of the United States to perform improvements to an approximately one-mile-long segment of SR 60. The major component of the project consists of elevating the SR 60 roadway over the existing CSX railroad at-grade crossing. The roadway will be elevated using permanent retaining walls (i.e., mechanically stabilized earth walls). Three new pairs of SR 60 bridge structures are proposed over the existing CSX railroad, over an existing underground petroleum pipeline and frontage road, and over the Peace Creek Drainage Canal. The existing eastbound SR 60 bridge over the Peace Creek Drainage Canal will be rehabilitated and re-used for frontage road access, and the westbound bridge will be removed. Dry shelves to accommodate a wildlife crossing are included in the new bridge plans. A retrofit of the existing bridge for a narrow wildlife shelf is also proposed. Sidewalks, bicycle lanes, and three new frontage roads will be included in the improvements. Two off-site SMF ponds are proposed. Right-of-way acquisition will occur to accommodate the proposed improvements. The project proposes to result in permanent (direct) impacts to 1.58 acres of waters of the United States (0.62 acre of palustrine herbaceous wetlands, 0.33 acre of drainage ditches, and 0.63 acre of canal).
Additionally, secondary wetlands impacts were assessed at locations where remnant wetlands will occur following the proposed impacts. Approximately 0.22 acre of secondary impacts are anticipated. These impacts are as follows:
WL 2377 L: Wetland 2377 L is a small wetland 0.03 acre in total size that will have a 0.01 remainder located outside the ROW. The remainder will likely have changes in water levels due to the changes in drainage characteristics and flow patterns. Changes in vegetation are also likely. Secondary impacts to this remnant wetland have been included in the federal mitigation proposal.
WL 2413 R: Wetland 2413 R is a linear, 25‐foot wide, shrubby area adjacent to the direct impact herbaceous area assessed for WL 2413 R. It is anticipated that the direct impact will result in changes to the type of vegetation within the wetland edge. The secondary impact area was included in the state and federal mitigation proposal.
SMF E WL 1: Wetland SMF E WL 1 is within the boundaries for SMF Pond and 3 is a small, deep depressional wetland, 0.11 acre in size that will have a 0.02 remainder located outside the ROW. The remainder will likely have changes in water levels due to the changes in drainage characteristics and flow patterns. Changes in vegetation are also likely. Secondary impacts to this remnant wetland have been included in the federal mitigation proposal.
Of the overall impacts, to include permanent (direct) and secondary impacts, 1.47 acres are considered to exhibit the features which provide wood stork SFH.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: Impacts to surface waters and wetlands were avoided or minimized to the extent practicable. Given the nature of the project (i.e., the addition of new bridge structures, frontage roads, and off‐site SMFs), complete avoidance of impacts is not possible. Minimization measures for the existing design were explored and implemented where technically capable and economically practicable. For example, impacts to wetlands and surface waters were minimized during the pond siting phase of the design by conducting thorough environmental evaluations of all alternative pond sites (refer to the section of this public notice entitled: “Existing Conditions” for additional information). Recommendations to the designers were provided and were used in the selection of final pond sites. Pond siting avoided several wetlands in the landscape, specifically wetlands identified as SMF W WL’s 1, 2, 3, and 4. Pond designs were developed to minimize wetland impacts to the extent practicable at other locations. Minimization of impacts to surface waters was achieved by incorporating many of the existing open ditches in the final plans with re‐contouring or re-grading. These areas are expected to maintain their current characteristics and functions. Mechanically stabilized earth walls were incorporated into the design as well which minimize impacts by reducing the overall footprint of the roadway. These walls avoid large, sloped areas that would cause additional wetland impacts.
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: Mitigation to compensate for unavoidable impacts to waters of the United States is proposed to occur through the purchase of herbaceous credits from Boran Ranch Mitigation Bank, a federally- approved mitigation bank. The Bank uses the Wetland Rapid Assessment Procedure (WRAP) to assess federal mitigation credit requirements. This in-basin wetland mitigation bank will provide mitigation credits to offset the impacts to waters of the United States and compensate for losses to SFH for the wood stork. Impacts to 1.80 acres to waters of the United States is anticipated to be mitigated by purchasing 0.69 herbaceous credits from Boran Ranch Mitigation Bank. This credit amount includes mitigation for impacts to 1.47 acres of wood stork SFH. Boran Ranch offers credits in both short and long hydroperiod wetlands. An overall net increase in kg of biomass will result from the 0.69 herbaceous credit purchase. Impacts will include direct impact in waters of the United States in herbaceous wetlands. Only secondary impacts will occur in one shrubby wetland. Only herbaceous mitigation credits are proposed as the direct impacts occur in herbaceous wetlands only.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. Additionally, the applicant has provided documentation to the Corps that the State Historic Preservation Officer has reviewed a Cultural Resource Assessment Survey performed for the proposed project area and that the State Historic Preservation Officer concurred with the survey findings of no effect on historic properties. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined that the proposed project may affect, but is not likely to adversely affect the Eastern Indigo snake (Drymarchon corais couperi), wood stork, and Audubon’s crested caracara (Caracara cheriway). The Corps will request U.S. Fish and Wildlife concurrence with this determination pursuant to Section 7 of the Endangered Species Act through separate letter. The Corps has also determined that the proposed project would have no effect on the Everglade Snail Kite (Rostrhamus sociabilis plumbeus), Florida grasshopper sparrow (Ammodramus savannarum floridanus), sand skink (Neoseps reynoldsi), blue-tailed mole skink (Eumeces egregious lividus), and Florida scrub jay (Aphelocoma coerulescens) or their designated critical habitat.
Eastern Indigo Snake: The Eastern indigo snake is stout-bodied, shiny black and can reach lengths up to eight feet. It may be found in a range of habitats, from scrub and sandhill to wet prairies and mangrove swamps. The Eastern Indigo snake may be present in gopher tortoise (Gopherus polyphemus) burrows in sandy uplands but forages in more hydric habitats, and requires very large tracts to survive. No Eastern Indigo snakes were observed during field reviews performed by the applicant; however, gopher tortoise burrows are present specifically east of CSX railroad tracks near potential pond sites. According to the information provided by the applicant, six active and inactive gopher tortoise burrows were observed within the limits of the proposed project. Given the above information, the Corps utilized The Eastern Indigo Snake Programmatic Effect Determination Key, August 2013, which resulted in the following sequential determination: A > B > C > D = not likely to adversely affect the Eastern Indigo snake.
Wood Stork: The wood stork is a large, white wading bird with black wings and a short black tail. Wood Storks nests colonially in a variety of inundated forested wetlands, including cypress strands and domes, mixed hardwood swamps, sloughs, and mangroves. Foraging habitat includes shallow water in freshwater marshes, swamps, lagoons, ponds, tidal creeks, flooded pastures, and ditches, where fluctuating water levels concentrate food sources. Data (FWS GIS data) were reviewed by the applicant to determine adjacent nesting colonies and Core Foraging Areas (CFAs). The project is within the CFA of four nesting colonies for the Wood Stork (Lake Rosalie, Lake Somerset, Mulberry Northeast, and Saddlebag Lake). The nearest colony (Saddlebag Lake) is located 11.8 miles to the east. Wetlands and surface waters within the proposed project limits are considered to be Suitable Foraging Habitat (SFH) for the Wood Stork. Wood Storks were observed, during the applicant’s field reviews, foraging within the Peace Creek Drainage Canal. There are no nesting colonies within the proposed project limits. The applicant proposes to provide compensatory mitigation to fully offset proposed impacts to wood stork SFH. Given the above information, the Corps utilized the Wood Stork Key for South Florida dated May 18, 2010, which resulted in the following sequential determination: A > B > C > D > E = not likely to adversely affect the wood stork.
Audubon’s Crested Caracara: The proposed project site is within the USFWS consultation area for this species. The Crested Caracara is both a raptor and a scavenger recognized by long legs, a bold color pattern and a black-capped head. Coloration is mainly blackbrown, has a white neck and throat; red facial skin is bare. This species prefers cabbage palms for nesting that are surrounded by habitats with low ground cover and low density of tall or shrubby vegetation. Audubon’s crested caracara has very specific nesting requirements. Suitable nesting habitat exists within the project limits as determined by both background research and on-site field inspections performed by the applicant. The applicant’s review of GIS data available indicates no historic evidence of Audubon’s crested caracara recorded in the proposed project limits. Field reviews found very few cabbage palms, and these were within mixed forested areas and on commercial sites. A survey was conducted by the applicant in the spring of 2016. No caracara individuals or caracara nesting activity were observed within the survey area during the 2016 survey. Also, no caracaras were observed at any time during the Southeastern American Kestrel (Falco sparverius paulus) surveys (conducted in the summer of 2015) or during establishment of wetland and surface water limits. However, these two activities were conducted outside of nesting season. Given the presence of suitable nesting habitat but no observations, the Corps has determined that the proposed project may affect, but is not likely to adversely affect the Audubon’s Crested Caracara.
Florida Scrub Jay: The proposed project site is within the USFWS consultation area for this species. The Florida Scrub Jay is known by its pale blue coloring on the head, nape, wings, and tail. Its size and appearance is similar to the Blue Jay, but has a crest-less head. This species is found on fire-dominated, low-growing oak scrub habitat. This oak habitat is typically on well-drained sandy soils. There is no scrub habitat within the project limits. The project limits, the parcels proposed for SMFs and areas adjacent to the proposed ROW limits were reviewed by the applicant for the presence of scrub oaks. No scrub oaks were identified. Due to the absence of nearby scrub habitat, the absence of scrub oaks, and no observations of Florida scrub jays during field reviews performed by the applicant, the Corps has determined that the proposed project would have no effect on the Florida scrub jay.
Everglade Snail Kite: The proposed project site is within the USFWS consultation area for this species. The Snail Kite is a dark colored raptor that is medium in size. Adult male snail kites can be slate gray colored to black colored however the tail is white and with a dark band and pale terminal band. The bill is long and hooked. Preferred foraging habitat is large, open marshes and lakes with shallow open waters. Nesting habitat includes low trees or shrubs over water. The snail kite’s principal prey are apple snails (Ampullariidae) that inhabit areas vegetated by spikerush, maidencane, and sawgrass. No designated critical habitat for the Everglade snail kite is located in the proposed project vicinity. No historic observations of snail kites were identified in the research performed by the applicant, and no observations of snail kites were made during the applicant’s field reviews. Given the lack of specific habitat within the study area and the lack of observation of this species, the Corps had determined that the proposed project would have no effect on the Everglade snail kite.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries associates with the receiving waters of the Peace Creek Drainage Canal. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer at the Palm Beach Gardens Office, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410-6557 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Mrs. Tarrie Ostrofsky, in writing at the Palm Beach Gardens Office, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410-6557, by electronic mail at Tarrie.L.Ostrofsky@usace.army.mil, by fax at (561) 626-6971, or by telephone at (561) 472-3519.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
CONTRACT PLANS COMPONENTS
STATE OF FLORIDA
ROADWAY PLANS
DEPARTMENT OF TRANSPORTATION
SIGNING AND PAVEMENT MARKING PLANS
STRUCTURES PLANS
CHIPLEY
10
95
75
TALLAHASSEE
PENSACOLA
CONTRACT PLANS
JACKSONVILLE
10
FORT WALTON
BEACH
LAKE
PANAMA
CITY
295
CITY
ST AUGUSTINE
GAINESVILLE
OCALA
INDEX OF ROADWAY PLANS
SHEET NO.
DAYTONA BEACH
DELAND
FINANCIAL PROJECT ID 436559-1-52-01
4
SHEET DESCRIPTION
ORLANDO
1
KEY SHEET
NEW PORT RICHEY
BEACH LINE
EXPRESSWAY
F
4
L
O
R
LAKELAND T ID
U
R A'
BARTOW
N S
P
IK
MELBOURNE COCOA
75
NOTES TO REVIEWER
3
SIGNATURE SHEET
4 - 10
SUMMARY OF PAY ITEMS
11 - 13
TAMPA
POLK COUNTY (16110)
14
ST PETERSBURG
275
SARASOTA -
DRAINAGE MAP
STATE ROAD NO. 60
E
FT PIERCE
75
BRADENTON
95
REGIONAL DRAINAGE MAP
15 - 21
TYPICAL SECTION
22 - 29
WEST PALM
BEACH
GRADE SEPARATION OVER CSX RAILROAD
FT MYERS
LOCATION OF PROJECT
TYPICAL SECTION DETAILS
75
30
SUPPLEMENTAL PAVEMENT CORES FOR ASPHALT DEPTH
NAPLES
END BRIDGE
39
SUMMARY OF QUANTITIES
DRAINAGE CANAL)
STA. 3388+70.00
OPTIONAL MATERIALS TABULATION
40 - 41
REFERENCE POINTS
42 - 43
BENCHMARKS
TO
HAINES
CITY
45 - 58
SR 60 ROADWAY PLAN
59 - 63
SW FRONTAGE ROAD ROADWAY PLAN-PROFILE
64 - 65
NW FRONTAGE ROAD ROADWAY PLAN-PROFILE
66 - 69
NE FRONTAGE ROAD ROADWAY PLAN-PROFILE
70 - 81
ROADWAY PROFILE LT.
82 - 93
ROADWAY PROFILE RT.
l
ana
eC
PROJECT NOTES
L.
Dinner
18
17
S
653
12
Myrtle
22
AIRPORT
END PROJECT
19
STA. 3386+89.00
STA. 3427+65.44
30
25
26
28
DRAINAGE STRUCTURES
139 - 141
LATERAL DITCH PLAN-PROFILE
LATERAL DITCH CROSS SECTION
153 - 160
POND SOIL SURVEY
POND CROSS SECTIONS
33
34
BARTOW
34
L.
Parker
17A
32
Effie
T-30-S
6
Brush L.
TURNOUT HALF SECTIONS
2
2
WALESPORT
TO
VERO
SE BASE
P
e
a
c
e
MUCK DELINEATION PLAN
10 MULE
11
BEACH
12
7
ISLAND
CROSS SECTIONS
8
9 LAKE WALES
k
e
Cre
185 - 232
3
Floritan
LAKE WALES
STA. 3364+49.34
MP 24.849
233 - 234
T-30-S
4
5
1
BEGIN PROJECT
ROADWAY SOIL SURVEY
T-29-S
LAKE
WALES
L.
3
182
35
31
36
35
60
T-29-S
POND DETAILS
161 - 173
174 - 181
27
Rd.
Bartow
Old
26
DRAINAGE DETAILS
142 - 147
183 - 184
N
MP 26.045
INTERSECTION GRADING DETAIL
TO
148 - 152
CHALET SUZANNE
20
L.
24
L. in
a
nt
ou
M
137 - 138
STA. 3401+66.48
Lake
Rattlesnake
23
27
96 - 136
KEY WEST
(CSX RAILROAD)
F
29
94 - 95
END BRIDGE
L.
15
Starr
L. Hart
L.
22
M
16
R
d
.
17A
(PEACE CREEK
DRAINAGE CANAL)
14
e
c
e
i
p
r
e
LAKE OF THE HILLS
t
s
a
CYPRESS
GARDENS
AIRPORT
Crystal
BEGIN BRIDGE
MIAMI
(CSX RAILROAD)
Nursery
13 Thompson
14
44
BEGIN BRIDGE
STA. 3399+62.48
Bess
540
L.
Gross
15
STORMWATER POLLUTION PREVENTION PLAN
10
11
MUNICIPAL
AIRPORT
P
ROADWAY PLANS
ALTURAS
TEMPORARY TRAFFIC CONTROL PLAN
274 - 317
TEMPORARY TRAFFIC CONTROL CROSS SECTIONS
15
14
13
18
ws
e
Cr
235 - 273
318 - 332
16
17
ENGINEER OF RECORD:
17B
15
l
a
n
a
C
14
UTILITY ADJUSTMENTS
KENNETH R. MUZYK, JR., P.E.
Drainage
POTENTIAL CONTAMINATION SITES
WETLAND IMPACTS PROJECT NOTES
Pe
rc
h
Gadau
Long L.
WETLAND IMPACTS
CROSS SECTIONS WETLAND IMPACTS
BEGIN BRIDGE
Rd
.
23
24
19
Lakes
22
Babson Park
Florida Department of Transportation, FY2018-19 Design Standards eBook (DSeB)
22
5525 W. CYPRESS STREET
23
USACE PERMIT SUBMITTAL
FEBRUARY 2017
FUEL LINE)
STA. 3394+96.06
CSX RAILROAD
R-27-W
(NW FRONTAGE RD
R-26-W
END BRIDGE
FALLER, DAVIS & ASSOCIATES, INC.
27
L.
FUEL LINE)
GOVERNING DESIGN STANDARDS:
25
L. Pembroke
(NW FRONTAGE RD
STA. 3394+00.56
21
20
.
Rd
356 - 362
P.E. NO.: 44076
Twin
L.
Alturas
Go
rd
on
333
335
336 - 355
FT LAUDERDALE
75
(PEACE CREEK
SUMMARY OF DRAINAGE STRUCTURES
R-27-W
31 - 38
R-26-W
SQ-1 - SQ-31
STA. 3400+64.17
RR# 625419 N
RR MP #SX 834.53
APPLICABLE DSRs: DSR400-01, DSR410-01
CONTRACT NO.: C9J30
VENDOR NO. F592594956001
CERTIFICATE OF AUTHORIZATION NO: 5864
TO
AVON
PARK
FDOT PROJECT MANAGER:
and applicable Design Standards Revisions (DSRs) at the following website:
http://www.dot.state.fl.us/rddesign/DesignStandards/Standards.shtm
TAMPA, FL 33607-1707
STATIONING IS SHOWN ALONG £ CONST. SR 60 LT.
ROXANNE LAKE
REVISIONS:
GOVERNING STANDARD SPECIFICATIONS:
Florida Department of Transportation, JULY 2018 Standard Specifications
for Road and Bridge Construction at the following website:
CONSTRUCTION
http://www.dot.state.fl.us/programmanagement/Implemented/SpecBooks
CONTRACT NO.
YEAR
T00000
19
gmedeiros
1/31/2017
5:52:41 PM
FISCAL
SHEET
NO.
1
H:\47100\43655913201\permits\Wetland Impacts\KEYSRD01_USACE.DGN
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
2
WETLAND IMPACTS GENERAL NOTES
===============================
1.
DISTRICT ONE OF THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PROPOSES TO MAKE IMPROVEMENTS TO AN APPROXIMATELY ONE-MILE-LONG SEGMENT OF SR 60.
THE MAJOR COMPONENT OF THE PROJECT CONSISTS OF ELEVATING THE SR 60 ROADWAY OVER THE EXISTING CSX RAILROAD AT-GRADE CROSSINGS. THE ROADWAY WILL
BE ELEVATED USING PERMANENT RETAINING WALLS (I.E. MECHANICALLY STABILIZED EARTH, OR MSE, WALLS). THREE NEW PAIRS OF SR 60 BRIDGE STRUCTURES ARE
PROPOSED OVER THE EXISTING CSX RAILROAD, OVER AN EXISTING UNDERGROUND PETROLEUM PIPELINE AND FRONTAGE ROAD, AND OVER THE PEACE CREEK DRAINAGE
CANAL (PCDC). THE EXISTING EASTBOUND SR 60 BRIDGE OVER THE PCDC WILL BE REHABILITATED AND RE-USED FOR FRONTAGE ROAD ACCESS AND THE WESTBOUND
BRIDGE WILL BE REMOVED. DRY SHELVES TO ACCOMMODATE WILDLIFE CROSSING ARE INCLUDED IN THE NEW BRIDGE PLANS. A RETROFIT OF THE EXISTING BRIDGE
FOR A NARROW WILDLIFE SHELF IS ALSO PROPOSED. SIDEWALKS, BICYCLE LANES, AND THREE NEW FRONTAGE ROADS WILL BE INCLUDED IN THE IMPROVEMENTS.
TWO OFF-SITE STORMWATER MANAGEMENT FACILITIES (SMFS OR PONDS) ARE PROPOSED. RIGHT-OF-WAY ACQUISITION WILL OCCUR TO ACCOMMODATE THE ELEVATION
OF SR 60, DRAINAGE AND ACCESS EASEMENTS, AND THE FRONTAGE ROADS.
2.
STRICT ADHERENCE TO SECTION 104 OF THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION USED IN
CONJUNCTION WITH THIS APPLICATION WILL PROVIDE REASONABLE ASSURANCE THAT WATER QUALITY WILL NOT BE VIOLATED.
3.
TYPES OF EQUIPMENT INVOLVED IN THE CONSTRUCTION WILL INCLUDE: GRADEALL, DUMP TRUCKS, BULLDOZER, EXCAVATOR, PUMP, CRANES, PILE DRIVERS, CRANE MATS
4.
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
AND FRONT END LOADERS. THE EQUIPMENT WILL BE TRUCKED OR SELF-PROPELLED TO THE SITE.
SEDIMENT BARRIERS, FLOATING TURBITY BARRIERS AND STAKED TURBIDITY BARRIERS WILL BE USED AS DIRECTED BY THE PROJECT ENGINEER TO MAINTAIN
STATE WATER QUALITY STANDARDS.
5.
ANY UNSUITABLE MATERIAL EXCAVATED DURING CONSTRUCTION WILL BE DISPOSED OF AND CONTAINED IN UPLAND SITES PROVIDED BY THE CONTRACTOR.
6.
TRAFFIC WILL BE MAINTAINED ON SR 60 DURING CONSTRUCTION.
7.
ALL FILL SHALL BE COMPRISED OF CLEAN, SUITABLE, BORROW MATERIALS.
8.
ALL ELEVATIONS SHOWN IN THIS PERMIT APPLICATION ARE REFERENCED TO NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
9.
THE PROJECT IS LOCATED IN HUC10 BASIN 0310010102. THIS BASIN IS NOT A HUC10 BASIN THAT REQUIRES TRACKING FOR IMPERVIOUS SURFACE CHANGE (ISC).
10.
THE FOLLOWING VOLUMES REPRESENT IMPACT WITHIN WATERS OF THE STATE:
A. JURISDICTIONAL FILL: 2,894 CUBIC YARDS
B. JURISDICTIONAL DREDGE: 1,398 CUBIC YARDS
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
WETLAND IMPACTS
PROJECT NOTES
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:26 PM
335
H:\47100\43655913201\permits\Wetland Impacts\GNNTEM01_USACE.DGN
=
1"
SR 60
'
40
N
BEGIN CONSTRUCTION
BEGIN MILLING AND RESURFACING
STA. 3361+00.00 £ CONST. SR 60 LT.
STA. 4361+00.00 £ CONST. SR 60 RT.
2359
2360
£ SURVEY SR 60
2361
3359
3360
£ CONST. SR 60 LT.
3361
2362
2363
NG
I
L
L
TS OF MI
MI
I
L
NG
AND RESURFACI
S 71° 57' 41" E
3362
3363
4362
4363
00'
40.
00'
40.
S 71° 57' 41" E
4359
4360
£ CONST. SR 60 RT.
4361
132.
00'
132.
00'
S 71° 57' 41" E
NG
I
L
L
TS OF MI
MI
I
L
NG
AND RESURFACI
EXIST. R/W LINE
FLOATING TURBIDITY
BARRIER
STAKED TURBIDITY
PERMANENT FILL
BARRIER
SEDIMENT BARRIER
REVISIONS
DATE
DESCRIPTION
DATE
PERMANENT DREDGE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (1)
SR 60
NO.
FINANCIAL PROJECT ID
436559-1-52-01
POLK
gmedeiros
1/31/2017
5:50:28 PM
336
H:\47100\43655913201\permits\Wetland Impacts\PLANEM00_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
50.
00'
50.
00'
EXIST. R/W LINE
=
1"
SR 60
BEGIN PROJECT
'
40
BEGIN OVERBUILD (LT.)
BEGIN WIDENING
STA. 2364+50.12 £ SURVEY SR 60 =
N
PC STA. 3364+49.34 £ CONST. SR 60 LT., 12.00' RT.
PC STA. 4364+48.74 £ CONST. SR 60 RT., 52.00' RT.
22824'
R
2364+50.12
PROP. R/W LINE
62.00' LT.
2364+50.12
STAB. SHLDR.
24.00' LT.
2364
2365
LIMITS OF MILLING
3364
S7
1
°5
7
'4
1
"E
AND RESURFACING
3365
2366
£ SURVEY SR 60
S7
1
°5
7
'4
1
"E
3366
£ CONST. SR 60 LT.
CURVE BLPGLLT1
2367
CONST. 7' SHLDR. PAVT.
2368
TS OF FC
MI
I
L
LIMITS OF MILLING
2369
AND RESURFACING
3367
00'
74.
+49.34
50.
00'
50.
00'
SPECIAL DT LT.
3368
3369
PC ST
A.3
3
6
4
+4
9
.
3
4
OF 18" PIPE
+27.63
STAB. SHLDR.
12.00' LT.
£ CONST. SR 60 RT.
4364
4365
4366
CURVE BLPGLRT1
4369
4368
4367
PC ST
A.4
3
6
4
+4
8
.
7
4
+27.63
LIMITS OF MILLING
LIMITS OF MILLING
+48.74
AND RESURFACING
24.00' RT.
TS OF FC
MI
I
L
0.00' RT.
+01.38
AND RESURFACING
24.00' RT.
132.
00'
132.
00'
S7
1
°5
7
'4
1
"E
00'
40.
40.
00'
CONST. 298 LF
0
0
1
S-
SPECIAL DT MED.
+01.38
CONST. 7' SHLDR. PAVT.
1
0
1
S-
STAB. SHLDR.
SPECIAL DT RT.
43.00' RT.
CONST. 7' SHLDR. PAVT.
CONST. 274 LF
STAB. SHLDR.
OF 24" PIPE
(<50 kV)
EXIST. R/W LINE
FLOATING TURBIDITY
BARRIER
STAKED TURBIDITY
PERMANENT FILL
BARRIER
SEDIMENT BARRIER
PERMANENT DREDGE
WIDENING
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (2)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:30 PM
337
H:\47100\43655913201\permits\Wetland Impacts\PLANEM01_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
EXIST. R/W LINE
50.00' LT.
=
1"
SR 60
40'
N
END MILLING AND RESURFACING
END WIDENING
STA. 2371+91.34 £ SURVEY SR 60 =
STA. 3371+90.00 £ CONST. SR 60 LT.
STA. 3371+90.69 £ CONST. SR 60 LT.
CONST. 24' ASPH. TURNOUT
PROP. R/W LINE
CONST. 297 LF
5
0
1
S-
SPECIAL DT LT.
CONST. 7' SHLDR. PAVT.
OF 24" PIPE
EXIST. R/W LINE
2
5
'
R
74.
00'
74.
00'
STAB. SHLDR.
50.
00'
LIMITS OF MILLING
AND RESURFACING
LIMITS OF FC
3371
3372
SPECIAL DT MED.
PI STA. 3369+84.37
+69.95
4.00' RT.
4.00' RT.
2
3
7
2
2
3
7
3
FLARED END
4
0
1
S-
+50.93
CONST. 18" PIPE
CONST. 297 LF OF 18" PIPE
4370
4371
3375
3374
S7
1
°5
7
'4
1
"E
STAB. SHLDR.
2
0
1
S-
0.00' LT.
+49.96
237
5
2
3
7
4
+43.83
16.32' RT.
6'
R
12.00' LT.
+43.02
4374
4373
4372
£ SURVEY SR 60
2
3
7
5
40.
00'
CURVE BLPGLLT1
3373
R
40.
00'
3370
+49.96
LIMITS OF FC
75
'C
2
3
7
1
230'R
2
3
7
0
50.
00'
CONST. 75 LF OF 18" PIPE
£ CONST. SR 60 LT.
4375
12.00' LT.
CONST. TYPE E C & G
132.
00'
CURVE BLPGLRT1
£ CONST. SR 60 RT.
PI STA. 4371+62.25
+7
8.
04
43.00' RT.
4
1
.
00'RT.
LIMITS OF FC
CONST. 5' SHLDR.
PAVT.
132.
00'
+15.41
LIMITS OF FC
90'
R
L
I
MI
TS OF MI
L
L
I
NG
AND RESURFACI
NG
CONST. 299 LF
3
0
1
S-
OF 24" PIPE
CONST. 7' SHLDR. PAVT.
NE
I
MATCHL
SEE SW FRONTAGE ROAD
)
1
E(
L
PROFI
ANROADWAY PL
6
0
1
S-
STAB. SHLDR.
CONST. 24" PIPE
SPECIAL DT RT.
(
<5
0 kV)
2374+61.33
CONST. 262 LF
132.00' RT.
OF 30" PIPE
EXIST. R/W LINE
PROP. R/W LINE
51' R
2374+72.92
160.98' RT.
FLOATING TURBIDITY
BARRIER
114' R
STAKED TURBIDITY
PERMANENT FILL
BARRIER
SEDIMENT BARRIER
REVISIONS
DATE
DESCRIPTION
DATE
PERMANENT DREDGE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (3)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:31 PM
338
H:\47100\43655913201\permits\Wetland Impacts\PLANEM02_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
BEGIN NEW CONSTRUCTION
+98.
48
22824'
R
END OVERBUILD
STA. 2380+11.68 £ SURVEY SR 60 =
SR 60
STA. 4380+11.44 £ CONST. SR 60 RT.
CONST. STAB. TURNOUT
BEGIN MSE RETAINING WALL
CONST. MSE RETAINING WALL
2379+01.99
AND PARAPET WALL WITH PED./
137.72' LT.
+99.06
BICYCLE BULLET DBL. RAILING
3378+50.00, LT.
40'
TURNOUT
=
1"
CONST. 24' ASPH.
66.50' LT.
2379+02.63
CONST. 16' ASPH.
+66.60
2377+71.26
82.02' LT.
WETLAND 2377L LIMITS
CONST. 8' CONC. SW (4" TK)
WETLAND 2377L (0.03 AC.)
'R
6
4
95.90' LT.
CONST. 10' SHLDR. PAVT.
WETLAND 2380L (0.25 AC.)
CONST. 236 LF OF 36" PIPE
0.18 AC. PERMANENT FILL
CONST. 12' STAB.
82.36' LT.
2377+72.22
106.46' LT.
0.02 AC. PERMANENT FILL
PROP. R/W
LINE R/W LINE
PROP.
0.01 AC. SECONDARY IMPACT
86.91' LT.
+19.20
0.07 AC. PERMANENT
DREDGE
TURNOUT
2379+91.36
WETLAND 2380L
118.71' LT.
LIMITS
58
'
R
R
23001'
2375+15.71
2375+16.14
CONST. 8'-3" CONC. SW (6" TK)
+54.90
STA. 100+00.00 £ CONST. SW FRONTAGE ROAD
70.00' LT.
N
PROP. R/W LINE
78.50' LT.
93.36' LT.
23007'
R
+10.52
+96.10
133.44' LT.
STA. 4375+42.79 £ CONST. SR 60 RT. =
116.23' LT.
+05.17
PROP. R/W LINE
TURNOUT
+50.00
22988' R
70.00' LT.
2
1
1
S-
CONST. 12" PIPE
EXIST. R/W LINE
+50.00
24.00' LT.
BEGIN SHLDR WALL
CURVE BLPGLLT1
36.00' LT.
46.00' RT.
R
'
6
40.
00'
+22.00
12.00' RT.
2
3
7
6
2
3
7
7
10'
R
100
23
0'
R
C
8
0
1
S-
4376
4377
£ SURVEY SR 60
2
3
7
8
10'
£ CONST. SR 60 RT.
8
7
3
4
10'
END GR
LIMITS OF FC
CONST. PERMANENT
TERMINAL (FLARED)
BEGIN GR
36.00' RT.
+67.28
43.00' RT.
CONST. 10' SHLDR. PAVT.
+30.00
+51.65
46.00' RT.
52.15' RT.
2
3
8
0
CURVE BLPGLRT2
PRC STA. 4378+75.30
EL. 118.28
+05.16
4380
CONST. 10' MEDIAN SHLDR. PAVT.
CONST. GRAVITY WALL AND
PEDESTRIAN RAILING
CURVE BLPGLRT1
46.00' RT.
CONST. APPROACH
CRASH CUSHION
1
1
1
S-
10.00' LT.
CONST. MEDIAN BARRIER WALL
0.00' LT.
+92.72
2
3
7
9
9
7
3
4
4378+91.94
+50.26
LIMITS OF FC
CR
'
75
3380
LIMITS OF FC
11471' R
16.33' LT.
'
5
7
"
0
0
'
0
°0
0
9
3379
EL. 118.38
CONST. MEDIAN SHLDR. PAVT.
22.00' RT.
+64.69
4375
22896' R
CONST. 74 LF OF 30" PIPE
12.00' LT.
3378
CONST. MEDIAN SHLDR. PAVT.
BEGIN SHLDR WALL
CONST. 8' CONC. SW (6" TK)
+04.56
CONST. SHLDR. WALL
CONST. 52 LF OF 18" PIPE
46.00' RT.
R
'
0
5
CONST. GR
0
1
1
S-
CONST. 5'
106
5
0
1
SHLDR. PAVT.
NE
I
MATCHL
SEE SW FRONTAGE ROAD
)
1
E(
L
PROFI
ANROADWAY PL
50.
00'
+65.62
23
7
5
132.
00'
4378+91.97
3377
3376
0
2
.
9
+1
5
7
3
A.3
ST
£ CONST. SR 60 LT.
+96.51
PC +20.18
61.00' RT.
EL. 115.94
+55.43
61.00' RT.
EL. 116.26
PT +52.84
PRC +31.55
+99.81
62.00' RT.
62.00' RT.
EL. 116.41
104
SW FRONTAGE ROAD
BEGIN GRAVITY WALL
4378+27.74, RT.
EL. 116.12
48' R
32' R
132.
00'
3375
CURVE BLPGLLT2
LIMITS OF FC
15" RCP
50.
00'
+50.00
LIMITS OF FC
PRC
CONST. MISC.
66.08' RT.
ASPH. (2" TK)
101
63.10' RT.
CONST. 8' CONC.
CONST. 106 LF
7
0
1
S-
SW (4" TK)
(
<5
0 kV)
SPECIAL DT RT.
OF 30" PIPE
3
10
£ CONST. SW FRONTAGE ROAD
CONST. 30" PIPE
PERMANENT FILL
EXIST. R/W LINE
FLOATING TURBIDITY
END MI
L
L
I
NG AND RESURFACI
NG
102
END WIDENING
BARRIER
PROP. R/W LINE
R
9'
45
PROP. R/W LINE
STAKED TURBIDITY
BARRIER
ROADWAY PLAN-PROFILE SHEET
BEGI
N NEW CONSTRUCTI
ON
SEDIMENT BARRIER
LIMITS OF MILLING
STA.4
37
6
+00.
00 £ CONST.SR 6
0 RT.
DESCRIPTION
DATE
SECONDARY IMPACT
AND RESURFACING
REVISIONS
DATE
PERMANENT DREDGE
SEE FRONTAGE ROAD
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (4)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:33 PM
339
H:\47100\43655913201\permits\Wetland Impacts\PLANEM03_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
+30.00
CONST. 7' SHLDR. PAVT.
STAB. SHLDR.
29.
54'
74.
00'
CONST. 232 LF OF 36" PIPE
9
0
1
S-
SPECIAL DT LT.
PI STA. 3380+54.
70
25'
R
CONST. 24" PIPE
3
1
1
S-
R
'
25
+99.
50
25
'
R
70
'
R
70.00' LT.
=
1"
SR 60
WETLAND 2380L (0.25 AC.)
0.18 AC. PERMANENT FILL
'
40
0.07 AC. PERMANENT DREDGE
WETLAND 2380L LIMITS
F
'O
4
1
x
'
0
.1
NST
CO
PRAP
E RI
RUBBL
RE)
BANK & SHO
(
N
POND 1
101.0
8
1
1
S-
PE
2"PI
F OF 4
3L
CONST.4
107.8
109.8
113.5
CONST. MSE RETAINING WALL AND
PARAPET WALL WITH PED./BICYCLE
BULLET DBL. RAILING
1
CS-
PE
"PI
F OF 24
6L
9
CONST.1
CONST. 197 LF OF 24" PIPE
CONST. 10' SHLDR. PAVT.
WETLAND 2380L LIMITS
114.5
9
1
1
S-
CONST. SHLDR. WALL
CONST. 8'-3" CONC. SW (6" TK)
PE
8"PI
CONST.1
6
1
1
S-
PE
8"PI
F OF 1
8L
CONST.5
3381+30.88
3381+81.00
12.00' RT.
15.06' RT.
CROSS SLOPE
EL. 119.65
EL. 118.99
BREAK LINE
0.00' RT.
0.
02
50.
00'
29.
54'
3381
11471' R
3382
3382+81.44
0.00' RT.
13.08' RT.
EL. 120.42
EL. 120.16
EXIST. R/W LINE
TS OF FC
MI
I
L
CONST. MEDIAN SHLDR. PAVT.
3383
BLPGLLT2
S 71° 57' 41" E
0.05
PI STA. 4382+31.75
3385
£ CONST. SR 60 LT.
PT ST
A.3
3
8
5
+9
0
.
0
0
7002' R
CONST. MEDIAN BARRIER WALL
4383
2
8
3
4
3384
+29.83
10.67' RT.
0.02
0.05
1
8
3
4
3382+50.31
CURVE
+80.94
PE
2"PI
CONST.1
4
2
1
SF
2L
1
CONST.1
PE
8"PI
OF 1
CURVE BLPGLRT2
3386
10.75'
4384
£ CONST. SR 60 RT.
4385
2384
£ SURVEY SR 60
2385
10.75'
4386
23.
50'
PE
2"PI
CONST.1
50.
00'
PE
"PI
CONST.36
0.
05
70
PI STA. 3380+54.
5
2
1
S-
10'
5
1
1
S-
2383
4381+81.63
2381
10.00' LT.
2382
EL. 119.36
PE
8"PI
F OF 1
2L
CONST.5
S7
1
°5
7
'4
1
"E
3382+81.48
PT ST
A.4
3
8
5
+8
7
.
9
6
CONST. MSE RETAINING WALL AND
CONST. 10' SHLDR. PAVT.
EL. 120.39
2386
10.90' LT.
CONST. 10' MEDIAN SHLDR. PAVT.
CONST. GRAVITY WALL AND
+29.92
TS OF FC
MI
I
L
15.08' RT.
CONST. 8' CONC. SW (6" TK)
CONST. SHLDR. WALL
S 71° 57' 41" E
PARAPET WALL WITH PED./BICYCLE
+00.00
BULLET DBL. RAILING
55.25' RT.
PEDESTRIAN RAILING
CONST. MEDIAN SHLDR. PAVT.
CONST. 8'-3" CONC. SW (6" TK)
3
2
1
S-
108
107
110
109
SW FRONTAGE ROAD
111
112
132.
00'
132.
00'
4
1
1
S-
£ CONST. SW FRONTAGE ROAD
PE
8"PI
CONST.1
PE
8"PI
CONST.1
0
2
1
S-
SPECIAL DT RT.
SPECIAL DT RT.
1
2
1
S-
2
2
1
S-
18" CMP
(<50 kV)
WETLAND 1 LIMITS
FLOATING TURBIDITY
EXIST. R/W LINE
EXIST. R/W LINE
BARRIER
2385+58.30
STAKED
TURBIDITY
132.00'
RT.
PERMANENT FILL
BARRIER
SEDIMENT BARRIER
REVISIONS
DATE
DESCRIPTION
DATE
PERMANENT DREDGE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (5)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:35 PM
340
H:\47100\43655913201\permits\Wetland Impacts\PLANEM04_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
7
1
1
S-
END BRIDGE (BR# 160358)
STA. 3386+89.00 £ CONST. SR 60 LT.
BEGIN APPROACH SLAB
STA. 3388+70.00 £ CONST. SR 60 LT.
SURFACE WATER 1 LIMITS
SURFACE WATER 1 LIMITS
PROP. R/W LINE
EXIST. R/W LINE
PROP. R/W LINE
EXIST. R/W LINE
EXIST. R/W LINE
CONST. 18" PIPE
2386+71.70
108.00' LT.
3
CS-
18" PIPE
2
CS-
PROP. R/W LINE
CONST.24" PIPE
CONST. 10' SHLDR. PAVT.
CONST. 24" PIPE
+72.13
BEGIN ASPHALT OVERLAY
CONST. MSE RETAINING WALL AND
9
0
2
S-
PARAPET WALL WITH PED./BICYCLE
BULLET DBL. RAILING
CONST. 126 LF OF 24" PIPE
2390+90.16
CONST. 8'-3" CONC. SW (6" TK)
108.00' LT.
CONST. SHLDR. WALL
PROP. R/W LINE
NW FRONTAGE ROAD
2390+92.94
2
0
2
S-
200
100.00' LT.
5
0
2
S-
D
CONST.
135.75' LT.
CONST. 101 LF OF 24" PIPE
6
0
2
SCONST. 12" PIPE
£ CONST. NW FRONTAGE ROAD
EXIST. R/W LINE
4
0
2
S-
TS OF FC
MI
I
L
23.
50'
50.
00'
50.00' LT.
3387
S 71° 57' 41" E
2391+10.31
50.00' LT.
SURFACE WATER 2392L (0.01 AC.)
CONST. 10'-9" MEDIAN
2389+42.27
3388
3389
SHLDR. PAVT.
3390
£ CONST. SR 60 LT.
100.
00'
+78.32
END ASPHALT OVERLAY
SURFACE WATER 2392L LIMITS
CONST. 112 LF OF 18" PIPE
EXIST. R/W LINE
50.00' LT.
0.01 AC. PERMANENT FILL
3391
LIMITS OF FC
3391+14.48
0.00'
23.
50'
+86.87
2386+37.86 END ASPHALT OVERLAY
CONST. MEDIAN BARRIER WALL
S 71° 57' 41" E
4387
4388
4389
S 71° 57' 41" E
2387
2388
2389
£ CONST. SR 60 RT.
2390
LIMITS OF FC
TS OF FC
MI
I
L
4390
4391
£ SURVEY SR 60
4391+22.64
2391
0.00'
CONST. MSE RETAINING WALL AND
CONST. 10'-9" MEDIAN SHLDR. PAVT.
2391+27.67
PARAPET WALL WITH PED./BICYCLE
CONST. 10' SHLDR. PAVT.
0.00'
BULLET DBL. RAILING
CONST. 8'-3" CONC. SW (6" TK)
CONST. SHLDR. WALL
SAND CEMENT RIPRAP
3
0
2
SRUBBLE RIPRAP
113
114
115
116
117
PERMANENT FILL
FLOATING TURBIDITY
132.
00'
PERMANENT DREDGE
STAKED
TURBIDITY
£ CONST.
SW FRONTAGE ROAD
BARRIER
SW FRONTAGE
ROAD
SW FRONTAGE
ROAD
PERMANENT IMPACT
SEDIMENT BARRIER
132.
00'
BARRIER
(CRANE MAT)
+63.58
BEGIN ASPHALT OVERLAY
CONST. 18" PIPE
1
0
2
S-
SPECIAL DT RT.
7
0
2
S-
0
0
2
S-
6
2
1
S-
18" RCP
CONST. 18" PIPE
END APPROACH SLAB
END ASPHALT OVERLAY
BEGIN NEW CONSTRUCTION
+93.37
END NEW CONSTRUCTION
BEGIN APPROACH SLAB
BEGIN ASPHALT OVERLAY
+48.52
CONST. 24" PIPE
SURFACE WATER 1 LIMITS
(<50 kV)
2388+09.48
132.00' RT.
SURFACE WATER 1 (1.79 AC.)
END BRIDGE (BR# 160357)
0.23 AC. PERMANENT FILL
BEGIN BRIDGE (BR# 160357)
BEGIN APPROACH SLAB
0.19 AC. PERMANENT DREDGE
STA. 4386+80.45 £ CONST. SR 60 RT.
STA. 4388+61.45 £ CONST. SR 60 RT.
END APPROACH SLAB
EXIST. R/W LINE
SEE FRONTAGE ROAD
0.20 AC. PERMANENT IMPACT (CRANE MAT)
REVISIONS
DATE
DESCRIPTION
DATE
ROADWAY PLAN-PROFILE SHEET
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (6)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:36 PM
341
H:\47100\43655913201\permits\Wetland Impacts\PLANEM05_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
108.00' LT.
108.00' LT.
N
2390+80.53
97.
75'
2386+44.09
2389+49.56
END APPROACH SLAB
END ASPHALT OVERLAY
BEGIN NEW CONSTRUCTION
+01.93
P
E
A
R
C
A
IN E
A
G CR
E
E
C EK
A
N
A
L
END NEW CONSTRUCTION
BEGIN APPROACH SLAB
BEGIN ASPHALT OVERLAY
+57.07
'
40
E
27
R
E
S
26
30
R
T
S
.6
30
CT
T
SE
.1
CT
SE
SURFACE WATER 1 LIMITS
BEGIN BRIDGE (BR# 160358)
=
1"
SR 60
END APPROACH SLAB
=
1"
SR 60
END APPROACH SLAB
'
40
BEGIN BRIDGE (BR# 160356)
END BRIDGE (BR# 160356)
STA. 3394+00.56 £ CONST. SR 60 LT.
BEGIN APPROACH SLAB
+98.25
END ASPHALT OVERLAY
V)
0 k
(< 5
CONST. 24" PIPE
PROP. R/W LINE
2
1
2
S-
CONST. 8'-3" CONC. SW (6" TK)
2394+66.84
135.75' LT.
CONST. MSE RETAINING WALL AND
PARAPET WALL WITH PED./BICYCLE
BULLET DBL. RAILING
4
1
2
S-
3
1
2
S-
CONST. SHLDR. WALL
CONST. MSE RETAINING WALL AND
PARAPET WALL WITH PED./BICYCLE
BULLET DBL. RAILING
CONST. 18" PIPE
108.00' LT.
£ CONST. NW FRONTAGE ROAD
201
CONST. 10' SHLDR. PAVT.
PROP. R/W LINE
2394+66.84
NW FRONTAGE ROAD
N
+98.37
BEGIN ASPHALT OVERLAY
CONST. 18" PIPE
END NEW CONSTRUCTION
BEGIN APPROACH SLAB
BEGIN ASPHALT OVERLAY
+65.92
202
CONST. 296 LF
OF 18" PIPE
EXIST. R/W LINE
SURFACE WATER 2399L (0.30 AC.)
CONST. 12" PIPE
97.
75'
0.30 AC. PERMANENT FILL
5
1
2
SSURFACE WATER 2399L LIMITS
£ CONST. SR 60 LT.
3393
TS OF FC
MI
I
L
CONST. 10'-9" MEDIAN SHLDR. PAVT.
3396
23.
50'
CONST. MEDIAN BARRIER WALL
4392
2392
4393
2393
£ SURVEY SR 60
£ CONST. SR 60 RT.
3394
3395
4394
4395
3397
S 71° 57' 41" E
CONST. 112 LF OF 18" PIPE
23.
50'
100.
00'
SURFACE WATER 2392L LIMITS
100.
00'
CONST. 8'-3" CONC. SW (6" TK)
0.01 AC. PERMANENT FILL
CONST. 10' SHLDR. PAVT.
3392
70.
00'
3
0
2
1
1
2
SSURFACE WATER 2392L (0.01 AC.)
CONST. MEDIAN BARRIER WALL
4396
4397
S 71° 57' 41" E
CONST. 10'-9" MEDIAN SHLDR. PAVT.
CONST. 10'-9" MEDIAN
2394
SHLDR. PAVT.
2395
2396
LIMITS OF FC
4
20
CONST. MSE RETAINING WALL AND
TS OF FC
MI
I
L
PARAPET WALL WITH PED./BICYCLE
BULLET DBL. RAILING
CONST. 10' SHLDR. PAVT.
CONST. SHLDR. WALL
CONST. 8'-3" CONC. SW (6" TK)
2397
S 71° 57' 41" E
CONST. 8'-3" CONC. SW (6" TK)
CONST. MSE RETAINING WALL AND
PARAPET WALL WITH PED./BICYCLE
BULLET DBL. RAILING
CONST. 10' SHLDR. PAVT.
CONST. SHLDR. WALL
2
2
"x 1
3
"CMP
0
1
2
S-
1
2
0
121
122
123
132.
00'
1
1
9
15" RCP
132.
00'
1
1
8
£ CONST. SW FRONTAGE ROAD
£ CONST. SW FRONTAGE ROAD
SW FRONTAGE
ROAD
SW FRONTAGE ROAD
8
0
2
S-
CONST. 24" PIPE
SPECIAL DT RT.
SPECIAL DT RT.
CONST. 24" PIPE
2
4
"CMP
24" CMP
)
kV
END NEW CONSTRUCTION
BEGIN APPROACH SLAB
BEGIN ASPHALT OVERLAY
+79.49
50
(<
CONST. 24" PIPE
6
1
2
S-
+11.82
END ASPHALT OVERLAY
9
1
2
S-
8
1
2
S-
7
1
2
S-
(<50 kV)
FLOATING TURBIDITY
+11.94
BEGIN ASHALT OVERLAY
EXIST. R/W LINE
END APPROACH SLAB
END BRIDGE (BR# 160355)
BEGIN BRIDGE (BR# 160355)
STA. 4394+14.13 £ CONST. SR 60 RT.
BEGIN APPROACH SLAB
DESCRIPTION
DATE
PERMANENT FILL
PERMANENT DREDGE
STA. 4395+09.63 £ CONST. SR 60 RT.
REVISIONS
DATE
BARRIER
END APPROACH SLAB
STAKED TURBIDITY
END ASPHALT OVERLAY
BARRIER
BEGIN NEW CONSTRUCTION
+44.27
SEDIMENT BARRIER
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (7)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:38 PM
342
H:\47100\43655913201\permits\Wetland Impacts\PLANEM06_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
CONST. 18" PIPE
STA. 3394+96.06 £ CONST. SR 60 LT.
=
1"
SR 60
END APPROACH SLAB
BEGIN BRIDGE (BR# 160354)
END BRIDGE (BR# 160354)
EXIST. CSX RR R/W LINE
BEGIN APPROACH SLAB
£ LATERAL DITCH NO. 1
+58.99
END ASPHALT OVERLAY
STA. 3401+66.48 £ CONST. SR 60 LT.
BULLET DBL. RAILING
BEGIN APPROACH SLAB
BEGIN ASPHALT OVERLAY
+10.18
CONST. 8'-3" CONC. SW (6" TK)
8
CONST. 8'-3" CONC. SW (6" TK)
1
CD-
135.75' LT.
2401+25.12
CONST. MSE RETAINING WALL AND
135.75' LT.
PARAPET WALL WITH PED./BICYCLE
CONST. 18" PIPE
BULLET DBL. RAILING
£ CONST. NE FRONTAGE ROAD
0
0
3
S-
2398+76.36
EXIST. R/W LINE
108.00' LT.
2
0
3
S-
1
0
3
S-
EXIST. R/W LINE
CONST. 177 LF
2398+87.82
100.00' LT.
5
0
'
CONST. 10'
SHLDR. PAVT.
NE FRONTAGE
ROAD
NE FRONTAGE
ROAD
300
OF 18" PIPE
301
302
+69.97
BEGIN ASPHALT OVERLAY
SURFACE
WATER 2399L LIMITS
CONST.
12" PIPE
2400+62.54
END APPROACH SLAB
END ASPHALT OVERLAY
BEGIN NEW CONSTRUCTION
+18.78
100.
00'
100.00' LT.
PC ST
A.3
4
0
3
+2
0
.
0
0
LIMITS OF FC
3398
£ CONST. SR 60 LT.
3399
3400
3401
S 71° 57' 41" E
100.
00'
CONST. 317 LF OF 30" PIPE
1
2
2
S-
70.
00'
97.
75'
2
2
2
S-
3402
3403
CONST. MEDIAN
BARRIER WALL
23.
50'
23.
50'
1
8
"CMP
CONST. MEDIAN BARRIER WALL
CONST. 112 LF OF 18" PIPE
£ CONST. SR 60 RT.
4399
2398
£ SURVEY SR 60
2399
CONST. 10'-9" MEDIAN SHLDR. PAVT.
2400
S 71° 57' 41" E
S 71° 57' 41" E
4401
4402
2401
2402
4403
2403
TS OF FC
MI
I
L
END NEW CONSTRUCTION
BEGIN APPROACH SLAB
BEGIN ASPHALT OVERLAY
+43.74
65.
74'
TS OF FC
MI
I
L
4400
30" RCP
4398
REMOVE EXIST. CONC. SLABS
0
2
2
S-
3
0
"
+92.55
END ASPHALT OVERLAY
CONST. 10' SHLDR. PAVT.
CSX RAILROAD
CONST. MSE RETAINING WALL AND
132.
00'
CONST. SHLDR. WALL
PARAPET WALL WITH PED./BICYCLE
CONST. 8'-3" CONC. SW (6" TK)
END BRIDGE (BR# 160353)
STA. 3400+64.17
RR R/W LINE
BEGIN APPROACH SLAB
BULLET DBL. RAILING
RR# 625419 N
OBLITERATE EXIST. ROADWAY
RR MP #SX 834.53
C
S
X
STA. 4402+00.04 £ CONST. SR 60 RT.
REMOVE EXIST. AND
CONST. 13'x11' CONC. DITCH PAVT.
EXIST. CSX RR R/W LINE
END APPROACH SLAB
+03.53
BEGIN ASPHALT OVERLAY
BEGIN BRIDGE (BR# 160353)
STA. 4399+96.04 £ CONST. SR 60 RT.
R
C
P
EXIST. CSX
R
A
IL
R
O
A
D
SPECIAL DT RT.
8" PVC
END APPROACH SLAB
END ASPHALT OVERLAY
BEGIN NEW CONSTRUCTION
+52.35
REMOVE EXIST.
CONC. SLABS
C
S
X
R
A
IL
R
O
A FILL
PERMANENT
D
(<50 kV)
FLOATING TURBIDITY
BARRIER
STAKED
TURBIDITY
2402+20.21
BARRIER
132.00' RT.
EXIST. R/W LINE
SEDIMENT BARRIER
PERMANENT DREDGE
TEMPORARY DREDGE
SEE FRONTAGE ROAD
ROADWAY PLAN-PROFILE SHEET
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (8)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
scurran
12/8/2016
5:45:55 PM
338
343
H:\47100\43655913201\permits\Wetland Impacts\PLANEM07_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
EXIST. R/W LINE
CONST. 18" PIPE
PROP. R/W LINE
CONST. SHLDR. WALL
2400+11.32
PROP. R/W LINE
CONST. SHLDR. WALL
135.75' LT.
CONST. 30" PIPE
R
A
IL
R
O
A
D
5
0
'
EXIST. CSX RR R/W LINE
SURFACE WATER 2399L (0.30 AC.)
CONST. MSE RETAINING WALL AND
0.30 AC. PERMANENT FILL
PARAPET WALL WITH PED./BICYCLE
N
2401+60.48
PROPOSED DRAINAGE EASEMENT
C
S
X
END NEW CONSTRUCTION
'
40
STA. 3399+62.48 £ CONST. SR 60 LT.
SR 60
=
1"
TO POND 3
PROP. DRAINAGE EASEMENT
'
40
£ POND 3
N
CONST. 30" PIPE
2406+62.16
R
23016'
133.21' LT.
CONST. 24" PIPE
2406+95.24
132.69' LT.
PROP. R/W LINE
V)
<50 k
(
CONST. 18" PIPE
8
0
3
S-
6
0
3
S-
CONST. 30" PIPE
CONST. 30" PIPE
4
1
3
S0
1
3
S-
£ CONST. NE FRONTAGE ROAD
EXIST. R/W LINE
NE FRONTAGE ROAD
2407+43.54
100.00' LT.
CONST. 54 LF OF 18" PIPE
50'
23.
+22.04
10.75'
10.75' RT.
3407
+47.57
CONST. MEDIAN
BARRIER WALL
CONST. 296 LF OF 18" PIPE
3408
"CMP
2
1
00'
50.
11471.75' R
3406
18" CMP
18" CMP
2403
EXIST. R/W LINE
50.00' LT.
CONST. 57 LF OF 18" PIPE
£ CONST. SR 60 LT.
3405
3404
3403
4403
2407+63.10
CURVE BLPGLLT3
TS OF FC
MI
I
L
CONST. MEDIAN SHLDR. PAVT.
PC STA. 3403+20.00
CONST. 10' SHLDR. PAVT.
CONST. SHLDR. WALL
13.02' RT.
PI STA. 4406+78.48
EL. 149.40
4404
+22.04
10.75'10.75' LT.
4
4
0
7
10.75'
2406
£ SURVEY SR 60
"E
1
'4
7
°5
1
S7
CONST. 54 LF OF 18" PIPE
CURVE BLPGLRT3
2
1
3
S-
4
4
0
8
2408
2407
50
(<
)
(<50 kV
TS OF FC
MI
I
L
S 71° 57' 41" E
CONST. MEDIAN SHLDR. PAVT.
+47.06
10.75' LT.
EL. 149.52
)
kV
74'
65.
4406
£ CONST. SR 60 RT.
2405
2404
PC STA. 4403+22.04
4405
4
0
3
S-
79'
29.
CONST. 8'-3" CONC. SW (6" TK)
CONST. 54 LF OF 18" PIPE
3
0
3
S-
1
1
3
S-
CONST. SHLDR. WALL
CONST. 30" PIPE
CONST. 10' SHLDR. PAVT.
OBLITERATE EXIST. ROADWAY
00'
132.
00'
100.
L AND
NG WAL
NI
CONST.MSE RETAI
E
CYCL
BI
/
TH PED.
L WI
PARAPET WAL
NG
I
L
.RAI
ET DBL
L
BUL
L AND
NG WAL
NI
CONST.MSE RETAI
E
CYCL
BI
/
TH PED.
L WI
PARAPET WAL
NG
I
L
.RAI
ET DBL
L
BUL
"TK)
6
3"CONC.SW (
CONST.8'
SPECIAL DT RT.
CD-1
15" CMP
0 kV)
<5
(
CURVE DATA BL
PGL
RT3
PISTA.= 4
4
06
+7
8.
4
8
CURVE DATA BL
PGL
L
T3
PISTA.= 34
08+5
5
.
5
0
T
T
EXIST. R/W LINE
132.00' RT.
L
= 35
6
.
4
4
= 7
1
2.
6
6
'
L
R
= 1
1
,
4
5
9
.
00
PC STA.= 4
4
03+22.
04
PRC STA.= 4
4
1
0+34
.
7
0
e
= NC
REVISIONS
DATE
DESCRIPTION
DATE
FLOATING TURBIDITY
BARRIER
2403+94.93
= 5
35
.
5
0
= 1
,
07
0.
80'
STAKED TURBIDITY
PERMANENT FILL
BARRIER
R
= 22,
9
1
8.
00
PC STA.= 34
03+20.
00
PRC STA.= 34
1
3+9
0.
80
e
= NC
SEDIMENT BARRIER
PERMANENT DREDGE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (9)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:42 PM
344
H:\47100\43655913201\permits\Wetland Impacts\PLANEM08_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
3
1
3
S-
5
0
3
S-
75'
97.
307
PI STA. 3408+55.
50
75'
97.
306
10
303
CONST. 18" PIPE
305
304
=
1"
SR 60
'
40
PERMANENT FILL
STA. 2408+98.32 £ SURVEY SR 60 =
FLOATING TURBIDITY
N
BARRIER
STA. 4408+98.56 £ CONST. SR 60 RT.
PERMANENT DREDGE
R
23016'
STAKED TURBIDITY
BARRIER
CONST. 18" PIPE
CONST. 30" PIPE
CONST. 30" PIPE
SEDIMENT BARRIER
SECONDARY IMPACT
CONST. 24" PIPE
PROP. R/W LINE
2413+94.98
110.63' LT.
9
1
3
S-
8
1
3
S-
4
2
3
S-
£ CONST. NE FRONTAGE ROAD
NE FRONTAGE ROAD
313
3
2
3
S-
CONST. 8'-3" CONC. SW (6" TK)
CONST. MSE RETAINING WALL AND
PARAPET WALL WITH PED./BICYCLE
3411
LIMITS OF FC
LIMITS OF FC
CONST. MEDIAN SHLDR. PAVT.
£ CONST. SR 60 LT.
CURVE BLPGLLT3
3412
00'
50.
CONST. 58 LF OF 18" PIPE
CONST. MEDIAN BARRIER WALL
"E
1
'4
7
°5
1
S7
4409
0
1
4
2
6
1
3
S-
05
0.
9
0
4
2
EL. 138.50
£ CONST. SR 60 RT.
0.02
22914' R
2EL. 138.02
1
4
2
4
4
1
2
23.00' LT.
3
1
4
2
2
2
3
S-
CURVE BLPGLRT4
0.02
4
1
4
2
EL. 132.78
10'
0.05
05
0.
4
4
1
1
3414
+64.00
14.24' RT.
22.00' LT.
£ SURVEY SR 60
3413
+89.80
+88.47
1
1
4
2
PRC STA. 3413+90.80
4413
CONST. PERMANENT
4414
CRASH CUSHION
4
4
1
0
+69.00
CURVE BLPGLRT3
PRC STA. 4410+34.70
0.00' RT.
CONST. MEDIAN
CROSS SLOPE
SHLDR. PAVT.
BREAK LINE
+88.47
+88.47
0.00' LT.
12.00' LT.
CONST. 72 LF OF 18" PIPE
TS OF FC
MI
I
L
CONST. 60 LF OF 18" PIPE
+08.81
LIMITS OF FC
36.00' RT.
15" RCP
5
1
3
S-
CONST. 10' SHLDR. PAVT.
+87.75
1
2
3
S-
00'
132.
3410
BULLET DBL. RAILING
00'
50.
CONST. SHLDR. WALL
£ SURVEY SR 60
00'
132.
CURVE BLPGLLT4
CONST. 60 LF OF 18" PIPE
CONST. 10' SHLDR. PAVT.
00'
40.
EXIST. R/W LINE
55.00' RT.
CONST. 10' SHLDR. PAVT.
CONST. SHLDR. WALL
CONST. MSE RETAINING WALL AND
WETLAND 2413R LIMITS
CONST. 8'-3" CONC. SW (6" TK)
PARAPET WALL WITH PED./BICYCLE
OBLITERATE EXIST. ROADWAY
BULLET DBL. RAILING
0
2
3
S-
SPECIAL DT RT.
0 kV)
<5
(
EXIST. R/W LINE
EXIST. R/W LINE
WETLAND 2413R (0.26 AC.)
0.26 AC. PERMANENT FILL
0.19 AC. SECONDARY IMPACT
SEE FRONTAGE ROAD
ROADWAY PLAN-PROFILE SHEET
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (10)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:43 PM
345
H:\47100\43655913201\permits\Wetland Impacts\PLANEM09_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
312
75'
97.
50
PI STA. 3408+55.
75'
97.
CONST. 12" PIPE
311
310
7
1
3
S-
3409
79'
29.
CONST. 12" PIPE
309
308
SR 60
=
1"
CONST. 18" PIPE
0
0
4
S-
8
2
3
S-
61.00' LT.
CONST. 8' CONC. SW (4" TK)
+60.51
SURFACE
WATER 2419L (0.01 AC.)
32' R
62.00' LT.
PC +07.09
EL. 121.29
0.01 AC. PERMANENT FILL
65.85' LT. PRC +27.74
2417+07.80
315
CONST. 12" PIPE
CONST. 284 LF
OF 18" PIPE
50.00' LT.
"RCP
8
1
+32.03
EXIST. R/W LINE
00'
75.
75'
97.
48' R
CONST. 57 LF OF 18" PIPE
3416
3417
£ CONST. SR 60 LT.
1
3
3
S-
8
1
4
2
+12.43
+32.43
4.00' RT.
4.00' RT.
CONST. 86 LF OF 24" PIPE
£ SURVEY SR 60
3419
+06.30
6'
R
C
4418
CONST. TYPE E C & G
+54.63
R
4417
+03.81
12.00' LT.
STA. 3417+19.31 £ CONST. SR 60 LT.
CONST. 49 LF
OF 18" PIPE
5
2
3
S-
CONST. 88 LF OF 24" PIPE
24.00' RT.
LIMITS OF FC
STA. 3418+57.13 £ CONST. SR 60 LT. =
STA. 319+08.11 £ CONST. NE FRONTAGE ROAD
CONST. 44 LF
OF 24" PIPE
STAB. SHLDR.
+25.06
55.00' RT.
CONST. 7' SHLDR. PAVT.
4
3
3
S-
0
3
3
S-
"CMP
8
1
8
3
3
S-
CONST. 15 LF OF 18" PIPE
'R
50
WETLAND 2413R LIMITS
CONST. 10' SHLDR. PAVT.
CONST. MSE RETAINING WALL AND
PARAPET WALL WITH PED./BICYCLE
BULLET DBL. RAILING
CONST. 8'-3" CONC. SW (6" TK)
9
3
3
S-
7
5'
R
7
3
3
S<50 kV)
(
CONST. 15 LF
OF 24" PIPE
CONST. MISC.
ASPHALT
END SHLDR. WALL &
CONST. SHLDR. WALL
CONST. 126 LF
OF 18" PIPE
MSE RETAINING WALL
EXIST. R/W LINE
+84.
21
9
2
3
S-
4418+09.04, RT.
CONST. 26' ASPH. TURNOUT
CONST. 8' CONC. SW (4" TK)
CONST. 215 LF OF 30" PIPE
PERMANENT FILL
FLOATING TURBIDITY
CONST. 30" PIPE
WETLAND 2413R (0.26 AC.)
BARRIER
0.26 AC. PERMANENT FILL
STAKED TURBIDITY
0.19 AC. SECONDARY IMPACT
REVISIONS
DATE
PERMANENT DREDGE
BARRIER
SEDIMENT BARRIER
DESCRIPTION
+70.63
REMOVE EXIST. C & G
'
5
7
R
C
86.
03' RT.
00'
132.
21
PI STA. 4417+48.
STA. 2417+18.66 £ SURVEY SR 60 =
TS OF FC
MI
I
L
REMOVE EXIST. C & G
12.00' RT.
CONST. TYPE E C & G
LIMITS OF FC
CONST. 88 LF OF 18" PIPE
16.32' LT.
4419
CURVE BLPGLRT4
CONST. 89 LF OF 18" PIPE
+56.84
R
6'
R
5
3
3
S-
C
16.32' RT.
12.00' LT.
£ CONST. SR 60 RT.
PI STA. 3419+25.83
CURVE BLPGLLT4
+11.72
4416
LIMITS OF FC
LIMITS OF FC
9
1
4
2
3418
FLARED END
3
3
3
S-
4415
R
C
'
75
"
0
'0
0
°0
0
9
'
5
7
STAB. SHLDR.
SURFACE WATER 2419L LIMITS
7
1
4
2
6
1
4
2
5
1
4
2
51.83' LT.
'
75
00'
40.
"E
1
'4
7
°5
1
S7
6
2
3
S-
+07.42
36.00' LT.
0.00' RT.
230'R
00'
50.
3415
+12.43
CONST. MSE RETAINING WALL AND
PARAPET WALL WITH PED./BICYCLE
BULLET DBL. RAILING
+06.88
319
CONST. 57 LF
OF 18" PIPE
END GR
CONST. APPROACH
TERMINAL (FLARED)
+48.89
46.00' LT.
00'
40.
BEGIN GR +48.29
46.00' LT.
00'
132.
END SHLDR WALL
CONST. 8'-3" CONC. SW (6" TK)
CONST. 10' SHLDR. PAVT.
23
0'
R
62.00' LT., EL. 123.26
'R
50
2
3
3
S-
CONST. SHLDR. WALL
LIMITS OF FC
90
'R
60.16' LT.
+60.01
7
2
3
S-
DATE
CONST. SHLDR.
EXIST.
PAVT.R/W LINE
2419+27.96
75.00' LT.
NE
I
MATCHL
SEE NE FRONTAGE ROAD
)
1
1
E(
L
PROFI
ANROADWAY PL
6
3
3
S-
2417+07.80
3415+91.53, LT.
314
63.01' LT.
EL. 120.34
75.00' LT.
END MSE RETAINING WALL
STAB. SHLDR.
AD
RO
6
31
£ CONST. NE FRONTAGE ROAD
PT +38.94
CONST. MISC.
ASPH. (2" TK)
N
SECONDARY IMPACT
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (11)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:45 PM
346
H:\47100\43655913201\permits\Wetland Impacts\PLANEM10_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
15
"R
CP
61.00' LT.
EL. 120.52
CONST. GR
129.58' LT.
PROP.
R/W LINE
PROP.
R/W LINE
R
8'
7
GE
TA
PROP. R/W LINE
+44.41
8
31
22800'
R
CP
"R
15
R
488'
2414+73.09
3419+06.53
ON
FR
CONST. 15" PIPE
107.11' LT.
'
40
NE
7
31
CONST. CONC. JACKET
INDEX 280
=
1"
SR 60
'
40
N
END NEW CONSTRUCTION
BEGIN MILLING AND RESURFACING
END WIDENING
BEGIN OVERBUILD
STA. 3424+80.78 £ CONST. SR 60 LT.
PROP. R/W LINE
2425+00.00
BEGIN WIDENING
2424+07.80
EXIST. R/W LINE
0
4
3
S-
75.00' LT.
75.00' LT.
EXIST. R/W LINE
SPECIAL DT LT.
2424+07.80
+80.78
50.00' LT.
43.01' LT.
STAB. SHLDR.
CONST. 7' SHLDR. PAVT.
00'
75.
CONST. 18" PIPE
00'
50.
CONST. 7' SHLDR. PAVT.
+80.78
23.65' LT.
+80.11
+86.49
78.77' LT.
TS OF FC
MI
I
L
2421
2420
3421
3420
£ CONST. SR 60 LT.
3422
3423
CURVE BLPGLLT4
2424
2425
3424
3425
"E
1
'4
7
°5
1
S7
SPECIAL DT MED.
FLARED END
S-401
+49.32
CONST. 4' SHLDR. PAVT.
STAB. SHLDR.
4.00' LT.
4421
£ CONST. SR 60 RT.
4423
2.19' RT.
REMOVE EXIST. C & G
CONST. TYPE E C & G
4425
4424
CURVE BLPGLRT4
+67.50
TS OF FC
MI
I
L
4.00' LT.
4422
"E
1
'4
7
°5
1
S7
00'
132.
230'R
40.
00'
"E
1
'4
7
°5
1
S7
PT STA. 3424+60.66
+29.31
00'
132.
2423
+49.47
12.00' RT.
4420
NG
I
L
L
TS OF MI
MI
I
L
NG
AND RESURFACI
2422
40.
00'
CONST. TYPE E C & G
£ SURVEY SR 60
PT STA. 4424+61.26
NG
I
L
L
TS OF MI
MI
I
L
NG
AND RESURFACI
15" RCP
43.00' LT.
TS OF FC
MI
I
L
TS OF FC
MI
I
L
CONST. 7' SHLDR. PAVT.
CONST. 7' SHLDR. PAVT.
STAB. SHLDR.
S-402
SPECIAL DT RT.
(<50 kV)
EXIST. R/W LINE
END NEW CONSTRUCTION
BEGIN MILLING AND RESURFACING
BEGIN WIDENING
END WIDENING
STA. 4421+67.50 £ CONST. SR 60 RT.
STA. 4424+79.37 £ CONST. SR 60 RT.
FLOATING TURBIDITY
BARRIER
STAKED TURBIDITY
BARRIER
PERMANENT FILL
LIMITS OF MILLING
AND RESURFACING
SEDIMENT BARRIER
PERMANENT DREDGE
WIDENING
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (12)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:47 PM
347
H:\47100\43655913201\permits\Wetland Impacts\PLANEM11_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
STA. 3421+80.00 £ CONST. SR 60 LT.
=
1"
SR 60
'
40
N
END OVERBUILD
END PROJECT
STA. 2427+64.67 £ SURVEY SR 60 =
STA. 3427+65.44 £ CONST. SR 60 LT., 12.00' RT.
STA. 4427+66.04 £ CONST. SR 60 RT., 52.00' RT.
PROP. R/W LINE
2426+00.00
50.00' LT.
50.
00'
50.
00'
STAB. SHLDR.
CONST. 7' SHLDR. PAVT.
LIMITS OF MILLING
AND RESURFACING
TS OF FC
MI
I
L
2426
2427
3426
3427
+65.44
23.76' LT.
2428
3428
2429
S 71° 57' 41" E
S 71° 57' 41" E
2430
£ SURVEY SR 60
3429
£ CONST. SR 60 LT.
NG
I
L
L
TS OF MI
MI
I
L
NG
AND RESURFACI
2431
3430
3431
4430
4431
+11.68
SPECI
AL DT MED.
40.
00'
40.
00'
0.30' RT.
+11.68
REMOVE EXI
ST.MEDI
AN OPENI
NG
12.00' RT.
STAB. SHLDR.
4428
+65.44
NG
I
L
L
TS OF MI
MI
I
L
NG
AND RESURFACI
STAB. SHLDR.
63.96' RT.
£ CONST. SR 60 RT.
4429
NG
I
L
L
TS OF MI
MI
I
L
NG
AND RESURFACI
R
'
5
2
2
5
'
R
TS OF FC
MI
I
L
S 71° 57' 41" E
132.
00'
4427
15" RCP
132.
00'
4426
CONST. 7' SHLDR. PAVT.
"CMP
8
1
SPECIAL DT RT.
S-404
S-403
0 kV)
<5
(
CONST. 46 LF 18" PIPE
EXIST. R/W LINE
+26.
66
CONST. 16' ASPH. TURNOUT
FLOATING TURBIDITY
BARRIER
STAKED TURBIDITY
PERMANENT FILL
BARRIER
SEDIMENT BARRIER
REVISIONS
DATE
DESCRIPTION
DATE
PERMANENT DREDGE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (13)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:48 PM
348
H:\47100\43655913201\permits\Wetland Impacts\PLANEM12_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
EXIST. R/W LINE
=
1"
SR 60
'
40
ST
WE
END MILLING AND RESURFACING
N
KE
LA
END CONSTRUCTION
STA. 2432+50.00 £ SURVEY SR 60 =
S
LE
WA
STA. 3432+50.00 £ CONST. SR 60 LT.
STA. 4432+50.00 £ CONST. SR 60 RT.
50.
00'
50.
00'
2433
3432
3433
4431
4432
4433
NG
I
L
L
TS OF MI
MI
I
L
NG
AND RESURFACI
132.
00'
2431
£ SURVEY SR 60
£ CONST. SR 60 LT.
£ CONST. SR 60 RT.
2434
S 71° 57' 41" E
3434
S 71° 57' 41" E
4434
S 71° 57' 41" E
2435
2436
3435
3436
4435
4436
132.
00'
2432
3431
NG
I
L
L
TS OF MI
MI
I
L
NG
AND RESURFACI
T
ES
WKE
LA
AD
ST
RO
W E ES
L
WA
KE
LA
EXIST. R.W LINE
S
LE
WA
AD
RO
FLOATING TURBIDITY
BARRIER
STAKED TURBIDITY
REVISIONS
DATE
DESCRIPTION
DATE
PERMANENT FILL
BARRIER
LIMITS OF MILLING
SEDIMENT BARRIER
AND RESURFACING
PERMANENT DREDGE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SR 60
WETLAND IMPACTS (14)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
6:29:33 PM
349
H:\47100\43655913201\permits\Wetland Impacts\PLANEM13_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
AD
RO
EXIST. R/W LINE
SW FRONTAGE ROAD
4387
CONC. RETAINING WALL
RIP RAP
4388
4389
RIP RAP
4390
=
1"
4386
4385
'
40
£ CONST. SR 60 RT.
PT STA. 4385+87.96
SR 60
N
RIP RAP
PT STA. 111+82.
45
ASPH.
EXIST. R/W LINE
E
RE FENC
BED WI
'BAR
4
END
APPROACH
SLAB
RIP RAP
113
114
115
116
CONC. RETAINING WALL
SURFACE WATER 1
LIMITS
SURFACE WATER 1 LIMITS
4
'BARBED WI
RE FENCE
END MILLING AND RESURFACING
EXIST. R/W LINE
BEGIN BRIDGE (BR# 160133)
STA.1
1
2+5
3.
1
1£ CONST.SW FRONTAGE ROAD
END BRIDGE (BR# 160133)
BEGIN APPROACH SLAB
BEGIN MILLING AND RESURFACING
STA.1
1
4
+1
3.
1
1£ CONST.SW FRONTAGE ROAD
SURFACE WATER 1 (1.79 AC.)
0.23 AC. PERMANENT FILL
0.19 AC. PERMANENT DREDGE
SAND CEMENT RIPRAP
0.20 AC. PERMANENT IMPACT (CRANE MAT)
RUBBLE RIPRAP
PERMANENT FILL
FLOATING TURBIDITY
BARRIER
PERMANENT DREDGE
STAKED TURBIDITY
BARRIER
PERMANENT IMPACT
SEDIMENT BARRIER
(CRANE MAT)
SCALE: 1" = 40' HORIZ.
1" = 4' VERT.
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SW FRONTAGE ROAD
WETLAND IMPACTS
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:50:51 PM
350
H:\47100\43655913201\permits\Wetland Impacts\PLPREM03_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
112
111
PE
AC
DR
E
AI
CR
NA
EE
GE
K
CA
NA
L
APHAL
T
N
0
20
80
Feet
EXIST. R/W LINE
39
K1
RT 6
H
7.
110
SW
PC
33
K1
RT 4
B
8.
110
SW
PC
37
K1
RT 4
F
8.
110
SW
PC
34
K1
RT 6
C
8.
110
SW
PC
00
110.
4
6
'R
32
K1
RT 5
A
7.
110
SW
PC
1
1
0
.
0
0
1
09.
50
00
9.
00
10 9.
10
50
9.
10
PROP. R/W LINE
50
9.
10
00
.
109
01
K1
RT 2
1
7.
110
SW
PC
0
.0
2
1
1
112.50
112.00
5
'R
00
.
0
11
107.8
1:
2
50
1.
11
112.00
00
113.
5
2
1
S-
50
2.
11
1:50
2
CS11
3.
00
1:
3
10
8.
50
D PE
A
R
C
A
IN
1
1
0
.0
0
10
3.
50
00
112.
1:
4
1
0
9
.
5
0
10
7.
00
10
8.
00
11
1.
00
10
7.
50
0
.0
5
0
1
3
CS-
10
5.
50
7
1
1
SC4
EP
CD 8
2
L
1.
11
80
23
WL
10
6.
00
00
.
113
108.00' LT.
2
0
2
S1
0
6
.0
0
4
6
'R
111.
00
00
.
111
00
.
112
PB-1-15
113
.
50
2
C1
EP
CD 7
7
L
1.
11
80
23
WL
+71.70
1
5
'MAI
NTENANCE BERM
1:15
114.5
B
12
SC
I
P1
CM 77
LN
1.
11
80
23
WL
11
SC
1
I
HW
CM 94
LS
1.
11
80
23
WL
1
CSR
'
6
4
1
C1
EP
CD 8
8
L
1.
11
80
23
WL
PROP. R/W LINE
1:3
113.5
PB-1-8
C3
EP
CD 3
3
L
1.
11
80
23
WL
108.00' LT.
1
1
2
.
5
0
116.70' LT.
+44.09
5'
R
PB-1-13
00
112.
110.0
00
4.
10
CONST. 63 LF
OF 18" PIPE
PB-1-11
1:2
107.8
C2
EP
CD 2
4
L
1.
11
80
23
WL
+90.84
00
.
111
00
111.
PB-1-4-1
SURFACE WATER 1 LIMITS
PB-1-4-2
+54.68
127.79' LT.
101.0
8
1
1
S-
3
C1
EP
CD 7
6
L
1.
11
80
23
WL
50
111.
'R
5
11
1.
00
PB-1-5
PROP. R/W LINE
PB-1-9
A
110
.
50
C1
EP
CD 0
5
L
1.
11
80
23
WL
DHW = 113.20
00
0.
11
0
+55.05
.0
2
1
1
130.09' LT.
0.07 AC. PERMANENT DREDGE
WETLAND 2380L LIMITS
PB-1-7
CONST. 10'x14'x2.5'
RUBBLE RIPRAP
(DITCH LINING)
15
1:
PB-1-3
0.18 AC. PERMANENT FILL
+31.18
196.38' LT.
DHW = 112.62
4
1:
PB-1-6
PB-1-12
PB-1-10
POND 1
2
1:
PB-1-2
WETLAND 2380L (0.25 AC.)
101.0
+35.92
127.29'
LT. 2380L LIMITS
WETLAND
+56.72
202.56' LT.
A
3
1:
1:
15
1:2
E
A
G CR
E
E
C EK
A
N
A
L
110.50
111.00
PB-1-14
111
.
50
B1
EP
CD 5
J
8.
110
SW
PC
40
K1
RT 0
I
7.
110
SW
PC
9
1
1
S-
7
GS
CT 4
OT
SH
1.
11
ND
OU
GR
3
1
1
S-
C5
EP
CD 7
1
L
1.
11
80
23
WL
0
C1
EP
CD 8
9
L
1.
11
80
23
WL
6
1
1
S-
4
2
1
SCONST. 42" PIPE
2
1
1
SC9
EP
CD 5
10
L
1.
11
80
23
WL
C6
EP
CD 5
13
L
1.
11
80
23
WL
C8
EP
CD 2
11
L
2.
11
80
23
WL
C7
EP
CD 9
12
L
1.
11
80
23
WL
£ CONST. SR 60 LT.
CONST. 84 LF
OF 18" PIPE
3385
0
8
3
3
25
K1
RT 9
3
6.
110
SW
PC
10
SC
I
CM 43
7.
W2
10
SH
PC
6
GS
T
CT 3
SHO
6.
10
ND
OU
GR
2380
26
K1
RT 5
4
6.
110
SW
PC
2385
22
K1
RT 8
26
8.
110
SW
PC
20
K1
RT 6
24
6.
110
SW
PC
S 71° 57' 41" E
5
1
1
S1
1
1
S-
SR 60
£ SURVEY SR 60
19
K1
RT 0
23
8.
110
SW
PC
27
K1
RT 0
5
7.
110
SW
PC
3
2
1
S15" RCP
4
1
1
S-
0
1
1
S-
21
K1
RT 4
25
7.
110
SW
PC
S 71° 57' 41" E
18
K1
RT 8
22
6.
110
SW
PC
28
K1
RT 5
6
7.
110
SW
PC
29
K1
RT 2
7
8.
110
SW
PC
SW FRONTAGE ROAD
17
K1
RT 0
21
8.
110
SW
PC
30
K1
RT 7
8
6.
110
SW
PC
31
K1
RT 4
9
7.
110
SW
PC
16
K1
RT 8
20
1.
111
SW
PC
09
K1
RT 7
A
13
7.
110
SW
PC
0
2
1
S-
18" CMP
1
2
1
S-
0
0
2
S-
6
2
1
S-
2
2
1
S-
11
K1
RT 3
15
2.
111
SW
PC
10
K1
RT 3
14
2.
111
SW
PC
1
0
2
S-
02
K1
RT 7
10
7.
110
SW
PC
5
GS
T
CT 4
SHO
7.
10
ND
OU
GR
9
SC
I
CM 42
8. WH1
10
S
W
PC
08
K1
RT 5
13
6.
110
SW
PC
EXIST. R/W LINE
FLOATING TURBIDITY
SURFACE
WATER 1 LIMITS
BARRIER
STAKED TURBIDITY
PERMANENT FILL
BARRIER
SEDIMENT BARRIER
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
TAMMY M. KREISLE, P.E. NO.: 61731
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
SR 60
COUNTY
NO.
POND DETAILS (1)
FINANCIAL PROJECT ID
POLK
WETLAND IMPACTS
436559-1-52-01
gmedeiros
PERMANENT DREDGE
1/31/2017
5:54:59 PM
351
H:\47100\43655913201\permits\Wetland Impacts\PDPLEM01_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
50
113.
1
1
0
.
0
0
1
1
0
.
5
0
1
1
1
.5
0
50
8.
10
0
5
.
9
0
1
109.
00
50
1.
11
50
9.
10
00
9.
10
50
8.
10
00
1.
11
00
1.
11
1:3
17
1-
35
K1
RT 8
D
9.
110
SW
PC
1:15
110.0
PB-1-1
WL
0
.0
8
0
1
113.5
W
1
0
9
.0
0
F
SM
10
9.
50
114.5
11
1.
00
R
'
6
4
1
5
'MAI
NTENANCE BERM
5
'
R
36
K1
RT 8
E
9.
110
SW
PC
00
0.
11
0
5
.
0
1
1
1:4
PB-1-4
300.00' LT.
00
.
109
0
0
.
0
1
1
111.00
38
K1
RT 8
G
7.
110
SW
PC
00
.
108
1
1
1.
5
0
50
0.
11
319.38' LT.
300.00' LT.
0
0
.
2
1
1
112.00
111.00
+09.18
109.
00
B
+95.03
330.00' LT.108.00
1
0
9
108 .
0
.
50
0
111.
50
00
1.
11
0
5
.
2
1
1
+91.36
+17.22
+77.41
300.00' LT.
00
3.
11
0
5
.
7
0
1
00
111.
50
110.
110.
00
10
9.
50
EXIST. R/W LINE
PI STA. 11+83.99
SMF E WETLAND 1 (0.11 AC.)
¬ = 165° 00' 00" LT.
0.09 AC. PERMANENT FILL
0
.0
5
1
1
EXIST. R/W LINE
STA. 22+41.11 £ POND 3 =
114.00
PI STA. 15+77.75
0.02 AC. SECONDARY IMPACT
113.50
¬ = 89° 13' 10" LT.
STA. 11+49.95 £ LATERAL DITCH 1
SMF E
11
6.
50
00
115.
WETLAND 1 LIMITS
+28.90
£ POND 3
EXIST. R/W LINE
20
1
:
3
00
5.
11
FL 105.8
INDEX NO. 272
60.6' LT. £ POND 3
11
3.
50
308.80' LT.
00
4.
11
PB-3-2-1
50
119.
1
1
7
.5
0
1
:
1
5
PB-3-2-16
00
7.
11
1
1
9
.0
0
£ SURVEY SR 60
CONST. 95 LF OF 30" PIPE
B
B
AR
1
1
7
.
5
0
E
00
6.
11
£ POND 3
£ POND 3
+17.91
11
8.
00
4'
D
£ CONST. SR 60 LT.
353.56' LT.
W
RTK170
113.4
SW 2399 L-4
1
1
8
.
0
0
117.00
9
'R
7
0
3
S-
B
50
6.
11 00
6.
11
00
5.
11
00
5.
11
£ SURVEY SR 60
1
2
2
S-
£ SURVEY SR 60
E
IR
1
0
3
S-
1
1
9
.
0
0
118.50
9
0
3
S-
EXIST. R/W LINE
0
.0
8
1
1
PROP. R/W LINE
34
00
E
EXIST. R/W LINE
119.
50
71
°5
7'
41
"
119.
00
120.
50
30
0
0
0
.
8
1
1
50
4.
11
RTK168
114.4
SW 2399 L-2
E
RTK160
114.6
SW 2399 L-1
S
.
£ CONST. NE FRONTAGE118
ROAD
50
0
0
3
S-
11
7.
50
RTK169
114.0
SW 2399 L-3
50
5.
11
E
C
N
71
°5
7'
41
"
11
8.
50
E
F
S
+89.70
343.68' LT.
£ SURVEY SR 60
+01.80
36
"P
I
NE
308.55' LT.
£ SURVEY SR 60
2
0
3
S-
24
00
NE
18
"O
AK
118.
50
6
0
3
S
8"
TR
EE
RO
AD
20
"T
WI
N
8
0
3
S-
30
5
CP
R
SR
SPECIAL DT RT.
60
TR
EE
0
1
3
S-
70
°
1
0'
48
"
34
05
18
"C
MP
24
05
EXIST. R/W LINE
8'
CH
AI
N
L
I
NK
0
.0
1
2
1
"
30
4
0
3
S-
RA
I
N
10
SURFACE WATER
2397R LIMITS
STA. 10+00.00 £ POND 3 =
STA. 305+90.60 £ CONST. NE FRONTAGE ROAD
30
"R
CP
RTK159
114.1
SW 2397 R-3
PROP. DRAINAGE EASEMENT
119.
00
4'B
ARB
ED
WI
RE
FEN
CE
5
0
3
S-
18
"C
MP
120.
00
FR
ON
TA
GE
4
1
3
S-
FE
NC
E
W/
BA
RB
ED
WI
RE
BARRIER
18
"C
MP
STAKED TURBIDITY
3
0
3
S-
PERMANENT FILL
FLOATING TURBIDITY
3
1
3
S-
PERMANENT DREDGE
BARRIER
SEDIMENT BARRIER
SECONDARY IMPACT
12
"C
MP
RTK177
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
TAMMY M. KREISLE, P.E. NO.: 61731
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
POND DETAILS (2)
WETLAND IMPACTS
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:55:01 PM
352
H:\47100\43655913201\permits\Wetland Impacts\PDPLEM03_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
1:
3
1:
2
1:
4
1:
15
50
5.
11
10
50
2.
11
118.
00
CONST. MES (30") (CD) (1:2)
+11.82
50
3.
11
+94.50
2399L LIMITS
STA. 13+01.08, 52.2' LT.
PB-3-2-14
1
:
2
1
:
4
SURFACE WATER
4
1:
00
4.
11
£ SURVEY SR 60
7
0
3
SPB-3-2-2
1
1
8.
4
PROP. DRAINAGE EASEMENT
308.80' LT.
PROP. R/W LINE
OF 18" PIPE
15
1:
00
116.
+87.43
1
05
.
8
1
1
2.
7
1
1
4.
7
1
1
7.
4
CONST. 45 LF
EXIST. R/W LINE
EXIST. R/W LINE
DHW = 116.38
DHW = 116.48
PB-3-2-12
BE
RM
3
1:
R
R
£ SURVEY SR 60
PB-3-2-15
2
1:
X
S
308.82' LT.
£ SURVEY SR 60
PB-3-2-13
POND 3
PB-3-2-11
1
5'
MA
I
NT
EN
AN
CE
113.00
308.81' LT.
2
2
2
S-
89.4' LT. £ POND 3
+44.99
+52.06
A
+03.84
1
1
7
.0
0
C
£ SURVEY SR 60
64.0' LT. £ POND 3
PB-3-2-8
PB-3-2-6
116.50
50
5.
11
00
5.
11
308.84' LT.
+43.04
75.6' LT. £ POND 3
PB-3-2-10
00
6.
11
+94.74
15
00
6.
11
1
1
5
.0
0
00
6.
11
5
CS-
PB-3-2-9
CDEPJ2
117.3
SMF E WL 1-2
+79.23
71.4' LT. £ POND 3
'R
9
80
Feet
PB-3-2-7
+12.32
4
CS-
20
0
5
7.
1
1
1:2
1
05.
8
PB-3-2-4
00
5.
11
EXIST. R/W LINE
£ LATERAL DITCH NO. 1
CDEPJ1
117.2
SMF E WL 1-3
M
CE BER
NTENAN
5'MAI
1
1:3
1
1
2.
7
0
50
.
117
0
.5
4 0
1 .0
1 4.50
1
113.00
113
1
A
1
:
1
5
1
1
7
.
4
1
1
4
.
7 PB-3-2-5
PB-3-2-3
9'
R
£ SURVEY SR 60
CTGS13
111.9
GROUND SHOT
1
1
8.
4
1
1116.
117
00
4.
.
00
50
115
.
50
50
4.
11
1:4
+58.74
413.05' LT.
CMISC21
113.95
SMF E WL1 SHW1
115.00
0.00' RT. £ POND 3
CMISC22
112.91
SMF E WL1 NP1
50
6.
11
N
£ SURVEY SR 60
0
5
.
3
1
1
113.00
0
5
.
2
1
1
115.00
CDEPJ6
114.3
SMF E WL 1-4
00
114.
+60.00
6
4
°
4
6
'
3
2
"
639.28' LT.
CDEPJ3
115.6
SMF E WL 1-1
00
2.
11
50
2.
11
£ SURVEY SR 60
111.
50
50
6.
11
116.50
+87.95
B
CDEPJ4
116.4
SMF E WL 1-6
111.00
0
.5
6
1
1
452.91' LT.
00
6.
11
00
2.
11
+50.39
CDEPJ5
117.6
SMF E WL 1-5
1
1
7
.
0
0
117
.
00
5
.5
0
B
£ SURVEY SR1160
9
'R
0
.5
4
1
1
424.91' LT.
1
0
4
3
4' BARBED WIRE FENCE
3
0
"RCP
N
1"
2
0
4
2
0
0
3
"
0
3
40
'
P
C
R
CONST. 18" PIPE
1
CD-
2
0
4
3
2401+19.30
13"
05'
47°
CENTER OF
£ SURVEY SR 60
2399+92.56
1
0
3
S-
308.80' LT.
1
CD-
£ SURVEY SR 6
8
"
8
1
3
0
4
2
P
M
C
PROP. DRAINAGE
135.75' LT.
1
0
3
LATERAL DITCH
=
0
0
3
S-
PROP. DRAINAGE
EASEMENT
EASEMENT
9
9
EASEMENT
C
P
3
0
0
.
0
2
+
3
0
4
3
.
3
A
0
T
4
S
STANDARD CLEARING & GRUBBING
O
R
F
C
P
8
5
.
4
3
+
2
0
3
.
A
T
S
D
A
E
G
A
T
N
CONST. 30" PIPE
£ LATERAL DITCH NO. 1
2399+94.50
PROP. DRAINAGE EASEMENT
E
N
308.80' LT.
2
0
3
S-
£ SURVEY SR 60
2401+53.44
135.75' LT.
A
X
£ SURVEY SR 60
(M
PERMANENT FILL
1
:2
.)
:3
X
1
A
(M
:2
1
1
:3
.)
SOD
2
0
3
VARIES
LATERAL
DITCH
PROFILE
POINT
O
R
E
IN
P
12.5'
"
6
3
12.5'
PROP. R/W LINE
PERMANENT DREDGE
0 £ CONST.NE FRONTAGE ROAD =
4
STA.300+82.
FLOATING TURBIDITY
BARRIER
£ CONST. NE FRONTAGE ROAD
TCH 1
ATERAL DI
0£ L
1
.
+09
STA.7
DEPTH AND WIDTH VARIES
SEE CROSS SECTIONS
TEMPORARY FILL
STAKED TURBIDITY
BARRIER
ON
CAL SECTI
TCH TYPI
ATERAL DI
L
SEDIMENT BARRIER
TEMPORARY DREDGE
NTS
SCALE: 1" = 40' HORIZ.
1" = 4' VERT.
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
TAMMY M. KREISLE, P.E. NO.: 61731
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
LATERAL DITCH
NO.
FINANCIAL PROJECT ID
WETLAND IMPACTS (1)
SR 60
POLK
436559-1-52-01
scurran
12/8/2016
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
PROP. DRAINAGE
5:46:04 PM
348
353
H:\47100\43655913201\permits\Wetland Impacts\LDPREM01_USACE.dgn
N
N
1"
=
40
'
2399+44.99
EXIST. R/W LINE
308.82' LT.
£ SURVEY SR 60
2398+94.74
308.84' LT.
2399+58.41
£ SURVEY SR 60
EXIST. R/W LINE
308.81' LT.
£ SURVEY SR 60
EXIST. R/W LINE
EXIST. R/W LINE
2399+92.56
2398+28.90
424.91' LT.
308.80' LT.
£ SURVEY SR 60
£ SURVEY SR 60
2398+58.74
413.05' LT.
EXIST. R/W LINE
£ SURVEY SR 60
EASEMENT
9
9
00
0+00.
PISTA.1
9
9
+83.
1
PISTA.1
T.
"L
7
'4
4
°5
7
7
¬= 1
T.
°00'00"L
5
6
¬= 1
£ LATERAL DITCH NO. 1
4
1
10
3
1
1
1
12
5
CS-
2399+94.50
308.80' LT.
£ SURVEY SR 60
"
2
3
'
6
°4
4
6
CONST. 18" PIPE
EXIST. R/W LINE
EXIST. R/W LINE
PERMANENT FILL
£ POND 3
2398+50.39
FRONTAGE ROAD =
22
4
.
8
11
4
CS-
452.91' LT.
PERMANENT DREDGE
£ SURVEY SR 60
FLOATING TURBIDITY
4
.
7
11
H 1
BARRIER
7
.
4
11
7
.
2
11
TEMPORARY DREDGE
TEMPORARY FILL
STAKED TURBIDITY
POND 3
8
.
5
10
1£ POND 3 =
1
.
1
STA.22+4
BARRIER
TCH 1
ATERAL DI
5£ L
9
.
9
+4
1
STA.1
SEDIMENT BARRIER
TEMPORARY DREDGE
SCALE: 1" = 40' HORIZ.
1" = 4' VERT.
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
TAMMY M. KREISLE, P.E. NO.: 61731
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
LATERAL DITCH
WETLAND IMPACTS (2)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
scurran
12/8/2016
5:46:04 PM
354
349
H:\47100\43655913201\permits\Wetland Impacts\LDPREM02_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
PROP. DRAINAGE
SW
E1
DD
1
0 EP
SM 7.
A1
F 7
CSX RR R/W LINE
=
4
0
'
SMF E SURFACE WATER 1 (0.03 AC.)
0.01 AC. PERMANENT FILL
SMF E
N
0.01 AC. PERMANENT CONSTRUCTION IMPACT
SURFACE WATER 1 LIMITS
1
"
18+23.18
17.50' LT.
=
4
0
'
CONST. RUBBLE RIPRAP
BANK AND SHORE (2.5' TK)
W
E
-2
H
10 NP1
F
7
N
.
D 78
NA
IL
H
10 GN
GN 7 D
. 2
D 7
2392+12.55
NP
1
A
17.50' LT.
H
10 SH
F
8 W
N
.
1
D 51
NA
IL
S
780.75' LT.
H
£ SURVEY SR 60
W
1
15
16
17
18
H
1 W EL
0
PE 6.
V1
AC 06
E
CR
EE
K
7
CS-
6
CS-
W
AT
ER
£ LATERAL DITCH NO. 1
EL
E
V
.
15
9/
2
1
/20
A
18+23.18
CONST. 22 LF OF 18" PIPE
2392+30.05
17.50' RT.
18+05.18
811.06' LT.
17.50' RT.
£ SURVEY SR 60
CONST. 35' x 18'
NATURAL
4" REINF. CONC.
GROUND
DT PAVT.
1
:
1'
3
NATURAL
FLOATING TURBIDITY
GROUND
BARRIER
H
H
10 GN 10 GN
D36 D3
GN 6 GN
.
.
D 2 D 2
PERM
ANEN
T FI
L
L
L
H
H
10 SH10 SH
FN 7 FNW 7 W
.
2.
2
D 97 D 97
NA
H
H NA
10 NP2
10 NP IL
IL
F
7 FN 7 2
SH
SH
ND .30
.
D 30
W
W
NA
NA
2
2
I
I
NP
2
L
PERM
ANEN
T DR
EDGE
PERMANENT FILL
3
1:
NP
2
S
E
-3
E
-3
DD
DD
11 EP
11 E
2.S A3
2. PA
M
3
F 6 F 6
SW
SW
M
8.1'
STAKED TURBIDITY
CONST.
BARRIER
TOEWALL
SECTION A-A
(6" TK)
NTS
SEDIMENT BARRIER
1'
PERMANENT DREDGE
CONST.
TOEWALL CONSTRUCTION
PERMANENT
(6" TK)
IMPACT
SCALE: 1" = 40' HORIZ.
1" = 4' VERT.
REVISIONS
DATE
DESCRIPTION
DATE
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
TAMMY M. KREISLE, P.E. NO.: 61731
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
LATERAL DITCH
WETLAND IMPACTS (3)
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:51:00 PM
355
H:\47100\43655913201\permits\Wetland Impacts\LDPREM03_USACE.dgn
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
S
DD
10 EP
SM 9
. A
2
F 4
H
10 GN
GN 4. D
1
D 8
18+05.18
EXIST. R/W LINE
PEACE CREEK
D RAINAG E CANAL
1
"
£ CONST. SR 60 LT.
PERMANENT FILL
Subsoil Exc.
A
V
Regular Exc.
A
V
Embankment
A
V
0
.
0
3
EXIST. R/W LINE
0
.
0
2
2
0
.
0
1
:4
114.74
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
112
2
0
.
0
114.
00
114
3
0
.
0
0
.
0
2
1
:3
116
W ETLAND LIM IT
120
118
2
1:
W ETLAND LIM IT
122
- £ CONST. SW. FRONTAGE RD.
STA. 106+96.54
95.93' RT.
112.
40
124
£ SURVEY SR 60
STA. 2381+00.
76
32.
33'RT.
EXIST. R/W LINE
126
119.
28
130
128
119.
41
£ CONST. SR 60 RT.
STA. 4381+00.
52
28.
20'RT.
PERMANENT DREDGE
110
108
106
104
102
3381+00.00
100
WETLAND 2380L LIMITS
98
96
94
92
90
£ CONST. SR 60 LT.
200
160
120
80
40
0
40
80
120
REVISIONS
DATE
DESCRIPTION
DATE
160
1" = 40' HORIZONTAL
1" = 10' VERTICAL
200
240
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
CROSS SECTIONS (1)
WETLAND IMPACTS
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
6:41:44 PM
356
H:\47100\43655913201\permits\Wetland Impacts\RDXSEM01_USACE.DGN
£ CONST. SR 60 LT.
PERMANENT FILL
Subsoil Exc.
A
V
Regular Exc.
A
V
Embankment
A
V
146
144
140
138
136
3
0
.
0
0
.
0
2
2
0
.
0
136.
79
142
0
.
0
2
0
.
0
3
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
148
136.
79
£ CONST. SR 60 RT.
STA. 4389+00.
00
23.
50'RT.
PERMANENT DREDGE
2
0
.
0
134
132
130
128
110
108
EXIST. R/W LINE
1
:3
114
112
EXIST. R/W LINE
116
SURFACE
W ATER LIM IT
112.
15
£ SURVEY SR 60
STA. 2389+00.
00
38.
00'RT.
120
118
:4
1
SURFACE W ATER LIM IT
122
EXIST. R/W LINE
124
SURFACE W ATER LIM IT
- £ CONST. SW. FRONTAGE RD.
STA. 114+94.49
91.96' RT.
126
112.90
SURFACE WATER 1 LIMITS
106
3389+00.00
104
END APPROACH SLAB
102
SURFACE WATER 1 LIMITS
BEGIN NEW CONSTRUCTION
100
STA. 4388+93.37 £ CONST. SR 60 RT.
98
96
94
92
END BRIDGE (BR# 160358)
90
BEGIN APPROACH SLAB
88
STA. 3388+70.00 £ CONST. SR 60 LT.
END BRIDGE (BR# 160357)
86
BEGIN APPROACH SLAB
84
STA. 4388+61.45 £ CONST. SR 60 RT.
82
80
£ CONST. SR 60 LT.
200
160
120
80
40
0
40
80
120
REVISIONS
DATE
DESCRIPTION
DATE
160
1" = 40' HORIZONTAL
1" = 10' VERTICAL
200
240
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
CROSS SECTIONS (2)
WETLAND IMPACTS
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:51:03 PM
357
H:\47100\43655913201\permits\Wetland Impacts\RDXSEM01_USACE.DGN
£ CONST. SR 60 LT.
PERMANENT FILL
Subsoil Exc.
A
V
Regular Exc.
A
V
Embankment
A
V
158
156
154
152
146
2
0
.
0
3
0
.
0
0
.
0
2
146.
55
150
148
146.
55
£ CONST. SR 60 RT.
STA. 4393+00.
00
23.
50'RT.
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
PERMANENT DREDGE
0
.
0
2
0
.
0
3
2
0
.
0
144
142
140
138
136
134
132
114
1
:4
EXIST. R/W LINE
1
:3
112.
53
2
0
.
0
1
:3
116
- £ CONST. SW. FRONTAGE RD.
STA. 118+94.60
97.91' RT.
£ SURVEY SR 60
STA. 2393+00.
00
38.
00'RT.
120
118
SURFACE W ATER LIM IT
122
EXIST. R/W LINE
124
114.
51
PROPOSED R/W LINE
126
SURFACE W ATER LIM IT
£ CONST. NW. FRONTAGE RD.
STA. 201+63.59
61.75' LT.
130
128
115.08
112
110
SURFACE WATER 2399L LIMITS
108
3393+00.00
£ CONST. SR 60 LT.
200
160
120
80
40
0
40
80
120
REVISIONS
DATE
DESCRIPTION
DATE
160
1" = 40' HORIZONTAL
1" = 10' VERTICAL
200
240
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
CROSS SECTIONS (3)
WETLAND IMPACTS
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:51:04 PM
358
H:\47100\43655913201\permits\Wetland Impacts\RDXSEM01_USACE.DGN
£ CONST. SR 60 LT.
PERMANENT FILL
Subsoil Exc.
A
V
Regular Exc.
A
V
Embankment
A
V
160
158
156
150
3
0
.
0
0
.
0
2
2
0
.
0
149.
94
154
152
0
.
0
2
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
162
149.
94
£ CONST. SR 60 RT.
STA. 4395+00.
00
23.
50'RT.
PERMANENT DREDGE
148
146
144
142
140
138
136
134
132
EXIST. R/W LINE
130
112
1
:3
4.8'
:4
1
114
2
0
.
0
112.
41
116
118.
48
120
118
- £ CONST. SW. FRONTAGE RD.
STA. 120+94.67
102.00' RT.
£ SURVEY SR 60
STA. 2395+00.
00
38.
00'RT.
122
SURFACE W ATER LIM IT
124
SURFACE W ATER LIM IT
126
EXIST. R/W LINE
PROPOSED R/W LINE
128
114.05
110
SURFACE WATER 2399L LIMITS
108
3395+00.00
106
104
END APPROACH SLAB
102
BEGIN BRIDGE (BR# 160355)
STA. 4394+14.13 £ CONST. SR 60 RT.
100
98
END BRIDGE (BR# 160356)
96
BEGIN APPROACH SLAB
STA. 3394+96.06 £ CONST. SR 60 LT.
94
92
END APPROACH SLAB
90
BEGIN BRIDGE (BR# 160356)
88
STA. 3394+00.56 £ CONST. SR 60 LT.
£ CONST. SR 60 LT.
200
160
120
80
40
0
40
80
120
REVISIONS
DATE
DESCRIPTION
DATE
160
1" = 40' HORIZONTAL
1" = 10' VERTICAL
200
240
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
CROSS SECTIONS (4)
WETLAND IMPACTS
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:51:05 PM
359
H:\47100\43655913201\permits\Wetland Impacts\RDXSEM01_USACE.DGN
£ CONST. SR 60 LT.
PERMANENT FILL
Subsoil Exc.
A
V
Regular Exc.
A
V
Embankment
A
V
PERMANENT DREDGE
162
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
160
158
156
154
152
150
148
146
144
142
140
138
116
0
.
0
2
0
.
0
3
119.87
EXIST. R/W LINE
£ CONST. SR 60 RT.
STA. 4418+39.
52
40.
00'RT.
122.
21 £ SURVEY SR 60
STA. 3418+40.
00
3.
60'RT.
2
0
.
0
W ETLAND LIM IT
3
0
.
0
W ETLAND LIM IT
:4
1
118
SURFACE W ATER LIM IT
0
.
0
2
SURFACE W ATER LIM IT
0
.
0
2
120
1
:3
124
122
EXIST. R/W LINE
126
£ CONST. NE. FRONTAGE RD. STA. 317+78.28
127.41' LT.
119.
00
130
128
1
:2
134
132
PROPOSED R/W LINE
136
1
:4
SURFACE WATER 2419L LIMITS
114
WETLAND 2413R LIMITS
112
110
108
106
104
102
100
3418+40.00
98
£ CONST. SR 60 LT.
200
160
120
80
40
0
40
80
120
REVISIONS
DATE
DESCRIPTION
DATE
160
1" = 40' HORIZONTAL
1" = 10' VERTICAL
200
240
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
KENNETH R. MUZYK, JR., P.E. NO.: 44076
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
CROSS SECTIONS (5)
WETLAND IMPACTS
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:51:05 PM
360
H:\47100\43655913201\permits\Wetland Impacts\RDXSEM01_USACE.DGN
£ CONST. SR 60 LT.
PERMANENT FILL
Regular Exc.
A
V
Embankment
A
V
PERMANENT DREDGE
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
120
110
1
:4
PROPOSED R/W LINE
PROPOSED R/W LINE
PROPOSED R/W LINE
EXIST. R/W LINE
PROPOSED R/W LINE
1:
20
W ETLAND LIM IT
1
:3
120
W ETLAND LIM IT
EXIST. R/W LINE
EXIST. R/W LINE
100
0
5
:
1
20
1:
:4
1
1:
2
110
2
1:
WETLAND 2380L LIMITS
3381+00.00
101.0
100
SCALE: 1" = 40' HORIZ.
1" = 10' VERT.
£ CONST. SR 60 LT.
360
320
280
240
200
160
120
80
40
REVISIONS
DATE
DESCRIPTION
DATE
0
40
80
120
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
TAMMY M. KREISLE, P.E. NO.: 61731
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
POND CROSS SECTION (1)
WETLAND IMPACTS
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:51:06 PM
361
H:\47100\43655913201\permits\Wetland Impacts\PDXSEM01_USACE.dgn
£ POND 3
PERMANENT FILL
Regular Exc.
A
V
Embankment
A
V
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
PERMANENT DREDGE
1:
21
20
1:
1
:4
1
:4
:4
1
2
1:
1:
2
110
W ETLAND LIM IT
:4
1
EXIST. R/W LINE
120
W ETLAND LIM IT
EXIST. R/W LINE
130
SMF E WETLAND LIMITS
105.8
100
19+00.00
19+19.08, 175' LT.
SCALE: 1" = 40' HORIZ.
1" = 10' VERT.
£ POND 3
360
320
280
240
200
160
120
80
40
REVISIONS
DATE
DESCRIPTION
DATE
0
40
80
120
STATE OF FLORIDA
DESCRIPTION
FALLER, DAVIS & ASSOCIATES, INC.
5525 W. CYPRESS ST.
TAMPA, FLORIDA 33607-1707
CERTIFICATE OF AUTHORIZATION NO.: 5864
TAMMY M. KREISLE, P.E. NO.: 61731
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
SHEET
POND CROSS SECTIONS (2)
WETLAND IMPACTS
SR 60
NO.
FINANCIAL PROJECT ID
POLK
436559-1-52-01
gmedeiros
1/31/2017
5:51:07 PM
362
H:\47100\43655913201\permits\Wetland Impacts\PDXSEM02_USACE.dgn