Home

St. Louis District

Run scraper

Simpson Materials proposes to create four new fleeting areas to support loading and unloading of non-hazardous products at their existing quarry facility. The fleets are proposed near the right descending bank

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Simpson Materials proposes to create four new fleeting areas to support loading and unloading of non-hazardous products at their existing quarry facility. The fleets are proposed near the right descending bank, between approximate Mississippi River miles 156.0 to 157.0, near Barnhart, Jefferson County, Missouri. The comment period opens on February 21, 2017, and closes on March 14, 2017.

Simpson Materials proposes to create four new fleeting areas to support loading and unloading of non-hazardous products at their existing quarry facility. The fleets are proposed near the right descending bank, between approximate Mississippi River miles 156.0 to 157.0, near Barnhart, Jefferson County, Missouri. The comment period opens on February 21, 2017, and closes on March 14, 2017.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas