You can copy from here when filling out the rest of the page.
CONSTRUCTION OF A POWER TRANSMISSION LINE AND EXPANSION OF AN EXISTING ELECTRICAL SUBSTATION IN ST. MARY PARISH
NAME OF APPLICANT: Cleco Power LLC, c/o: Coastal Environments, Inc., Attn: Ed Fike, 1260 Main Street, Baton Rouge, Louisiana 70802
LOCATION OF WORK: At and in the vicinity of Atchafalaya River, Bayou Shaffer, GIWW and Bayou Bouef, commencing at the existing Bayou Vista Substation, traveling a distance of approximately 11.84 miles and terminating at a tie-in with Entergy’s new transmission line near Amelia, Louisiana, in St. Mary Parish (29.679100, -91.1904)
CHARACTER OF WORK: Construction of a 230KV aerial transmission line and expansion of the existing Cleco Bayou Vista electrical substation. Approximately 14,705 cubic yards of fill (clay/sand/base material) will be deposited; and approximately 103 transmission poles with an average spacing of approximately 550 feet, will be mounted on steel caissons. The proposed project will include the permanent clearing of approximately 49.4 acres of jurisdictional bottomland hardwoods (BLH) and 26.6 acres of swamp for the perpetual right-of-way, temporary clearing of 2.5 acres of BLH and 3.4 acres of swamp for construction, temporary disturbance to 11.8 acres of fresh marsh and/or emergent wetlands for construction, and permanent filling of 0.03 acres of BLH and 0.01 acres of swamp, and 1.37 acres of fresh marsh and/or emergent wetlands for construction of a substation. The applicant proposed to mitigate for all authorized and unavoidable impacts to jurisdictional wetlands through the use of an approved and acceptable mitigation bank within the N.O. District or a proposed permittee-responsible mitigation plan (yet to be determined).
JOINT PUBLIC NOTICE
February 27, 2017
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
7400 Leake Ave.
New Orleans, Louisiana 70118-3651
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager:
Bobby Quebedeaux
(504) 862-2224
bobby.d.quebedeaux@usace.army.mil
Application #: MVN-2016-1386-WJJ
Project Manager:
Elizabeth Hill
(225) 219-3225
WQC Application Number:
WQC 170217-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water
Act (86 Stat. 816; 33 USC 1344).
The application has also been mailed to the Louisiana Department of Environmental Quality, for a
Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana Revised
Statute 30:2074 A(3), and provisions of Section 401 of the Clean Water Act (P.L. 95-17).
CONSTRUCTION OF A POWER TRANSMISSION LINE AND EXPANSION OF
AN EXISTING ELECTRICAL SUBSTATION IN ST. MARY PARISH
NAME OF APPLICANT: Cleco Power LLC, c/o: Coastal Environments, Inc., Attn: Ed Fike, 1260 Main
Street, Baton Rouge, Louisiana 70802
LOCATION OF WORK: At and in the vicinity of Atchafalaya River, Bayou Shaffer, GIWW and Bayou
Bouef, commencing at the existing Bayou Vista Substation, traveling a distance of approximately 11.84
miles and terminating at a tie-in with Entergy's new transmission line near Amelia, Louisiana, in St. Mary
Parish (29.679100, -91.1904)
CHARACTER OF WORK: Construction of a 230KV aerial transmission line and expansion of the
existing Cleco Bayou Vista electrical substation. Approximately 14,705 cubic yards of fill (clay/sand/base
material) will be deposited; and approximately 103 transmission poles with an average spacing of
approximately 550 feet, will be mounted on steel caissons. The proposed project will include the
permanent clearing of approximately 49.4 acres of jurisdictional bottomland hardwoods (BLH) and 26.6
acres of swamp for the perpetual right-of-way, temporary clearing of 2.5 acres of BLH and 3.4 acres of
swamp for construction, temporary disturbance to 11.8 acres of fresh marsh and/or emergent wetlands
for construction, and permanent filling of 0.03 acres of BLH and 0.01 acres of swamp, and 1.37 acres of
fresh marsh and/or emergent wetlands for construction of a substation. The applicant proposed to
mitigate for all authorized and unavoidable impacts to jurisdictional wetlands through the use of an
approved and acceptable mitigation bank within the N.O. District or a proposed permittee-responsible
mitigation plan (yet to be determined).
The applicant also proposes to restore natural contours and conditions within temporarily impacted
emergent and forested wetlands areas immediately following project construction, and will abide by any
restoration requirements set forth by the N.O. District, should permit issuance be justified.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating reasons
thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must
be submitted so as to be received before or by the last day of the comment period. Letters concerning
the Corps of Engineers permit application must reference the applicant's name and the Permit Application
Number, and be forwarded to the Corps of Engineers at the address above, ATTENTION:
REGULATORY BRANCH. Individuals or parties may request an extension of time in which to
comment on the proposed work by writing, faxing, or e-mailing the Corps of Engineers Project
Manager listed above. Any request must be specific and substantively supportive of the
requested extension, and received by this office prior to the end of the initial comment period.
The Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to the
initial comment period and, inclusive of the initial comment period, will not exceed a total of 30
calendar days. Letters concerning the Water Quality Certification must reference the applicant's name
and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at
the address above.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit which reasonably
may be expected to accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property ownership
and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of
Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make
this decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant
to the National Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or destroy
presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this public
notice are being sent to the State Archeologist and State Historic Preservation Officer regarding potential
impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as endangered
by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the
survival and recovery of any endangered species. Based on the South Louisiana Standard Local
Operating Procedure for Endangered Species (SLOPES), as signed on October 22, 2014, between the
U.S. Army Corps of Engineers, New Orleans and the U.S. Fish and Wildlife Service, it has been
determined that the project would have no effect to any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal may result in the
destruction or alteration of 0.0 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact
on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will
not violate applicable water quality standards will be required from the Department of Environmental
Quality, before a Department of the Army permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The
Department of the Army permit will not be issued unless the applicant received approval or a waiver of
the Coastal Use Permit by the Department of Natural Resources.
You are invited to communicate the information contained in this notice to any other parties whom
you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure