You can copy from here when filling out the rest of the page.
Brevard County. US Air Force, 45th Space Wing. Patrick Air Force Base, Florida. PROJECT PURPOSE: Basic: shoreline stabilization.
Overall: Restore an eroded shoreline by armoring the existing shoreline with riprap, install a 800 linear foot additional breakwater barrier (living shoreline) waterward of the existing shoreline, and plant native marsh grasses between the existing shoreline and breakwater at the west end of Runway 11, PAFB.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: US Air Force, 45th Space Wing
Attn: Patrick Giniewski
1224 Jupiter St.
Patrick Air Force Base, Florida 32925
WATERWAY AND LOCATION: The project would affect waters of the United States associated with the Banana River. The project site is located along 800 feet of the Banana River shoreline, west of Rescue Road at the west end of Runway 11, in Section 10, Township 26 South, Range 37 East, Patrick Air Force Base (PAFB), Brevard County, Florida.
Directions to the site are as follows: Work occurs within PAFB.
APPROXIMATE CENTRAL COORDINATES: Latitude 28.2425°
Longitude -80.6167°
PROJECT PURPOSE:
Basic: Shoreline stabilization.
Overall: Restore an eroded shoreline by armoring the existing shoreline with riprap, install a 800 linear foot additional breakwater barrier (living shoreline) waterward of the existing shoreline, and plant native marsh grasses between the existing shoreline and breakwater at the west end of Runway 11, PAFB.
EXISTING CONDITIONS: The subject shoreline at PAFB has eroded significantly during the past 20 years and more than 100 feet of loss occurred since 2009. Heavy wind and wave action continues to erode PAFB land, and the shoreline is now 30 feet from the edge of Rescue Road at its closest and 230 feet from the edge of Runway 11. A portion of the shoreline is armored with riprap to protect an underground sewer pipe exposed by high waves in 2014, with the rest unarmored. Benthic conditions are described as sand with shell and rock scattered along the river bottom. A fluctuating area of approximately 200-400 square feet of small patches of shoal grass (Halodule wrightii) were identified within the project footprint. The shoreline supports a total of approximately 30 linear feet of mangrove shoreline including 5-6 red mangrove seedlings and 20 white mangroves.
PROPOSED WORK: The applicant seeks authorization to restore an eroded shoreline by armoring the existing shoreline with 490 linear feet of riprap, installing a 780 linear foot breakwater barrier (living shoreline) waterward of the existing shoreline, discharging clean fill material into wetlands and waters to reshape the shoreline, and planting native marsh grasses between the existing shoreline and breakwater.
1. Riprap for the shoreline stabilization will be installed using a backhoe or long-arm
excavator from the shoreline.
2. The riprap breakwater will be installed by a barge-mounted backhoe or land-based crane and will be staggered with gaps to allow water flow and species movement. The breakwaters will consist of 70-foot (ft) sections with 5-ft gaps and will have 15-ft sections placed behind each gap opening.
3. The area between the shoreline riprap and breakwaters will be graded with a bulldozer or backhoe and then planted with marsh grasses by hand.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: Only minimum distance into water for required erosion protection of shoreline is proposed. Shoreline protection is designed to prevent future erosion, area of work is within previous limits of land so no impacts to navigation. Work on active military installation and activity will be conducted either by long-reach backhoe from uplands, or small barge or platform in water. By protecting against further erosion of shore, the existing wetlands and vegetation will survive. Plantings along shore will provide habitat.
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: The Patrick Air Force Base shoreline protection project with substantial wetland plantings will prevent future erosion and further destruction of shoreline wetlands which compensates impacts caused by this project. The impacts are minimized by avoiding the existing wetland vegetation at the south end of the project. There is little to no seagrass in the project area.
CULTURAL RESOURCES: The US Air Force is the lead federal agency for this proposal documented compliance with Section 106 of the National Historic Preservation Act. No further consultation is required.
ENDANGERED SPECIES: The US Air Force is the lead federal agency for this proposal and completed consultation with the U.S. Fish and Wildlife Service and the National Marine Fisheries Service, Protected Resource Division by separate letter. The US Air Force has documented compliance with Section 7 of the Endangered Species Act. No further consultation is required.
ESSENTIAL FISH HABITAT (EFH): The US Air Force completed consultation with the National Marine Fisheries Service, Habitat Conservation Division as the lead federal agency for the proposed action. The US Air Force has documented compliance with the EFH provisions of the Magnuson Stevens Fishery Conservation and Management Act. No further consultation is required.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Andrew Phillips, in writing at the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926; by electronic mail at andrew.w.phillips@usace.army.mil; by facsimile transmission at (321)504-3803; or, by telephone at (321)504-3771 extension 14.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
2
3
4
6
USER:
PATRICK AIR FORCE BASE
FLORIDA
CHIEF, ENGINEERING FLIGHT:
SXHT 15-1005
PROJECT MANAGER:
BUILDING 535-45TH CES
MAIN GATE (PERSONNEL ONLY)
C
DRAWING INDEX
DITCH
SHEET ID
DESCRIPTION
RE
SC
UE
RO
AD
GENERAL
PROJECT
LOCATION
G-001
BANANA
RIVER
AY 1
1
EAN
IC OC
ATLANT
C-001
GENERAL NOTES, ABBREVIATIONS, AND LEGEND
C-100
OVERALL SHORELINE PROTECTION PLAN
C-101
NORTH SECTION SHORELINE PROTECTION PLAN
C-102
SOUTH SECTION SHORELINE PROTECTION PLAN
C-301
CROSS SECTIONS
C-501
TYPICAL CROSS SECTION AND BREAKWATER DETAILS
C-502
MISCELLANEOUS DETAILS
1636
AD
UE RO
RESC
CHEVRON
PARK
1638
BANANA RIVER
CIVIL
XI
1523
1637
ENLARGED
RUNWAY 11 SHORELINE AREA
AS BUILT DATE:
####
SUBMITTED BY:
G. BEARD
0095
DELIVERY NO.
FA2521-13-D-0005
LLEN
E ngineering,Inc.
A
SCALE: NONE
B
GOLF COURSE
11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE
A
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT IDENTIFIED
ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN ORDER TO
PERFORM THE CONTRACT WORK, LEAVE MATERIAL UNDISTURBED AND
IMMEDIATELY INFORM THE CONTRACTING OFFICER.
ERP/STORMWATER
NOI/SWPPP
ERP/WETLANDS/DREDGE & FILL
IRP
FDEP/DRINKING WATER
SURVEY/WILDLIFE
ASBESTOS
FDEP/DOM. WASTE WATER
ARCHEO./HISTORICAL
HEAVY METALS
LOCATION PLAN
FDEP/IND. WASTE WATER
OTHER
LEAD
SCALE: NONE
FDEP/FUEL TANK
NONE
PCB
SOUTH GATE (PERSONNEL ONLY)
PINEDA EXPRESSWAY
HAZARDOUS MATERIALS
YES
NO
TRUE
NORTH
1
2
3
4
5
NOT
VERIFIED
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS:
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150005
RAEIS CONTRACT NO: FA2521-13-D-0005-0095
6
VICINITY MAP, LOCATION MAP
AND DRAWING INDEX
BAN
PRINTED COPIES OF THIS DOCUMENT ARE NOT
CONSIDERED SIGNED AND SEALED. THE
SIGNATURE MUST BE VERIFIED ON THE
ELECTRONIC DOCUMENTS.
David A.
Lavender
Digitally signed by David A.
Lavender
DN: cn=David A. Lavender, o=Allen
Engineering, Inc., ou=Civil
Engineering,
email=dlavender@alleneng.net,
c=US
Date: 2017.02.03 16:00:02 -05'00'
REPAIR RIVER SHORELINE,
RUNWAY 11
ANA
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED
AND SEALED BY: DAVID A. LAVENDER, P.E.
USING A DIGITAL SIGNATURE.
SXHT 15-1005
RIVE
R
TRUCK DELIVERY ONLY
N
L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 G-001.dwg, 1/18/2017 11:09:52 AM, DWG To PDF.pc3
M
RUN
W
UE
SC .
RE RD
B
TA
Y
WA
VICINITY MAP, LOCATION PLAN AND DRAWING INDEX
C
Oneida Total Integrated Enterprises
BUILDING 423-CONTRACTING OFFICER
RANGE ARCHITECT-ENGINEER,
INSPECTION SERVICES
SCALE: NONE
CONTRACT NO.: FA2521-13-D-0005 - 0095
USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL
STATE OF FLORIDA
RAEIS
OTHER:
J. KELLEY
IC OCEA
ATLANT
VER
ATO:
REVIEWED BY:
SECURITY FORCES:
BAN
A
NA R
I
MIAMI
D
SAFETY:
N
TAMPA
COMMUNICATIONS:
D. ARTZNER
S.R. A1A
PATRICK
AIR FORCE BASE
CE OPERATIONS:
DRAWN BY:
ORLANDO
SXHT 15-1005
REPAIR RIVER SHORELINE,
RUNWAY 11
D
FIRE:
01/18/17
JACKSONVILLE
ENVIRONMENTAL:
DATE:
A
P
P
R
O
V
E
D
D. LAVENDER
TALLAHASSEE
5
DESIGNED BY:
1
SHEET
IDENTIFICATION
G-001
A
9.
CONTRACTOR SHALL COMPLETE ALL NECESSARY WORK TO CONSTRUCT/REPAIR A STABLE SHORELINE
PROTECTION SYSTEM.
10. IF ANY CONSTRUCTION DEWATERING IS NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
APPROVAL OF A DEWATERING PLAN, THROUGH THE CONTRACTING OFFICER, PRIOR TO ANY DEWATERING. NO
CONSTRUCTION DEWATERING SHALL BE ALLOWED INTO EXISTING STORMWATER RETENTION AREAS. REFERENCE
SPECIFICATIONS SECTION 01 57 19, DEWATERING.
C
11. IF A STORAGE TANK IS UTILIZED FOR FUELING CONSTRUCTION VEHICLES, THE TANK MUST HAVE ADEQUATE
SECONDARY CONTAINMENT AND IF THE TANK IS 55 GALS OR GREATER, MONTHLY INSPECTIONS ARE TO BE
PERFORMED AND DOCUMENTED BY THE CONTRACTOR. THE CONTRACTOR'S REFUELING PLAN SHALL BE
SUBMITTED TO THE 45 CES/CEIE OFFICE FOR REVIEW.
16. THE EXISTING CONDITIONS SURVEY WAS PERFORMED BY ALLEN ENGINEERING, INC. DATED 4/2/15.
17. CONTRACTOR SHALL REPAIR OR RESTORE DISTURBED AREAS TO ORIGINAL CONDITION OR BETTER. CERTIFIED
WEED-FREE BAHIA SOD SHALL BE USED BEHIND REVETMENTS, AND OTHER DISTURBED AREAS.
19. CONTRACTOR SHALL PERFORM WORK ONLY DURING NORMAL DAYTIME HOURS, NO NIGHT WORK IS AUTHORIZED.
20. THE CONTRACTOR SHALL COMPLY WITH, BUT NOT BE LIMITED TO: AFI 32-7086, HAZARDOUS MATERIALS
MANAGEMENT, FEBRUARY 2015 AND THE 45TH SW HAZMAT TRACKING PROCEDURES FOR CONSTRUCTION AND
SERVICE CONTRACTORS. THE CONTRACTOR SHALL CONTACT THE 45 CES/CEIE HAZARDOUS MATERIALS
PROGRAM MANAGER AT 321-494-9268 TO REVIEW HAZARDOUS MATERIALS AUTHORIZATION PROCEDURES PRIOR
TO HAZARDOUS MATERIALS BEING BROUGHT ON TO 45 SW FACILITIES. NO HAZARDOUS MATERIALS ARE
ALLOWED TO BE BROUGHT ON TO ANY 45 SW INSTALLATION WITHOUT PRIOR APPROVAL.
L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-001.dwg, 2/3/2017 3:55:21 PM, DWG To PDF.pc3
21. IF ANY HAZARDOUS/CONTROLLED WASTE IS GENERATED OR BROUGHT ONSITE BY THE CONTRACTOR, IT MUST BE
MANAGED IN ACCORDANCE WITH 45 SW MANAGEMENT PLAN 19-14.
22. STORMWATER DISCHARGE SHALL BE MONITORED FOR QUALITY DURING THE CONSTRUCTION, AND FLOATING
TURBIDITY BARRIERS SHALL BE INSTALLED AROUND WORK AREAS TO PREVENT DISCHARGE OF TURBID WATER
TO THE BANANA RIVER PRIOR TO START OF WORK.
B
23. DURING CONSTRUCTION AIRFIELD WAIVERS WILL BE REQUIRED, EQUIPMENT WILL NEED TO BE FLAGGED WHILE
WORKING WITHIN THE AIRFIELD CLEAR ZONE, AND STAGING AREAS APPROX. 1,000 FEET AWAY FROM THE SITE
WILL REQUIRE COORDINATION AND APPROVAL FROM THE CONTRACTING OFFICER.
24. FILL SOIL MATERIAL SHALL BE OBTAINED FROM THE PAFB MARINA DREDGE SPOIL AREA OR OTHER LOCAL SITE SO
THAT COMPOSITION AND Ph LEVELS ARE SIMILAR TO EXISTING SOILS AND SUPPORT PLANT VIABILITY.
SHORELINE PROTECTION NOTES:
1.
EXISTING ADJACENT AND OFF-SITE DRAINAGE PATTERNS SHALL BE MAINTAINED DURING CONSTRUCTION.
2. ALL UNDERGROUND UTILITIES MUST BE LOCATED AND PROTECTED DURING CONSTRUCTION.
3. THE CONTRACTOR SHALL PROVIDE THE CONTRACTING OFFICER AND ENGINEER WITH FINAL IMPROVEMENT
AS-BUILT INFORMATION FROM A REGISTERED SURVEYOR MEETING REGULATORY PERMIT CONDITIONS AS WELL AS
THE FOLLOWING:
LOCATION, MATERIAL, BOTTOM AND CREST ELEVATIONS, LENGTHS AND WIDTHS OF BREAKWATER STRUCTURES.
LOCATION, ELEVATIONS OF FILL SLOPES, REVETMENT TOE AND TOP.
COMPLETE TOPOGRAPHIC AND BATHYMETRIC SURVEY OF ALTERED PROJECT AREA .
4. TYPE II FLOATING TURBIDITY BARRIERS SHALL BE INSTALLED IN THE WATER AROUND WORK AREAS TO PREVENT
SEDIMENT TRANSPORT OUTSIDE OF WORK AREA.
5. THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH THE CONDITIONS OF THE ENVIRONMENTAL
RESOURCE PERMIT FOR WORK IN THE WATERS OF THE STATE.
A
6. GEOTEXTILE FOR USE IN THE WATER UNDER THE BREAKWATER ROCKS SHALL BE MIRAFI HP370 WOVEN
POLYPROPYLENE FABRIC OR APPROVED EQUAL.
EXISTING CONTOUR LINE
D.
ALL VESSELS ASSOCIATED WITH THE CONSTRUCTION PROJECT SHALL OPERATE AT
x
WATER DEPTHS WHERE THE DRAFT OF THE VESSEL PROVIDES LESS THAN A FOUR-FOOT
CLEARANCE FROM THE BOTTOM. ALL VESSELS WILL PREFERENTIALLY FOLLOW
DEEP-WATER ROUTES (E.G., MARKED CHANNELS) WHENEVER POSSIBLE.
E.
IF A SEA TURTLE OR SMALLTOOTH SAWFISH IS SEEN WITHIN 100 YARDS OF THE
ACTIVE DAILY CONSTRUCTION/DREDGING OPERATION OR VESSEL MOVEMENT, ALL
APPROPRIATE PRECAUTIONS SHALL BE IMPLEMENTED TO ENSURE ITS PROTECTION. THESE
PRECAUTIONS SHALL INCLUDE CESSATION OF OPERATION OF ANY MOVING EQUIPMENT
CLOSER THAN 50 FEET OF A SEA TURTLE OR SMALLTOOTH SAWFISH. OPERATION OF ANY
MECHANICAL CONSTRUCTION EQUIPMENT SHALL CEASE IMMEDIATELY IF A SEA TURTLE OR
SMALLTOOTH SAWFISH IS SEEN WITHIN A 50-FT RADIUS OF THE EQUIPMENT. ACTIVITIES
MAY NOT RESUME UNTIL THE PROTECTED SPECIES HAS DEPARTED THE PROJECT AREA OF
ITS OWN VOLITION.
F.
x
STANDARD MANATEE CONDITIONS FOR IN-WATER WORK
BOT.
CONC.
E
EL.
LB
MHWL
N
NAVD
NGVD
TYP.
B.
ALL VESSELS ASSOCIATED WITH THE CONSTRUCTION PROJECT SHALL OPERATE AT
WHERE THE DRAFT OF THE VESSEL PROVIDES LESS THAN A FOUR-FOOT CLEARANCE FROM
THE BOTTOM. ALL VESSELS WILL FOLLOW ROUTES OF DEEP WATER WHENEVER POSSIBLE.
C.
SILTATION OR TURBIDITY BARRIERS SHALL BE MADE OF MATERIAL IN WHICH
MANATEES CANNOT BECOME ENTANGLED, SHALL BE PROPERLY SECURED, AND SHALL BE
REGULARLY MONITORED TO AVOID MANATEE ENTANGLEMENT OR ENTRAPMENT. BARRIERS
MUST NOT IMPEDE MANATEE MOVEMENT.
D.
ALL ON-SITE PROJECT PERSONNEL ARE RESPONSIBLE FOR OBSERVING WATERRELATED ACTIVITIES FOR THE PRESENCE OF MANATEE(S). ALL IN-WATER OPERATIONS,
INCLUDING VESSELS, MUST BE SHUTDOWN IF A MANATEE(S) COMES WITHIN 50 FEET OF THE
OPERATION. ACTIVITIES WILL NOT RESUME UNTIL THE MANATEE(S) HAS MOVED BEYOND
THE 50-FOOT RADIUS OF THE PROJECT OPERATION, OR UNTIL 30 MINUTES ELAPSES IF THE
MANATEE(S) HAS NOT REAPPEARED WITHIN 50 FEET OF THE OPERATION. ANIMALS MUST
NOT BE HERDED AWAY OR HARASSED INTO LEAVING.
PROPOSED FINISHED GRADE SPOT ELEVATION
BOTTOM
CONCRETE
EASTING
ELEVATION
LAND SURVEYING BUSINESS
MEAN HIGH WATER LEVEL
NORTHING
NORTH AMERICAN VERTICAL DATUM
NATIONAL GEODETIC VERTICAL DATUM
TYPICAL
SURVEYOR'S NOTES:
1.
THIS IS NOT A BOUNDARY SURVEY.
2.
THE COORDINATE VALUES AND BEARINGS SHOWN HEREON ARE BASED ON NORTH AMERICAN
DATUM (NAD) OF 1983, FLORIDA EAST AND WERE ESTABLISHED FROM GPS OBSERVATIONS USING
PUBLISHED VALUES FOR UNITED STATES COASTAL & GEODETIC SURVEY (USC&GS) MONUMENT
"TECH."
3.
THE ELEVATIONS SHOWN HEREON ARE BASED ON USC&GS MONUMENT "TECH," ELEVATION= 6.80
FEET. ALL ELEVATIONS SHOWN ARE BASED ON NORTH AMERICAN VERTICAL DATUM (NAVD) OF
1988.
4.
ONLY ABOVE GROUND INDICATIONS OF UTILITIES WERE LOCATED BY THIS SURVEY.
THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING CONDITIONS INTENDED TO
PROTECT MANATEES FROM DIRECT PROJECT EFFECTS:
A.
ALL PERSONNEL ASSOCIATED WITH THE PROJECT SHALL BE INSTRUCTED ABOUT THE
PRESENCE OF MANATEES AND MANATEE SPEED ZONES, AND THE NEED TO AVOID
COLLISIONS WITH AND INJURY TO MANATEES. THE CONTRACTOR SHALL ADVISE ALL
CONSTRUCTION PERSONNEL THAT THERE ARE CIVIL AND CRIMINAL PENALTIES FOR
HARMING, HARASSING, OR KILLING MANATEES WHICH ARE PROTECTED UNDER THE MARINE
MAMMAL PROTECTION ACT, THE ENDANGERED SPECIES ACT, AND THE FLORIDA
MANATEE SANCTUARY ACT.
EXISTING GRADE SPOT ELEVATION
ABBREVIATIONS:
ANY COLLISION WITH AND/OR INJURY TO A SEA TURTLE OR SMALLTOOTH SAWFISH
PROTECTED RESOURCES DIVISION (727-824-5312) AND THE LOCAL AUTHORIZED SEA
TURTLE STRANDING/RESCUE ORGANIZATION.
2.50
2.50
CONSTRUCTION EQUIPMENT NOTES:
1.
THE CONTRACTOR SHALL UTILIZE A LONG-REACH EXCAVATOR OR BACKHOE TO ACCOMPLISH THE
IN-WATER WORK IF POSSIBLE. IF THE PLACEMENT OF THE BREAKWATER OR FILL SOILS CANNOT BE
ACCOMPLISHED WITH LONG-REACH EQUIPMENT FROM THE LAND, THEN THE ALTERNATE METHODS
SHALL BE EITHER A SHALLOW BARGE OR WATER-BASED PLATFORM WITH MOUNTED EQUIPMENT OR
BY THE USE OF AMPHIBIOUS EQUIPMENT.
2.
THE BARGE OR PLATFORM SHALL BE LOCATED WITHIN THE LIMITS OF THE FLOATING TURBIDITY
BARRIERS AND SHALL BE MOVED OUTSIDE THE RUNWAY CLEAR ZONE DURING NON-OPERATING
HOURS. THE MAXIMUM DRAFT OF THE VESSEL IS 2.0 FEET.
3.
AMPHIBIOUS EQUIPMENT SHALL BE LOCATED WITHIN THE LIMITS OF THE FLOATING TURBIDITY
BARRIERS AND SHALL BE MOVED OUTSIDE THE RUNWAY CLEAR ZONE DURING NON-OPERATING
HOURS. THE ENTRY/EXIT POINT FROM LAND INTO THE WATER SHALL BE LOCATED WITHIN THE
PERMITTED LIMITS OF CONSTRUCTION IMPACTS AND SHALL BE RESTORED TO MATCH THE
PROPOSED DESIGN SECTION CONDITIONS.
E.
ANY COLLISION WITH OR INJURY TO A MANATEE SHALL BE REPORTED IMMEDIATELY
TO THE FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION (FWC) HOTLINE AT
1-888-404-3922. COLLISION AND/OR INJURY SHOULD ALSO BE REPORTED TO THE U.S. FISH
AND WILDLIFE SERVICE IN JACKSONVILLE (1-904-731-3336) FOR NORTH FLORIDA OR IN VERO
BEACH (1-772-562-3909) FOR SOUTH FLORIDA, AND EMAILED TO FWC AT
IMPERILEDSPECIES@MYFWC.COM.
11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE
F.
TEMPORARY SIGNS CONCERNING MANATEES SHALL BE POSTED PRIOR TO AND
DURING ALL IN-WATER PROJECT ACTIVITIES. ALL SIGNS ARE TO BE REMOVED BY THE
CONTRACTOR UPON COMPLETION OF THE PROJECT. TEMPORARY SIGNS THAT HAVE
ALREADY BEEN APPROVED FOR THIS USE BY THE FWC MUST BE USED. ONE SIGN WHICH
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS:
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150005
RAEIS CONTRACT NO: FA2521-13-D-0005-0095
7. GEOTEXTILE FOR USE IN THE SHORELINE REVETMENT RIP-RAP SHALL BE MIRAFI S1600 NON-WOVEN
POLYPROPYLENE FABRIC OR APPROVED EQUAL.
8. COQUINA ROCK BOULDERS SHALL BE USED FOR THE BREAKWATER AND SHALL BE 18 INCHES MINIMUM SIZE WITH
AN AVERAGE WEIGHT BETWEEN 175 - 250 POUNDS.
9. CONCRETE RUBBLE RIP-RAP SHALL BE USED FOR THE SHORELINE REVETMENT AND SHALL VARY BETWEEN 6 INCH
TO 3 FEET IN SIZE, A MINIMUM WEIGHT OF 25 POUNDS, AND AVERAGE WEIGHT OF 100 POUNDS. CONCRETE RUBBLE
SHALL BE FREE OF REBAR, OTHER METALS, OR DEBRIS.
1
2
OF IN-WATER OPERATIONS MUST BE POSTED IN A LOCATION PROMINENTLY VISIBLE TO ALL
PERSONNEL ENGAGED IN WATER-RELATED ACTIVITIES. THESE SIGNS CAN BE VIEWED
AT HTTP://WWW.MYFWC.COM/WILDLIFEHABITATS/MANATEE_SIGN_VENDORS.HTM.
QUESTIONS CONCERNING THESE SIGNS CAN BE FORWARDED TO THE EMAIL ADDRESS
LISTED ABOVE.
3
4
5
6
0095
DELIVERY NO.
FA2521-13-D-0005
G. BEARD
PROPOSED SILT FENCE
AS BUILT DATE:
SF
####
PROPOSED FLOATING TURBIDITY BARRIER
SUBMITTED BY:
FB
A
CONSTRUCTION MATERIALS REJECTED BY THE GOVERNMENT SHALL BE REMOVED FROM THE SITE IMMEDIATELY.
EXISTING RECLAIMED WATER MAIN
C
Oneida Total Integrated Enterprises
8.
RW
RANGE ARCHITECT-ENGINEER,
INSPECTION SERVICES
CONSTRUCTION OF BREAKWATERS AND REVETMENT RIP-RAP SHALL COMPLY WITH ALL PROJECT SPECIFICATIONS
AND PERMITS.
EXISTING SANITARY FORCE MAIN
D
LLEN
E ngineering,Inc.
7.
C.
SILTATION BARRIERS SHALL BE MADE OF MATERIAL IN WHICH A SEA TURTLE OR
SMALLTOOTH SAWFISH CANNOT BECOME ENTANGLED, BE PROPERLY SECURED, AND BE
REGULARLY MONITORED TO AVOID PROTECTED SPECIES ENTRAPMENT. BARRIERS MAY
NOT BLOCK SEA TURTLE OR SMALLTOOTH SAWFISH ENTRY TO OR EXIT FROM DESIGNATED
CRITICAL HABITAT WITHOUT PRIOR AGREEMENT FROM THE NATIONAL MARINE FISHERIES
FM
RAEIS
ALL SURFACE WATERS WILL BE PROTECTED AS REQUIRED USING TURBIDITY BARRIERS, SILT FENCING OR
EQUIVALENT MATERIAL TO PREVENT EROSION AND SLOUGHING OF EXCAVATED MATERIALS INTO ADJACENT
WATERS OR STORM INLETS. THE CONTRACTING OFFICER MUST BE NOTIFIED OF ANY IMPACTS TO EXISTING
VEGETATION. TREES THAT MUST BE REMOVED DUE TO IMPEDANCES MUST BE IDENTIFIED TO THE CONTRACTING
OFFICER AND 45 CES ENVIRONMENTAL (45 CES/CEIE) PRIOR TO REMOVAL.
EXISTING TOP OF BANK
GENERAL NOTES, ABBREVIATIONS,
AND LEGEND
6.
B.
THE CONTRACTOR SHALL ADVISE ALL CONSTRUCTION PERSONNEL THAT THERE ARE
CIVIL AND CRIMINAL PENALTIES FOR HARMING, HARASSING, OR KILLING SEA TURTLES OR
SMALLTOOTH SAWFISH, WHICH ARE PROTECTED UNDER THE ENDANGERED SPECIES ACT
OF 1973.
J. KELLEY
DISTURBED AREAS SHALL BE KEPT TO A MINIMUM AND ONLY AS NECESSARY TO ACCOMPLISH THE WORK.
SAFE UPLAND LINE (OHWL)
REVIEWED BY:
5.
EXISTING RIVER WATER EDGE LINE (4/2/15)
SXHT 15-1005
ANY DAMAGE CAUSED TO EXISTING SITE FEATURES, ROADS, CURBS, WALKS, DRAINAGE STRUCTURES, ETC.,
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR OR REPLACE TO EXISTING CONDITIONS OR BETTER.
THE CONTRACTOR WILL BE REQUIRED TO MOVE CONSTRUCTION EQUIPMENT OUTSIDE THE RUNWAY CLEAR ZONE
(1,000 FEET FROM RWY. CENTERLINE) AT THE END OF EACH WORK DAY FOR STORAGE, COORDINATE WITH
CONTRACTING OFFICER FOR ACCEPTABLE LOCATION.
BANANA RIVER MHWL OF 2009
D. ARTZNER
4.
A.
THE CONTRACTOR SHALL INSTRUCT ALL PERSONNEL ASSOCIATED WITH THE
PROJECT OF THE POTENTIAL PRESENCE OF THESE SPECIES AND THE NEED TO AVOID
COLLISIONS WITH SEA TURTLES AND SMALLTOOTH SAWFISH. ALL CONSTRUCTION
PERSONNEL ARE RESPONSIBLE FOR OBSERVING WATER-RELATED ACTIVITIES FOR THE
PRESENCE OF THESE SPECIES.
CONTRACT NO.: FA2521-13-D-0005 - 0095
PRIOR TO CONSTRUCTION AND EXCAVATION, THE CONTRACTOR SHALL PROCESS AN AF FORM 103,
WHICH INCLUDES NOTIFICATION OF SUNSHINE ONE CALL (811) UTILITY LOCATE TICKET.
BANANA RIVER MHWL OF 2007
DRAWN BY:
3.
THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING PROTECTED SPECIES
CONSTRUCTION CONDITIONS:
REPAIR RIVER SHORELINE,
RUNWAY 11
CONTRACTOR IS RESPONSIBLE FOR REQUESTING UTILITY LOCATES AND VERIFYING ALL EXISTING UTILITIES
PRIOR TO STARTING CONSTRUCTION.
BANANA RIVER MHWL OF 2001
01/18/17
2.
LEGEND:
DATE:
D
NO UNDERGROUND UTILITY LINES HAVE BEEN LOCATED; ALL SITE FEATURES AND UNDERGROUND UTILITIES
SHOWN ARE BASED ON PAFB GIS MAPPING AND SCALED AERIAL MAPS; 45TH SW TAKES NO RESPONSIBILITY FOR
THE ACCURACY OF THESE LOCATIONS. EXTREME CAUTION SHALL BE USED TO MAINTAIN EXISTING UTILITIES.
6
D. LAVENDER
1.
5
4
DESIGNED BY:
GENERAL CONSTRUCTION NOTES:
3
SEA TURTLE AND SMALLTOOTH SAWFISH
CONSTRUCTION CONDITIONS
USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL
2
SXHT 15-1005
1
SHEET
IDENTIFICATION
C-001
B
A
2
3
4
5
CONSTRUCTION FLAG NOTES:
-2
.9
1.3
TOP OF BANK
.0
.94
2.4
85
'
3.2
10' WIDE DIRT ROAD
0.3
-0.4
.6
-2
3.0
3.2
2.3
FB
5
3.5
EMERGENCY REPAIR APPROX. 213 LF
RIP-RAP PREVIOUSLY INSTALLED EARLY
2015 TO PROTECT EXISTING UTILITIES THAT
HAD BECOME EXPOSED
= 0.096 ACRES
SEE NORTH PLAN C-101
SEE SOUTH PLAN C-102
4+0
0
8
2.3
FM
RW
3.3
CHORD
34.60'
56.02'
199.89'
56.32'
165.91'
CHORD BEARING
ID
L1
L2
L3
L4
L5
BEARING
LENGTH
169.31'
6.39'
29.67'
24.35'
20.47'
3.6
5
-2.
9
3.1
3.1
FB
.8
-0
3.5
4
LENGTH
40.67'
56.45'
209.31'
56.51'
166.87'
LINE TABLE
3.6
L1
4
3.5
3.0
FB
2.6
FM
RW
2.4
-1
.8
7
-0.
.7
-0
3.3
3.6
3
2.2
3+5
0
FM
RW
-2.
4
5
3.6
2.3
DELTA ANGLE
3
2.7
-2.
.8
LEGEND:
5
3.6
3.5
3.2
3.4
-1
2.9
.9
E ROAD
9
FM
RW
.7
3.4
3.0
2.9
2.7
2.6
6
3
2
ROL LINE
3.5
-0.3
RW
9
3.6
4
3.5
3.4
2.4
2.2
-0.3
.9
1.8
1.0
.9
-1
-0
.7
2.3
4
-2
-2.
3.3
F ASPH
SAFE UPLAND LINE (OHWL)
ELEVATION= 1.10' (1929 NGVD)
ELEVATION= -0.32' (1988 NAVD)
3.7
1
2.3
2.7
3.5
9
.6
-1
.7
-2
1.2
6
-0
.7
WETLAND #2 (7-8-16)
7,352 SF = 0.169 AC
WL-2 IMPACT = 1,431 SF = 0.033 AC
0
3.6
2
3.6
2.5
OVERALL
SHORELINE PROTECTION PLAN
FM
RW
0.4
N
-0
.8
7
3
SCALE: 1" = 40'
-1
.8
-2.
1
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS:
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150005
RAEIS CONTRACT NO: FA2521-13-D-0005-0095
3.4
2.7
0
P
-3.
2
120'
11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE
WATER LEVEL LINE (4-02-15)
0.2
-1.
-0
9.53
5
+
I: 7 EP: 7+80.00
1.1
.7
-2
L5
7S+F 8
.7
FM
RW
4
-2.
9
+3
PI: 7
80'
9
2.9
2.5
-0
FM
RW
50
L74+
5.18
40'
GRAPHIC SCALE 1" = 40'
DO NOT DISTURB THIS PORTION
OF WETLAND #2 EXISTING VEGETATION
NOT DISTURBED = 5,291 SF = 0.136 AC
FB
8
0'
3.6
0
3.6
1
3.5
1.1
0.2
C
C-50
.6
0.0
3
-2.
ANK
-2
.8
-3
B
OF
P
40'
RUNWAY 11/29
0.9
.8
WETLAND #1 (W1) IMPACTS = 3,360 SF (0.077 AC)
WETLAND #2 (W2) IMPACTS = 1,431 SF (0.033 AC)
TOTAL WETLAND IMPACTS = 4,791 SF (0.110 AC)
FM
RW
TOP
160.42'
L3
5.51
A
3.4
AS BUILT DATE:
####
SUBMITTED BY:
G. BEARD
0095
DELIVERY NO.
FA2521-13-D-0005
J. KELLEY
REVIEWED BY:
LLEN
E ngineering,Inc.
A
B
WETLAND IMPACTS:
9
ALT
FB
SF
+0
T: 7
LENGTH OF WORK IN EXISTING SURFACE WATERS = 805 LF
LENGTH OF NEW RIP-RAP ALONG SHORELINE = 490 LF
SQUARE FEET OF WORK IN EXISTING SURFACE WATERS = 26,956 SF (0.619 AC)
3
EDGE O
1
SURFACE WATER IMPACTS:
2
FM
RW
.4
TYPE III SILT FENCE
4
3.6
.2
-2
SF
3.7
RW
FM
-0
6+50
.7
5
PROJECT CONTROL POINT
NAIL & DISK
STAMPED "TRAVERSE LB 266"
N 1420838.300
E 779590.540
EL.= 1.91 FEET, NAVD 88
1.4
-2
.6
.8
C5
FB
-3
TYPE II FLOATING TURBIDITY BARRIER
C-501
-0
FB
7
2.0
Mid: 6+2
FB
A
FM
2.0
2
4
PROPOSED
188 LF RIP-RAP
3.2
SURVEY CONT
-0.1
2.3
.8
4
-1.
-0.7
3.6
3.4
2.6
-0.2
5+50 L2
.3
-2
2.2
0
3.6
.4
-2
-0
2.2
COQUINA ROCK BREAKWATERS
780 LINEAR FEET
EXISTING WETLAND AREAS; 0.246 AC (10,712 SF)
3.6
2.5
.7
2.5
-2
1
C4 5+00
-2
3.6
2.3
.8
-0
PT: 5+32.25
PC: 5+38.64
6
FM
RW
.0
-1
.4
-1
B
FB
L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-100.dwg, 1/18/2017 11:10:27 AM, DWG To PDF.pc3
.7
2.7
3.7
AREA OF HARD ARMOR ROCK REVETMENT
0.139 AC (6,076 SF); 490 LINEAR FEET
RESCU
4+5
0
FM
RW
2.4
2.4
-0
+03.99
AREA OF SOFT ARMOR FILL WITH SALT
MARSH VEGETATION PLANTINGS
0.582 AC (25,360 SF)
7
C
3
4
5
6
OVERALL
SHORELINE PROTECTION PLAN
3+00
8
3.5
FM
RW
1.9
RADIUS
21'
132'
200'
200'
450'
Oneida Total Integrated Enterprises
3.2
ID
C1
C2
C3
C4
C5
RANGE ARCHITECT-ENGINEER,
INSPECTION SERVICES
CURVE TABLE
7
RAEIS
S
CONTRACT NO.: FA2521-13-D-0005 - 0095
2.3
R
REPAIR RIVER SHORELINE,
RUNWAY 11
0.4
ROL LINE
SURVEY CONT
RE
E
CU
3
4
.8
3.6
-1
GE
2
3.6
FM
RW
FB
3.2
ED
D
OA
USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL
-1.
8
FB
2+50
2.6
2.4
-2
.5
2.4
SP
A
OF
9. SMALL VEGETATION CLUSTERS WITHIN LIMITS OF PROPOSED REVETMENT ARE
TO BE REMOVED. COORDINATE WITH CONTRACTING OFFICER PRIOR TO ANY
VEGETATION REMOVAL.
3.6
HA
FM
-2
.8
3.2
LT
-0
5.74
FB
Mid: 5
D. LAVENDER
2.6
2.4
4
3.6
2.6
1
2.5
1.9
.8
-0
6.42
.8
4+7
DRAWN BY:
2.6
2.2
2.2
2.4
7
3.5
8. EXISTING MANGROVE/VEGETATION TO REMAIN, ADJUST COQUINA BREAKWATER
AS NEEDED, SEE DETAIL 'C' ON SHEET C-501.
3.5
RW
5
0.3
.7
3+0
D
3.0
2.5
2.5
2.4
-2
.4
0.4
8
-0
.7
3.4
4
3.6
3.3
2.1
.8
-0
2.5
2.1
-0
PC:
01/18/17
2.3
5
-1.
2
7. EXISTING RIP-RAP REVETMENT TO REMAIN, REMOVE 5' OF ROCK FROM EITHER
END TO EXPOSE EXISTING FILTER FABRIC AND LAP SPLICE EXTENSION OF
FILTER FABRIC TO CONTINUE RIP-RAP IN BOTH DIRECTIONS, REPLACE ROCK.
2.7
FB
3.4
-2
.9
3.1
6. TURN RIP-RAP REVETMENT BACK IN TOWARD SHORE TO ANCHOR.
7
3.4
BANK
TOP OF
WATER LEVEL LINE (4-02-15)
4
-0
PT:
PROPOSED ACTION: FILL WITHIN
WATERS OF THE BANANA RIVER
FROM ELEV. -0.32 SAFE UPLAND LINE
OUT TO ROCK BREAKWATER TOE
PROTECTION LINE = 0.599 ACRES
(26,106 SF)
PROPOSED
302 LF RIP-RAP
2.2
+01.77
MEAN HIGH WATER LEVEL LINE (2007)
ELEVATION= 0.49' (1929 NGVD)
ELEVATION= -0.93' (1988 NAVD)
C
5. CLEAN SAND FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL, PLACE FROM
COQUINA BREAKWATER EASTERN TOE AT 14:1 FILL SLOPE TO MEET RIP-RAP
REVETMENT. PLANT SALT MARSH VEGETATION AS DETAILED ON SHEET C-501.
SAFE UPLAND LINE (OHWL)
ELEVATION= 1.10' (1929 NGVD)
ELEVATION= -0.32' (1988 NAVD)
Mid: 2
MEAN HIGH WATER LEVEL LINE (2001)
ELEVATION= 0.49' (1929 NGVD)
ELEVATION= -0.93' (1988 NAVD)
DATE:
-0.
2
1.9
-0
.7
-0
.7
0.5
C3
MEAN HIGH WATER LEVEL LINE (2009)
ELEVATION= 0.49' (1929 NGVD)
ELEVATION= -0.93' (1988 NAVD)
D. LAVENDER
-0.4
2.0
-0
.8
-1
.3
-3
.3
FB
7
-0.
50
1+
4
-2.
2
BANANA RIVER
WETLAND #1 (7-8-16)
3,360 SF = 0.077 AC
WL-1 IMPACT = 3,360 SF = 0.077 AC
2.5
0
4. CONCRETE RIP-RAP REVETMENT OVER FILTER FABRIC, SEE DETAIL ON SHEET
C-501.
SXHT 15-1005
3.2
2.5
-0.8
-1
.7
1
C:
R
P
2.8
2.4
1
7.
+9
3. CLEAN FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL, PLACE FROM
ELEVATION 2.5' OF TOP OF ROCK DOWN TO EXISTING TOP OF BANK ELEVATION
VARIES FROM 1.9' TO 2.5'. SOD DISTURBED AREAS BEHIND RIP-RAP.
2.2
-0.5
2.5
2.3
-2
.2
00
1+
Mid: 0+68.89
PROJECT CONTROL POINT
NAIL & DISK
STAMPED "TRAVERSE LB 266"
N 1421351.999
E 779635.217
EL.= 2.55 FEET, NAVD 88
2.5
.2
-0
FB
-3
.1
-0.7
-1
.4
0
- 0 .8
.2
-0
.7
2
-0.7
7
-0.
C2
-1.
-3
.2
.7
-0
1.2
1.0
2
PROPOSED ACTION: CUT UPLAND
"PENINSULA" TO CREATE WATERS OF THE
BANANA RIVER FROM ELEV. -1.8 TO TOE
OF REVETMENT PROTECTION LINE. WORK
WITHIN EXISTING WATERS =
0.020 ACRES (850 SF)
AREA OF WATER CREATED =
0.029 ACRES (1253 SF)
3
2.8
-3
.6
2.7
1.5
1.7
-0.6
-1.
D
.6
-1
0+
:
PCC
5
-3.
0
0+5
7
-1.
7
40.6
2. COQUINA ROCK BREAK WATER PLACED ON TOP OF WOVEN GEOTEXTILE FABRIC
AS DETAILED ON SHEET C-501.
DESIGNED BY:
-1.6
6
BP: -0+00.00
3
2.9
C1
0.6
3.5
1.2
SF
3.3
-3.
8
5
DRAINAGE DITCH
-1
.2
-0
.9
.4
-1
-2.
1
-0+00
-1.6
RW
-2
.3
3
FM
.3
#
1. INSTALL AND MAINTAIN THROUGHOUT CONSTRUCTION TYPE II FLOATING
TURBIDITY BARRIER. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH
PERMIT CONDITIONS OF WORK IN WATERS OF THE STATE. REMOVE UPON
PROJECT STABILIZATION COMPLETION.
RW
2
-3.
STA 0+00.00
BEGIN BREAKWATER
CONSTRUCTION
FM
0+
20
FB
M
id:
6
SXHT 15-1005
1
SHEET
IDENTIFICATION
C-100
A
2
3
4
5
CONSTRUCTION FLAG NOTES:
4
2.3
R
AREA OF HARD ARMOR ROCK REVETMENT
0.139 AC (6,076 SF); 490 LINEAR FEET
0.3
0
3+0
-0.4
2.3
.6
3.2
0'
20'
40'
60'
7
FB
0
3+5
3
ROC
KS
.4
GRAPHIC SCALE 1" = 20'
3.6
-2
5
3.5
FM
RW
5
3.0
2.3
2.2
.7
-0
8
-1.
11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS:
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150005
RAEIS CONTRACT NO: FA2521-13-D-0005-0095
2.4 2.6
SEE SHEET C-102
FM
RW
FB
5
3.6
-2
TYPE III SILT FENCE
20'
EMERGENCY REPAIR 213 LF RIP-RAP
PREVIOUSLY INSTALLED EARLY 2015
TO PROTECT EXISTING UTILITIES
THAT HAD BECOME EXPOSED = 0.096
ACRES
NORTH SECTION
SHORELINE PROTECTION PLAN
N
SCALE: 1" = 20'
2
SF
8
9'
2
1
TYPE II FLOATING TURBIDITY BARRIER
3.5
39.8
1
A
FB
1.9
-0.30 TOP
-1.80 BOT.
3
AS BUILT DATE:
####
SUBMITTED BY:
G. BEARD
0095
DELIVERY NO.
FA2521-13-D-0005
J. KELLEY
REVIEWED BY:
SXHT 15-1005
D. LAVENDER
DRAWN BY:
LLEN
E ngineering,Inc.
A
B
EXISTING WETLAND AREA
3.2
FM
RW
1.9
6.42
.8
3+0
-0
PT:
01/18/17
COQUINA ROCK BREAKWATERS
780 LINEAR FEET
S
RE
50
2.
.8
2.5
OL LINE
SURVEY CONTR
2+50
4
2.
50
-1
.8
-1
2
FB
3.6
4
E
U
C
3
3.6
-2
1
3.5
2.6
FM
3.6
A
OF
2.5
0.3
7
GE
D
E
3.2
RW
2.1
-0.
D
A
O
S
2.4
2.4
4
A
PH
Oneida Total Integrated Enterprises
0.4
.8
FB
3.2
LT
FM
RW
8
-0.
0.4
AREA OF SOFT ARMOR FILL WITH SALT
MARSH VEGETATION PLANTINGS
0.582 AC (25,360 SF)
RANGE ARCHITECT-ENGINEER,
INSPECTION SERVICES
2.6
LEGEND:
RAEIS
2.9
4
3.6
2.1
SURVEYED WATER LEVEL LINE (4-02-15)
D
C
4
5
6
NORTH SECTION
SHORELINE PROTECTION PLAN
-1
.5
-2
.9
FB
2.4
7
3.5
3'
5'
3.3
2.2
SAFE UPLAND LINE (OHWL)
ELEVATION= 1.10' (1929 NGVD)
ELEVATION= -0.32' (1988 NAVD)
2.7
4
3.6
5
7
3.4
BANK
4
15'
5
-2.
SURVEYED
MEAN HIGH WATER LEVEL LINE (2007)
ELEVATION= 0.49' (1929 NGVD)
ELEVATION= -0.93' (1988 NAVD)
SURVEYED
MEAN HIGH WATER LEVEL LINE (2001)
ELEVATION= 0.49' (1929 NGVD)
ELEVATION= -0.93' (1988 NAVD)
ATER
OF W
3'
5'
PROPOSED ACTION: FILL WITHIN
WATERS OF THE BANANA RIVER FROM
ELEV. -0.32 SAFE UPLAND LINE OUT TO
ROCK BREAKWATER TOE PROTECTION
LINE = 0.599 ACRES (26,106 SF)
2.2
12.00'
41.91'
Mid: 2
2.2
TOP OF
EDGE
'
R200
4
2.6
FB
.4
-2
50
3
7
-0.
+01.77
B
2.4
70'
-2.
2.6
2.5 2.5
0
2.5
.3
0.5
1+
23'
43.
BANANA RIVER
SURVEYED
MEAN HIGH WATER LEVEL LINE (2009)
ELEVATION= 0.49' (1929 NGVD)
ELEVATION= -0.93' (1988 NAVD)
WETLAND #1 (7-8-16)
3,360 SF = 0.077 AC
WL-1 IMPACT = 3,360 SF = 0.077 AC
RW
-3
'
00
.
2
71
-0.
CONTRACT NO.: FA2521-13-D-0005 - 0095
2.4
3.0
-0
.7
P
1
L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-101.dwg, 1/18/2017 11:10:46 AM, DWG To PDF.pc3
PROPOSED
302 LF RIP-RAP
2.5
2.4
RC
-1
.3
-2
.2
-1.
7
'
.92
8
2
3
2
97
2.8
2.3
3
REPAIR RIVER SHORELINE,
RUNWAY 11
2.5
-0
.
1.9 2
-0
.7
.2
-0
+
:0
8. REMOVE EXISTING RUBBLE REVETMENT PENINSULA SOUTH OF DRAINAGE
DITCH. EXCAVATE GRADE TO ELEVATION -1.2 UP TO PROPOSED LOCATION OF
BREAKWATER.
9. INSTALL SILT FENCE PRIOR TO START OF WORK.
0
1
.1
7. EXISTING RIP-RAP REVETMENT TO REMAIN, REMOVE 5' OF ROCK FROM EITHER
END TO EXPOSE EXISTING FILTER FABRIC AND LAP SPLICE EXTENSION OF
FILTER FABRIC TO CONTINUE RIP-RAP IN BOTH DIRECTIONS, REPLACE ROCK.
PROJECT CONTROL POINT
NAIL & DISK
STAMPED "TRAVERSE LB 266"
N 1421351.999
E 779635.217
EL.= 2.55 FEET, NAVD 88
2.
50
-0.4
2.0
-0.
8
2
DATE:
3.2
-0.5
'
00
.
0
-0.7
Mid: 0+68.89
6. TURN RIP-RAP REVETMENT BACK IN TOWARD SHORE TO ANCHOR.
D. LAVENDER
3.3
2.5
2.7
0
.5 0'
-0 2.0
1
-1
.4
-0
.2
-0.7
10' WIDE DIRT ROAD
2.2
-0.8
S
RO CK
2.3
1
-0
-0 .7
.7
' -0.6
32
R1
1.0
5. PLACE CLEAN SAND FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL FROM
COQUINA BREAKWATER EASTERN TOE AT 14:1 FILL SLOPE TO MEET RIP-RAP
REVETMENT. PLANT SALT MARSH VEGETATION AS DETAILED ON SHEET C-501.
2.8
0
1+
-3
.1
3.2
-3
.2
'
2
-3
.6
.94
1
2.5
7
-0.
.2
-1
FB 2
PROPOSED ACTION: CUT UPLAND
"PENINSULA" TO CREATE WATERS OF THE
BANANA RIVER FROM ELEV. -1.8 TO TOE
OF REVETMENT PROTECTION LINE. WORK
WITHIN EXISTING WATERS =
0.020 ACRES (850 SF)
AREA OF WATER CREATED =
0.029 ACRES (1253 SF)
1.2
2
-1.
0.8
0 7
0+5 1.
P
-0.30 TOP
-1.80 BOT.
1.5
.7
-1
0.67
0+4
CC:
.6
-1
-
3.5
TOP OF BANK
3.0
85
2.4
-0.30 TOP
-1.80 BOT.
4. CONCRETE RIP-RAP REVETMENT OVER FILTER FABRIC, SEE DETAIL ON SHEET
C-501.
DESIGNED BY:
2.
50
-1.6
1.3
0.6BP: -0+00.00
-0.50
8
6
USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL
0
.5
0
-
3.5
1.2
-0.
9
T. O
.R
-1. .
2
.4
-1
0.30 TOP
-1.20 BOT.
-1.6
DRAINAGE DITCH
'
-0+00
-0.50 SF
FM
R2
1
.3 '
3
-2.
5
20
3. PLACE CLEAN FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL FROM
ELEVATION 2.5' OF TOP OF ROCK DOWN TO EXISTING TOP OF BANK ELEVATION
VARIES FROM 1.9' TO 2.5'. SOD ALL DISTURBED AREAS BEHIND RIP-RAP.
RW
0+
18.50
FM
-2.
3
STA 0+00.00
BEGIN BREAKWATER
CONSTRUCTION
FB
2
-3.
D
C
2. 3' WIDE COQUINA ROCK BREAK WATER PLACED ON TOP OF WOVEN GEOTEXTILE
FABRIC AS DETAILED ON SHEET C-501.
9
8
-3.
id:
#
1. INSTALL AND MAINTAIN THROUGHOUT CONSTRUCTION TYPE II FLOATING
TURBIDITY BARRIER. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH
PERMIT CONDITIONS OF WORK IN WATERS OF THE STATE. REMOVE UPON
PROJECT STABILIZATION COMPLETION.
9
-2.
M
6
SXHT 15-1005
1
SHEET
IDENTIFICATION
C-101
A
3
2
5
3.6
8
-1
.4
6
0
3
PROPOSED
188 LF RIP-RAP
3.2
-0.3
9
FM
RW
2.0
4
3.5
PROJECT CONTROL POINT
NAIL & DISK
STAMPED "TRAVERSE LB 266"
N 1420838.300
E 779590.540
EL.= 1.91 FEET, NAVD 88
3.4
2.4
2.2
3.6
-0.7
.8
-0
FB
1.8
1.0
.9
2.3
2.
50
.7
-0
3.3
-1
-3
.7
8
2.
50
2.7
3.4
50 2.3
1
00' .2
0.9
12.
-1
.6
-0
.8
2.
8
-2
.7
.3
0.0
1.1
-2
50
2.
0
3.6
2.5
2.9
-0
.6
FM
9RW
2
11
3.4
2.7
2
3.6
0
3.6
N
SOUTH SECTION
SHORELINE PROTECTION PLAN
SCALE: 1" = 20'
2.5
1.1
-0
.7
0.2
9
.9
-1
-2
.4
.7
-2
1
EP: 7+80.00
1.25 TOP
-0.25 BOT.
20'
40'
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS:
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150005
RAEIS CONTRACT NO: FA2521-13-D-0005-0095
SURVEYED WATER LEVEL LINE (4-02-15)
10
0'
60'
11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE
FM
RW
0.90 TOP
-0.60 BOT.
7+8
SF 0
TYPE III SILT FENCE
GRAPHIC SCALE 1" = 20'
3.5
1.50 TOP
0.00 BOT.
0
9.53
5
+
PI: 7
SF
3.6
9
.4
-2
-2
.4
-3
.7
LT
FM
7+5
P
0.70 TOP
-0.80 BOT.
TYPE II FLOATING TURBIDITY BARRIER
20'
.18
35
I: 7+
FB
DO NOT DISTURB THIS PORTION
OF WETLAND #2 EXISTING VEGETATION
NOT DISTURBED = 5,921 SF = 0.136 AC
0.2
3
AS BUILT DATE:
####
SUBMITTED BY:
G. BEARD
0095
DELIVERY NO.
FA2521-13-D-0005
SXHT 15-1005
01/18/17
J. KELLEY
REVIEWED BY:
D. LAVENDER
DRAWN BY:
LLEN
E ngineering,Inc.
A
B
EXISTING WETLAND AREA
K
8
COQUINA ROCK BREAKWATERS
780 LINEAR FEET
FB
2
A
4
WETLAND #2 (7-8-16)
7,352 SF = 0.169 AC
WL-2 IMPACT = 1,431 SF = 0.033 AC
BAN
0.10 TOP
-1.40 BOT.
AREA OF HARD ARMOR ROCK REVETMENT
0.139 AC (6,076 SF); 490 LINEAR FEET
5
1
3.7
9
3.5
OF
7+
160.42'
PT:
RW
TOP
.8
-2
1
FM
RW
WATER
9'
51.8
1
05.5
3
6
SF
-0.30 TOP
-1.80 BOT.
AREA OF SOFT ARMOR FILL WITH SALT
MARSH VEGETATION PLANTINGS
0.582 AC (25,360 SF)
SAFE UPLAND LINE
ELEVATION= 1.10' (1929 NGVD)
ELEVATION= -0.32' (1988 NAVD)
F ASPHA
EDGE OF
6+50
FB
SURVEYED
MEAN HIGH WATER LEVEL LINE (2009)
ELEVATION= 0.49' (1929 NGVD)
ELEVATION= -0.93' (1988 NAVD)
FB
L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-102.dwg, 1/18/2017 11:18:04 AM, DWG To PDF.pc3
BANANA RIVER
LEGEND:
9
4
.2
3.7
-0
3.6
2
EDGE O
B
ANA RIVER
RW
12.00'
35.77'
R450'
2.07
Mid: 6+2
FM
-2
.9
1.4
-2
.6
-0.3
C
Oneida Total Integrated Enterprises
.3
-2
2.2
3.6
3.5
2.5
2.2
-
2
7
4
5
6
REPAIR RIVER SHORELINE,
RUNWAY 11
2.5
-2
.7
FB
0.8
7
-0.1
2.3
7
5+50
PC: 5+38.64
11. INSTALL SILT FENCE PRIOR TO STARTING WORK.
3.4
SURVEY CONT
ROL LINE
-0.2
PT: 5+32.25
2.7
2.6
2.6
2.
50
.8
-0
C
3.6
2.3
FM
RW
2.7
.4
-1
.0
10.SLOPE COQUINA ROCK BREAKWATER UP STARTING AT STA. 7+00 AND ANGLE
THE END SECTION TOWARD THE SHORELINE WITH THE ROCKS PARTIALLY
BURIED TO MEET EXISTING CONTOURS.
3.6
-1
RANGE ARCHITECT-ENGINEER,
INSPECTION SERVICES
R200'
RAEIS
9. SMALL MANGROVE CLUSTERS WITHIN LIMITS OF PROPOSED REVETMENT ARE
TO BE REMOVED.
CONTRACT NO.: FA2521-13-D-0005 - 0095
2.9
3.0
6
1
5+00
3.6
-2
.4
.7
3.7
8. EXISTING MANGROVES / BUTTONWOODS TO REMAIN, ADJUST COQUINA
BREAKWATER AS NEEDED, SEE DETAIL C ON SHEET C-501
SOUTH SECTION
SHORELINE PROTECTION PLAN
ROAD
-2
.7
2.4
-0
FB
3.4
7. EXISTING RIP-RAP REVETMENT TO REMAIN, REMOVE 5' OF ROCK FROM EITHER
END TO EXPOSE EXISTING FILTER FABRIC AND LAP SPLICE EXTENSION OF
FILTER FABRIC TO CONTINUE RIP-RAP IN BOTH DIRECTIONS, REPLACE ROCK.
RESCU
E
6
FM
RW
7'
+03.99
DATE:
3.2
3.4
5.74
6. TURN RIP-RAP REVETMENT BACK IN TOWARD SHORE SLOPING UP TO ANCHOR.
USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL
ROC
.9
-1
4+5
0
5'
15'
6
4+7
39.9
Mid: 5
D
KS
9
3.6
5
.8
-0
PC:
3.5
5. PLACE CLEAN SAND FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL FROM
COQUINA BREAKWATER EASTERN TOE AT 14:1 FILL SLOPE TO MEET RIP-RAP
REVETMENT. PLANT SALT MARSH VEGETATION AS DETAILED ON SHEET C-501.
EMERGENCY REPAIR 213 LF RIP-RAP
PREVIOUSLY INSTALLED EARLY 2015
TO PROTECT EXISTING UTILITIES
THAT HAD BECOME EXPOSED = 0.096
ACRES
2.9
2.4
-0.30 TOP
-1.80 BOT.
FM
RW
SURVEYED
MEAN HIGH WATER LEVEL LINE (2001)
ELEVATION= 0.49' (1929 NGVD)
ELEVATION= -0.93' (1988 NAVD)
DESIGNED BY:
3.3
3.1
2.7
.8
5'
3'
4. CONCRETE RIP-RAP REVETMENT OVER FILTER FABRIC, SEE DETAIL ON SHEET
C-501.
5
-0
3'
.3
-2
D. LAVENDER
4+0
0
70'
FB
5
-2
3.6
.9
3. PLACE CLEAN FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL FROM
ELEVATION 2.5' OF TOP OF ROCK DOWN TO EXISTING TOP OF BANK ELEVATION
VARIES FROM 1.9' TO 2.5'. SOD ALL DISTURBED AREAS BEHIND RIP-RAP
4
3.5
D
3.1
#
2. 3' WIDE COQUINA ROCK BREAK WATER PLACED ON TOP OF WOVEN GEOTEXTILE
FABRIC AS DETAILED ON SHEET C-501.
FM
RW
.8
2
-0
SURVEYED
MEAN HIGH WATER LEVEL LINE (2007)
ELEVATION= 0.49' (1929 NGVD)
ELEVATION= -0.93' (1988 NAVD)
2.3
1
6
1. INSTALL AND MAINTAIN THROUGHOUT CONSTRUCTION TYPE II FLOATING
TURBIDITY BARRIER. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH
PERMIT CONDITIONS OF WORK IN WATERS OF THE STATE. REMOVE UPON
PROJECT STABILIZATION COMPLETION.
4
3.5
.7
-0
3.0
3.3
FB
FM
2.6
RW
SEE SHEET C-101
5
CONSTRUCTION FLAG NOTES:
4
SXHT 15-1005
1
SHEET
IDENTIFICATION
C-102
A
3
4
4
3
1
0
4
PROPOSED
GRADE
(TYP.)
3
10
APPROX.
ADDITIONAL
EROSION
1
SINCE
SURVEY
0
2
-1
-1
-2
-2
-3
-3
5
BANANA
RIVER
WATERWARD
EDGE OF
BREAKWATER
(TYP.)
FLOATING
TURBIDITY
BARRIER
-0.32 SAFE UPLAND LINE
14
:1
FILL
-80.0 -70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0
SECTION 5
-50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0
SECTION 2
20'
2.5'
TOP OF REVETMENT
EL. 2.5 (TYP.)
%
2
3'
-0.93 MHWL
EXIST.
GRADE
(TYP.)
COQUINA
BREAKWATER
TOE OF
REVETMENTSALT
MARSH
3
2
1
0
-1
-2
-3
LEGEND:
-80.0 -70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0
SECTION 8
EXISTING GRADE
3
WATERWARD
EDGE OF
BREAKWATER
(TYP.)
FLOATING
TURBIDITY
BARRIER
-0.32 SAFE UPLAND LINE
FILL
-3
EXIST.
FM & RW TOE OF
-2
REVETMENT
-3
SALT
MARSH
-1.98
-2
-0.93 MHWL
EXIST.
GRADE
(TYP.)
COQUINA
BREAKWATER
-1
-1.89
-1.80/-0.30
-1
-70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0
SECTION 4
2
14
:1
BANANA
RIVER
3
20'
40'
AS BUILT DATE:
####
SUBMITTED BY:
G. BEARD
0095
01/18/17
D. LAVENDER
60'
2.50
GRAPHIC SCALE 1" = 20'
1
0
-1
-2
-3
5
0'
2
-80.0 -70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0
SECTION 7
4
20'
SCALE:
VERTICAL: 1" = 2'
HORIZONTAL: 1" = 20'
11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS:
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150005
RAEIS CONTRACT NO: FA2521-13-D-0005-0095
6
LLEN
E ngineering,Inc.
J. KELLEY
REVIEWED BY:
D. ARTZNER
DRAWN BY:
A
REPAIR RIVER SHORELINE,
RUNWAY 11
0
DATUM: ELEVATIONS SHOWN BASED ON NAVD '88
(NAVD '88 + 1.42' = NGVD '29)
SXHT 15-1005
1
20.0
5
-2.07
1
APPROX.
ADDITIONAL
EROSION
1
SINCE
SURVEY
0
-1.70
-1.30
-3
-3
2
-1.41
-0.59
SALT
MARSH
2
0%
-1.05
0.13
-2
-50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0
SECTION 1
1
TOE OF
REVETMENT
3
PROPOSED
GRADE
(TYP.)
-0.23
0.84
-1
-1
-0.93 MHWL
EXIST.
GRADE
(TYP.)
COQUINA
BREAKWATER
3
20'
1.9'
PROP.
GRADE
B
4
1.79
2.38
FILL
4
2.69
0
0
-2.15
-2.00
0.60
-1.80/-0.30
1.64
-1.21
2.15
COQUINA
BREAKWATER
14
:1
WATERWARD
EDGE OF
BREAKWATER
(TYP.)
FLOATING
TURBIDITY
BARRIER
-0.32 SAFE UPLAND LINE
4
3'
EXIST.
GRADE
TOP OF REVETMENT
EL. 2.5 (TYP.)
3.57
SALT
MARSH
-3
EXIST.
GRADE
(TYP.)
1
1
-2
-1.71
-1.80
-2
2.44
-0.50
A
-0.93 MHWL
:1
TOE OF
REVETMENT
2.09
2.00
-1
14
%
10
BANANA
RIVER
5
-2.02
0
2
2
PROPOSED
GRADE
(TYP.)
-1.82
CUT
3
TOP OF REVETMENT
EL. 2.5 (TYP.)
5
37'
4:1
FILL
3
3.5' 12'
8.6'
4:1
2
WATERWARD
EDGE OF
BREAKWATER
(TYP.)
FLOATING
TURBIDITY
BARRIER
-0.32 SAFE UPLAND LINE
4
20'
-1.63
-1.80/-0.30
10
%
3
BANANA
RIVER
4
3'
-1.44
-1.30
PROPOSED
GRADE
(TYP.)
5
5
35.5'
12'
-1.25
-0.59
TOP OF REVETMENT
EL. 2.5 (TYP.)
4
1
1.2'
16.75'
-1.01
0.13
12'
-0.33
0.83
3'
2.29
2.50
5
17'
2.38
3.7' 12'
5+50
1.42
2+50
0+50.00
DELIVERY NO.
FA2521-13-D-0005
SXHT 15-1005
DATE:
DESIGNED BY:
PROPOSED GRADE
C
Oneida Total Integrated Enterprises
5
31'
RANGE ARCHITECT-ENGINEER,
INSPECTION SERVICES
-1.70
-1.30
-3
-1.41
-0.59
-3
SALT
MARSH
-1.05
0.13
-2
TOE OF
REVETMENT
-3
CROSS SECTIONS
-0.93 MHWL
EXIST.
GRADE
(TYP.)
COQUINA
BREAKWATER
5
12'
-1.38
-1.30
WATERWARD
EDGE OF
BREAKWATER
(TYP.)
FLOATING
TURBIDITY
BARRIER
-0.32 SAFE UPLAND LINE
-1
-2
7.7'
BANANA
RIVER
14
:1
-2
-70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0
SECTION 9
-1.03
-0.59
EXIST.
FM & RW
-1
RAEIS
-3
SECONDARY
BREAKWATER
0
CONTRACT NO.: FA2521-13-D-0005 - 0095
-3
EXISTING
VEGETATION
TO REMAIN
-0.93 MHWL
EXIST.
GRADE
(TYP.)
COQUINA
BREAKWATER
D
1
USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL
-2
-0.84
0.13
1
-1.91
-1.06
-1.80
COQUINA
BREAKWATER
0.41
-1.80
-0.50
-1.80/-0.30
B
20'
1.9'
PROPOSED
GRADE
(TYP.)
%
10
2
-1
CUT
SECONDARY
BREAKWATER
3'
FILL
-0.93 MHWL
0.34
-1.40/0.10
2.16
SALT
MARSH
4:1
L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-301.dwg, 1/18/2017 11:11:22 AM, DWG To PDF.pc3
-3
TOE OF
REVETMENT
2.42
-0.50
-2
0
14
:1
2.32
2.00
-1
-0.32 SAFE UPLAND LINE 0
0.71
-1.80
0
3
-0.23
0.84
CUT
-2
4:1
4:1
FILL
4
37'
4:1
2
4
BANANA
RIVER
3
WATERWARD
EDGE OF
BREAKWATER
2
EXIST. (TYP.)
FLOATING
GRADE
TURBIDITY 1
(TYP.)
BARRIER
1.79
2.38
10
%
3
-1
2
6+50
TOP OF REVETMENT
EL. 2.5 (TYP.)
RESCUE
RD.
2.69
PROPOSED
GRADE
(TYP.)
12'
5
5
TOP OF REVETMENT
EL. 2.5 (TYP.)
4
1
1.2'
46'
3.57
5
-1
3+50
3' 5' 3'
9'
0
-80.0 -70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0
SECTION 6
0+68.89
3.5' 12'
0
3
-1.61
-3
1
BANANA
RIVER
-2.22
SECONDARY
BREAKWATER
1
4
-1.09
-3
SALT
MARSH
2
0.97
0.00/1.50
-2
TOE OF EXIST.
REVETMENT
2
20'
WATERWARD
EDGE OF
BREAKWATER
(TYP.)
FLOATING
TURBIDITY
BARRIER
-0.32 SAFE UPLAND LINE
0.90
-2
-70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0
SECTION 3
C
-0.93 MHWL
EXIST.
GRADE
(TYP.)
COQUINA
BREAKWATER
-1
3
0.43
-1
3
3' 5' 3'
WETLAND AREA #2
DO NOT DISTURB
0.53
FILL
-1.99
-1.86
-1.73
-1.80/-0.30
-1.21
-0.04
-0.18
2.50
2.30
-3
SECONDARY
BREAKWATER
0
:1
4
-0.02
1.38
SALT
MARSH
-1.58
-2
0
14
EXIST.
FM & RW
4
25.9'
5
1.46
2.24
TOE OF
REVETMENT
-0.84
0.67
-1
-0.93 MHWL
EXIST.
GRADE
(TYP.)
COQUINA
BREAKWATER
FILL
1
5
2.19
0
1
5
-2.07
14
:1
2
-2.05
FILL
2
WATERWARD
EDGE OF
BREAKWATER
(TYP.)
FLOATING
TURBIDITY
BARRIER
-0.32 SAFE UPLAND LINE
-1.98
1
3
-2.00
-1.80/-0.30
4:1
2
3
23.1'
BANANA
RIVER
-1.89
-1.80/-0.30
%
10
WATERWARD
EDGE OF
BREAKWATER
(TYP.)
FLOATING
TURBIDITY
BARRIER
-0.32 SAFE UPLAND LINE
3.21
3
4
RESCUE
RD.
-1.95
-1.40/0.10
PROPOSED
GRADE
(TYP.)
-1.45
-0.76
D
4
BANANA
RIVER
20'
3.1'
TOP OF EXIST.
REVETMENT
EL. 2.4 (TYP.)
PROPOSED
GRADE
(TYP.)
-1.69
-0.59
4
5
3' 5' 3'
1.62
5
TOP OF REVETMENT
EL. 2.5 (TYP.)
-1.27
0.13
5.6'
5
29'
2.70
12'
6
7+50
-2.12
20'
-0.23
0.84
3' 5' 3'
28'
2.28
12'
4+50
2.82
6.7'
5
-2.01
1+50
4
-0.33
-0.80/0.70
2
-1.72
-1.80/-0.30
1
SHEET
IDENTIFICATION
C-301
A
1
2
3
4
5
6
6.0
6.0
(VARIES SEE PLAN) 40'
(VARIES SEE PLAN) 27'
C
EXISTING WATERS
EDGE @ SAFE UPLAND LINE /
OHWL PER FDEP = 1.1 NGVD
= -0.32 NAVD
-80
-60
EL. -1.4
SLO
PE
1:14
-20
DISTANCE (FT)
A
C-501
SCALE: HORIZ.:1" = 5'; VERT.:1"=1'
EXISTING GRADE
RIVER BOTTOM
WOVEN GEOTEXTILE FABRIC
BELOW BREAKWATER
0
20
NOTE: SPOT ELEVATIONS SHOWN ON TYPICAL CROSS SECTION REPRESENT THE TYPICAL
VALUE, BUT THE CONTRACTOR SHALL FOLLOW THE DESIGN GRADES SHOWN ON THE PLANS
AND SPECIFIC CROSS SECTIONS WHICH HAVE SOME VARYING ELEVATIONS ALONG THE
COURSE OF THE SHORELINE WORK AREA.
6.0
EXISTING MANGROVE OR
BUTTONWOOD CLUSTER
3'
3'
20'
LEGEND:
MAINTAIN MIN. 3' CLEAR FROM
TRUNK OR EXPOSED ROOT OF
VEGETATION TO REMAIN
5'
70'
(VARIES)
17'
5'
3'
15'
3'
60'
5'
CLEAN SAND FILL
@ 14:1 SLOPE
EL. -0.68
15'
4.0
DO NOT DISTURB
PORTION OF EXISTING
WETLAND #2
VEGETATION
HARD ARMOR RIP-RAP REVETMENT
OR COQUINA ROCK BREAKWATERS
2.0
EL. 1.1
EL. 0.8
0.0
TYPE II FLOATING
TURBIDITY BARRIER
DURING
CONSTRUCTION
0.0
SAFE UPLAND LINE
OHWL -0.32, NAVD
SURVEY 4-2-15
WL -0.74, NAVD
BANANA RIVER
MHWL -0.93, NAVD
3'
PLAN VIEW
TYPICAL BREAKWATER & PLANTING LAYOUT DETAIL
-2.0
-2.0
-20
0
DISTANCE (FT)
TYPICAL SECTION AT MANGROVE / BUTTONWOOD
C-501
SCALE: N.T.S.
1
B
WOVEN GEOTEXTILE FABRIC
BELOW BREAKWATER
CLEAN SAND FILL
OBTAINED FROM PAFB
DREDGE SPOIL AREA
(TYP.)
SCALE: HORIZ.:1" = 5'; VERT.:1"=1'
2
3
4
AS BUILT DATE:
####
SUBMITTED BY:
G. BEARD
0095
DELIVERY NO.
FA2521-13-D-0005
J. KELLEY
REVIEWED BY:
SXHT 15-1005
A
B
AREA OF SUITABLE BACKFILL
WITH BAHIA SOD
11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE
EL. -0.7
75'
C
TOE ANCHOR STONE WITH
GEOTEXTILE FABRIC
2.0
EXISTING WETLAND #2
VEGETATION AREA
A
CLEAN SAND FILL, 14:1 SLOPE
ELEVATION (FT, NAVD)
PRIMARY COQUINA
ROCK BREAKWATER
AREA OF SOFT ARMOR FILL WITH SALT
MARSH VEGETATION PLANTINGS
PRIMARY 3' WIDE x 1'-6" HIGH
(2) 18" SIZE COQUINA ROCK
BREAKWATER
TOP EL. 0.8
BOTTOM EL. -0.7
ELEVATION (FT, NAVD)
SECONDARY COQUINA
ROCK BREAKWATER
4.0
SALT MARSH PLANTINGS
SPACED @ 36" O.C.
ON CLEAN SAND FILL
20'
SALTMARSH
PLANTINGS
STAGGER ROWS
(VARIES)
B
5'
L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-501.dwg, 1/18/2017 11:11:38 AM, DWG To PDF.pc3
EL. -1.8
-2.0
6.0
CONCRETE RIP-RAP
REVETMENT
BANANA RIVER
MHWL -0.93, NAVD
PROPOSED WATERS
EDGE @ MHWL
CLEAN SAND FILL
SLOPED @ 1' VERTICAL
TO 14' HORIZONTAL
-40
TYPICAL CROSS SECTION DETAIL
EL. -0.3
SURVEY 4-2-15
WL -0.74, NAVD
EL. -0.68
EXISTING WATERS
EDGE @ MHWL
-2.0
-100
14:1
Oneida Total Integrated Enterprises
TOE STONE ANCHOR
WRAPPED IN FILTER
FABRIC
PE
20
C
C-501
5
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS:
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150005
RAEIS CONTRACT NO: FA2521-13-D-0005-0095
6
TYPICAL CROSS SECTION
DETAIL
EL. -0.5
0.0
SAFE UPLAND LINE
OHWL -0.32, NAVD
REPAIR RIVER SHORELINE,
RUNWAY 11
3'
SLO
RANGE ARCHITECT-ENGINEER,
INSPECTION SERVICES
1
4:
EL. 0.1
D
LLEN
E ngineering,Inc.
E
EL. 0.75
NON-WOVEN GEOTEXTILE
FABRIC BELOW RIP-RAP
REVETMENT
0.0
TYPE II FLOATING
TURBIDITY BARRIER
DURING
CONSTRUCTION
RAEIS
OP
SL
BACKFILL BEHIND RIP-RAP REVETMENT
AT 10% SLOPE MAX TO MATCH EXISTING
GRADE, RESTORE DISTURBED AREA WITH
CERTIFIED WEED-FREE BAHIA SOD.
2.0
D. ARTZNER
2.0
CONTRACT NO.: FA2521-13-D-0005 - 0095
SECONDARY 3' WIDE x 1'-6" HIGH
(2) 18" SIZE COQUINA ROCK
BREAKWATER
TOP EL. 0.1
BOTTOM EL. -1.4
PRIMARY 3' WIDE x 1'-6" HIGH
(2) 18" SIZE COQUINA ROCK
BREAKWATER
TOP EL. -0.3
BOTTOM EL. -1.8
DRAWN BY:
SALTMEADOW
CORDGRASS;
(SPARTINA PATENS)
SPACED @ 36" O.C.
01/18/17
4.0
DATE:
EL. 2.5
EL. 2.25
(VARIES) 17'
12'
MIX OF
SEASHORE PASPALUM
(PASPALUM VAGINATUM)
& SEA-OX-EYE DAISY
(BORRICHIA FRUTESCENS)
SPACED @ 36" O.C.
EXISTING GRADE
20'
D. LAVENDER
8'
3'
DESIGNED BY:
EL. 3.55
SALTMARSH PLANTINGS
(VARIES) 20'
5'
SXHT 15-1005
EL. 3.7
3'
USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL
CONCRETE RIP-RAP
REVETMENT
TOP EL. 2.5
TOE EL. -0.5
4.0
ELEVATION (FT, NAVD)
12'
RIP-RAP
EXISTING
RESCUE ROAD
D
(VARIES) 7'
30'
ELEVATION (FT, NAVD)
24'
SHEET
IDENTIFICATION
C-501
A
1
2
3
4
5
6
15"-18"
CLEAN SAND FILL
AT 14:1 SLOPE WITH
SALTMARSH PLANTINGS
12"
6"
2'
ELEVATION
SHORELINE RIP-RAP REVETMENT DETAIL
1
C-502
SALTMARSH PLANTING DETAIL
2
C-502
SCALE: NONE
SCALE: NONE
3
C-502
VINYL SHEATHED EAW STEEL CABLE
(9800 LBS. BREAKING STRENGTH) WITH
GALVANIZED CONNECTORS (TOOL FREE DISCONNECT)
CLOSED CELL SOLID PLASTIC FOAM
FLOTATION (8" DIA. EQUIV.) (17 LBS.
PER FT. BUOYANCY)
SLOTTED PVC CONNECTOR PIPE
(METAL COLLAR REINFORCED)
B
18 OZ. NYLON REINFORCED
PVC FABRIC (300 PSI TEST)
STRESS PLATE
5
"
16
GALVANIZED CHAIN
(2) 18" DIAMETER
COQUINA BOULDERS
1
RIVER BOTTOM
EXISTING GRADE
14
MIRAFI HP 370
(OR EQUAL WOVEN GEOTEXTILE)
COQUINA ROCK BREAKWATER DETAIL
4
C-502
5
C-502
SCALE: NONE
11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE
NOTES:
1. THE CONTRACTOR SHALL INSPECT THE TURBIDITY BARRIER TO ENSURE PROPER
MAINTENANCE AND FUNCTION.
2. THE ROUTINE INSPECTIONS OF THE BARRIERS SHALL INCLUDE ANY SIGNS OF
DISTRESSED WILDLIFE. CEI SHALL BE NOTIFIED IMMEDIATELY TO RESPOND IF ANY
DISTRESSED WILDLIFE ARE FOUND.
1
AS BUILT DATE:
####
SUBMITTED BY:
G. BEARD
0095
J. KELLEY
REVIEWED BY:
A
CLEAN SAND FILL
AT 14:1 SLOPE
BANANA RIVER
MHWL -0.93, NAVD
NOTE: COMPONENTS OF TYPE II MAY BE SIMILAR OR IDENTICAL TO
PROPRIETARY DESIGNS. ANY INFRINGEMENT ON THE PROPRIETARY
RIGHTS OF THE DESIGNER SHALL BE THE SOLE RESPONSIBILITY OF
THE USER. SUBSTITUTIONS FOR TYPE II SHALL BE AS APPROVED
BY THE ENGINEER.
FLOATING TURBIDITY BARRIER
D. ARTZNER
SHORE SIDE
TYPE II
D1 = 5' STD. (SINGLE PANEL FOR DEPTHS 5' OR LESS).
D2 = 5' STD. (ADDITIONAL PANEL FOR DEPTHS > 5').
CURTAIN TO REACH BOTTOM UP TO DEPTHS OF 10 FEET.
TWO (2) PANELS TO BE USED FOR DEPTHS GREATER THAN
10 FEET UNLESS SPECIAL DEPTH CURTAINS SPECIFICALLY CALLED
FOR IN THE PLANS OR AS DETERMINED BY THE ENGINEER.
A
3'
B
1.5'
D2
WATER SIDE
SXHT 15-1005
D1
L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-502.dwg, 1/18/2017 11:11:53 AM, DWG To PDF.pc3
5 "
16
C
2
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS:
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150005
RAEIS CONTRACT NO: FA2521-13-D-0005-0095
3
4
5
6
MISCELLANEOUS DETAILS
SCALE: NONE
NOTES:
1. SEE TYPICAL SECTION FOR PLANT SPECIES AND ZONES FOR SPECIFIC SPECIES.
2. THE PLANTING HOLE SHALL BE THE SAME SIZE OR ONLY SLIGHTLY LARGER THAN
THE ROOTBALL AND DEEP ENOUGH THAT THE TOP OF ROOTBALL IS FLUSH OR
SLIGHTLY BELOW GROUND, BUT NOT MORE THAN 2" BELOW GROUND.
3. SETTLE SOIL TIGHTLY AROUND ROOT BALL OF EACH PLANT TO PREVENT WOBBLING,
PLANTS SHALL REMAIN UPRIGHT AFTER PLANTING.
REPAIR RIVER SHORELINE,
RUNWAY 11
SILT FENCE DETAIL
PLAN
Oneida Total Integrated Enterprises
14
RANGE ARCHITECT-ENGINEER,
INSPECTION SERVICES
1
LLEN
E ngineering,Inc.
FILTER FABRIC (IN
CONFORMANCE WITH
SEC. 985 FDOT SPEC.)
HIGHLY PERMEABLE BACKFILL
LAYER OF CLEAN SAND 6" MIN.
"
12
NOTES:
1. INSTALL MIRAFI S 1600 FILTER FABRIC (OR
EQUAL) AND ANCHORS PER
1
MANUFACTURER'S INSTRUCTIONS.
4
2.
BOTH ENDS OF REVETMENT MUST TURN
EL. -0.50
BACK TO THE SHORELINE IN ORDER TO
ANCHOR TOE OF REVETMENT
PREVENT FLANKING.
W/ 2' DIA. ROCK
3. THE REVETMENT MUST CONNECT TO THE
FILL 12"x6"
EXISTING SHORELINE REVETMENT AT
FOLD W/PEA
CENTER SECTION OF PROJECT WITH 5'
GRAVEL
HORIZONTAL OVERLAP OF GEOTEXTILE
FABRIC.
4. CONCRETE RIP-RAP SHALL BE FREE OF
DEBRIS AND CONTAIN NO METAL OR
REBAR.
RAEIS
6' MAX.
CLEAN SAND FILL
CONTRACT NO.: FA2521-13-D-0005 - 0095
MIRAFI S 1600
(OR EQUAL NON-WOVEN GEOTEXTILE)
2' 1'
USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL
PLAN
8"
12" MIN.
3' OR MORE
ANCHOR PINS
"
36
1-GALLON CONTAINER
PLANTS, 18" HEIGHT
10
BANANA RIVER
"
MATCH EXISTING
GRADE
EL. 2.50
DRAWN BY:
SECTION
1
SCALE: NONE
01/18/17
2"
MAX.
36
0.5' MIN. TO 3' MAX. DIAMETER CONC.
RIP-RAP OVER FILTER FABRIC
MIN. ROCK WEIGHT IS 25 LBS
AVE. ROCK WEIGHT IS 100 LBS
SILT FLOW
C
D
BAHIA SOD
FILTER FABRIC
POST OPTIONS:
SOFTWOOD 2 1/2" DIA.
SOFTWOOD 2"x4"
HARDWOOD 1 1/2"x1 1/2"
STEEL 1.33 LBS/FT
DATE:
GROUND
D. LAVENDER
7'
12'
DESIGNED BY:
18"
PRINCIPLE POST POSITION
VERTICAL
D
SXHT 15-1005
OPTIONAL
POST POSITIONS
DELIVERY NO.
FA2521-13-D-0005
36"
SHEET
IDENTIFICATION
C-502
A