Brevard County. US Air Force, 45th Space Wing. Patrick Air Force Base, Florida. PROJECT PURPOSE: Basic: shoreline stabilization. Overall: Restore an eroded shoreline by armoring the existing shoreline with riprap, install a 800 linear foot additional breakwater barrier (living shoreline) waterward of the existing shoreline, and plant native marsh grasses between the existing shoreline and breakwater at the west end of Runway 11, PAFB.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:

APPLICANT: US Air Force, 45th Space Wing

Attn: Patrick Giniewski

1224 Jupiter St.

Patrick Air Force Base, Florida 32925

WATERWAY AND LOCATION: The project would affect waters of the United States associated with the Banana River. The project site is located along 800 feet of the Banana River shoreline, west of Rescue Road at the west end of Runway 11, in Section 10, Township 26 South, Range 37 East, Patrick Air Force Base (PAFB), Brevard County, Florida.

Directions to the site are as follows: Work occurs within PAFB.

APPROXIMATE CENTRAL COORDINATES: Latitude 28.2425°

Longitude -80.6167°

PROJECT PURPOSE:

Basic: Shoreline stabilization.

Overall: Restore an eroded shoreline by armoring the existing shoreline with riprap, install a 800 linear foot additional breakwater barrier (living shoreline) waterward of the existing shoreline, and plant native marsh grasses between the existing shoreline and breakwater at the west end of Runway 11, PAFB.

EXISTING CONDITIONS: The subject shoreline at PAFB has eroded significantly during the past 20 years and more than 100 feet of loss occurred since 2009. Heavy wind and wave action continues to erode PAFB land, and the shoreline is now 30 feet from the edge of Rescue Road at its closest and 230 feet from the edge of Runway 11. A portion of the shoreline is armored with riprap to protect an underground sewer pipe exposed by high waves in 2014, with the rest unarmored. Benthic conditions are described as sand with shell and rock scattered along the river bottom. A fluctuating area of approximately 200-400 square feet of small patches of shoal grass (Halodule wrightii) were identified within the project footprint. The shoreline supports a total of approximately 30 linear feet of mangrove shoreline including 5-6 red mangrove seedlings and 20 white mangroves.

PROPOSED WORK: The applicant seeks authorization to restore an eroded shoreline by armoring the existing shoreline with 490 linear feet of riprap, installing a 780 linear foot breakwater barrier (living shoreline) waterward of the existing shoreline, discharging clean fill material into wetlands and waters to reshape the shoreline, and planting native marsh grasses between the existing shoreline and breakwater.

1. Riprap for the shoreline stabilization will be installed using a backhoe or long-arm

excavator from the shoreline.

2. The riprap breakwater will be installed by a barge-mounted backhoe or land-based crane and will be staggered with gaps to allow water flow and species movement. The breakwaters will consist of 70-foot (ft) sections with 5-ft gaps and will have 15-ft sections placed behind each gap opening.

3. The area between the shoreline riprap and breakwaters will be graded with a bulldozer or backhoe and then planted with marsh grasses by hand.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: Only minimum distance into water for required erosion protection of shoreline is proposed. Shoreline protection is designed to prevent future erosion, area of work is within previous limits of land so no impacts to navigation. Work on active military installation and activity will be conducted either by long-reach backhoe from uplands, or small barge or platform in water. By protecting against further erosion of shore, the existing wetlands and vegetation will survive. Plantings along shore will provide habitat.

COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: The Patrick Air Force Base shoreline protection project with substantial wetland plantings will prevent future erosion and further destruction of shoreline wetlands which compensates impacts caused by this project. The impacts are minimized by avoiding the existing wetland vegetation at the south end of the project. There is little to no seagrass in the project area.

CULTURAL RESOURCES: The US Air Force is the lead federal agency for this proposal documented compliance with Section 106 of the National Historic Preservation Act. No further consultation is required.

ENDANGERED SPECIES: The US Air Force is the lead federal agency for this proposal and completed consultation with the U.S. Fish and Wildlife Service and the National Marine Fisheries Service, Protected Resource Division by separate letter. The US Air Force has documented compliance with Section 7 of the Endangered Species Act. No further consultation is required.

ESSENTIAL FISH HABITAT (EFH): The US Air Force completed consultation with the National Marine Fisheries Service, Habitat Conservation Division as the lead federal agency for the proposed action. The US Air Force has documented compliance with the EFH provisions of the Magnuson Stevens Fishery Conservation and Management Act. No further consultation is required.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926 within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Andrew Phillips, in writing at the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926; by electronic mail at andrew.w.phillips@usace.army.mil; by facsimile transmission at (321)504-3803; or, by telephone at (321)504-3771 extension 14.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

2

3

4

6 USER:

PATRICK AIR FORCE BASE FLORIDA

CHIEF, ENGINEERING FLIGHT:

SXHT 15-1005

PROJECT MANAGER:

BUILDING 535-45TH CES

MAIN GATE (PERSONNEL ONLY)

C

DRAWING INDEX

DITCH

SHEET ID

DESCRIPTION

RE

SC

UE

RO

AD

GENERAL

PROJECT LOCATION

G-001 BANANA RIVER

AY 1 1

EAN IC OC ATLANT

C-001

GENERAL NOTES, ABBREVIATIONS, AND LEGEND

C-100

OVERALL SHORELINE PROTECTION PLAN

C-101

NORTH SECTION SHORELINE PROTECTION PLAN

C-102

SOUTH SECTION SHORELINE PROTECTION PLAN

C-301

CROSS SECTIONS

C-501

TYPICAL CROSS SECTION AND BREAKWATER DETAILS

C-502

MISCELLANEOUS DETAILS

1636

AD

UE RO

RESC

CHEVRON PARK 1638

BANANA RIVER

CIVIL

XI

1523 1637

ENLARGED RUNWAY 11 SHORELINE AREA

AS BUILT DATE:

####

SUBMITTED BY:

G. BEARD

0095

DELIVERY NO. FA2521-13-D-0005

LLEN E ngineering,Inc.

A

SCALE: NONE

B

GOLF COURSE

11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE

A

PERMIT(S)/ENVIRONMENTAL ACTIONS REQUIRED PRIOR TO CONSTRUCTION

NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.

ERP/STORMWATER

NOI/SWPPP

ERP/WETLANDS/DREDGE & FILL

IRP

FDEP/DRINKING WATER

SURVEY/WILDLIFE

ASBESTOS

FDEP/DOM. WASTE WATER

ARCHEO./HISTORICAL

HEAVY METALS

LOCATION PLAN

FDEP/IND. WASTE WATER

OTHER

LEAD

SCALE: NONE

FDEP/FUEL TANK

NONE

PCB

SOUTH GATE (PERSONNEL ONLY) PINEDA EXPRESSWAY

HAZARDOUS MATERIALS

YES

NO

TRUE NORTH

1

2

3

4

5

NOT VERIFIED

ENGINEER OF RECORD: DAVID A. LAVENDER LICENSE NUMBER: 66400 NAME AND ADDRESS OF BUSINESS: ALLEN ENGINEERING, INC. 106 DIXIE LANE (P.O. BOX 321321) COCOA BEACH, FLORIDA 32932-1321 OFFICE: (321) 783-7443 - FAX: (321)783-5902 E-MAIL: INFO@ALLENENG.NET FL C.A. # LB 266 AEI #: 150005 RAEIS CONTRACT NO: FA2521-13-D-0005-0095

6

VICINITY MAP, LOCATION MAP AND DRAWING INDEX

BAN

PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED. THE SIGNATURE MUST BE VERIFIED ON THE ELECTRONIC DOCUMENTS.

David A. Lavender

Digitally signed by David A. Lavender DN: cn=David A. Lavender, o=Allen Engineering, Inc., ou=Civil Engineering, email=dlavender@alleneng.net, c=US Date: 2017.02.03 16:00:02 -05'00'

REPAIR RIVER SHORELINE, RUNWAY 11

ANA

THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY: DAVID A. LAVENDER, P.E. USING A DIGITAL SIGNATURE.

SXHT 15-1005

RIVE R

TRUCK DELIVERY ONLY

N

L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 G-001.dwg, 1/18/2017 11:09:52 AM, DWG To PDF.pc3

M

RUN W

UE SC . RE RD

B

TA

Y WA

VICINITY MAP, LOCATION PLAN AND DRAWING INDEX

C

Oneida Total Integrated Enterprises

BUILDING 423-CONTRACTING OFFICER

RANGE ARCHITECT-ENGINEER, INSPECTION SERVICES

SCALE: NONE

CONTRACT NO.: FA2521-13-D-0005 - 0095

USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL

STATE OF FLORIDA

RAEIS

OTHER:

J. KELLEY

IC OCEA ATLANT

VER

ATO:

REVIEWED BY:

SECURITY FORCES:

BAN A

NA R I

MIAMI

D

SAFETY:

N

TAMPA

COMMUNICATIONS:

D. ARTZNER

S.R. A1A

PATRICK AIR FORCE BASE

CE OPERATIONS:

DRAWN BY:

ORLANDO

SXHT 15-1005

REPAIR RIVER SHORELINE, RUNWAY 11

D

FIRE:

01/18/17

JACKSONVILLE

ENVIRONMENTAL:

DATE:

A P P R O V E D

D. LAVENDER

TALLAHASSEE

5

DESIGNED BY:

1

SHEET IDENTIFICATION

G-001

A

9.

CONTRACTOR SHALL COMPLETE ALL NECESSARY WORK TO CONSTRUCT/REPAIR A STABLE SHORELINE PROTECTION SYSTEM.

10. IF ANY CONSTRUCTION DEWATERING IS NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING APPROVAL OF A DEWATERING PLAN, THROUGH THE CONTRACTING OFFICER, PRIOR TO ANY DEWATERING. NO CONSTRUCTION DEWATERING SHALL BE ALLOWED INTO EXISTING STORMWATER RETENTION AREAS. REFERENCE SPECIFICATIONS SECTION 01 57 19, DEWATERING.

C

11. IF A STORAGE TANK IS UTILIZED FOR FUELING CONSTRUCTION VEHICLES, THE TANK MUST HAVE ADEQUATE SECONDARY CONTAINMENT AND IF THE TANK IS 55 GALS OR GREATER, MONTHLY INSPECTIONS ARE TO BE PERFORMED AND DOCUMENTED BY THE CONTRACTOR. THE CONTRACTOR'S REFUELING PLAN SHALL BE SUBMITTED TO THE 45 CES/CEIE OFFICE FOR REVIEW. 16. THE EXISTING CONDITIONS SURVEY WAS PERFORMED BY ALLEN ENGINEERING, INC. DATED 4/2/15. 17. CONTRACTOR SHALL REPAIR OR RESTORE DISTURBED AREAS TO ORIGINAL CONDITION OR BETTER. CERTIFIED WEED-FREE BAHIA SOD SHALL BE USED BEHIND REVETMENTS, AND OTHER DISTURBED AREAS. 19. CONTRACTOR SHALL PERFORM WORK ONLY DURING NORMAL DAYTIME HOURS, NO NIGHT WORK IS AUTHORIZED. 20. THE CONTRACTOR SHALL COMPLY WITH, BUT NOT BE LIMITED TO: AFI 32-7086, HAZARDOUS MATERIALS MANAGEMENT, FEBRUARY 2015 AND THE 45TH SW HAZMAT TRACKING PROCEDURES FOR CONSTRUCTION AND SERVICE CONTRACTORS. THE CONTRACTOR SHALL CONTACT THE 45 CES/CEIE HAZARDOUS MATERIALS PROGRAM MANAGER AT 321-494-9268 TO REVIEW HAZARDOUS MATERIALS AUTHORIZATION PROCEDURES PRIOR TO HAZARDOUS MATERIALS BEING BROUGHT ON TO 45 SW FACILITIES. NO HAZARDOUS MATERIALS ARE ALLOWED TO BE BROUGHT ON TO ANY 45 SW INSTALLATION WITHOUT PRIOR APPROVAL.

L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-001.dwg, 2/3/2017 3:55:21 PM, DWG To PDF.pc3

21. IF ANY HAZARDOUS/CONTROLLED WASTE IS GENERATED OR BROUGHT ONSITE BY THE CONTRACTOR, IT MUST BE MANAGED IN ACCORDANCE WITH 45 SW MANAGEMENT PLAN 19-14. 22. STORMWATER DISCHARGE SHALL BE MONITORED FOR QUALITY DURING THE CONSTRUCTION, AND FLOATING TURBIDITY BARRIERS SHALL BE INSTALLED AROUND WORK AREAS TO PREVENT DISCHARGE OF TURBID WATER TO THE BANANA RIVER PRIOR TO START OF WORK.

B

23. DURING CONSTRUCTION AIRFIELD WAIVERS WILL BE REQUIRED, EQUIPMENT WILL NEED TO BE FLAGGED WHILE WORKING WITHIN THE AIRFIELD CLEAR ZONE, AND STAGING AREAS APPROX. 1,000 FEET AWAY FROM THE SITE WILL REQUIRE COORDINATION AND APPROVAL FROM THE CONTRACTING OFFICER. 24. FILL SOIL MATERIAL SHALL BE OBTAINED FROM THE PAFB MARINA DREDGE SPOIL AREA OR OTHER LOCAL SITE SO THAT COMPOSITION AND Ph LEVELS ARE SIMILAR TO EXISTING SOILS AND SUPPORT PLANT VIABILITY.

SHORELINE PROTECTION NOTES: 1.

EXISTING ADJACENT AND OFF-SITE DRAINAGE PATTERNS SHALL BE MAINTAINED DURING CONSTRUCTION.

2. ALL UNDERGROUND UTILITIES MUST BE LOCATED AND PROTECTED DURING CONSTRUCTION. 3. THE CONTRACTOR SHALL PROVIDE THE CONTRACTING OFFICER AND ENGINEER WITH FINAL IMPROVEMENT AS-BUILT INFORMATION FROM A REGISTERED SURVEYOR MEETING REGULATORY PERMIT CONDITIONS AS WELL AS THE FOLLOWING: LOCATION, MATERIAL, BOTTOM AND CREST ELEVATIONS, LENGTHS AND WIDTHS OF BREAKWATER STRUCTURES. LOCATION, ELEVATIONS OF FILL SLOPES, REVETMENT TOE AND TOP. COMPLETE TOPOGRAPHIC AND BATHYMETRIC SURVEY OF ALTERED PROJECT AREA . 4. TYPE II FLOATING TURBIDITY BARRIERS SHALL BE INSTALLED IN THE WATER AROUND WORK AREAS TO PREVENT SEDIMENT TRANSPORT OUTSIDE OF WORK AREA. 5. THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH THE CONDITIONS OF THE ENVIRONMENTAL RESOURCE PERMIT FOR WORK IN THE WATERS OF THE STATE.

A

6. GEOTEXTILE FOR USE IN THE WATER UNDER THE BREAKWATER ROCKS SHALL BE MIRAFI HP370 WOVEN POLYPROPYLENE FABRIC OR APPROVED EQUAL.

EXISTING CONTOUR LINE D.

ALL VESSELS ASSOCIATED WITH THE CONSTRUCTION PROJECT SHALL OPERATE AT

x

WATER DEPTHS WHERE THE DRAFT OF THE VESSEL PROVIDES LESS THAN A FOUR-FOOT CLEARANCE FROM THE BOTTOM. ALL VESSELS WILL PREFERENTIALLY FOLLOW DEEP-WATER ROUTES (E.G., MARKED CHANNELS) WHENEVER POSSIBLE. E. IF A SEA TURTLE OR SMALLTOOTH SAWFISH IS SEEN WITHIN 100 YARDS OF THE ACTIVE DAILY CONSTRUCTION/DREDGING OPERATION OR VESSEL MOVEMENT, ALL APPROPRIATE PRECAUTIONS SHALL BE IMPLEMENTED TO ENSURE ITS PROTECTION. THESE PRECAUTIONS SHALL INCLUDE CESSATION OF OPERATION OF ANY MOVING EQUIPMENT CLOSER THAN 50 FEET OF A SEA TURTLE OR SMALLTOOTH SAWFISH. OPERATION OF ANY MECHANICAL CONSTRUCTION EQUIPMENT SHALL CEASE IMMEDIATELY IF A SEA TURTLE OR SMALLTOOTH SAWFISH IS SEEN WITHIN A 50-FT RADIUS OF THE EQUIPMENT. ACTIVITIES MAY NOT RESUME UNTIL THE PROTECTED SPECIES HAS DEPARTED THE PROJECT AREA OF ITS OWN VOLITION. F.

x

STANDARD MANATEE CONDITIONS FOR IN-WATER WORK

BOT. CONC. E EL. LB MHWL N NAVD NGVD TYP.

B.

ALL VESSELS ASSOCIATED WITH THE CONSTRUCTION PROJECT SHALL OPERATE AT

WHERE THE DRAFT OF THE VESSEL PROVIDES LESS THAN A FOUR-FOOT CLEARANCE FROM THE BOTTOM. ALL VESSELS WILL FOLLOW ROUTES OF DEEP WATER WHENEVER POSSIBLE. C. SILTATION OR TURBIDITY BARRIERS SHALL BE MADE OF MATERIAL IN WHICH MANATEES CANNOT BECOME ENTANGLED, SHALL BE PROPERLY SECURED, AND SHALL BE REGULARLY MONITORED TO AVOID MANATEE ENTANGLEMENT OR ENTRAPMENT. BARRIERS MUST NOT IMPEDE MANATEE MOVEMENT. D. ALL ON-SITE PROJECT PERSONNEL ARE RESPONSIBLE FOR OBSERVING WATERRELATED ACTIVITIES FOR THE PRESENCE OF MANATEE(S). ALL IN-WATER OPERATIONS, INCLUDING VESSELS, MUST BE SHUTDOWN IF A MANATEE(S) COMES WITHIN 50 FEET OF THE OPERATION. ACTIVITIES WILL NOT RESUME UNTIL THE MANATEE(S) HAS MOVED BEYOND THE 50-FOOT RADIUS OF THE PROJECT OPERATION, OR UNTIL 30 MINUTES ELAPSES IF THE MANATEE(S) HAS NOT REAPPEARED WITHIN 50 FEET OF THE OPERATION. ANIMALS MUST NOT BE HERDED AWAY OR HARASSED INTO LEAVING.

PROPOSED FINISHED GRADE SPOT ELEVATION

BOTTOM CONCRETE EASTING ELEVATION LAND SURVEYING BUSINESS MEAN HIGH WATER LEVEL NORTHING NORTH AMERICAN VERTICAL DATUM NATIONAL GEODETIC VERTICAL DATUM TYPICAL

SURVEYOR'S NOTES: 1.

THIS IS NOT A BOUNDARY SURVEY.

2.

THE COORDINATE VALUES AND BEARINGS SHOWN HEREON ARE BASED ON NORTH AMERICAN DATUM (NAD) OF 1983, FLORIDA EAST AND WERE ESTABLISHED FROM GPS OBSERVATIONS USING PUBLISHED VALUES FOR UNITED STATES COASTAL & GEODETIC SURVEY (USC&GS) MONUMENT "TECH."

3.

THE ELEVATIONS SHOWN HEREON ARE BASED ON USC&GS MONUMENT "TECH," ELEVATION= 6.80 FEET. ALL ELEVATIONS SHOWN ARE BASED ON NORTH AMERICAN VERTICAL DATUM (NAVD) OF 1988.

4.

ONLY ABOVE GROUND INDICATIONS OF UTILITIES WERE LOCATED BY THIS SURVEY.

THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING CONDITIONS INTENDED TO PROTECT MANATEES FROM DIRECT PROJECT EFFECTS: A. ALL PERSONNEL ASSOCIATED WITH THE PROJECT SHALL BE INSTRUCTED ABOUT THE PRESENCE OF MANATEES AND MANATEE SPEED ZONES, AND THE NEED TO AVOID COLLISIONS WITH AND INJURY TO MANATEES. THE CONTRACTOR SHALL ADVISE ALL CONSTRUCTION PERSONNEL THAT THERE ARE CIVIL AND CRIMINAL PENALTIES FOR HARMING, HARASSING, OR KILLING MANATEES WHICH ARE PROTECTED UNDER THE MARINE MAMMAL PROTECTION ACT, THE ENDANGERED SPECIES ACT, AND THE FLORIDA MANATEE SANCTUARY ACT.

EXISTING GRADE SPOT ELEVATION

ABBREVIATIONS:

ANY COLLISION WITH AND/OR INJURY TO A SEA TURTLE OR SMALLTOOTH SAWFISH

PROTECTED RESOURCES DIVISION (727-824-5312) AND THE LOCAL AUTHORIZED SEA TURTLE STRANDING/RESCUE ORGANIZATION.

2.50 2.50

CONSTRUCTION EQUIPMENT NOTES: 1.

THE CONTRACTOR SHALL UTILIZE A LONG-REACH EXCAVATOR OR BACKHOE TO ACCOMPLISH THE IN-WATER WORK IF POSSIBLE. IF THE PLACEMENT OF THE BREAKWATER OR FILL SOILS CANNOT BE ACCOMPLISHED WITH LONG-REACH EQUIPMENT FROM THE LAND, THEN THE ALTERNATE METHODS SHALL BE EITHER A SHALLOW BARGE OR WATER-BASED PLATFORM WITH MOUNTED EQUIPMENT OR BY THE USE OF AMPHIBIOUS EQUIPMENT.

2.

THE BARGE OR PLATFORM SHALL BE LOCATED WITHIN THE LIMITS OF THE FLOATING TURBIDITY BARRIERS AND SHALL BE MOVED OUTSIDE THE RUNWAY CLEAR ZONE DURING NON-OPERATING HOURS. THE MAXIMUM DRAFT OF THE VESSEL IS 2.0 FEET.

3.

AMPHIBIOUS EQUIPMENT SHALL BE LOCATED WITHIN THE LIMITS OF THE FLOATING TURBIDITY BARRIERS AND SHALL BE MOVED OUTSIDE THE RUNWAY CLEAR ZONE DURING NON-OPERATING HOURS. THE ENTRY/EXIT POINT FROM LAND INTO THE WATER SHALL BE LOCATED WITHIN THE PERMITTED LIMITS OF CONSTRUCTION IMPACTS AND SHALL BE RESTORED TO MATCH THE PROPOSED DESIGN SECTION CONDITIONS.

E. ANY COLLISION WITH OR INJURY TO A MANATEE SHALL BE REPORTED IMMEDIATELY TO THE FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION (FWC) HOTLINE AT 1-888-404-3922. COLLISION AND/OR INJURY SHOULD ALSO BE REPORTED TO THE U.S. FISH AND WILDLIFE SERVICE IN JACKSONVILLE (1-904-731-3336) FOR NORTH FLORIDA OR IN VERO BEACH (1-772-562-3909) FOR SOUTH FLORIDA, AND EMAILED TO FWC AT IMPERILEDSPECIES@MYFWC.COM. 11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE

F. TEMPORARY SIGNS CONCERNING MANATEES SHALL BE POSTED PRIOR TO AND DURING ALL IN-WATER PROJECT ACTIVITIES. ALL SIGNS ARE TO BE REMOVED BY THE CONTRACTOR UPON COMPLETION OF THE PROJECT. TEMPORARY SIGNS THAT HAVE ALREADY BEEN APPROVED FOR THIS USE BY THE FWC MUST BE USED. ONE SIGN WHICH

ENGINEER OF RECORD: DAVID A. LAVENDER LICENSE NUMBER: 66400 NAME AND ADDRESS OF BUSINESS: ALLEN ENGINEERING, INC. 106 DIXIE LANE (P.O. BOX 321321) COCOA BEACH, FLORIDA 32932-1321 OFFICE: (321) 783-7443 - FAX: (321)783-5902 E-MAIL: INFO@ALLENENG.NET FL C.A. # LB 266 AEI #: 150005 RAEIS CONTRACT NO: FA2521-13-D-0005-0095

7. GEOTEXTILE FOR USE IN THE SHORELINE REVETMENT RIP-RAP SHALL BE MIRAFI S1600 NON-WOVEN POLYPROPYLENE FABRIC OR APPROVED EQUAL. 8. COQUINA ROCK BOULDERS SHALL BE USED FOR THE BREAKWATER AND SHALL BE 18 INCHES MINIMUM SIZE WITH AN AVERAGE WEIGHT BETWEEN 175 - 250 POUNDS. 9. CONCRETE RUBBLE RIP-RAP SHALL BE USED FOR THE SHORELINE REVETMENT AND SHALL VARY BETWEEN 6 INCH TO 3 FEET IN SIZE, A MINIMUM WEIGHT OF 25 POUNDS, AND AVERAGE WEIGHT OF 100 POUNDS. CONCRETE RUBBLE SHALL BE FREE OF REBAR, OTHER METALS, OR DEBRIS.

1

2

OF IN-WATER OPERATIONS MUST BE POSTED IN A LOCATION PROMINENTLY VISIBLE TO ALL PERSONNEL ENGAGED IN WATER-RELATED ACTIVITIES. THESE SIGNS CAN BE VIEWED AT HTTP://WWW.MYFWC.COM/WILDLIFEHABITATS/MANATEE_SIGN_VENDORS.HTM. QUESTIONS CONCERNING THESE SIGNS CAN BE FORWARDED TO THE EMAIL ADDRESS LISTED ABOVE.

3

4

5

6

0095

DELIVERY NO. FA2521-13-D-0005

G. BEARD

PROPOSED SILT FENCE

AS BUILT DATE:

SF

####

PROPOSED FLOATING TURBIDITY BARRIER

SUBMITTED BY:

FB

A

CONSTRUCTION MATERIALS REJECTED BY THE GOVERNMENT SHALL BE REMOVED FROM THE SITE IMMEDIATELY.

EXISTING RECLAIMED WATER MAIN

C

Oneida Total Integrated Enterprises

8.

RW

RANGE ARCHITECT-ENGINEER, INSPECTION SERVICES

CONSTRUCTION OF BREAKWATERS AND REVETMENT RIP-RAP SHALL COMPLY WITH ALL PROJECT SPECIFICATIONS AND PERMITS.

EXISTING SANITARY FORCE MAIN

D

LLEN E ngineering,Inc.

7.

C. SILTATION BARRIERS SHALL BE MADE OF MATERIAL IN WHICH A SEA TURTLE OR SMALLTOOTH SAWFISH CANNOT BECOME ENTANGLED, BE PROPERLY SECURED, AND BE REGULARLY MONITORED TO AVOID PROTECTED SPECIES ENTRAPMENT. BARRIERS MAY NOT BLOCK SEA TURTLE OR SMALLTOOTH SAWFISH ENTRY TO OR EXIT FROM DESIGNATED CRITICAL HABITAT WITHOUT PRIOR AGREEMENT FROM THE NATIONAL MARINE FISHERIES

FM

RAEIS

ALL SURFACE WATERS WILL BE PROTECTED AS REQUIRED USING TURBIDITY BARRIERS, SILT FENCING OR EQUIVALENT MATERIAL TO PREVENT EROSION AND SLOUGHING OF EXCAVATED MATERIALS INTO ADJACENT WATERS OR STORM INLETS. THE CONTRACTING OFFICER MUST BE NOTIFIED OF ANY IMPACTS TO EXISTING VEGETATION. TREES THAT MUST BE REMOVED DUE TO IMPEDANCES MUST BE IDENTIFIED TO THE CONTRACTING OFFICER AND 45 CES ENVIRONMENTAL (45 CES/CEIE) PRIOR TO REMOVAL.

EXISTING TOP OF BANK

GENERAL NOTES, ABBREVIATIONS, AND LEGEND

6.

B. THE CONTRACTOR SHALL ADVISE ALL CONSTRUCTION PERSONNEL THAT THERE ARE CIVIL AND CRIMINAL PENALTIES FOR HARMING, HARASSING, OR KILLING SEA TURTLES OR SMALLTOOTH SAWFISH, WHICH ARE PROTECTED UNDER THE ENDANGERED SPECIES ACT OF 1973.

J. KELLEY

DISTURBED AREAS SHALL BE KEPT TO A MINIMUM AND ONLY AS NECESSARY TO ACCOMPLISH THE WORK.

SAFE UPLAND LINE (OHWL)

REVIEWED BY:

5.

EXISTING RIVER WATER EDGE LINE (4/2/15) SXHT 15-1005

ANY DAMAGE CAUSED TO EXISTING SITE FEATURES, ROADS, CURBS, WALKS, DRAINAGE STRUCTURES, ETC., SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR OR REPLACE TO EXISTING CONDITIONS OR BETTER. THE CONTRACTOR WILL BE REQUIRED TO MOVE CONSTRUCTION EQUIPMENT OUTSIDE THE RUNWAY CLEAR ZONE (1,000 FEET FROM RWY. CENTERLINE) AT THE END OF EACH WORK DAY FOR STORAGE, COORDINATE WITH CONTRACTING OFFICER FOR ACCEPTABLE LOCATION.

BANANA RIVER MHWL OF 2009

D. ARTZNER

4.

A. THE CONTRACTOR SHALL INSTRUCT ALL PERSONNEL ASSOCIATED WITH THE PROJECT OF THE POTENTIAL PRESENCE OF THESE SPECIES AND THE NEED TO AVOID COLLISIONS WITH SEA TURTLES AND SMALLTOOTH SAWFISH. ALL CONSTRUCTION PERSONNEL ARE RESPONSIBLE FOR OBSERVING WATER-RELATED ACTIVITIES FOR THE PRESENCE OF THESE SPECIES.

CONTRACT NO.: FA2521-13-D-0005 - 0095

PRIOR TO CONSTRUCTION AND EXCAVATION, THE CONTRACTOR SHALL PROCESS AN AF FORM 103, WHICH INCLUDES NOTIFICATION OF SUNSHINE ONE CALL (811) UTILITY LOCATE TICKET.

BANANA RIVER MHWL OF 2007

DRAWN BY:

3.

THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING PROTECTED SPECIES CONSTRUCTION CONDITIONS:

REPAIR RIVER SHORELINE, RUNWAY 11

CONTRACTOR IS RESPONSIBLE FOR REQUESTING UTILITY LOCATES AND VERIFYING ALL EXISTING UTILITIES PRIOR TO STARTING CONSTRUCTION.

BANANA RIVER MHWL OF 2001

01/18/17

2.

LEGEND:

DATE:

D

NO UNDERGROUND UTILITY LINES HAVE BEEN LOCATED; ALL SITE FEATURES AND UNDERGROUND UTILITIES SHOWN ARE BASED ON PAFB GIS MAPPING AND SCALED AERIAL MAPS; 45TH SW TAKES NO RESPONSIBILITY FOR THE ACCURACY OF THESE LOCATIONS. EXTREME CAUTION SHALL BE USED TO MAINTAIN EXISTING UTILITIES.

6

D. LAVENDER

1.

5

4

DESIGNED BY:

GENERAL CONSTRUCTION NOTES:

3 SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS

USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL

2

SXHT 15-1005

1

SHEET IDENTIFICATION

C-001

B

A

2

3

4

5 CONSTRUCTION FLAG NOTES:

-2 .9

1.3

TOP OF BANK

.0 .94

2.4

85

'

3.2

10' WIDE DIRT ROAD

0.3

-0.4

.6 -2

3.0 3.2

2.3

FB

5

3.5

EMERGENCY REPAIR APPROX. 213 LF RIP-RAP PREVIOUSLY INSTALLED EARLY 2015 TO PROTECT EXISTING UTILITIES THAT HAD BECOME EXPOSED = 0.096 ACRES

SEE NORTH PLAN C-101 SEE SOUTH PLAN C-102

4+0

0

8

2.3 FM RW

3.3

CHORD 34.60' 56.02' 199.89' 56.32' 165.91'

CHORD BEARING

ID L1 L2 L3 L4 L5

BEARING

LENGTH 169.31' 6.39' 29.67' 24.35' 20.47'

3.6 5

-2. 9

3.1

3.1

FB

.8

-0

3.5

4

LENGTH 40.67' 56.45' 209.31' 56.51' 166.87'

LINE TABLE

3.6

L1

4

3.5

3.0

FB

2.6

FM RW

2.4

-1

.8

7 -0.

.7

-0

3.3

3.6

3

2.2

3+5 0

FM RW

-2. 4

5

3.6

2.3

DELTA ANGLE

3

2.7

-2.

.8

LEGEND: 5

3.6

3.5

3.2 3.4

-1

2.9

.9

E ROAD

9

FM

RW

.7

3.4

3.0

2.9 2.7

2.6

6

3

2

ROL LINE

3.5

-0.3

RW

9 3.6

4 3.5 3.4

2.4

2.2 -0.3

.9

1.8

1.0

.9 -1

-0

.7

2.3

4

-2

-2.

3.3

F ASPH

SAFE UPLAND LINE (OHWL) ELEVATION= 1.10' (1929 NGVD) ELEVATION= -0.32' (1988 NAVD)

3.7

1 2.3

2.7

3.5

9

.6 -1

.7 -2

1.2

6

-0 .7

WETLAND #2 (7-8-16) 7,352 SF = 0.169 AC WL-2 IMPACT = 1,431 SF = 0.033 AC

0 3.6

2 3.6

2.5

OVERALL SHORELINE PROTECTION PLAN

FM RW

0.4

N -0

.8

7 3

SCALE: 1" = 40'

-1

.8

-2.

1

ENGINEER OF RECORD: DAVID A. LAVENDER LICENSE NUMBER: 66400 NAME AND ADDRESS OF BUSINESS: ALLEN ENGINEERING, INC. 106 DIXIE LANE (P.O. BOX 321321) COCOA BEACH, FLORIDA 32932-1321 OFFICE: (321) 783-7443 - FAX: (321)783-5902 E-MAIL: INFO@ALLENENG.NET FL C.A. # LB 266 AEI #: 150005 RAEIS CONTRACT NO: FA2521-13-D-0005-0095

3.4

2.7

0

P

-3.

2

120'

11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE

WATER LEVEL LINE (4-02-15) 0.2

-1. -0 9.53 5 + I: 7 EP: 7+80.00

1.1

.7 -2

L5 7S+F 8 .7

FM RW

4 -2.

9

+3

PI: 7

80'

9 2.9

2.5

-0

FM RW

50 L74+

5.18

40'

GRAPHIC SCALE 1" = 40'

DO NOT DISTURB THIS PORTION OF WETLAND #2 EXISTING VEGETATION NOT DISTURBED = 5,291 SF = 0.136 AC

FB

8

0'

3.6

0 3.6

1

3.5

1.1

0.2

C

C-50

.6

0.0

3 -2.

ANK

-2

.8

-3

B OF

P

40'

RUNWAY 11/29

0.9

.8

WETLAND #1 (W1) IMPACTS = 3,360 SF (0.077 AC) WETLAND #2 (W2) IMPACTS = 1,431 SF (0.033 AC) TOTAL WETLAND IMPACTS = 4,791 SF (0.110 AC)

FM

RW

TOP

160.42'

L3

5.51

A

3.4

AS BUILT DATE:

####

SUBMITTED BY:

G. BEARD

0095

DELIVERY NO. FA2521-13-D-0005

J. KELLEY

REVIEWED BY:

LLEN E ngineering,Inc.

A B

WETLAND IMPACTS:

9

ALT

FB

SF

+0 T: 7

LENGTH OF WORK IN EXISTING SURFACE WATERS = 805 LF LENGTH OF NEW RIP-RAP ALONG SHORELINE = 490 LF SQUARE FEET OF WORK IN EXISTING SURFACE WATERS = 26,956 SF (0.619 AC)

3

EDGE O

1

SURFACE WATER IMPACTS:

2

FM

RW

.4

TYPE III SILT FENCE

4

3.6

.2

-2

SF

3.7

RW

FM

-0

6+50

.7

5

PROJECT CONTROL POINT NAIL & DISK STAMPED "TRAVERSE LB 266" N 1420838.300 E 779590.540 EL.= 1.91 FEET, NAVD 88

1.4

-2

.6

.8

C5 FB

-3

TYPE II FLOATING TURBIDITY BARRIER

C-501

-0

FB

7

2.0 Mid: 6+2

FB

A

FM

2.0

2

4

PROPOSED 188 LF RIP-RAP

3.2

SURVEY CONT

-0.1 2.3

.8 4 -1.

-0.7

3.6

3.4

2.6

-0.2

5+50 L2 .3 -2

2.2

0

3.6

.4 -2

-0

2.2

COQUINA ROCK BREAKWATERS 780 LINEAR FEET EXISTING WETLAND AREAS; 0.246 AC (10,712 SF)

3.6

2.5

.7

2.5

-2

1

C4 5+00

-2

3.6

2.3

.8

-0

PT: 5+32.25 PC: 5+38.64

6

FM

RW

.0

-1 .4

-1

B

FB

L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-100.dwg, 1/18/2017 11:10:27 AM, DWG To PDF.pc3

.7 2.7

3.7

AREA OF HARD ARMOR ROCK REVETMENT 0.139 AC (6,076 SF); 490 LINEAR FEET

RESCU

4+5

0

FM RW 2.4

2.4

-0

+03.99

AREA OF SOFT ARMOR FILL WITH SALT MARSH VEGETATION PLANTINGS 0.582 AC (25,360 SF)

7

C

3

4

5

6

OVERALL SHORELINE PROTECTION PLAN

3+00

8

3.5

FM

RW

1.9

RADIUS 21' 132' 200' 200' 450'

Oneida Total Integrated Enterprises

3.2

ID C1 C2 C3 C4 C5

RANGE ARCHITECT-ENGINEER, INSPECTION SERVICES

CURVE TABLE

7

RAEIS

S

CONTRACT NO.: FA2521-13-D-0005 - 0095

2.3

R

REPAIR RIVER SHORELINE, RUNWAY 11

0.4

ROL LINE SURVEY CONT

RE

E CU

3

4

.8

3.6

-1

GE

2 3.6

FM RW

FB

3.2

ED

D OA

USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL

-1.

8

FB

2+50

2.6

2.4

-2 .5

2.4

SP

A OF

9. SMALL VEGETATION CLUSTERS WITHIN LIMITS OF PROPOSED REVETMENT ARE TO BE REMOVED. COORDINATE WITH CONTRACTING OFFICER PRIOR TO ANY VEGETATION REMOVAL.

3.6

HA

FM

-2 .8

3.2 LT

-0

5.74

FB

Mid: 5

D. LAVENDER

2.6

2.4

4 3.6

2.6

1

2.5

1.9

.8

-0

6.42

.8

4+7

DRAWN BY:

2.6

2.2 2.2

2.4

7

3.5

8. EXISTING MANGROVE/VEGETATION TO REMAIN, ADJUST COQUINA BREAKWATER AS NEEDED, SEE DETAIL 'C' ON SHEET C-501.

3.5 RW

5

0.3

.7

3+0

D

3.0

2.5 2.5 2.4

-2 .4

0.4

8

-0 .7

3.4

4 3.6

3.3

2.1

.8 -0

2.5

2.1

-0

PC:

01/18/17

2.3

5 -1.

2

7. EXISTING RIP-RAP REVETMENT TO REMAIN, REMOVE 5' OF ROCK FROM EITHER END TO EXPOSE EXISTING FILTER FABRIC AND LAP SPLICE EXTENSION OF FILTER FABRIC TO CONTINUE RIP-RAP IN BOTH DIRECTIONS, REPLACE ROCK.

2.7

FB

3.4

-2 .9

3.1

6. TURN RIP-RAP REVETMENT BACK IN TOWARD SHORE TO ANCHOR.

7 3.4

BANK TOP OF

WATER LEVEL LINE (4-02-15)

4

-0

PT:

PROPOSED ACTION: FILL WITHIN WATERS OF THE BANANA RIVER FROM ELEV. -0.32 SAFE UPLAND LINE OUT TO ROCK BREAKWATER TOE PROTECTION LINE = 0.599 ACRES (26,106 SF)

PROPOSED 302 LF RIP-RAP

2.2

+01.77

MEAN HIGH WATER LEVEL LINE (2007) ELEVATION= 0.49' (1929 NGVD) ELEVATION= -0.93' (1988 NAVD)

C

5. CLEAN SAND FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL, PLACE FROM COQUINA BREAKWATER EASTERN TOE AT 14:1 FILL SLOPE TO MEET RIP-RAP REVETMENT. PLANT SALT MARSH VEGETATION AS DETAILED ON SHEET C-501.

SAFE UPLAND LINE (OHWL) ELEVATION= 1.10' (1929 NGVD) ELEVATION= -0.32' (1988 NAVD)

Mid: 2

MEAN HIGH WATER LEVEL LINE (2001) ELEVATION= 0.49' (1929 NGVD) ELEVATION= -0.93' (1988 NAVD)

DATE:

-0. 2 1.9

-0 .7

-0 .7

0.5

C3

MEAN HIGH WATER LEVEL LINE (2009) ELEVATION= 0.49' (1929 NGVD) ELEVATION= -0.93' (1988 NAVD)

D. LAVENDER

-0.4 2.0

-0 .8

-1 .3 -3 .3

FB

7

-0.

50 1+

4 -2.

2

BANANA RIVER

WETLAND #1 (7-8-16) 3,360 SF = 0.077 AC WL-1 IMPACT = 3,360 SF = 0.077 AC

2.5

0

4. CONCRETE RIP-RAP REVETMENT OVER FILTER FABRIC, SEE DETAIL ON SHEET C-501.

SXHT 15-1005

3.2

2.5 -0.8

-1 .7

1

C: R P

2.8

2.4

1 7.

+9

3. CLEAN FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL, PLACE FROM ELEVATION 2.5' OF TOP OF ROCK DOWN TO EXISTING TOP OF BANK ELEVATION VARIES FROM 1.9' TO 2.5'. SOD DISTURBED AREAS BEHIND RIP-RAP.

2.2

-0.5

2.5 2.3

-2 .2

00 1+

Mid: 0+68.89

PROJECT CONTROL POINT NAIL & DISK STAMPED "TRAVERSE LB 266" N 1421351.999 E 779635.217 EL.= 2.55 FEET, NAVD 88

2.5

.2 -0

FB

-3 .1

-0.7

-1 .4

0 - 0 .8 .2

-0 .7

2

-0.7

7 -0.

C2

-1.

-3 .2

.7 -0

1.2 1.0

2

PROPOSED ACTION: CUT UPLAND "PENINSULA" TO CREATE WATERS OF THE BANANA RIVER FROM ELEV. -1.8 TO TOE OF REVETMENT PROTECTION LINE. WORK WITHIN EXISTING WATERS = 0.020 ACRES (850 SF) AREA OF WATER CREATED = 0.029 ACRES (1253 SF)

3 2.8

-3 .6

2.7

1.5 1.7

-0.6 -1.

D

.6 -1

0+

: PCC

5

-3.

0 0+5

7 -1.

7 40.6

2. COQUINA ROCK BREAK WATER PLACED ON TOP OF WOVEN GEOTEXTILE FABRIC AS DETAILED ON SHEET C-501.

DESIGNED BY:

-1.6

6

BP: -0+00.00 3

2.9

C1

0.6

3.5

1.2

SF

3.3

-3. 8

5

DRAINAGE DITCH

-1 .2 -0 .9

.4 -1

-2.

1

-0+00

-1.6

RW

-2 .3

3

FM

.3

#

1. INSTALL AND MAINTAIN THROUGHOUT CONSTRUCTION TYPE II FLOATING TURBIDITY BARRIER. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH PERMIT CONDITIONS OF WORK IN WATERS OF THE STATE. REMOVE UPON PROJECT STABILIZATION COMPLETION.

RW

2 -3.

STA 0+00.00 BEGIN BREAKWATER CONSTRUCTION

FM

0+ 20

FB

M id:

6

SXHT 15-1005

1

SHEET IDENTIFICATION

C-100

A

2

3

4

5 CONSTRUCTION FLAG NOTES:

4

2.3

R

AREA OF HARD ARMOR ROCK REVETMENT 0.139 AC (6,076 SF); 490 LINEAR FEET

0.3

0 3+0

-0.4

2.3

.6

3.2

0'

20'

40'

60'

7

FB

0 3+5

3

ROC KS

.4

GRAPHIC SCALE 1" = 20'

3.6

-2

5

3.5

FM RW

5

3.0

2.3

2.2

.7

-0

8 -1.

11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE ENGINEER OF RECORD: DAVID A. LAVENDER LICENSE NUMBER: 66400 NAME AND ADDRESS OF BUSINESS: ALLEN ENGINEERING, INC. 106 DIXIE LANE (P.O. BOX 321321) COCOA BEACH, FLORIDA 32932-1321 OFFICE: (321) 783-7443 - FAX: (321)783-5902 E-MAIL: INFO@ALLENENG.NET FL C.A. # LB 266 AEI #: 150005 RAEIS CONTRACT NO: FA2521-13-D-0005-0095

2.4 2.6

SEE SHEET C-102

FM RW

FB

5

3.6

-2

TYPE III SILT FENCE

20'

EMERGENCY REPAIR 213 LF RIP-RAP PREVIOUSLY INSTALLED EARLY 2015 TO PROTECT EXISTING UTILITIES THAT HAD BECOME EXPOSED = 0.096 ACRES

NORTH SECTION SHORELINE PROTECTION PLAN

N

SCALE: 1" = 20'

2

SF

8

9'

2

1

TYPE II FLOATING TURBIDITY BARRIER

3.5

39.8

1

A

FB

1.9

-0.30 TOP -1.80 BOT.

3

AS BUILT DATE:

####

SUBMITTED BY:

G. BEARD

0095

DELIVERY NO. FA2521-13-D-0005

J. KELLEY

REVIEWED BY:

SXHT 15-1005 D. LAVENDER

DRAWN BY:

LLEN E ngineering,Inc.

A B

EXISTING WETLAND AREA

3.2

FM RW

1.9

6.42

.8

3+0

-0

PT:

01/18/17

COQUINA ROCK BREAKWATERS 780 LINEAR FEET

S RE

50

2.

.8

2.5

OL LINE SURVEY CONTR

2+50 4

2. 50

-1

.8

-1

2

FB

3.6 4

E U C

3

3.6

-2

1

3.5

2.6 FM

3.6

A OF

2.5

0.3

7

GE D E

3.2

RW

2.1

-0.

D A O

S

2.4 2.4

4

A PH

Oneida Total Integrated Enterprises

0.4

.8

FB

3.2 LT

FM

RW

8 -0. 0.4

AREA OF SOFT ARMOR FILL WITH SALT MARSH VEGETATION PLANTINGS 0.582 AC (25,360 SF)

RANGE ARCHITECT-ENGINEER, INSPECTION SERVICES

2.6

LEGEND:

RAEIS

2.9 4 3.6

2.1 SURVEYED WATER LEVEL LINE (4-02-15)

D

C

4

5

6

NORTH SECTION SHORELINE PROTECTION PLAN

-1 .5

-2 .9

FB

2.4

7 3.5

3'

5'

3.3

2.2

SAFE UPLAND LINE (OHWL) ELEVATION= 1.10' (1929 NGVD) ELEVATION= -0.32' (1988 NAVD)

2.7

4 3.6

5

7 3.4

BANK

4

15'

5 -2.

SURVEYED MEAN HIGH WATER LEVEL LINE (2007) ELEVATION= 0.49' (1929 NGVD) ELEVATION= -0.93' (1988 NAVD) SURVEYED MEAN HIGH WATER LEVEL LINE (2001) ELEVATION= 0.49' (1929 NGVD) ELEVATION= -0.93' (1988 NAVD)

ATER OF W

3' 5'

PROPOSED ACTION: FILL WITHIN WATERS OF THE BANANA RIVER FROM ELEV. -0.32 SAFE UPLAND LINE OUT TO ROCK BREAKWATER TOE PROTECTION LINE = 0.599 ACRES (26,106 SF)

2.2

12.00'

41.91'

Mid: 2

2.2

TOP OF

EDGE

' R200

4

2.6

FB

.4 -2

50

3

7 -0.

+01.77

B

2.4

70' -2.

2.6

2.5 2.5 0 2.5

.3

0.5

1+

23' 43.

BANANA RIVER SURVEYED MEAN HIGH WATER LEVEL LINE (2009) ELEVATION= 0.49' (1929 NGVD) ELEVATION= -0.93' (1988 NAVD)

WETLAND #1 (7-8-16) 3,360 SF = 0.077 AC WL-1 IMPACT = 3,360 SF = 0.077 AC

RW

-3

' 00 . 2 71 -0.

CONTRACT NO.: FA2521-13-D-0005 - 0095

2.4

3.0

-0 .7

P

1

L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-101.dwg, 1/18/2017 11:10:46 AM, DWG To PDF.pc3

PROPOSED 302 LF RIP-RAP

2.5

2.4

RC

-1 .3

-2 .2

-1. 7

' .92 8 2

3

2

97

2.8

2.3

3

REPAIR RIVER SHORELINE, RUNWAY 11

2.5

-0 . 1.9 2 -0 .7

.2 -0

+ :0

8. REMOVE EXISTING RUBBLE REVETMENT PENINSULA SOUTH OF DRAINAGE DITCH. EXCAVATE GRADE TO ELEVATION -1.2 UP TO PROPOSED LOCATION OF BREAKWATER. 9. INSTALL SILT FENCE PRIOR TO START OF WORK.

0 1 .1

7. EXISTING RIP-RAP REVETMENT TO REMAIN, REMOVE 5' OF ROCK FROM EITHER END TO EXPOSE EXISTING FILTER FABRIC AND LAP SPLICE EXTENSION OF FILTER FABRIC TO CONTINUE RIP-RAP IN BOTH DIRECTIONS, REPLACE ROCK.

PROJECT CONTROL POINT NAIL & DISK STAMPED "TRAVERSE LB 266" N 1421351.999 E 779635.217 EL.= 2.55 FEET, NAVD 88

2. 50 -0.4 2.0 -0. 8

2

DATE:

3.2

-0.5 ' 00 . 0

-0.7

Mid: 0+68.89

6. TURN RIP-RAP REVETMENT BACK IN TOWARD SHORE TO ANCHOR.

D. LAVENDER

3.3

2.5

2.7

0 .5 0' -0 2.0 1

-1 .4

-0 .2 -0.7

10' WIDE DIRT ROAD

2.2

-0.8

S RO CK

2.3

1

-0 -0 .7 .7

' -0.6 32

R1 1.0

5. PLACE CLEAN SAND FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL FROM COQUINA BREAKWATER EASTERN TOE AT 14:1 FILL SLOPE TO MEET RIP-RAP REVETMENT. PLANT SALT MARSH VEGETATION AS DETAILED ON SHEET C-501.

2.8

0 1+

-3 .1

3.2

-3 .2

'

2

-3 .6

.94

1

2.5

7 -0.

.2 -1 FB 2

PROPOSED ACTION: CUT UPLAND "PENINSULA" TO CREATE WATERS OF THE BANANA RIVER FROM ELEV. -1.8 TO TOE OF REVETMENT PROTECTION LINE. WORK WITHIN EXISTING WATERS = 0.020 ACRES (850 SF) AREA OF WATER CREATED = 0.029 ACRES (1253 SF)

1.2

2 -1.

0.8

0 7 0+5 1.

P

-0.30 TOP -1.80 BOT.

1.5

.7 -1

0.67

0+4 CC:

.6 -1

-

3.5

TOP OF BANK

3.0

85

2.4

-0.30 TOP -1.80 BOT.

4. CONCRETE RIP-RAP REVETMENT OVER FILTER FABRIC, SEE DETAIL ON SHEET C-501.

DESIGNED BY:

2. 50

-1.6

1.3

0.6BP: -0+00.00

-0.50

8

6

USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL

0 .5 0 -

3.5

1.2

-0. 9

T. O .R -1. . 2

.4 -1

0.30 TOP -1.20 BOT.

-1.6

DRAINAGE DITCH

' -0+00 -0.50 SF

FM

R2 1 .3 ' 3 -2. 5

20

3. PLACE CLEAN FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL FROM ELEVATION 2.5' OF TOP OF ROCK DOWN TO EXISTING TOP OF BANK ELEVATION VARIES FROM 1.9' TO 2.5'. SOD ALL DISTURBED AREAS BEHIND RIP-RAP.

RW

0+

18.50

FM

-2. 3

STA 0+00.00 BEGIN BREAKWATER CONSTRUCTION

FB

2

-3.

D

C

2. 3' WIDE COQUINA ROCK BREAK WATER PLACED ON TOP OF WOVEN GEOTEXTILE FABRIC AS DETAILED ON SHEET C-501.

9

8 -3.

id:

#

1. INSTALL AND MAINTAIN THROUGHOUT CONSTRUCTION TYPE II FLOATING TURBIDITY BARRIER. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH PERMIT CONDITIONS OF WORK IN WATERS OF THE STATE. REMOVE UPON PROJECT STABILIZATION COMPLETION.

9 -2.

M

6

SXHT 15-1005

1

SHEET IDENTIFICATION

C-101

A

3

2

5

3.6 8

-1 .4

6

0

3

PROPOSED 188 LF RIP-RAP

3.2

-0.3

9

FM

RW

2.0

4 3.5

PROJECT CONTROL POINT NAIL & DISK STAMPED "TRAVERSE LB 266" N 1420838.300 E 779590.540 EL.= 1.91 FEET, NAVD 88

3.4

2.4

2.2

3.6

-0.7

.8

-0

FB

1.8

1.0

.9

2.3

2. 50

.7 -0

3.3

-1

-3 .7

8

2. 50

2.7 3.4

50 2.3

1 00' .2

0.9

12.

-1 .6

-0 .8

2.

8

-2 .7

.3

0.0

1.1

-2

50 2.

0

3.6

2.5

2.9

-0 .6

FM

9RW

2

11

3.4

2.7

2 3.6

0 3.6

N

SOUTH SECTION SHORELINE PROTECTION PLAN SCALE: 1" = 20'

2.5

1.1

-0 .7

0.2

9

.9

-1

-2 .4

.7 -2

1

EP: 7+80.00

1.25 TOP -0.25 BOT.

20'

40'

ENGINEER OF RECORD: DAVID A. LAVENDER LICENSE NUMBER: 66400 NAME AND ADDRESS OF BUSINESS: ALLEN ENGINEERING, INC. 106 DIXIE LANE (P.O. BOX 321321) COCOA BEACH, FLORIDA 32932-1321 OFFICE: (321) 783-7443 - FAX: (321)783-5902 E-MAIL: INFO@ALLENENG.NET FL C.A. # LB 266 AEI #: 150005 RAEIS CONTRACT NO: FA2521-13-D-0005-0095

SURVEYED WATER LEVEL LINE (4-02-15) 10

0'

60'

11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE

FM RW

0.90 TOP -0.60 BOT.

7+8 SF 0

TYPE III SILT FENCE

GRAPHIC SCALE 1" = 20'

3.5

1.50 TOP 0.00 BOT.

0

9.53 5 + PI: 7

SF

3.6 9

.4 -2 -2 .4

-3 .7

LT

FM

7+5

P 0.70 TOP -0.80 BOT.

TYPE II FLOATING TURBIDITY BARRIER

20'

.18

35 I: 7+

FB

DO NOT DISTURB THIS PORTION OF WETLAND #2 EXISTING VEGETATION NOT DISTURBED = 5,921 SF = 0.136 AC

0.2

3

AS BUILT DATE:

####

SUBMITTED BY:

G. BEARD

0095

DELIVERY NO. FA2521-13-D-0005

SXHT 15-1005

01/18/17

J. KELLEY

REVIEWED BY:

D. LAVENDER

DRAWN BY:

LLEN E ngineering,Inc.

A B

EXISTING WETLAND AREA

K

8

COQUINA ROCK BREAKWATERS 780 LINEAR FEET

FB

2

A

4

WETLAND #2 (7-8-16) 7,352 SF = 0.169 AC WL-2 IMPACT = 1,431 SF = 0.033 AC

BAN

0.10 TOP -1.40 BOT.

AREA OF HARD ARMOR ROCK REVETMENT 0.139 AC (6,076 SF); 490 LINEAR FEET

5

1

3.7

9 3.5

OF

7+

160.42'

PT:

RW

TOP

.8

-2

1

FM

RW

WATER

9'

51.8

1 05.5

3

6

SF

-0.30 TOP -1.80 BOT.

AREA OF SOFT ARMOR FILL WITH SALT MARSH VEGETATION PLANTINGS 0.582 AC (25,360 SF)

SAFE UPLAND LINE ELEVATION= 1.10' (1929 NGVD) ELEVATION= -0.32' (1988 NAVD)

F ASPHA

EDGE OF

6+50

FB

SURVEYED MEAN HIGH WATER LEVEL LINE (2009) ELEVATION= 0.49' (1929 NGVD) ELEVATION= -0.93' (1988 NAVD)

FB

L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-102.dwg, 1/18/2017 11:18:04 AM, DWG To PDF.pc3

BANANA RIVER

LEGEND:

9

4

.2

3.7

-0

3.6 2

EDGE O

B

ANA RIVER

RW

12.00'

35.77'

R450' 2.07 Mid: 6+2

FM

-2

.9

1.4

-2 .6

-0.3

C

Oneida Total Integrated Enterprises

.3 -2

2.2

3.6

3.5

2.5

2.2

-

2

7

4

5

6

REPAIR RIVER SHORELINE, RUNWAY 11

2.5

-2 .7

FB

0.8

7

-0.1 2.3

7

5+50

PC: 5+38.64

11. INSTALL SILT FENCE PRIOR TO STARTING WORK.

3.4

SURVEY CONT ROL LINE

-0.2

PT: 5+32.25

2.7

2.6 2.6 2. 50

.8 -0

C

3.6

2.3

FM

RW

2.7

.4

-1

.0

10.SLOPE COQUINA ROCK BREAKWATER UP STARTING AT STA. 7+00 AND ANGLE THE END SECTION TOWARD THE SHORELINE WITH THE ROCKS PARTIALLY BURIED TO MEET EXISTING CONTOURS.

3.6

-1

RANGE ARCHITECT-ENGINEER, INSPECTION SERVICES

R200'

RAEIS

9. SMALL MANGROVE CLUSTERS WITHIN LIMITS OF PROPOSED REVETMENT ARE TO BE REMOVED.

CONTRACT NO.: FA2521-13-D-0005 - 0095

2.9

3.0

6

1

5+00

3.6

-2 .4

.7

3.7

8. EXISTING MANGROVES / BUTTONWOODS TO REMAIN, ADJUST COQUINA BREAKWATER AS NEEDED, SEE DETAIL C ON SHEET C-501

SOUTH SECTION SHORELINE PROTECTION PLAN

ROAD

-2 .7

2.4

-0

FB

3.4

7. EXISTING RIP-RAP REVETMENT TO REMAIN, REMOVE 5' OF ROCK FROM EITHER END TO EXPOSE EXISTING FILTER FABRIC AND LAP SPLICE EXTENSION OF FILTER FABRIC TO CONTINUE RIP-RAP IN BOTH DIRECTIONS, REPLACE ROCK.

RESCU E

6

FM RW

7'

+03.99

DATE:

3.2 3.4

5.74

6. TURN RIP-RAP REVETMENT BACK IN TOWARD SHORE SLOPING UP TO ANCHOR.

USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL

ROC

.9

-1

4+5 0 5' 15'

6

4+7

39.9

Mid: 5

D

KS

9 3.6

5

.8 -0

PC:

3.5

5. PLACE CLEAN SAND FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL FROM COQUINA BREAKWATER EASTERN TOE AT 14:1 FILL SLOPE TO MEET RIP-RAP REVETMENT. PLANT SALT MARSH VEGETATION AS DETAILED ON SHEET C-501.

EMERGENCY REPAIR 213 LF RIP-RAP PREVIOUSLY INSTALLED EARLY 2015 TO PROTECT EXISTING UTILITIES THAT HAD BECOME EXPOSED = 0.096 ACRES

2.9

2.4

-0.30 TOP -1.80 BOT.

FM RW

SURVEYED MEAN HIGH WATER LEVEL LINE (2001) ELEVATION= 0.49' (1929 NGVD) ELEVATION= -0.93' (1988 NAVD)

DESIGNED BY:

3.3

3.1

2.7

.8

5'

3'

4. CONCRETE RIP-RAP REVETMENT OVER FILTER FABRIC, SEE DETAIL ON SHEET C-501.

5

-0

3'

.3 -2

D. LAVENDER

4+0 0

70'

FB

5

-2

3.6

.9

3. PLACE CLEAN FILL OBTAINED FROM PAFB MARINA DREDGE SPOIL FROM ELEVATION 2.5' OF TOP OF ROCK DOWN TO EXISTING TOP OF BANK ELEVATION VARIES FROM 1.9' TO 2.5'. SOD ALL DISTURBED AREAS BEHIND RIP-RAP

4 3.5

D

3.1

#

2. 3' WIDE COQUINA ROCK BREAK WATER PLACED ON TOP OF WOVEN GEOTEXTILE FABRIC AS DETAILED ON SHEET C-501.

FM RW

.8

2

-0

SURVEYED MEAN HIGH WATER LEVEL LINE (2007) ELEVATION= 0.49' (1929 NGVD) ELEVATION= -0.93' (1988 NAVD)

2.3

1

6

1. INSTALL AND MAINTAIN THROUGHOUT CONSTRUCTION TYPE II FLOATING TURBIDITY BARRIER. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH PERMIT CONDITIONS OF WORK IN WATERS OF THE STATE. REMOVE UPON PROJECT STABILIZATION COMPLETION.

4 3.5

.7 -0

3.0 3.3

FB

FM

2.6

RW

SEE SHEET C-101

5 CONSTRUCTION FLAG NOTES:

4

SXHT 15-1005

1

SHEET IDENTIFICATION

C-102

A

3

4

4

3

1 0

4 PROPOSED GRADE (TYP.)

3

10

APPROX. ADDITIONAL EROSION 1 SINCE SURVEY 0 2

-1

-1

-2

-2

-3

-3

5

BANANA RIVER WATERWARD EDGE OF BREAKWATER (TYP.) FLOATING TURBIDITY BARRIER -0.32 SAFE UPLAND LINE

14 :1 FILL

-80.0 -70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 SECTION 5

-50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 SECTION 2

20' 2.5'

TOP OF REVETMENT EL. 2.5 (TYP.)

%

2

3'

-0.93 MHWL EXIST. GRADE (TYP.) COQUINA BREAKWATER

TOE OF REVETMENTSALT MARSH

3 2 1 0 -1 -2 -3

LEGEND:

-80.0 -70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 SECTION 8

EXISTING GRADE

3

WATERWARD EDGE OF BREAKWATER (TYP.) FLOATING TURBIDITY BARRIER -0.32 SAFE UPLAND LINE

FILL

-3

EXIST. FM & RW TOE OF -2 REVETMENT -3

SALT MARSH -1.98

-2

-0.93 MHWL EXIST. GRADE (TYP.) COQUINA BREAKWATER

-1

-1.89 -1.80/-0.30

-1

-70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 SECTION 4

2

14 :1

BANANA RIVER

3

20'

40'

AS BUILT DATE:

####

SUBMITTED BY:

G. BEARD

0095

01/18/17 D. LAVENDER

60'

2.50

GRAPHIC SCALE 1" = 20'

1 0 -1 -2 -3

5

0'

2

-80.0 -70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 SECTION 7

4

20'

SCALE: VERTICAL: 1" = 2' HORIZONTAL: 1" = 20' 11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE ENGINEER OF RECORD: DAVID A. LAVENDER LICENSE NUMBER: 66400 NAME AND ADDRESS OF BUSINESS: ALLEN ENGINEERING, INC. 106 DIXIE LANE (P.O. BOX 321321) COCOA BEACH, FLORIDA 32932-1321 OFFICE: (321) 783-7443 - FAX: (321)783-5902 E-MAIL: INFO@ALLENENG.NET FL C.A. # LB 266 AEI #: 150005 RAEIS CONTRACT NO: FA2521-13-D-0005-0095

6

LLEN E ngineering,Inc.

J. KELLEY

REVIEWED BY:

D. ARTZNER

DRAWN BY:

A

REPAIR RIVER SHORELINE, RUNWAY 11

0

DATUM: ELEVATIONS SHOWN BASED ON NAVD '88 (NAVD '88 + 1.42' = NGVD '29)

SXHT 15-1005

1

20.0

5

-2.07

1

APPROX. ADDITIONAL EROSION 1 SINCE SURVEY 0

-1.70 -1.30

-3

-3

2

-1.41 -0.59

SALT MARSH

2

0%

-1.05 0.13

-2

-50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 SECTION 1

1

TOE OF REVETMENT

3

PROPOSED GRADE (TYP.)

-0.23 0.84

-1

-1

-0.93 MHWL EXIST. GRADE (TYP.) COQUINA BREAKWATER

3

20' 1.9'

PROP. GRADE

B

4

1.79 2.38

FILL

4

2.69

0

0

-2.15

-2.00

0.60 -1.80/-0.30

1.64 -1.21

2.15

COQUINA BREAKWATER

14 :1

WATERWARD EDGE OF BREAKWATER (TYP.) FLOATING TURBIDITY BARRIER -0.32 SAFE UPLAND LINE

4

3'

EXIST. GRADE

TOP OF REVETMENT EL. 2.5 (TYP.)

3.57

SALT MARSH

-3

EXIST. GRADE (TYP.)

1

1

-2

-1.71 -1.80

-2

2.44 -0.50

A

-0.93 MHWL

:1

TOE OF REVETMENT

2.09 2.00

-1

14

% 10

BANANA RIVER

5

-2.02

0

2

2

PROPOSED GRADE (TYP.)

-1.82

CUT

3

TOP OF REVETMENT EL. 2.5 (TYP.)

5

37'

4:1

FILL

3

3.5' 12'

8.6'

4:1

2

WATERWARD EDGE OF BREAKWATER (TYP.) FLOATING TURBIDITY BARRIER -0.32 SAFE UPLAND LINE

4

20'

-1.63 -1.80/-0.30

10

%

3

BANANA RIVER

4

3'

-1.44 -1.30

PROPOSED GRADE (TYP.)

5

5

35.5'

12'

-1.25 -0.59

TOP OF REVETMENT EL. 2.5 (TYP.)

4

1

1.2'

16.75'

-1.01 0.13

12'

-0.33 0.83

3'

2.29 2.50

5

17'

2.38

3.7' 12'

5+50

1.42

2+50

0+50.00

DELIVERY NO. FA2521-13-D-0005

SXHT 15-1005

DATE: DESIGNED BY:

PROPOSED GRADE

C

Oneida Total Integrated Enterprises

5

31'

RANGE ARCHITECT-ENGINEER, INSPECTION SERVICES

-1.70 -1.30

-3 -1.41 -0.59

-3

SALT MARSH -1.05 0.13

-2

TOE OF REVETMENT

-3

CROSS SECTIONS

-0.93 MHWL EXIST. GRADE (TYP.) COQUINA BREAKWATER

5

12'

-1.38 -1.30

WATERWARD EDGE OF BREAKWATER (TYP.) FLOATING TURBIDITY BARRIER -0.32 SAFE UPLAND LINE

-1

-2

7.7'

BANANA RIVER

14 :1

-2

-70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 SECTION 9

-1.03 -0.59

EXIST. FM & RW

-1

RAEIS

-3

SECONDARY BREAKWATER

0

CONTRACT NO.: FA2521-13-D-0005 - 0095

-3

EXISTING VEGETATION TO REMAIN

-0.93 MHWL EXIST. GRADE (TYP.) COQUINA BREAKWATER

D

1

USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL

-2

-0.84 0.13

1

-1.91

-1.06 -1.80

COQUINA BREAKWATER

0.41 -1.80

-0.50 -1.80/-0.30

B

20' 1.9'

PROPOSED GRADE (TYP.)

% 10

2

-1

CUT

SECONDARY BREAKWATER

3'

FILL

-0.93 MHWL

0.34 -1.40/0.10

2.16

SALT MARSH

4:1

L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-301.dwg, 1/18/2017 11:11:22 AM, DWG To PDF.pc3

-3

TOE OF REVETMENT

2.42 -0.50

-2

0

14 :1

2.32 2.00

-1

-0.32 SAFE UPLAND LINE 0

0.71 -1.80

0

3

-0.23 0.84

CUT

-2

4:1

4:1

FILL

4

37'

4:1

2

4 BANANA RIVER 3 WATERWARD EDGE OF BREAKWATER 2 EXIST. (TYP.) FLOATING GRADE TURBIDITY 1 (TYP.) BARRIER

1.79 2.38

10

%

3

-1

2

6+50

TOP OF REVETMENT EL. 2.5 (TYP.)

RESCUE RD.

2.69

PROPOSED GRADE (TYP.)

12'

5

5

TOP OF REVETMENT EL. 2.5 (TYP.)

4

1

1.2'

46'

3.57

5

-1

3+50

3' 5' 3'

9'

0

-80.0 -70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 SECTION 6

0+68.89 3.5' 12'

0

3

-1.61

-3

1

BANANA RIVER

-2.22

SECONDARY BREAKWATER

1

4

-1.09

-3

SALT MARSH

2

0.97 0.00/1.50

-2

TOE OF EXIST. REVETMENT

2

20'

WATERWARD EDGE OF BREAKWATER (TYP.) FLOATING TURBIDITY BARRIER -0.32 SAFE UPLAND LINE

0.90

-2

-70.0 -60.0 -50.0 -40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 SECTION 3

C

-0.93 MHWL EXIST. GRADE (TYP.) COQUINA BREAKWATER

-1

3

0.43

-1

3

3' 5' 3'

WETLAND AREA #2 DO NOT DISTURB

0.53

FILL

-1.99

-1.86

-1.73 -1.80/-0.30

-1.21 -0.04

-0.18 2.50

2.30

-3

SECONDARY BREAKWATER

0

:1

4

-0.02 1.38

SALT MARSH

-1.58

-2

0

14

EXIST. FM & RW

4

25.9'

5

1.46 2.24

TOE OF REVETMENT

-0.84 0.67

-1

-0.93 MHWL EXIST. GRADE (TYP.) COQUINA BREAKWATER

FILL

1

5

2.19

0

1

5

-2.07

14 :1

2

-2.05

FILL

2

WATERWARD EDGE OF BREAKWATER (TYP.) FLOATING TURBIDITY BARRIER -0.32 SAFE UPLAND LINE

-1.98

1

3

-2.00 -1.80/-0.30

4:1

2

3

23.1'

BANANA RIVER

-1.89 -1.80/-0.30

%

10

WATERWARD EDGE OF BREAKWATER (TYP.) FLOATING TURBIDITY BARRIER -0.32 SAFE UPLAND LINE

3.21

3

4

RESCUE RD.

-1.95 -1.40/0.10

PROPOSED GRADE (TYP.)

-1.45 -0.76

D

4 BANANA RIVER

20' 3.1'

TOP OF EXIST. REVETMENT EL. 2.4 (TYP.) PROPOSED GRADE (TYP.)

-1.69 -0.59

4

5

3' 5' 3'

1.62

5

TOP OF REVETMENT EL. 2.5 (TYP.)

-1.27 0.13

5.6'

5

29'

2.70

12'

6

7+50

-2.12

20'

-0.23 0.84

3' 5' 3'

28'

2.28

12'

4+50

2.82

6.7'

5

-2.01

1+50

4

-0.33 -0.80/0.70

2

-1.72 -1.80/-0.30

1

SHEET IDENTIFICATION

C-301

A

1

2

3

4

5

6 6.0

6.0

(VARIES SEE PLAN) 40' (VARIES SEE PLAN) 27'

C

EXISTING WATERS EDGE @ SAFE UPLAND LINE / OHWL PER FDEP = 1.1 NGVD = -0.32 NAVD -80

-60

EL. -1.4 SLO PE 1:14

-20

DISTANCE (FT)

A C-501

SCALE: HORIZ.:1" = 5'; VERT.:1"=1'

EXISTING GRADE RIVER BOTTOM

WOVEN GEOTEXTILE FABRIC BELOW BREAKWATER

0 20 NOTE: SPOT ELEVATIONS SHOWN ON TYPICAL CROSS SECTION REPRESENT THE TYPICAL VALUE, BUT THE CONTRACTOR SHALL FOLLOW THE DESIGN GRADES SHOWN ON THE PLANS AND SPECIFIC CROSS SECTIONS WHICH HAVE SOME VARYING ELEVATIONS ALONG THE COURSE OF THE SHORELINE WORK AREA.

6.0

EXISTING MANGROVE OR BUTTONWOOD CLUSTER

3'

3'

20'

LEGEND:

MAINTAIN MIN. 3' CLEAR FROM TRUNK OR EXPOSED ROOT OF VEGETATION TO REMAIN

5'

70'

(VARIES)

17'

5'

3'

15'

3'

60'

5'

CLEAN SAND FILL @ 14:1 SLOPE

EL. -0.68 15'

4.0 DO NOT DISTURB PORTION OF EXISTING WETLAND #2 VEGETATION

HARD ARMOR RIP-RAP REVETMENT OR COQUINA ROCK BREAKWATERS

2.0

EL. 1.1 EL. 0.8

0.0

TYPE II FLOATING TURBIDITY BARRIER DURING CONSTRUCTION 0.0

SAFE UPLAND LINE OHWL -0.32, NAVD SURVEY 4-2-15 WL -0.74, NAVD

BANANA RIVER MHWL -0.93, NAVD

3' PLAN VIEW

TYPICAL BREAKWATER & PLANTING LAYOUT DETAIL

-2.0

-2.0 -20

0 DISTANCE (FT)

TYPICAL SECTION AT MANGROVE / BUTTONWOOD

C-501

SCALE: N.T.S.

1

B

WOVEN GEOTEXTILE FABRIC BELOW BREAKWATER

CLEAN SAND FILL OBTAINED FROM PAFB DREDGE SPOIL AREA (TYP.)

SCALE: HORIZ.:1" = 5'; VERT.:1"=1'

2

3

4

AS BUILT DATE:

####

SUBMITTED BY:

G. BEARD

0095

DELIVERY NO. FA2521-13-D-0005

J. KELLEY

REVIEWED BY:

SXHT 15-1005

A B

AREA OF SUITABLE BACKFILL WITH BAHIA SOD

11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE

EL. -0.7

75'

C

TOE ANCHOR STONE WITH GEOTEXTILE FABRIC

2.0

EXISTING WETLAND #2 VEGETATION AREA

A

CLEAN SAND FILL, 14:1 SLOPE

ELEVATION (FT, NAVD)

PRIMARY COQUINA ROCK BREAKWATER

AREA OF SOFT ARMOR FILL WITH SALT MARSH VEGETATION PLANTINGS

PRIMARY 3' WIDE x 1'-6" HIGH (2) 18" SIZE COQUINA ROCK BREAKWATER TOP EL. 0.8 BOTTOM EL. -0.7 ELEVATION (FT, NAVD)

SECONDARY COQUINA ROCK BREAKWATER

4.0

SALT MARSH PLANTINGS SPACED @ 36" O.C. ON CLEAN SAND FILL

20'

SALTMARSH PLANTINGS STAGGER ROWS

(VARIES)

B

5'

L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-501.dwg, 1/18/2017 11:11:38 AM, DWG To PDF.pc3

EL. -1.8 -2.0

6.0

CONCRETE RIP-RAP REVETMENT

BANANA RIVER MHWL -0.93, NAVD

PROPOSED WATERS EDGE @ MHWL

CLEAN SAND FILL SLOPED @ 1' VERTICAL TO 14' HORIZONTAL

-40

TYPICAL CROSS SECTION DETAIL

EL. -0.3 SURVEY 4-2-15 WL -0.74, NAVD

EL. -0.68

EXISTING WATERS EDGE @ MHWL

-2.0

-100

14:1

Oneida Total Integrated Enterprises

TOE STONE ANCHOR WRAPPED IN FILTER FABRIC

PE

20

C C-501

5

ENGINEER OF RECORD: DAVID A. LAVENDER LICENSE NUMBER: 66400 NAME AND ADDRESS OF BUSINESS: ALLEN ENGINEERING, INC. 106 DIXIE LANE (P.O. BOX 321321) COCOA BEACH, FLORIDA 32932-1321 OFFICE: (321) 783-7443 - FAX: (321)783-5902 E-MAIL: INFO@ALLENENG.NET FL C.A. # LB 266 AEI #: 150005 RAEIS CONTRACT NO: FA2521-13-D-0005-0095

6

TYPICAL CROSS SECTION DETAIL

EL. -0.5

0.0

SAFE UPLAND LINE OHWL -0.32, NAVD

REPAIR RIVER SHORELINE, RUNWAY 11

3'

SLO

RANGE ARCHITECT-ENGINEER, INSPECTION SERVICES

1 4: EL. 0.1

D

LLEN E ngineering,Inc.

E EL. 0.75

NON-WOVEN GEOTEXTILE FABRIC BELOW RIP-RAP REVETMENT

0.0

TYPE II FLOATING TURBIDITY BARRIER DURING CONSTRUCTION

RAEIS

OP SL

BACKFILL BEHIND RIP-RAP REVETMENT AT 10% SLOPE MAX TO MATCH EXISTING GRADE, RESTORE DISTURBED AREA WITH CERTIFIED WEED-FREE BAHIA SOD.

2.0

D. ARTZNER

2.0

CONTRACT NO.: FA2521-13-D-0005 - 0095

SECONDARY 3' WIDE x 1'-6" HIGH (2) 18" SIZE COQUINA ROCK BREAKWATER TOP EL. 0.1 BOTTOM EL. -1.4 PRIMARY 3' WIDE x 1'-6" HIGH (2) 18" SIZE COQUINA ROCK BREAKWATER TOP EL. -0.3 BOTTOM EL. -1.8

DRAWN BY:

SALTMEADOW CORDGRASS; (SPARTINA PATENS) SPACED @ 36" O.C.

01/18/17

4.0 DATE:

EL. 2.5

EL. 2.25

(VARIES) 17'

12'

MIX OF SEASHORE PASPALUM (PASPALUM VAGINATUM) & SEA-OX-EYE DAISY (BORRICHIA FRUTESCENS) SPACED @ 36" O.C.

EXISTING GRADE

20'

D. LAVENDER

8'

3'

DESIGNED BY:

EL. 3.55

SALTMARSH PLANTINGS (VARIES) 20'

5'

SXHT 15-1005

EL. 3.7

3'

USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL

CONCRETE RIP-RAP REVETMENT TOP EL. 2.5 TOE EL. -0.5

4.0

ELEVATION (FT, NAVD)

12' RIP-RAP

EXISTING RESCUE ROAD

D

(VARIES) 7'

30'

ELEVATION (FT, NAVD)

24'

SHEET IDENTIFICATION

C-501

A

1

2

3

4

5

6

15"-18"

CLEAN SAND FILL AT 14:1 SLOPE WITH SALTMARSH PLANTINGS

12"

6"

2'

ELEVATION

SHORELINE RIP-RAP REVETMENT DETAIL

1 C-502

SALTMARSH PLANTING DETAIL

2 C-502

SCALE: NONE

SCALE: NONE

3 C-502

VINYL SHEATHED EAW STEEL CABLE (9800 LBS. BREAKING STRENGTH) WITH GALVANIZED CONNECTORS (TOOL FREE DISCONNECT) CLOSED CELL SOLID PLASTIC FOAM FLOTATION (8" DIA. EQUIV.) (17 LBS. PER FT. BUOYANCY)

SLOTTED PVC CONNECTOR PIPE (METAL COLLAR REINFORCED)

B 18 OZ. NYLON REINFORCED PVC FABRIC (300 PSI TEST)

STRESS PLATE

5 " 16

GALVANIZED CHAIN

(2) 18" DIAMETER COQUINA BOULDERS

1

RIVER BOTTOM EXISTING GRADE

14

MIRAFI HP 370 (OR EQUAL WOVEN GEOTEXTILE)

COQUINA ROCK BREAKWATER DETAIL

4 C-502

5 C-502

SCALE: NONE

11x17 DRAWING SIZE IS HALF SIZE OF NOTED SCALE

NOTES: 1. THE CONTRACTOR SHALL INSPECT THE TURBIDITY BARRIER TO ENSURE PROPER MAINTENANCE AND FUNCTION. 2. THE ROUTINE INSPECTIONS OF THE BARRIERS SHALL INCLUDE ANY SIGNS OF DISTRESSED WILDLIFE. CEI SHALL BE NOTIFIED IMMEDIATELY TO RESPOND IF ANY DISTRESSED WILDLIFE ARE FOUND.

1

AS BUILT DATE:

####

SUBMITTED BY:

G. BEARD

0095

J. KELLEY

REVIEWED BY:

A

CLEAN SAND FILL AT 14:1 SLOPE

BANANA RIVER MHWL -0.93, NAVD

NOTE: COMPONENTS OF TYPE II MAY BE SIMILAR OR IDENTICAL TO PROPRIETARY DESIGNS. ANY INFRINGEMENT ON THE PROPRIETARY RIGHTS OF THE DESIGNER SHALL BE THE SOLE RESPONSIBILITY OF THE USER. SUBSTITUTIONS FOR TYPE II SHALL BE AS APPROVED BY THE ENGINEER.

FLOATING TURBIDITY BARRIER

D. ARTZNER

SHORE SIDE

TYPE II

D1 = 5' STD. (SINGLE PANEL FOR DEPTHS 5' OR LESS). D2 = 5' STD. (ADDITIONAL PANEL FOR DEPTHS > 5'). CURTAIN TO REACH BOTTOM UP TO DEPTHS OF 10 FEET. TWO (2) PANELS TO BE USED FOR DEPTHS GREATER THAN 10 FEET UNLESS SPECIAL DEPTH CURTAINS SPECIFICALLY CALLED FOR IN THE PLANS OR AS DETERMINED BY THE ENGINEER.

A

3'

B

1.5'

D2

WATER SIDE

SXHT 15-1005

D1

L:\Engineering\DWG\2015\150005 Repair River Shoreline RWY 11\15-1005 C-502.dwg, 1/18/2017 11:11:53 AM, DWG To PDF.pc3

5 " 16

C

2

ENGINEER OF RECORD: DAVID A. LAVENDER LICENSE NUMBER: 66400 NAME AND ADDRESS OF BUSINESS: ALLEN ENGINEERING, INC. 106 DIXIE LANE (P.O. BOX 321321) COCOA BEACH, FLORIDA 32932-1321 OFFICE: (321) 783-7443 - FAX: (321)783-5902 E-MAIL: INFO@ALLENENG.NET FL C.A. # LB 266 AEI #: 150005 RAEIS CONTRACT NO: FA2521-13-D-0005-0095

3

4

5

6

MISCELLANEOUS DETAILS

SCALE: NONE

NOTES: 1. SEE TYPICAL SECTION FOR PLANT SPECIES AND ZONES FOR SPECIFIC SPECIES. 2. THE PLANTING HOLE SHALL BE THE SAME SIZE OR ONLY SLIGHTLY LARGER THAN THE ROOTBALL AND DEEP ENOUGH THAT THE TOP OF ROOTBALL IS FLUSH OR SLIGHTLY BELOW GROUND, BUT NOT MORE THAN 2" BELOW GROUND. 3. SETTLE SOIL TIGHTLY AROUND ROOT BALL OF EACH PLANT TO PREVENT WOBBLING, PLANTS SHALL REMAIN UPRIGHT AFTER PLANTING.

REPAIR RIVER SHORELINE, RUNWAY 11

SILT FENCE DETAIL

PLAN

Oneida Total Integrated Enterprises

14

RANGE ARCHITECT-ENGINEER, INSPECTION SERVICES

1

LLEN E ngineering,Inc.

FILTER FABRIC (IN CONFORMANCE WITH SEC. 985 FDOT SPEC.)

HIGHLY PERMEABLE BACKFILL LAYER OF CLEAN SAND 6" MIN. " 12 NOTES: 1. INSTALL MIRAFI S 1600 FILTER FABRIC (OR EQUAL) AND ANCHORS PER 1 MANUFACTURER'S INSTRUCTIONS. 4 2. BOTH ENDS OF REVETMENT MUST TURN EL. -0.50 BACK TO THE SHORELINE IN ORDER TO ANCHOR TOE OF REVETMENT PREVENT FLANKING. W/ 2' DIA. ROCK 3. THE REVETMENT MUST CONNECT TO THE FILL 12"x6" EXISTING SHORELINE REVETMENT AT FOLD W/PEA CENTER SECTION OF PROJECT WITH 5' GRAVEL HORIZONTAL OVERLAP OF GEOTEXTILE FABRIC. 4. CONCRETE RIP-RAP SHALL BE FREE OF DEBRIS AND CONTAIN NO METAL OR REBAR.

RAEIS

6' MAX.

CLEAN SAND FILL

CONTRACT NO.: FA2521-13-D-0005 - 0095

MIRAFI S 1600 (OR EQUAL NON-WOVEN GEOTEXTILE)

2' 1'

USAF 45TH CIVIL ENGINEER SQUADRON PAFB, FL

PLAN

8"

12" MIN.

3' OR MORE

ANCHOR PINS

" 36

1-GALLON CONTAINER PLANTS, 18" HEIGHT

10 BANANA RIVER

"

MATCH EXISTING GRADE

EL. 2.50

DRAWN BY:

SECTION

1

SCALE: NONE

01/18/17

2" MAX.

36

0.5' MIN. TO 3' MAX. DIAMETER CONC. RIP-RAP OVER FILTER FABRIC MIN. ROCK WEIGHT IS 25 LBS AVE. ROCK WEIGHT IS 100 LBS

SILT FLOW

C

D

BAHIA SOD FILTER FABRIC

POST OPTIONS: SOFTWOOD 2 1/2" DIA. SOFTWOOD 2"x4" HARDWOOD 1 1/2"x1 1/2" STEEL 1.33 LBS/FT

DATE:

GROUND

D. LAVENDER

7'

12'

DESIGNED BY:

18"

PRINCIPLE POST POSITION

VERTICAL

D

SXHT 15-1005

OPTIONAL POST POSITIONS

DELIVERY NO. FA2521-13-D-0005

36"

SHEET IDENTIFICATION

C-502

A

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas