The applicant proposes to remove existing derelict structures and pilings, mechanically excavate 1,373 cubic yards of material.
Full Public notice Project Plans
PROJECT DESCRIPTION: The applicant proposes to remove existing derelict structures and pilings, mechanically excavate approximately 1,373 cubic yards of material and discharge dredged and/or fill material into the Neches River for the purpose of constructing a breakwater, creating 0.57-acre of intertidal marsh behind the breakwater, and construct a recreational boardwalk, on the breakwater at the edge of the created marsh.