The USACE, North Dakota Regulatory Office, approved the Ducks Unlimited, Inc. North Dakota Aquatic Resource In-Lieu Fee Program Instrument on March 4, 2014. The Program is used to satisfy compensatory mitigation requirements for DA permits issued under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act. DU is seeking approval of the Site Plan for the Thompson Mitigation Site, which will provide wetland compensation credits in the Red River Basin RSA. The Site is located 8 miles southwest of Grand Forks, North Dakota in Grand Forks County County. [Lat: 47.82770°N Long: -97.15934°W]

The USACE, North Dakota Regulatory Office, approved the Ducks Unlimited, Inc. North Dakota Aquatic Resource In-Lieu Fee Program Instrument on March 4, 2014. The Program is used to satisfy compensatory mitigation requirements for DA permits issued under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act. DU is seeking approval of the Site Plan for the Thompson Mitigation Site, which will provide wetland compensation credits in the Red River Basin RSA. The Site is located 8 miles southwest of Grand Forks, North Dakota in Grand Forks County County. [Lat: 47.82770°N Long: -97.15934°W]

Public Notice Subject: Action ID:

Public Notice of Prosed ILF Mitigation Site NWO-2017-00346-BIS

Comments Period: March 9 ­ April 10, 2017 SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a site plan submitted by Ducks Unlimited (DU) for the Thompson Mitigation Site. The purpose of this public notice is to solicit comments on the plan from the public; Indian Tribes; Federal, state and local agencies/officials; and other interested parties. Participation is encouraged to assist the Corps in making a reasonable decision to accept, modify or reject the plan. All comments must be postmarked by April 10, 2017. This notice is to inform interested parties of the proposed activity and to solicit comments. IN-LIEU FEE PROGRAM: The Corps approved the Ducks Unlimited, Inc. North Dakota Aquatic Resource In-Lieu Fee Program Instrument on March 5, 2014 (Program). It was established in accordance with the implementing regulations of the Compensatory Mitigation for Losses of Aquatic Resources; Final Rule found at 33 CFR Part 332, which was published in the Federal Register on April 10, 2008. The Program is used to satisfy compensatory mitigation requirements for Department of the Army permits issued under Section 404 of the Clean Water Act (33 USC 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403). It allows for DU to accept mitigation responsibility in any of the six regional service areas (RSA) in North Dakota and establishes a time frame for fulfilling their mitigation obligations. SPONSOR:

Ducks Unlimited, Inc. Great Plains Regional Office Attn: Trent Hieb 2525 River Road Bismarck, North Dakota 58503

MITIGATION SITE PLAN: The Thompson Mitigation Site is located approximately 8 miles southwest of Grand Forks, North Dakota in the NE¼ of Section 10, Township 150 North, Range 51 West, Grand Forks County, North Dakota. [Lat: 47.82770° N; Long: -97.159344°W] Credits established will be used to offset wetland impacts in the Red River Basin Regional Service Area. Ratios contained in the Wetland Mitigation Banking in North Dakota Interagency Guidance for Mitigation Bank Sponsors were used to estimate the number of credits the site will yield upon plan implementation. DU estimates the 152 acre site will yield 35.3 credits. Details of the proposed Thompson Mitigation Site can be viewed and downloaded from the Corps web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street Bismarck, ND 58504-6640 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx.

CENWO-OD-R-ND

Page 2

Action ID: NWO-2017-00346-BIS

If you do not have access to the internet or wish to obtain a printed copy of the site plan, please contact the project manager listed below. HISTORIC PROPERTIES: National Historic Preservation Act of 1966 ["NHPA"]: (54 USC 306108) The Omaha District is reviewing a proposed site plan only at this time. If the plan is approved, or approved with modifications, DU would be responsible for obtaining permits, if necessary, prior to construction. At that time, physical disturbance of the site will occur. The Corps will comply with the NHPA and amendments and the procedures set forth in 33 CFR, Appendix C if the site is approved. We will evaluate input by Indian Tribes and any interested parties in response to this public notice. The Corps preliminary determination is that the project will have `No Effect' on historic or cultural properties. ENDANGERED SPECIES: Endangered Species Act of 1973 ["ESA"]: (16 USC 1531, et. Seq.) As stated above, the Omaha District is reviewing a proposed site plan only at this time. If the plan is approved, or approved with modifications, DU would be responsible for obtaining permits, if necessary, prior to construction. The proposed site is within the known ranges of the endangered Whooping crane (Grus americanis) and Gray wolf (Canis lupus). It is also within the known ranges of the threatened Northern long-eared bat (Myotis septentrionalis). No critical habitat has been identified in the County. The Corps has made a preliminary determination that the project will have `No Effect' on the species listed or critical habitat. SUBMITTING COMMENTS: Anyone whose interests may be affected by this proposal is invited to submit favorable or unfavorable written comments by April 10, 2017 to the office listed below: Toni Erhardt, Project Manager US Army Corps of Engineers, Omaha District North Dakota Regulatory Office Email: CENWO-OD-RND@usace.army.mil Please note that all comment letters received are subject to release to the public through the Freedom of Information Act. If you have questions or need additional information please contact the applicant or the Corps' project manager Toni Erhardt at the email above, the address below or by telephone at (701) 255-0015 X 2003. REQUEST TO POSTMASTERS: Please post this notice in a conspicuous place until the expiration date specified at the top of page one. NOTICE TO EDITORS: This notice is provided for your use in developing news stories only. No payment for publication will be provided. Attachments: 6 drawings

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

THOMPSON IN-LIEU FEE

WETLAND MITIGATION PLAN

Prepared by:

Ducks Unlimited, Inc. 2525 River Road Bismarck, ND 58503

Date Submitted: March 1, 2017

Table of Contents

1. Project Objectives

1

2. Site Selection Criteria

1

3. Baseline Information

1

4. Conceptual Design and Work Plan

2

5. Credit Determination Methodology

3

6. Maintenance Plan

5

7. Performance Standards

5

8. Monitoring Requirements

5

9. Adaptive Management Plan

6

10. Long-Term Management Plan

6

11. Site Protection Instruments

6

12. Financial Assurances

7

13. References

7

Tables Table 1 ­ Credit Determinations Table 2 ­ Credit Release Schedule Figures Figure 1 ­ Location Map Figure 2 ­ Land Cover Figure 3 ­ Grand Forks Prairie Project Figure 4 ­ Easement Boundary Figure 5 ­ Wetland Delineation Figure 6 ­ Design Concept Appendices Appendix A - Wetland Delineation Report Appendix B ­ Memorandum of Understanding

1. PROJECT OBJECTIVES Ducks Unlimited (DU) is proposing the Thompson In-Lieu Fee (ILF) Mitigation Site (TIMS) under the DU North Dakota ILF Mitigation Instrument. The goal of this ILF Site is to establish high quality wetland mitigation credits in the Red River Basin service area. Objectives to accomplish this goal include restoration of wetland hydrology, creation of new wetland areas, restoration of native wetland and upland vegetation communities, and longterm management and site protection mechanisms to ensure the wetlands and surrounding natural areas endure as a sustainable resource into the future.

2. SITE SELECTION CRITERIA DU performed an extensive search for appropriate properties within the Red River Basin Service Area (Figure 1). The Thompson property presented an opportunity to restore and expand several drained prairie pothole wetland basins. In addition to restoring the wetland basins, the parcels is large enough to re-establish a sizeable upland grass community to surround and protect the wetland basins. By choosing existing basins that have been drained and used for agriculture, the opportunity for a successful restoration of high functioning wetland basins is increased.

3. BASELINE INFORMATION The TIMS is located in Grand Forks County in the Red River Basin Service Area (Figure 1). The TIMS is approximately 8 miles southwest of Grand Forks, ND within Section 10 (NE1/4), T 150 N, R 51W. The TIMS consists of an approximately 152 acre cultivated field. The North border is formed by 11th Ave NE and the East border is formed by 15th Street NE. The site is adjacent to farm fields to the West, Southwest, and South. The Project Area is located in the Glacial Lake Agassiz Basin sub-ecoregion with a landscape that is nearly flat and composed of fertile silty and clayey soils with high water tables (Bryce et al. 1998). The former grasslands and wetlands on the TIMS property were converted to row crop agriculture many years ago. Numerous wetland areas have been hydrologically modified with ditches (Figure 5). The elevation at the property ranges from about 860 to 870 feet above sea level. The site is in a low lying area and receives runoff from a fairly large local watershed to the south and west of the site. The total contributing watershed is approximately 280 acres. Carlson McCain conducted a wetland delineation and scope and effect determination in July of 2015. A total of 22 wetland areas were delineated (Figure 5). Eight of the wetlands are fully drained based on the scope and effect analysis, and the remainder are impaired due to anthropogenic disturbances. Existing vegetation in most of the site is of poor quality due to farming practices. However, approximately 10 acres of former CRP land in the NE corner of the TIMS remain in vegetated cover. The wetlands at TIMS are impaired by sedimentation, with sediments depths ranging from 3 to 11 inches. Additional details are provided in the attached report (Appendix A).

1

This property is located in the Prairie Pothole Region, a crucially important waterfowl breeding habitat in North America (Gilbert et al. 2006). For thousands of years, this vast expanse of wetlands and prairie habitats has supported the largest densities of breeding waterfowl in North America. However, since European settlers first arrived, conversion of these prairies for agricultural purposes has been extensive. Millions of acres of grasslands and wetlands have been plowed, drained, and replaced with annually tilled crops (Figure 2). The TIMS is within 10 miles of the Kelly Slough National Wildlife Refuge (NWR) complex, including Waterfowl Production Areas (WPA's), NWR's, State Wildlife Management Areas (WMA's), and other protected government lands. Approximately 4 miles west of TIMS, a large swath of grassland is maintained through various program sponsors including Natural Resources Conservation Service (NRCS), US Fish and Wildlife Service (FWS), North Dakota Game and Fish (NDGF), ND Natural Resources Trust (NDNRT), University of North Dakota (UND), Pheasants Forever (PF), Audubon Dakota, Grand Forks Prairie Partners, and private landowners, through a Memorandum of Understanding (MOU). This grasslands area and MOU is collectively known as the Grand Forks County Prairie Project (GFCPP), which is tasked with "sustaining, enhancing, and restoring the natural resources in the GFCPP area". This landscape includes unique remnants of tallgrass prairie habitat for sensitive species such as prairie chicken and migrating shorebirds. The TIMS lies within the designated boundaries of the GFCPP (Figure 3). Further details on this MOU can be found attached in (Appendix B). Fragmentation due to agricultural practices has greatly reduced the habitat base in the areas immediately surrounding TIMS. However, restoration of grassland and wetlands on the TIMS tract would increase the amount of protected habitat in this landscape, creating an ecologically valuable patch of habitat in close proximity to other nearby resources. The site would retain water in a previously drained area, improving overall water quality and watershed function.

4. CONCEPTUAL DESIGN AND WORK PLAN The mitigation strategy for the TIMS would take a multi-faceted approach to restore wetland hydrology and native vegetation at various locations (Figure 6). Construction of the project would be completed by the contractor in association with a DU construction manager. Typical equipment could include scrapers, bulldozers, trucks and compaction equipment. The primary source of water for the wetlands would be surface water runoff, which is typical of the prairie pothole region. Additional details are provided below. Excavation A large basin (approximately 40 acres) would be excavated in the south portion of the TIMS. The excavation would allow creation of wetlands in the resulting low lying areas. Additional deeper areas would be excavated within the large basin to allow increased water storage and a variety of hydrologic regimes and vegetation communities. The 2

deeper excavations correspond to delineated wetland areas (Wetlands 3, 4, 8, 9, 14, 15, 16, 17, 18, and 19) that are impaired by surface drains, sediment accumulation, and highly-disturbed wetland and buffer vegetation. The depressions' bottom elevations would be 0.25 to 1.5 feet deeper than the large basin. Surplus soil material would be stockpiled and graded to mimic natural topography on the site. Some of the cottonwoods along the ditch running north from the large basin would be removed as a result of the excavation activities. Sediment Removal Restoration efforts for Wetlands 12, 13, 20, 21, 22, 23, 30, 31, and 32 would focus on performing shallow excavations (between 0.1' and 0.5' deep) to remove accumulated sediment. Embankments A ditch plug embankment would be built at Wetland 11 to restore the natural outlet elevation of the drained wetland basin. An approximately 2500' length of embankment would be built in the northeast portion of the site to allow ponding of water in low lying areas. The embankment would be between 0.5 and 2 feet higher than existing natural topography and utilize gradual side slopes (10:1). The embankment would prevent water from leaving the site in three existing ditches, thus restoring two fully drained wetlands (Wetlands 1 and 2). The embankment would result in increased inundation in low-lying areas near Sample Point 6 and extending to the areas surrounding Wetlands 1 and 2 (hereafter referred to collectively as Wetland 6). A ditch plug along the cottonwood-lined ditch would prevent water from exiting to the south until it reaches the desired outlet elevation. It is estimated that a minimum of 5 acres of wetland area would be created at Wetland 6 due to increased inundation. Vegetation Improvements The site would be seeded with native grass and forbs representative of native grassland and shallow wetland plant communities. Deeper areas of the resulting wetlands would rely on revegetation by existing wetland seed bank.

5. CREDIT DETERMINATION METHODOLOGY Credits would be determined using the mitigation ratios from Table 1 in the North Dakota mitigation guidance (NDIRT 2010). Table 1 below shows the projected credits for the TIMS project, with all figures rounded to the nearest tenth. Acreages for restored wetlands are based on the Carlson McCain wetland delineation boundaries. Acreages for creation and enhancement are estimated based on engineering designs, and would be modified based on monitoring results. Creation acreage for the large excavation basin is based on the total excavation of 40 acres, minus existing delineated wetlands (11.5 acres). Estimated enhancement credits were determined by using a 5:1 ratio for restored grasslands within a 50-foot buffer surrounding the predicted wetland boundaries. A 20:1 credit ratio was applied to additional restored grasslands outside the 50-foot buffer. 3

Overall, the project should results in approximately 35 wetland credits. Credits would be released based on project milestones and monitoring results (Table 2). The restoration project at TIMS would create a diverse variety of wetlands types based on wetland water regime and vegetation communities. The wetlands would include temporary, seasonal, and semi-permanent water regimes. The vegetation communities would include emergent, scrub-shrub, and forested wetlands. The associated wetland classification for anticipated wetlands are PEMA, PEMC, PEMF, PSSA, and PFOA (Cowardin et al. 1979). It is anticipated that DU would have the option to designate some of the developed credits as specific wetland types, in coordination with USACE. Table 1: Projected Credits Area Wetlands 1, 2, 11 Wetland 6 (new wetland areas)

Acres 1.9 5.0

Method Restoration Creation

Ratio 1:1 2:1

Credits 1.9 2.5

Wetlands 12, 13, 22, 23 Wetlands 20, 21, 30, 31, 32

2.7 1.3

Restoration Restoration

2:1 2:1

1.4 0.6

Wetlands 3, 4, 8, 9, 14, 15, 16, 18, 19 Wetland 17 (fully drained portion) Wetland 17b (impaired portion) Excavation Large Basin

5.4 4.6 1.5 28.5

Restoration Restoration Restoration Creation

2:1 1:1 2:1 2:1

2.7 4.6 0.8 14.3

Buffer Grassland Grassland

15.0 70.0

Enhancement Enhancement

5:1 20:1

3.0 3.5

Total

135.9

-

-

35.3

Table 2: Credit Release Schedule Criteria Mitigation Plan approved, Site Specific Agreement recorded, financial account established Construction Complete 1st year Monitoring 2nd Year Monitoring 3rd Year Monitoring 4th Year Monitoring 5th Year Monitoring

Credits % Released Released 15%

5.30

15% 10% 15% 20% 10% 15%

5.30 3.53 5.30 7.06 3.53 5.30

Cumulative Credits % Complete Released 5.30 15%

10.60 14.13 19.43 26.49 30.02 35.30

30% 40% 55% 75% 85% 100% 4

6. MAINTENANCE PLAN The wetland basins are fairly shallow and should be well-vegetated. This reduces the impacts of erosion due to wave action, etc. Constructed ditch plugs, embankments, excavations, and fill areas would have gradual slopes to minimize erosion due to moving water. If applicable, and as determined in the final design plans, erosion control blankets would be installed in certain areas to minimize erosion until vegetative cover can be established. DU would monitor the site to determine if maintenance is required and implement maintenance activities to correct any issues.

7. PERFORMANCE STANDARDS Historical wetland basins as delineated by Carlson McCain that are restored within the project area should meet the criteria of soils, hydrology and vegetation as found in the 1987 Corps of Engineers Wetland Delineation Manual. Created basins within the project area must also meet the criteria of the 1987 Corps of Engineers Wetland Delineation manual, except for the soils evaluation, as hydric soil indicators may not be present due to the short timeframe. Therefore, created wetlands will be creditable based on hydrology and vegetation, assuming hydric soils will eventually form. The wetland complex within this project will consist of several shallow basins. Based on these depths, the wetland fringe should be expected to be seasonal in nature while the deeper interior could be considered more semi-permanent. The shallower portions could be expected to develop emergent and possibly some submerged vegetation while the deeper portion may stay partially open water and develop submerged aquatic vegetation. Of course, the condition of the wetlands will be based entirely on the hydro-period. Given the dynamic nature of the North Dakota climate with dramatic swings from extremely wet to extremely dry, it should be expected these wetlands follow the typical wetland cycle based on the given climatic conditions at the time. The 50' upland buffer should meet a minimum 90% canopy cover. The remaining upland cover outside the buffer zone but within the easement boundary shall exceed a 70% canopy cover. The easement area can be hayed after July 15 or grazed according to FWS grassland easement policy. In addition, all noxious weeds within the easement area will be in compliance of the policy set forth by the Grand Forks County Weed Control Board.

8. MONITORING REQUIREMENTS DU would monitor the TIMS for a period of five years starting the first growing season after completion of construction. Monitoring would consist of delineating wetland 5

boundaries based on hydrology and vegetation criteria in the Great Plains Regional Supplement to the Corps' Delineation Manual (USACE 2010). Transects would be established in the first year and repeated in following years to show changes in vegetation and hydrology. Sample points with photos would be taken along transects at changes in vegetation community. Additional photo points would be established at various other locations showing overall site vegetative development. DU would submit annual monitoring reports to USACE no later than January 31 of the following year describing the conditions of the site. The report would include information sufficient to determine status of achieving performance standards. The report would include a map depicting wetland boundaries, photo/sample points, and any relevant observation points or areas of concern or management needs.

9. ADAPTIVE MANAGEMENT PLAN Adaptive management would be carried out by DU, should corrective actions be deemed necessary during annual monitoring. Actions would be taken to maintain the success and viability of the wetland mitigation site. Management activities may include, but not limited to; haying, grazing, weed spraying, planting/seeding, prescribed fire, hydrological modifications, or other management activities as needed. All management activities would be reported to USACE in annual monitoring reports.

10. LONG-TERM MANAGEMENT PLAN Long-term management and maintenance would be provided by DU, its heirs, assigns or successors; unless the easement lands are transferred to a state or federal resource management agency or this responsibility is contractually conveyed to another person, subject to approval by USACE. In addition, as a conservation easement would be placed on the property and the easement holder would have authority to monitor and maintain the integrity of the easement under their easement program guidelines. The long-term management phase would be initiated upon closure of TIMS. The goal of the long-term management is to foster the long term viability of the project's wetlands and upland habitats. DU will also designate a financial endowment sizeable enough to assure site viability into the future.

11. SITE PROTECTION INSTRUMENTS In February of 2016 Ducks Unlimited, Inc. and a private individual (current landowner) signed a Site Specific Agreement (SSA) for the 152 acre mitigation parcel (Figure 4). As part of the SSA, said individual has agreed to sign a conservation easement. The preferred easement would be enrollment of the site into a perpetual wetland and grassland combination conservation easement with USFWS. The easement would perpetually protect against disturbance to the site by restricting land use. All activities on the property are required to be consistent with the purposes of the easement, "to preserve and protect in perpetuity fish and wildlife habitat". In the event that USFWS declines to accept an easement, said landowner has agreed to a 99 year DU easement restricting farming at the site, as stipulated in the SSA. 6

12. FINANCIAL ASSURANCES DU is committed to funding the development of the project, including monitoring and maintenance, with financial assurances. The financial assurances also include a commitment to an endowment fund suitable in size to ensure the future viability of the site which would be dedicated for long term management of the TIMS. The endowment would be held by DU in an interest bearing account. The project development costs, including the contingency and long-term management fund endowment, would be funded by ILF credit sales in the Red River Basin service area.

13. REFERENCES Cowardin, L. M., V. Carter, F. C. Golet, and E. T. LaRoe. 1979. Classification of wetlands and deepwater habitats of the United States. U.S. Fish and Wildlife Service. FWS/OBS-79/31. Washington, DC. North Dakota Interagency Review Team (NDIRT) 2010. Wetland Mitigation Banking in North Dakota. Interagency Guidance for Mitigation Bank Sponsors. 36 Pages. US Army Corps of Engineers (USACE) 2010. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Great Plains Region (Version 2.0). Wetlands Regulatory Assistance Program ERDC/EL TR-10-1

7

APPENDIX A Wetland Delineation Report

Appendix B Grand Forks County Prairie Project Memorandum of Understanding

N:\mitigation\ND\ND-554-2 NDILF_Thompson Mitigation\mitigation_plan_2017\draft\figs\Fig1_gSA.mxd

W X

Legend

W X

Thompson ILF

North Dakota Counties

Devils Lake

Red River

Missouri South

Southwest Slope

Missouri North

Souris River

±

0

25

50

Miles 100

Figure 1 Project Location and Service Area

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

Mitigation Boundary T150 R51 S10 NE4

^

Project Site

^

.

Figure 2 Land Cover

Gilby

Manvel

Grand Forks AFB

Emerado

Grand Forks

Thompson

Northwood Grand Forks Prairie Project

Mitigation Property T150 R51 S10 NE4

Land Ownership

US Fish and Wildlife Service ND Game and Fish State School Land

ND Parks and Recreation

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

.

Figure 3 Grand Forks Prairie Project

3

10

2

150051

11

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

Mitigation Boundary T150 R51 S10 NE4

^

Project Site

^

.

Figure 4 Easement Boundary

R 51W

PSSC

2

* #

12

Wetland12

` ^

* #

PEMA

( !

1 1

PEMA

( !

7

* #

1

* #

Wetland1

2

Wetland2

6

Wetland1 1 13 # * Wetland13

PEMC

* #

22

Wetland16 Wetland20

PEMA

20# *

23

PEMA

* 30 Wetland30 #

m xd on. nati g3WetlandDeterm i T h om pson Fi gu res\ fi on Project\ gati ti 5728_T h om pson Mi DU\ Projects\ \ E:

T150N

Wetland31

* #

31

( ki ndred !

10

* #

* # Wetland23 * # 21

Wetland15 15 * #

Wetland14

* #

Wetland3

* WetlandObserv # ati on Poi nt ( UplandObserv ! ati on Poi nt

19

` ^

PEMA

c olvi n Wetland8

* # * #

4

* # Wetland4

PEMA

Wetland Effecti velyDrai nedWetland

* #

9 # * ( ! bearden

# * 3 * #

Legend

10

Wetland17 Wetland9 Wetland19

32

14

( !

Wetland21

PEMA

* #

PEMC

PEMA

5

16 # * ( antler !

18 # * Wetland18

Wetland32

Su rfaceDrai n T h om pson Mi ti gati on Si te PLSSSecti on

( !

T150N

Wetland22

8PEMA

1 1

c olvi n

17

PEMC PEMCd

PEMC

Grand Forks

PEMC

` ^ PEMC

PEMA

` ^

Thompson

1: 6, 000 250

500 Feet

` ^

Basem ap:NAI POrth oph oto 2014 GrandForks Cou nty ,North Dakota

` ^

PEMC

PEMC

PEMC

North Dakotastateagenci es PEMC andth eND GI SHu b

0 J u ly2015

` ^

3

q

PEMC

R 51W

ENVI RONMENT AL·ENGI NEERI NG ·LAND SURVEYI NG 600Sou th 2ndStreet,Su i te105,Bi sm arc k,North Dakota58504 www. c arlsonm c c ai n. c om

North Dakotastateagenci es andth eNDGI SHu b

Figure 5 Wetland Determination Section 10, T150N, R51W Thompson Mitigation Site

0

250

500

Feet 750 1,000

Legend embankments Thompson ILF Site

Increased Ponding

"Wetland 6" Area Ditch Plug

Shallow Excavation

2500' Embankment

Excavation Large Basin

N:\mitigation\ND\ND-554-2 NDILF_Thompson Mitigation\Mit Plan\draft\figs\Fig6__design_concept.mxd

Ditch Plug

Excavation Depressions Stockpile Areas

Tree Removal

±

Figure 6 Design Concept

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas