The USACE, North Dakota Regulatory Office, approved the Ducks Unlimited, Inc. North Dakota Aquatic Resource In-Lieu Fee Program Instrument on March 4, 2014. The Program is used to satisfy compensatory mitigation requirements for DA permits issued under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act. DU is seeking approval of the Site Plan for the Thompson Mitigation Site, which will provide wetland compensation credits in the Red River Basin RSA. The Site is located 8 miles southwest of Grand Forks, North Dakota in Grand Forks County County. [Lat: 47.82770°N Long: -97.15934°W]
The USACE, North Dakota Regulatory Office, approved the Ducks Unlimited, Inc. North Dakota Aquatic Resource In-Lieu Fee Program Instrument on March 4, 2014. The Program is used to satisfy compensatory mitigation requirements for DA permits issued under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act. DU is seeking approval of the Site Plan for the Thompson Mitigation Site, which will provide wetland compensation credits in the Red River Basin RSA. The Site is located 8 miles southwest of Grand Forks, North Dakota in Grand Forks County County. [Lat: 47.82770°N Long: -97.15934°W]
Public Notice
Subject:
Action ID:
Public Notice of Prosed ILF Mitigation Site
NWO-2017-00346-BIS
Comments Period: March 9 April 10, 2017
SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a site
plan submitted by Ducks Unlimited (DU) for the Thompson Mitigation Site. The purpose of this
public notice is to solicit comments on the plan from the public; Indian Tribes; Federal, state
and local agencies/officials; and other interested parties. Participation is encouraged to assist
the Corps in making a reasonable decision to accept, modify or reject the plan. All comments
must be postmarked by April 10, 2017. This notice is to inform interested parties of the
proposed activity and to solicit comments.
IN-LIEU FEE PROGRAM: The Corps approved the Ducks Unlimited, Inc. North Dakota
Aquatic Resource In-Lieu Fee Program Instrument on March 5, 2014 (Program). It was
established in accordance with the implementing regulations of the Compensatory Mitigation
for Losses of Aquatic Resources; Final Rule found at 33 CFR Part 332, which was published in
the Federal Register on April 10, 2008. The Program is used to satisfy compensatory
mitigation requirements for Department of the Army permits issued under Section 404 of the
Clean Water Act (33 USC 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33
USC 403). It allows for DU to accept mitigation responsibility in any of the six regional service
areas (RSA) in North Dakota and establishes a time frame for fulfilling their mitigation
obligations.
SPONSOR:
Ducks Unlimited, Inc.
Great Plains Regional Office
Attn: Trent Hieb
2525 River Road
Bismarck, North Dakota 58503
MITIGATION SITE PLAN: The Thompson Mitigation Site is located approximately 8 miles
southwest of Grand Forks, North Dakota in the NE¼ of Section 10, Township 150 North,
Range 51 West, Grand Forks County, North Dakota. [Lat: 47.82770° N; Long: -97.159344°W]
Credits established will be used to offset wetland impacts in the Red River Basin Regional
Service Area. Ratios contained in the Wetland Mitigation Banking in North Dakota Interagency Guidance for Mitigation Bank Sponsors were used to estimate the number of
credits the site will yield upon plan implementation. DU estimates the 152 acre site will yield
35.3 credits. Details of the proposed Thompson Mitigation Site can be viewed and
downloaded from the Corps web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office
1513 South 12th Street
Bismarck, ND 58504-6640
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx.
CENWO-OD-R-ND
Page 2
Action ID: NWO-2017-00346-BIS
If you do not have access to the internet or wish to obtain a printed copy of the site plan,
please contact the project manager listed below.
HISTORIC PROPERTIES: National Historic Preservation Act of 1966 ["NHPA"]: (54 USC
306108) The Omaha District is reviewing a proposed site plan only at this time. If the plan is
approved, or approved with modifications, DU would be responsible for obtaining permits, if
necessary, prior to construction. At that time, physical disturbance of the site will occur. The
Corps will comply with the NHPA and amendments and the procedures set forth in 33 CFR,
Appendix C if the site is approved. We will evaluate input by Indian Tribes and any interested
parties in response to this public notice. The Corps preliminary determination is that the
project will have `No Effect' on historic or cultural properties.
ENDANGERED SPECIES: Endangered Species Act of 1973 ["ESA"]: (16 USC 1531, et.
Seq.) As stated above, the Omaha District is reviewing a proposed site plan only at this time.
If the plan is approved, or approved with modifications, DU would be responsible for obtaining
permits, if necessary, prior to construction. The proposed site is within the known ranges of
the endangered Whooping crane (Grus americanis) and Gray wolf (Canis lupus). It is also
within the known ranges of the threatened Northern long-eared bat (Myotis septentrionalis).
No critical habitat has been identified in the County. The Corps has made a preliminary
determination that the project will have `No Effect' on the species listed or critical habitat.
SUBMITTING COMMENTS: Anyone whose interests may be affected by this proposal is
invited to submit favorable or unfavorable written comments by April 10, 2017 to the office
listed below:
Toni Erhardt, Project Manager
US Army Corps of Engineers, Omaha District
North Dakota Regulatory Office
Email: CENWO-OD-RND@usace.army.mil
Please note that all comment letters received are subject to release to the public through the
Freedom of Information Act. If you have questions or need additional information please
contact the applicant or the Corps' project manager Toni Erhardt at the email above, the
address below or by telephone at (701) 255-0015 X 2003.
REQUEST TO POSTMASTERS: Please post this notice in a conspicuous place until the
expiration date specified at the top of page one.
NOTICE TO EDITORS: This notice is provided for your use in developing news stories only.
No payment for publication will be provided.
Attachments: 6 drawings
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office
1513 South 12th Street, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx
THOMPSON IN-LIEU FEE
WETLAND MITIGATION PLAN
Prepared by:
Ducks Unlimited, Inc.
2525 River Road
Bismarck, ND 58503
Date Submitted: March 1, 2017
Table of Contents
1. Project Objectives
1
2. Site Selection Criteria
1
3. Baseline Information
1
4. Conceptual Design and Work Plan
2
5. Credit Determination Methodology
3
6. Maintenance Plan
5
7. Performance Standards
5
8. Monitoring Requirements
5
9. Adaptive Management Plan
6
10. Long-Term Management Plan
6
11. Site Protection Instruments
6
12. Financial Assurances
7
13. References
7
Tables
Table 1 Credit Determinations
Table 2 Credit Release Schedule
Figures
Figure 1 Location Map
Figure 2 Land Cover
Figure 3 Grand Forks Prairie Project
Figure 4 Easement Boundary
Figure 5 Wetland Delineation
Figure 6 Design Concept
Appendices
Appendix A - Wetland Delineation Report
Appendix B Memorandum of Understanding
1. PROJECT OBJECTIVES
Ducks Unlimited (DU) is proposing the Thompson In-Lieu Fee (ILF) Mitigation Site
(TIMS) under the DU North Dakota ILF Mitigation Instrument. The goal of this ILF Site
is to establish high quality wetland mitigation credits in the Red River Basin service area.
Objectives to accomplish this goal include restoration of wetland hydrology, creation of
new wetland areas, restoration of native wetland and upland vegetation communities, and
longterm management and site protection mechanisms to ensure the wetlands and
surrounding natural areas endure as a sustainable resource into the future.
2. SITE SELECTION CRITERIA
DU performed an extensive search for appropriate properties within the Red River Basin
Service Area (Figure 1). The Thompson property presented an opportunity to restore and
expand several drained prairie pothole wetland basins. In addition to restoring the
wetland basins, the parcels is large enough to re-establish a sizeable upland grass
community to surround and protect the wetland basins. By choosing existing basins that
have been drained and used for agriculture, the opportunity for a successful restoration of
high functioning wetland basins is increased.
3. BASELINE INFORMATION
The TIMS is located in Grand Forks County in the Red River Basin Service Area (Figure
1). The TIMS is approximately 8 miles southwest of Grand Forks, ND within Section 10
(NE1/4), T 150 N, R 51W. The TIMS consists of an approximately 152 acre cultivated
field. The North border is formed by 11th Ave NE and the East border is formed by 15th
Street NE. The site is adjacent to farm fields to the West, Southwest, and South. The
Project Area is located in the Glacial Lake Agassiz Basin sub-ecoregion with a landscape
that is nearly flat and composed of fertile silty and clayey soils with high water tables
(Bryce et al. 1998). The former grasslands and wetlands on the TIMS property were
converted to row crop agriculture many years ago.
Numerous wetland areas have been hydrologically modified with ditches (Figure 5). The
elevation at the property ranges from about 860 to 870 feet above sea level. The site is in
a low lying area and receives runoff from a fairly large local watershed to the south and
west of the site. The total contributing watershed is approximately 280 acres. Carlson
McCain conducted a wetland delineation and scope and effect determination in July of
2015. A total of 22 wetland areas were delineated (Figure 5). Eight of the wetlands are
fully drained based on the scope and effect analysis, and the remainder are impaired due
to anthropogenic disturbances. Existing vegetation in most of the site is of poor quality
due to farming practices. However, approximately 10 acres of former CRP land in the NE
corner of the TIMS remain in vegetated cover. The wetlands at TIMS are impaired by
sedimentation, with sediments depths ranging from 3 to 11 inches. Additional details are
provided in the attached report (Appendix A).
1
This property is located in the Prairie Pothole Region, a crucially important waterfowl
breeding habitat in North America (Gilbert et al. 2006). For thousands of years, this vast
expanse of wetlands and prairie habitats has supported the largest densities of breeding
waterfowl in North America. However, since European settlers first arrived, conversion
of these prairies for agricultural purposes has been extensive. Millions of acres of
grasslands and wetlands have been plowed, drained, and replaced with annually tilled
crops (Figure 2).
The TIMS is within 10 miles of the Kelly Slough National Wildlife Refuge (NWR)
complex, including Waterfowl Production Areas (WPA's), NWR's, State Wildlife
Management Areas (WMA's), and other protected government lands. Approximately 4
miles west of TIMS, a large swath of grassland is maintained through various program
sponsors including Natural Resources Conservation Service (NRCS), US Fish and
Wildlife Service (FWS), North Dakota Game and Fish (NDGF), ND Natural Resources
Trust (NDNRT), University of North Dakota (UND), Pheasants Forever (PF), Audubon
Dakota, Grand Forks Prairie Partners, and private landowners, through a Memorandum of
Understanding (MOU).
This grasslands area and MOU is collectively known as the Grand Forks County Prairie
Project (GFCPP), which is tasked with "sustaining, enhancing, and restoring the natural
resources in the GFCPP area". This landscape includes unique remnants of tallgrass
prairie habitat for sensitive species such as prairie chicken and migrating shorebirds. The
TIMS lies within the designated boundaries of the GFCPP (Figure 3). Further details on
this MOU can be found attached in (Appendix B).
Fragmentation due to agricultural practices has greatly reduced the habitat base in the
areas immediately surrounding TIMS. However, restoration of grassland and wetlands on
the TIMS tract would increase the amount of protected habitat in this landscape, creating
an ecologically valuable patch of habitat in close proximity to other nearby resources.
The site would retain water in a previously drained area, improving overall water quality
and watershed function.
4. CONCEPTUAL DESIGN AND WORK PLAN
The mitigation strategy for the TIMS would take a multi-faceted approach to restore
wetland hydrology and native vegetation at various locations (Figure 6). Construction of
the project would be completed by the contractor in association with a DU construction
manager. Typical equipment could include scrapers, bulldozers, trucks and compaction
equipment. The primary source of water for the wetlands would be surface water runoff,
which is typical of the prairie pothole region. Additional details are provided below.
Excavation
A large basin (approximately 40 acres) would be excavated in the south portion of the
TIMS. The excavation would allow creation of wetlands in the resulting low lying areas.
Additional deeper areas would be excavated within the large basin to allow increased
water storage and a variety of hydrologic regimes and vegetation communities. The
2
deeper excavations correspond to delineated wetland areas (Wetlands 3, 4, 8, 9, 14, 15,
16, 17, 18, and 19) that are impaired by surface drains, sediment accumulation, and
highly-disturbed wetland and buffer vegetation. The depressions' bottom elevations
would be 0.25 to 1.5 feet deeper than the large basin. Surplus soil material would be
stockpiled and graded to mimic natural topography on the site. Some of the cottonwoods
along the ditch running north from the large basin would be removed as a result of the
excavation activities.
Sediment Removal
Restoration efforts for Wetlands 12, 13, 20, 21, 22, 23, 30, 31, and 32 would focus on
performing shallow excavations (between 0.1' and 0.5' deep) to remove accumulated
sediment.
Embankments
A ditch plug embankment would be built at Wetland 11 to restore the natural outlet
elevation of the drained wetland basin.
An approximately 2500' length of embankment would be built in the northeast portion of
the site to allow ponding of water in low lying areas. The embankment would be between
0.5 and 2 feet higher than existing natural topography and utilize gradual side slopes
(10:1). The embankment would prevent water from leaving the site in three existing
ditches, thus restoring two fully drained wetlands (Wetlands 1 and 2). The embankment
would result in increased inundation in low-lying areas near Sample Point 6 and
extending to the areas surrounding Wetlands 1 and 2 (hereafter referred to collectively as
Wetland 6). A ditch plug along the cottonwood-lined ditch would prevent water from
exiting to the south until it reaches the desired outlet elevation. It is estimated that a
minimum of 5 acres of wetland area would be created at Wetland 6 due to increased
inundation.
Vegetation Improvements
The site would be seeded with native grass and forbs representative of native grassland
and shallow wetland plant communities. Deeper areas of the resulting wetlands would
rely on revegetation by existing wetland seed bank.
5. CREDIT DETERMINATION METHODOLOGY
Credits would be determined using the mitigation ratios from Table 1 in the North Dakota
mitigation guidance (NDIRT 2010). Table 1 below shows the projected credits for the
TIMS project, with all figures rounded to the nearest tenth. Acreages for restored
wetlands are based on the Carlson McCain wetland delineation boundaries. Acreages for
creation and enhancement are estimated based on engineering designs, and would be
modified based on monitoring results. Creation acreage for the large excavation basin is
based on the total excavation of 40 acres, minus existing delineated wetlands (11.5 acres).
Estimated enhancement credits were determined by using a 5:1 ratio for restored
grasslands within a 50-foot buffer surrounding the predicted wetland boundaries. A 20:1
credit ratio was applied to additional restored grasslands outside the 50-foot buffer.
3
Overall, the project should results in approximately 35 wetland credits. Credits would be
released based on project milestones and monitoring results (Table 2).
The restoration project at TIMS would create a diverse variety of wetlands types based on
wetland water regime and vegetation communities. The wetlands would include
temporary, seasonal, and semi-permanent water regimes. The vegetation communities
would include emergent, scrub-shrub, and forested wetlands. The associated wetland
classification for anticipated wetlands are PEMA, PEMC, PEMF, PSSA, and PFOA
(Cowardin et al. 1979). It is anticipated that DU would have the option to designate some
of the developed credits as specific wetland types, in coordination with USACE.
Table 1: Projected Credits
Area
Wetlands 1, 2, 11
Wetland 6 (new wetland areas)
Acres
1.9
5.0
Method
Restoration
Creation
Ratio
1:1
2:1
Credits
1.9
2.5
Wetlands 12, 13, 22, 23
Wetlands 20, 21, 30, 31, 32
2.7
1.3
Restoration
Restoration
2:1
2:1
1.4
0.6
Wetlands 3, 4, 8, 9, 14, 15, 16, 18, 19
Wetland 17 (fully drained portion)
Wetland 17b (impaired portion)
Excavation Large Basin
5.4
4.6
1.5
28.5
Restoration
Restoration
Restoration
Creation
2:1
1:1
2:1
2:1
2.7
4.6
0.8
14.3
Buffer Grassland
Grassland
15.0
70.0
Enhancement
Enhancement
5:1
20:1
3.0
3.5
Total
135.9
-
-
35.3
Table 2: Credit Release Schedule
Criteria
Mitigation Plan approved,
Site Specific Agreement
recorded, financial
account established
Construction Complete
1st year Monitoring
2nd Year Monitoring
3rd Year Monitoring
4th Year Monitoring
5th Year Monitoring
Credits
% Released
Released
15%
5.30
15%
10%
15%
20%
10%
15%
5.30
3.53
5.30
7.06
3.53
5.30
Cumulative
Credits
% Complete
Released
5.30
15%
10.60
14.13
19.43
26.49
30.02
35.30
30%
40%
55%
75%
85%
100%
4
6. MAINTENANCE PLAN
The wetland basins are fairly shallow and should be well-vegetated. This reduces the
impacts of erosion due to wave action, etc. Constructed ditch plugs, embankments,
excavations, and fill areas would have gradual slopes to minimize erosion due to moving
water. If applicable, and as determined in the final design plans, erosion control blankets
would be installed in certain areas to minimize erosion until vegetative cover can be
established. DU would monitor the site to determine if maintenance is required and
implement maintenance activities to correct any issues.
7. PERFORMANCE STANDARDS
Historical wetland basins as delineated by Carlson McCain that are restored within the
project area should meet the criteria of soils, hydrology and vegetation as found in the
1987 Corps of Engineers Wetland Delineation Manual.
Created basins within the project area must also meet the criteria of the 1987 Corps of
Engineers Wetland Delineation manual, except for the soils evaluation, as hydric soil
indicators may not be present due to the short timeframe. Therefore, created wetlands
will be creditable based on hydrology and vegetation, assuming hydric soils will
eventually form.
The wetland complex within this project will consist of several shallow basins. Based on
these depths, the wetland fringe should be expected to be seasonal in nature while the
deeper interior could be considered more semi-permanent. The shallower portions could
be expected to develop emergent and possibly some submerged vegetation while the
deeper portion may stay partially open water and develop submerged aquatic vegetation.
Of course, the condition of the wetlands will be based entirely on the hydro-period.
Given the dynamic nature of the North Dakota climate with dramatic swings from
extremely wet to extremely dry, it should be expected these wetlands follow the typical
wetland cycle based on the given climatic conditions at the time.
The 50' upland buffer should meet a minimum 90% canopy cover. The remaining
upland cover outside the buffer zone but within the easement boundary shall exceed a
70% canopy cover.
The easement area can be hayed after July 15 or grazed according to FWS grassland
easement policy. In addition, all noxious weeds within the easement area will be in
compliance of the policy set forth by the Grand Forks County Weed Control Board.
8. MONITORING REQUIREMENTS
DU would monitor the TIMS for a period of five years starting the first growing season
after completion of construction. Monitoring would consist of delineating wetland
5
boundaries based on hydrology and vegetation criteria in the Great Plains Regional
Supplement to the Corps' Delineation Manual (USACE 2010). Transects would be
established in the first year and repeated in following years to show changes in vegetation
and hydrology. Sample points with photos would be taken along transects at changes in
vegetation community. Additional photo points would be established at various other
locations showing overall site vegetative development. DU would submit annual
monitoring reports to USACE no later than January 31 of the following year describing
the conditions of the site. The report would include information sufficient to determine
status of achieving performance standards. The report would include a map depicting
wetland boundaries, photo/sample points, and any relevant observation points or areas of
concern or management needs.
9. ADAPTIVE MANAGEMENT PLAN
Adaptive management would be carried out by DU, should corrective actions be deemed
necessary during annual monitoring. Actions would be taken to maintain the success and
viability of the wetland mitigation site. Management activities may include, but not
limited to; haying, grazing, weed spraying, planting/seeding, prescribed fire, hydrological
modifications, or other management activities as needed. All management activities
would be reported to USACE in annual monitoring reports.
10. LONG-TERM MANAGEMENT PLAN
Long-term management and maintenance would be provided by DU, its heirs, assigns or
successors; unless the easement lands are transferred to a state or federal resource
management agency or this responsibility is contractually conveyed to another person,
subject to approval by USACE. In addition, as a conservation easement would be placed
on the property and the easement holder would have authority to monitor and maintain
the integrity of the easement under their easement program guidelines. The long-term
management phase would be initiated upon closure of TIMS. The goal of the long-term
management is to foster the long term viability of the project's wetlands and upland
habitats. DU will also designate a financial endowment sizeable enough to assure site
viability into the future.
11. SITE PROTECTION INSTRUMENTS
In February of 2016 Ducks Unlimited, Inc. and a private individual (current landowner)
signed a Site Specific Agreement (SSA) for the 152 acre mitigation parcel (Figure 4). As
part of the SSA, said individual has agreed to sign a conservation easement. The
preferred easement would be enrollment of the site into a perpetual wetland and grassland
combination conservation easement with USFWS. The easement would perpetually
protect against disturbance to the site by restricting land use. All activities on the property
are required to be consistent with the purposes of the easement, "to preserve and protect
in perpetuity fish and wildlife habitat". In the event that USFWS declines to accept an
easement, said landowner has agreed to a 99 year DU easement restricting farming at the
site, as stipulated in the SSA.
6
12. FINANCIAL ASSURANCES
DU is committed to funding the development of the project, including monitoring and
maintenance, with financial assurances. The financial assurances also include a
commitment to an endowment fund suitable in size to ensure the future viability of the
site which would be dedicated for long term management of the TIMS. The endowment
would be held by DU in an interest bearing account. The project development costs,
including the contingency and long-term management fund endowment, would be funded
by ILF credit sales in the Red River Basin service area.
13. REFERENCES
Cowardin, L. M., V. Carter, F. C. Golet, and E. T. LaRoe. 1979. Classification of
wetlands and deepwater habitats of the United States. U.S. Fish and Wildlife Service.
FWS/OBS-79/31. Washington, DC.
North Dakota Interagency Review Team (NDIRT) 2010. Wetland Mitigation Banking in
North Dakota. Interagency Guidance for Mitigation Bank Sponsors. 36 Pages.
US Army Corps of Engineers (USACE) 2010. Regional Supplement to the Corps of
Engineers Wetland Delineation Manual: Great Plains Region (Version 2.0). Wetlands
Regulatory Assistance Program ERDC/EL TR-10-1
7
APPENDIX A
Wetland Delineation Report
Appendix B
Grand Forks County Prairie Project
Memorandum of Understanding
N:\mitigation\ND\ND-554-2 NDILF_Thompson Mitigation\mitigation_plan_2017\draft\figs\Fig1_gSA.mxd
W
X
Legend
W
X
Thompson ILF
North Dakota Counties
Devils Lake
Red River
Missouri South
Southwest Slope
Missouri North
Souris River
±
0
25
50
Miles
100
Figure 1
Project Location and Service Area
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA,
USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Mitigation Boundary T150 R51 S10 NE4
^
Project Site
^
.
Figure 2
Land Cover
Gilby
Manvel
Grand Forks AFB
Emerado
Grand Forks
Thompson
Northwood
Grand Forks Prairie Project
Mitigation Property T150 R51 S10 NE4
Land Ownership
US Fish and Wildlife Service
ND Game and Fish
State School Land
ND Parks and Recreation
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA,
USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
.
Figure 3
Grand Forks Prairie Project
3
10
2
150051
11
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA,
USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User
Community
Mitigation Boundary T150 R51 S10 NE4
^
Project Site
^
.
Figure 4
Easement Boundary
R 51W
PSSC
2
*
#
12
Wetland12
`
^
*
#
PEMA
(
!
1
1
PEMA
(
!
7
*
#
1
*
#
Wetland1
2
Wetland2
6
Wetland1
1
13
#
*
Wetland13
PEMC
*
#
22
Wetland16
Wetland20
PEMA
20#
*
23
PEMA
* 30
Wetland30 #
m xd
on.
nati
g3WetlandDeterm i
T h om pson Fi
gu res\
fi
on Project\
gati
ti
5728_T h om pson Mi
DU\
Projects\
\
E:
T150N
Wetland31
*
#
31
(
ki
ndred !
10
*
#
*
#
Wetland23
*
#
21
Wetland15
15
*
#
Wetland14
*
#
Wetland3
* WetlandObserv
#
ati
on Poi
nt
( UplandObserv
!
ati
on Poi
nt
19
`
^
PEMA
c
olvi
n
Wetland8
*
#
*
#
4
*
#
Wetland4
PEMA
Wetland
Effecti
velyDrai
nedWetland
*
#
9
#
*
(
!
bearden
#
*
3
*
#
Legend
10
Wetland17
Wetland9
Wetland19
32
14
(
!
Wetland21
PEMA
*
#
PEMC
PEMA
5
16
#
*
( antler
!
18
#
*
Wetland18
Wetland32
Su rfaceDrai
n
T h om pson Mi
ti
gati
on Si
te
PLSSSecti
on
(
!
T150N
Wetland22
8PEMA
1
1
c
olvi
n
17
PEMC
PEMCd
PEMC
Grand Forks
PEMC
`
^
PEMC
PEMA
`
^
Thompson
1:
6,
000
250
500
Feet
`
^
Basem ap:NAI
POrth oph oto 2014
GrandForks Cou nty
,North Dakota
`
^
PEMC
PEMC
PEMC
North Dakotastateagenci
es PEMC
andth eND GI
SHu b
0
J
u ly2015
`
^
3
q
PEMC
R 51W
ENVI
RONMENT AL·ENGI
NEERI
NG ·LAND SURVEYI
NG
600Sou th 2ndStreet,Su i
te105,Bi
sm arc
k,North Dakota58504
www.
c
arlsonm c
c
ai
n.
c
om
North Dakotastateagenci
es andth eNDGI
SHu b
Figure 5
Wetland Determination
Section 10, T150N, R51W
Thompson Mitigation Site
0
250
500
Feet
750 1,000
Legend
embankments
Thompson ILF Site
Increased Ponding
"Wetland 6" Area
Ditch Plug
Shallow Excavation
2500' Embankment
Excavation Large Basin
N:\mitigation\ND\ND-554-2 NDILF_Thompson Mitigation\Mit Plan\draft\figs\Fig6__design_concept.mxd
Ditch Plug
Excavation Depressions
Stockpile Areas
Tree Removal
±
Figure 6
Design Concept