You can copy from here when filling out the rest of the page.
Application for Permit Santa Margarita River Conjunctive Use Project
The proposed project would replace an existing sheet pile diversion structure with an upgraded inflatable weir system, upgrade an existing water intake to include fish exclusion screens and increase capacity, modify O’Neil ditch channel to increase capacity and line the channel with concrete, construct a raw water pipeline, and construct a bi-directional water pipeline.