Home

Tulsa District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The application is for an After-the-Fact Permit for the unauthorized placement of fill into waters of the United States and the proposed excavation of riverine gravel from the Illinois River associated with a bank stabilization project.

The applicant’s proposal would require both the excavation of native river gravel and the placement of excavated fill material for bank stabilization. Demolition concrete slabs and concrete rip rap have been placed for erosion protection within the Illinois River, without a DA permit. The applicant’s proposal is to leave the demolition concrete and rip rap in place and to fill voids behind and between the concrete slabs with native river gravel (0.03 ac), which would be excavated from the proposed project location. The proposal includes approximately 1,770 lf (0.31 ac) of existing and proposed impacts, resulting in a total of approximately 2,619 cys of fill material below the OHWM. All work would be performed using conventional earthmoving equipment. For safety, the Corps has required that all protruding rebar and metal be removed from the concrete.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas