Puerto Rico Ports Authority
Mr. Romel Pedraza Claudio
Acting Assistant Executive Director
for Planning, Engineering, Construction and
Environmental Affairs
P.O. Box 362829
San Juan, Puerto Rico 00936-2829
PROJECT PURPOSE:
Basic: Dredging
Overall: To provide maintenance dredging and safety depth to avoid grounding of large cruise ships in a berthing area of pier number 4.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) and Section 103 of the Marine Protection, Research and Sanctuaries Act (MPRSA) of 1972, as described below:
APPLICANT: Puerto Rico Ports Authority
Mr. Romel Pedraza Claudio
Acting Assistant Executive Director
for Planning, Engineering, Construction and
Environmental Affairs
P.O. Box 362829
San Juan, Puerto Rico 00936-2829
WATERWAY AND LOCATION: The project would affect waters of the United States associated with the San Juan Bay and the Atlantic Ocean. The project site is located at the berthing area located to the West side of Pier 4, Old San Juan, Puerto Rico. The proposed ocean disposal site is at the San Juan Harbor ocean dredged material disposal site (ODMDS).
Directions to the site are as follows: Luis Muñoz Rivera Expressway turn left (going west) on Fernández Juncos Avenue and keep all the way to the end and turn right on Paseo Concepción de Gracia and turn left next pier building.
APPROXIMATE CENTRAL COORDINATES:
Latitude: 18.46223°
Longitude: -66.110555°
COORDINATES of San Juan Harbor ODMDS:
Latitude Longitude
18.50277778° -66.15861111°
18.50277778° -66.14138889°
18.51944444° -66.14138889°
18.51944444° -66.15861111°
PROJECT PURPOSE:
Basic: Dredging
Overall: To provide maintenance dredging and safety depth to avoid grounding of large cruise ships in a berthing area of pier number 4.
EXISTING CONDITIONS: The San Juan Bay is an active port area. Pier 4 is used by cruise ships. The proposed area has been dredged several times in the past. The last maintenance dredging at the berthing areas of pier 4 was performed in 2012. The actual depths adjacent to pier number 4 fluctuate from approximately -33 feet to -38 feet. The Environmental Sensitivity Index Map describes the existing shoreline habitat as sheltered, solid man-made structures. In addition, based on available information, no seagrass or reefs are present at the project site. Sediments collected from pier 4 are composed mostly of sand (20.8% to 52.7%), clay (33.4% to 49%) and silt (13.9% to 30.2%). No gravel was found.
PROPOSED WORK: The applicant seeks authorization to perform maintenance dredging of approximately 4,000 cubic yards of sediments in navigable waters of the United States at the docking and the berthing area located at the West side of pier 4. The proposed dredge is located within an area of approximately 483 feet long by 463 feet wide. The method of dredging will be clamshell. The proposed dredging depth is -36 feet and -2 feet allowable overdepth. The dredged material will be transported to the Environmental Protection Agency (EPA) designated San Juan Harbor ODMDS.
BIOLOGICAL AND CHEMICAL TESTING: Sampling and testing of the material to be dredged were conducted in February and March 2015. The results of the physical, chemical and toxicological analyses of the samples collected are included on the Final Report San Juan Harbor Piers 3, 4, and Pan American MPRSA Section 103 Sediment Testing and Analysis dated December 2015. Copies of this report documenting the results of these analyses are available upon request. The EPA will evaluate the results and assess the suitability of the dredged sediments from the areas of Pier4 for the offshore disposal at the San Juan Harbor ODMDS.
CULTURAL RESOURCES:
The Corps has determined the permit area has been extensively modified by previous work and there is little likelihood a historic property may be affected.
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, but is not likely to adversely affect the Green sea turtles (Chelonia mydas), Hawksbill sea turtles (Eretmochelys imbricata) and the Antillean Manatee (Trichechus manatus) and it would not affect their designated critical habitat. The Corps has determined the proposal would have no effect on listed threatened or endangered coral species and the Nassau grouper (Epinephelus striatus) and their designated critical habitat. The Corps will request U.S. Fish and Wildlife/National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Caribbean. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program.
AUTHORIZATION FROM OTHER AGENCIES: A Coastal Zone Federal Consistency Certificate with the Puerto Rico Coastal Zone Management Plan is required from the Puerto Rico Planning Board.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Antilles Permit Section, Fundación Angel Ramos, Annex BLDG., Suite 202, 383 F. D. Roosevelt Ave., San Juan, Puerto Rico 00918 within 20 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the aquatic environment.
QUESTIONS concerning this application should be directed to the project manager, Ms. Carmen Gisela Román, in writing at the Antilles Permits Section, Fundación Angel Ramos, Annex BLDG., Suite 202, 383 F. D. Roosevelt Ave., San Juan, Puerto Rico 00918; by electronic mail at carmen.g.roman@usace.army.mil or by telephone at (787)729-6637.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
N
+
A,------~B
I
I
I
I
I
I
LOCATION
OF WORK
ATLANTIC OCEAN
I
PUERTO
RICO
f>
1
HUMACAO
c-------l o
SAN JUAN HARBOR ODMDS
CARIBBEAN SEA
LOCATION MAP
NOTTO SCALE
ATLANTIC OCEAN
PIER3
PIER4
PAN AMERICAN DOCKS
~~"(!.
~eAJ,...
Catano
LOCATION AND VICINITY MAP
~~-t
0
,.(;~
~- ":...o
oi:
'
;
0
o .
·* '
..,
0 ,.,...
GOVE.RNME.NTOF
PUERTO RIC'O
Por~ Aud1ority
.
GRAPHIC SCALE
PLANNING, ENGINEERING, CONSTRUCTION &
ENVIRONMENTAL AFFAIRS BUREAU
CARlJJ'~ AGOSTO. PLS
CO
TIFICATE
UC NUM 13,428
APPROVED ,
ROMEL PEDRAZA CLAUDIO
LIC NUM 21 224
5,000'
l
l. 1 l
l
l
0
5000'
I .1. J _ L _L ____ __ _~
DATE: FEBRUARY, 2017
MAINTENANCE DREDGING, 2017
I SHEET
PROJECT : PANAMERICAN DOCKS,
SAN ANTONIO CHANNEL,
PIER 3 EAST & WEST AND PIER 4 WEST
I 2 OF 9
PUERTORICC
PORTS
AUTHORITY
N
NOTE:
1. ALL THE SOUNDINGS AND VOLUMES DATA WERE PROVIDED BY THE U S.
CORPS OF ENGINEERS.
*
BAHIA URBANA
DREDGING PLAN
SCALE : 1"
GRAPHIC SCALE
fll·
.,.. t
~· 1'<,~
"
-
700
·* ·
"'
~o
..,
.,...
GOVERNMENT OF
PUERTO RIC'O
Por~
Authority
=4,000 CUBIC YARDS
DREDGING VOLUME PIER 4 = 4,000 CUBIC YARDS
PLANNING. ENGINEERING, CONSTRUCTION &
ENVIRONMENTAL AFFAIRS BUREAU
CA~J!r~ts AGOSTO PLS
C
ERTIFICATE
LIC NUM. 13.~28
DATE: FEBRUARY 2017
DREDGE AREA PIER 4 = 241 ,948 SQ. FT.
DREDGE AREA PIER 3 = 356,378 SQ. FT.
DREDGING VOLUME PIER 3
=350'
APPROVED
l-'-
ROM EL PEDR"-ZA CLAUDIO
UC NlJM 21,2.24
MAINTENANCE DREDGING, 2017
PROJECT : PANAMERICAN DOCKS,
SAN ANTON IO CHANNEL,
PIER 3 EAST & WEST AND PIER 4 WEST
I SHEET
I 4 OF g
PUE.1f0 MICO
PORTS
AUTHORITY
N
-+NOTE:
1. SIDE SLOPES SHOWN ARE FOR CONTRACTUAL PAYMENT PURPOSES
ONLY
2. ACTUAL SLOPES VARY WITH THE NATURAL ANGLE OF REPOSE FOR THE
ADJACENT MATERAL.
I
25 FOOT OFFSET----t
PORT BERTHS
0
25 FOOT OFFSET
PORT BERTHS
- -- - t
PORT BERTHS
AREA TO BE DREDGED
~
AREA TO BE DREDGED
t
10
~
25 FOOT OFFSET--
'
I·
...J
...J
~ 20
36 FOOT REQUIRED DEPTH
~
110
36 FOOT REQUIRED DEPTH
30
20
~
t
""
30
3;
z
Q
0
i= 40
:;
w
_,
w
f
::l
EXISTING BOTIOM ~
t
z
.
-1
0
2 FOOT ALLOWABLE OVERDEPTH
EXISTING BOTIOM
so
APPROX
60-800
-700
.500
.QOO
-400
I
/_j1
EXIST STRUCTURE _ _s
_ _
-300
-200
~
-t
J
0
-100
5
100
40
2 FOOT ALLOWABLE OVERDEPTH
APPROX EXIST STRUCTURE- - --
200
300
400
APPROX EXIST
STRU£TURE
-t
500
700
600
800
- 50
~
900
~
>
w
...J
w
60
CROSS SECTION AT CRUISE SHIP BASIN · PIERS 3 & 4
HORZ = SCALE: A
VERT SCALE: B
=
UAlt
200'
0
I I ' I '
I I I I I
200'
I
GRAPHIC SCALES
"B"
40'
I
CROSS SECTION AT CRUISE SHIP BASIN - PIERS 3 & 4
1 J":.
..~ot ,.
.<
";.
co
"(,~
GOVERNMENT OF
o PUERTO RICO
.
..,
. o">'
'*'
Por~ Audiorlty
PLANNING, ENGINEERING, CONSTRUCTION &
ENVIRONMENTAL AFFAIRS BUREAU
~
cfc:11!' ~s AGOSTO PLS
C
RTIFICATE
CA
rlc:s
UC NUM 13 428
CLAUDt~
APPROVED
ROMEL PEDRAZA
UC. NUM. 21 224
MAINTENANCE DREDGING, 2017
PROJECT : PANAMERICAN DOCKS,
SAN ANTONIO CHANNEL.
PIER 3 EAST & WEST AND PIER 4 WEST
0
II I
I I I I II I
DATE: FEBRUARY 2017
1
SHEET
6 OF 9
1
40'
I
__.
w·
0
g
o_
o_
o_
o_
0
0
m
m
21
~I
m
m
0
q
0
0
0
0
0
0
0
0
0
0
tti
0
Ol
II
>-__
0
0
q
A
"0
Ol
~--
r-----------, B
I
I
I
0
0
o_
N
0
Ol
I
I
I
I
I
I
I
I
II
>-__
I
CENTER
-
I
I
0
0
0
0
0
Ol
I
I
II
>-__
I
I
I
I
0
0
o_
co
Ol
co
POINT
PLANE COORDINATES
I
x
y
A
751,473.66
904,659.43
B
757,440.03
904,668.64
c
751,482.77
898,607.25
D
757,449.42
898,616.73
CENTER
754,443.38
901 ,575.77
CL - - - - - - - - - - .J D
ti
>-__
SAN JUAN HARBOR ODMDS
2,000'
0
2000'
GRAPHIC SCALES
LOCATION SAN JUAN HARBOR ODMDS
,~~
0
"<·~
~-~-o
'
~
"'
7
00
GOVERNMENT OF
PUEEITO RICO
..,
o"'
'*·
PLANN ING, ENGINEERING , CONSTRUCTION &
ENVIRONMENTAL AFFAIRS BUREAU
CAR~~AGOSTO,
Pt.S
llC NUM 13 428
CO
Ports Authority
DATE: FEBRUARY 2017
RTIFICATE
APPROVED~~
ROMELPEORAZACLAUOIO
UC NUM 21 224
MAINTENANCE DREDGING, 2017 ( SHEET
PROJECT : PANAMERICAN DOCKS,
SAN ANTONIO CHANNEL,
PIER 3 EAST & WEST AND PIER 4 WEST
I 3 OF 9
~ , PUERTO RICO
foUi PORTS
~ AUTHORITY