Puerto Rico Ports Authority
Mr. Romel Pedraza Claudio
Acting Assistant Executive Director
for Planning, Engineering, Construction and
Environmental Affairs
P.O. Box 362829
San Juan, Puerto Rico 00936-2829
PROJECT PURPOSE:
Basic: Dredging
Overall: To provide maintenance dredging and safety depth to avoid grounding of large cruise ships in berthing and adjacent areas of Panamerican Dock.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) and Section 103 of the Marine Protection, Research and Sanctuaries Act (MPRSA) of 1972, as described below:
APPLICANT: Puerto Rico Ports Authority
Mr. Romel Pedraza Claudio
Acting Assistant Executive Director
for Planning, Engineering, Construction and
Environmental Affairs
P.O. Box 362829
San Juan, Puerto Rico 00936-2829
WATERWAY AND LOCATION: The project would affect waters of the United States associated with the San Antonio Channel and the Atlantic Ocean. The project site is located at the dock and berthing areas of Panamerican Dock and a section of San Antonio Channel, Isla Grande, San Juan, Puerto Rico. The proposed ocean disposal site is at the San Juan Harbor ocean dredged material disposal site (ODMDS).
Directions to the site are as follows: Luis Muñoz Rivera Expressway turn left (going west) on Fernández Juncos Avenue, turn left on next exit, pass two marinas and take right exit, turn right at the stop light toward Lindbergh Street, turn right on the next street and keep all the way toward the Panamerican Dock to your right side.
APPROXIMATE CENTRAL COORDINATES:
Latitude: 18.459279°
Longitude: - 66.098302°
COORDINATES of San Juan Harbor ODMDS:
Latitude Longitude
18.50277778° -66.15861111°
18.50277778° -66.14138889°
18.51944444° -66.14138889°
18.51944444° -66.15861111°
PROJECT PURPOSE:
Basic: Dredging
Overall: To provide maintenance dredging and safety depth to avoid grounding of large cruise ships in berthing and adjacent areas of Panamerican Dock.
EXISTING CONDITIONS: The San Juan Bay is an active port area. Panamerican Dock is used by large cruise ships. The Panamerican Dock and berthing areas were dredged in the past in 2003. The actual depths at the project site fluctuate between 18 feet and 39 feet. The Environmental Sensitivity Index Map describes the existing shoreline habitat as sheltered, solid man-made structures. In addition, based on available information, no seagrass or reefs are present at the project site. Sediments collected from Panamerican Dock are composed mostly of sand (31.2% to 52.1%), clay (32.7% to 47.8%) and silt (15.2% to 25.9%). No gravel was found.
PROPOSED WORK: The applicant seeks authorization to perform maintenance dredging of approximately 8,000 cubic yards of sediments in an area of 2,256 feet long and 64 feet wide of navigable waters of the United States at the docking and berthing areas of Panamerican Dock. Also, the maintenance dredging of approximately 35,000 cubic yards of sediments in an area of 1,050 feet long and 570 feet wide of navigable waters at the San Antonio Channel. The method of dredging will be clamshell. The proposed dredging depth is -36 feet and -2 feet allowable overdepth. The dredged material will be transported to the Environmental Protection Agency (EPA) designated San Juan Harbor ODMDS.
BIOLOGICAL AND CHEMICAL TESTING: Sampling and testing of the material to be dredged were conducted in February and March 2015. The results of the physical, chemical and toxicological analyses of the samples collected are included on the Final Report San Juan Harbor Piers 3, 4, and Pan American MPRSA Section 103 Sediment Testing and Analysis dated December 2015. Copies of this report documenting the results of these analyses are available upon request. The EPA will evaluate the results and assess the suitability of the dredged material from the areas of Panamerican dock/San Antonio Channel for disposal at the San Juan Harbor ODMDS.
CULTURAL RESOURCES:
The Corps has determined the permit area has been extensively modified by previous work and there is little likelihood a historic property may be affected.
ENDANGERED SPECIES:
The Corps has determined the proposed project may affect, but is not likely to adversely affect the Green sea turtles (Chelonia mydas), Hawksbill sea turtles (Eretmochelys imbricata) and the Antillean Manatee (Trichechus manatus) and it would not affect their designated critical habitat. The Corps has determined the proposal would have no effect on listed threatened or endangered coral species and the Nassau grouper (Epinephelus striatus) and their designated critical habitat. The Corps will request U.S. Fish and Wildlife/National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act.
ESSENTIAL FISH HABITAT (EFH):
This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Caribbean. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program.
AUTHORIZATION FROM OTHER AGENCIES: A Coastal Zone Federal Consistency Certificate with the Puerto Rico Coastal Zone Management Plan is required from the Puerto Rico Planning Board.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Antilles Permit Section, Fundación Angel Ramos, Annex BLDG., Suite 202, 383 F. D. Roosevelt Ave., San Juan, Puerto Rico 00918 within 20 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms. Carmen Gisela Román, in writing at the Antilles Permits Section, Fundación Angel Ramos, Annex BLDG., Suite 202, 383 F. D. Roosevelt Ave., San Juan, Puerto Rico 00918; by electronic mail at carmen.g.roman@usace.army.mil or by telephone at (787)729-6637.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
N
Al ______
+
I
I
I
I
I
I
LOCATION
OF WORK
~B
A Tl.ANTIC OCEAN
I
·
DORADO
e
BAYAMON
ARECIBO
c:umR
P UERTO
RI C O
HUMACAO
c-------l o
..
SAN JUAN HARBOR ODMDS
CARIBBEAN SEA
LOCATION MAP
NOT TO SCALE
ATLANTIC OCEAN
PIER3
PIER4
PAN AMERICAN DOCKS
~"ll
~~}.-
catano
LOCATI ON AND VICINITY MAP
t- 1'_,
~t<~ ~· "'-'-1
GOVERNMENTOF
o PUERTO RICO
"
";
0 ,,
..,
'*'
o"'
Ports Authont'y
L
GRAPHIC SCALE
PLANNING, ENGINEERING, CONSTRUCTION &
ENVIRONMENTAL AFFAIRS BUREAU
R:J:~ AGOSTO PLS
CO
, ...
RTIFICATE
LIC NUM 13.~28
APPROVED ,
ROM EL PEDRAZA CLAUDIO
UC NUM 21 22~
,
5,000'
I_ .l . I J Lt L L I
I_
0
5000'
l
I
MAINTENANCE DREDGING, 2017
DATE : FEBRUARY, 2017
SHEET
PROJECT PANAMERICAN DOCKS.
· ---·
SAN ANTON IO CHANNEL.
2 OF 9
PIER 3 EAST & WEST AND PIER 4 WEST
PUERTO RICO
PORTS
AUTHORITY
N
+
q
o.
q
0
g
m
m
21
~I
0
0
0
0
0
0
0
0
q
0
0
o_
~I
m
0
0
o.
(0
0
0)
>II __
0
0
0
~-
A
Cll
>II __
r----------1 8
0
0
o_
POINT
N
0
PLANE COORDINATES
I
x
y
A
751.473.66
904,659.43
B
757,440.03
904,668.64
c
751,482.77
898,607.25
D
757,449.42
898,616.73
CENTER
754,443.38
901,575.77
0)
~--
CENTER
+
0
0
0
0
c
0)
~-0
0
0
o:i
0)
CL - - - ·- - -
o:>
- - - - .J D
>II __
SAN JUAN HARBOR ODMDS
2.000'
0
2000'
GRAPHIC SCALES
LOCATION SAN JUAN HARBOR ODMDS
0
1.
f-~o
., ·
-.':'"'
-;
0
'
''(·
.
o -
'*'
GOVERNMENTOF
PUERTO RICO
. ..,
03'
Poi ts Authority
PLANN ING, ENGINEERING , CONSTRUCTION &
ENVIRONMENTAL AFFAIRS BUREAU
CAR~~
>,GOSTO. PLS
LIC NUM 13.428
CO
TIFICATE
APPROVED 1~
ROM EL PEDRAZP CLAUDIO
UC NUM 21.224
DATE: FEBRUARY 2017
MAINTENANCE DREDGING, 2017
PROJECT PANAMERICAN DOCKS,
SAN ANTONIO CHANNEL
PIER 3 EAST & WEST AND PIER 4 WEST
1
SHEET
3 OF 9
1
~
PUERTO RICO
PORTS
~ AUTHORITY
N
·
§"'
"' !:
-
~
$
-.t ,...
0
-
APPROXIMATE SHORELINE
PIER 11
"""
PIER 13
PIER 14
cs
ch
G
>- !f! G
a: >
:::> a:
Cl)
:::>
8
°'
:::>
(/}
-
'"
b':-
~'l>
~
~ ....'.F~-
-
---=:::::_
~'II
'!>
~i:::~~~'k.. ~~~~--~~~~~
"""- ~
·--
-/-
cj
PANAMERJCAN
DOCK II
0
0
.,.a
',_<:)
·§>'
u·
PAN AMERICAN DOCl(s
0
0
I/)
11"1
P~AMER1c~ooc1
+
..,
u
0
TE SHORELINE
"'"""'""'"'
tlM~ OF CRUISE SHIP TERMINALS
+
0)
~
WJ.), .-. . .
'!>
.....
ci
~
~:- '!>'$ ~...l._ ....lb '\~
~'l> ~ J}~ -~ '!>~
~/--
..J'-"'~ -~'t> - ,;-
0
0
..,+
I/)
u
cS
II)
36 FOOT REQUIRED DEPTH
36 FOOT REQUIRED DEPTH
PLUS 2 FOOT ALLow"BLe OVERDEPTH
l.ENGTH 10so FT
=
PLUS 2 FOOT ALLOWABLE OVERDEPTH
NOTE·
1. ALL THE SOUNDINGS AND \IOLU MES DATA WERE PROVIDED
FERNADo l. RIBAS DOMINICc1 AIRP ORT
t///~ DREDGE AREA
BY THE U.S. CORPS OF ENGINEERS
DREDGING PLAN
GRAPHIC SCALE
3sa
o
DREDGE AREA PANAMERICAN DOCKS = 145,069 SQ. FT
,,,.~ .,. "<'.t-
";
t;;
..,
.
'*'
o'>
GOVERNME?JTOF
PUERTO RICO
Poit~ A11th<1rl tv
PLANN ING. ENG INEERING. CONSTRUCTION &
ENVIRONMENTAL AFFAIRS BUREAU
CAR~,,_~AGOSTO Pt..5
CO
t
TIFICATE
\.....· LIC ~UM 1'.l -26
APPROVED'·
SCALE
1" =350'
DATE· FEBRUARY 2017
DREDGE AREA SAN ANTON IO CHANNEL= 598,814 SQ FT
DREDGING VOLUME PANAMER ICAN DOCKS = 8,000 CU BIC YARDS
111
· - ~.o.
" '
3srr
LL___1_i___L _L ._i_L~~------~
\J
ROMELPEDRAZACl)IUOIO
UC NUM 21.22·
DREDGING VOLUM E SAN ANTONIO CHANNEL = 35 ,000 CUBIC YARDS
MAINTENANCE DREDGING , 2017
I SHEET
PROJECT PANAMERICAN DOCKS
SAN ANTONIO CHANNEL,
PIER 3 EAST & WEST AND PIER 4 WEST
I 5 OF 9
N
+
NOTE
1. SIDE SLOPES SHOWN ARE FOR CONTRACTUAL PAYMENT PURPOSES
ONLY
2. ACTUAL SLOPES VARY WITH THE NATURAL ANGLE OF REPOSE FOR THE
ADJACENT MATERAL
AREA TO BE DREDGED
.....,
~
1: [
/
.....,
,,,
,,.
,,.
~ 20
t-
u.
~
z
30
<
>
40
--'
w
_...
J---
l
60
-e-Or·
-700
-600
-500
(.\
~
25 FOOT OFFSET
PORT BERTHS
0
.....
~l'o20 ~~
'.....
'
-
.... 30
-400
-300
-200
-100
(,
100
200
.... 40
.... 50
300
~
z
0
EXISTING BOTTOM
APPROX EXIST STRUCTURE
APPROX EXIST STRUCTURE
....
I.I..
....
FOOT ALLOWABLE OVERD
...
50
I
·~~~~~~~:::=:;:::=s;:z:::=A.7·
S
2
,,,..
uJ
fl I
:JQ FOOT REQUIRED DEPTH
_,.,
Q
l
'
/
--'
--'
I
FEDERAL CHANNEL (BY OTHERS/
400
:,r.:i
"
>
w
--'
w
90060
eoo
700
600
;::
CROSS SECTION AT PANAMERICAN DOCKS
HORZ
VERT
=SCALE A
=SCALE: B
"A"
200'
I
t
I
I
!
I
I
I
t
I
0
200·
0
40'
I
I
GRAPHIC SCALES
"B"
CROSS SECTION AT PANAMERICAN DOCKS
111
·
~'""',. "<'.i
<":. GOVERNMENT OF
,; ·
o PUERTO RICO
""
7
··
0.:> ,
' + ·
~,,--
..,
.
Pott\ Aud1ority
PLANNING ENGINEERING. CONSTRUCTION &
ENVIRONMENTAL AFFAIRS BUREAU
CARL)~~N~_GOS10
~~
13·28
CO
APPROVED~~
IFICATE
NUM
PLS
ROMEL PEDRAZACl.AUOIO
LIC tJUM 21 224
40'
DATE FEBRUARY 2017
MAINTENANCE DREDGING, 2017
PROJECT PANAMERICAN DOCKS
SAN ANTONIO CHANNEL,
PIER 3 EAST & WEST AND PIER 4 WEST
I SHEET
~ PUERTO 81CO
~'} PORTS
I
I 7 OF 9
~ AUTHORITY
N
~
~
NOTE.
1 SIDE SLOPES SHOWN ARE FOR CONTRACTUAL PAYMENT PURPOSES
ONLY
2 ACTUAL SLOPES VARY WITH THE NATURAL ANGLE OF REPOSE FOR THE
ADJACENT MATERAL
AREA TO BE DREOGEDl -
0
r-
/
/
,;
e.
....
20 i:-
~
30 I'-
...
z
,.
/
,.
,,,.
0
i=
40
4:
I'-
>
w
_,
36 FOOT REQU IRED OEPTI-t
1~, ~
/
-
50
61000
2 FOOT ALLOWABLE OVERDEPTH
/--i-1'
EXISTINGl!OTIOM
-900
·700
-800
-500
-"00
20
... 30
40
t
J
_ ]'-
APPROX. EXIST STRUCTURE --i-..
- - APPROX EXIST STRUCTURE
-600
-'I
5
I'-
J -
- · 10
~
::l
~
....
LL
~
z
0
,;
w
0
~
AREA TO BE DREDGED t
.,,.
10 I'-
3_,_,
- - - 25 FOOT OFFSET
PORT BERTHS
1
I
NON· FEDERAL CHANNEL· SAN ANTONIO CHANNEL EXTENTION
.300
·200
-100
0
100
200
~oo
300
500
600
50
~
>
w
w
70060
CROSS SECTION BEYOND SAN ANTONIO CHANNEL · PANAMERICAN DOCKS
=
HORZ SCALE: A
VERT = SCALE B
..A"
200'
0
200'
40'
0
40'
GRAPHIC SCALES
1t9·+
CROSS SECTION BEYOND SAN ANTONIO CHANNEL - PANAMERICAN DOCKS
}1 1
· "'"'
,..,. ~ ,, ''t,,
.i:
GOVERNMENT OF
o PUERTO RICO
·
";
00
-»
'
' * '0
'>'
PLANNING, ENGINEERING, CONSTRUCTION &
ENVIRONMENTAL AFFAIRS BUREAU
°"ill's~AGOSTO.PLS
CO
Ports Authorll\
C
CAR
it:.Sf[IC
RTIFICl\TE
~iUM
13 428
APPROVE~
R0\4ELPEOR,.,ZACLAi.JDIO
LIC NUM 21 224
DATE· FEBRUARY 2017
MAINTENANCE DR EDGING, 2017
I SHEET
PROJECT: PANAMERICAN DOCKS .
SAN ANTONIO CHANNEL.
PIER 3 EAST & WEST AND PIER 4 WEST
I 8 OF g
la.
PUERTO Rico
~T_.}1 ) PORTS
-
'- Y AUTHORITY