Puerto Rico Ports Authority Mr. Romel Pedraza Claudio Acting Assistant Executive Director for Planning, Engineering, Construction and Environmental Affairs P.O. Box 362829 San Juan, Puerto Rico 00936-2829

PROJECT PURPOSE:

Basic: Dredging

Overall: To provide maintenance dredging and safety depth to avoid grounding of large cruise ships in berthing and adjacent areas of Panamerican Dock.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) and Section 103 of the Marine Protection, Research and Sanctuaries Act (MPRSA) of 1972, as described below:

APPLICANT: Puerto Rico Ports Authority

Mr. Romel Pedraza Claudio

Acting Assistant Executive Director

for Planning, Engineering, Construction and

Environmental Affairs

P.O. Box 362829

San Juan, Puerto Rico 00936-2829

WATERWAY AND LOCATION: The project would affect waters of the United States associated with the San Antonio Channel and the Atlantic Ocean. The project site is located at the dock and berthing areas of Panamerican Dock and a section of San Antonio Channel, Isla Grande, San Juan, Puerto Rico. The proposed ocean disposal site is at the San Juan Harbor ocean dredged material disposal site (ODMDS).

Directions to the site are as follows: Luis Muñoz Rivera Expressway turn left (going west) on Fernández Juncos Avenue, turn left on next exit, pass two marinas and take right exit, turn right at the stop light toward Lindbergh Street, turn right on the next street and keep all the way toward the Panamerican Dock to your right side.

APPROXIMATE CENTRAL COORDINATES: Latitude: 18.459279°

Longitude: - 66.098302°

COORDINATES of San Juan Harbor ODMDS:

Latitude Longitude

18.50277778° -66.15861111°

18.50277778° -66.14138889°

18.51944444° -66.14138889°

18.51944444° -66.15861111°

PROJECT PURPOSE:

Basic: Dredging

Overall: To provide maintenance dredging and safety depth to avoid grounding of large cruise ships in berthing and adjacent areas of Panamerican Dock.

EXISTING CONDITIONS: The San Juan Bay is an active port area. Panamerican Dock is used by large cruise ships. The Panamerican Dock and berthing areas were dredged in the past in 2003. The actual depths at the project site fluctuate between 18 feet and 39 feet. The Environmental Sensitivity Index Map describes the existing shoreline habitat as sheltered, solid man-made structures. In addition, based on available information, no seagrass or reefs are present at the project site. Sediments collected from Panamerican Dock are composed mostly of sand (31.2% to 52.1%), clay (32.7% to 47.8%) and silt (15.2% to 25.9%). No gravel was found.

PROPOSED WORK: The applicant seeks authorization to perform maintenance dredging of approximately 8,000 cubic yards of sediments in an area of 2,256 feet long and 64 feet wide of navigable waters of the United States at the docking and berthing areas of Panamerican Dock. Also, the maintenance dredging of approximately 35,000 cubic yards of sediments in an area of 1,050 feet long and 570 feet wide of navigable waters at the San Antonio Channel. The method of dredging will be clamshell. The proposed dredging depth is -36 feet and -2 feet allowable overdepth. The dredged material will be transported to the Environmental Protection Agency (EPA) designated San Juan Harbor ODMDS.

BIOLOGICAL AND CHEMICAL TESTING: Sampling and testing of the material to be dredged were conducted in February and March 2015. The results of the physical, chemical and toxicological analyses of the samples collected are included on the Final Report San Juan Harbor Piers 3, 4, and Pan American MPRSA Section 103 Sediment Testing and Analysis dated December 2015. Copies of this report documenting the results of these analyses are available upon request. The EPA will evaluate the results and assess the suitability of the dredged material from the areas of Panamerican dock/San Antonio Channel for disposal at the San Juan Harbor ODMDS.

CULTURAL RESOURCES:

The Corps has determined the permit area has been extensively modified by previous work and there is little likelihood a historic property may be affected.

ENDANGERED SPECIES:

The Corps has determined the proposed project may affect, but is not likely to adversely affect the Green sea turtles (Chelonia mydas), Hawksbill sea turtles (Eretmochelys imbricata) and the Antillean Manatee (Trichechus manatus) and it would not affect their designated critical habitat. The Corps has determined the proposal would have no effect on listed threatened or endangered coral species and the Nassau grouper (Epinephelus striatus) and their designated critical habitat. The Corps will request U.S. Fish and Wildlife/National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act.

ESSENTIAL FISH HABITAT (EFH):

This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Caribbean. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program.

AUTHORIZATION FROM OTHER AGENCIES: A Coastal Zone Federal Consistency Certificate with the Puerto Rico Coastal Zone Management Plan is required from the Puerto Rico Planning Board.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Antilles Permit Section, Fundación Angel Ramos, Annex BLDG., Suite 202, 383 F. D. Roosevelt Ave., San Juan, Puerto Rico 00918 within 20 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Ms. Carmen Gisela Román, in writing at the Antilles Permits Section, Fundación Angel Ramos, Annex BLDG., Suite 202, 383 F. D. Roosevelt Ave., San Juan, Puerto Rico 00918; by electronic mail at carmen.g.roman@usace.army.mil or by telephone at (787)729-6637.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

N Al ______

+

I I I I I I

LOCATION OF WORK

~B

A Tl.ANTIC OCEAN

I

·

DORADO e BAYAMON

ARECIBO c:umR

P UERTO

RI C O HUMACAO

c-------l o

..

SAN JUAN HARBOR ODMDS CARIBBEAN SEA

LOCATION MAP NOT TO SCALE

ATLANTIC OCEAN

PIER3

PIER4

PAN AMERICAN DOCKS

~"ll

~~}.-

catano LOCATI ON AND VICINITY MAP

t- 1'_, ~t<~ ~· "'-'-1

GOVERNMENTOF o PUERTO RICO

"

";

0 ,,

..,

'*'

o"'

Ports Authont'y

L GRAPHIC SCALE

PLANNING, ENGINEERING, CONSTRUCTION & ENVIRONMENTAL AFFAIRS BUREAU

R:J:~ AGOSTO PLS

CO

, ...

RTIFICATE

LIC NUM 13.~28

APPROVED , ROM EL PEDRAZA CLAUDIO UC NUM 21 22~

,

5,000' I_ .l . I J Lt L L I

I_

0

5000'

l

I

MAINTENANCE DREDGING, 2017

DATE : FEBRUARY, 2017 SHEET

PROJECT PANAMERICAN DOCKS. · ---· SAN ANTON IO CHANNEL. 2 OF 9 PIER 3 EAST & WEST AND PIER 4 WEST

PUERTO RICO

PORTS AUTHORITY

N

+

q

o.

q

0

g

m

m

21

~I

0 0

0 0

0

0 0 0

q

0 0

o_

~I

m

0 0

o. (0

0 0)

>II __ 0 0

0

~-

A

Cll

>II __

r----------1 8

0 0

o_

POINT

N 0

PLANE COORDINATES

I

x

y

A

751.473.66

904,659.43

B

757,440.03

904,668.64

c

751,482.77

898,607.25

D

757,449.42

898,616.73

CENTER

754,443.38

901,575.77

0)

~--

CENTER

+

0 0 0

0 c

0)

~-0 0 0

o:i 0)

CL - - - ·- - -

o:>

- - - - .J D

>II __

SAN JUAN HARBOR ODMDS

2.000'

0

2000'

GRAPHIC SCALES

LOCATION SAN JUAN HARBOR ODMDS 0

1.

f-~o ., · -.':'"'

-; 0

'

''(·

.

o -

'*'

GOVERNMENTOF PUERTO RICO

. .., 03' Poi ts Authority

PLANN ING, ENGINEERING , CONSTRUCTION & ENVIRONMENTAL AFFAIRS BUREAU

CAR~~ >,GOSTO. PLS LIC NUM 13.428 CO

TIFICATE

APPROVED 1~ ROM EL PEDRAZP CLAUDIO UC NUM 21.224

DATE: FEBRUARY 2017

MAINTENANCE DREDGING, 2017 PROJECT PANAMERICAN DOCKS, SAN ANTONIO CHANNEL PIER 3 EAST & WEST AND PIER 4 WEST

1

SHEET

3 OF 9

1

~

PUERTO RICO

PORTS

~ AUTHORITY

N

·

§"'

"' !: -

~

$

-.t ,... 0

-

APPROXIMATE SHORELINE PIER 11

"""

PIER 13

PIER 14

cs

ch

G

>- !f! G a: > :::> a: Cl) :::>

8

°'

:::>

(/}

-

'"

b':-

~'l>

~ ~ ....'.F~-

-

---=:::::_

~'II

'!>

~i:::~~~'k.. ~~~~--~~~~~ """- ~ ·--

-

/-

cj

PANAMERJCAN DOCK II 0 0

.,.a

',_<:)

·§>'

u·

PAN AMERICAN DOCl(s 0 0

I/)

11"1

P~AMER1c~ooc1

+

.., u

0

TE SHORELINE

"'"""'""'"'

tlM~ OF

CRUISE SHIP TERMINALS

+

0)

~

WJ.), .-. . . '!>

.....

ci

~

~:- '!>'$ ~...l._ ....lb '\~ ~'l> ~ J}~ -~ '!>~

~/--

..J'-"'~ -~'t> - ,;-

0

0

..,+

I/)

u cS

II)

36 FOOT REQUIRED DEPTH

36 FOOT REQUIRED DEPTH

PLUS 2 FOOT ALLow"BLe OVERDEPTH l.ENGTH 10so FT

=

PLUS 2 FOOT ALLOWABLE OVERDEPTH NOTE· 1. ALL THE SOUNDINGS AND \IOLU MES DATA WERE PROVIDED

FERNADo l. RIBAS DOMINICc1 AIRP ORT

t///~ DREDGE AREA

BY THE U.S. CORPS OF ENGINEERS

DREDGING PLAN

GRAPHIC SCALE

3sa

o

DREDGE AREA PANAMERICAN DOCKS = 145,069 SQ. FT

,,,.~ .,. "<'.t-

";

t;;

..,

.

'*'

o'>

GOVERNME?JTOF PUERTO RICO

Poit~ A11th<1rl tv

PLANN ING. ENG INEERING. CONSTRUCTION & ENVIRONMENTAL AFFAIRS BUREAU

CAR~,,_~AGOSTO Pt..5 CO

t

TIFICATE

\.....· LIC ~UM 1'.l -26

APPROVED'·

SCALE

1" =350'

DATE· FEBRUARY 2017

DREDGE AREA SAN ANTON IO CHANNEL= 598,814 SQ FT

DREDGING VOLUME PANAMER ICAN DOCKS = 8,000 CU BIC YARDS

111 · - ~.o. " '

3srr

LL___1_i___L _L ._i_L~~------~

\J

ROMELPEDRAZACl)IUOIO UC NUM 21.22·

DREDGING VOLUM E SAN ANTONIO CHANNEL = 35 ,000 CUBIC YARDS

MAINTENANCE DREDGING , 2017

I SHEET

PROJECT PANAMERICAN DOCKS SAN ANTONIO CHANNEL, PIER 3 EAST & WEST AND PIER 4 WEST

I 5 OF 9

N

+ NOTE 1. SIDE SLOPES SHOWN ARE FOR CONTRACTUAL PAYMENT PURPOSES ONLY

2. ACTUAL SLOPES VARY WITH THE NATURAL ANGLE OF REPOSE FOR THE ADJACENT MATERAL

AREA TO BE DREDGED

....., ~

1: [

/

.....,

,,, ,,. ,,.

~ 20

t-

u.

~

z

30

< >

40

--'

w

_...

J---

l

60 -e-Or·

-700

-600

-500

(.\ ~

25 FOOT OFFSET PORT BERTHS

0

.....

~l'o20 ~~

'..... '

-

.... 30

-400

-300

-200

-100

(,

100

200

.... 40 .... 50

300

~

z

0

EXISTING BOTTOM APPROX EXIST STRUCTURE

APPROX EXIST STRUCTURE

....

I.I..

....

FOOT ALLOWABLE OVERD

...

50

I

·~~~~~~~:::=:;:::=s;:z:::=A.7· S 2

,,,..

uJ

fl I

:JQ FOOT REQUIRED DEPTH

_,.,

Q

l

'

/

--' --'

I

FEDERAL CHANNEL (BY OTHERS/

400

:,r.:i

"

> w --' w

90060

eoo

700

600

;::

CROSS SECTION AT PANAMERICAN DOCKS HORZ VERT

=SCALE A =SCALE: B "A"

200' I

t

I

I

!

I

I

I

t

I

0

200·

0

40'

I

I

GRAPHIC SCALES

"B"

CROSS SECTION AT PANAMERICAN DOCKS

111 ·

~'""',. "<'.i <":. GOVERNMENT OF ,; · o PUERTO RICO "" 7

··

0.:> ,

' + ·

~,,--

..,

.

Pott\ Aud1ority

PLANNING ENGINEERING. CONSTRUCTION & ENVIRONMENTAL AFFAIRS BUREAU

CARL)~~N~_GOS10 ~~ 13·28 CO

APPROVED~~

IFICATE

NUM

PLS

ROMEL PEDRAZACl.AUOIO LIC tJUM 21 224

40'

DATE FEBRUARY 2017

MAINTENANCE DREDGING, 2017 PROJECT PANAMERICAN DOCKS SAN ANTONIO CHANNEL, PIER 3 EAST & WEST AND PIER 4 WEST

I SHEET

~ PUERTO 81CO ~'} PORTS I

I 7 OF 9

~ AUTHORITY

N

~ ~

NOTE. 1 SIDE SLOPES SHOWN ARE FOR CONTRACTUAL PAYMENT PURPOSES ONLY 2 ACTUAL SLOPES VARY WITH THE NATURAL ANGLE OF REPOSE FOR THE ADJACENT MATERAL

AREA TO BE DREOGEDl -

0

r-

/

/

,;

e. ....

20 i:-

~

30 I'-

... z

,. /

,. ,,,.

0

i=

40

4:

I'-

> w

_,

36 FOOT REQU IRED OEPTI-t

1~, ~

/

-

50

6

2 FOOT ALLOWABLE OVERDEPTH

/--i-1'

EXISTINGl!OTIOM -900

·700

-800

-500

-"00

20

... 30 40

t

J

_ ]'-

APPROX. EXIST STRUCTURE --i-..

- - APPROX EXIST STRUCTURE -600

-'I

5

I'-

J -

- · 10

~

::l ~ .... LL ~

z

0

,;

w

0

~

AREA TO BE DREDGED t

.,,.

10 I'-

3_,_,

- - - 25 FOOT OFFSET PORT BERTHS

1

I

NON· FEDERAL CHANNEL· SAN ANTONIO CHANNEL EXTENTION

.300

·200

-100

0

100

200

~oo

300

500

600

50

~

> w

w

70060

CROSS SECTION BEYOND SAN ANTONIO CHANNEL · PANAMERICAN DOCKS

=

HORZ SCALE: A VERT = SCALE B

..A"

200'

0

200'

40'

0

40'

GRAPHIC SCALES 1t9·+

CROSS SECTION BEYOND SAN ANTONIO CHANNEL - PANAMERICAN DOCKS

}1 1 · "'"' ,..,. ~ ,, ''t,,

.i:

GOVERNMENT OF o PUERTO RICO

·

";

00

-»

'

' * '0

'>'

PLANNING, ENGINEERING, CONSTRUCTION & ENVIRONMENTAL AFFAIRS BUREAU

°"ill's~AGOSTO.PLS

CO

Ports Authorll\

C

CAR it:.Sf[IC

RTIFICl\TE

~iUM

13 428

APPROVE~ R0\4ELPEOR,.,ZACLAi.JDIO LIC NUM 21 224

DATE· FEBRUARY 2017

MAINTENANCE DR EDGING, 2017

I SHEET

PROJECT: PANAMERICAN DOCKS . SAN ANTONIO CHANNEL. PIER 3 EAST & WEST AND PIER 4 WEST

I 8 OF g

la.

PUERTO Rico ~T_.}1 ) PORTS

-

'- Y AUTHORITY

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas