Margaret Chang is the Regulatory point-of-contact for this permit application from the Port of Portland to conduct work impacting four wetlands in Portland, Multnomah County, OR.
PUBLIC NOTICE
Application for Permit
Issue Date: March 7, 2017
Expiration Date: April 6, 2017
US Army Corps of Engineers No: NWP-2013-233/1
30-Day Notice Oregon Department of State Lands No: 59819-RF
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has received an application for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plans. The Corps is soliciting comments on the proposed work.
Applicant: Port of Portland
Attention: Vince Granato, Chief Operating Officer
c/o Kristine Shigley
Box 3529
Portland, OR 97208
Email: Kristine.Shigley@portofportland.com
Telephone: (503) 415-6142
Applicant’s Agent: Port of Portland
Attention: Maureen Minister, Natural Resources Manager
Box 3529
Portland, OR 97208
Email: Maureen.Minister@portofportland.com
Telephone: 503-415-6682
Location: The project site is located at southern end of Runway 3-21, within the airport perimeter fence, at the Portland International Airport (PDX), Portland, Oregon. The site is in Section 7, Township 1 North, Range 2 East.
Latitude and Longitude: 45.58 North, 122.62 West
Waterway: Four wetlands, Wetlands B (0.97 acre), Wetland C (5.76 acres), Wetland D (0.84 acre), and Wetland E (0.08 acre) and a ditch (100 linear feet that continues offsite upstream and downstream from the proposed project area) were delineated within the Runway 3-21 Runway Safety Area (RSA) project area. All four wetlands classified as palustrine emergent wetlands under the U.S. Fish and Wildlife Service’s Classification of Wetlands and Deepwater Habitats of the United States. All four of these wetlands appear to have developed on the sides of gentle slopes and are classified as slope/flats wetlands under the hydrogeomorphic classification system. Wetlands B, D, and E all appear to have developed in topographically low areas of the airfield. Wetland C is quite similar to these areas but contains a slightly depressional swale that flows from the southwestern corner to the northwestern corner of the wetland, where it outfalls to a catch basin. The catch basins in this area convey stormwater to the ditch located south of the project area, which eventually drains to the Columbia Slough. The wetland boundaries shown on the project drawings have not yet been verified by the Corps. If the Corps determines the boundaries of the wetland/waters are substantially inaccurate a new public notice may be published.
Project Purpose: The purpose is to improve stormwater drainage; to prevent flooding at the south end of Runway 3-21 at PDX; and to comply with Federal Aviation Administration (FAA) safety criteria for airport runway design and operations.
Project Description: The proposed project would place approximately 7,920 cubic yards of fill in approximately 6.68 acres of wetlands, and approximately 1.2 cubic yards of fill in approximately 4 linear feet of ditch to improve stormwater drainage and to prevent flooding at the south end of Runway 3-21 at PDX. A total of approximately 14,500 cubic yards of material would be brought into the project area to fill the wetlands and surrounding uplands in the proposed project area. This project would permanently improve grading and stormwater drainage to eliminate ponding and remove all wetlands from the RSA and surrounding infield area and prevent the wetlands from re-forming in the future. The project would include the following components:
1. Improve the stormwater infrastructure in and adjacent to the RSA of Runway 3-21, including installation of larger stormwater lines, new catch basins, pump lift station, and outfall.
2. Fill and re-grade the RSA and surrounding infield area on the south end of Runway 3-21. This includes filling of Wetlands C, D, E; and the grading of Wetlands B, C, D, and E in the project area.
3. Raise a section of Perimeter Road directly south of Runway 3-21, which has consistently flooded in the past.
Work within the wetlands would include replacing the existing 24-inch pipes that are located within Wetland C with new 48-inch pipes. Construction activities would include excavating a trench and placing the new pipe. Native backfill from the project excavation would be used. The existing pipe would be left in place and filled with concrete. The new pipes would either be high density polyethylene (HDPE) or reinforced concrete (to be determined by the contractor). Wetlands C, D, and E would be filled and graded, which would disturb the entire surface of these wetlands. Wetland B would not be filled, however, a small amount of material would be removed from Wetland B. Once filled, the proposed project area would be graded to direct stormwater runoff to the catch basin locations. This would raise the final ground elevation above the current water level in the slough and above the existing groundwater table. The existing stormwater pipe under Wetlands D and E would not be altered; however, the catch basins that this pipe flows into would be adjusted in accordance with the new site elevation.
Two existing 24-inch stormwater lines are located in the project area. These stormwater lines would either be abandoned in place or removed (to be determined during construction). The main line through the RSA would be replaced with a 48-inch stormwater line to the south of the existing line, between 25 and 100 feet away. New catch basins and 12-inch pipes connecting to the 48-inch line would be installed along with new manholes. The 48-inch line would connect to another new line that would tie into a new pump lift station that would be constructed with this project. The pump station would contain four pumps: one low-flow pump and three high-flow pumps to handle larger storm events. Only two of the high-flow pumps would be operated at a time during an event; the third pump would be used as backup. From the pump station would be two lines: a 12-inch line associated with the low-flow pump and 30-inch line associated with the high-flow pump. These lines would connect to the receiving ditch where one new 4 x 8–foot concrete outfall structure would be constructed 25 feet south of the existing outfall. The new outfall would be placed outside of the PDX perimeter fence approximately 10 feet from the water’s edge. A riprap pad would be placed around the new outfall structure, and continue down below the ordinary high water mark (OHWM) of the ditch, to protect against erosion. The outfall would be placed at approximately 7.0 feet (NAVD88); the rip-rap would go from the edge of the outfall down to an elevation of approximately 5.5 feet which is a foot below the OHWM. The existing outfall would be decommissioned and left in place.
A 680-foot section of Perimeter Road would also be rebuilt in the project area. A 450-foot stretch of this section would be raised 1 foot above the current grade; the remaining 230 feet would transition at each end of the roadway back into the existing grade. Although the elevation of the road would increase, the location and the width would remain the same resulting in no change in the amount of impervious surface. Base material (1 inch gravel from a commercial quarry) would be brought in to raise the grade of the road and then 6 inches of asphalt would be laid down to complete the roadway. Prior to the start of construction sediment fence would be installed along the security fence that runs between the ditch and the proposed construction. The section of old road would be removed with a milling machine and disposed of off Port property.
Mitigation: The applicant did not propose compensatory mitigation in the permit application. The Corps will determine the type and amount of compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings: Nine (9) drawings are attached and labeled Corps No. NWP-2013-233/1. Copies of this public notice, which have been mailed or otherwise physically distributed, feature project drawings in black and white. The electronic version features those drawings in color, which we think more accurately illustrates the proposed project. To access the electronic version of this public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public Notices.
Additional Information: The Federal Aviation Administration (FAA) is the lead Federal agency for this project.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated for compliance with guidelines promulgated by the U.S. Environmental Protection Agency under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used in evaluating discharges of dredged or fill material into waters of the United States. The source of the fill material would be clean fill from on-site.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires applicants to obtain a water quality certification for proposed discharges into waters of the United States. A permit for the described work will not be issued until certification has been issued or is waived from the certifying state. Attached is the state's notice for a water quality certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or that may adversely modify designated critical habitat. The Corps’ preliminary review indicates the described activity will not affect any endangered species or designated critical habitat. Consultation under Section 7 of the ESA is not required for the described activity. The Corps will make a final determination on the need to consult after receipt of comments from this public notice including any comments provided by the NMFS and/or USFWS.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps’ preliminary review indicates the described activity would not adversely affect EFH at the project location or in its vicinity. The Corps will make a final determination on the need to consult on EFH after receipt of comments from this public notice including any comments provided by the NMFS.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of actions they undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic Places. For this project, the Federal Aviation Administration (FAA), as the lead Federal agency for compliance with Section 106 of the NHPA, will consult with the appropriate State and/or Tribal Historic Preservation Officer as applicable. The Corps will review FAA’s compliance with NHPA as part of the review process, and include that documentation in the project file.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the FAA project manager identified below to assist in a complete evaluation of potential effects.
Sean Callahan
Federal Aviation Administration
1601 Lind Avenue, S.W., Suite 250
Renton, WA 98057-3356
Sean.Callahan@faa.gov
(425) 227-2629
State and Local Authorizations: The applicant will be applying for the following additional governmental authorizations for the project: Notice of Proposed Construction or Alteration, Federal Aviation Administration; 401 Water Quality Certification, Oregon Department of Environmental Quality; Removal/Fill Permit, Oregon Department of State Lands; Land Use Permit and Site Development Permit, City of Portland.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed project. Comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed project. Comments may be submitted by conventional mail or email. All comments received will be considered in determining whether authorizing the work would be contrary to the public interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown on page 1 and include the commenter’s name and address. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the Corps reference number. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act including any personally identifiable information such as names, phone numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project Manager listed below. All comments, whether by conventional mail or email, must be received no later than the expiration date of this public notice to ensure consideration. Please reference Corps No. NWP-2013-233/1. Comments should be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Regulatory Branch
Margaret Chang
P.O. 2946
Portland, Oregon 97208-2946
Email: Margaret.Chang@usace.army.mil
Telephone: (503) 808-4041
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: March 7, 2017
Written Comments Due: April 6, 2017
Corps of Engineers No: NWP-2013-233/1
Oregon Department of State Lands No: 59819-RF
WHO IS THE APPLICANT: Port of Portland
Attention: Vince Granato, Chief Operating Officer
c/o Kristine Shigley
Box 3529
Portland, OR 97208
Email: Kristine.Shigley@portofportland.com
Telephone: (503) 415-6142
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that “The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing.”
Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address.
PUBLIC NOTICE
Application for Permit
Issue Date: March 7, 2017
Expiration Date: April 6, 2017
US Army Corps of Engineers No: NWP-2013-233/1
Oregon Department of State Lands No: 59819-RF
30-Day Notice
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has
received an application for a Department of the Army permit for certain work in waters of the United
States, as described below and shown on the attached plans. The Corps is soliciting comments on the
proposed work.
Applicant:
Port of Portland
Attention: Vince Granato, Chief Operating Officer
c/o Kristine Shigley
Box 3529
Portland, OR 97208
Email: Kristine.Shigley@portofportland.com
Telephone: (503) 415-6142
Applicant's Agent:
Port of Portland
Attention: Maureen Minister, Natural Resources Manager
Box 3529
Portland, OR 97208
Email: Maureen.Minister@portofportland.com
Telephone: 503-415-6682
Location: The project site is located at southern end of Runway 3-21, within the airport perimeter
fence, at the Portland International Airport (PDX), Portland, Oregon. The site is in Section 7, Township
1 North, Range 2 East.
Latitude and Longitude: 45.58 North, 122.62 West
Waterway: Four wetlands, Wetlands B (0.97 acre), Wetland C (5.76 acres), Wetland D (0.84 acre),
and Wetland E (0.08 acre) and a ditch (100 linear feet that continues offsite upstream and downstream
from the proposed project area) were delineated within the Runway 3-21 Runway Safety Area (RSA)
project area. All four wetlands classified as palustrine emergent wetlands under the U.S. Fish and
Wildlife Service's Classification of Wetlands and Deepwater Habitats of the United States. All four of
these wetlands appear to have developed on the sides of gentle slopes and are classified as slope/flats
wetlands under the hydrogeomorphic classification system. Wetlands B, D, and E all appear to have
developed in topographically low areas of the airfield. Wetland C is quite similar to these areas but
contains a slightly depressional swale that flows from the southwestern corner to the northwestern
corner of the wetland, where it outfalls to a catch basin. The catch basins in this area convey stormwater
to the ditch located south of the project area, which eventually drains to the Columbia Slough. The
wetland boundaries shown on the project drawings have not yet been verified by the Corps. If the Corps
determines the boundaries of the wetland/waters are substantially inaccurate a new public notice may
be published.
Corps No. NWP-2013-233/1
Page 1 of 7
Project Purpose: The purpose is to improve stormwater drainage; to prevent flooding at the south end
of Runway 3-21 at PDX; and to comply with Federal Aviation Administration (FAA) safety criteria for
airport runway design and operations.
Project Description: The proposed project would place approximately 7,920 cubic yards of fill in
approximately 6.68 acres of wetlands, and approximately 1.2 cubic yards of fill in approximately 4 linear
feet of ditch to improve stormwater drainage and to prevent flooding at the south end of Runway 3-21
at PDX. A total of approximately 14,500 cubic yards of material would be brought into the project area
to fill the wetlands and surrounding uplands in the proposed project area. This project would
permanently improve grading and stormwater drainage to eliminate ponding and remove all wetlands
from the RSA and surrounding infield area and prevent the wetlands from re-forming in the future. The
project would include the following components:
1. Improve the stormwater infrastructure in and adjacent to the RSA of Runway 3-21, including
installation of larger stormwater lines, new catch basins, pump lift station, and outfall.
2. Fill and re-grade the RSA and surrounding infield area on the south end of Runway 3-21.
This includes filling of Wetlands C, D, E; and the grading of Wetlands B, C, D, and E in the project
area.
3. Raise a section of Perimeter Road directly south of Runway 3-21, which has consistently
flooded in the past.
Work within the wetlands would include replacing the existing 24-inch pipes that are located within
Wetland C with new 48-inch pipes. Construction activities would include excavating a trench and
placing the new pipe. Native backfill from the project excavation would be used. The existing pipe
would be left in place and filled with concrete. The new pipes would either be high density
polyethylene (HDPE) or reinforced concrete (to be determined by the contractor). Wetlands C, D, and
E would be filled and graded, which would disturb the entire surface of these wetlands. Wetland B
would not be filled, however, a small amount of material would be removed from Wetland B. Once
filled, the proposed project area would be graded to direct stormwater runoff to the catch basin
locations. This would raise the final ground elevation above the current water level in the slough and
above the existing groundwater table. The existing stormwater pipe under Wetlands D and E would
not be altered; however, the catch basins that this pipe flows into would be adjusted in accordance
with the new site elevation.
Two existing 24-inch stormwater lines are located in the project area. These stormwater lines would
either be abandoned in place or removed (to be determined during construction). The main line
through the RSA would be replaced with a 48-inch stormwater line to the south of the existing line,
between 25 and 100 feet away. New catch basins and 12-inch pipes connecting to the 48-inch line
would be installed along with new manholes. The 48-inch line would connect to another new line that
would tie into a new pump lift station that would be constructed with this project. The pump station
would contain four pumps: one low-flow pump and three high-flow pumps to handle larger storm
events. Only two of the high-flow pumps would be operated at a time during an event; the third pump
would be used as backup. From the pump station would be two lines: a 12-inch line associated with
the low-flow pump and 30-inch line associated with the high-flow pump. These lines would connect to
the receiving ditch where one new 4 x 8foot concrete outfall structure would be constructed 25 feet
south of the existing outfall. The new outfall would be placed outside of the PDX perimeter fence
approximately 10 feet from the water's edge. A riprap pad would be placed around the new outfall
structure, and continue down below the ordinary high water mark (OHWM) of the ditch, to protect
against erosion. The outfall would be placed at approximately 7.0 feet (NAVD88); the rip-rap would go
from the edge of the outfall down to an elevation of approximately 5.5 feet which is a foot below the
OHWM. The existing outfall would be decommissioned and left in place.
Corps No. NWP-2013-233/1
Page 2 of 7
A 680-foot section of Perimeter Road would also be rebuilt in the project area. A 450-foot stretch of
this section would be raised 1 foot above the current grade; the remaining 230 feet would transition at
each end of the roadway back into the existing grade. Although the elevation of the road would
increase, the location and the width would remain the same resulting in no change in the amount of
impervious surface. Base material (1 inch gravel from a commercial quarry) would be brought in to
raise the grade of the road and then 6 inches of asphalt would be laid down to complete the roadway.
Prior to the start of construction sediment fence would be installed along the security fence that runs
between the ditch and the proposed construction. The section of old road would be removed with a
milling machine and disposed of off Port property.
Mitigation: The applicant did not propose compensatory mitigation in the permit application. The
Corps will determine the type and amount of compensatory mitigation necessary to offset environmental
losses from the proposed project.
Drawings: Nine (9) drawings are attached and labeled Corps No. NWP-2013-233/1. Copies of this
public notice, which have been mailed or otherwise physically distributed, feature project drawings in
black and white. The electronic version features those drawings in color, which we think more
accurately illustrates the proposed project. To access the electronic version of this public notice, go to
the Portland District website at http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit
Information. At the Regulatory page select Regulatory Public Notices.
Additional Information: The Federal Aviation Administration (FAA) is the lead Federal agency for this
project.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into
waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated for
compliance with guidelines promulgated by the U.S. Environmental Protection Agency under authority
of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used
in evaluating discharges of dredged or fill material into waters of the United States. The source of the
fill material would be clean fill from on-site.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires applicants
to obtain a water quality certification for proposed discharges into waters of the United States. A permit
for the described work will not be issued until certification has been issued or is waived from the
certifying state. Attached is the state's notice for a water quality certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536) requires
federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and
Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under
the ESA as threatened or endangered or that may adversely modify designated critical habitat. The
Corps' preliminary review indicates the described activity will not affect any endangered species or
designated critical habitat. Consultation under Section 7 of the ESA is not required for the described
activity. The Corps will make a final determination on the need to consult after receipt of comments
from this public notice including any comments provided by the NMFS and/or USFWS.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and
Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to consult with the
NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may
adversely affect Essential Fish Habitat (EFH). The Corps' preliminary review indicates the described
activity would not adversely affect EFH at the project location or in its vicinity. The Corps will make a
Corps No. NWP-2013-233/1
Page 3 of 7
final determination on the need to consult on EFH after receipt of comments from this public notice
including any comments provided by the NMFS.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation Act
(NHPA) of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the appropriate
State and/or Tribal Historic Preservation Officer to take into account the effects of actions they
undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic
Places. For this project, the Federal Aviation Administration (FAA), as the lead Federal agency for
compliance with Section 106 of the NHPA, will consult with the appropriate State and/or Tribal Historic
Preservation Officer as applicable. The Corps will review FAA's compliance with NHPA as part of the
review process, and include that documentation in the project file.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native
American Indian Tribes, and other interested parties. If you have information pertaining to cultural
resources within the permit area, please provide this information to the FAA project manager identified
below to assist in a complete evaluation of potential effects.
Sean Callahan
Federal Aviation Administration
1601 Lind Avenue, S.W., Suite 250
Renton, WA 98057-3356
Sean.Callahan@faa.gov
(425) 227-2629
State and Local Authorizations: The applicant will be applying for the following additional
governmental authorizations for the project: Notice of Proposed Construction or Alteration, Federal
Aviation Administration; 401 Water Quality Certification, Oregon Department of Environmental Quality;
Removal/Fill Permit, Oregon Department of State Lands; Land Use Permit and Site Development
Permit, City of Portland.
Public Hearing: Any person may request in writing within the comment period specified in this notice
that a public hearing be held to consider this application. Requests for public hearings shall state with
particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable
impact, including cumulative impacts, of the described activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The benefit, which
reasonably may be expected to accrue from the described activity, must be balanced against its
reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be
considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian
Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed
project. Comments received will be considered by the Corps to determine whether to issue, modify,
condition or deny a permit for this proposal. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy
Act. Comments are also used to determine the need for a public hearing.
Corps No. NWP-2013-233/1
Page 4 of 7
Submitting Comments: Interested parties are invited to provide comments on the proposed project.
Comments may be submitted by conventional mail or email. All comments received will be considered
in determining whether authorizing the work would be contrary to the public interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown on
page 1 and include the commenter's name and address. In order to be accepted, e-mail comments
must originate from the author's e-mail account and must include on the subject line of the e-mail
message the Corps reference number. All comments received will become part of the administrative
record and are subject to public release under the Freedom of Information Act including any personally
identifiable information such as names, phone numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project Manager
listed below. All comments, whether by conventional mail or email, must be received no later than the
expiration date of this public notice to ensure consideration. Please reference Corps No. NWP-2013233/1. Comments should be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Regulatory Branch
Margaret Chang
P.O. 2946
Portland, Oregon 97208-2946
Email: Margaret.Chang@usace.army.mil
Telephone: (503) 808-4041
Corps No. NWP-2013-233/1
Page 5 of 7
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: March 7, 2017
Written Comments Due: April 6, 2017
Corps of Engineers No: NWP-2013-233/1
Oregon Department of State Lands No: 59819-RF
WHO IS THE APPLICANT: Port of Portland
Attention: Vince Granato, Chief Operating Officer
c/o Kristine Shigley
Box 3529
Portland, OR 97208
Email: Kristine.Shigley@portofportland.com
Telephone: (503) 415-6142
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants
for Federal permits or licenses to provide the Federal agency a water quality certification from
the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice
on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as
a result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are
available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible
during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with
hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-7352900.
Corps No. NWP-2013-233/1
Page 6 of 7
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section
on page one of this notice. Written comments may be emailed, mailed or faxed as described
below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon Telecommunications
Relay Service at 1-800-735-2900.
Corps No. NWP-2013-233/1
Page 7 of 7
Figure 1: Site Location Map
NWP-2013-233/1
1/9
Figure 2a: Tax Lot Map, Aerial Base
NWP-2013-233/1
2/9
Figure 2b: Tax Lot Map, Paper Base
NWP-2013-233/1
3/9
;Ö
Wetland D
Wetland E
5
Perimeter Road
0
24" S torm water Pipes
to be removed
West Quiescent
Basin
West Detention
Basin
Wetland C
Wetland B
;Ö
Outfall 2
;Ö
Receiving Ditch
MCDD Broadm oor Pump S tation
Outfall to Colum bia Slough
;Ö
0
NWP-2013-233/1
Feet
450
±
4/9
Figure 3: Existing Conditions
NO.
DATE
BY
9:50:25 AM
REVISIONS
FOSTEB
APPV'D
-2'
CB-D1
STS PUMP WETWELL
SEE SHEET P-01 FOR DETAILS
CK'D
NO.
DATE
BY
r:\aviation\pdx\2017\0001\brant's files\stormwater plan and profile_rw3-21.dwg
NWP-2013-233/1
PRINTED: 1/6/2017
0'
2'
4'
6'
8'
10'
12'
14'
VALVE VAULT 1, 2, AND 3
SEE SHEET P-01 FOR DETAILS
120 LF - 30" DIP @ S=0.20%
120 LF - 12" DIP @ S=0.20%
(TWO LINES RUN PARALLEL
IN TRENCH TO SAME
OUTFALL LOCATION)
PROPOSED OUTFALL
SEE DETAIL
IE 7.0
STS OUTFALL
STA. 88+62.22
OFF: 160.04' LT
150'
60+00
ST
S
D
100'
ST
S
ST LIN
S E
61+00
50'
60+50
STS MH D3
STA. 90+21.33
OFF: 113.47' LT
STS
VALVE VAULT 1, 2, AND 3
SEE SHEET P-01 FOR DETAILS
STS
APPV'D
249 LF - 48" @ S = 0.20%
EXIST. (4) 4" POWER
AND COMM CONDUITS
(TO BE POT HOLED)
30 LF - 48" @ S = 0.20%
REVISIONS
90+
00
STS PUMP WETWELL
SEE SHEET P-01 FOR DETAILS
STS MH D3
RIM ELEV. 10.88
IE 5.04 (12")
IE 5.04 (12")
IE 1.01 (48")
IE 1.01 (48")
IE SUMP 0.01
62+00
25'
SCALE: IN FEET
CK'D
63+50
0'
64+00
2"
1"
1/2"
1/4"
0
GRAPHIC SCALE - FOR REFERENCE ONLY
CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING.
SETTINGS FOR VIEWING AND PRINTING DRAWING CONTENT ARE OPTIMIZED WHEN ALL THREE PLANES ARE
VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.
light
dark
gray
gray
black
STS MH D4
STA. 91+31.09
OFF: 110.40' RT
CB-D3
STS
STS LINE D
244 LF - 48" @ S = 0.20%
EXIST. FAA DUCTBANK
CONCRETE ENCASED
(SURVEYED-AS
CONSTRUCTED)
102277 & 102518
PROJECT NUMBER
2015D142
DESIGN NUMBER
PORTLAND, OREGON
CB-D4
STS MH D5
STA. 92+38.47
OFF: 329.42' RT
E
12" STS CONNECTION
STA. 92+21.40
OFF: 294.60' RT
PORT OF PORTLAND
65+00
STS
62+50
STS MH D4
RIM ELEV. 10.98
IE 5.51 (12")
IE 1.51 (48")
IE 1.51 (48")
IE SUMP 0.51
64+50
CT
DU
E
A
FA
CT
DU
N
63+00
E
65+50
FA
A
FA
A
66+00
-2'
0'
2'
4'
6'
8'
10'
12'
14'
5/9
STS
MINA R Y
100.00' RT
278.18' RT
91+52.31
92+54.90
CB-D3
CB-D4
SCALE
DATE
CHECKED BY
DRAWN BY
AS SHOWN
JAN 2017
J. OSTLUND
P. EBERT
7.89%
9.33%
0.65%
2.38%
C-55
3
C-56
1
2
12"
12"
12"
12"
PIPE SIZE
C-56
5.08'
5.51'
5.04'
5.04'
NEW CATCH BASIN, SEE DETAIL
NEW MANHOLE, SEE DETAIL
NEW STORM LINE
HAND DIG AROUND UTILITY
37'
24'
294'
76'
IE @ MAIN
OR
MANHOLE
PORTLAND INTERNATIONAL AIRPORT
6. VERTICAL DATUM BASED ON NAVD88.
5. GEOMETRY BASED ON RUNWAY 3-21 CENTERLINE ALIGNMENT,
SEE SHEETS C-2 AND C-3 FOR DETAILS.
4. NOTIFY PORT IF TRANSITE, ASBESTOS -CEMENT, OR SIMILAR PIPE
MATERIAL IS ENCOUNTERED. THE PORT MAINTAINS A SPECIALTY
CONTRACT FOR REMOVAL OF THESE MATERIALS.
3. COORDINATE SCHEDULE OF UTILITY DEMOLITION THROUGH
PORT AND NOTIFY INSPECTOR AT LEAST 72 HOURS PRIOR TO
COMMENCING ANY REMOVAL WORK.
2. ABANDONED UTILITY LINES NOT SHOWN ON THE DRAWINGS, BUT
WHICH ARE ENCOUNTERED DURING CONSTRUCTION SHALL,
UNLESS OTHERWISE DIRECTED BY THE PORT, BE REMOVED TO
PROVIDE UNOBSTRUCTED ACCESS FOR NEW CONSTRUCTION.
THE REMAINDER OF THE UTILITY LINE SHALL BE LEFT
ABANDONED IN-PLACE AND PLUGGED IN ACCORDANCE WITH
THE SPECIFICATIONS.
1. LOCATIONS AND SIZES OF ALL SURFACE FEATURES,
UNDERGROUND UTILITIES, AND STRUCTURES MAY BE
APPROXIMATE AND WERE DETERMINED FROM BEST
INFORMATION AVAILABLE (SURVEY DATA, AS-BUILT DRAWINGS,
OR CONSTRUCTION DOCUMENTS). LOCATIONS,
CONFIGURATIONS, SIZES, AND MATERIAL TYPES SHOWN MAY
NOT MATCH ACTUAL CONDITIONS. FIELD VERIFY ALL ITEMS
WITHIN THE LIMITS OF DEMOLITION OR INSTALLATION WORK AND
REPORT TO THE PORT ANY DISCREPANCIES PRIOR TO BEGINNING
WORK.
NOTES:
STS
LEGEND:
8.00'
7.75'
6.95'
6.85'
SLOPE
SUBMITTED BY
PROJECT ENGINEER
BRANT FOSTER
DRAWING NO.
61 / 128
SHEET NO.
C-48
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
CD PDX 2017-1
TYPE
STORMWATER PLAN AND PROFILE
STS LINE D
10.75'
10.50'
9.70'
9.60'
LENGTH
CATCH BASIN DATA TABLE
GRATE ELEV. IE OUT
RUNWAY 3-21 STORMWATER INFRASTRUCTURE & PAVEMENT IMPROVEMENTS
367.61' LT
91+69.91
CB-D2
DESIGNED BY B. FOSTER
184.23' LT
89+94.21
CB-D1
OFFSET
STATION
NAME
Figure 4: Proposed Stormwater Pipes Plan and Profile
DR A W I N
LI
FAA
E
CB-D2
66+50
66+59
STS MH D5
RIM ELEV. 11.96
IE 2.00 (48")
IE SUMP 1.00
D
PR
ROA
G
E
TER
E
IME
E
PER
COM
S
ST
61+50
DATE
BY
10:14:37 AM
60'
R UINN
REVISIONS
2"
1"
1/2"
1/4"
APPV'D
-6'
-4'
-2'
0'
2'
4'
6'
8'
10'
12'
14'
CK'D
NO.
EXISTING
SLOUGH
DATE
BY
12" STS FM
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
STS
STS
STS LINE D
30" x 30" CROSS
N: 59800.52
E: 110358.31
STA. 89+55.29
OFF: 132.80' LT
OAD
VALVE VAULT (1-3)
RIM ELEV. 12.25
IE 7.24 (24")
VALVE VAULT 2
N: 59806.01
E: 110368.33
STA. 89+66.25
OFF: 129.59' LT
SEE DETAIL 1/P-03
VALVE VAULT 3
N: 59798.26
E: 110372.57
STA. 89+63.76
OFF: 121.11' LT
SEE DETAIL 1/P-03
STS
CONTROL
PANEL
REVISIONS
APPV'D
CK'D
PUMP STATION
13 LF (VARIES) - 24" @ S = 0.00%
SEE DETAIL 2/P-03
30" STS
PERIM
n:\c\p\2016\1600058-pop-civil-on-call\cad\plot\task 3 - r nway 321 p mp station\p mp station plan and profile_rw3-21.dwg
30" STS FM
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
STS OUTFALL
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
40'
NWP-2013-233/1
PRINTED: 12/30/2016
NO.
SCALE: IN FEET
20'
60+00
60+00
10'
60+50
ETER R
VALVE VAULT 1
N: 59813.75
E: 110364.08
STA. 89+68.73
OFF: 138.07' LT
SEE DETAIL 1/P-03
61+00
0'
N
STS
48" STS
STS WET WELL
STA 89+92.35
RIM ELEV. 11.00
IE 3.96 (12")
IE 0.95 (48")
IE 7.24 (20") (3 EA.)
IE 7.24 (10") (1 EA.)
IE SUMP -5.42
STS PUMP WET WELL
N: 59817.88
E: 110393.21
STA. 89+92.24
OFF: 120.38' LT
SEE DETAIL 4/P-02
STS
S
ST
PROJECT
PROJECT NUMBER
EAN
DESIGN NUMBER
PORT OF PORTLAND
-6'
-4'
-2'
0'
2'
4'
6'
8'
10'
12'
14'
48" STS
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
PORTLAND, OREGON
48" STS
STS MH D3
STA 61+65.78
IE 4.02 (12")
IE 1.00 (48")
STS MH D3
STA. 90+21.33
OFF: 113.47' LT
SEE SHEET C-48.
12" STS
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
E
12" STS
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
61+50
0
GRAPHIC SCALE - FOR REFERENCE ONLY
CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING.
SETTINGS FOR VIEWING AND PRINTING DRAWING CONTENT ARE OPTIMIZED WHEN ALL THREE PLANES ARE
VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.
light
dark
gray
gray
black
62+00
62+50
62+50
EXISTING
SLOUGH
6/9
AS SHOWN
DEC 2016
R. MILSKOWSKI
SUBMITTED BY
SUBMITTED_BY
BRANT FOSTER
DRAWING NO.
X / XX
SHEET NO.
P-01
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
CD PDX 2017-1
TYPE
PUMP STATION
PLAN AND PROFILE
PORTLAND INTERNATIONAL AIRPORT
RUNWAY 3-21 STORMWATER INFRASTRUCTURE & PAVEMENT IMPROVEMENTS
UINN
J.R. CADUA
Figure 5: Proposed Pump Station Plan and Profile
SCALE
DATE
CHECKED BY
DRAWN BY
DESIGNED BY R.
7. FINE GRADE AROUND VALVE VAULTS AND WET WELL TO PREVENT
PONDING AND PROVIDE POSITIVE DRAINAGE TOWARD AREA
DRAINS.
6. INSTALL CONFINED SPACE SIGNS IN WET WELL AND VALVE
VALVES. SEE DETAIL 1/P-04.
5. SEE ELECTRICAL DRAWING X/XX FOR ELECTRICAL SERVICE TO
PUMP STATION.
4. VERTICAL DATUM BASED ON NAVD88.
3. WET WELL STATION AND OFFSETS ARE BASED ON TAXIWAY B
WEST CENTERLINE ALIGNMENT.
2. GEOMETRY BASED ON POP LOCAL PROJECTION COORDINATE
SYSTEM.
1. LOCATIONS AND SIZES OF ALL SURFACE FEATURES,
UNDERGROUND UTILITIES, AND STRUCTURES MAY BE
APPROXIMATE AND WERE DETERMINED FROM BEST
INFORMATION AVAILABLE (SURVEY DATA, AS-BUILT DRAWINGS,
OR CONSTRUCTION DOCUMENTS). LOCATIONS,
CONFIGURATIONS, SIZES, AND MATERIAL TYPES SHOWN MAY
NOT MATCH ACTUAL CONDITIONS. FIELD VERIFY ALL ITEMS
WITHIN THE LIMITS OF DEMOLITION OR INSTALLATION WORK AND
REPORT TO THE PORT ANY DISCREPANCIES PRIOR TO BEGINNING
WORK.
NOTES:
5"
1
SEE
2
C-17
3
C-17
48"
SECTION A-A
NWP-2013-233/1
PROPOSED RIP RAP
EROSION PAD
SEE
18
"
OUTFLOW GRATE
ELEVATION AS SHOWN ON
PLANS
5"
12" MIN.
SUMP
30°
INVERT ELEVATION AS
SHOWN ON PLANS
48" STORM SEWER
MANHOLE RING MITERED
CUT AT 30°
16"
21" MIN.
1
2" X 2" SQ. EDGE
FLAT BARS
BOTH ENDS
ALL BARS
2
7/9
MATERIAL TO BE NEW STRUCTURAL STEEL, ASTM A-36.
NOTE:
4614"
4314"
16"
PROPOSED OUTFALL
3
DRILL 5 8" DIA.
4 PLACES
STEEL PLATE
8 PLACES
1 "
4
512"
8 @ 514" C.C.
512"
3
403 4"
373 4"
3
11 2"
ALL PRECAST SECTIONS SHALL CONFORM TO
THE REQUIREMENTS OF ASTM C-478. ALL
POURED IN PLACE CONCRETE SHALL HAVE A 28
DAY STRENGTH OF 4000 PSI AND 2" TO 4" SLUMP.
REINFORCING SHALL BE ASTM A615, GR 60.
PROVIDE FLEX JOINT WITHIN 18" OF MANHOLE
OR INLET FACE, KOR-N-SEAL, OR EQUAL, IS
ACCEPTABLE.
1.
2.
NOTES:
1
1
2" X 5 2" PHILLIPS
REDHEAD STAINLESS
STEEL WEDGE
ANCHORS, 4 EA.
(CATALONG NO.
W.W.1254 OR EQUAL)
Figure 6: Proposed Outfall Structure
STAINLESS
STEEL NUT &
WASHER, 4 EA.
1 "
2
PRINTED: 10/24/2016
DETTMM
4
0+00
5+00
9+00
r:\aviation\pdx\2017\0001\quantity calcs\wetland area cut and fill at 60 percent.dwg
300'
NWP-2013-233/1
8:48:11 AM
SCALE: IN FEET
200'
5
0
3+0
WETLAND B
WETLAND C
0
0+0
3
2+00
0+00
7,060 (CY) NET FILL
80 (CY) NET CUT
3,681
250,849
42,156
WETLAND E
WETLAND C
WETLAND B
8/9
10 (CY) NET FILL
NET CUT/FILL (CY)
ROAD
850 (CY) NET FILL
AREA (SF)
TAXILANE ATC
PERIMETER ROAD
TAXIWAY E
ETER
TWY E5
36,712
WETLAND D
WETLAND
WETLAND E
WETLAND D
PERIM
8'
10'
12'
14'
PROPOSED GRADE
PROPOSED GRADE
12'
14'
16'
14'
16'
18'
18'
EXISTING GRADE
12'
14'
16'
PROPOSED GRADE
8'
10'
12'
14'
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
EXHIBIT 1
PORTLAND INTERNATIONAL AIRPORT
RUNWAY 3-21 STORMWATER INFRASTRUCTURE & PAVEMENT IMPROVEMENT
WETLANDS B, C, D AND E PLAN AND SECTIONS
14'
16'
EXISTING GRADE
18'
12'
14'
16'
EXISTING GRADE
EXISTING GRADE
PROPOSED GRADE
18'
Figure 7: Wetlands Plan and Section
12'
14'
16'
0+00
1+00
100'
1+00
2+00
50'
3+00
0'
2
2+00
3+00
0+00
1+00
7+00
N
5+00
2+00
4+00
1+00
0+00
6+00
3+00
2+00
8+00
2"
1"
1/2"
1/4"
0
GRAPHIC SCALE - FOR REFERENCE ONLY
CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING.
SETTINGS FOR VIEWING AND PRINTING DRAWING CONTENT ARE OPTIMIZED WHEN ALL THREE PLANES ARE
VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.
light
dark
gray
gray
black
9+00
0+00
TAXIWAY E6
3+00
0+00
NO.
DATE
BY
AD
RO
PRINTED: 10/13/2016
REVISIONS
DETTMM
CK'D
NO.
DATE
BY
6'
8'
10'
12'
14'
16'
PVI 10+70.00
EXISTING
SLOPE
-2.1500%
REVISIONS
10+50
18'
-2.
75
01
%
GRADE BREAK
ELEV. 15.95
(MATCH EXISTING)
11+00
APPV'D
CK'D
200' VC
PVI 12+50.0
12+00
10+00
10+00
S0° 29' 26"W
13+00
PERIMETER ROAD
14+50
-0.0000%
102277 & 102518
PROJECT NUMBER
2015D142
DESIGN NUMBER
PORTLAND, OREGON
PORT OF PORTLAND
PVT 13+50.0
ELEV. 11.00'
13+50
20'
PVC 11+50.0
ELEV. 13.75'
11+50
POINT OF CURVE
PERIMETER ROAD CENTERLINE
STA. 15+53.98
OFF. 0.00' RT
N: 59914.77
E: 110292.15
14+00
BEGIN ALIGNMENT
PERIMETER ROAD CENTERLINE
STA. 10+00.00
OFF. 0.00' RT
N: 60468.74
E: 110296.89
ELEV. 11.00'
12+50
15+00
15+00
MINA R Y
9/9
DR A W I N
LI
SCALE
DATE
CHECKED BY
DRAWN BY
18
+
50
G. EVENHUS
M. DETTMER
AS SHOWN
OCT 2016
EXISTING
SLOPE
1.4851%
1.2481%
DESIGNED BY B. FOSTER
100' VC
RADIUS POINT
PERIMETER ROAD CENTERLINE
STA. 17+24.78
OFF. 215.00' RT
N: 59912.93
E: 110507.14
PVI 16+70.0
PAVING LIMITS
r:\aviation\pdx\2017\0001\sheets - civil\plan and profile_rw3-21.dwg
APPV'D
150'
NWP-2013-233/1
4:27:21 PM
SCALE: IN FEET
100'
ELEV. 11.00'
50'
PVT 17+20.0
ELEV. 11.62'
25'
17+00
0'
PVI 17+50.00
17+50
PVC 16+20.0
ELEV. 11.00'
LOW PT. 16+20
ELEV. 11.00
S
4
5°
01
'3
5"
E
GRADE BREAK
ELEV. 12.00
(MATCH EXISTING)
2"
1"
1/2"
1/4"
0
GRAPHIC SCALE - FOR REFERENCE ONLY
CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING.
SETTINGS FOR VIEWING AND PRINTING DRAWING CONTENT ARE OPTIMIZED WHEN ALL THREE PLANES ARE
VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.
light
dark
gray
gray
black
16+00
E
PR
16+50
G
RI
N
18+00
M
6'
8'
10'
12'
14'
16'
18'
20'
1.
S=5.00%
S=2.00%
12'
14' AC PVMNT
2' SHOULDER
S=
V
AR
IES
0.1'
GRADING
PERIMETER ROAD
GEOMETRY BASED ON PERIMETER ROAD
CENTERLINE ALIGNMENT.
NOTE:
S=5.00%
S=2.00%
12'
14' AC PVMNT
PROJECT ENGINEER
BRANT FOSTER
TYPE
DRAWING NO.
14 / 99
SHEET NO.
C-4
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
CD PDX 2017-1
Figure 8: Perimeter Road Detail
SUBMITTED BY
PLAN AND PROFILE
PERIMETER ROAD STA. 10+00 TO STA. 18+50
PORTLAND INTERNATIONAL AIRPORT
V
S=
IES
AR
GRADING
2' SHOULDER
POINT OF TANGENT
PERIMETER ROAD CENTERLINE
STA. 17+24.78
OFF. 0.00' RT
N: 59760.84
E: 110355.18
END ALIGNMENT
PERIMETER ROAD CENTERLINE
STA. 18+50.00
OFF. 0.00' RT
N: 59672.33
E: 110443.76
AD
RUNWAY 3-21 STORMWATER INFRASTRUCTURE & PAVEMENT IMPROVEMENT
18+50
ER
PE
RO
R
RI
ET
E
PE
T
ME
IUS
AD
0' R
5.0
21
15+50
Figure 1: Site Location Map
NWP-2013-233/1
1/9
Figure 2a: Tax Lot Map, Aerial Base
NWP-2013-233/1
2/9
Figure 2b: Tax Lot Map, Paper Base
NWP-2013-233/1
3/9
;Ö
Wetland D
Wetland E
5
Perimeter Road
0
24" S torm water Pipes
to be removed
West Quiescent
Basin
West Detention
Basin
Wetland C
Wetland B
;Ö
Outfall 2
;Ö
Receiving Ditch
MCDD Broadm oor Pump S tation
Outfall to Colum bia Slough
;Ö
0
NWP-2013-233/1
Feet
450
±
4/9
Figure 3: Existing Conditions
NO.
DATE
BY
9:50:25 AM
REVISIONS
FOSTEB
APPV'D
-2'
CB-D1
STS PUMP WETWELL
SEE SHEET P-01 FOR DETAILS
CK'D
NO.
DATE
BY
r:\aviation\pdx\2017\0001\brant's files\stormwater plan and profile_rw3-21.dwg
NWP-2013-233/1
PRINTED: 1/6/2017
0'
2'
4'
6'
8'
10'
12'
14'
VALVE VAULT 1, 2, AND 3
SEE SHEET P-01 FOR DETAILS
120 LF - 30" DIP @ S=0.20%
120 LF - 12" DIP @ S=0.20%
(TWO LINES RUN PARALLEL
IN TRENCH TO SAME
OUTFALL LOCATION)
PROPOSED OUTFALL
SEE DETAIL
IE 7.0
STS OUTFALL
STA. 88+62.22
OFF: 160.04' LT
150'
60+00
ST
S
D
100'
ST
S
ST LIN
S E
61+00
50'
60+50
STS MH D3
STA. 90+21.33
OFF: 113.47' LT
STS
VALVE VAULT 1, 2, AND 3
SEE SHEET P-01 FOR DETAILS
STS
APPV'D
249 LF - 48" @ S = 0.20%
EXIST. (4) 4" POWER
AND COMM CONDUITS
(TO BE POT HOLED)
30 LF - 48" @ S = 0.20%
REVISIONS
90+
00
STS PUMP WETWELL
SEE SHEET P-01 FOR DETAILS
STS MH D3
RIM ELEV. 10.88
IE 5.04 (12")
IE 5.04 (12")
IE 1.01 (48")
IE 1.01 (48")
IE SUMP 0.01
62+00
25'
SCALE: IN FEET
CK'D
63+50
0'
64+00
2"
1"
1/2"
1/4"
0
GRAPHIC SCALE - FOR REFERENCE ONLY
CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING.
SETTINGS FOR VIEWING AND PRINTING DRAWING CONTENT ARE OPTIMIZED WHEN ALL THREE PLANES ARE
VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.
light
dark
gray
gray
black
STS MH D4
STA. 91+31.09
OFF: 110.40' RT
CB-D3
STS
STS LINE D
244 LF - 48" @ S = 0.20%
EXIST. FAA DUCTBANK
CONCRETE ENCASED
(SURVEYED-AS
CONSTRUCTED)
102277 & 102518
PROJECT NUMBER
2015D142
DESIGN NUMBER
PORTLAND, OREGON
CB-D4
STS MH D5
STA. 92+38.47
OFF: 329.42' RT
E
12" STS CONNECTION
STA. 92+21.40
OFF: 294.60' RT
PORT OF PORTLAND
65+00
STS
62+50
STS MH D4
RIM ELEV. 10.98
IE 5.51 (12")
IE 1.51 (48")
IE 1.51 (48")
IE SUMP 0.51
64+50
CT
DU
E
A
FA
CT
DU
N
63+00
E
65+50
FA
A
FA
A
66+00
-2'
0'
2'
4'
6'
8'
10'
12'
14'
5/9
STS
MINA R Y
100.00' RT
278.18' RT
91+52.31
92+54.90
CB-D3
CB-D4
SCALE
DATE
CHECKED BY
DRAWN BY
AS SHOWN
JAN 2017
J. OSTLUND
P. EBERT
7.89%
9.33%
0.65%
2.38%
C-55
3
C-56
1
2
12"
12"
12"
12"
PIPE SIZE
C-56
5.08'
5.51'
5.04'
5.04'
NEW CATCH BASIN, SEE DETAIL
NEW MANHOLE, SEE DETAIL
NEW STORM LINE
HAND DIG AROUND UTILITY
37'
24'
294'
76'
IE @ MAIN
OR
MANHOLE
PORTLAND INTERNATIONAL AIRPORT
6. VERTICAL DATUM BASED ON NAVD88.
5. GEOMETRY BASED ON RUNWAY 3-21 CENTERLINE ALIGNMENT,
SEE SHEETS C-2 AND C-3 FOR DETAILS.
4. NOTIFY PORT IF TRANSITE, ASBESTOS -CEMENT, OR SIMILAR PIPE
MATERIAL IS ENCOUNTERED. THE PORT MAINTAINS A SPECIALTY
CONTRACT FOR REMOVAL OF THESE MATERIALS.
3. COORDINATE SCHEDULE OF UTILITY DEMOLITION THROUGH
PORT AND NOTIFY INSPECTOR AT LEAST 72 HOURS PRIOR TO
COMMENCING ANY REMOVAL WORK.
2. ABANDONED UTILITY LINES NOT SHOWN ON THE DRAWINGS, BUT
WHICH ARE ENCOUNTERED DURING CONSTRUCTION SHALL,
UNLESS OTHERWISE DIRECTED BY THE PORT, BE REMOVED TO
PROVIDE UNOBSTRUCTED ACCESS FOR NEW CONSTRUCTION.
THE REMAINDER OF THE UTILITY LINE SHALL BE LEFT
ABANDONED IN-PLACE AND PLUGGED IN ACCORDANCE WITH
THE SPECIFICATIONS.
1. LOCATIONS AND SIZES OF ALL SURFACE FEATURES,
UNDERGROUND UTILITIES, AND STRUCTURES MAY BE
APPROXIMATE AND WERE DETERMINED FROM BEST
INFORMATION AVAILABLE (SURVEY DATA, AS-BUILT DRAWINGS,
OR CONSTRUCTION DOCUMENTS). LOCATIONS,
CONFIGURATIONS, SIZES, AND MATERIAL TYPES SHOWN MAY
NOT MATCH ACTUAL CONDITIONS. FIELD VERIFY ALL ITEMS
WITHIN THE LIMITS OF DEMOLITION OR INSTALLATION WORK AND
REPORT TO THE PORT ANY DISCREPANCIES PRIOR TO BEGINNING
WORK.
NOTES:
STS
LEGEND:
8.00'
7.75'
6.95'
6.85'
SLOPE
SUBMITTED BY
PROJECT ENGINEER
BRANT FOSTER
DRAWING NO.
61 / 128
SHEET NO.
C-48
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
CD PDX 2017-1
TYPE
STORMWATER PLAN AND PROFILE
STS LINE D
10.75'
10.50'
9.70'
9.60'
LENGTH
CATCH BASIN DATA TABLE
GRATE ELEV. IE OUT
RUNWAY 3-21 STORMWATER INFRASTRUCTURE & PAVEMENT IMPROVEMENTS
367.61' LT
91+69.91
CB-D2
DESIGNED BY B. FOSTER
184.23' LT
89+94.21
CB-D1
OFFSET
STATION
NAME
Figure 4: Proposed Stormwater Pipes Plan and Profile
DR A W I N
LI
FAA
E
CB-D2
66+50
66+59
STS MH D5
RIM ELEV. 11.96
IE 2.00 (48")
IE SUMP 1.00
D
PR
ROA
G
E
TER
E
IME
E
PER
COM
S
ST
61+50
DATE
BY
10:14:37 AM
60'
R UINN
REVISIONS
2"
1"
1/2"
1/4"
APPV'D
-6'
-4'
-2'
0'
2'
4'
6'
8'
10'
12'
14'
CK'D
NO.
EXISTING
SLOUGH
DATE
BY
12" STS FM
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
STS
STS
STS LINE D
30" x 30" CROSS
N: 59800.52
E: 110358.31
STA. 89+55.29
OFF: 132.80' LT
OAD
VALVE VAULT (1-3)
RIM ELEV. 12.25
IE 7.24 (24")
VALVE VAULT 2
N: 59806.01
E: 110368.33
STA. 89+66.25
OFF: 129.59' LT
SEE DETAIL 1/P-03
VALVE VAULT 3
N: 59798.26
E: 110372.57
STA. 89+63.76
OFF: 121.11' LT
SEE DETAIL 1/P-03
STS
CONTROL
PANEL
REVISIONS
APPV'D
CK'D
PUMP STATION
13 LF (VARIES) - 24" @ S = 0.00%
SEE DETAIL 2/P-03
30" STS
PERIM
n:\c\p\2016\1600058-pop-civil-on-call\cad\plot\task 3 - r nway 321 p mp station\p mp station plan and profile_rw3-21.dwg
30" STS FM
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
STS OUTFALL
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
40'
NWP-2013-233/1
PRINTED: 12/30/2016
NO.
SCALE: IN FEET
20'
60+00
60+00
10'
60+50
ETER R
VALVE VAULT 1
N: 59813.75
E: 110364.08
STA. 89+68.73
OFF: 138.07' LT
SEE DETAIL 1/P-03
61+00
0'
N
STS
48" STS
STS WET WELL
STA 89+92.35
RIM ELEV. 11.00
IE 3.96 (12")
IE 0.95 (48")
IE 7.24 (20") (3 EA.)
IE 7.24 (10") (1 EA.)
IE SUMP -5.42
STS PUMP WET WELL
N: 59817.88
E: 110393.21
STA. 89+92.24
OFF: 120.38' LT
SEE DETAIL 4/P-02
STS
S
ST
PROJECT
PROJECT NUMBER
EAN
DESIGN NUMBER
PORT OF PORTLAND
-6'
-4'
-2'
0'
2'
4'
6'
8'
10'
12'
14'
48" STS
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
PORTLAND, OREGON
48" STS
STS MH D3
STA 61+65.78
IE 4.02 (12")
IE 1.00 (48")
STS MH D3
STA. 90+21.33
OFF: 113.47' LT
SEE SHEET C-48.
12" STS
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
E
12" STS
SEE SHEET C-48
FOR ADDITIONAL
INFORMATION.
61+50
0
GRAPHIC SCALE - FOR REFERENCE ONLY
CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING.
SETTINGS FOR VIEWING AND PRINTING DRAWING CONTENT ARE OPTIMIZED WHEN ALL THREE PLANES ARE
VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.
light
dark
gray
gray
black
62+00
62+50
62+50
EXISTING
SLOUGH
6/9
AS SHOWN
DEC 2016
R. MILSKOWSKI
SUBMITTED BY
SUBMITTED_BY
BRANT FOSTER
DRAWING NO.
X / XX
SHEET NO.
P-01
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
CD PDX 2017-1
TYPE
PUMP STATION
PLAN AND PROFILE
PORTLAND INTERNATIONAL AIRPORT
RUNWAY 3-21 STORMWATER INFRASTRUCTURE & PAVEMENT IMPROVEMENTS
UINN
J.R. CADUA
Figure 5: Proposed Pump Station Plan and Profile
SCALE
DATE
CHECKED BY
DRAWN BY
DESIGNED BY R.
7. FINE GRADE AROUND VALVE VAULTS AND WET WELL TO PREVENT
PONDING AND PROVIDE POSITIVE DRAINAGE TOWARD AREA
DRAINS.
6. INSTALL CONFINED SPACE SIGNS IN WET WELL AND VALVE
VALVES. SEE DETAIL 1/P-04.
5. SEE ELECTRICAL DRAWING X/XX FOR ELECTRICAL SERVICE TO
PUMP STATION.
4. VERTICAL DATUM BASED ON NAVD88.
3. WET WELL STATION AND OFFSETS ARE BASED ON TAXIWAY B
WEST CENTERLINE ALIGNMENT.
2. GEOMETRY BASED ON POP LOCAL PROJECTION COORDINATE
SYSTEM.
1. LOCATIONS AND SIZES OF ALL SURFACE FEATURES,
UNDERGROUND UTILITIES, AND STRUCTURES MAY BE
APPROXIMATE AND WERE DETERMINED FROM BEST
INFORMATION AVAILABLE (SURVEY DATA, AS-BUILT DRAWINGS,
OR CONSTRUCTION DOCUMENTS). LOCATIONS,
CONFIGURATIONS, SIZES, AND MATERIAL TYPES SHOWN MAY
NOT MATCH ACTUAL CONDITIONS. FIELD VERIFY ALL ITEMS
WITHIN THE LIMITS OF DEMOLITION OR INSTALLATION WORK AND
REPORT TO THE PORT ANY DISCREPANCIES PRIOR TO BEGINNING
WORK.
NOTES:
5"
1
SEE
2
C-17
3
C-17
48"
SECTION A-A
NWP-2013-233/1
PROPOSED RIP RAP
EROSION PAD
SEE
18
"
OUTFLOW GRATE
ELEVATION AS SHOWN ON
PLANS
5"
12" MIN.
SUMP
30°
INVERT ELEVATION AS
SHOWN ON PLANS
48" STORM SEWER
MANHOLE RING MITERED
CUT AT 30°
16"
21" MIN.
1
2" X 2" SQ. EDGE
FLAT BARS
BOTH ENDS
ALL BARS
2
7/9
MATERIAL TO BE NEW STRUCTURAL STEEL, ASTM A-36.
NOTE:
4614"
4314"
16"
PROPOSED OUTFALL
3
DRILL 5 8" DIA.
4 PLACES
STEEL PLATE
8 PLACES
1 "
4
512"
8 @ 514" C.C.
512"
3
403 4"
373 4"
3
11 2"
ALL PRECAST SECTIONS SHALL CONFORM TO
THE REQUIREMENTS OF ASTM C-478. ALL
POURED IN PLACE CONCRETE SHALL HAVE A 28
DAY STRENGTH OF 4000 PSI AND 2" TO 4" SLUMP.
REINFORCING SHALL BE ASTM A615, GR 60.
PROVIDE FLEX JOINT WITHIN 18" OF MANHOLE
OR INLET FACE, KOR-N-SEAL, OR EQUAL, IS
ACCEPTABLE.
1.
2.
NOTES:
1
1
2" X 5 2" PHILLIPS
REDHEAD STAINLESS
STEEL WEDGE
ANCHORS, 4 EA.
(CATALONG NO.
W.W.1254 OR EQUAL)
Figure 6: Proposed Outfall Structure
STAINLESS
STEEL NUT &
WASHER, 4 EA.
1 "
2
PRINTED: 10/24/2016
DETTMM
4
0+00
5+00
9+00
r:\aviation\pdx\2017\0001\quantity calcs\wetland area cut and fill at 60 percent.dwg
300'
NWP-2013-233/1
8:48:11 AM
SCALE: IN FEET
200'
5
0
3+0
WETLAND B
WETLAND C
0
0+0
3
2+00
0+00
7,060 (CY) NET FILL
80 (CY) NET CUT
3,681
250,849
42,156
WETLAND E
WETLAND C
WETLAND B
8/9
10 (CY) NET FILL
NET CUT/FILL (CY)
ROAD
850 (CY) NET FILL
AREA (SF)
TAXILANE ATC
PERIMETER ROAD
TAXIWAY E
ETER
TWY E5
36,712
WETLAND D
WETLAND
WETLAND E
WETLAND D
PERIM
8'
10'
12'
14'
PROPOSED GRADE
PROPOSED GRADE
12'
14'
16'
14'
16'
18'
18'
EXISTING GRADE
12'
14'
16'
PROPOSED GRADE
8'
10'
12'
14'
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
EXHIBIT 1
PORTLAND INTERNATIONAL AIRPORT
RUNWAY 3-21 STORMWATER INFRASTRUCTURE & PAVEMENT IMPROVEMENT
WETLANDS B, C, D AND E PLAN AND SECTIONS
14'
16'
EXISTING GRADE
18'
12'
14'
16'
EXISTING GRADE
EXISTING GRADE
PROPOSED GRADE
18'
Figure 7: Wetlands Plan and Section
12'
14'
16'
0+00
1+00
100'
1+00
2+00
50'
3+00
0'
2
2+00
3+00
0+00
1+00
7+00
N
5+00
2+00
4+00
1+00
0+00
6+00
3+00
2+00
8+00
2"
1"
1/2"
1/4"
0
GRAPHIC SCALE - FOR REFERENCE ONLY
CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING.
SETTINGS FOR VIEWING AND PRINTING DRAWING CONTENT ARE OPTIMIZED WHEN ALL THREE PLANES ARE
VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.
light
dark
gray
gray
black
9+00
0+00
TAXIWAY E6
3+00
0+00
NO.
DATE
BY
AD
RO
PRINTED: 10/13/2016
REVISIONS
DETTMM
CK'D
NO.
DATE
BY
6'
8'
10'
12'
14'
16'
PVI 10+70.00
EXISTING
SLOPE
-2.1500%
REVISIONS
10+50
18'
-2.
75
01
%
GRADE BREAK
ELEV. 15.95
(MATCH EXISTING)
11+00
APPV'D
CK'D
200' VC
PVI 12+50.0
12+00
10+00
10+00
S0° 29' 26"W
13+00
PERIMETER ROAD
14+50
-0.0000%
102277 & 102518
PROJECT NUMBER
2015D142
DESIGN NUMBER
PORTLAND, OREGON
PORT OF PORTLAND
PVT 13+50.0
ELEV. 11.00'
13+50
20'
PVC 11+50.0
ELEV. 13.75'
11+50
POINT OF CURVE
PERIMETER ROAD CENTERLINE
STA. 15+53.98
OFF. 0.00' RT
N: 59914.77
E: 110292.15
14+00
BEGIN ALIGNMENT
PERIMETER ROAD CENTERLINE
STA. 10+00.00
OFF. 0.00' RT
N: 60468.74
E: 110296.89
ELEV. 11.00'
12+50
15+00
15+00
MINA R Y
9/9
DR A W I N
LI
SCALE
DATE
CHECKED BY
DRAWN BY
18
+
50
G. EVENHUS
M. DETTMER
AS SHOWN
OCT 2016
EXISTING
SLOPE
1.4851%
1.2481%
DESIGNED BY B. FOSTER
100' VC
RADIUS POINT
PERIMETER ROAD CENTERLINE
STA. 17+24.78
OFF. 215.00' RT
N: 59912.93
E: 110507.14
PVI 16+70.0
PAVING LIMITS
r:\aviation\pdx\2017\0001\sheets - civil\plan and profile_rw3-21.dwg
APPV'D
150'
NWP-2013-233/1
4:27:21 PM
SCALE: IN FEET
100'
ELEV. 11.00'
50'
PVT 17+20.0
ELEV. 11.62'
25'
17+00
0'
PVI 17+50.00
17+50
PVC 16+20.0
ELEV. 11.00'
LOW PT. 16+20
ELEV. 11.00
S
4
5°
01
'3
5"
E
GRADE BREAK
ELEV. 12.00
(MATCH EXISTING)
2"
1"
1/2"
1/4"
0
GRAPHIC SCALE - FOR REFERENCE ONLY
CAN YOU SEE THE AIRPLANES? THE ADJACENT SAMPLES SHOW THREE DIFFERENT LEVELS OF SHADING.
SETTINGS FOR VIEWING AND PRINTING DRAWING CONTENT ARE OPTIMIZED WHEN ALL THREE PLANES ARE
VISIBLE. THIS GUIDANCE IS PROVIDED FOR REFERENCE ONLY.
light
dark
gray
gray
black
16+00
E
PR
16+50
G
RI
N
18+00
M
6'
8'
10'
12'
14'
16'
18'
20'
1.
S=5.00%
S=2.00%
12'
14' AC PVMNT
2' SHOULDER
S=
V
AR
IES
0.1'
GRADING
PERIMETER ROAD
GEOMETRY BASED ON PERIMETER ROAD
CENTERLINE ALIGNMENT.
NOTE:
S=5.00%
S=2.00%
12'
14' AC PVMNT
PROJECT ENGINEER
BRANT FOSTER
TYPE
DRAWING NO.
14 / 99
SHEET NO.
C-4
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
CD PDX 2017-1
Figure 8: Perimeter Road Detail
SUBMITTED BY
PLAN AND PROFILE
PERIMETER ROAD STA. 10+00 TO STA. 18+50
PORTLAND INTERNATIONAL AIRPORT
V
S=
IES
AR
GRADING
2' SHOULDER
POINT OF TANGENT
PERIMETER ROAD CENTERLINE
STA. 17+24.78
OFF. 0.00' RT
N: 59760.84
E: 110355.18
END ALIGNMENT
PERIMETER ROAD CENTERLINE
STA. 18+50.00
OFF. 0.00' RT
N: 59672.33
E: 110443.76
AD
RUNWAY 3-21 STORMWATER INFRASTRUCTURE & PAVEMENT IMPROVEMENT
18+50
ER
PE
RO
R
RI
ET
E
PE
T
ME
IUS
AD
0' R
5.0
21
15+50