Home

New Orleans District

Run scraper

Louisiana Department of Wildlife and Fisheries (LDWF)

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

SOUTH PASS 89 ARTIFICIAL REEF IN THE GULF OF MEXICO

NAME OF APPLICANT: Louisiana Department of Wildlife and Fisheries (LDWF), Artificial Reef Program, Post Office Box 98000, Baton Rouge, Louisiana 70808.

LOCATION OF WORK: Gulf of Mexico, Outer Continental Shelf, South Pass Area, Block 89, off the coast of Plaquemines Parish, Louisiana, as shown on the attached drawings.

CHARACTER OF WORK: Enhance the existing South Pass 89 artificial reef by install and maintaining Fieldwood Energy’s South Pass 75-A jacket to provide structural habitat for the purpose of enhancing fishing opportunities in the Gulf of Mexico. Clearance from the top of the deployed platform jacket to the water surface will be approximately 247 feet.

This request is pursuant to Act 100, 1986 Louisiana Legislature and the National Fishing Enhancement Act of 1984.

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVENUE NEW ORLEANS, LOUISIANA 70118 REPLY TO ATTENTION OF

20 March 2017

Operations Division Eastern Evaluation Section Project Manager Melissa Marino (504) 862-2637 Melissa.L.Marino@usace.army.mil SUBJECT: MVN-2016-01481-MM PUBLIC NOTICE Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [ ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). SOUTH PASS 89 ARTIFICIAL REEF IN THE GULF OF MEXICO NAME OF APPLICANT: Louisiana Department of Wildlife and Fisheries (LDWF), Artificial Reef Program, Post Office Box 98000, Baton Rouge, Louisiana 70808. LOCATION OF WORK: Gulf of Mexico, Outer Continental Shelf, South Pass Area, Block 89, off the coast of Plaquemines Parish, Louisiana, as shown on the attached drawings. CHARACTER OF WORK: Enhance the existing South Pass 89 artificial reef by installing and maintaining Fieldwood Energy's South Pass 75-A jacket to provide structural habitat for the purpose of enhancing fishing opportunities in the Gulf of Mexico. Clearance from the top of the deployed platform jacket to the water surface will be approximately 247 feet. This request is pursuant to Act 100, 1986 Louisiana Legislature and the National Fishing Enhancement Act of 1984. The comment period will close 15 days from the date of this public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief

-2-

will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the impact of the proposed work on navigation and national security. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and the State Historic Preservation Officer regarding potential impacts to cultural resources. Our initial finding is that the proposed work would neither affect critical habitat nor any species listed as endangered by the U.S. Department of Commerce. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may result in the alteration of 0.87 acres of EFH utilized by various life stages of red drum, reef fish, penaeid shrimp and coastal migratory pelagics. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality before a permit is issued.

-3-

The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Michael Farabee Chief, Eastern Evaluation Section Attachments

Louisiana Artificial Reef Planning Areas Baton Rouge Lafayette New Orleans Cameron Morgan City

Cocodrie

Leeville Grand Isle

Venice

8

7 6

3 9

2 4 1

5

0

12.5

25

50

75

100 Nautical Miles

Planning Areas Planning Areas Fairways OCS Blocks

1. West Cameron Planning Area 2. East Cameron Planning Area 3. South Marsh Island (76) Planning Area 4. South Marsh Island (146) Planning Area 5. Eugene Island Planning Area

6. South Timbalier Planning Area 7. West Delta Planning Area 8. Main Pass Planning Area 9. Ship Shoal Planning Area

Louisiana Artificial Reef Program MP65 MP64

Venice

MP68

MP63

MP62

MP69 MP70 MP71

MP61

MP140

MP138

MP137

MP136

MP135 MP134

MP141

MP142

MP143

MP144 MP145

MP72 MP73 MP147 MP146 MP300 MP299 MP298 MP297 MP296

Main Pass

WD20 WD21 WD22 WD23

MP74 MP148

MP149

MP301

MP302

MP303

MP304

MP77 MP151

MP150

MP312

MP311

MP310

MP309

MP152

MP153

MP313

MP314

MP315

MP316

VK856

VK857

SP65

SP64

SP63

SP62 VK900

VK901

Pilottown WD24

WD31 WD30 WD29 WD28 WD27 WD26 WD25

MP78

SP6 SP59

WD44 WD45 WD46 WD47 WD48 WD49WD50

SP66

VK898 VK899 SP17 SP60

SP67

WD63 WD62 WD61 WD60 WD59 WD58 WD57WD56 SP18

SP61

SP68

SP28

SP27

West Delta

SP38

SP37

SP34

SP35

WD91 WD90 WD89 WD88 WD87 WD86WD85 SP43

SP71

VK943

VK944

VK945

VK985

VK986

VK987

VK988

VK989

VK941

VK984

SP70 VK983

SP31

SP36

SP39

SP72

SP32

SP29

VK942 VK940

SP19 WD81 WD74 WD75 WD76 WD77 WD78 WD79 WD80

SP69

MC21

MC22

MC23

MC24

MC25

MC26

MC27

MC65

MC66

MC67

MC68

MC69

MC70

MC71

MC107 MC108

MC109

MC110

MC111

MC112

MC113

MC114

MC115

SP33

SP44

SP45

SP46

SP47

SP48

SP49

SP56

SP55

SP54

SP53

SP52

SP51

SP50

SP73

MC63

MC20

MC64

SP42 WD103WD104 WD105WD106 WD107WD108

WD109 SP58

WD114

WD113

WD112

WD111

WD110

WD123

WD124

WD125

WD126

WD127

SP57

MC103MC104 MC149

MC150

MC151

MC152

MC153

MC154

MC155

MC156

MC157

MC158

MC159

MC193

MC194

MC195

MC196

MC197

MC198

MC199

MC200

MC201

MC202

MC203

MC236 MC235

MC237

MC238

MC239

MC240

MC241

MC242

MC243

MC244

MC245

MC246

MC247

MC279

MC280

MC281

MC282

MC283

MC284

MC285

MC286

MC287

MC288

MC289

MC290

MC291

MC323

MC324

MC325

MC326

MC327

MC328

MC329

MC330

MC331

MC332

MC333

MC334

MC335

SP78

SP77

SP76

SP75

SP74 MC147 MC148

SP79

SP80

SP81

SP82

SP83

SP86

SP85

MC190 SP84 MC234

MC191 MC192

SP87 WD132

WD131

WD130

WD129

WD128

WD141

WD142

WD143

WD144

WD145

WD150

WD149

WD148

WD147

WD146

South Pass 89 Reef SP88

SP94

SP89

SP93

SP90

SP92

SP91 MC277 MC278 MC321 MC322

Planning Area Permitted Reef Sites Fairways OCS Blocks

0 1 2

4

6

8 Nautical Miles

South Pass 89 Vicinity Map

1

2

525'

525'

4

3

NOTES

ARTIFICIAL REEF BOUNDARY

1. THIS PLAT WAS PREPARED FOR PERMIT PURPOSES ONLY, AND IS NOT A PROPERTY BOUNDARY SURVEY, AND AS SUCH DOES NOT COMPLY WITH THE "STANDARDS OF PRACTICE FOR BOUNDARY SURVEYS" AS ADOPTED BY THE LOUISIANA PROFESSIONAL ENGINEERING AND LAND SURVEYING BOARD.

Tie

X Coordinate

Y Coordinate

Longitude

Latitude

1

2,621,786.00

19,018.00

28°42'16.1763"N

89°23'38.7441"W

2

2,623,286.00

19,018.00

28°42'15.9248"N

89°23'21.9057"W

3

2,623,286.00

17,118.00

28°41'57.1192"N

89°23'22.2675"W

4

2,621,786.00

17,118.00

28°41'57.3707"N

89°23'39.1051"W

L O U I S I A N A Baton Rouge Lake Charles Lafayette

Cameron SABINE PASS (LA)

CHAND. SOUND

Morgan City Amelia

Fresh Water City

WEST CAMERON

EUGENE ISLAND

Grand Isle Fourchon

Venice

S. BAY PELT. MARCH. GR. ISLE SHIP SHOAL

SOUTH TIMBALIER

PROJECT LOCATION 0

BLOCK 89 SOUTH PASS AREA GULF OF MEXICO

MAIN PASS

Dulac

EAST VERMILION SOUTH CAMERON MARSH ISLAND

CHAND.

BRETON SOUND

Houma

Cocodrie

SOUTH PASS 75 - "A" PROPOSED REEF POSITION

CHAND. SND.ADDN.

New Orleans Grand Cheniere

Intracoastal City

VICINITY MAP SCALE IN MILES

WEST DELTA

SOUTH PASS

FUGRO CHANCE INC. 200 Dulles Drive

Lafayette, Louisiana 70506

NAD27 LOUISIANA SOUTH US SURVEY FEET 100

Job No.: 1600764

Date: 11/02/2016

(337) 237-1300

SCALE 1:12000

1000

0

FEET

Drwn: MGK

DWG File: H:\2016\1600764\GIS\1600...\SP89_SP75-A_REEF_PROPOSE...

Chart:

1

Of:

3

11/02/2016

53' x 70'

TOP OF JACKET

WATER LINE (MLLW)

PLAN

PROFILE

MUD LINE (ELEV. -358')

130' x 146'

SOUTH PASS 75 - "A" TO BE REEFED BLOCK 89 SOUTH PASS AREA GULF OF MEXICO

FUGRO CHANCE INC. 200 Dulles Drive

Lafayette, Louisiana 70506

NAD27 LOUISIANA SOUTH US SURVEY FEET

Job No.: 1600764

Date: 11/02/2016

(337) 237-1300

SCALE

0

60'

FEET

Drwn: MGK

DWG File: H:\2016\1600764\GIS\1600...\SP89_SP75-A_REEF_PROPOSE...

Chart:

2

Of:

3

11/02/2016

WATER LINE (MLLW)

$IBSUFESFFGDMFBSBODFGU

1SPQPTFETUSVDUVSFDMFBSBODFGU

MUD LINE (ELEV. -393')

379'

PROFILE NOTES 1. THIS PLAT WAS PREPARED FOR PERMIT PURPOSES ONLY, AND IS NOT A PROPERTY BOUNDARY SURVEY, AND AS SUCH DOES NOT COMPLY WITH THE "STANDARDS OF PRACTICE FOR BOUNDARY SURVEYS" AS ADOPTED BY THE LOUISIANA PROFESSIONAL ENGINEERING AND LAND SURVEYING BOARD. 2. 0.71 MILES TO NEAREST SHIPPING FAIRWAY. 3. CLEARANCES BASED ON CONSTRUCTION DRAWINGS.

SOUTH PASS 75 - "A" PROPOSED REEF POSITION BLOCK 89 SOUTH PASS AREA GULF OF MEXICO

FUGRO CHANCE INC. 200 Dulles Drive

Lafayette, Louisiana 70506

NAD27 LOUISIANA SOUTH US SURVEY FEET

Job No.: 1600764

Date: 11/02/2016

(337) 237-1300

SCALE

0

60'

FEET

Drwn: MGK

DWG File: H:\2016\1600764\GIS\1600...\SP89_SP75-A_REEF_PROPOSE...

Chart:

3

Of:

3

11/02/2016

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas