HICKORY LAKE CREEK MITIGATION BANK IN ALLEN PARISH
NAME OF APPLICANT: Great Western Investments Company, C/O Matrix New World Engineering, 4451 Bluebonnet Blvd, Suite E., Baton Rouge, Louisiana 70809.
LOCATION OF WORK: The 301.6 acre site is located approximately 7 miles west-northwest of Kinder, Louisiana, inAllen Parish, as shown on enclosed drawings (Latitude: 30.525314 N, Longitude:–92.962742 W). The Project is located within the Upper Calcasieu Basin, Hydrologic Unit 08080203.
CHARACTER OF WORK: Commercial logging of undesirable trees across 277.1 acres, as well as removal of bedded rows with redistribution of in-situ material on site will take place to restore traditional surface hydrology to the site for the construction of a mitigation bank consisting of longleaf pine savanna and bottomland hardwoods.
JOINT PUBLIC NOTICE
March 20, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, La. 70118
State of Louisiana
Department of Environmental Quality
Post Office Box 4313
Baton Rouge, La. 70821-4313
Attn: Water Quality Certifications
(504) 862-2548/ FAX (504) 862-2574
Jacqueline.R.Farabee@usace.army.mil
Project Manager
Jacqueline Farabee
Permit Application Number
MVN-2015-02507-MR
(225) 219-219-3225 FAX (225) 325-8250
Elizabeth.Hill@LA.gov
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 170316-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers
and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [ X ] Section 404 of the
Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, for a
Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana
Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
HICKORY LAKE CREEK MITIGATION BANK IN ALLEN PARISH
NAME OF APPLICANT: Great Western Investments Company, C/O Matrix New World
Engineering, 4451 Bluebonnet Blvd, Suite E., Baton Rouge, Louisiana 70809.
LOCATION OF WORK: The 301.6 acre site is located approximately 7 miles west-northwest of
Kinder, Louisiana, in Allen Parish, as shown on enclosed drawings (Latitude: 30.525314 N,
Longitude:92.962742 W). The Project is located within the Upper Calcasieu Basin, Hydrologic
Unit 08080203.
CHARACTER OF WORK: Commercial logging of undesirable trees across 277.1 acres, as
well as removal of bedded rows with redistribution of in-situ material on site will take place to
restore traditional surface hydrology to the site for the construction of a mitigation bank
consisting of longleaf pine savanna and bottomland hardwoods.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 30 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
-2Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the address
above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership
and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and
local agencies and officials, Indian Tribes, and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the
U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit
for this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and other public
interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data.
Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered, nor affect any habitat designated as critical to the survival and recovery of any
endangered species listed by the U.S. Department of Commerce,
Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana
(SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans
and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that
the proposed activity would have no effect on any species listed as endangered by the U.S.
Department of the Interior.
-3-
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of N/A acre(s) of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed
activity will not violate applicable water quality standards will be required from the Department of
Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Martin S. Mayer
Chief, Regulatory Branch
Enclosure
DRAFT PROSPECTUS FOR THE PROPOSED
HICKORY LAKE CREEK MITIGATION BANK
Allen Parish, Louisiana
March 2017
Sponsor: Great Western Investments Company
Patrick Deshotels
P.O. Box 80429
Lafayette, Louisiana 70598
Agent:
Matrix New World Engineering
Charles Jones
4451 Bluebonnet Blvd., Suite E
Baton Rouge, Louisiana 70809
Table of Contents
1.0
1.1
2.0
3.0
3.1
3.2
3.3
3.4
4.0
4.1
4.2
4.3
5.0
6.0
6.1
6.2
6.3
6.4
6.5
7.0
INTRODUCTION ................................................................................................... 1
Site Location ........................................................................................................ 1
PROJECT GOALS AND OBJECTIVES ................................................................ 1
ECOLOGICAL SUITABILITY OF THE SITE ...................................................... 1
Historical Ecological Characteristics of the Site .................................................. 1
Current Ecological Characteristics of the Site ..................................................... 2
General Need for the Project in this Area ............................................................ 6
Technical Feasibility ............................................................................................ 7
ESTABLISHMENT OF THE MITIGATION BANK ............................................ 7
Site Restoration Plan ............................................................................................ 8
Current Site Risks............................................................................................... 11
Long-Term Sustainability of the Site ................................................................. 11
PROPOSED SERVICE AREA.............................................................................. 12
OPERATION OF THE MITIGATION BANK ..................................................... 12
Project Representatives ...................................................................................... 12
Qualifications of the Sponsor ............................................................................. 12
Proposed Long-Term Ownership and Management Representatives ................ 13
Site Protection .................................................................................................... 13
Long-Term Strategy ........................................................................................... 13
REFERENCES ...................................................................................................... 13
Tables
Table 1
Table 2
Table 3
Table 4
Table 5
Pre-Restoration Habitat Acreage Summary
Soil Map Unit Components and Hydric Status
Post-Construction Restoration/Enhancement/Preservation Habitat Acreage
Summary
Areas Not Proposed for Restoration/Enhancement/Preservation
Bottomland Hardwood Species Selection List
i
Figures
Figure 1
Figure 2
Figures 3a-3b
Figures 4a-4b
Figures 5a-5b
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
Figure 11
Figure 12
Figure 13
Figure 14
Figure 15
Figure 16
Figure 17
Figure 18
Figure 19
Vicinity Map
Site Location Map
Pre-Restoration Site Plan
Post-Restoration Site Plan
Post-Restoration Site Plan (Aerial)
Service Area Map
Soils Map
1952 Aerial Photograph
1974 Aerial Photograph
2004 Aerial Photograph
2015 Aerial Photograph
LIDAR Map
Cross Section A-A'
Cross Section B-B'
Cross Section C-C'
Cross Section D-D'
Cross Section E-E'
Cross Section F-F'
Cross Section G-G'
Appendices
Appendix A
Appendix B
Preliminary Jurisdictional Determination (MVN 2015-02507-SQ)
ENG Form 4645
ii
Hickory Lake Creek Mitigation Bank
1.0
INTRODUCTION
Great Western Investments Company (GWIC) is pleased to present the following prospectus and
site restoration plan for the Hickory Lake Creek Mitigation Bank (HLCMB) to the Interagency
Review Team (IRT) and U.S. Army Corps of Engineers (USACE), New Orleans District.
HLCMB is approximately 301.6 acres within Sections 14, 15, and 22, Township 06 North,
Range 06 West of Allen Parish, Louisiana. The purpose of this report is to summarize the
existing conditions of the proposed HLCMB and assess the potential for establishing a mitigation
bank to provide compensatory wetland mitigation for unavoidable impacts to wetlands
associated with Department of the Army (DA) permits authorized under Section 404 of the Clean
Water Act and Section 10 of the Rivers and Harbors Act issued by the USACE, New Orleans
District.
1.1
Site Location
The 301.6-acre HLCMB is approximately 7 miles west-northwest of Kinder, Louisiana, centered
at approximate Latitude 30.525314°; Longitude -92.962742° in Sections 14, 15, and 22,
Township 06 North, Range 06 West of Allen Parish, Louisiana (Figures 1 & 2). Access to
HLCMB is via Walker Road and Tarver Road (parish-owned roads), approximately 0.82 mile
north of US 190.
HLCMB currently contains 264.6 acres of palustrine forested wetlands, consisting of bottomland
hardwoods and bedded loblolly pine; 8.2 acres of palustrine emergent wetlands, consisting of
managed windrows and pipeline right-of-way (utility corridor); and 28.8 acres of upland
inclusions, consisting of forested uplands and a maintained forest road.
2.0
PROJECT GOALS AND OBJECTIVES
The goals of HLCMB are to enhance 165.0 acres of longleaf pine savannah and 83.3 acres of
bottomland hardwood wetlands; restore 28.8 acres of longleaf pine upland buffer; and preserve
22.3 acres of bottomland hardwood wetlands.
The objectives of HLCMB are as follows:
Increase longleaf pine savannah habitat within its natural range
Increase biodiversity
Provide habitat for wildlife, including threatened and endangered species
Provide for water quality enhancement
Provide for increased flood storage
3.0
ECOLOGICAL SUITABILITY OF THE SITE
3.1
Historical Ecological Characteristics of the Site
Based on aerial photography, HLCMB and the surrounding areas historically supported longleaf
pine savanna and bottomland hardwood habitats, as defined in the Natural Communities of
Louisiana published by the Louisiana Department of Wildlife and Fisheries, Louisiana Natural
1
Hickory Lake Creek Mitigation Bank
Heritage Program (LNHP). Based on 1952 aerial photography, pine savannahs occupied the
poorly drained and seasonally saturated low flats. It appears that longleaf pine (Pinus palutstris)
was likely the dominant tree species on HLCMB, with a diverse herbaceous component likely
consisting of broomsedges (Andropogon spp.), panic grasses (Panicum spp.) three-awn grasses
(Aristida spp.) plume-grasses (Erianthus spp.), beak-rushes (Rhychospora spp.), yellow-eyed
grasses (Xyris spp.). The habitat also likely supported a variety of forb species, such as lobelias
(Lobelia spp.), gerardias (Rhexia spp.), milkworts (Polygala spp.), and bladderworts (Utricularia
spp.).
Bottomland hardwoods occupied shallow, meandering depressional areas that stretched north to
south across HLCMB. The dominant species likely consisted of laurel oak (Quercus laurifolia),
red maple (Acer rubrum), water oak (Quercus nigra), sweet-bay (Magnolia virginiana), and
southern bayberry (Morella cerifera). The larger bottomland hardwood inclusions on HLCMB
were, and currently are, located in depressions along the southern boundary, the western
boundary south the junction of Walker and Tarver Roads, and the eastern boundary north of
Tarver Road.
Pre-impact hydrology was primarily attributed to backwater flooding from Hickory Lake Creek,
rainfall, and sheet flow. Aerial photography suggests that HLCMB historically drained from
north-northeast to south on the northern portion of the site, and north-northwest to southsoutheast on the southern portion.
During the mid-20th century, the longleaf pine was cleared from HLCMB, and the land adapted
to agricultural production with the construction of levees to control hydrology. Aerial
photography suggests that this was a common practice in the area at the time, as adjacent
properties also transitioned from pine savannah to agricultural fields. On-site hydrology was
severely hampered through the use of levees and culverts that allowed farmers to control the
water levels in the fields during rice production. However, historic aerial photography suggests
that the fields were drained into the natural depressional areas that remained on HLCMB. Also at
this time, Tarver Road was constructed, essentially bisecting the site, only allowing flow northto-south through two culvert locations at existing depressional areas.
At the turn of the 21st century, HLCMB again saw a land use change from commodity
agriculture to timber production. The levees and culverts that controlled water on HLCMB were
removed, and it appears that ground elevations were returned to pre-agricultural conditions.
Between 1998 and 2003, the site was rowed into beds and planted with loblolly pine. Despite the
construction of bedded rows, the resulting hydrologic conditions closely resemble those of preimpact conditions. As is discussed later, the bedded rows restrict natural sheet flow on HLCMB,
though hydrology is largely prevalent on HLCMB.
3.2
Current Ecological Characteristics of the Site
Land Use
The major land use on HLCMB consists of timber production in the form of bedded loblolly pine
plantation. Four distinct bottomland hardwood wetland inclusions are located within the tract:
along the northern boundary, along the eastern boundary north of Tarver Road, along the western
2
Hickory Lake Creek Mitigation Bank
boundary south of Tarver Road, and along the southern boundary. Multiple non-bedded,
herbaceous windrows are scattered throughout the loblolly plantation.
Table 1 contains pre-restoration habitat descriptions and acreages of the jurisdictional wetlands
and upland areas associated with the 301.6-acre tract proposed for enhancement, restoration, and
preservation activities within the HLCMB.
Table 1: Pre-Restoration Habitat Acreage Summary
Class
Jurisdictional Wetlands
Habitat
Acreage
Bottomland Hardwood Forest
22.3
Bedded Loblolly Pine-Dominant
242.3
Herbaceous
Windrows
6.0
Utility Corridor
2.2
Uplands
Non-Jurisdictional Areas
TOTALS
28.8
301.6
A maintained pipeline corridor traverses the south portion of HLCMB. The corridor is
approximately 70 feet wide, and is maintained by Texas Eastern Transmission, LP via
mechanical mowing.
One local road bisects HLCMB. Tarver Road is a paved road that provides access to adjacent
residential properties to the east. Shallow ditches run parallel to the road on either side. Two
culverts, situated in natural depressions on either end of the road, facilitate normal drainage
across the road from north to south. Based on discussions with the land owner, the road elevation
is such that water sheet flows over the Tarver Road during high water events. Tarver Road is
owned and maintained by the Allen Parish Policy Jury. Additionally, an overhead electric line
parallels Tarver Road and shares the ROW, whose width varies from 30 to 65 feet. The entire
ROW acreage has been excluded from HLCMB.
The adjacent land use includes timber production in the form of loblolly plantations, managed
longleaf pine stands, livestock pasture, and residential properties. The longleaf pine stands are
part of the Environmental Quality Incentives Program (EQIP) administered by the U.S.
Department of Agriculture (USDA), Natural Resource Conservation Service (NRCS), and are
owned by GWIC.
Vegetation
Dominant habitats associated with the jurisdictional wetlands on HLCMB consisted of
bottomland hardwood forest, bedded pine-dominant wetlands, longleaf pine-dominant wetlands,
and herbaceous wetlands. Dominant species identified in these habitats include loblolly pine
(Pinus taeda), sweet-gum (Liquidambar styraciflua), Chinese tallowtree (Triadica sebifera),
3
Hickory Lake Creek Mitigation Bank
laurel oak, red maple, water oak, longleaf pine, sweet-bay, southern bayberry, yaupon (Ilex
vomitoria), Elliot's blueberry (Vaccinium elliotii), tapered rosette grass (Dichanthelium
acuminatum), Japanese climbing fern (Lygodium japonicum), long-leaf wood-oats
(Chasmanthium sessiliflorum), lamp rush (Juncus effusus), dog-fennel (Eupatorium
capillifolium), short-bristle horned beak sedge (Rhynchospora corniculata), southern waxy sedge
(Carex glaucescens), bushy bluestem (Andropogon glomeratus), sawtooth blackberry (Rubus
argutus), cottongrass bulrush (Scirpus cyperinus), red-top cut-throat grass (Coleataenia
rigidula), sawbrier (Smilax glauca), muscadine (Vitis rotundifolia), and laurel-leaf greenbrier
(Smilax laurifolia).
Species identified within the upland habitats include loblolly pine (Pinus taeda), cherry-bark oak
(Quercus pagoda), sweet-gum (Liquidambar styraciflua), Chinese tallowtree (Triadica sebifera),
southern bayberry (Morella cerifera), American beauty-berry (Callicarpa americana), yaupon
(Ilex vomitoria), sassafras (Sassafras albidum), tapered rosette grass (Dichanthelium
acuminatum), dog-fennel (Eupatorium capillifolium), Japanese climbing fern (Lygodium
japonicum), bushy bluestem (Andropogon glomeratus), long-leaf wood-oats (Chasmanthium
sessiliflorum), sawtooth blackberry (Rubus argutus), muscadine (Vitis rotundifolia), and sawbrier
(Smilax glauca).
Hydrology
Hydrology on the Site is primarily attributed to backwater flooding from Hickory Lake Creek,
rainfall, and sheet flow. Hydrology indicators observed on HLCMB include surface water, a
high-water table, saturation and oxidized root channels within the upper twelve inches of soil
profiles, water marks, water stained leaves, moss trim lines, and positive FAC-neutral tests.
Elevation contours show that HLCMB naturally drains from north-northeast to south on the
northern portion of the site, and north-northwest to south-southeast on the southern portion.
However, the pine plantation that constitutes much of the acreage on HLCMB is bedded into
approximately 1-2' tall and 3-4' wide rows spaced on roughly 10-foot intervals. While these
beds have altered to some degree surface sheet flow and other localized hydrology
characteristics, the overall wetland hydrology of the bedded wet flats appears to be essentially
intact, as evidenced by the observed hydrology indicators. However, lateral movement of water
across the site is limited, as the bedded rows are oriented north-northeast to south-southwest.
Water flows south across Tarver Road through culverts at two locations associated with natural
depressions. The eastern culvert is a 36-inch-diameter by 22-foot-long corrugated metal pipe,
and the western culverts are one 36-inch-diameter by 22-foot-long reinforced concrete pipe and
one 24-inch-diameter by 22-foot-long corrugated metal pipe. Tarver Road is paralleled by two
low-profile ditches that serve to drain water during rain events towards the culverts in the natural
depressions. As evidenced by elevation contours, the midpoint of Tarver Road (located where
the southern eastern boundary meets Tarver Road) is situated at a higher elevation and decreases
in elevation towards the culverts. Thus, the road side ditches drain from the midpoint in both
directions, leading water towards the culverts/lower elevations and the southern portion of
HLCMB. Based on discussions with the landowner, outside of the low-elevation areas, water
sheet flows over Tarver Road during high water events.
4
Hickory Lake Creek Mitigation Bank
One culvert, an 18-inch-diameter by 28-foot-long corrugated metal pipe, located beneath Walker
Road along the western boundary allows flow from the adjacent property onto the site during
high water events. Walker Road is paralleled by two roadside ditches as well, and are intended to
drain water off the roadway during rain events. The grade of Walker Road north of Tarver Road
is such that it sits above the elevation of the adjacent properties. South of Tarver Road, Walker
Road is situated below the elevation of the adjacent properties. In both locations, the elevations
on HLCMB indicate that the ground slopes away from Walker Road. Walker Road and its
associated ditches will have no impact on the hydrology within HLCMB.
Allen Parish is part of a broad region of the southeastern United States that has a humid,
subtropical climate. The parish is dominated by warm, moist, tropical air from the nearby Gulf of
Mexico (USDA 1980). Average annual rainfall for Allen Parish ranges from 60-62 inches (Di
Luzio 2007).
Soils
The NRCS Web Soil Survey shows that HLCMB may be underlain by five soil map units:
Bienville loamy fine sand, 1 to 5 percent slopes (Bn); Caddo-Messer complex, 0 to 1 percent
slopes (Cd); Cahaba-Bienville-Guyton complex, gently undulating (Ck); Glenmora silt loam, 1
to 3 percent slopes (GE); and Guyton silt loam, 0 to 1 percent slopes, occasionally flooded (Go).
Table 2 depicts the soil map unit's individual soil components, component percentage, and
hydric status within Allen Parish (NRCS Survey Area Data: Version 11, September 27, 2015).
Table 2: Soil Map Unit Components and Hydric Status
Map Unit
Component
Soil Series/ Component
Name
Percentage
Bienville loamy fine sand, 1 to 5 percent slopes
Bienville
90
Guyton
10
Caddo-Messer complex, 0 to 1 percent slopes
Caddo
50-65
Messer
20-35
Guyton
0-15
Glenmora
0-15
Cahaba-Bienville-Guyton complex, gently undulating
Cahaba
34
Bienville
30
Guyton
26
Unnamed
10
Glenmora silt loam, 1 to 3 percent slopes
Glenmora
80-95
Messer
0-10
Caddo
0-5
Kinder
0-5
Hydric
Status
No
Yes
Yes
No
Yes
No
No
No
Yes
No
No
No
Yes
Yes
Acres
Percent of
Area
3.5
1.1%
217.1
72.0%
35..9
11.9%
33.7
11.2%
5
Hickory Lake Creek Mitigation Bank
Map Unit
Component Hydric
Soil Series/ Component
Name
Percentage
Status
Guyton silt loam, 0 to 1 percent slopes, occasionally flooded
Guyton
80-90
Yes
Glenmora
0-10
No
Caddo
0-10
Yes
Messer
0-10
No
Acres
Percent of
Area
11.4
3.8%
Per Web Soil Survey, Caddo-Messer complex, 0 to 1 percent slopes has a representative depth to
water table of 13 centimeters (5.1 inches), while Guyton silt loam, 0 to 1 percent slopes,
occasionally flooded has a representative depth to water table of 23 centimeters (9.1 inches).
Both map units are designated as poorly drained soils. Therefore, approximately 73.6% of the
site is poorly drained and has a depth to water table of less than 10 inches.
Jurisdictional Determination
A wetland delineation was conducted by Matrix on behalf of the Sponsor in November 2015. A
request for preliminary jurisdictional determination (JD) was submitted to the USACE, New
Orleans District on December 11, 2015, and a subsequent preliminary JD was rendered on June
8, 2016 (MVN 2015-02507-SQ). A copy of the preliminary JD is included as Attachment A.
3.3
General Need for the Project in this Area
As noted in the Natural Communities of Louisiana, western longleaf pine savannahs provide
critical habitat for many animal and plant species (LNHP, 2009). At the beginning of the 17th
century, there were an estimated 90 million acres of longleaf pine forests with nearly 900
different plant species in the southeastern United States. In western Louisiana, the historic range
of longleaf pine included all or parts of Acadia, Allen, Avoyelles, Beauregard, Calcasieu,
Evangeline, Jefferson Davis, Natchitoches, Rapides, Sabine, St. Landry, and Vernon Parishes.
The habitat type has been reduced by 95-99% of its original extent in the Lower West Gulf
Coastal Plain ecoregion in the southwest and west central portions of Louisiana. Threats to
western longleaf pine savannahs include construction of roads, pipeline or utilities, conversion to
loblolly pine plantations, fire exclusion or inappropriate fire regimes, use of chemical herbicides
or fertilizers, invasive or alien species, and hydrological alterations.
In 2009, America's Longleaf Restoration Initiative (ALRI) was launched through collaboration
with many stakeholders, including non-governmental organizations, state and federal agencies,
private industry, universities and research extensions, and private landowners. The 15-year goal
of the ALRI is to increase longleaf pine acreages by 3.4 to 8.0 million acres. In 2010, the NRCS
established the Longleaf Pine Initiative (LLPI) to partner with landowners to restore longleaf
forests, in support of the ALRI. The goal of the LLPI is to restore an additional 4.6 million acres
of longleaf pine ecosystems in their natural range by 2025. Within Louisiana, Allen Parish, along
with Beauregard, Tangipahoa, St. Tammany Vernon, and Washington Parishes, is listed as a
priority area by NRCS for longleaf pine restoration. The restoration and preservation of longleaf
pine habitat within HLCMB is consistent with and supports the goals of both the ALRI and the
LLPI.
6
Hickory Lake Creek Mitigation Bank
As development activities increase in the Calcasieu Basin, a need for high quality mitigation to
offset for unavoidable impacts to longleaf pine savannahs and bottomland hardwoods will
increase. According to a study conducted for the SWLA Economic Development Alliance,
approximately $65 billion in capital investment is planned in southwest Louisiana, consisting of
Allen, Beauregard, Calcasieu, Cameron, and Jefferson Davis Parishes. As a result of the influx of
capital investment, it is predicted that southwest Louisiana, most of which is located within the
Calcasieu Basin, could see an increase of 50,000 new residents by the year 2020 (Adrian and
Icaza).
In addition, longleaf pine savannahs provide habitat for 23 species of conservation concern in
Louisiana, including the federally-listed red-cockaded woodpecker (Picoides borealis) and
American chaffseed (Schwalbea americana), and the candidate species Louisiana pine snake
(Pituophis ruthveni).
3.4
Technical Feasibility
The site is relatively isolated and not threatened by surrounding land uses. The construction work
required to complete accomplish restoration on HLCMB is routine in nature and feasible,
consisting primarily of removal of bedded rows in order to return the site to its pre-agriculture
and timber-production hydrologic conditions, as well as vegetative plantings of native longleaf
pine and bottomland hardwood species. The mapped soils typed are historically supportive of the
native forested communities which are proposed for restoration, such as Caddo and Guyton silt
loams. This is supported by the existence of two longleaf pine EQIP easements immediately
adjacent to HLCMB. Additionally, a majority of the soils are mapped as hydric, indicating the
site formed under hydric conditions and therefore historically supported wetlands.
4.0
ESTABLISHMENT OF THE MITIGATION BANK
The Sponsor proposes to enhance 165.0 acres of longleaf pine savannah and 83.3 acres of
bottomland hardwood wetlands; restore 28.8 acres of longleaf pine upland buffer; and preserve
22.3 acres of bottomland hardwood wetlands.
Tables 3 and 4 contains post-construction habitats and acreage descriptions for the proposed
restoration, enhancement, and preservation of wetlands and upland buffers associated with the
301.6-acre tract, as well as areas not proposed for restoration, enhancement, or preservation.
7
Hickory Lake Creek Mitigation Bank
Table 3: Post-Construction Habitat Acreage Summary
Habitat
Enhancement
(Currently Bedded
Pine and Herbaceous
Windrows)
Restoration
(Currently Mixed
Hardwood-Pine
Uplands)
Preservation
Bottomland
Hardwood Wetlands
83.3 acres
N/A
22.3 acres
Longleaf Pine
Savannah Wetlands
165.0 acres
N/A
N/A
Longleaf Pine
Upland Buffer
N/A
28.8 acres
N/A
Totals
248.3 acres
28.8 acres
22.3 acres
Table 4: Areas Not Proposed for Restoration/Enhancement/Preservation
4.1
Areas
Acreage
Utility Corridor
2.2 acres
Site Restoration Plan
Commercial Logging of Undesirable Pine and Hardwoods
To facilitate restoration, commercial logging of undesirable trees across 277.1 acres, comprising
the loblolly pine plantation and mixed hardwood-pine upland areas, will be performed
immediately as weather permits for minimal impact on soil and vegetation. Planted loblolly pine,
as well as any naturally-occurring hardwoods, will be removed in longleaf savannah
enhancement areas (165.0 acres) and longleaf pine upland buffer restoration areas (28.8 acres).
In addition, loblolly pine will be removed in the bottomland hardwood rehabilitation areas (83.3
acres). Once all commercial-grade timber is removed from HLCMB, residual slash will be
mechanically piled on existing windrows for burning. Likewise, the stumps left after harvest will
be removed via a raking blade on a dozer and piled to be burned on the existing windrows. All
logging events will be carefully designed, implemented immediately as weather permits, and
monitored by experienced professionals.
Restoring Site Hydrology
While the existing hydrology on HLCMB is largely intact, bedded plantations of loblolly pine
present on much of the tract, approximately 277.1 acres, artificially restrict lateral sheet flow. As
8
Hickory Lake Creek Mitigation Bank
previously discussed, prior to planting, these areas were "bedded" by forming closely spaced
rows approximately 1 to 2 feet tall and approximately 3 to 4 feet wide, and are situated roughly
10 feet apart. During normal commercial logging practices, the bedded rows are typically
destroyed when stumps are removed using a raking blade. However, to ensure that HLCMB is
restored to natural grade, the 277.1-acre logged tract, as well as the 6.0 acres of herbaceous
windrows, will be disked to a depth of at least six inches. In addition to removing unnatural
impediments to sheet flow, disking will aid in soil decompaction, resulting in better planting
conditions. Once all beds are removed and natural grade restored, HLCMB will drain from
north-northeast to south on the northern portion of the site, and north-northwest to southsoutheast on the southern portion.
Vegetative Plantings
Longleaf pine savannah and bottomland hardwood restoration and enhancement areas were
determined by historic vegetation patterns and elevation contours. Based on historic aerial
imagery prior to conversion to agriculture, bottomland hardwoods on and adjacent to the
southern portion of the tract were confined to 39.5' NGVD and lower. In the north portion, aerial
imagery suggests that bottomland hardwoods were confined to 46.5' NGVD and lower. As seen
in historic aerial photography, these elevations correspond to the shallow, wide drains that
historically flowed through HLCMB.
Longleaf Pine
Following hydrologic restoration, longleaf pine seedlings will be planted on approximately 193.8
acres (165.0 acres of longleaf pine savannah enhancement, and 28.8 acres of longleaf pine
upland buffer enhancement) during the standard planting season (December-March). As lower
planting densities are optimal for longleaf pine ecosystem restoration, seedlings shall be planted
using 12 x 12 spacing for an initial stocking level of 302 trees per acre. The planted areas will be
subsequently thinned to mimic natural clusters of longleaf pine to achieve targeted stocking and
to create the park-like effect of the historical savanna. The Sponsor will target 125 -150 trees per
acre for the 1 year survival criteria and 25 -65 longleaf or slash pine trees per acre for Year 5.
Herbaceous understory will be re-established through natural recruitment. The native ground
cover communities that historically characterized the great majority of the bank have been
severely impacted by the pine plantation management. Prescribed fire will arguably be the most
important long-term management tool used on the tract to reestablish the native grasses, forbs,
and herbaceous plants. Burning is essential for rehabilitation/perpetuation of grass-herbaceous
ground-cover communities. Among other effects, properly timed fires stimulate native grass and
herbaceous plants to grow vigorously, flower and produce seeds, stimulate longleaf pine to grow
out of the "grass-stage", and control brown spot needle-blight on young longleaf.
Bottomland Hardwoods
Following hydrologic restoration, approximately 83.3 acres of bottomland hardwood
enhancement will be planted with an appropriate species mixture of bottomland hardwoods
during the standard planting season (December-March). Seedlings will be planted on
approximately using 9 x 9 spacing for an initial stand density of at least 537 seedlings per acre. A
9
Hickory Lake Creek Mitigation Bank
mixture of at least 60 percent hard-mast and a maximum of 40 percent soft-mast-producing
species will be planted in accordance with the following species selection list (Table 4). If
seedling availability renders a discrepancy of more than five percent from the desired mixture of
hard-mast to soft-mast species, New Orleans approval to modify the plan will be obtained. A
mixture of the following species will be planted to restore bottomland hardwoods:
Table 4: Bottomland Hardwood Species Selection List
COMMON NAME
SCIENTIFIC NAME
Laurel oak
Quercus laurifolia
Texas red oak
Quercus texana
Willow oak
Quercus phellos
Water oak
Quercus nigra
Water hickory
Carya aquatica
Percent Composition
Sweet gum
Liquidambar styraciflua
Bald cypress
Taxodium distichum
Red maple
Acer rubrum
Persimmon
Diospyros virginiana
Sugar-berry
Celtis laevigata
Percent Composition
MAST
Hard
Hard
Hard
Hard
Hard
60%
Soft
Soft
Soft
Soft
Soft
40%
Fire Management Regime
Prescribed fire will arguably be the most important regular management tool used on the tract.
Burning is essential for longleaf pine regeneration, preclusion of unwanted hardwoods and
shrubs, and rehabilitation/perpetuation of rich herbaceous ground-cover communities.
Application of frequent fire is necessary to help restore the native distribution of longleaf pine
and slash pine-pond cypress habitats into areas that have been overtaken by hardwoods and other
pines. Further, properly timed fires stimulate native herbaceous plants to grow vigorously, flower
and produce seeds, stimulate longleaf pine to grow out of the "grass-stage", and control brown
spot needle blight on young longleaf.
The Sponsor proposes to reestablish a fire regime within the Longleaf Pine Savannah Wetland
and Upland Buffer areas on the HLCMB through a strictly regulated ecological burning program.
Growing season burns, that mimic historical wildfire occurrences (late March June), will be
favored over dormant season burns. The regulated burning program will commence the first year
as a site preparation burn and continued every two years for the first six years and then on a two
to three-year rotation as needed. Natural or existing fire breaks will be used whenever possible to
reduce unnatural disturbances to the bank and allow burns to mimic natural fire behavior.
Controlled burns will be administered in large blocks, to mimic a natural wildfire, by a
contractor properly equipped and trained on the techniques of prescribed burning. Fire breaks
will be set along the boundaries of the bottomland hardwood areas, the longleaf pine savannah,
and upland areas. Tarver Road will be utilized as a fire break, allowing HLCMB to be burned in
two contiguous blocks. Utilizing paved roads is a common practice in prescribed burning. The
10
Hickory Lake Creek Mitigation Bank
cleared right-of way for Tarver Road ranges from 30-feet to 60-feet-wide. Additionally, Tarver
Road is a dead-end road, approximately 0.5-mile long, and services two residential properties.
While vehicular traffic is extremely limited, adjacent landowners, as well as local fire officials,
will be made aware of planned burns in advance. Prescribed fire is common to this area, as
GWIC uses prescribed burns on its loblolly pine stands as a regular management technique.
4.2
Current Site Risks
A pipeline corridor traverses the south portion of HLCMB. The corridor is approximately 70 feet
wide, and is maintained by Texas Eastern Transmission, LP via mechanical mowing. This
corridor acreage has been excluded from the restoration plan acreage, but will be within the
conservation servitude boundary. Although the corridor will not be subordinate to the
conservation servitude while the pipeline is operational, it will be protected by the conservation
servitude in the event the servitude is terminated.
According to the Louisiana Department of Natural Resources Strategic Online Natural Resources
Information System (SONRIS), there is one oil and gas well (Serial Number 198839) located
within the HLCMB project area and one oil and gas well (Serial Number 208895) located
adjacent to the HLCMB project area. According to SONRIS, the onsite well (Serial Number
198839) was plugged and abandoned on December 29, 1995. The well on adjacent property
(Serial Number 208895) was permitted on August 18, 1988, but was never put into service and
the permit was allowed to expire.
Tarver Road bisects HLCMB, servicing two residences on the eastern boundary of HLCMB.
Two culverts on either end of the road facilitate drainage from north to south. Upon discussions
between the Sponsor and the Parish, it has been determined that modifications to the size and
location of the culverts can be coordinated, if required. As previously discussed, the entire ROW
for Tarver Road which varies from 30 feet to 60 feet, has been excluded from the HLCMB.
Walker Road serves as the western boundary of HLCMB. Apparent ROW ranges from 45 feet
(north of Tarver Road) to 60 feet (southern end of HLCMB). The western boundary of HLCMB
has been set to avoid encroachment upon the ROW.
A survey and title opinion, to be prepared and submitted with the Draft Mitigation Bank
Instrument, will verify the existence of any mortgages, liens, or other such impediments.
4.3
Long-Term Sustainability of the Site
Long-term viability and sustainability of the HLCMB will be ensured through active and
adaptive management including, but not limited to, fire management regime, invasive species
control, appropriate monitoring, and long-term maintenance.
Allen Parish is home to some of the largest, protected pine savannahs in southwest Louisiana,
including Creek Savannah Natural Area, Parkers Longleaf Natural Area, and CC Road Savannah
Preserve. The soils at the site (Caddo and Guyton silt loams) are common to pine savannahs, and
are moderately to strongly acidic. In addition, two longleaf pine EQIP easements are located
directly adjacent to HLCMB, suggesting a high probability for sustainability of HLCMB.
11
Hickory Lake Creek Mitigation Bank
5.0 PROPOSED SERVICE AREA
HLCMB is located with the Upper Calcasieu Watershed (USGS HUC 08080203) of the
Calcasieu Basin, which includes portions of Allen, Beauregard, Calcasieu, Jefferson Davis,
Natchitoches, Rapides, and Vernon Parishes. HLCMB will service HUCs 08080203, 08080204,
08080205, and 08080206 of the Calcasieu Basin. The Calcasieu Basin includes the current and
historic range of the western longleaf pine savannah, which has been reduced to 95 to 99% of its
original extent.
6.0 OPERATION OF THE MITIGATION BANK
The Sponsor will comply with all conditions required of a mitigation bank sponsor, and
established and operated through mitigation bank procedures approved by the Corps of
Engineers. This includes, but is not limited to, review process, modifications, permit
coordination, project implementation, financial assurance determination and mechanisms, credit
determination, accounting procedures, credit withdrawals, and the use of credits. Details on the
operation of the HLCMB will be further described in the Draft Mitigation Banking Instrument.
6.1 Project Representatives
Sponsor:
Patrick Deshotels
Great Western Investments Company
P.O. Box 80429
Lafayette, Louisiana 70598
337-412-0732
Agent:
Charles Jones, Director of Ecological Services
Matrix New World Engineering
4451 Bluebonnet Blvd., Suite E
Baton Rouge, Louisiana 70809
cjones@matrixneworld.com
225-292-3271
Landowner:
Ken Sullivan
Great Western Investments Company
234 Rue Beauregard, Suite 200
Lafayette, Louisiana 70508
337-232-9600
6.2 Qualifications of the Sponsor
GWIC has never participated in the creation of a mitigation bank. However, GWIC has held
contracts with the NRCS for WHIP, EQUP, and CSP easements; the USFWS for partner
agreements; and the LDWF for red-cockaded woodpecker safe harbor agreements. GWIC has
also entered negotiation with non-governmental groups such as the National Wild Turkey
Federation for various conservation initiatives. GWIC has a track record of being excellent
stewards of the land, and have a special commitment to restoring longleaf pine habitat. Other
12
Hickory Lake Creek Mitigation Bank
conservation initiatives include creation of prairies, pollinator habitat, wildlife nest habitat,
and wild turkey foraging and nesting habitat.
6.3 Proposed Long-Term Ownership and Management Representatives
GWIC will serve as the sponsor and long-term owner, and Louisiana Pacific Land and Water
Conservancy will serve as the long-term manager and steward of the Bank. However, the
Sponsor may appoint a long-term steward if such appointment is approved by the Corps of
Engineers. The anticipated long-term management will consist of monitoring, invasive species
control, prescribed burning, forest management, boundary maintenance, and site protection.
6.4 Site Protection
The Sponsor will execute a perpetual Conservation Servitude held by Louisiana Land and
Water Conservancy, a non-profit conservation group (pursuant to the Louisiana Conservation
Servitude Act, R.S. 9:1271 et. seq.) on the entirety of the 301.6-acre tract. A copy of the
Conservation Servitude will be filed in the real estate records of the Mortgage and
Conveyance Office of Allen Parish and shall be provided to the USACE for review and
approval prior to filing. After filing, a copy of the recorded Conservation Servitude, clearly
showing the book, page, and date of filing, will be provided to the USACE.
6.5 Long-Term Strategy
Long-term management will consist of monitoring, vegetation management via a prescribed
fire regime, invasive species control, boundary maintenance (approximately 4.8 miles), site
protection, and the funding of such activities. Prescribed burns will be conducted on a two- to
three-year basis during the growing season to mimic historical wildfire occurrences (late MayJune). The burns will be managed by the long-term steward, and conducted by a contractor
properly equipped and trained on the techniques of prescribed burning. The wetland habitats
will be managed to increase and maintain the biological, chemical, and physical wetland
functions of the HLCMB and to provide forested habitat capable of supporting populations for
priority wildlife species (e.g., native wildlife, Nearctic-Neotropical migrants, and the redcockaded woodpecker).
A long-term management plan will be included with the Draft Mitigation Banking Instrument,
which will detail long-term management need and costs, and identify a funding mechanism.
The Sponsor (or Long-term Steward) and the Owner shall be responsible for protecting lands
contained within the HLCMB in perpetuity. An interest-bearing long-term management
account, specifically an escrow account, will be established to insure adequate funding is
available to cover the costs of these activities in the future.
7.0
REFERENCES
Adrian, Mitchel and J. Icaza. Estimations for Job Growth in the Tertiary and Quaternary Sectors
in Southwest Louisiana: Predicting Permanent "Post Boom" Employment Based Upon
Anticipated Population Growth. McNeese State University.
13
Hickory Lake Creek Mitigation Bank
Allen, J.A., Keeland, B.D., Stanturf, J.A., Clewell, A.F., and Kennedy, H.E., Jr., 2001 (revised
2004), A guide to bottomland hardwood restoration: U.S. Geological Survey, Biological
Resources Division Information and Technology Report USGS/BRD/ITR2000-0011,
U.S. Department of Agriculture, Forest Service, Southern Research Station, General
Technical Report SRS40, 132 p.
America's Longleaf Restoration Initiative. 2009. Range-Wide Conservation Plan for Longleaf
Pine. Retrieved May 16, 2016, from http://www.americaslongleaf.org/
Demers, Chris, A. Long, and P. Moinogue. 2013. Longleaf Pine Regeneration (SS-FOR-13).
Gainesville: University of Florida Institute of Food and Agricultural Sciences. Retrieved
March 8, 2016, from http://edis.ifas.ufl.edu/DLN/.
Di Luzio, Mauro. 2007. Data from: Seamless Daily Precipitation for the Conterminous United
States. USDA/NRCS Geospatial Data Gateway. https://gdg.sc.egov.usda.gov/
Lester, Gary. D., S. G. Sorensen, P. L. Faulkner, C. S. Reid, and I. E. Maxit. 2005. Louisiana
Comprehensive Wildlife Conservation Strategy. Louisiana Department of Wildlife and
Fisheries. Baton Rouge. 455 pp.
Lichvar, R.W., M. Butterwick, N.C. Melvin, and W.N. Kirchner. 2014. The National Wetland
Plant List: 2014 Update of Wetland Ratings. Phytoneuron 2014-41: 1-42.
Longleaf Pine Initiative. 2011. Longleaf Pine Initiative Fact Sheet. Natural Resources
Conservation Service. Retrieved May 16, 2016, from
http://www.nrcs.usda.gov/wps/portal/nrcs/detailfull/national/programs/initiatives/?cid=nr
csdev11_023913
Louisiana Natural Heritage Program. 2009. The Natural Communities of Louisiana. Louisiana
Department of Wildlife and Fisheries.
Smith, Latimore. 1996. The Rare and Sensitive Natural Wetland Plant Communities of Interior
Louisiana. Louisiana Department of Wildlife and Fisheries, Louisiana Natural Heritage
Program. 40pp.
Soil Survey Staff, Natural Resources Conservation Service, United States Department of
Agriculture. Web Soil Survey. Available online at http://websoilsurvey.nrcs.usda.gov/
Accessed [11/7/2016].
United States Department of Agriculture, Soil Conservation Service. 1980. Soil Survey of Allen
Parish, Louisiana.
14
FIGURES
£
_
^
Project Center
Latitude 30.525314°
Longitude -92.962742°
Legend
Vicinty Map
Hickory Lake Creek Mitigation Bank (301.6 acres)
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
4
2
0
4
Miles
Source: Base map comprised of ESRI StreetMap USA data.
Approved By
CEJ
Date
11/18/2016
1
Drawing No.
15-566-A022
Figure No.
£
See Figures 3a & 4a
Project Center
Latitude 30.525314°
Longitude -92.962742°
See Figures 3b & 4b
Legend
Site Location Map
Hickory Lake Creek Mitigation Bank (301.6 acres)
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
2,000
Source: Base map comprised of U.S.G.S. 7.5 minute topographic map, "LeBlanc, LA" dated
1986.
1,000
0
2,000
Feet
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A023
2
Figure No.
£
Existing Longleaf
Pine EQIP Easement
Existing Longleaf Pine
EQIP Easement
E
E
Walker Road
(owned by parish)
E
E
E
Existing 36"
Culvert
E
!
!
E
E
Matchline a
E
E
E
E
Tarver Road
(owned by parish)
E
!
!
Existing 36" and
24" Culverts
Overhead
Electrical Line
E
Legend
Hickory Lake Creek Mitigation Bank (301.6 acres)
Pre-Restoration Site Plan
Mitigation Bank Prospectus
Allen Parish, Louisiana
E
Bedded Loblolly Pine-Dominant Wetlands (242.3 acres)
Bottomland Hardwood Wetlands (22.3 acres)
Herbaceous Wetlands (6.0 acres)
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
E
Uplands (28.8 acres)
Utility Corridor (2.2 acres; 70' wide)
Drainage Flow
600
300
0
600
Feet
E
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A024
3a
Figure No.
E
£
E
Existing 36"
Culvert
E
!
!
E
E
E
E
Matchline a
E
E
Tarver Road
(owned by parish)
!
!
E
Existing 36" and
24" Culverts
Overhead
Electrical Line
E
!
!
E
Existing 24"x28'
Culvert
E
Walker Road
(owned by parish)
E
E
E
E
E
E
E
E
E
E
E
E
E
E
US 190
E
E
E
E
E
Legend
Hickory Lake Creek Mitigation Bank (301.6 acres)
Pre-Restoration Site Plan
Mitigation Bank Prospectus
Allen Parish, Louisiana
Bedded Loblolly Pine-Dominant Wetlands (242.3 acres)
Bottomland Hardwood Wetlands (22.3 acres)
Herbaceous Wetlands (6.0 acres)
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Uplands (28.8 acres)
Utility Corridor (2.2 acres; 70' wide)
Drainage Flow
600
300
0
600
Feet
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A024
3b
Figure No.
£
Existing Longleaf
Pine EQIP Easement
Existing Longleaf Pine
EQIP Easement
E
E
Walker Road
(owned by parish)
E
E
E
Existing 36"
Culvert
E
!
!
E
E
Matchline a
E
E
E
E
Tarver Road
(owned by parish)
!
!
Existing 36" and
24" Culverts
Overhead
Electrical Line
E
Legend
E
Hickory Lake Creek Mitigation Bank (301.6 acres)
Post-Restoration Site Plan
Mitigation Bank Prospectus
Allen Parish, Louisiana
E
Longleaf Pine Savannah Enhancement (165.0 acres)
Bottomland Hardwood Enhancement (83.3 acres)
Bottomland Hardwood Preservation (22.3 acres)
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
E
Longleaf Pine Upland Restoration (28.8 acres)
Utility Corridor (2.2 acres; 70' wide)
Drainage Flow
600
300
0
600
Feet
E
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A025
4a
Figure No.
E
£
E
Existing 36"
Culvert
E
!
!
E
E
E
E
Tarver Road
(owned by parish)
E
Matchline a
E
!
!
E
Existing 36" and
24" Culverts
Overhead
Electrical Line
E
!
!
E
Existing 24"x28'
Culvert
E
Walker Road
(owned by parish)
E
E
E
E
E
E
E
E
E
E
E
E
E
E
US 190
E
E
E
E
E
Legend
Hickory Lake Creek Mitigation Bank (301.6 acres)
Post-Restoration Site Plan
Mitigation Bank Prospectus
Allen Parish, Louisiana
Longleaf Pine Savannah Enhancement (165.0 acres)
Bottomland Hardwood Enhancement (83.3 acres)
Bottomland Hardwood Preservation (22.3 acres)
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Longleaf Pine Upland Restoration (28.8 acres)
Utility Corridor (2.2 acres; 70' wide)
Drainage Flow
600
300
0
600
Feet
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A025
4b
Figure No.
Existing Longleaf
Pine EQIP Easement
£
Existing Longleaf Pine
EQIP Easement
A
A'
Walker Road
(owned by parish)
B
B'
E
D
C
Existing 36"
Culvert
!
!
D'
C'
E'
Tarver Road
(owned
by parish)
!
!
Existing 36" and
24" Culverts
Legend
Hickory Lake Creek Mitigation Bank (301.6 acres)
Post-Restoration Site Plan
Mitigation Bank Prospectus
Allen Parish, Louisiana
Longleaf Pine Savannah Enhancement (165.0 acres)
Bottomland Hardwood Enhancement (83.3 acres)
Bottomland Hardwood Preservation (22.3 acres)
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Longleaf Pine Upland Restoration (28.8 acres)
Utility Corridor (2.2 acres; 70' wide)
Source: Base map comprised of ESRI World Imagery.
600
300
0
600
Feet
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A026
5a
Figure No.
E
D
C
Existing 36"
Culvert
!
!
D'
C'
E'
Tarver Road
(owned
by parish)
!
!
Existing 36" and
24" Culverts
F
!
!
F'
£
Existing 24"x28'
Culvert
G
G'
Walker Road
(owned by parish)
US 190
Legend
Hickory Lake Creek Mitigation Bank (301.6 acres)
Post-Restoration Site Plan
Mitigation Bank Prospectus
Allen Parish, Louisiana
Longleaf Pine Savannah Enhancement (165.0 acres)
Bottomland Hardwood Enhancement (83.3 acres)
Bottomland Hardwood Preservation (22.3 acres)
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Longleaf Pine Upland Restoration (28.8 acres)
Utility Corridor (2.2 acres; 70' wide)
Source: Base map comprised of ESRI World Imagery.
600
300
0
600
Feet
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A026
5b
Figure No.
08040304
11140207
12010004
£
08040301
12020005
LOUISIANA
08080102
08080204
12010005
TEXAS
12020003
08080205
08080201
08080203
08080202
08080103
08080206
12040201
Legend
Service Area Map
Hickory Lake Creek Mitigation Bank (301.6 acres)
Mitigation Bank Prospectus
Allen Parish, Louisiana
Hydrologic Unit Boundary
Calcasieu Basin
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
16
Source: Base map comprised of ESRI World Imagery. Hydrologic Unit Code (HUC)
boundaries obtained from the U.S. Department of Agriculture (USDA).
8
0
16
Miles
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A027
6
Figure No.
Cd
Go
Ck
Ck
Ge
Bn
Cd
Go
£
Ck
Ck
Cd
Bn
Bn
Ge
Bn
Bn
Bn
Ge
Cd
Cd
Go
Go
Ck
Go
Ge
Go
Ck
Ck
Cd
GY
Ck
Ch
Ge
Go
Legend
Soils Map
Hickory Lake Creek Mitigation Bank (301.6 acres)
Mitigation Bank Prospectus
Allen Parish, Louisiana
Soils
Bn - Bienville loamy fine sand, 1 to 5 percent slopes
Cd - Caddo-Messer complex, 0 to 1 percent slopes
Ck - Cahaba-Bienville-Guyton complex, gently undulating
Ge - Glenmora silt loam, 1 to 3 percent slopes
Go - Guyton silt loam, occasionally flooded
Source: Base map comprised of ESRI World Imagery. Soils data obtained from Natural
Resources Conservation Service (NRCS) Web Soil Survey.
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
1,000
500
0
1,000
Feet
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A028
7
Figure No.
£
Legend
Hickory Lake Creek Mitigation Bank (301.6 acres)
1952 Aerial Photograph
Mitigation Bank Prospectus
Allen Parish, Louisiana
Pre-Impact Drainage Flow
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
1,000
Source: U.S. Geological Survey (U.S.G.S). Aerial Single Frame Photo ID: A000960152556
[aerial photo]. Sioux Falls, S. Dak.: EROS Data Center, April 14, 1952.
500
0
1,000
Feet
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A029
8
Figure No.
£
Legend
Hickory Lake Creek Mitigation Bank (301.6 acres)
1974 Aerial Photograph
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
1,000
Source: U.S. Geological Survey (U.S.G.S). Aerial Single Frame Photo ID:
AR1VDMMI0010005 [aerial photo]. Sioux Falls, S. Dak.: EROS Data Center, October 1, 1974.
500
0
1,000
Feet
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A030
9
Figure No.
£
Legend
Hickory Lake Creek Mitigation Bank (301.6 acres)
2004 Aerial Photograph
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
1,000
Source: Base map comprised of 2004 aerial photograph from Louisiana Oil Spill Coordinators
Office.
500
0
1,000
Feet
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A031
10
Figure No.
£
Legend
Conservation Servitude Boundary (301.6 acres)
Conservation Servitude Map
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
1,000
Source: Base map comprised of 2015 aerial photograph from USDA/FSA Aerial Photography
Field Office.
500
0
1,000
Feet
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A032
11
Figure No.
£
Legend
LIDAR Map
Hickory Lake Creek Mitigation Bank (301.6 acres)
Mitigation Bank Prospectus
Allen Parish, Louisiana
Contours (feet)
30.50 - 33.50
42.01 - 44.50
33.51 - 36.00
44.51 - 46.50
Great Western Investments Company
36.01 - 38.00
46.51 - 48.00
Hickory Lake Creek Mitigation Bank
38.01 - 40.00
48.01 - 50.00
40.01 - 42.00
50.01 - 54.50
Source: Base map comprised of 2015 aerial photograph from USDA/FSA Aerial Photography
Field Office.
1,000
500
0
1,000
Feet
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A033
12
Figure No.
Walker Road
Right-of-Way (45')
10'
22'
10'
HLCMB Boundary
Walker Road Profile
Cross Section A-A'
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Not to Scale
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A035
13
Figure No.
Bedded Loblolly Pine-Dominant Wetlands
Bedded Loblolly
Pine-Dominant Uplands
Existing
Bedded Rows
Pre-Restoration
Bottomland Hardwood
Enhancement
Longleaf Pine Savannah Enhancement
Longleaf Pine
Upland Restoration
Bedded Rows to be
Bladded and Disked
Post-Restoration
Cross Section B-B'
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Not to Scale
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A036
14
Figure No.
Tarver Road and Overhead Electirc Shared ROW (58')
HLCMB Boundary
(1) 36"x22' Corregated Metal Pipe Culvert
HLCMB Boundary
EL. 43.8'
EL. 43.5'
Tarver Road and Culvert Profile
(Low-Elevation Water Crossing)
Cross Section C-C'
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Not to Scale
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A037
15
Figure No.
Tarver Road ROW (30')
HLCMB Boundary
8'
14'
8'
Tarver Road Profile
Cross Section D-D'
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Not to Scale
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A038
16
Figure No.
Tarver Road ROW (30')
HLCMB Boundary
(1) 36" x 22' Reinforced Concrete Pipe Culvert &
(1) 24" x 22' Corrugated Metal Pipe Culvert
EL. 42.5'
EL. 41.6'
Tarver Road and Culvert Profile
(Low-Elevation Water Crossing)
Cross Section E-E'
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Not to Scale
Approved By
CEJ
Date
3/6/2017
Drawing No.
15-566-A039
17
Figure No.
Walker Road ROW (50')
(1) 18" x 28' Corrugated Metal Pipe Culvert
HLCMB Boundary
Berm Constructed by
Adjacent Landowner
EL. 39.9'
EL. 40.2'
Walker Road and Culvert Profile
Cross Section F-F'
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Not to Scale
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A040
18
Figure No.
Walker Road ROW (50')
HLCMB Boundary
8'
4'
22'
4'
8'
Walker Road Profile
Cross Section G-G'
Mitigation Bank Prospectus
Allen Parish, Louisiana
Great Western Investments Company
Hickory Lake Creek Mitigation Bank
Not to Scale
Approved By
CEJ
Date
11/18/2016
Drawing No.
15-566-A041
19
Figure No.
APPENDIX A
PRELIMINARY JURISDICTIONAL
DETERMINATION (MVN 2015-02507-SQ)