HICKORY LAKE CREEK MITIGATION BANK IN ALLEN PARISH

NAME OF APPLICANT: Great Western Investments Company, C/O Matrix New World Engineering, 4451 Bluebonnet Blvd, Suite E., Baton Rouge, Louisiana 70809.

LOCATION OF WORK: The 301.6 acre site is located approximately 7 miles west-northwest of Kinder, Louisiana, inAllen Parish, as shown on enclosed drawings (Latitude: 30.525314 N, Longitude:–92.962742 W). The Project is located within the Upper Calcasieu Basin, Hydrologic Unit 08080203.

CHARACTER OF WORK: Commercial logging of undesirable trees across 277.1 acres, as well as removal of bedded rows with redistribution of in-situ material on site will take place to restore traditional surface hydrology to the site for the construction of a mitigation bank consisting of longleaf pine savanna and bottomland hardwoods.

JOINT PUBLIC NOTICE March 20, 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, La. 70118

State of Louisiana Department of Environmental Quality Post Office Box 4313 Baton Rouge, La. 70821-4313 Attn: Water Quality Certifications

(504) 862-2548/ FAX (504) 862-2574 Jacqueline.R.Farabee@usace.army.mil Project Manager Jacqueline Farabee Permit Application Number MVN-2015-02507-MR

(225) 219-219-3225 FAX (225) 325-8250 Elizabeth.Hill@LA.gov Project Manager Elizabeth Hill WQC Application Number WQC # 170316-02

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [ X ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, for a Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of Section 401 of the Clean Water Act (P.L.95-17). HICKORY LAKE CREEK MITIGATION BANK IN ALLEN PARISH NAME OF APPLICANT: Great Western Investments Company, C/O Matrix New World Engineering, 4451 Bluebonnet Blvd, Suite E., Baton Rouge, Louisiana 70809. LOCATION OF WORK: The 301.6 acre site is located approximately 7 miles west-northwest of Kinder, Louisiana, in Allen Parish, as shown on enclosed drawings (Latitude: 30.525314 N, Longitude:­92.962742 W). The Project is located within the Upper Calcasieu Basin, Hydrologic Unit 08080203. CHARACTER OF WORK: Commercial logging of undesirable trees across 277.1 acres, as well as removal of bedded rows with redistribution of in-situ material on site will take place to restore traditional surface hydrology to the site for the construction of a mitigation bank consisting of longleaf pine savanna and bottomland hardwoods. The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 30 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the

-2Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources. Our initial finding is that the proposed work would neither affect any species listed as endangered, nor affect any habitat designated as critical to the survival and recovery of any endangered species listed by the U.S. Department of Commerce, Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that the proposed activity would have no effect on any species listed as endangered by the U.S. Department of the Interior. -3-

This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of N/A acre(s) of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Martin S. Mayer Chief, Regulatory Branch Enclosure

DRAFT PROSPECTUS FOR THE PROPOSED HICKORY LAKE CREEK MITIGATION BANK Allen Parish, Louisiana

March 2017

Sponsor: Great Western Investments Company Patrick Deshotels P.O. Box 80429 Lafayette, Louisiana 70598 Agent:

Matrix New World Engineering Charles Jones 4451 Bluebonnet Blvd., Suite E Baton Rouge, Louisiana 70809

Table of Contents 1.0 1.1 2.0 3.0 3.1 3.2 3.3 3.4 4.0 4.1 4.2 4.3 5.0 6.0 6.1 6.2 6.3 6.4 6.5 7.0

INTRODUCTION ................................................................................................... 1 Site Location ........................................................................................................ 1 PROJECT GOALS AND OBJECTIVES ................................................................ 1 ECOLOGICAL SUITABILITY OF THE SITE ...................................................... 1 Historical Ecological Characteristics of the Site .................................................. 1 Current Ecological Characteristics of the Site ..................................................... 2 General Need for the Project in this Area ............................................................ 6 Technical Feasibility ............................................................................................ 7 ESTABLISHMENT OF THE MITIGATION BANK ............................................ 7 Site Restoration Plan ............................................................................................ 8 Current Site Risks............................................................................................... 11 Long-Term Sustainability of the Site ................................................................. 11 PROPOSED SERVICE AREA.............................................................................. 12 OPERATION OF THE MITIGATION BANK ..................................................... 12 Project Representatives ...................................................................................... 12 Qualifications of the Sponsor ............................................................................. 12 Proposed Long-Term Ownership and Management Representatives ................ 13 Site Protection .................................................................................................... 13 Long-Term Strategy ........................................................................................... 13 REFERENCES ...................................................................................................... 13

Tables Table 1 Table 2 Table 3 Table 4 Table 5

Pre-Restoration Habitat Acreage Summary Soil Map Unit Components and Hydric Status Post-Construction Restoration/Enhancement/Preservation Habitat Acreage Summary Areas Not Proposed for Restoration/Enhancement/Preservation Bottomland Hardwood Species Selection List

i

Figures Figure 1 Figure 2 Figures 3a-3b Figures 4a-4b Figures 5a-5b Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Figure 14 Figure 15 Figure 16 Figure 17 Figure 18 Figure 19

Vicinity Map Site Location Map Pre-Restoration Site Plan Post-Restoration Site Plan Post-Restoration Site Plan (Aerial) Service Area Map Soils Map 1952 Aerial Photograph 1974 Aerial Photograph 2004 Aerial Photograph 2015 Aerial Photograph LIDAR Map Cross Section A-A' Cross Section B-B' Cross Section C-C' Cross Section D-D' Cross Section E-E' Cross Section F-F' Cross Section G-G'

Appendices Appendix A Appendix B

Preliminary Jurisdictional Determination (MVN 2015-02507-SQ) ENG Form 4645

ii

Hickory Lake Creek Mitigation Bank

1.0

INTRODUCTION

Great Western Investments Company (GWIC) is pleased to present the following prospectus and site restoration plan for the Hickory Lake Creek Mitigation Bank (HLCMB) to the Interagency Review Team (IRT) and U.S. Army Corps of Engineers (USACE), New Orleans District. HLCMB is approximately 301.6 acres within Sections 14, 15, and 22, Township 06 North, Range 06 West of Allen Parish, Louisiana. The purpose of this report is to summarize the existing conditions of the proposed HLCMB and assess the potential for establishing a mitigation bank to provide compensatory wetland mitigation for unavoidable impacts to wetlands associated with Department of the Army (DA) permits authorized under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act issued by the USACE, New Orleans District. 1.1

Site Location

The 301.6-acre HLCMB is approximately 7 miles west-northwest of Kinder, Louisiana, centered at approximate Latitude 30.525314°; Longitude -92.962742° in Sections 14, 15, and 22, Township 06 North, Range 06 West of Allen Parish, Louisiana (Figures 1 & 2). Access to HLCMB is via Walker Road and Tarver Road (parish-owned roads), approximately 0.82 mile north of US 190. HLCMB currently contains 264.6 acres of palustrine forested wetlands, consisting of bottomland hardwoods and bedded loblolly pine; 8.2 acres of palustrine emergent wetlands, consisting of managed windrows and pipeline right-of-way (utility corridor); and 28.8 acres of upland inclusions, consisting of forested uplands and a maintained forest road. 2.0

PROJECT GOALS AND OBJECTIVES

The goals of HLCMB are to enhance 165.0 acres of longleaf pine savannah and 83.3 acres of bottomland hardwood wetlands; restore 28.8 acres of longleaf pine upland buffer; and preserve 22.3 acres of bottomland hardwood wetlands. The objectives of HLCMB are as follows: Increase longleaf pine savannah habitat within its natural range Increase biodiversity Provide habitat for wildlife, including threatened and endangered species Provide for water quality enhancement Provide for increased flood storage 3.0

ECOLOGICAL SUITABILITY OF THE SITE

3.1

Historical Ecological Characteristics of the Site

Based on aerial photography, HLCMB and the surrounding areas historically supported longleaf pine savanna and bottomland hardwood habitats, as defined in the Natural Communities of Louisiana published by the Louisiana Department of Wildlife and Fisheries, Louisiana Natural 1

Hickory Lake Creek Mitigation Bank Heritage Program (LNHP). Based on 1952 aerial photography, pine savannahs occupied the poorly drained and seasonally saturated low flats. It appears that longleaf pine (Pinus palutstris) was likely the dominant tree species on HLCMB, with a diverse herbaceous component likely consisting of broomsedges (Andropogon spp.), panic grasses (Panicum spp.) three-awn grasses (Aristida spp.) plume-grasses (Erianthus spp.), beak-rushes (Rhychospora spp.), yellow-eyed grasses (Xyris spp.). The habitat also likely supported a variety of forb species, such as lobelias (Lobelia spp.), gerardias (Rhexia spp.), milkworts (Polygala spp.), and bladderworts (Utricularia spp.). Bottomland hardwoods occupied shallow, meandering depressional areas that stretched north to south across HLCMB. The dominant species likely consisted of laurel oak (Quercus laurifolia), red maple (Acer rubrum), water oak (Quercus nigra), sweet-bay (Magnolia virginiana), and southern bayberry (Morella cerifera). The larger bottomland hardwood inclusions on HLCMB were, and currently are, located in depressions along the southern boundary, the western boundary south the junction of Walker and Tarver Roads, and the eastern boundary north of Tarver Road. Pre-impact hydrology was primarily attributed to backwater flooding from Hickory Lake Creek, rainfall, and sheet flow. Aerial photography suggests that HLCMB historically drained from north-northeast to south on the northern portion of the site, and north-northwest to southsoutheast on the southern portion. During the mid-20th century, the longleaf pine was cleared from HLCMB, and the land adapted to agricultural production with the construction of levees to control hydrology. Aerial photography suggests that this was a common practice in the area at the time, as adjacent properties also transitioned from pine savannah to agricultural fields. On-site hydrology was severely hampered through the use of levees and culverts that allowed farmers to control the water levels in the fields during rice production. However, historic aerial photography suggests that the fields were drained into the natural depressional areas that remained on HLCMB. Also at this time, Tarver Road was constructed, essentially bisecting the site, only allowing flow northto-south through two culvert locations at existing depressional areas. At the turn of the 21st century, HLCMB again saw a land use change from commodity agriculture to timber production. The levees and culverts that controlled water on HLCMB were removed, and it appears that ground elevations were returned to pre-agricultural conditions. Between 1998 and 2003, the site was rowed into beds and planted with loblolly pine. Despite the construction of bedded rows, the resulting hydrologic conditions closely resemble those of preimpact conditions. As is discussed later, the bedded rows restrict natural sheet flow on HLCMB, though hydrology is largely prevalent on HLCMB. 3.2

Current Ecological Characteristics of the Site

Land Use The major land use on HLCMB consists of timber production in the form of bedded loblolly pine plantation. Four distinct bottomland hardwood wetland inclusions are located within the tract: along the northern boundary, along the eastern boundary north of Tarver Road, along the western 2

Hickory Lake Creek Mitigation Bank boundary south of Tarver Road, and along the southern boundary. Multiple non-bedded, herbaceous windrows are scattered throughout the loblolly plantation. Table 1 contains pre-restoration habitat descriptions and acreages of the jurisdictional wetlands and upland areas associated with the 301.6-acre tract proposed for enhancement, restoration, and preservation activities within the HLCMB. Table 1: Pre-Restoration Habitat Acreage Summary Class

Jurisdictional Wetlands

Habitat

Acreage

Bottomland Hardwood Forest

22.3

Bedded Loblolly Pine-Dominant

242.3

Herbaceous

Windrows

6.0

Utility Corridor

2.2

Uplands

Non-Jurisdictional Areas TOTALS

28.8 301.6

A maintained pipeline corridor traverses the south portion of HLCMB. The corridor is approximately 70 feet wide, and is maintained by Texas Eastern Transmission, LP via mechanical mowing. One local road bisects HLCMB. Tarver Road is a paved road that provides access to adjacent residential properties to the east. Shallow ditches run parallel to the road on either side. Two culverts, situated in natural depressions on either end of the road, facilitate normal drainage across the road from north to south. Based on discussions with the land owner, the road elevation is such that water sheet flows over the Tarver Road during high water events. Tarver Road is owned and maintained by the Allen Parish Policy Jury. Additionally, an overhead electric line parallels Tarver Road and shares the ROW, whose width varies from 30 to 65 feet. The entire ROW acreage has been excluded from HLCMB. The adjacent land use includes timber production in the form of loblolly plantations, managed longleaf pine stands, livestock pasture, and residential properties. The longleaf pine stands are part of the Environmental Quality Incentives Program (EQIP) administered by the U.S. Department of Agriculture (USDA), Natural Resource Conservation Service (NRCS), and are owned by GWIC. Vegetation Dominant habitats associated with the jurisdictional wetlands on HLCMB consisted of bottomland hardwood forest, bedded pine-dominant wetlands, longleaf pine-dominant wetlands, and herbaceous wetlands. Dominant species identified in these habitats include loblolly pine (Pinus taeda), sweet-gum (Liquidambar styraciflua), Chinese tallowtree (Triadica sebifera), 3

Hickory Lake Creek Mitigation Bank laurel oak, red maple, water oak, longleaf pine, sweet-bay, southern bayberry, yaupon (Ilex vomitoria), Elliot's blueberry (Vaccinium elliotii), tapered rosette grass (Dichanthelium acuminatum), Japanese climbing fern (Lygodium japonicum), long-leaf wood-oats (Chasmanthium sessiliflorum), lamp rush (Juncus effusus), dog-fennel (Eupatorium capillifolium), short-bristle horned beak sedge (Rhynchospora corniculata), southern waxy sedge (Carex glaucescens), bushy bluestem (Andropogon glomeratus), sawtooth blackberry (Rubus argutus), cottongrass bulrush (Scirpus cyperinus), red-top cut-throat grass (Coleataenia rigidula), sawbrier (Smilax glauca), muscadine (Vitis rotundifolia), and laurel-leaf greenbrier (Smilax laurifolia). Species identified within the upland habitats include loblolly pine (Pinus taeda), cherry-bark oak (Quercus pagoda), sweet-gum (Liquidambar styraciflua), Chinese tallowtree (Triadica sebifera), southern bayberry (Morella cerifera), American beauty-berry (Callicarpa americana), yaupon (Ilex vomitoria), sassafras (Sassafras albidum), tapered rosette grass (Dichanthelium acuminatum), dog-fennel (Eupatorium capillifolium), Japanese climbing fern (Lygodium japonicum), bushy bluestem (Andropogon glomeratus), long-leaf wood-oats (Chasmanthium sessiliflorum), sawtooth blackberry (Rubus argutus), muscadine (Vitis rotundifolia), and sawbrier (Smilax glauca). Hydrology Hydrology on the Site is primarily attributed to backwater flooding from Hickory Lake Creek, rainfall, and sheet flow. Hydrology indicators observed on HLCMB include surface water, a high-water table, saturation and oxidized root channels within the upper twelve inches of soil profiles, water marks, water stained leaves, moss trim lines, and positive FAC-neutral tests. Elevation contours show that HLCMB naturally drains from north-northeast to south on the northern portion of the site, and north-northwest to south-southeast on the southern portion. However, the pine plantation that constitutes much of the acreage on HLCMB is bedded into approximately 1-2' tall and 3-4' wide rows spaced on roughly 10-foot intervals. While these beds have altered to some degree surface sheet flow and other localized hydrology characteristics, the overall wetland hydrology of the bedded wet flats appears to be essentially intact, as evidenced by the observed hydrology indicators. However, lateral movement of water across the site is limited, as the bedded rows are oriented north-northeast to south-southwest. Water flows south across Tarver Road through culverts at two locations associated with natural depressions. The eastern culvert is a 36-inch-diameter by 22-foot-long corrugated metal pipe, and the western culverts are one 36-inch-diameter by 22-foot-long reinforced concrete pipe and one 24-inch-diameter by 22-foot-long corrugated metal pipe. Tarver Road is paralleled by two low-profile ditches that serve to drain water during rain events towards the culverts in the natural depressions. As evidenced by elevation contours, the midpoint of Tarver Road (located where the southern eastern boundary meets Tarver Road) is situated at a higher elevation and decreases in elevation towards the culverts. Thus, the road side ditches drain from the midpoint in both directions, leading water towards the culverts/lower elevations and the southern portion of HLCMB. Based on discussions with the landowner, outside of the low-elevation areas, water sheet flows over Tarver Road during high water events. 4

Hickory Lake Creek Mitigation Bank

One culvert, an 18-inch-diameter by 28-foot-long corrugated metal pipe, located beneath Walker Road along the western boundary allows flow from the adjacent property onto the site during high water events. Walker Road is paralleled by two roadside ditches as well, and are intended to drain water off the roadway during rain events. The grade of Walker Road north of Tarver Road is such that it sits above the elevation of the adjacent properties. South of Tarver Road, Walker Road is situated below the elevation of the adjacent properties. In both locations, the elevations on HLCMB indicate that the ground slopes away from Walker Road. Walker Road and its associated ditches will have no impact on the hydrology within HLCMB. Allen Parish is part of a broad region of the southeastern United States that has a humid, subtropical climate. The parish is dominated by warm, moist, tropical air from the nearby Gulf of Mexico (USDA 1980). Average annual rainfall for Allen Parish ranges from 60-62 inches (Di Luzio 2007). Soils The NRCS Web Soil Survey shows that HLCMB may be underlain by five soil map units: Bienville loamy fine sand, 1 to 5 percent slopes (Bn); Caddo-Messer complex, 0 to 1 percent slopes (Cd); Cahaba-Bienville-Guyton complex, gently undulating (Ck); Glenmora silt loam, 1 to 3 percent slopes (GE); and Guyton silt loam, 0 to 1 percent slopes, occasionally flooded (Go). Table 2 depicts the soil map unit's individual soil components, component percentage, and hydric status within Allen Parish (NRCS Survey Area Data: Version 11, September 27, 2015). Table 2: Soil Map Unit Components and Hydric Status Map Unit Component Soil Series/ Component Name Percentage Bienville loamy fine sand, 1 to 5 percent slopes Bienville 90 Guyton 10 Caddo-Messer complex, 0 to 1 percent slopes Caddo 50-65 Messer 20-35 Guyton 0-15 Glenmora 0-15 Cahaba-Bienville-Guyton complex, gently undulating Cahaba 34 Bienville 30 Guyton 26 Unnamed 10 Glenmora silt loam, 1 to 3 percent slopes Glenmora 80-95 Messer 0-10 Caddo 0-5 Kinder 0-5

Hydric Status No Yes Yes No Yes No No No Yes No No No Yes Yes

Acres

Percent of Area

3.5

1.1%

217.1

72.0%

35..9

11.9%

33.7

11.2%

5

Hickory Lake Creek Mitigation Bank Map Unit Component Hydric Soil Series/ Component Name Percentage Status Guyton silt loam, 0 to 1 percent slopes, occasionally flooded Guyton 80-90 Yes Glenmora 0-10 No Caddo 0-10 Yes Messer 0-10 No

Acres

Percent of Area

11.4

3.8%

Per Web Soil Survey, Caddo-Messer complex, 0 to 1 percent slopes has a representative depth to water table of 13 centimeters (5.1 inches), while Guyton silt loam, 0 to 1 percent slopes, occasionally flooded has a representative depth to water table of 23 centimeters (9.1 inches). Both map units are designated as poorly drained soils. Therefore, approximately 73.6% of the site is poorly drained and has a depth to water table of less than 10 inches. Jurisdictional Determination A wetland delineation was conducted by Matrix on behalf of the Sponsor in November 2015. A request for preliminary jurisdictional determination (JD) was submitted to the USACE, New Orleans District on December 11, 2015, and a subsequent preliminary JD was rendered on June 8, 2016 (MVN 2015-02507-SQ). A copy of the preliminary JD is included as Attachment A. 3.3

General Need for the Project in this Area

As noted in the Natural Communities of Louisiana, western longleaf pine savannahs provide critical habitat for many animal and plant species (LNHP, 2009). At the beginning of the 17th century, there were an estimated 90 million acres of longleaf pine forests with nearly 900 different plant species in the southeastern United States. In western Louisiana, the historic range of longleaf pine included all or parts of Acadia, Allen, Avoyelles, Beauregard, Calcasieu, Evangeline, Jefferson Davis, Natchitoches, Rapides, Sabine, St. Landry, and Vernon Parishes. The habitat type has been reduced by 95-99% of its original extent in the Lower West Gulf Coastal Plain ecoregion in the southwest and west central portions of Louisiana. Threats to western longleaf pine savannahs include construction of roads, pipeline or utilities, conversion to loblolly pine plantations, fire exclusion or inappropriate fire regimes, use of chemical herbicides or fertilizers, invasive or alien species, and hydrological alterations. In 2009, America's Longleaf Restoration Initiative (ALRI) was launched through collaboration with many stakeholders, including non-governmental organizations, state and federal agencies, private industry, universities and research extensions, and private landowners. The 15-year goal of the ALRI is to increase longleaf pine acreages by 3.4 to 8.0 million acres. In 2010, the NRCS established the Longleaf Pine Initiative (LLPI) to partner with landowners to restore longleaf forests, in support of the ALRI. The goal of the LLPI is to restore an additional 4.6 million acres of longleaf pine ecosystems in their natural range by 2025. Within Louisiana, Allen Parish, along with Beauregard, Tangipahoa, St. Tammany Vernon, and Washington Parishes, is listed as a priority area by NRCS for longleaf pine restoration. The restoration and preservation of longleaf pine habitat within HLCMB is consistent with and supports the goals of both the ALRI and the LLPI. 6

Hickory Lake Creek Mitigation Bank As development activities increase in the Calcasieu Basin, a need for high quality mitigation to offset for unavoidable impacts to longleaf pine savannahs and bottomland hardwoods will increase. According to a study conducted for the SWLA Economic Development Alliance, approximately $65 billion in capital investment is planned in southwest Louisiana, consisting of Allen, Beauregard, Calcasieu, Cameron, and Jefferson Davis Parishes. As a result of the influx of capital investment, it is predicted that southwest Louisiana, most of which is located within the Calcasieu Basin, could see an increase of 50,000 new residents by the year 2020 (Adrian and Icaza). In addition, longleaf pine savannahs provide habitat for 23 species of conservation concern in Louisiana, including the federally-listed red-cockaded woodpecker (Picoides borealis) and American chaffseed (Schwalbea americana), and the candidate species Louisiana pine snake (Pituophis ruthveni). 3.4

Technical Feasibility

The site is relatively isolated and not threatened by surrounding land uses. The construction work required to complete accomplish restoration on HLCMB is routine in nature and feasible, consisting primarily of removal of bedded rows in order to return the site to its pre-agriculture and timber-production hydrologic conditions, as well as vegetative plantings of native longleaf pine and bottomland hardwood species. The mapped soils typed are historically supportive of the native forested communities which are proposed for restoration, such as Caddo and Guyton silt loams. This is supported by the existence of two longleaf pine EQIP easements immediately adjacent to HLCMB. Additionally, a majority of the soils are mapped as hydric, indicating the site formed under hydric conditions and therefore historically supported wetlands. 4.0

ESTABLISHMENT OF THE MITIGATION BANK

The Sponsor proposes to enhance 165.0 acres of longleaf pine savannah and 83.3 acres of bottomland hardwood wetlands; restore 28.8 acres of longleaf pine upland buffer; and preserve 22.3 acres of bottomland hardwood wetlands. Tables 3 and 4 contains post-construction habitats and acreage descriptions for the proposed restoration, enhancement, and preservation of wetlands and upland buffers associated with the 301.6-acre tract, as well as areas not proposed for restoration, enhancement, or preservation.

7

Hickory Lake Creek Mitigation Bank Table 3: Post-Construction Habitat Acreage Summary

Habitat

Enhancement (Currently Bedded Pine and Herbaceous Windrows)

Restoration (Currently Mixed Hardwood-Pine Uplands)

Preservation

Bottomland Hardwood Wetlands

83.3 acres

N/A

22.3 acres

Longleaf Pine Savannah Wetlands

165.0 acres

N/A

N/A

Longleaf Pine Upland Buffer

N/A

28.8 acres

N/A

Totals

248.3 acres

28.8 acres

22.3 acres

Table 4: Areas Not Proposed for Restoration/Enhancement/Preservation

4.1

Areas

Acreage

Utility Corridor

2.2 acres

Site Restoration Plan

Commercial Logging of Undesirable Pine and Hardwoods To facilitate restoration, commercial logging of undesirable trees across 277.1 acres, comprising the loblolly pine plantation and mixed hardwood-pine upland areas, will be performed immediately as weather permits for minimal impact on soil and vegetation. Planted loblolly pine, as well as any naturally-occurring hardwoods, will be removed in longleaf savannah enhancement areas (165.0 acres) and longleaf pine upland buffer restoration areas (28.8 acres). In addition, loblolly pine will be removed in the bottomland hardwood rehabilitation areas (83.3 acres). Once all commercial-grade timber is removed from HLCMB, residual slash will be mechanically piled on existing windrows for burning. Likewise, the stumps left after harvest will be removed via a raking blade on a dozer and piled to be burned on the existing windrows. All logging events will be carefully designed, implemented immediately as weather permits, and monitored by experienced professionals. Restoring Site Hydrology While the existing hydrology on HLCMB is largely intact, bedded plantations of loblolly pine present on much of the tract, approximately 277.1 acres, artificially restrict lateral sheet flow. As 8

Hickory Lake Creek Mitigation Bank previously discussed, prior to planting, these areas were "bedded" by forming closely spaced rows approximately 1 to 2 feet tall and approximately 3 to 4 feet wide, and are situated roughly 10 feet apart. During normal commercial logging practices, the bedded rows are typically destroyed when stumps are removed using a raking blade. However, to ensure that HLCMB is restored to natural grade, the 277.1-acre logged tract, as well as the 6.0 acres of herbaceous windrows, will be disked to a depth of at least six inches. In addition to removing unnatural impediments to sheet flow, disking will aid in soil decompaction, resulting in better planting conditions. Once all beds are removed and natural grade restored, HLCMB will drain from north-northeast to south on the northern portion of the site, and north-northwest to southsoutheast on the southern portion. Vegetative Plantings Longleaf pine savannah and bottomland hardwood restoration and enhancement areas were determined by historic vegetation patterns and elevation contours. Based on historic aerial imagery prior to conversion to agriculture, bottomland hardwoods on and adjacent to the southern portion of the tract were confined to 39.5' NGVD and lower. In the north portion, aerial imagery suggests that bottomland hardwoods were confined to 46.5' NGVD and lower. As seen in historic aerial photography, these elevations correspond to the shallow, wide drains that historically flowed through HLCMB. Longleaf Pine Following hydrologic restoration, longleaf pine seedlings will be planted on approximately 193.8 acres (165.0 acres of longleaf pine savannah enhancement, and 28.8 acres of longleaf pine upland buffer enhancement) during the standard planting season (December-March). As lower planting densities are optimal for longleaf pine ecosystem restoration, seedlings shall be planted using 12 x 12 spacing for an initial stocking level of 302 trees per acre. The planted areas will be subsequently thinned to mimic natural clusters of longleaf pine to achieve targeted stocking and to create the park-like effect of the historical savanna. The Sponsor will target 125 -150 trees per acre for the 1 year survival criteria and 25 -65 longleaf or slash pine trees per acre for Year 5. Herbaceous understory will be re-established through natural recruitment. The native ground cover communities that historically characterized the great majority of the bank have been severely impacted by the pine plantation management. Prescribed fire will arguably be the most important long-term management tool used on the tract to reestablish the native grasses, forbs, and herbaceous plants. Burning is essential for rehabilitation/perpetuation of grass-herbaceous ground-cover communities. Among other effects, properly timed fires stimulate native grass and herbaceous plants to grow vigorously, flower and produce seeds, stimulate longleaf pine to grow out of the "grass-stage", and control brown spot needle-blight on young longleaf. Bottomland Hardwoods Following hydrologic restoration, approximately 83.3 acres of bottomland hardwood enhancement will be planted with an appropriate species mixture of bottomland hardwoods during the standard planting season (December-March). Seedlings will be planted on approximately using 9 x 9 spacing for an initial stand density of at least 537 seedlings per acre. A 9

Hickory Lake Creek Mitigation Bank mixture of at least 60 percent hard-mast and a maximum of 40 percent soft-mast-producing species will be planted in accordance with the following species selection list (Table 4). If seedling availability renders a discrepancy of more than five percent from the desired mixture of hard-mast to soft-mast species, New Orleans approval to modify the plan will be obtained. A mixture of the following species will be planted to restore bottomland hardwoods: Table 4: Bottomland Hardwood Species Selection List COMMON NAME SCIENTIFIC NAME Laurel oak Quercus laurifolia Texas red oak Quercus texana Willow oak Quercus phellos Water oak Quercus nigra Water hickory Carya aquatica Percent Composition Sweet gum Liquidambar styraciflua Bald cypress Taxodium distichum Red maple Acer rubrum Persimmon Diospyros virginiana Sugar-berry Celtis laevigata Percent Composition

MAST Hard Hard Hard Hard Hard 60% Soft Soft Soft Soft Soft 40%

Fire Management Regime Prescribed fire will arguably be the most important regular management tool used on the tract. Burning is essential for longleaf pine regeneration, preclusion of unwanted hardwoods and shrubs, and rehabilitation/perpetuation of rich herbaceous ground-cover communities. Application of frequent fire is necessary to help restore the native distribution of longleaf pine and slash pine-pond cypress habitats into areas that have been overtaken by hardwoods and other pines. Further, properly timed fires stimulate native herbaceous plants to grow vigorously, flower and produce seeds, stimulate longleaf pine to grow out of the "grass-stage", and control brown spot needle blight on young longleaf. The Sponsor proposes to reestablish a fire regime within the Longleaf Pine Savannah Wetland and Upland Buffer areas on the HLCMB through a strictly regulated ecological burning program. Growing season burns, that mimic historical wildfire occurrences (late March ­ June), will be favored over dormant season burns. The regulated burning program will commence the first year as a site preparation burn and continued every two years for the first six years and then on a two to three-year rotation as needed. Natural or existing fire breaks will be used whenever possible to reduce unnatural disturbances to the bank and allow burns to mimic natural fire behavior. Controlled burns will be administered in large blocks, to mimic a natural wildfire, by a contractor properly equipped and trained on the techniques of prescribed burning. Fire breaks will be set along the boundaries of the bottomland hardwood areas, the longleaf pine savannah, and upland areas. Tarver Road will be utilized as a fire break, allowing HLCMB to be burned in two contiguous blocks. Utilizing paved roads is a common practice in prescribed burning. The 10

Hickory Lake Creek Mitigation Bank cleared right-of way for Tarver Road ranges from 30-feet to 60-feet-wide. Additionally, Tarver Road is a dead-end road, approximately 0.5-mile long, and services two residential properties. While vehicular traffic is extremely limited, adjacent landowners, as well as local fire officials, will be made aware of planned burns in advance. Prescribed fire is common to this area, as GWIC uses prescribed burns on its loblolly pine stands as a regular management technique. 4.2

Current Site Risks

A pipeline corridor traverses the south portion of HLCMB. The corridor is approximately 70 feet wide, and is maintained by Texas Eastern Transmission, LP via mechanical mowing. This corridor acreage has been excluded from the restoration plan acreage, but will be within the conservation servitude boundary. Although the corridor will not be subordinate to the conservation servitude while the pipeline is operational, it will be protected by the conservation servitude in the event the servitude is terminated. According to the Louisiana Department of Natural Resources Strategic Online Natural Resources Information System (SONRIS), there is one oil and gas well (Serial Number 198839) located within the HLCMB project area and one oil and gas well (Serial Number 208895) located adjacent to the HLCMB project area. According to SONRIS, the onsite well (Serial Number 198839) was plugged and abandoned on December 29, 1995. The well on adjacent property (Serial Number 208895) was permitted on August 18, 1988, but was never put into service and the permit was allowed to expire. Tarver Road bisects HLCMB, servicing two residences on the eastern boundary of HLCMB. Two culverts on either end of the road facilitate drainage from north to south. Upon discussions between the Sponsor and the Parish, it has been determined that modifications to the size and location of the culverts can be coordinated, if required. As previously discussed, the entire ROW for Tarver Road which varies from 30 feet to 60 feet, has been excluded from the HLCMB. Walker Road serves as the western boundary of HLCMB. Apparent ROW ranges from 45 feet (north of Tarver Road) to 60 feet (southern end of HLCMB). The western boundary of HLCMB has been set to avoid encroachment upon the ROW. A survey and title opinion, to be prepared and submitted with the Draft Mitigation Bank Instrument, will verify the existence of any mortgages, liens, or other such impediments. 4.3

Long-Term Sustainability of the Site

Long-term viability and sustainability of the HLCMB will be ensured through active and adaptive management including, but not limited to, fire management regime, invasive species control, appropriate monitoring, and long-term maintenance. Allen Parish is home to some of the largest, protected pine savannahs in southwest Louisiana, including Creek Savannah Natural Area, Parkers Longleaf Natural Area, and CC Road Savannah Preserve. The soils at the site (Caddo and Guyton silt loams) are common to pine savannahs, and are moderately to strongly acidic. In addition, two longleaf pine EQIP easements are located directly adjacent to HLCMB, suggesting a high probability for sustainability of HLCMB. 11

Hickory Lake Creek Mitigation Bank 5.0 PROPOSED SERVICE AREA HLCMB is located with the Upper Calcasieu Watershed (USGS HUC 08080203) of the Calcasieu Basin, which includes portions of Allen, Beauregard, Calcasieu, Jefferson Davis, Natchitoches, Rapides, and Vernon Parishes. HLCMB will service HUCs 08080203, 08080204, 08080205, and 08080206 of the Calcasieu Basin. The Calcasieu Basin includes the current and historic range of the western longleaf pine savannah, which has been reduced to 95 to 99% of its original extent. 6.0 OPERATION OF THE MITIGATION BANK The Sponsor will comply with all conditions required of a mitigation bank sponsor, and established and operated through mitigation bank procedures approved by the Corps of Engineers. This includes, but is not limited to, review process, modifications, permit coordination, project implementation, financial assurance determination and mechanisms, credit determination, accounting procedures, credit withdrawals, and the use of credits. Details on the operation of the HLCMB will be further described in the Draft Mitigation Banking Instrument. 6.1 Project Representatives Sponsor:

Patrick Deshotels Great Western Investments Company P.O. Box 80429 Lafayette, Louisiana 70598 337-412-0732

Agent:

Charles Jones, Director of Ecological Services Matrix New World Engineering 4451 Bluebonnet Blvd., Suite E Baton Rouge, Louisiana 70809 cjones@matrixneworld.com 225-292-3271

Landowner:

Ken Sullivan Great Western Investments Company 234 Rue Beauregard, Suite 200 Lafayette, Louisiana 70508 337-232-9600

6.2 Qualifications of the Sponsor GWIC has never participated in the creation of a mitigation bank. However, GWIC has held contracts with the NRCS for WHIP, EQUP, and CSP easements; the USFWS for partner agreements; and the LDWF for red-cockaded woodpecker safe harbor agreements. GWIC has also entered negotiation with non-governmental groups such as the National Wild Turkey Federation for various conservation initiatives. GWIC has a track record of being excellent stewards of the land, and have a special commitment to restoring longleaf pine habitat. Other 12

Hickory Lake Creek Mitigation Bank conservation initiatives include creation of prairies, pollinator habitat, wildlife nest habitat, and wild turkey foraging and nesting habitat. 6.3 Proposed Long-Term Ownership and Management Representatives GWIC will serve as the sponsor and long-term owner, and Louisiana Pacific Land and Water Conservancy will serve as the long-term manager and steward of the Bank. However, the Sponsor may appoint a long-term steward if such appointment is approved by the Corps of Engineers. The anticipated long-term management will consist of monitoring, invasive species control, prescribed burning, forest management, boundary maintenance, and site protection. 6.4 Site Protection The Sponsor will execute a perpetual Conservation Servitude held by Louisiana Land and Water Conservancy, a non-profit conservation group (pursuant to the Louisiana Conservation Servitude Act, R.S. 9:1271 et. seq.) on the entirety of the 301.6-acre tract. A copy of the Conservation Servitude will be filed in the real estate records of the Mortgage and Conveyance Office of Allen Parish and shall be provided to the USACE for review and approval prior to filing. After filing, a copy of the recorded Conservation Servitude, clearly showing the book, page, and date of filing, will be provided to the USACE. 6.5 Long-Term Strategy Long-term management will consist of monitoring, vegetation management via a prescribed fire regime, invasive species control, boundary maintenance (approximately 4.8 miles), site protection, and the funding of such activities. Prescribed burns will be conducted on a two- to three-year basis during the growing season to mimic historical wildfire occurrences (late MayJune). The burns will be managed by the long-term steward, and conducted by a contractor properly equipped and trained on the techniques of prescribed burning. The wetland habitats will be managed to increase and maintain the biological, chemical, and physical wetland functions of the HLCMB and to provide forested habitat capable of supporting populations for priority wildlife species (e.g., native wildlife, Nearctic-Neotropical migrants, and the redcockaded woodpecker). A long-term management plan will be included with the Draft Mitigation Banking Instrument, which will detail long-term management need and costs, and identify a funding mechanism. The Sponsor (or Long-term Steward) and the Owner shall be responsible for protecting lands contained within the HLCMB in perpetuity. An interest-bearing long-term management account, specifically an escrow account, will be established to insure adequate funding is available to cover the costs of these activities in the future. 7.0

REFERENCES

Adrian, Mitchel and J. Icaza. Estimations for Job Growth in the Tertiary and Quaternary Sectors in Southwest Louisiana: Predicting Permanent "Post Boom" Employment Based Upon Anticipated Population Growth. McNeese State University.

13

Hickory Lake Creek Mitigation Bank Allen, J.A., Keeland, B.D., Stanturf, J.A., Clewell, A.F., and Kennedy, H.E., Jr., 2001 (revised 2004), A guide to bottomland hardwood restoration: U.S. Geological Survey, Biological Resources Division Information and Technology Report USGS/BRD/ITR­2000-0011, U.S. Department of Agriculture, Forest Service, Southern Research Station, General Technical Report SRS­40, 132 p. America's Longleaf Restoration Initiative. 2009. Range-Wide Conservation Plan for Longleaf Pine. Retrieved May 16, 2016, from http://www.americaslongleaf.org/ Demers, Chris, A. Long, and P. Moinogue. 2013. Longleaf Pine Regeneration (SS-FOR-13). Gainesville: University of Florida Institute of Food and Agricultural Sciences. Retrieved March 8, 2016, from http://edis.ifas.ufl.edu/DLN/. Di Luzio, Mauro. 2007. Data from: Seamless Daily Precipitation for the Conterminous United States. USDA/NRCS Geospatial Data Gateway. https://gdg.sc.egov.usda.gov/ Lester, Gary. D., S. G. Sorensen, P. L. Faulkner, C. S. Reid, and I. E. Maxit. 2005. Louisiana Comprehensive Wildlife Conservation Strategy. Louisiana Department of Wildlife and Fisheries. Baton Rouge. 455 pp. Lichvar, R.W., M. Butterwick, N.C. Melvin, and W.N. Kirchner. 2014. The National Wetland Plant List: 2014 Update of Wetland Ratings. Phytoneuron 2014-41: 1-42. Longleaf Pine Initiative. 2011. Longleaf Pine Initiative Fact Sheet. Natural Resources Conservation Service. Retrieved May 16, 2016, from http://www.nrcs.usda.gov/wps/portal/nrcs/detailfull/national/programs/initiatives/?cid=nr csdev11_023913 Louisiana Natural Heritage Program. 2009. The Natural Communities of Louisiana. Louisiana Department of Wildlife and Fisheries. Smith, Latimore. 1996. The Rare and Sensitive Natural Wetland Plant Communities of Interior Louisiana. Louisiana Department of Wildlife and Fisheries, Louisiana Natural Heritage Program. 40pp. Soil Survey Staff, Natural Resources Conservation Service, United States Department of Agriculture. Web Soil Survey. Available online at http://websoilsurvey.nrcs.usda.gov/ Accessed [11/7/2016]. United States Department of Agriculture, Soil Conservation Service. 1980. Soil Survey of Allen Parish, Louisiana.

14

FIGURES

£

_ ^

Project Center Latitude 30.525314° Longitude -92.962742°

Legend

Vicinty Map

Hickory Lake Creek Mitigation Bank (301.6 acres)

Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank 4

2

0

4 Miles

Source: Base map comprised of ESRI StreetMap USA data.

Approved By

CEJ

Date

11/18/2016

1

Drawing No.

15-566-A022

Figure No.

£ See Figures 3a & 4a

Project Center Latitude 30.525314° Longitude -92.962742°

See Figures 3b & 4b

Legend

Site Location Map

Hickory Lake Creek Mitigation Bank (301.6 acres)

Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank 2,000

Source: Base map comprised of U.S.G.S. 7.5 minute topographic map, "LeBlanc, LA" dated 1986.

1,000

0

2,000 Feet

Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A023

2

Figure No.

£

Existing Longleaf Pine EQIP Easement

Existing Longleaf Pine EQIP Easement

E E

Walker Road (owned by parish)

E

E

E

Existing 36" Culvert

E

! !

E

E

Matchline a

E

E

E

E

Tarver Road (owned by parish)

E

! !

Existing 36" and 24" Culverts

Overhead Electrical Line E

Legend

Hickory Lake Creek Mitigation Bank (301.6 acres)

Pre-Restoration Site Plan Mitigation Bank Prospectus Allen Parish, Louisiana

E

Bedded Loblolly Pine-Dominant Wetlands (242.3 acres) Bottomland Hardwood Wetlands (22.3 acres) Herbaceous Wetlands (6.0 acres)

Great Western Investments Company Hickory Lake Creek Mitigation Bank

E

Uplands (28.8 acres)

Utility Corridor (2.2 acres; 70' wide) Drainage Flow

600

300

0

600 Feet

E

Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A024

3a

Figure No.

E

£

E

Existing 36" Culvert

E

! !

E

E

E

E

Matchline a

E

E

Tarver Road (owned by parish)

! !

E

Existing 36" and 24" Culverts

Overhead Electrical Line E ! !

E

Existing 24"x28' Culvert

E

Walker Road (owned by parish)

E E

E E E E

E

E

E E

E

E

E E

US 190

E E E E E

Legend Hickory Lake Creek Mitigation Bank (301.6 acres)

Pre-Restoration Site Plan Mitigation Bank Prospectus Allen Parish, Louisiana

Bedded Loblolly Pine-Dominant Wetlands (242.3 acres) Bottomland Hardwood Wetlands (22.3 acres) Herbaceous Wetlands (6.0 acres)

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Uplands (28.8 acres) Utility Corridor (2.2 acres; 70' wide) Drainage Flow

600

300

0

600 Feet Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A024

3b

Figure No.

£

Existing Longleaf Pine EQIP Easement

Existing Longleaf Pine EQIP Easement

E E

Walker Road (owned by parish)

E

E

E

Existing 36" Culvert

E

! !

E

E

Matchline a

E

E

E

E

Tarver Road (owned by parish)

! !

Existing 36" and 24" Culverts

Overhead Electrical Line E

Legend

E

Hickory Lake Creek Mitigation Bank (301.6 acres)

Post-Restoration Site Plan Mitigation Bank Prospectus Allen Parish, Louisiana

E

Longleaf Pine Savannah Enhancement (165.0 acres) Bottomland Hardwood Enhancement (83.3 acres) Bottomland Hardwood Preservation (22.3 acres)

Great Western Investments Company Hickory Lake Creek Mitigation Bank

E

Longleaf Pine Upland Restoration (28.8 acres) Utility Corridor (2.2 acres; 70' wide) Drainage Flow

600

300

0

600 Feet

E

Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A025

4a

Figure No.

E

£

E

Existing 36" Culvert

E

! !

E

E

E

E

Tarver Road (owned by parish)

E

Matchline a

E

! !

E

Existing 36" and 24" Culverts

Overhead Electrical Line E ! !

E

Existing 24"x28' Culvert

E

Walker Road (owned by parish)

E E

E E E E

E

E

E E

E

E

E E

US 190

E E E E E

Legend Hickory Lake Creek Mitigation Bank (301.6 acres)

Post-Restoration Site Plan Mitigation Bank Prospectus Allen Parish, Louisiana

Longleaf Pine Savannah Enhancement (165.0 acres) Bottomland Hardwood Enhancement (83.3 acres) Bottomland Hardwood Preservation (22.3 acres)

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Longleaf Pine Upland Restoration (28.8 acres) Utility Corridor (2.2 acres; 70' wide) Drainage Flow

600

300

0

600 Feet Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A025

4b

Figure No.

Existing Longleaf Pine EQIP Easement

£

Existing Longleaf Pine EQIP Easement

A

A'

Walker Road (owned by parish)

B B'

E

D

C

Existing 36" Culvert

! !

D'

C'

E'

Tarver Road (owned by parish)

! !

Existing 36" and 24" Culverts

Legend Hickory Lake Creek Mitigation Bank (301.6 acres)

Post-Restoration Site Plan Mitigation Bank Prospectus Allen Parish, Louisiana

Longleaf Pine Savannah Enhancement (165.0 acres) Bottomland Hardwood Enhancement (83.3 acres) Bottomland Hardwood Preservation (22.3 acres)

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Longleaf Pine Upland Restoration (28.8 acres) Utility Corridor (2.2 acres; 70' wide)

Source: Base map comprised of ESRI World Imagery.

600

300

0

600 Feet Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A026

5a

Figure No.

E

D

C

Existing 36" Culvert

! !

D'

C'

E'

Tarver Road (owned by parish)

! !

Existing 36" and 24" Culverts F

! !

F'

£

Existing 24"x28' Culvert

G

G'

Walker Road (owned by parish)

US 190

Legend Hickory Lake Creek Mitigation Bank (301.6 acres)

Post-Restoration Site Plan Mitigation Bank Prospectus Allen Parish, Louisiana

Longleaf Pine Savannah Enhancement (165.0 acres) Bottomland Hardwood Enhancement (83.3 acres) Bottomland Hardwood Preservation (22.3 acres)

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Longleaf Pine Upland Restoration (28.8 acres) Utility Corridor (2.2 acres; 70' wide)

Source: Base map comprised of ESRI World Imagery.

600

300

0

600 Feet Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A026

5b

Figure No.

08040304

11140207 12010004

£

08040301 12020005

LOUISIANA 08080102

08080204

12010005

TEXAS 12020003 08080205

08080201 08080203

08080202

08080103

08080206 12040201

Legend

Service Area Map

Hickory Lake Creek Mitigation Bank (301.6 acres)

Mitigation Bank Prospectus Allen Parish, Louisiana

Hydrologic Unit Boundary Calcasieu Basin

Great Western Investments Company Hickory Lake Creek Mitigation Bank 16

Source: Base map comprised of ESRI World Imagery. Hydrologic Unit Code (HUC) boundaries obtained from the U.S. Department of Agriculture (USDA).

8

0

16 Miles Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A027

6

Figure No.

Cd

Go

Ck

Ck

Ge

Bn

Cd

Go

£

Ck

Ck Cd

Bn

Bn

Ge

Bn

Bn Bn

Ge

Cd

Cd

Go Go

Ck

Go

Ge

Go

Ck

Ck Cd GY Ck

Ch

Ge

Go

Legend

Soils Map

Hickory Lake Creek Mitigation Bank (301.6 acres)

Mitigation Bank Prospectus Allen Parish, Louisiana

Soils Bn - Bienville loamy fine sand, 1 to 5 percent slopes Cd - Caddo-Messer complex, 0 to 1 percent slopes Ck - Cahaba-Bienville-Guyton complex, gently undulating Ge - Glenmora silt loam, 1 to 3 percent slopes Go - Guyton silt loam, occasionally flooded

Source: Base map comprised of ESRI World Imagery. Soils data obtained from Natural Resources Conservation Service (NRCS) Web Soil Survey.

Great Western Investments Company Hickory Lake Creek Mitigation Bank 1,000

500

0

1,000 Feet

Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A028

7

Figure No.

£

Legend Hickory Lake Creek Mitigation Bank (301.6 acres)

1952 Aerial Photograph Mitigation Bank Prospectus Allen Parish, Louisiana

Pre-Impact Drainage Flow

Great Western Investments Company Hickory Lake Creek Mitigation Bank 1,000

Source: U.S. Geological Survey (U.S.G.S). Aerial Single Frame Photo ID: A000960152556 [aerial photo]. Sioux Falls, S. Dak.: EROS Data Center, April 14, 1952.

500

0

1,000 Feet

Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A029

8

Figure No.

£

Legend Hickory Lake Creek Mitigation Bank (301.6 acres)

1974 Aerial Photograph Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank 1,000

Source: U.S. Geological Survey (U.S.G.S). Aerial Single Frame Photo ID: AR1VDMMI0010005 [aerial photo]. Sioux Falls, S. Dak.: EROS Data Center, October 1, 1974.

500

0

1,000 Feet

Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A030

9

Figure No.

£

Legend Hickory Lake Creek Mitigation Bank (301.6 acres)

2004 Aerial Photograph Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank 1,000

Source: Base map comprised of 2004 aerial photograph from Louisiana Oil Spill Coordinators Office.

500

0

1,000 Feet

Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A031

10

Figure No.

£

Legend Conservation Servitude Boundary (301.6 acres)

Conservation Servitude Map Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank 1,000

Source: Base map comprised of 2015 aerial photograph from USDA/FSA Aerial Photography Field Office.

500

0

1,000 Feet

Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A032

11

Figure No.

£

Legend

LIDAR Map

Hickory Lake Creek Mitigation Bank (301.6 acres)

Mitigation Bank Prospectus Allen Parish, Louisiana

Contours (feet) 30.50 - 33.50

42.01 - 44.50

33.51 - 36.00

44.51 - 46.50

Great Western Investments Company

36.01 - 38.00

46.51 - 48.00

Hickory Lake Creek Mitigation Bank

38.01 - 40.00

48.01 - 50.00

40.01 - 42.00

50.01 - 54.50

Source: Base map comprised of 2015 aerial photograph from USDA/FSA Aerial Photography Field Office.

1,000

500

0

1,000 Feet

Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A033

12

Figure No.

Walker Road Right-of-Way (45')

10'

22'

10'

HLCMB Boundary

Walker Road Profile

Cross Section A-A' Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Not to Scale Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A035

13

Figure No.

Bedded Loblolly Pine-Dominant Wetlands

Bedded Loblolly Pine-Dominant Uplands

Existing Bedded Rows

Pre-Restoration

Bottomland Hardwood Enhancement

Longleaf Pine Savannah Enhancement

Longleaf Pine Upland Restoration

Bedded Rows to be Bladded and Disked

Post-Restoration

Cross Section B-B' Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Not to Scale Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A036

14

Figure No.

Tarver Road and Overhead Electirc Shared ROW (58')

HLCMB Boundary

(1) 36"x22' Corregated Metal Pipe Culvert

HLCMB Boundary

EL. 43.8'

EL. 43.5'

Tarver Road and Culvert Profile (Low-Elevation Water Crossing)

Cross Section C-C' Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Not to Scale Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A037

15

Figure No.

Tarver Road ROW (30')

HLCMB Boundary

8'

14'

8'

Tarver Road Profile

Cross Section D-D' Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Not to Scale Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A038

16

Figure No.

Tarver Road ROW (30')

HLCMB Boundary

(1) 36" x 22' Reinforced Concrete Pipe Culvert & (1) 24" x 22' Corrugated Metal Pipe Culvert

EL. 42.5'

EL. 41.6'

Tarver Road and Culvert Profile (Low-Elevation Water Crossing)

Cross Section E-E' Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Not to Scale Approved By

CEJ

Date

3/6/2017

Drawing No.

15-566-A039

17

Figure No.

Walker Road ROW (50')

(1) 18" x 28' Corrugated Metal Pipe Culvert

HLCMB Boundary

Berm Constructed by Adjacent Landowner EL. 39.9' EL. 40.2'

Walker Road and Culvert Profile

Cross Section F-F' Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Not to Scale Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A040

18

Figure No.

Walker Road ROW (50') HLCMB Boundary 8'

4'

22'

4'

8'

Walker Road Profile

Cross Section G-G' Mitigation Bank Prospectus Allen Parish, Louisiana

Great Western Investments Company Hickory Lake Creek Mitigation Bank

Not to Scale Approved By

CEJ

Date

11/18/2016

Drawing No.

15-566-A041

19

Figure No.

APPENDIX A PRELIMINARY JURISDICTIONAL DETERMINATION (MVN 2015-02507-SQ)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas