Papio-Missouri River Natural Resources District (P-MRNRD) is planning to construct Zorinsky Basin 2 (ZB-2) within Boxelder Creek for water quality improvements in Lake Zorinsky. A proposed dam structure would be an earthen embankment approximately 800 feet long and approximately 20 feet above the valley floor (approximately 36 feet above the channel bottom). The structure would require approximately 55,000 cubic yards of clean fill material, with 2,170 cubic yards of fill below the ordinary high water mark. The drainage area of ZB-2 would be approximately 1.44 square miles, and the normal pool area would be approximately 20 acres (at elevation 1,181.5 feet). The top-of-dam limits would exist at an elevation of 1,191 feet.

Papio-Missouri River Natural Resources District (P-MRNRD) is planning to construct Zorinsky Basin 2 (ZB-2) within Boxelder Creek for water quality improvements in Lake Zorinsky. A proposed dam structure would be an earthen embankment approximately 800 feet long and approximately 20 feet above the valley floor (approximately 36 feet above the channel bottom). The structure would require approximately 55,000 cubic yards of clean fill material, with 2,170 cubic yards of fill below the ordinary high water mark. The drainage area of ZB-2 would be approximately 1.44 square miles, and the normal pool area would be approximately 20 acres (at elevation 1,181.5 feet). The top-of-dam limits would exist at an elevation of 1,191 feet.

PUBLIC NOTICE Application No: NWO-2016-00916-WEH Project Name: Zorinsky Water Quality Basin No. 2 Applicant: Papio-Missouri River Natural Resource District Waterway: Boxelder Creek and Adjacent/Abutting Wetlands Issue Date: March 21, 2017 Expiration Date: April 11, 2017

21 DAY NOTICE Reply To: NEBRASKA REGULATORY OFFICE 8901 SOUTH 154TH STREET, SUITE 1, OMAHA, NEBRASKA 68138-3635 JOINT PUBLIC NOTICE: This public notice is issued jointly by the U.S. Army Corps of Engineers (USACE), Omaha District, and the Nebraska Department of Environmental Quality (NDEQ). The NDEQ will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The NDEQ hereby incorporates this public notice as its own public notice and procedures by reference thereto. For the purposes of the NDEQ, their public notice will expire 30 calendar days from the issue date shown above. AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344). APPLICANT: Amanda Grint, Papio-Missouri River Natural Resources District, 8901 South 154th Street, Omaha, Nebraska 68138. PROJECT LOCATION: South 204th Street and "F Street; Section 36, Township 15 North, Range 10 East; City of Omaha, Douglas County, Nebraska; 41.22603° North, -96.23932° West. PROJECT DESCRIPTION: Papio-Missouri River Natural Resources District (P-MRNRD) is planning to construct Zorinsky Basin 2 (ZB-2) within Boxelder Creek for water quality improvements in Lake Zorinsky. A proposed dam structure would be an earthen embankment approximately 800 feet long and approximately 20 feet above the valley floor (approximately 36 feet above the channel bottom). The structure would require approximately 55,000 cubic yards of clean fill material, with 2,170 cubic yards of fill below the ordinary high water mark. The drainage area of ZB-2 would be approximately 1.44 square miles, and the normal pool area would be approximately 20 acres (at elevation 1,181.5 feet). The top-of-dam limits would exist at an elevation of 1,191 feet.

1

The proposed project pool will inundate 2.88 acres of PEMA/C riverine channel wetlands, 1.03 acres of PEMA/C lacustrine fringe wetlands, 0.09 acre of PEMA/C floodplain depressional wetlands, 0.61 acre of PFOA riverine channel forested wetland, and 1.28 acres of open water. The proposed project will fill 304 linear feet of R2UB Boxelder Creek (WUS-01, perennial), 306 linear feet of R4SB un-named tributary (WUS-04, intermittent) to Boxelder Creek, 133 linear feet of un-named tributary to (WUS-02, ephemeral) to Boxelder Creek, and 397 linear feet of unnamed tributary (WUS-03, ephemeral) to Boxelder Creek. PROJECT PURPOSE: The applicant's project purpose is as follows: "The purpose of the project is to reduce sediment and nutrient loads during the transition phase from agriculture to urbanization in Sub-basin No. 2 of the Zorinsky Lake Drainage Area to meet the goals and objectives of the Community ­Based Watershed Management Plan for Zorinsky Lake." The basic project purpose, as defined by the USACE, is water quality. The overall project purpose, as defined by the USACE, is to decrease the sediment and nutrient load that enters Zorinsky Lake from Zorinsky Basin 2. SPECIAL AQUATIC SITES: The proposed project would result in the discharge of fill material into Waters of the U.S., thus impacting 2.88 acres of PEMA/C riverine channel wetlands, 1.03 acres of PEMA/C lacustrine fringe wetlands, 0.09 acre of PEMA/C floodplain depressional wetlands, 0.61 acre of PFOA riverine channel forested wetland, 1.28 acres of open water, 304 linear feet of R2UB Boxelder Creek (WUS-01, perennial), 306 linear feet of R4SB un-named tributary (WUS-04, intermittent) to Boxelder Creek, 133 linear feet of un-named tributary to (WUS-02, ephemeral) to Boxelder Creek, and 397 linear feet of un-named tributary (WUS-03, ephemeral) to Boxelder Creek. AVOIDANCE, MINIMIZATION, AND MITIGATION: The applicant has considered alternatives to avoid, minimize, and mitigate impacts to waters of the U.S. Project impacts on wetlands and waters of the U.S. are unavoidable. Impacts were minimized on WUS-04 by realigning the least length of channel possible away from the dam footprint while maintaining dam constructability. The applicant has provided an alternatives analysis for compliance with 404(b)(1) guidelines. The alternatives analysis is under review. Wetland Mitigation: Impacts to wetlands will be mitigated on-site as follows: 1) 2.88 acres of PEMA/C riverine channel wetland will be mitigated with 11.52 acres of PEMA/C lacustrine fringe wetland;

2

2) 0.09 acre of PEMA/C floodplain depressional wetland will be mitigated with 0.36 acre of PEMA/C lacustrine fringe wetland; 3) 1.03 acres of PEMA/C lacustrine fringe wetland will be mitigated with 2.06 acres of PEMA/C lacustrine fringe wetland; and 4) 0.61 acre of PFOA riverine channel wetland will be mitigated with 2.44 acres of PEMA/C lacustrine fringe wetland. All wetland mitigation areas will be protected with a minimum 50-foot buffer of native grasses. The applicant has not yet provided a mitigation plan for review. A final mitigation plan, completed in accordance with the 2008 Mitigation Rule, is required to be submitted by the applicant, and approved by the U. S. Army Corps of Engineers, prior to any permit issuance. Stream Mitigation: The Nebraska Stream Condition Assessment Procedure (NeSCAP) will be used by the applicant to evaluate pre-construction and proposed post-construction functions of the impacted channels. An evaluation between existing Pre-Project functions and Post-Project functions is used to determine if sufficient stream mitigation has been proposed. To replace lost stream function, stream channel improvements will be performed within channels RR-03 and RR-20 and are identified as on the Figure A6-A (PEMA/C Wetland & Stream Mitigation) as RRm1, RRm2, RRm3, and RRm4. All stream mitigation areas will be protected with a minimum 50-foot buffer of native grasses. A NeSCAP functional assessment has been submitted by the applicant and is under review. Mitigation Banks or In-Lieu Fee Programs: The project is located within the service area of the Indian Cave/Lincoln Bend wetland mitigation bank. However, this is a single-user bank and not available to the applicant. CULTURAL RESOURCES: The Corps of Engineers, Omaha District, will comply with the National Historic Preservation Act of 1966 and amendments, and the procedures set forth in 33 CFR 325, Appendix C. We have checked the National Register of Historic Places, and any available site database information, and there are no known National Register sites in the vicinity. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. In a letter dated October 18, 2016 the Nebraska State Historical Society found that the project has the potential to impact cultural properties eligible for listing on the National Register of Historic Places, based on the presence of a previously identified historic period archaeological site within the top-of-dam area. While the site is ineligible for listing, other cultural properties may be located within the project area. A pedestrian survey for archaeological and historic resources will be conducted within the ZB-2 study area in the spring of 2017.

3

We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not affect species designated as threatened or endangered or adversely affect critical habitat for the following species: Least Tern (Sterna antillarum), Piping Plover (Charadrius melodus), Pallid Sturgeon (Scaphirhynchus albus), and Western Prairie Fringed Orchid (Platanthera praeclara). The project is in the known range of the threatened Northern Long-Eared Bat (Myotis septentrionalis). A preliminary determination has been made that the described work may affect but is not likely to adversely affect the Northern Long-Eared Bat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. FLOODPLAIN: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341) requires that all discharges of fill material must be certified by the appropriate state agency as complying with applicable effluent limitations and water quality standards. The discharge must be certified before a Department of the Army permit can be issued. Certification, if issued, expresses the State's opinion that the discharge will not violate applicable water quality standards. It is the responsibility of the applicant to contact Nebraska Department of Environmental Quality as soon as possible in the permitting process to discuss requirements for certification. Please contact: CWA Section 401 Coordinator Water Quality Division, Planning Unit Nebraska Department of Environmental Quality 1200 'N' Street, Suite 400 Lincoln, NE 68509-8922 Phone: 402.471.2875 Fax: 402.471.2909 E-mail: ndeq.401certification@nebraska.gov PUBLIC INTEREST REVIEW: The decision whether to issue the USACE permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed/completed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against their reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the 4

cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). COMMENTS: The USACE is soliciting comments from the public, Federal, State, and Local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity. Anyone whose interests may be affected by the proposed/completed work is invited to submit favorable or unfavorable written comments to the Nebraska Regulatory Office, 8901 South 154th Street, Suite 1, Omaha, NE 68138-3635. The District Engineer is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic system's functional values, cumulative and secondary effects and endangered species. All comments received will be considered public information; copies of all comments, including names and addresses of commenters, may be provided to the applicant unless confidentiality is requested. Comments must be submitted on or before the expiration date (located at the top of the first page) of this notice to be considered in the subsequent actions on this application. PUBLIC HEARING: Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state the reason(s) for holding a public hearing. If the District Engineer determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. ADDITIONAL INFORMATION: Additional information about this application may be obtained by writing to Ms. Laura Banker at the address shown on page one, or by calling (402) 896-0896. You can also e-mail Ms. Banker at Laura.Banker@usace.army.mil. REQUEST TO POSTMASTERS: Please post this notice conspicuously and continuously until the expiration date specified at the top of page one.

5

NOTICE TO EDITORS: This notice purpose is provided as background information for your use in formatting news stories. This notice is not a contract for classified display advertising.

6

LEGEND Delineated Channel Stream Mitigation Reaches RRm1 - 284 feet RRm2 - 1,296 feet RRm3 - 664 feet RRm4 - 554 feet Proposed PEMA/C Mitigation - 3-feet above and below the Normal Pool Elevation Approximately 14.1 acres Normal Pool

Dam Footprint Study Area

O 0

Feet

600

AERIAL IMAGERY: 2016 MAPA

F St

PEMA/C WETLAND & STREAM MITIGATION ZORINSKY BASIN NO. 2

FIGURE A6-A

PATH: Z:\PROJECTS\PAPIO_NRD\280335_ZORINSKY_BASIN_2_PREDESIGN\MAP_DOCS\DRAFT\IP_FIGA6A_MITIGATION.MXD - USER: BFISHER - DATE: 3/6/2017

INDIVIDUAL PERMIT APPLICATION

LEGEND ZB-2 PFOA Proposed Mitigation - 2.92 acres DS-15A Normal Pool

180th St

DS-15A PFOA Existing Mitigation

O 0

Feet

Proposed ZB-2 PFOA Mitigation

Proposed ZB-2

800

State St

AERIAL IMAGERY: 2016 MAPA

186th St Ida St

PFOA WETLAND MITIGATION

ZORINSKY BASIN NO. 2

FIGURE A6-B

PATH: Z:\PROJECTS\PAPIO_NRD\280335_ZORINSKY_BASIN_2_PREDESIGN\MAP_DOCS\DRAFT\IP_FIGA6B_MITIGATION.MXD - USER: BFISHER - DATE: 3/20/2017

INDIVIDUAL PERMIT APPLICATION

f I

pi

a

r

204th St

AERIAL IMAGERY: 2016 MAPA

ek

ek

$ a " !

1

î I ? n on C re

C e Project Location

Dodge Rd k

e

ay C re

Miles

W

est P

P a pill ee ion Cr

" ! $ e

ch

isper i ng Rid ge

Study Area

We s

k

County Boundary

t

5 ghway 27

Waterbody

O 0

n

Wh

Waterway

a rth B r

Maple Rd

lli

LEGEND

S Hi

U

No

hw

Lincoln Old H ig

240th St

n Cr

iv e

Center Rd

Box e

E

R

or n lkh

lder C re k e

eek

180th St

r

o

Mort

Zorinsky Lake

d Bea

ek re illi o n C p P a h

Cree k

bu

Ti

t

So u

Creek le

ro n

Douglas Count y Sarpy County

PROJECT LOCATION ZORINSKY BASIN NO. 2

FIGURE A1

PATH: Z:\PROJECTS\PAPIO_NRD\280335_ZORINSKY_BASIN_2_PREDESIGN\MAP_DOCS\DRAFT\IP_FIGA1_PROJECT_LOCATION.MXD - USER: BFISHER - DATE: 3/6/2017

INDIVIDUAL PERMIT APPLICATION

LEGEND

Center Rd

Waterway

Normal Pool

Dam Footprint Top of Dam Study Area

O Feet

800

Boxeld er Cre ek

0

AERIAL IMAGERY: 2016 MAPA

204th St

F St

PROJECT SITE MAP

ZORINSKY BASIN NO. 2

FIGURE A2

PATH: Z:\PROJECTS\PAPIO_NRD\280335_ZORINSKY_BASIN_2_PREDESIGN\MAP_DOCS\DRAFT\IP_FIGA2_PROJECT_SITE_MAP.MXD - USER: BFISHER - DATE: 3/6/2017

INDIVIDUAL PERMIT APPLICATION

C:\pwworking\oma\d2281362\00G-01.dwg, 00-00, 3/1/2017 9:51:54 AM, tmeyer

PAPIO - MISSOURI RIVER NATURAL RESOURCES DISTRICT

B-1 B-2

I T C

BY __________________________________________ JOHN J. ENGEL, P.E., NEBRASKA E-9416

BY __________________________________________ JOHN WINKLER, GENERAL MANAGER

___________, 2017

I FURTHER CERTIFY THAT THIS DAM WAS DESIGNED TO MEET THE REQUIREMENTS OF A HIGH HAZARD STRUCTURE.

I HEREBY CERTIFY THAT THESE DRAWINGS WERE MADE WITH MY FULL KNOWLEDGE AND CONSENT.

___________, 2017

I HEREBY CERTIFY THAT THE DESIGN OF THE ZORINSKY WATER QUALITY BASIN #2, REPRESENTED ON THESE DRAWINGS, WAS MADE UNDER MY DIRECTION.

HDR ENGINEERING, INC.

ENGINEER'S CERTIFICATE

SITE BORING PLAN GEOLOGIC PROFILES ALONG DAM AND SPILLWAY

U R T S N O C

SPILLWAY PLAN SPILLWAY PROFILE AND SECTIONS

GEOLOGICAL

S-1 S-2

N O

DAM SITE PLAN AND REMOVALS GEOMETRICS AND GRADING PLAN EMBANKMENT TYPICAL SECTION AND PROFILE ALONG DAM CENTERLINE

COVER SHEET, LOCATION MAP AND INDEX OF DRAWINGS RESERVOIR AREA PLAN AND CAPACITY TABLE HYDROLOGIC AND HYDRAULIC DATA PROJECT BOUNDARY AND EASEMENT MAP

STRUCTURAL

C-1 C-2 C-3

CIVIL

G-1 G-2 G-3 G-4

GENERAL

PAPIO - MISSOURI RIVER NATURAL RESOURCES DISTRICT

APPLICANT'S CERTIFICATE

HDR PROJECT NO. 280355

R O F FEBRUARY 2017 T NO

DRAFT PRELIMINARY PLANS

E 1/2 SECTION 36, T15N, R10E DOUGLAS COUNTY, NEBRASKA

P-MRNRD ZORINSKY WATER QUALITY BASIN #2

INDEX OF DRAWINGS

C:\pwworking\oma\d2281362\00G-02.dwg, PLOT, 3/1/2017 9:55:42 AM, tmeyer

PROPERTY PARCELS

LIMITS OF PROJECT ACQUISITION

NORMAL POOL ELEV. 1181.5

SPILLWAY ELEV. 1183.0

TOP OF DAM ELEV. 1191.0

LEGEND

EASEMENTS

BLUE SAGE SID

BLUE SAGE CREEK SID

208TH ST

REET

1. TOP OF DAM AFTER SETTLEMENT SET AT ELEVATION 1191.0. 2. DESIGN SEDIMENT STORAGE AVAILABLE BELOW ELEVATION 1181.5 = 97 ACRE-FT. 3. EXISTING TOPOGRAPHY IS COMBINATION OF JUNE 2016 E&A CONSULTING GROUP, 2010 LiDAR 2-METER DEM FROM NEBRASKA DNR, AND 2016 OLSSON ASSOCIATES PROPOSED GRADING PLAN FOR GRANDVIEW RIDGE SUBDIVISION. 4. COORDINATES ARE MODIFIED STATE PLANE (MODIFIED SCALE FACTOR = 0.99961299) 2. ELEVATIONS ARE NAVD 88, NAD 1983.

GENERAL NOTES

SCALE: 1" = 500'

OVERALL RESERVOIR PLAN

MUD WATERLINE AND EASEMENT

STR

EET

TO

O

E STREET

HOWE STREET

GRANDVIEW SID

EE K C R ER

PARKWAY

C.P. #2 - BRASS CAP - N: 530248.76; E: 2676654.49 23.75' WEST - NORTHWEST TO RAILROAD SPIKE IN BACK OF CURB OF CENTER MEDIAN. 68.75' NORTHEAST TO 60D NAIL IN POWER POLE. 50.14' EAST TO TOP NUT FIRE - HYDRANT. 28.09' WEST TO PIKE NAIL IN CENTERLINE OF MEDIAN. EAST QUARTER CORNER S36, T15N, R10E

C.P. #1 - IRON BAR - N: 530248.76; E: 2674018.72 5.26' NORTHWEST TO "X" NAILS IN FACE OF POWER POLE. 3.78' WEST - NORTHWEST TO 60D NAIL IN WOOD FENCE POST. 8.62' SOUTHWEST TO 60D NAIL IN SQUARE WOOD FENCE POST. CENTER CORNER S36, T15N, R10E

LAKE

A STREET

EL D X 205TH STREET

BO

E RG

D STREET

GE

IB U TR

204TH STREET

0

0

1

1

1

2

4

7

11

1162

1164

1166

1168

1170

1172

1174

1176

1178

55

62

1196

48

1194

1192

45

41

1190

1191

36

31

27

24

21

1188

1186

1184

1183

1182

20

15

0

1160

1180

0

0

117

103

46

43

78

67

58

26

22

10

26

26

19

12

6

3

2

1

1

1

0

0

0

INCREMENTAL STORAGE (AC-FT)

STRUCTURE CAPACITY DATA SURFACE AREA (AC)

1158

1181.5

C.P. #4 - BRASS CAP - N: 527494.63; E: 2674139.08 44.38' SOUTHWEST TO "X" TOP NUT OF FIRE-HYDRANT. 27.60' SOUTH TO 60D NAIL IN NORTH FACE OF FENCE POST. 49.01' SOUTHEAST TO 60D NAIL IN TOP GATE POST. 38.43' NORTHEAST TO "X" NAILS IN SOUTH FACE 12" TREE. SOUTH QUARTER CORNER S36, T15N, R10E

C.P. #3 - BRASS CAP - N: 527612.99; E: 2676775.52 86.45' NORTHEAST TO TOP NUT FIRE - HYDRANT. 18.18' EAST TO PK NAIL IN NOSE OF ISLAND. 79.44' SOUTHWEST TO DRILL HOLE IN NOSE OF ISLAND. 73.56' NORTHWEST TO DRILL HOLE IN NOSE OF ISLAND. SOUTHEAST CORNER S36, T15N, R10E

TOP OF DAM

SPILLWAY CREST

NORMAL POOL

DRAWDOWN

ELEVATION (FT)

667

550

447

401

358

280

213

155

131

107

98

71

44

26

14

8

6

4

2

2

1

0

0

0

CUMULATIVE STORAGE (AC-FT)

02-17 TRM

02-17 TRM

RESERVOIR AREA PLAN AND CAPACITY TABLE

TA R Y

CONTROL POINTS / BENCHMARKS

F STREET

207T H

2

G-2

00G-02.dwg

DOUGLAS COUNTY, NE ZORINSKY WATER QUALITY BASIN #2

02-17 JJE

PAPIO - MISSOURI RIVER NATURAL RESOURCES DISTRICT

C:\pwworking\oma\d2281362\00C-01.dwg, Plot, 3/1/2017 10:36:05 AM, tmeyer

5

C-1

00C-01.dwg

PAPIO - MISSOURI RIVER NATURAL RESOURCES DISTRICT

DAM SITE PLAN AND REMOVALS

ZORINSKY WATER QUALITY BASIN #2

DOUGLAS COUNTY, NE

C:\pwworking\oma\d2281362\00S-01.dwg, 00S-01, 3/1/2017 11:29:39 AM, tmeyer

8

S-1

00S-01.dwg

PAPIO - MISSOURI RIVER NATURAL RESOURCES DISTRICT

SPILLWAY PLAN

ZORINSKY WATER QUALITY BASIN #2

DOUGLAS COUNTY, NE

C:\pwworking\oma\d2281362\00S-02.dwg, 00S-02, 3/1/2017 10:46:36 AM, tmeyer

9

S-2

00S-02.dwg

PAPIO - MISSOURI RIVER NATURAL RESOURCES DISTRICT

SPILLWAY SECTIONS

ZORINSKY WATER QUALITY BASIN #2

DOUGLAS COUNTY, NE

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas