BULK TERMINAL NUMBER 1 EXPANSION PROJECT IN CALCASIEU PARISH

NAME OF APPLICANT: Lake Charles Harbor and Terminal District, C/O: Gahagan & Bryant Associates, Inc., Ms. Dana Cheney, at 9330 Kirby Drive, Suite 100, Houston, TX 77054.

LOCATION OF WORK: Located off of Bayou D’Inde Road on the Calcasieu Ship Channel, in Westlake Louisiana, Calcasieu Parish, Louisiana, as shown on the enclosed drawings. Location: Latitude: 30.19528/Longitude: -93.29278 Hydrologic Unit Code: 08080206 – Lower Calcasieu. LA.

CHARACTER OF WORK: The applicant proposed to modify the existing permit to extend the length of the patented open cell design bulkhead that will be used for shoreline stabilization. The applicant has cited the change in bulkhead design as a necessity in preparation for the deposition of dredge material into Disposal Area #6. Approximately 150,000 cubic yards of dredged material will be placed behind the bulkhead for stabilization, permanently impacting 4.45 acres of fresh marsh. The applicant proposes to purchase mitigation credits from a mitigation bank to offset any unavoidable losses to wetland functions cause by project implementation.

JOINT PUBLIC NOTICE March 27, 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118

State of Louisiana Department of Environmental Quality ATTN: Water Quality Certifications Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1280 Brandon.D.Gaspard@usace.army.mil Project Manager Brandon Gaspard Permit Application Number MVN 1997-00353-MG

(225) 219-3225/FAX (225) 325-8250 Elizabeth.Hill@la.gov Project Manager Elizabeth Hill WQC Application Number WQC 170327-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Water Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). BULK TERMINAL NUMBER 1 EXPANSION PROJECT IN CALCASIEU PARISH

NAME OF APPLICANT: Lake Charles Harbor and Terminal District, C/O: Gahagan & Bryant Associates, Inc., Ms. Dana Cheney, at 9330 Kirby Drive, Suite 100, Houston, TX 77054. LOCATION OF WORK: Located off of Bayou D'Inde Road on the Calcasieu Ship Channel, in Westlake Louisiana, Calcasieu Parish, Louisiana, as shown on the enclosed drawings. Location: Latitude: 30.19528/Longitude: -93.29278 Hydrologic Unit Code: 08080206 ­ Lower Calcasieu. LA.

-2CHARACTER OF WORK: The applicant proposed to modify the existing permit to extend the length of the patented open cell design bulkhead that will be used for shoreline stabilization. The applicant has cited the change in bulkhead design as a necessity in preparation for the deposition of dredge material into Disposal Area #6. Approximately 150,000 cubic yards of dredged material will be placed behind the bulkhead for stabilization, permanently impacting 4.45 acres of fresh marsh. The applicant proposes to purchase mitigation credits from a mitigation bank to offset any unavoidable losses to wetland functions cause by project implementation. The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or emailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and

-3conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. A copy of this public notice is sent to the State Archeologist and State Historic Preservation Officer soliciting input on potential impacts to cultural resources. Our initial finding is that the proposed work will have no effect any species listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES) dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that the proposed activity would have no effect on any listed species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 4.45 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, Water Quality Certifications, before a permit is issued.

-4Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Darrell S. Barbara Chief, Western Evaluation Section Regulatory Branch Enclosure

LAKE CHARLES HARBOR & TERMINAL DISTRICT PERMIT APPLICATION FOR: BULK TERMINAL NO. 1 EXPANSION PROJECT CALCASIEU PARISH, LOUISIANA

SECTION

SHEET NUMBER

GENERAL

00.1 00.2 01.1 01.2 01.3 01.4 02.1 02.2 02.3 02.4 02.5 02.6 02.7 02.8 02.9 02.10 02.11 02.12 02.13 02.14 02.15 02.16 02.17 02.18 02.19 02.20 02.21 03.1 03.2 03.3 03.4 04.1

DREDGING

NEW LIQUID & DRY DOCK

SHORELINE STABILIZATION

MISCELLANEOUS

SHEET NAME INDEX OF SHEETS PROJECT VICINITY MAP DREDGING SITE PLAN DREDGE TEMPLATE TYPICAL SECTIONS A & B TYPICAL SECTIONS C & D EXISTING SITE PLAN DOLPHIN DEMOLITION PLAN PROPOSED SITE PLAN GENERAL ARRANGEMENT PLAN WHARF EXTENSION LAY BERTH LIQUID DOCK WHARF EXTENSION PLAN WHARF EXTENSION SECTION WHARF EXTENSION BENT DETAIL LAY BERTH PLAN LIQUID DOCK PLAN LIQUID DOCK LOADING PLATFORM PILE PLAN LIQUID DOCK LOADING PLATFORM LIQUID DOCK PLATFORM ELEVATIONS TYPICAL MOORING DOLPHIN PLAN TYPICAL MOORING DOLPHIN ELEVATIONS TYPICAL BREASTING DOLPHIN PLAN TYPICAL BREASTING DOLPHIN ELEVATIONS ACCESS TRESTLE SECTION WALKWAY DETAILS BULKHEAD LOCATION KEY PLAN PARTIAL BULKHEAD PLAN PARTIAL BULKHEAD PLAN TYPICAL BULKHEAD PLAN & SECTION USACE JURISDICTIONAL DETERMINATION

FOR PERMITTING

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

DECEMBER 20, 2013

FILE:

POLC_BT1ExpansionPrj.dwg

PARISH:

CALCASIEU

FOR CMD/COE USE ONLY USACE Permit # Applicant:

INDEX OF SHEETS DATE:

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

REV.#: 2 DATE: 03/22/17

Gahagan & Bryant Associates, Inc. 9330 Kirby Drive, Suite 100 Houston, TX 77054 832.377.4800 (O) 832.377.4802 (F) www.gba-inc.com

SCALE:

NONE

EXHIBIT:

00.1

W

H

FOR PERMITTING

HWY 378

E 2,680,000

PROJECT LOCATION / LOCATION OF DREDGING

E 2,660,000

LEGEND:

Y 37 9

N 640,000

N 640,000

SULPHUR

I-10

NAPOLEAN ST

LAKE CHARLES

I-10

LAKE CHARLES

3

2

HWY 108

0

7 I-2

1

CALCASIEU RIVER

4 AND PASS SHIP

BAYOU D'INDIE RD

CHANNEL

5

6

I-270

PORT OF LAKE CHARLES, BT-1

N 620,000

PRIEN

RYAN ST

7

PRIEN LAKE NELSON RD

N 620,000

PROJECT LOCATION / LOCATION OF DREDGING

8

Vicinity Map State of Louisiana

HWY 384

LAKE ST

BIG LAKE RD

10

0

Baton Rouge

1 MILE

E 2,680,000

E 2,660,000

NOTES:

1 MILE

GRAPHIC SCALE

1. HORIZONTAL COORDINATES REFERENCED TO NAD 83 LOUISIANA SOUTH ZONE 1702.

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

PROJECT VICINITY MAP DATE:

DECEMBER 20, 2013

FILE:

POLC_BT1ExpansionPrj.dwg

PARISH:

REV.#: 1 CALCASIEU DATE: 10/19/16

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

Gahagan & Bryant Associates, Inc. 9330 Kirby Drive, Suite 100 Houston, TX 77054 832.377.4800 (O) 832.377.4802 (F) www.gba-inc.com

COMMON ST

Shreveport

9

Lake Charles New Orleans

Project Location

Gulf of Mexico

FOR CMD/COE USE ONLY USACE Permit # Applicant:

SCALE:

AS SHOWN

EXHIBIT:

00.2

E 2,670,000

E 2,660,000

I-10

FOR PERMITTING

DA #3 N 630,000

N 630,000

70 I-2

BAY O

UD

AXIALL PPG

'IND

E

BAYOU D'INDE RD PLANT ENTRANCE

DA #5 DA #6

POLC BT NO. 1

EL

NN

N 620,000

U

IE

R

PA

SS

LOCATION OF DREDGING

N 620,000 PLACEMENT AREA WILL BE ACCESSED BY WAY OF THE CALCASIEU RIVER AND PASS SHIP CHANNEL WHICH IS MAINTAINED TO -40 FT MLG

DA #7

NELSON RD

AS

LC CA

VE

RI

D AN

IP SH

A CH

DA #8 LEGEND: PROPOSED FOOTPRINT OF AREA TO BE DREDGED

LA 384

NOTES:

3,000'

0

1. HORIZONTAL COORDINATES REFERENCED TO NAD 83 LOUISIANA SOUTH ZONE 1702.

3. REFER TO 03.X SHEETS FOR DETAILS OF PROPOSED SHORELINE STABILIZATION.

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

DREDGING SITE PLAN DATE:

DECEMBER 20, 2013

FILE:

POLC_BT1ExpansionPrj.dwg

PARISH:

REV.#: 1 CALCASIEU DATE: 10/19/16

N 610,000

E 2,670,000

PILE SUPPORTED DOCK STRUCTURE.

GRAPHIC SCALE

E 2,660,000

N REFER 610,000 2. TO 02.X SHEETS FOR DETAILS OF PROPOSED

3,000'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

Gahagan & Bryant Associates, Inc. 9330 Kirby Drive, Suite 100 Houston, TX 77054 832.377.4800 (O) 832.377.4802 (F) www.gba-inc.com

FOR CMD/COE USE ONLY USACE Permit # Applicant:

SCALE:

AS SHOWN

EXHIBIT:

01.1

64

2,0

00

150'

250'

PROPOSED PILE SUPPORTED DOCK STRUCTURE 0

200'

200'

3

500'

PROPOSED SHORELINE STABILIZATION

GRAPHIC SCALE

N

500'

0

00

PROPOSED FOOTPRINT OF AREA TO BE DREDGED

,00

PROPOSED ACCESS

FOR PERMITTING

4

D 01.4 16+3662

DREDGING FOOTPRINT POINT NORTHING EASTING 1 621,001.85 2,660,730.90 2 620,798.43 2,660,876.24 3 622,759.71 2,663,621.39 4 622,711.41 2,663,123.73

C 01.4

ESTIMATED DREDGE QUANTITIES

N

TOTAL:

E

2,6

60

OP

ER

TY

LIN

E

16+2862

PR

62 4,0 0

0

AUTHORIZED CHANNEL DEPTH: -40' MLG +2' OF ADVANCE MAINTENANCE: -42' MLG +2' OF ALLOWABLE OVERDEPTH: -44' MLG 797,000 CY

EXISTING SHORELINE (+/-)

,00

0

B 01.3

DA #6

CALCASIEU RIVER AND PASS SHIP CHANNEL

2,6 6

2,6

62 2,0

00 62 4,0 N E

E LEGEND:

E

16+1862

2,6

62

,00

0

NOTES:

PROPOSED ACCESS ROAD TO FOLLOW EXISTING INTERIOR LEVEE

A 01.3 16+1262

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

DREDGE TEMPLATE DATE:

DECEMBER 20, 2013

FILE:

POLC_BT1ExpansionPrj.dwg

PARISH:

REV.#: 1 CALCASIEU DATE: 10/19/16

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

Gahagan & Bryant Associates, Inc. 9330 Kirby Drive, Suite 100 Houston, TX 77054 832.377.4800 (O) 832.377.4802 (F) www.gba-inc.com

,00

0

62 N CHNL. TOE N 62 0,0 00

60

CHNL. CENTERLINE

2,6

CHNL. TOE

POLC BT-1

N

5. CHANNEL STATIONING APPROXIMATE.

62 2,0

00

E

STRU. LIMIT LINE

LINE R.O W

POLC BT-1

EXISTING DOCK

3. REFER TO 02.X SHEETS FOR DETAILS OF PROPOSED PILE SUPPORTED DOCK STRUCTURE. 4. REFER TO 03.X SHEETS FOR DETAILS OF PROPOSED SHORELINE STABILIZATION.

2

0,0

1

00

2. HORIZONTAL COORDINATES REFERENCED TO NAD 83 LOUISIANA SOUTH ZONE 1702. ELEVATIONS REFERENCED TO MEAN LOW GULF (MLG). ORIGINAL DATA COLLECTED IN NAVD88 AND CONVERTED TO MLG BY RELATIONSHIP DETERMINED FROM FIELD DATA AND CORRESPONDENCE WITH USACE NEW ORLEANS DISTRICT.

CHNL.

1. CONTOURS SHOWN REPRESENT A COMBINED DATA SET INCORPORATING GBA HYDROGRAPHIC SURVEY DATA COLLECTED IN DECEMBER OF 2012, HTI/SEVENSON HYDROGRAPHIC SURVEY DATA COLLECTED IN SEPTEMBER OF 2015, AND TOPOGRAPHIC SURVEY DATA PROVIDED BY PELICAN LAND SURVEYING, L.L.C., COLLECTED IN OCTOBER AND NOVEMBER OF 2012. ELEVATIONS ARE POSITIVE UNLESS PRECEDED BY A (-) SIGN.

FOR CMD/COE USE ONLY USACE Permit # Applicant:

SCALE:

AS SHOWN

EXHIBIT:

01.2

LEGEND: MATERIAL TO BE DREDGED PROPOSED PILE SUPPORTED DOCK STRUCTURE

FOR PERMITTING

PROPOSED SHORELINE STABILIZATION

B

A

*SEE DRAWING NOTES EXHIBIT 01.2

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

TYPICAL SECTIONS A & B DATE:

DECEMBER 20, 2013

FILE:

POLC_BT1ExpansionPrj.dwg

PARISH:

REV.#: 1 CALCASIEU DATE: 10/19/16

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

Gahagan & Bryant Associates, Inc. 9330 Kirby Drive, Suite 100 Houston, TX 77054 832.377.4800 (O) 832.377.4802 (F) www.gba-inc.com

FOR CMD/COE USE ONLY USACE Permit # Applicant:

SCALE:

AS SHOWN

EXHIBIT:

01.3

LEGEND: MATERIAL TO BE DREDGED PROPOSED PILE SUPPORTED DOCK STRUCTURE

FOR PERMITTING

PROPOSED SHORELINE STABILIZATION

D

C

*SEE DRAWING NOTES EXHIBIT 01.2

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

TYPICAL SECTIONS C & D DATE:

DECEMBER 20, 2013

FILE:

POLC_BT1ExpansionPrj.dwg

PARISH:

REV.#: 1 CALCASIEU DATE: 10/19/16

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

Gahagan & Bryant Associates, Inc. 9330 Kirby Drive, Suite 100 Houston, TX 77054 832.377.4800 (O) 832.377.4802 (F) www.gba-inc.com

FOR CMD/COE USE ONLY USACE Permit # Applicant:

SCALE:

AS SHOWN

EXHIBIT:

01.4

CHANNEL R.O.W. LINE

STRUCTURE LIMIT LINE

PROPERTY LINE

LIMITS OF FEDERAL CHANNEL

1

EXISTING DOLPHINS TO BE REMOVED

EXISTING WHARF

BT-1

CHANNEL R.O.W. LINE

150'

250'

200'

200'

EXISTING COKE FACILITY

300'

0'

300'

600'

SCALE: 1''=600'

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

EXISTING SITE PLAN 2.01

BULK TERMINAL NO. 1

106'-6" 57'-9"

48'-9"

EXISTING WHARF 17'-6"± (TYP) DOLPHIN TO BE REMOVED

CONC WALKWAY TO BE REMOVED

10'-6"± (TYP)

CL WALKWAY

CONC WALKWAY TO BE REMOVED

4'-6"±

4'-6"± CL DOLPHIN

DOLPHIN TO BE REMOVED

36'-0"±

18" SQ CONC PILE, 1H:3V BATTER (TYP), TO BE REMOVED

CL DOLPHIN

18" SQ CONC PILE, 1H:3V BATTER (TYP), TO BE REMOVED

FRONT FACE OF FENDER

10'

0'-0''

10'

20'

SCALE: 1''=20'

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

1

DEMOLITION PLAN SCALE: 1"=20'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

DOLPHIN DEMOLITION PLAN 2.02

N: 622811.75 E: 2663137.11

LIQUID DOCK

CHANNEL R.O.W. LINE

PROPERTY LINE

LAY BERTH

STRUCTURE LIMIT LINE

WHARF EXTENSION

LIMITS OF FEDERAL CHANNEL

N: 621127.26 E: 2660901.29

BT-1

EXISTING WHARF

CHANNEL R.O.W. LINE 150'

250'

200'

200'

EXISTING COKE FACILITY

300'

0'

300'

600'

SCALE: 1''=600'

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

PROPOSED SITE PLAN 2.03

MOORING DOLPHIN, SEE SHEET 2.16 & 2.17

M9

CATWALK (TYP), SEE SHEET 2.21

B8

M8

BREASTING DOLPHIN (TYP), SEE SHEET 2.18 & 2.19

840'-0" LIQUID BERTH

B7

LOADING PLATFORM, SEE SHEET 2.13 & 2.15

B5

B6

C

BREASTING DOLPHIN (TYP), SEE SHEET 2.18 & 2.19

M6

100'-0"

M7

MOORING DOLPHIN, SEE SHEET 2.16 & 2.17

M5

CATWALK (TYP), SEE SHEET 2.21

M4

0.77' MLLW

B4

CREST OF DIKE (TYP)

MOORING DOLPHIN, SEE SHEET 2.16 & 2.17

M1

130'-0" 100'-0"

M2 M3

B1

B2

840'-0" LAY BERTH

B3

B

A

STRUCTURE LIMIT LINE

LIMITS OF FEDERAL CHANNEL

775'-0"

WHARF ACCESS TRESTLE

EXISTING WHARF 200'

0'

200'

400'

WHARF EXTENSION, SEE SHEET 2.09

BT-1

SCALE: 1''=400' PROPERTY LINE & CHANNEL R.O.W. LINE

M1 = MOORING DOLPHIN I.D. B1 = BREASTING DOLPHIN I.D.

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

GENERAL ARRANGEMENT PLAN 2.04

300

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

-100

-80

-60

-40

-20

0

20

40

-300

-200

MHW 2.0

CHANNEL LIMITS

DREDGED SURFACE @ EL -42'

-100

A

SCALE: 1"=80'

100 FEET FROM FENDER LINE 0 EXISTING GRADE

SECTION AT WHARF EXTENSION

200

PILE TIP EL @ -120'

PROPERTY LINE & CHANNEL R.O.W. LINE LIGHT POLE

CONVEYOR CRANE

STRUCTURE LIMIT LINE

ELEVATION (FT)

40'

0'

40'

80'

SCALE: 1''=80'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

WHARF EXTENSION 2.05

300 0 DREDGED SURFACE @ EL -42'

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

40'

80'

SCALE: 1''=80'

FOR CMD/COE USE ONLY USACE Permit # Applicant:

LAY BERTH DATE:

0'

-100

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

-80

-60

-40

-20

0

20

40

-300

-200

CHANNEL LIMITS

-100

MHW 2.0

B

EXISTING GRADE

SCALE: 1"=80'

100 FEET FROM FENDER LINE

BREASTING DOLPHIN

63'-8"

SECTION AT BREASTING DOLPHIN

PILE TIP EL @ -120'

200

EXISTING LEVEE MOORING DOLPHIN BEYOND

PROPERTY LINE & CHANNEL R.O.W. LINE STRUCTURE LIMIT LINE (FACE OF FENDER)

ELEVATION (FT)

40'

REV.#: DATE:

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.06

300 PILE TIP EL @ -120'

SHEET PILE WALL

EXISTING LEVEE

100 0

FEET FROM FENDER LINE

LIQUID DOCK

DREDGED SURFACE

-300

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

-80

-60

-40

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

FOR CMD/COE USE ONLY USACE Permit # Applicant:

LIQUID DOCK DATE:

0

ELEVATION (FT)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

-20

SCALE: 1''=80'

20

80'

-100

40'

40

0'

-200

CHANNEL LIMITS

EXISTING GRADE

-100

C

MHW 2.0

SCALE: 1"=80'

SECTION AT LOADING PLATFORM

200

PROPERTY LINE ACCESS TRESTLE STRUCTURE LIMIT LINE 40'

REV.#: DATE:

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.07

MATCH LINE - SHEET 2.11 M1

STRUCTURE LIMIT LINE

MOORING DOLPHIN

ACCESS TRESTLE

4'-10 3/4"

130'-0"

2 LAT: N030° 11' 40.71" LON: W093° 17' 37.58"

50'-0"

A 119'-9"

CREST OF EXISTING LEVEE (TYP)

CONCRETE BENT (TYP)

774'-9 1/2"

52 BENTS SPACED @ 15'-0" CC = 765'-0"

1

PROPERTY LINE & CHANNEL R.O.W. LINE

MLLW

LAT: N030° 11' 36.15" LON: W093° 17' 44.67"

0'

60'

4'-10 3/4"

EXISTING CONVEYOR SUPPORT (TYP)

120'

SCALE: 1''=120'

EXISTING CRANE RAIL

BT-1

60'

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

FOR CMD/COE USE ONLY USACE Permit # Applicant:

WHARF EXTENSION PLAN DATE:

EXISTING WHARF

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

LIMIT OF FEDERAL CHANNEL

100'-0"

EXISTING CONVEYOR TOWER

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.08

PILE (TYP)

CONCRETE PILE CAP (TYP)

57'-6"

PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

FENDER PILE

PILE CAP

DREDGE EL -42.0

0'

15'

30'

SCALE: 1''=30'

FOR CMD/COE USE ONLY USACE Permit # Applicant:

WHARF EXTENSION SECTION DATE:

MHW 2.0 MSL

EL 13.17

BOLLARD

1

3

A

SCALE: 1"=30'

TYPICAL SECTION

PILE (TYP)

CONVEYOR

CRANE

LIGHT POLE

2'-0"

EXISTING GRADE

WHARF ACCESS TRESTLE

115'-0" 57'-6" 100'-0"

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT

15'

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.09

100'-0" 7'-0"

24" SQ CONC BATTER PILE

10'-0" (TYP)

CONC BENT CAP

3'-0"

7'-0"

2'-0"

2'-0"

4'-0"

3'-0"

30" SQ CONC PILE (TYP)

20.0° TYP ALL BATTER PILES 24" SQ CONC BATTER PILE

1

24" SQ CONC BATTER PILE

24" SQ CONC BATTER PILE

PLAN - WHARF BENT (TYP) SCALE: 1"=20'

50'-0" 12'-1 3/16"

4'-0"

9'-9 5/8"

4'-0"

4'-0"

12'-1 3/16"

4'-0" CONC BARRIER (TYP)

8" CONCRETE OVERLAY

CONC DECK AASHTO TYPE V MODIFIED GIRDER (TYP)

4'-0"

5'-3"

10" PRECAST PANELS

CAST IN PLACE CONC. PILE CAP

2

10'

0'

10'

ACCESS TRESTLE CROSS SECTION SCALE: 1" = 10'

20'

SCALE: 1''=20'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

USACE Permit # Applicant:

WHARF EXTENSION BENT DETAIL DATE:

FOR CMD/COE USE ONLY

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.10

MOORING DOLPHIN, SEE SHEET 2.16

B1

BREASTING DOLPHIN, SEE SHEET 2.18

63'-8"

STRUCTURE LIMIT LINE

CL BERTHING DOLPHINS

C L MOORING DOLPHINS

M3

LAT: N030° 11' 43.54" LON: W093° 17' 33.18"

M2

MOORING DOLPHIN, SEE SHEET 2.16

140'-0"

MOORING DOLPHIN, SEE SHEET 2.16

PROPERTY LINE & CHANNEL R.O.W. LINE

120'-0" 110'-0"

420'-0"

280'-0"

B2

50'-0"

B3

50'-0"

MLLW LINE

LIMITS OF FEDERAL CHANNEL

B4

SHIP OUTLINE

BREASTING DOLPHIN, SEE SHEET 2.18

LAT: N030° 11' 45.54" LON: W093° 17' 30.07"

110'-0" 120'-0"

280'-0"

420'-0" CL BERTH

840'-0"

WALKWAY (TYP), SEE SHEET 2.21

M5 M4

MOORING DOLPHIN, SEE SHEET 2.16

140'-0"

EXISTING LEVEE (TYP)

MATCH LINE - SHEET 2.12

MATCH LINE - SHEET 2.08 60'

0'

60'

120'

SCALE: 1''=120'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

USACE Permit # Applicant:

LAY BERTH PLAN DATE:

FOR CMD/COE USE ONLY

REV.#: DATE:

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.11

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT

PROJECT:

DATE:

FILE:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

LIQUID DOCK PLAN

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

0 _ M6 M7

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

STRUCTURE LIMIT LINE

CL BERTHING DOLPHINS

B5

BREASTING DOLPHIN, SEE SHEET 2.18

110'-0"

MOORING DOLPHIN, SEE SHEET 2.16

MOORING DOLPHIN, SEE SHEET 2.16

C L MOORING DOLPHINS

EXISTING LEVEE (TYP)

MLLW LINE

140'-0"

420'-0"

114'-0"

280'-0"

B6

56'-0"

B7

ACCESS TRESTLE, SEE SHEET 2.20

LIMIT OF FEDERAL CHANNEL

SHIP OUTLINE

110'-0"

420'-0"

B8

M8

140'-0"

M9

MOORING DOLPHIN, SEE SHEET 2.16

WALKWAY (TYP), SEE SHEET 2.21

BREASTING DOLPHIN, SEE SHEET 2.18

SHEET PILE WALL, SEE SHEET 2.20

114'-0"

280'-0"

UNLOADING PLATFORM, SEE SHEET 2.13 & 2.14

56'-0"

C L BERTH

LAT: N030° 11' 51.08" LON: W093° 17' 21.46"

125'-0"

LAT: N030° 11' 49.07" LON: W093° 17' 24.58"

63'-8"

60'

SCALE:

AS SHOWN

0'

60'

EXHIBIT:

120'

MATCH LINE - SHEET 2.11

SCALE: 1''=120'

FOR CMD/COE USE ONLY

USACE Permit #

Applicant:

2.12

MOORING DOLPHIN, SEE SHEET 2.16

CHANNEL R.O.W. LINE

PROPERTY LINE

80'-0" CL PLATFORM

40'-0" 19'-1"

19'-1"

19'-1"

1'-10"

19'-1"

BREASTING DOLPHIN (TYP)

3'-5 3/8"

6'-4"

4'-0" (TYP)

3'-3 5/8"

14'-0 5/8"

40'-0"

15'-0"

7'-6"

7'-6"

CL PLATFORM

80'-0"

15'-0"

40'-0"

15'-0"

2'-6"

1'-10"

40'-0"

1

CONC BEAM (TYP)

1 10'

0'

10'

24" CONC PILE (TYP)

CONC BENT CAP (TYP)

3'-6" (TYP)

20'

STRUCTURE LIMIT LINE

LIMITS OF CONC DECK

PILE PLAN SCALE: 1"=20'

SCALE: 1''=20'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

LIQUID DOCK LOADING PLATFORM PILE PLAN DATE: FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

0 _

FOR CMD/COE USE ONLY USACE Permit # Applicant:

SCALE:

AS SHOWN

EXHIBIT:

2.13

80'-0" CL PLATFORM

40'-0"

15'-0"

14'-0"

VEHICLE TRESTLE CONTROL BUILDING 15' x 40'

PIPE TRESTLE

40'-0"

2'-6" WALKWAY

FIRE MONITOR

CL VAPOR RECOVERY ARM

FIRE MONITOR STRIPPING PUMPS

CL LOADING ARM (TYP)

HYDRAULIC CONTROL CENTER

80'-0"

C L VAPOR RECOVERY ARM

WALKWAY TO DOLPHIN (TYP)

CONCRETE CURB (TYP)

6'-9"

36'-0"

CL LOADING ARMS

CONC CURB (TYP)

10'-0"

10'-0"

10'-0"

9'-0"

2

10'

0'

10'

STRUCTURE LIMIT LINE

1'-0"

1'-0" 9'-0"

10'-0"

10'-0"

10'-0"

DECK PLAN SCALE: 1"=20'

20'

SCALE: 1''=20'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

USACE Permit # Applicant:

LIQUID DOCK LOADING PLATFORM DATE:

FOR CMD/COE USE ONLY

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.14

9'-2"

UNLOADING ARM TRESTLE ROADWAY

2 STORY BLDG

STRUCTURE LIMIT LINE

70'

CONC CURB CONC DECK

DECK EL 13.17 CONC BEAM CONC PILE CAP (TYP)

CONC PILE (TYP)

MHW 2.0 MSL EXIST DREDGE EL -42.0 PILE TIP EL -100'

PILE TIP EL -100'

1

ELEVATION - SIDE SCALE: 1"=20'

UNLOADING ARM (TYP)

VAPOR RECOVERY ARM 2 STORY BLDG

1'-0"

1'-0"

CONC CURB

CONC DECK

3'-4"

CONC PILE CAP (TYP) CONC BEAM

MHW 2.0 MSL 24" CONC PILE (TYP) DREDGE EL -42.0

2

10'

0'

10'

ELEVATION - FRONT SCALE: 1"=20'

20'

SCALE: 1''=20'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

USACE Permit # Applicant:

LIQUID DOCK PLATFORM ELEVATIONS DATE:

FOR CMD/COE USE ONLY

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.15

27'-4" 8'-3" 6'-3"

4'-6"

2'-11"

6'-3"

4'-6"

2'-11"

6'-3"

GUARD RAIL

CONCRETE DECK

5'-6"

2'-10"

30" SQ CONC PILE

150 TONNE QUICK RELEASE HOOK

3'-10"

21'-3"

1

8'-3"

10'-10"

2'-10"

30" SQ CONC BATTER PILE (TYP)

2

MOORING DOLPHIN PLAN

1

5'-0"

0'-0''

5'-0"

SCALE: 1"=10'

10'-0"

SCALE: 1''=10'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

USACE Permit # Applicant:

TYPICAL MOORING DOLPHIN PLAN DATE:

FOR CMD/COE USE ONLY

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.16

27'-4"

150 TONNE QUICK RELEASE HOOK GUARD RAIL

4'-0"

EL +13.17 MSL CONCRETE DECK

30" SQ CONC BATTER PILE, SEE PLAN (TYP) MHW 2.0 MSL

1

EXISTING MUDLINE EL VARIES

3

TIP EL -120'

FRONT ELEVATION

2

SCALE: 1"=10'

21'-3" 150 TONNE QUICK RELEASE HOOK

GUARD RAIL

1 3 MHW 2.0 MSL

30" SQ CONC BATTER PILE (TYP)

EXISTING MUDLINE EL VARIES

TIP EL -120' 5'-0"

0'-0''

5'-0"

10'-0"

SIDE ELEVATION

1

SCALE: 1''=10'

SCALE: 1"=10'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

TYPICAL MOORING DOLPHIN ELEVATIONS DATE: FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

0 _

FOR CMD/COE USE ONLY USACE Permit # Applicant:

SCALE:

AS SHOWN

EXHIBIT:

2.17

30'-0" 5'-1"

4'-1"

5'-10"

5'-10"

5'-1"

4'-1"

10'-3"

1'-1"

3'-3"

5'-0"

6'-3"

16'-9"

27'-0"

6'-3"

3'-9"

4'-6"

3'-0"

150 TONNE HOOK

FENDER PANEL

MCN-1400 FENDER

7'-6"

2'-11"

0'-0''

5'-0"

7'-6"

2'-11"

SCALE: 1"=10'

2.12

10'-0"

4'-7"

TYPICAL BREASTING DOLPHIN PLAN

1 5'-0"

4'-7"

30" SQ CONC PILE (TYP)

SCALE: 1''=10'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

USACE Permit # Applicant:

TYPICAL BREASTING DOLPHIN PLAN DATE:

FOR CMD/COE USE ONLY

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.18

30'-0" CONC DECK

150 TONNE HOOK GUARDRAIL

EL +13.17 MSL FENDER

12'-0"

FENDER PANEL

MHW 2.0 MSL

6'-3 1/4"

27'-0" 3'-0"

17'-8" 150 TONNE HOOK

CONC DECK

10'-0"

3'-0"

4'-0"

GUARDRAIL

6'-4"

FENDER PANEL FENDER

PILE TIP EL -120'

5'-0"

0'-0''

5'-0"

10'-0"

SCALE: 1''=10'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

TYPICAL BREASTING DOLPHIN ELEVATIONS DATE: FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

FOR CMD/COE USE ONLY USACE Permit # Applicant:

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.19

29'-0" C L TRESTLE

14'-6"

14'-6" VEHICLE ACCESS

6'-0"

6'-0"

6'-0"

6'-0"

EL 13.44

SLOPE VARIES

0.5% SLOPE

CONC BARRIER (TYP) CONC DECK

4'-10" 2'-9"

TYPE III GIRDER (TYP) RISER PAD (TYP) CONC BENT CAP BATTER PILE

30" SQ CONC BATTER PILE

MHW 2.0 MSL

CONC PILE (TYP)

A 2.14

SECTION SCALE: 1"=10'

5'-0"

0'-0''

5'-0"

10'-0"

SCALE: 1''=10'

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

FILE:

DECEMBER 20, 2013

PARISH:

CALCASIEU

REV.#: DATE:

USACE Permit # Applicant:

ACCESS TRESTLE SECTION DATE:

FOR CMD/COE USE ONLY

0 _

SCALE:

AS SHOWN

EXHIBIT:

2.20

1

PLAN SCALE: 1/4"=1'-0"

SECTION

A

2

SCALE: 1/4"=1'-0"

ELEVATION SCALE: 1/4"=1'-0" 2'-0"

0'-0''

2'-0"

4'-0"

SCALE: 1/4"=1'-0''

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

WALKWAY DETAILS 2.21

62 4,0 00 N

2,6

64 ,00 0

PROPOSED FOOTPRINT OF AREA TO BE DREDGED

2,6 6

2,0

00 500'

0

62 2,0 00

PROPOSED PILE SUPPORTED DOCK STRUCTURE 500'

PROPOSED SHORELINE STABILIZATION

GRAPHIC SCALE

FOR PERMITTING

N

E

E LEGEND:

PROPOSED ACCESS

CALCASIEU RIVER AND PASS SHIP CHANNEL

NOTES: BOUNDARIES ARE APPROXIMATE BASED ON THE USACE JURISDICTIONAL DETERMINATION MVN 2016-00876-MG APPROVED JULY 27, 2016.

16+3662

MIXED/NOT DELINEATED

WATERS OF US (10/404)

N

62

4,0

PR

00

OP

ER

TY

LIN

E

16+2862

E

WETLANDS (10/404)

2,6 6

0,0

00 E

DA #6

NON-WETLANDS

2,6

62 ,00

0

16+1862

WETLANDS (10/404) FOR POTENTIAL IMPACT APPROXIMATELY 4.45 ACRES

PROPOSED ACCESS ROAD TO FOLLOW EXISTING INTERIOR LEVEE

N

62

0,0

00

16+1262

APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT PROJECT:

PERMIT APPLICATION FOR THE BULK TERMINAL NO. 1 EXPANSION PROJECT WESTLAKE, LOUISIANA

USACE JURISDICTIONAL DETERMINATION DATE: FILE:

MARCH 22, 2017 POLC_BT1ExpansionPrj.dwg

PARISH:

CALCASIEU

REV.#: DATE:

0 X

0,0

60

N

Lake Charles Harbor & Terminal District Port of Lake Charles P.O. Box 3753 Lake Charles, LA 70602 337.493.3526 (O) 337.493.3623 (F)

,00

62

62

2,6

0

N

2,0

00

E POLC BT-1

00

POLC BT-1

FOR CMD/COE USE ONLY USACE Permit # Applicant:

Gahagan & Bryant Associates, Inc. 9330 Kirby Drive, Suite 100 Houston, TX 77054 832.377.4800 (O) 832.377.4802 (F) www.gba-inc.com

SCALE:

AS SHOWN

EXHIBIT:

04.1

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas