BULK TERMINAL NUMBER 1 EXPANSION PROJECT IN CALCASIEU PARISH
NAME OF APPLICANT: Lake Charles Harbor and Terminal District, C/O: Gahagan & Bryant Associates, Inc., Ms. Dana Cheney, at 9330 Kirby Drive, Suite 100, Houston, TX 77054.
LOCATION OF WORK: Located off of Bayou D’Inde Road on the Calcasieu Ship Channel, in Westlake Louisiana, Calcasieu Parish, Louisiana, as shown on the enclosed drawings.
Location: Latitude: 30.19528/Longitude: -93.29278
Hydrologic Unit Code: 08080206 – Lower Calcasieu. LA.
CHARACTER OF WORK: The applicant proposed to modify the existing permit to extend the length of the patented open cell design bulkhead that will be used for shoreline stabilization. The applicant has cited the change in bulkhead design as a necessity in preparation for the deposition of dredge material into Disposal Area #6. Approximately 150,000 cubic yards of dredged material will be placed behind the bulkhead for stabilization, permanently impacting 4.45 acres of fresh marsh. The applicant proposes to purchase mitigation credits from a mitigation bank to offset any unavoidable losses to wetland functions cause by project implementation.
JOINT PUBLIC NOTICE
March 27, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1280
Brandon.D.Gaspard@usace.army.mil
Project Manager
Brandon Gaspard
Permit Application Number
MVN 1997-00353-MG
(225) 219-3225/FAX (225) 325-8250
Elizabeth.Hill@la.gov
Project Manager
Elizabeth Hill
WQC Application Number
WQC 170327-01
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
BULK TERMINAL NUMBER 1 EXPANSION PROJECT IN CALCASIEU PARISH
NAME OF APPLICANT: Lake Charles Harbor and Terminal District, C/O: Gahagan & Bryant
Associates, Inc., Ms. Dana Cheney, at 9330 Kirby Drive, Suite 100, Houston, TX 77054.
LOCATION OF WORK: Located off of Bayou D'Inde Road on the Calcasieu Ship Channel, in
Westlake Louisiana, Calcasieu Parish, Louisiana, as shown on the enclosed drawings.
Location: Latitude: 30.19528/Longitude: -93.29278
Hydrologic Unit Code: 08080206 Lower Calcasieu. LA.
-2CHARACTER OF WORK: The applicant proposed to modify the existing permit to extend the length
of the patented open cell design bulkhead that will be used for shoreline stabilization. The applicant
has cited the change in bulkhead design as a necessity in preparation for the deposition of dredge
material into Disposal Area #6. Approximately 150,000 cubic yards of dredged material will be placed
behind the bulkhead for stabilization, permanently impacting 4.45 acres of fresh marsh. The
applicant proposes to purchase mitigation credits from a mitigation bank to offset any unavoidable
losses to wetland functions cause by project implementation.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification
must reference the applicant's name and the WQC Application number and be mailed to the
Louisiana Department of Environmental Quality at the address above. Individuals or parties may
request an extension of time in which to comment on the proposed work by writing or emailing the Corps of Engineers Project Manager listed above. Any request must be specific
and substantively supportive of the requested extension, and received by this office prior to
the end of the initial comment period. The Section Chief will review the request and the
requestor will be promptly notified of the decision to grant or deny the request. If granted, the
time extension will be continuous to the initial comment period and, inclusive of the initial
comment period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
-3conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. A copy of
this public notice is sent to the State Archeologist and State Historic Preservation Officer soliciting
input on potential impacts to cultural resources.
Our initial finding is that the proposed work will have no effect any species listed as endangered
by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the
survival and recovery of any endangered species. Utilizing Standard Local Operating Procedure for
Endangered Species in Louisiana (SLOPES) dated October 22, 2014, between the U.S. Army Corps
of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps
has determined that the proposed activity would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 4.45 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
-4Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure
LAKE CHARLES HARBOR & TERMINAL DISTRICT
PERMIT APPLICATION FOR:
BULK TERMINAL NO. 1 EXPANSION PROJECT
CALCASIEU PARISH, LOUISIANA
SECTION
SHEET NUMBER
GENERAL
00.1
00.2
01.1
01.2
01.3
01.4
02.1
02.2
02.3
02.4
02.5
02.6
02.7
02.8
02.9
02.10
02.11
02.12
02.13
02.14
02.15
02.16
02.17
02.18
02.19
02.20
02.21
03.1
03.2
03.3
03.4
04.1
DREDGING
NEW LIQUID
& DRY DOCK
SHORELINE
STABILIZATION
MISCELLANEOUS
SHEET NAME
INDEX OF SHEETS
PROJECT VICINITY MAP
DREDGING SITE PLAN
DREDGE TEMPLATE
TYPICAL SECTIONS A & B
TYPICAL SECTIONS C & D
EXISTING SITE PLAN
DOLPHIN DEMOLITION PLAN
PROPOSED SITE PLAN
GENERAL ARRANGEMENT PLAN
WHARF EXTENSION
LAY BERTH
LIQUID DOCK
WHARF EXTENSION PLAN
WHARF EXTENSION SECTION
WHARF EXTENSION BENT DETAIL
LAY BERTH PLAN
LIQUID DOCK PLAN
LIQUID DOCK LOADING PLATFORM PILE PLAN
LIQUID DOCK LOADING PLATFORM
LIQUID DOCK PLATFORM ELEVATIONS
TYPICAL MOORING DOLPHIN PLAN
TYPICAL MOORING DOLPHIN ELEVATIONS
TYPICAL BREASTING DOLPHIN PLAN
TYPICAL BREASTING DOLPHIN ELEVATIONS
ACCESS TRESTLE SECTION
WALKWAY DETAILS
BULKHEAD LOCATION KEY PLAN
PARTIAL BULKHEAD PLAN
PARTIAL BULKHEAD PLAN
TYPICAL BULKHEAD PLAN & SECTION
USACE JURISDICTIONAL DETERMINATION
FOR PERMITTING
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
DECEMBER 20, 2013
FILE:
POLC_BT1ExpansionPrj.dwg
PARISH:
CALCASIEU
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
INDEX OF SHEETS
DATE:
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
REV.#:
2
DATE: 03/22/17
Gahagan & Bryant Associates, Inc.
9330 Kirby Drive, Suite 100
Houston, TX 77054
832.377.4800 (O)
832.377.4802 (F)
www.gba-inc.com
SCALE:
NONE
EXHIBIT:
00.1
W
H
FOR PERMITTING
HWY 378
E 2,680,000
PROJECT LOCATION /
LOCATION OF DREDGING
E 2,660,000
LEGEND:
Y
37
9
N 640,000
N 640,000
SULPHUR
I-10
NAPOLEAN ST
LAKE
CHARLES
I-10
LAKE CHARLES
3
2
HWY 108
0
7
I-2
1
CALCASIEU RIVER
4 AND PASS SHIP
BAYOU D'INDIE RD
CHANNEL
5
6
I-270
PORT OF LAKE
CHARLES, BT-1
N 620,000
PRIEN
RYAN ST
7
PRIEN
LAKE
NELSON RD
N 620,000
PROJECT LOCATION /
LOCATION OF DREDGING
8
Vicinity Map
State of
Louisiana
HWY 384
LAKE ST
BIG LAKE RD
10
0
Baton Rouge
1 MILE
E 2,680,000
E 2,660,000
NOTES:
1 MILE
GRAPHIC SCALE
1. HORIZONTAL COORDINATES REFERENCED TO NAD 83
LOUISIANA SOUTH ZONE 1702.
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
PROJECT VICINITY MAP
DATE:
DECEMBER 20, 2013
FILE:
POLC_BT1ExpansionPrj.dwg
PARISH:
REV.#:
1
CALCASIEU DATE: 10/19/16
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
Gahagan & Bryant Associates, Inc.
9330 Kirby Drive, Suite 100
Houston, TX 77054
832.377.4800 (O)
832.377.4802 (F)
www.gba-inc.com
COMMON ST
Shreveport
9
Lake Charles
New Orleans
Project
Location
Gulf of Mexico
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
SCALE:
AS SHOWN
EXHIBIT:
00.2
E 2,670,000
E 2,660,000
I-10
FOR PERMITTING
DA #3
N 630,000
N 630,000
70
I-2
BAY
O
UD
AXIALL PPG
'IND
E
BAYOU D'INDE RD
PLANT
ENTRANCE
DA #5
DA #6
POLC
BT NO. 1
EL
NN
N 620,000
U
IE
R
PA
SS
LOCATION OF DREDGING
N 620,000
PLACEMENT AREA WILL BE
ACCESSED BY WAY OF THE
CALCASIEU RIVER AND PASS
SHIP CHANNEL WHICH IS
MAINTAINED TO -40 FT MLG
DA #7
NELSON RD
AS
LC
CA
VE
RI
D
AN
IP
SH
A
CH
DA #8
LEGEND:
PROPOSED FOOTPRINT OF
AREA TO BE DREDGED
LA 384
NOTES:
3,000'
0
1. HORIZONTAL COORDINATES REFERENCED TO NAD 83
LOUISIANA SOUTH ZONE 1702.
3. REFER TO 03.X SHEETS FOR DETAILS OF PROPOSED
SHORELINE STABILIZATION.
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
DREDGING SITE PLAN
DATE:
DECEMBER 20, 2013
FILE:
POLC_BT1ExpansionPrj.dwg
PARISH:
REV.#:
1
CALCASIEU DATE: 10/19/16
N 610,000
E 2,670,000
PILE SUPPORTED DOCK STRUCTURE.
GRAPHIC SCALE
E 2,660,000
N REFER
610,000
2.
TO 02.X SHEETS FOR DETAILS OF PROPOSED
3,000'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
Gahagan & Bryant Associates, Inc.
9330 Kirby Drive, Suite 100
Houston, TX 77054
832.377.4800 (O)
832.377.4802 (F)
www.gba-inc.com
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
SCALE:
AS SHOWN
EXHIBIT:
01.1
64
2,0
00
150'
250'
PROPOSED PILE SUPPORTED
DOCK STRUCTURE
0
200'
200'
3
500'
PROPOSED SHORELINE
STABILIZATION
GRAPHIC SCALE
N
500'
0
00
PROPOSED FOOTPRINT OF
AREA TO BE DREDGED
,00
PROPOSED
ACCESS
FOR PERMITTING
4
D
01.4
16+3662
DREDGING FOOTPRINT
POINT NORTHING
EASTING
1
621,001.85 2,660,730.90
2
620,798.43 2,660,876.24
3
622,759.71 2,663,621.39
4
622,711.41 2,663,123.73
C
01.4
ESTIMATED DREDGE QUANTITIES
N
TOTAL:
E
2,6
60
OP
ER
TY
LIN
E
16+2862
PR
62
4,0
0
0
AUTHORIZED CHANNEL DEPTH:
-40' MLG
+2' OF ADVANCE MAINTENANCE:
-42' MLG
+2' OF ALLOWABLE OVERDEPTH:
-44' MLG
797,000 CY
EXISTING
SHORELINE
(+/-)
,00
0
B
01.3
DA #6
CALCASIEU RIVER AND PASS SHIP CHANNEL
2,6
6
2,6
62
2,0
00
62
4,0
N
E
E
LEGEND:
E
16+1862
2,6
62
,00
0
NOTES:
PROPOSED ACCESS ROAD TO
FOLLOW EXISTING INTERIOR LEVEE
A
01.3
16+1262
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
DREDGE TEMPLATE
DATE:
DECEMBER 20, 2013
FILE:
POLC_BT1ExpansionPrj.dwg
PARISH:
REV.#:
1
CALCASIEU DATE: 10/19/16
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
Gahagan & Bryant Associates, Inc.
9330 Kirby Drive, Suite 100
Houston, TX 77054
832.377.4800 (O)
832.377.4802 (F)
www.gba-inc.com
,00
0
62
N
CHNL. TOE
N
62
0,0
00
60
CHNL. CENTERLINE
2,6
CHNL. TOE
POLC BT-1
N
5. CHANNEL STATIONING APPROXIMATE.
62
2,0
00
E
STRU. LIMIT LINE
LINE
R.O W
POLC BT-1
EXISTING DOCK
3. REFER TO 02.X SHEETS FOR DETAILS OF PROPOSED
PILE SUPPORTED DOCK STRUCTURE.
4. REFER TO 03.X SHEETS FOR DETAILS OF PROPOSED
SHORELINE STABILIZATION.
2
0,0
1
00
2. HORIZONTAL COORDINATES REFERENCED TO NAD 83
LOUISIANA SOUTH ZONE 1702. ELEVATIONS REFERENCED
TO MEAN LOW GULF (MLG). ORIGINAL DATA COLLECTED
IN NAVD88 AND CONVERTED TO MLG BY RELATIONSHIP
DETERMINED FROM FIELD DATA AND CORRESPONDENCE
WITH USACE NEW ORLEANS DISTRICT.
CHNL.
1. CONTOURS SHOWN REPRESENT A COMBINED DATA
SET INCORPORATING GBA HYDROGRAPHIC SURVEY DATA
COLLECTED IN DECEMBER OF 2012, HTI/SEVENSON
HYDROGRAPHIC SURVEY DATA COLLECTED IN
SEPTEMBER OF 2015, AND TOPOGRAPHIC SURVEY DATA
PROVIDED BY PELICAN LAND SURVEYING, L.L.C.,
COLLECTED IN OCTOBER AND NOVEMBER OF 2012.
ELEVATIONS ARE POSITIVE UNLESS PRECEDED BY A (-)
SIGN.
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
SCALE:
AS SHOWN
EXHIBIT:
01.2
LEGEND:
MATERIAL TO
BE DREDGED
PROPOSED PILE
SUPPORTED DOCK
STRUCTURE
FOR PERMITTING
PROPOSED
SHORELINE
STABILIZATION
B
A
*SEE DRAWING NOTES EXHIBIT 01.2
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
TYPICAL SECTIONS A & B
DATE:
DECEMBER 20, 2013
FILE:
POLC_BT1ExpansionPrj.dwg
PARISH:
REV.#:
1
CALCASIEU DATE: 10/19/16
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
Gahagan & Bryant Associates, Inc.
9330 Kirby Drive, Suite 100
Houston, TX 77054
832.377.4800 (O)
832.377.4802 (F)
www.gba-inc.com
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
SCALE:
AS SHOWN
EXHIBIT:
01.3
LEGEND:
MATERIAL TO
BE DREDGED
PROPOSED PILE
SUPPORTED DOCK
STRUCTURE
FOR PERMITTING
PROPOSED
SHORELINE
STABILIZATION
D
C
*SEE DRAWING NOTES EXHIBIT 01.2
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
TYPICAL SECTIONS C & D
DATE:
DECEMBER 20, 2013
FILE:
POLC_BT1ExpansionPrj.dwg
PARISH:
REV.#:
1
CALCASIEU DATE: 10/19/16
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
Gahagan & Bryant Associates, Inc.
9330 Kirby Drive, Suite 100
Houston, TX 77054
832.377.4800 (O)
832.377.4802 (F)
www.gba-inc.com
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
SCALE:
AS SHOWN
EXHIBIT:
01.4
CHANNEL R.O.W. LINE
STRUCTURE
LIMIT LINE
PROPERTY LINE
LIMITS OF FEDERAL CHANNEL
1
EXISTING DOLPHINS
TO BE REMOVED
EXISTING WHARF
BT-1
CHANNEL
R.O.W. LINE
150'
250'
200'
200'
EXISTING COKE FACILITY
300'
0'
300'
600'
SCALE: 1''=600'
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
EXISTING SITE PLAN
2.01
BULK TERMINAL NO. 1
106'-6"
57'-9"
48'-9"
EXISTING WHARF
17'-6"±
(TYP)
DOLPHIN TO
BE REMOVED
CONC WALKWAY
TO BE REMOVED
10'-6"±
(TYP)
CL WALKWAY
CONC WALKWAY
TO BE REMOVED
4'-6"±
4'-6"±
CL DOLPHIN
DOLPHIN TO
BE REMOVED
36'-0"±
18" SQ CONC PILE,
1H:3V BATTER (TYP),
TO BE REMOVED
CL DOLPHIN
18" SQ CONC PILE,
1H:3V BATTER (TYP),
TO BE REMOVED
FRONT FACE OF FENDER
10'
0'-0''
10'
20'
SCALE: 1''=20'
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
1
DEMOLITION PLAN
SCALE: 1"=20'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
DOLPHIN DEMOLITION PLAN
2.02
N: 622811.75
E: 2663137.11
LIQUID DOCK
CHANNEL R.O.W. LINE
PROPERTY LINE
LAY BERTH
STRUCTURE
LIMIT LINE
WHARF EXTENSION
LIMITS OF FEDERAL CHANNEL
N: 621127.26
E: 2660901.29
BT-1
EXISTING WHARF
CHANNEL
R.O.W. LINE
150'
250'
200'
200'
EXISTING COKE FACILITY
300'
0'
300'
600'
SCALE: 1''=600'
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
PROPOSED SITE PLAN
2.03
MOORING DOLPHIN,
SEE SHEET 2.16 & 2.17
M9
CATWALK (TYP),
SEE SHEET 2.21
B8
M8
BREASTING DOLPHIN (TYP),
SEE SHEET 2.18 & 2.19
840'-0"
LIQUID BERTH
B7
LOADING PLATFORM,
SEE SHEET 2.13 & 2.15
B5
B6
C
BREASTING DOLPHIN (TYP),
SEE SHEET 2.18 & 2.19
M6
100'-0"
M7
MOORING DOLPHIN,
SEE SHEET 2.16 & 2.17
M5
CATWALK (TYP),
SEE SHEET 2.21
M4
0.77' MLLW
B4
CREST OF
DIKE (TYP)
MOORING DOLPHIN,
SEE SHEET
2.16 & 2.17
M1
130'-0" 100'-0"
M2 M3
B1
B2
840'-0"
LAY BERTH
B3
B
A
STRUCTURE
LIMIT LINE
LIMITS OF
FEDERAL CHANNEL
775'-0"
WHARF
ACCESS
TRESTLE
EXISTING WHARF
200'
0'
200'
400'
WHARF EXTENSION,
SEE SHEET 2.09
BT-1
SCALE: 1''=400'
PROPERTY LINE &
CHANNEL R.O.W. LINE
M1 = MOORING DOLPHIN I.D.
B1 = BREASTING DOLPHIN I.D.
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
GENERAL ARRANGEMENT PLAN
2.04
300
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
-100
-80
-60
-40
-20
0
20
40
-300
-200
MHW 2.0
CHANNEL LIMITS
DREDGED
SURFACE
@ EL -42'
-100
A
SCALE: 1"=80'
100
FEET FROM FENDER LINE
0
EXISTING
GRADE
SECTION AT WHARF EXTENSION
200
PILE TIP
EL @ -120'
PROPERTY LINE &
CHANNEL R.O.W. LINE
LIGHT POLE
CONVEYOR
CRANE
STRUCTURE
LIMIT LINE
ELEVATION (FT)
40'
0'
40'
80'
SCALE: 1''=80'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
WHARF EXTENSION
2.05
300
0
DREDGED
SURFACE
@ EL -42'
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
40'
80'
SCALE: 1''=80'
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
LAY BERTH
DATE:
0'
-100
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
-80
-60
-40
-20
0
20
40
-300
-200
CHANNEL LIMITS
-100
MHW 2.0
B
EXISTING
GRADE
SCALE: 1"=80'
100
FEET FROM FENDER LINE
BREASTING
DOLPHIN
63'-8"
SECTION AT BREASTING DOLPHIN
PILE TIP
EL @ -120'
200
EXISTING LEVEE
MOORING
DOLPHIN
BEYOND
PROPERTY LINE &
CHANNEL R.O.W. LINE
STRUCTURE
LIMIT LINE
(FACE OF FENDER)
ELEVATION (FT)
40'
REV.#:
DATE:
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.06
300
PILE TIP
EL @ -120'
SHEET PILE WALL
EXISTING LEVEE
100
0
FEET FROM FENDER LINE
LIQUID DOCK
DREDGED
SURFACE
-300
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
-80
-60
-40
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
LIQUID DOCK
DATE:
0
ELEVATION (FT)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
-20
SCALE: 1''=80'
20
80'
-100
40'
40
0'
-200
CHANNEL LIMITS
EXISTING
GRADE
-100
C
MHW 2.0
SCALE: 1"=80'
SECTION AT LOADING PLATFORM
200
PROPERTY LINE
ACCESS
TRESTLE
STRUCTURE
LIMIT LINE
40'
REV.#:
DATE:
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.07
MATCH LINE - SHEET 2.11
M1
STRUCTURE
LIMIT LINE
MOORING
DOLPHIN
ACCESS TRESTLE
4'-10 3/4"
130'-0"
2
LAT: N030° 11' 40.71"
LON: W093° 17' 37.58"
50'-0"
A
119'-9"
CREST OF EXISTING
LEVEE (TYP)
CONCRETE
BENT (TYP)
774'-9 1/2"
52 BENTS SPACED @ 15'-0" CC = 765'-0"
1
PROPERTY LINE &
CHANNEL R.O.W. LINE
MLLW
LAT: N030° 11' 36.15"
LON: W093° 17' 44.67"
0'
60'
4'-10 3/4"
EXISTING CONVEYOR
SUPPORT (TYP)
120'
SCALE: 1''=120'
EXISTING
CRANE RAIL
BT-1
60'
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
WHARF EXTENSION PLAN
DATE:
EXISTING
WHARF
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
LIMIT OF
FEDERAL
CHANNEL
100'-0"
EXISTING CONVEYOR
TOWER
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.08
PILE (TYP)
CONCRETE
PILE CAP (TYP)
57'-6"
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
FENDER PILE
PILE CAP
DREDGE EL -42.0
0'
15'
30'
SCALE: 1''=30'
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
WHARF EXTENSION SECTION
DATE:
MHW 2.0 MSL
EL 13.17
BOLLARD
1
3
A
SCALE: 1"=30'
TYPICAL SECTION
PILE
(TYP)
CONVEYOR
CRANE
LIGHT POLE
2'-0"
EXISTING GRADE
WHARF
ACCESS TRESTLE
115'-0"
57'-6"
100'-0"
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
15'
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.09
100'-0"
7'-0"
24" SQ CONC
BATTER PILE
10'-0"
(TYP)
CONC BENT CAP
3'-0"
7'-0"
2'-0"
2'-0"
4'-0"
3'-0"
30" SQ CONC
PILE (TYP)
20.0° TYP
ALL BATTER PILES
24" SQ CONC
BATTER PILE
1
24" SQ CONC
BATTER PILE
24" SQ CONC
BATTER PILE
PLAN - WHARF BENT (TYP)
SCALE: 1"=20'
50'-0"
12'-1 3/16"
4'-0"
9'-9 5/8"
4'-0"
4'-0"
12'-1 3/16"
4'-0"
CONC BARRIER (TYP)
8" CONCRETE
OVERLAY
CONC DECK
AASHTO TYPE V
MODIFIED GIRDER (TYP)
4'-0"
5'-3"
10" PRECAST
PANELS
CAST IN PLACE
CONC. PILE CAP
2
10'
0'
10'
ACCESS TRESTLE CROSS SECTION
SCALE: 1" = 10'
20'
SCALE: 1''=20'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
USACE Permit #
Applicant:
WHARF EXTENSION BENT DETAIL
DATE:
FOR CMD/COE USE ONLY
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.10
MOORING DOLPHIN,
SEE SHEET 2.16
B1
BREASTING
DOLPHIN, SEE
SHEET 2.18
63'-8"
STRUCTURE
LIMIT LINE
CL BERTHING
DOLPHINS
C
L MOORING
DOLPHINS
M3
LAT: N030° 11' 43.54"
LON: W093° 17' 33.18"
M2
MOORING DOLPHIN,
SEE SHEET 2.16
140'-0"
MOORING DOLPHIN,
SEE SHEET 2.16
PROPERTY LINE &
CHANNEL R.O.W. LINE
120'-0"
110'-0"
420'-0"
280'-0"
B2
50'-0"
B3
50'-0"
MLLW
LINE
LIMITS OF
FEDERAL CHANNEL
B4
SHIP OUTLINE
BREASTING
DOLPHIN, SEE
SHEET 2.18
LAT: N030° 11' 45.54"
LON: W093° 17' 30.07"
110'-0"
120'-0"
280'-0"
420'-0"
CL BERTH
840'-0"
WALKWAY (TYP),
SEE SHEET 2.21
M5
M4
MOORING DOLPHIN,
SEE SHEET 2.16
140'-0"
EXISTING
LEVEE (TYP)
MATCH LINE - SHEET 2.12
MATCH LINE - SHEET 2.08
60'
0'
60'
120'
SCALE: 1''=120'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
USACE Permit #
Applicant:
LAY BERTH PLAN
DATE:
FOR CMD/COE USE ONLY
REV.#:
DATE:
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.11
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
DATE:
FILE:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
LIQUID DOCK PLAN
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
0
_
M6
M7
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
STRUCTURE
LIMIT LINE
CL BERTHING
DOLPHINS
B5
BREASTING
DOLPHIN, SEE
SHEET 2.18
110'-0"
MOORING DOLPHIN,
SEE SHEET 2.16
MOORING DOLPHIN,
SEE SHEET 2.16
C
L MOORING
DOLPHINS
EXISTING
LEVEE (TYP)
MLLW LINE
140'-0"
420'-0"
114'-0"
280'-0"
B6
56'-0"
B7
ACCESS TRESTLE,
SEE SHEET 2.20
LIMIT OF
FEDERAL
CHANNEL
SHIP OUTLINE
110'-0"
420'-0"
B8
M8
140'-0"
M9
MOORING DOLPHIN,
SEE SHEET 2.16
WALKWAY (TYP),
SEE SHEET 2.21
BREASTING
DOLPHIN, SEE
SHEET 2.18
SHEET PILE WALL,
SEE SHEET 2.20
114'-0"
280'-0"
UNLOADING PLATFORM,
SEE SHEET 2.13 & 2.14
56'-0"
C
L BERTH
LAT: N030° 11' 51.08"
LON: W093° 17' 21.46"
125'-0"
LAT: N030° 11' 49.07"
LON: W093° 17' 24.58"
63'-8"
60'
SCALE:
AS SHOWN
0'
60'
EXHIBIT:
120'
MATCH LINE - SHEET 2.11
SCALE: 1''=120'
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
2.12
MOORING DOLPHIN,
SEE SHEET 2.16
CHANNEL
R.O.W. LINE
PROPERTY LINE
80'-0"
CL PLATFORM
40'-0"
19'-1"
19'-1"
19'-1"
1'-10"
19'-1"
BREASTING
DOLPHIN
(TYP)
3'-5 3/8"
6'-4"
4'-0"
(TYP)
3'-3 5/8"
14'-0 5/8"
40'-0"
15'-0"
7'-6"
7'-6"
CL PLATFORM
80'-0"
15'-0"
40'-0"
15'-0"
2'-6"
1'-10"
40'-0"
1
CONC BEAM (TYP)
1
10'
0'
10'
24" CONC PILE (TYP)
CONC BENT CAP (TYP)
3'-6"
(TYP)
20'
STRUCTURE
LIMIT LINE
LIMITS OF CONC DECK
PILE PLAN
SCALE: 1"=20'
SCALE: 1''=20'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
LIQUID DOCK LOADING PLATFORM PILE
PLAN
DATE:
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
0
_
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
SCALE:
AS SHOWN
EXHIBIT:
2.13
80'-0"
CL PLATFORM
40'-0"
15'-0"
14'-0"
VEHICLE
TRESTLE
CONTROL BUILDING
15' x 40'
PIPE
TRESTLE
40'-0"
2'-6"
WALKWAY
FIRE MONITOR
CL VAPOR
RECOVERY ARM
FIRE MONITOR
STRIPPING
PUMPS
CL LOADING
ARM (TYP)
HYDRAULIC
CONTROL CENTER
80'-0"
C
L VAPOR
RECOVERY ARM
WALKWAY TO
DOLPHIN (TYP)
CONCRETE
CURB (TYP)
6'-9"
36'-0"
CL LOADING ARMS
CONC CURB (TYP)
10'-0"
10'-0"
10'-0"
9'-0"
2
10'
0'
10'
STRUCTURE
LIMIT LINE
1'-0"
1'-0"
9'-0"
10'-0"
10'-0"
10'-0"
DECK PLAN
SCALE: 1"=20'
20'
SCALE: 1''=20'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
USACE Permit #
Applicant:
LIQUID DOCK LOADING PLATFORM
DATE:
FOR CMD/COE USE ONLY
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.14
9'-2"
UNLOADING ARM
TRESTLE
ROADWAY
2 STORY
BLDG
STRUCTURE
LIMIT LINE
70'
CONC CURB
CONC
DECK
DECK
EL 13.17
CONC BEAM
CONC PILE
CAP (TYP)
CONC
PILE
(TYP)
MHW 2.0 MSL
EXIST DREDGE
EL -42.0
PILE TIP
EL -100'
PILE TIP
EL -100'
1
ELEVATION - SIDE
SCALE: 1"=20'
UNLOADING
ARM (TYP)
VAPOR
RECOVERY ARM
2 STORY BLDG
1'-0"
1'-0"
CONC CURB
CONC DECK
3'-4"
CONC PILE
CAP (TYP)
CONC
BEAM
MHW 2.0 MSL
24" CONC
PILE (TYP)
DREDGE
EL -42.0
2
10'
0'
10'
ELEVATION - FRONT
SCALE: 1"=20'
20'
SCALE: 1''=20'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
USACE Permit #
Applicant:
LIQUID DOCK PLATFORM ELEVATIONS
DATE:
FOR CMD/COE USE ONLY
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.15
27'-4"
8'-3"
6'-3"
4'-6"
2'-11"
6'-3"
4'-6"
2'-11"
6'-3"
GUARD RAIL
CONCRETE DECK
5'-6"
2'-10"
30" SQ CONC
PILE
150 TONNE QUICK
RELEASE HOOK
3'-10"
21'-3"
1
8'-3"
10'-10"
2'-10"
30" SQ CONC BATTER
PILE (TYP)
2
MOORING DOLPHIN PLAN
1
5'-0"
0'-0''
5'-0"
SCALE: 1"=10'
10'-0"
SCALE: 1''=10'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
USACE Permit #
Applicant:
TYPICAL MOORING DOLPHIN PLAN
DATE:
FOR CMD/COE USE ONLY
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.16
27'-4"
150 TONNE QUICK
RELEASE HOOK
GUARD RAIL
4'-0"
EL +13.17 MSL
CONCRETE DECK
30" SQ CONC BATTER PILE,
SEE PLAN (TYP)
MHW 2.0 MSL
1
EXISTING
MUDLINE
EL VARIES
3
TIP EL -120'
FRONT ELEVATION
2
SCALE: 1"=10'
21'-3"
150 TONNE QUICK
RELEASE HOOK
GUARD
RAIL
1
3
MHW 2.0 MSL
30" SQ CONC BATTER
PILE (TYP)
EXISTING MUDLINE
EL VARIES
TIP EL -120'
5'-0"
0'-0''
5'-0"
10'-0"
SIDE ELEVATION
1
SCALE: 1''=10'
SCALE: 1"=10'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
TYPICAL MOORING DOLPHIN ELEVATIONS
DATE:
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
0
_
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
SCALE:
AS SHOWN
EXHIBIT:
2.17
30'-0"
5'-1"
4'-1"
5'-10"
5'-10"
5'-1"
4'-1"
10'-3"
1'-1"
3'-3"
5'-0"
6'-3"
16'-9"
27'-0"
6'-3"
3'-9"
4'-6"
3'-0"
150 TONNE HOOK
FENDER
PANEL
MCN-1400 FENDER
7'-6"
2'-11"
0'-0''
5'-0"
7'-6"
2'-11"
SCALE: 1"=10'
2.12
10'-0"
4'-7"
TYPICAL BREASTING DOLPHIN PLAN
1
5'-0"
4'-7"
30" SQ CONC PILE (TYP)
SCALE: 1''=10'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
USACE Permit #
Applicant:
TYPICAL BREASTING DOLPHIN PLAN
DATE:
FOR CMD/COE USE ONLY
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.18
30'-0"
CONC
DECK
150 TONNE HOOK
GUARDRAIL
EL
+13.17 MSL
FENDER
12'-0"
FENDER
PANEL
MHW
2.0 MSL
6'-3 1/4"
27'-0"
3'-0"
17'-8"
150 TONNE HOOK
CONC
DECK
10'-0"
3'-0"
4'-0"
GUARDRAIL
6'-4"
FENDER PANEL
FENDER
PILE TIP
EL -120'
5'-0"
0'-0''
5'-0"
10'-0"
SCALE: 1''=10'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
TYPICAL BREASTING DOLPHIN
ELEVATIONS
DATE:
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.19
29'-0"
C
L TRESTLE
14'-6"
14'-6"
VEHICLE ACCESS
6'-0"
6'-0"
6'-0"
6'-0"
EL 13.44
SLOPE
VARIES
0.5%
SLOPE
CONC BARRIER (TYP)
CONC DECK
4'-10"
2'-9"
TYPE III GIRDER (TYP)
RISER PAD (TYP)
CONC BENT CAP
BATTER PILE
30" SQ CONC BATTER PILE
MHW 2.0 MSL
CONC PILE (TYP)
A
2.14
SECTION
SCALE: 1"=10'
5'-0"
0'-0''
5'-0"
10'-0"
SCALE: 1''=10'
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
FILE:
DECEMBER 20, 2013
PARISH:
CALCASIEU
REV.#:
DATE:
USACE Permit #
Applicant:
ACCESS TRESTLE SECTION
DATE:
FOR CMD/COE USE ONLY
0
_
SCALE:
AS SHOWN
EXHIBIT:
2.20
1
PLAN
SCALE: 1/4"=1'-0"
SECTION
A
2
SCALE: 1/4"=1'-0"
ELEVATION
SCALE: 1/4"=1'-0"
2'-0"
0'-0''
2'-0"
4'-0"
SCALE: 1/4"=1'-0''
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
WALKWAY DETAILS
2.21
62
4,0
00
N
2,6
64
,00
0
PROPOSED FOOTPRINT OF
AREA TO BE DREDGED
2,6
6
2,0
00
500'
0
62
2,0
00
PROPOSED PILE SUPPORTED
DOCK STRUCTURE
500'
PROPOSED SHORELINE
STABILIZATION
GRAPHIC SCALE
FOR PERMITTING
N
E
E
LEGEND:
PROPOSED
ACCESS
CALCASIEU RIVER AND PASS SHIP CHANNEL
NOTES:
BOUNDARIES ARE APPROXIMATE BASED ON THE USACE
JURISDICTIONAL DETERMINATION MVN 2016-00876-MG
APPROVED JULY 27, 2016.
16+3662
MIXED/NOT DELINEATED
WATERS OF US (10/404)
N
62
4,0
PR
00
OP
ER
TY
LIN
E
16+2862
E
WETLANDS (10/404)
2,6
6
0,0
00
E
DA #6
NON-WETLANDS
2,6
62
,00
0
16+1862
WETLANDS (10/404)
FOR POTENTIAL
IMPACT
APPROXIMATELY
4.45 ACRES
PROPOSED ACCESS ROAD TO
FOLLOW EXISTING INTERIOR LEVEE
N
62
0,0
00
16+1262
APPLICANT: LAKE CHARLES HARBOR & TERMINAL DISTRICT
PROJECT:
PERMIT APPLICATION FOR THE
BULK TERMINAL NO. 1 EXPANSION PROJECT
WESTLAKE, LOUISIANA
USACE JURISDICTIONAL DETERMINATION
DATE:
FILE:
MARCH 22, 2017
POLC_BT1ExpansionPrj.dwg
PARISH:
CALCASIEU
REV.#:
DATE:
0
X
0,0
60
N
Lake Charles Harbor & Terminal District
Port of Lake Charles
P.O. Box 3753
Lake Charles, LA 70602
337.493.3526 (O)
337.493.3623 (F)
,00
62
62
2,6
0
N
2,0
00
E
POLC BT-1
00
POLC BT-1
FOR CMD/COE USE ONLY
USACE Permit #
Applicant:
Gahagan & Bryant Associates, Inc.
9330 Kirby Drive, Suite 100
Houston, TX 77054
832.377.4800 (O)
832.377.4802 (F)
www.gba-inc.com
SCALE:
AS SHOWN
EXHIBIT:
04.1