The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the Army permit application from The City of Evans, CO.

The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the Army permit application from The City of Evans, CO.

PUBLIC NOTICE US Army Corps of Engineers Omaha District

Application No: Project: Applicant: Waterway: Issue Date: Expiration Date:

NWO-2016-2451-DEN Riverside Park Shoreline City of Evans South Platte River March 27, 2017 April 27, 2017

REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd Littleton, CO 80128-6901 FAX (303) 979-0602

30 DAY NOTICE

PUBLIC NOTICE FOR SECTION 404 PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the Army permit application from The City of Evans, CO. Permits are issued under Section 404 of the Clean Water Act (Section 404) which regulates the placement of dredged or fill material in the nation's waters. Summary The applicant proposes to construct approximately 2,349 linear feet of bank stabilization using bioengineering techniques along the South Platte River in Weld County, Colorado. Location The project area is located along Riverside Parkway, adjacent to Riverside Park located at 40.372456, -104.680465, Section 29 of Township 5 North, Range 65 West of the 6th Principal Meridian in Evans, Colorado. Description of work The applicant proposes to repair and enhance the bank along the South Platte River that was severely damaged from the 2013 floods. The project purpose is to provide a more natural topography to the shoreline, reconnect the river to the floodplain, and reinforce the existing shoreline. This will include removing approximately 1,600 linear feet of a man-made berm that was created in the 1960s-1970s with a combination trash and clean fill. Restoration work will include earthwork and riparian plantings to reshape the earth behind the shoreline in order to create a terraced transition zone of floodplain and 1 Project: Riverside Park Bank Stabilization Waterway: South Platte River

Corps File No: NWO-2016-2451-DEN Applicant: The City of Evans

riparian/wetland habitat between the ball fields and the river and raise some areas above the 100-year floodplain. Site preparation will include clearing and grubbing of the site, removal of surface debris, removal of 100,000 cubic yards of unsuitable material (landfill debris) and demolition and removal of existing structures. Stabilization of the bank will include bioengineering techniques with plantings and the installation of buried rip rap along 2,349 linear feet of shoreline which will permanently impact approximately 0.37 acres of waters of the US. Purpose For purposes of definition under Section 404, the basic project purpose is bank stabilization. The overall project purpose is to provide a more natural topography to the shoreline, reconnect the river to the floodplain, and reinforce the existing shoreline. Impacts and Mitigation The total length of impacts to the South Platte River, including berm removal and grading, will be 2,349 linear feet of shoreline which will permanently impact approximately 0.37 acres of waters of the US. The applicant has proposed that the project is self-mitigating and no additional compensatory mitigation is required. ********************* The Colorado Department of Public Health and Environment, WQCD-GWPS-B2, 4300 Cherry Creek Drive South, Denver, Colorado 80222-1530, will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. For further information, please contact the Colorado Water Quality Control Division, (303) 692-3500. In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not adversely affect species designated as threatened or endangered or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against the reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, wetlands, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). 2 Project: Riverside Park Bank Stabilization Waterway: South Platte River

Corps File No: NWO-2016-2451-DEN Applicant: The City of Evans

The Corps of Engineers is soliciting written comments from the public; Federal, state and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. Any agency or individual having an objection to the work should identify it as an objection with clear and specific reasons. All replies to the public notice should be sent to the U. S. Army Corps of Engineers, Denver Regulatory Office, 9307 South Wadsworth Blvd, Littleton, Colorado 80128-6901. For additional information please contact Stephen Decker at (303) 979-4120 or stephen.j.decker@usace.army.mil or visit the Denver Regulatory Office web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx The District Engineer will consider requests for holding a public hearing, for the purpose of gathering additional information. Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held. Requests for a public hearing should state specifically the reasons for holding a public hearing, and what additional information would be obtained. Should the District Engineer decide that additional information is required and a public hearing should be held, interested parties will be notified of the date, time and location. Comments received after the close of business on the expiration date of this public notice will not be considered.

3 Project: Riverside Park Bank Stabilization Waterway: South Platte River

Corps File No: NWO-2016-2451-DEN Applicant: The City of Evans

Attachment A /KE'/EZ^>KWWZKdd/KE

WZ

4650

Existing

4648

4643

4643

Proposed 4646

Elevation (ft)

4644

Cross-Section 1

0 464

4644

OHW Riprap

4642 4640

4

4641

Excavation of existing berm and restoration of floodplain.

46 4

2 464 4641

2 464

46 4

4638 4636

3

4634 0

20

40

60

80

100

120

140

2

4650

46 4

464 1

Distance (ft)

Existing concrete rubble riprap.

4648

4647

46 4

3

Elevation (ft)

4646

5

4648

Cross-Section 1

46 4

4644

Cross-Section 2

4644 Existing 4642

Proposed

Excel electrical tower limits excavation limits and requires existing concrete rubble riprap be replaced with soil mixed rock riprap.

4640 4638

4 46

4 46

4 46

1

4646

1

OHW Riprap

4636

3

4634

4642

0

10

20

30

40

50

60

70

80

90

100

Distance (ft)

4641

Cross-Section 2

4650

Cross-Section 3 Existing

4648

Elevation (ft)

0

464 1

4 46

464 46 2 43

Proposed 4646

Service Layer LayerCredits: Credits: Source: Source: Esri, Esri, Service DigitalGlobe, GeoEye, Earthstar Geographics, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community IGN, and the GIS User Community

OHW

Excavation of existing berm and restoration of floodplain.

4644

Riprap

4642 4640 4638 4636

Cross-Section 3

4634 0

20

40

60

80

100

120

Distance (ft)

Stream Polygon

Wetlands

Major Contours

Cross-Sections

Riprap

Minor Contours

PATH: U:\PROJECTS\273736_THKRIVERSIDE PARK DESIGN\MAP_DOCS\RIVERSIDE_USACE404_MAP1.MXD - USER: MATTJOHN - DATE: 1/27/2017

RIVERSIDE PARK

O

Existing Contours 0

Feet

404 IMPACTS 125

FIGURE 1

6 464

4642

4648

4644

Cross-Section 4

5

4646

Excavation of existing berm and restoration of floodplain.

4643

Elevation (ft)

46 4

4644 4642 4640

Existing Proposed

4638

4646

OHW 4636

Riprap

4647

4643

4634 0

20

40

60

80

100

140

120

Distance (ft) 4650

4643

Cross-Section 4

Cross-Section 5

4648

Proposed OHW

464 8

4646

Riprap Existing

9 464

6

0

46 4

Elevation (ft)

4644 4645

464 7

46 4

4638

4636 10

20

30

40

50

60

70

80

90

1

0

46 4

6

46 4

4 46

4

464 8

464 5

4642

4640

Existing concrete rubble riprap (see photos) 464 7

4644

Distance (ft)

4650

Cross-Section 6

Cross-Section 5 4648

Existing Proposed

46 4

Elevation (ft)

5 4 64

4

4646

4 46

4 2 46

3

Excavation of existing berm and restoration of floodplain.

4644

OHW Riprap

4642 4640

Service Layer LayerCredits: Credits: Source: Source: Esri, Esri, Service DigitalGlobe, GeoEye, Earthstar Geographics, DigitalGlobe, GeoEye, Earthstar 464Geographics, 3 CNES/Airbus DS, USDA, USGS, AeroGRID, CNES/Airbus DS, USDA, USGS, AeroGRID, 4642 IGN, and the GIS User Community 4 IGN, and the GIS64 User Community 8

4638

Cross-Section 6

4636 0

4645

50

100

150

200

250

Distance (ft)

Stream Polygon

Wetlands

Major Contours

Cross-Sections

Riprap

Minor Contours

PATH: U:\PROJECTS\273736_THKRIVERSIDE PARK DESIGN\MAP_DOCS\RIVERSIDE_USACE404_MAP2.MXD - USER: MATTJOHN - DATE: 1/27/2017

RIVERSIDE PARK

O

Existing Contours 0

Feet

404 IMPACTS 125

FIGURE 2

8

46 4

5

46 4

4650 4648

4641

4646

Elevation (ft)

4 46

4

4642 4643

4647

4644 4643 4647

4645

Cross-Section 6

4643 4645

4644

Cross-Section 7

Excavation of existing berm and restoration of floodplain.

4644

Existing Proposed

4642

OHW 4640

4642

Riprap

4638 4636 0

10

20

Distance (ft)

30

40

50

6

Existing

4650

Proposed

464 9

4

4648

3 464

Elevation (ft)

6 464

Cross-Section 8

4652

46 4

8 464 4 5 46 464

Cross-Section 7

5

4 46

46 5

0

4645

1 465

464 2

Cross-Section 8

OHW Riprap

4646 4644 4642

1 464

4640 4638 0

4646

10

20

4651

Cross-Section 9

7

4650

46 4

2

50

Proposed

46 4

Elevation (ft)

9

4648

46 4

4651

60

Existing

4650

8

5 46

40

Cross-Section 9

46 4

6

4652

30

Distance (ft)

OHW

Excavation of existing berm and restoration of floodplain.

4646

Riprap

4644 4642

5 46 2

Service Layer LayerCredits: Credits: Source: Source: Esri, Esri, Service DigitalGlobe, GeoEye, Earthstar Geographics, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community IGN, and the GIS User Community

4640 4638 0

Stream Polygon

Wetlands

Major Contours

Cross-Sections

Riprap

Minor Contours

PATH: U:\PROJECTS\273736_THKRIVERSIDE PARK DESIGN\MAP_DOCS\RIVERSIDE_USACE404_MAP3.MXD - USER: MATTJOHN - DATE: 1/27/2017

20

40

0

Feet

80

100

120

RIVERSIDE PARK

O

Existing Contours

60 (ft) Distance

404 IMPACTS 125

FIGURE 3

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas