GAS PIPELINE REPLACEMENT BELOW THE MISSISSIPPI RIVER IN
EAST BATON ROUGE AND WEST BATON ROUGE PARISHES
NAME OF APPLICANT: Bridgeline Holdings, LP, c/o James Vincent of GeoEngineers, Inc., 11955 Lakeland Park Blvd., Baton Rouge, LA 70809.
LOCATION OF WORK: In the Mississippi River, Section 37, T6S-R1E, Mississippi River RM 233.9 north of Port Allen, Louisiana, in East Baton Rouge and West Baton Rouge Parishes, within the Mississippi River Basin in hydrologic unit (HUC 08070201), as shown on the attached drawings (Latitude 30.507780 N, Longitude -91.201000 W).
CHARACTER OF WORK: The work described herein was previously authorized for Chevron Pipe Line Company on September 15, 2010, extended on May 24, 2013. The applicant has procured the property and has requested Department of the Army authorization to modify and complete the project to include temporary workspaces, temporary spoil areas and the Horizontal Directional Drill (HDD) of 2,900 linear feet of16-inch natural gas pipeline to a depth of minus 110-feet under the Mississippi River to replace the existing damaged 16-inch natural gas pipeline. Approximately 1,410 cubic yards of native material will be excavated and backfilled for the HDD installation. Excavated material will be stockpiled and used as backfill upon successful completion of the project. A preliminary analysis has determined wetlands to be present at the project site; however, extent of coverage and impacts is undetermined at this time pending wetland delineation.
The applicant proposes to avoid additional direct impacts and minimize secondary impacts by remaining within the previously authorized footprint of the worksite, restricting activity to previously developed areas and utilizing timber mats for equipment if necessary. No impacts to wetlands have been proposed or are anticipated for this project. As compensation for any unavoidable wetland impacts, the applicant proposes to mitigate inkind wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
April 3, 2017
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1545
Project Manager
S. Gail Gainey
Sandra.G.Gainey@usace.army.mil
MVN-2010-01324-CG
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 170327-02
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the
Clean Water Act.
GAS PIPELINE REPLACEMENT BELOW THE MISSISSIPPI RIVER IN
EAST BATON ROUGE AND WEST BATON ROUGE PARISHES
NAME OF APPLICANT: Bridgeline Holdings, LP, c/o James Vincent of GeoEngineers,
Inc., 11955 Lakeland Park Blvd., Baton Rouge, LA 70809.
LOCATION OF WORK: In the Mississippi River, Section 37, T6S-R1E, Mississippi River
RM 233.9 north of Port Allen, Louisiana, in East Baton Rouge and West Baton Rouge
Parishes, within the Mississippi River Basin in hydrologic unit (HUC 08070201), as shown
on the attached drawings (Latitude 30.507780 N, Longitude -91.201000 W).
CHARACTER OF WORK: The work described herein was previously authorized for
Chevron Pipe Line Company on September 15, 2010, extended on May 24, 2013. The
applicant has procured the property and has requested Department of the Army
authorization to modify and complete the project to include temporary workspaces,
temporary spoil areas and the Horizontal Directional Drill (HDD) of 2,900 linear feet of16inch natural gas pipeline to a depth of minus 110-feet under the Mississippi River to
replace the existing damaged 16-inch natural gas pipeline. Approximately 1,410 cubic
yards of native material will be excavated and backfilled for the HDD installation.
Excavated material will be stockpiled and used as backfill upon successful completion of
the project. A preliminary analysis has determined wetlands to be present at the project
site; however, extent of coverage and impacts is undetermined at this time pending
2
wetland delineation.
The applicant proposes to avoid additional direct impacts and minimize secondary
impacts by remaining within the previously authorized footprint of the worksite, restricting
activity to previously developed areas and utilizing timber mats for equipment if necessary.
No impacts to wetlands have been proposed or are anticipated for this project. As
compensation for any unavoidable wetland impacts, the applicant proposes to mitigate inkind wetland credits from a Corps approved mitigation bank located in the watershed.
The comment period for the Department of Army will close in 30 days from the date of
this public notice. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit and must be mailed so as to be received before or by the last day of
the comment period. Letters concerning the Corps of Engineers permit application must
reference the applicant's name and the Permit Application Number, and be mailed to the
Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH.
Similar letters concerning the Water Quality Certification must reference the applicant's
name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
3
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and the State
Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species. Utilizing
Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES),
dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and
U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that
the proposed project is not likely to adversely affect the Interior Least Tern (Sterna
antillarum) as there will be no activity conducting in or near suitable nesting habitat for the
species. Additionally, the proposed work has been determined not likely to adversely
affect Pallid Sturgeon (Scaphirhynchus albus) as there will be no dredging activities
associated with this project.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to n/a acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosures
P&O Pipeline Alignment
(Survey 11/8/1990)
U.L.S.I Pipeline Alignment
(Survey 8/18/1992)
Fenstermaker Pipeline Alignment
(Survey 7/28/2016)
BASELINE SURVEY SECTION
80
80
70
70
60
60
50
40
40
U.L.S.I. Mudline
(Survey 8/1992)
30
30
P&O Mudline
(Survey 6/29 - 7/2/1990)
20
20
10
10
Elevation (ft)
P:\21\21669004\00\CAD\Working\Previous Survey.dwg TAB:11x17 Landscape Date Exported: 10/14/16 - 15:03 by kcook
50
Fenstermaker Mudline
(Survey 7/28/2016)
0
0
P&O Mudline
(Survey 12/24/1985)
-10
-10
-20
-20
-30
Before Rock
(Survey 11/8/90)
Top of Riprap
(Survey 1992)
-40
-30
-40
After Rock
(Survey 11/19/90)
-50
-50
Top of 16" Pipeline
(Survey 1992)
-60
-60
-70
-70
-80
-80
-90
-90
-100
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
Distance (ft)
1600
1700
Notes:
1900
W
0
Feet
2100
2200
2300
2400
2500
2600
2700
2800
2900
-100
3000
Enlink Midstream Mississippi River 16" Crossing-MP 234
West & East Baton Rouge Parishes, Louisiana
E
S
200
2000
Plan of Profile
Pipeline Alignment and Survey Comparisons
N
1. The locations of all features shown are approximate.
2. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers,
Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the
official record of this communication.
Data Source:
1. Aerial was taken from Google Earth Pro., Imagery Dated: 8/26/2015.
2. Fenstermaker Pipeline Alignment and Survey, Dwg Name: 072716_EXPORT - Fenstermaker_GeoEngineers_MS River MP 234 AHP
Survey_FINAL.dwg, Dated 7/27/2016.
3. P&O Pipeline Alignment and Survey, Plan & Profile Survey of 11/19/90 (After Rock Placement), DWG No: BR-167-A-1, Dated 11/28/90
4. U.L.S.I. Pipeline Alignment and Survey, Mississippi River Crossing, Dwg No: BR-179-N-1, Dated: 9/1992
1800
200
Figure 1
WEST BATON ROUGE PARISH
EAST BATON ROUGE PARISH
EXISTING PIPELINE
U.L.S.I. SURVEY (08/18/1992)
EXISTING PIPELINE
FENSTERMAKER SURVEY (07/28/2016)
PROPOSED TEMPORARY
PRODUCT PIPE STRINGING
AND FABRICATION WORKSPACE
(SEE SHEET 2 FOR LAYOUT)
FLOW
EXISTING PIPELINE
P&O SURVEY (11/08/1990)
PROPOSED TEMPORARY
HDD EXIT WORKSPACE
PROPOSED
HDD ENTRY POINT
N. 730174.62178
E. 3322260.92777
LAT. N30° 30' 27.8984"
LONG. W91° 12' 06.4220"
PROPOSED 16" HORIZONTAL DIRECTIONAL DRILL - 2,900'
B-2
B-2A
200'
B-4
100' 150'
B-3
100'
0
B-6
450'
CPT-1
75'
B-5
200'
0
50'
250'
VE
R
RO
AD
PROPOSED
HDD EXIT POINT
N. 730163.64854
E. 3325160.90701
LAT. N30° 30' 27.7557"
LONG. W91° 11' 33.2712"
115'
CPT-2
B-1
MATCH LINE (SEE SHEET 2)
MISSISSIPPI RIVER
PROPOSED TEMPORARY
HDD ENTRY WORKSPACE
RI
WB HWY 190
EB HWY 190
DATUM:
HORIZONTAL: NAD83, LOUISIANA STATE PLANE, SOUTH ZONE, US FOOT
VERTICAL: NAVD 88
PROPOSED HDD EXIT POINT
CENTER OF LEVEE
12°
GROUND SURFACE (LiDAR) (TYP.)
PROPOSED HDD ENTRY POINT
B-5
LIMESTONE
(3.0)
SANDY CLAY W/ GRAVEL
(1.5)
CLAY W/ GRAVEL
LIMESTONE
SANDY CLAY W/ CLAY POCKETS
CLAYEY SILT
2 4 6
SILTY CLAY W/ FERROUS NODULES
SILTY CLAY
SILT W/ CLAY POCKETS
SILT
(0.25)
(0.25)
SILTY CLAY
SILTY CLAY
(0.2)
(0.5)
(3.0)
(4.5)
0
(1.75)
(0.25)
(0.4)
(2.0)
(0.75)
(0.25)
(0.5)
(0.5)
(0.25)
(0.25)
(0.25)
B-2A
100'
16
26
27
55
34
60
71
65
68
86/11½"
77/11"
SILTY CLAYEY SAND W/ MICA
SAND
SAND W/ SILTY CLAY & MICA
SAND
CPT-1
SAND W/ SILT AND MICA
B-1
250'
CLAY
10°
2 4 6
29'
(0.25)
(1.2)
(0.3)
(0.7)
3
13
14
19
18
32
72
27
23
39
66
48
71
38
57
50/5"
71
93/10"
50/2½"
50/5"
50/5"
TOP OF DECK = 0
28'
SANDY SILTY
CLAY W/
ORGANIC
MATTER
SILT
9
13
19
14
28
42
25
23
38
34
41
34
38
41
SILTY CLAY
CLAYEY SILT
CLAYEY SAND
SILTY SAND
STABILITY CONTROL LINE
(1.51)
SAND
BATHYMETRIC SURFACE (SURVEY)
PT2
(1.84)
1,600 FT R.
1,600 FT R.
34'
(1.25)
50/5½"
PT1
P:\21\21669004\00\CAD\Mississippi River HDD\Drawings\Mississippi River HDD_DRAFT.dwg\TAB:SHEET 1 modified on Oct 18, 2016 - 8:37am
ELEVATION (FT)
ENTRY @ 10°
16+48.02
26.48
PC 1
(10.00° @ 1,600 ft R.)
22+84.20
-85.69
PT1
25+62.03
-110.00
PC 2
(12.00° @ 1,600 FT R.)
35+82.08
-110.00
PT2
39+14.74
-75.04
EXIT @ 12°
45+48.02
59.57
HORIZONTAL DISTANC E = 2,900.00 FT
DIREC TIONAL DRILL PIPE LENGTH = 2,927.82 FT
PILOT HOLE ENTRY ANGLE
PILOT HOLE ENTRY LOCATION
PILOT HOLE EXIT ANGLE
PILOT HOLE EXIT LOCATION
PILOT HOLE DEPTH
PILOT HOLE ALIGNMENT
TOLERANCE
INCREASE ANGLE UP TO 1º (STEEPER), BUT NO
DECREASE IN ANGLE ALLOWED.
AS PER COORDINATES PROVIDED BY COMPANY WITH
NO CHANGES WITHOUT COMPANY APPROVAL.
INCREASE ANGLE UP TO 1º (STEEPER) OR
DECREASE UP TO 2º (FLATTER).
UP TO 20 FEET BEYOND OR 10 FEET SHORT OF THE
EXIT STAKE. BETWEEN 5 FEET LEFT AND 5 FEET
RIGHT OF CENTERLINE.
UP TO 2 FEET ABOVE THE DESIGN DRILL PROFILE
ALLOWED. UP TO 10 FEET BELOW THE DESIGN DRILL
PROFILE ALLOWED.
SHALL REMAIN WITHIN 5 FEET LEFT OR RIGHT OF THE
HDD ALIGNMENT.
CLAY W/ SAND
PC2
62
RECOMMENDED TOLERANCES
ITEM
STATION * (FT)
(2.69)
(3.02)
SAND
PROPOSED 16" HORIZONTAL DIRECTIONAL DRILL PROFILE
(REFER TO BASIS OF DESIGN NOTES)
CPT-2
MISSISSIPPI RIVER HDD
CLAY W/
(1.45)
B-3
DIREC TIONAL DRILL DATA
9
(1.34)
PC1
36
63'
EXISTING 16" ENLINK PIPELINE
(U.L.S.I. SURVEY 08/18/1992)
51
SAND
TOP OF DECK = 0
SAND W/ SILT
55
SAND W/ SILT
B-2
DESC RIPTION
21
27
5
MISSISSIPPI RIVER
(APPROXIMATE WATER LEVEL)
W/ SAND LENSES
B-4
SAND POCKETS
4
2
28
(2.5)
(3.5)
(4.25)
(4.0)
(4.0)
(4.5)
(3.5)
(3.0)
(3.0)
(4.0)
(4.5)
(3.75)
(3.25)
(4.5)
(4.0)
(4.25)
(2.0)
(1.95)
(2.0)
(1.65)
(1.75)
(4.5)
(4.0)
59
38
44
92/11"
60
65
80/9"
29
49
93/11"
85/11"
50/6"
21'
SILTY CLAY
W/ GRAVEL
SAND W/ SILT AND GRAVEL
ROCK
FRAGMENTS AND GRAVEL
SILTY
CLAY
CLAY W/ CALCAREOUS
NODULES AND
FERROUS STAINS
SILTY CLAY W/ SILT LAYERS
(3.25)
(2.0)
(2.25)
(2.25)
(3.25)
(2.75)
(2.75)
(1.25)
(4.5)
(4.5)
(4.5)
(4.5)
(2.5)
(1.5)
(3.25)
(3.0)
(2.25)
(4.25)
(4.5)
(3.25)
CLAY
CLAY W/ FERROUS STAINS
CLAY W/ SILT
CLAY
CLAY W/ SILT
CLAY W/ FERROUS STAINS
SILTY CLAY W/ FINE SAND
CLAY W/ SILT SEAMS
AND FERROUS NODULES
SILTY CLAY
CLAY
B-6
200'
CLAY
SILTY CLAY W/ CLAY AND SAND POCKETS
CLAY W/ SILTY CLAY POCKETS
SILTY CLAY
SILTY SAND W/ MICA
CLAY
SILTY CLAY W/ FINE SAND
SILTY
SILTY SAND
CLAY W/ CLAY POCKETS AND MICA
SILTY SAND W/ CLAY POCKETS AND MICA
LEGEND
(SHEAR STRENGTH KSF)
TYPE OF SOIL
SPT (N)
BORING LOCATION
MAJOR CONTOUR - 20' INTERVAL
MINOR CONTOUR - 5' INTERVAL
CPT LEGEND
Sensitive, Fine Grained Soils
Sands-Clean Sand to Silty Sand
Organic Soils, Peats
Gravelly Sand to Sand
Clays-Clay to Silty Clay
Very Stiff Clay to Clayey Sand
Silt Mixtures-Clay Silt to Silty Clay
Very Stiff Fine Grained Soils
Sand Mixtures-Silty Sand to Sandy Silt
©
FINAL
FLOW
MISSISSIPPI RIVER
EXISTING PIPELINE
P&O SURVEY (11/08/1990)
115'
B-4
PROPOSED TEMPORARY
HDD EXIT WORKSPACE
PROPOSED
HDD EXIT POINT
N. 730163.64854
E. 3325160.90701
LAT. N30° 30' 27.7557"
LONG. W91° 11' 33.2712"
RAILR
OAD TR
AC
EXISTING PIPELINE
FENSTERMAKER SURVEY (07/28/2016)
KS
MATCH LINE (SEE SHEET 1)
EXISTING PIPELINE
U.L.S.I. SURVEY (08/18/1992)
PROPOSED
TEMPORARY PRODUCT PIPE
STRINGING AND FABRICATION
WORKSPACE (50' X 2,565')
3,200 FT R.
100' 150'
B-6
0
B-5
75'
200'
WB HWY 190
RAILROAD TRACKS
EB HWY 190
PROPOSED 16" HORIZONTAL DIRECTIONAL DRILL - 2,900'
WEST BATON ROUGE PARISH
EAST BATON ROUGE PARISH
AL
CAN
P:\21\21669004\00\CAD\Mississippi River HDD\Drawings\Mississippi River HDD_DRAFT.dwg\TAB:SHEET 2 modified on Oct 18, 2016 - 8:33am
DATUM:
HORIZONTAL: NAD83, LOUISIANA STATE PLANE, SOUTH ZONE, US FOOT
VERTICAL: NAVD 88
©
LEGEND
BORING LOCATION
FINAL
MAJOR CONTOUR - 20' INTERVAL
MINOR CONTOUR - 5' INTERVAL