GAS PIPELINE REPLACEMENT BELOW THE MISSISSIPPI RIVER IN EAST BATON ROUGE AND WEST BATON ROUGE PARISHES

NAME OF APPLICANT: Bridgeline Holdings, LP, c/o James Vincent of GeoEngineers, Inc., 11955 Lakeland Park Blvd., Baton Rouge, LA 70809. LOCATION OF WORK: In the Mississippi River, Section 37, T6S-R1E, Mississippi River RM 233.9 north of Port Allen, Louisiana, in East Baton Rouge and West Baton Rouge Parishes, within the Mississippi River Basin in hydrologic unit (HUC 08070201), as shown on the attached drawings (Latitude 30.507780 N, Longitude -91.201000 W). CHARACTER OF WORK: The work described herein was previously authorized for Chevron Pipe Line Company on September 15, 2010, extended on May 24, 2013. The applicant has procured the property and has requested Department of the Army authorization to modify and complete the project to include temporary workspaces, temporary spoil areas and the Horizontal Directional Drill (HDD) of 2,900 linear feet of16-inch natural gas pipeline to a depth of minus 110-feet under the Mississippi River to replace the existing damaged 16-inch natural gas pipeline. Approximately 1,410 cubic yards of native material will be excavated and backfilled for the HDD installation. Excavated material will be stockpiled and used as backfill upon successful completion of the project. A preliminary analysis has determined wetlands to be present at the project site; however, extent of coverage and impacts is undetermined at this time pending wetland delineation. The applicant proposes to avoid additional direct impacts and minimize secondary impacts by remaining within the previously authorized footprint of the worksite, restricting activity to previously developed areas and utilizing timber mats for equipment if necessary. No impacts to wetlands have been proposed or are anticipated for this project. As compensation for any unavoidable wetland impacts, the applicant proposes to mitigate inkind wetland credits from a Corps approved mitigation bank located in the watershed.

JOINT PUBLIC NOTICE April 3, 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118

State of Louisiana Department of Environmental Quality Office of Environmental Services Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1545 Project Manager S. Gail Gainey Sandra.G.Gainey@usace.army.mil MVN-2010-01324-CG

(225) 219-3225 Project Manager Elizabeth Hill WQC Application Number WQC # 170327-02

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act. GAS PIPELINE REPLACEMENT BELOW THE MISSISSIPPI RIVER IN EAST BATON ROUGE AND WEST BATON ROUGE PARISHES NAME OF APPLICANT: Bridgeline Holdings, LP, c/o James Vincent of GeoEngineers, Inc., 11955 Lakeland Park Blvd., Baton Rouge, LA 70809. LOCATION OF WORK: In the Mississippi River, Section 37, T6S-R1E, Mississippi River RM 233.9 north of Port Allen, Louisiana, in East Baton Rouge and West Baton Rouge Parishes, within the Mississippi River Basin in hydrologic unit (HUC 08070201), as shown on the attached drawings (Latitude 30.507780 N, Longitude -91.201000 W). CHARACTER OF WORK: The work described herein was previously authorized for Chevron Pipe Line Company on September 15, 2010, extended on May 24, 2013. The applicant has procured the property and has requested Department of the Army authorization to modify and complete the project to include temporary workspaces, temporary spoil areas and the Horizontal Directional Drill (HDD) of 2,900 linear feet of16inch natural gas pipeline to a depth of minus 110-feet under the Mississippi River to replace the existing damaged 16-inch natural gas pipeline. Approximately 1,410 cubic yards of native material will be excavated and backfilled for the HDD installation. Excavated material will be stockpiled and used as backfill upon successful completion of the project. A preliminary analysis has determined wetlands to be present at the project site; however, extent of coverage and impacts is undetermined at this time pending

2 wetland delineation. The applicant proposes to avoid additional direct impacts and minimize secondary impacts by remaining within the previously authorized footprint of the worksite, restricting activity to previously developed areas and utilizing timber mats for equipment if necessary. No impacts to wetlands have been proposed or are anticipated for this project. As compensation for any unavoidable wetland impacts, the applicant proposes to mitigate inkind wetland credits from a Corps approved mitigation bank located in the watershed. The comment period for the Department of Army will close in 30 days from the date of this public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The US Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the

3 proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this notice are being sent to the State Archeologist and the State Historic Preservation Officer. Our initial finding is that the proposed work would neither affect any species listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that the proposed project is not likely to adversely affect the Interior Least Tern (Sterna antillarum) as there will be no activity conducting in or near suitable nesting habitat for the species. Additionally, the proposed work has been determined not likely to adversely affect Pallid Sturgeon (Scaphirhynchus albus) as there will be no dredging activities associated with this project. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of up to n/a acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate water quality standards will be required from the Department of Environmental Quality, Office of Environmental Services before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

JOHN M. HERMAN Chief, Central Evaluation Section Regulatory Branch Enclosures

P&O Pipeline Alignment (Survey 11/8/1990)

U.L.S.I Pipeline Alignment (Survey 8/18/1992)

Fenstermaker Pipeline Alignment (Survey 7/28/2016) BASELINE SURVEY SECTION

80

80

70

70 60

60 50 40

40

U.L.S.I. Mudline (Survey 8/1992)

30

30

P&O Mudline (Survey 6/29 - 7/2/1990)

20

20 10

10 Elevation (ft)

P:\21\21669004\00\CAD\Working\Previous Survey.dwg TAB:11x17 Landscape Date Exported: 10/14/16 - 15:03 by kcook

50

Fenstermaker Mudline (Survey 7/28/2016)

0

0

P&O Mudline (Survey 12/24/1985)

-10

-10 -20

-20 -30

Before Rock (Survey 11/8/90)

Top of Riprap (Survey 1992)

-40

-30 -40

After Rock (Survey 11/19/90)

-50

-50

Top of 16" Pipeline (Survey 1992)

-60

-60

-70

-70

-80

-80 -90

-90 -100 0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500 Distance (ft)

1600

1700

Notes:

1900

W

0 Feet

2100

2200

2300

2400

2500

2600

2700

2800

2900

-100 3000

Enlink Midstream Mississippi River 16" Crossing-MP 234 West & East Baton Rouge Parishes, Louisiana

E S

200

2000

Plan of Profile Pipeline Alignment and Survey Comparisons

N

1. The locations of all features shown are approximate. 2. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. Data Source: 1. Aerial was taken from Google Earth Pro., Imagery Dated: 8/26/2015. 2. Fenstermaker Pipeline Alignment and Survey, Dwg Name: 072716_EXPORT - Fenstermaker_GeoEngineers_MS River MP 234 AHP Survey_FINAL.dwg, Dated 7/27/2016. 3. P&O Pipeline Alignment and Survey, Plan & Profile Survey of 11/19/90 (After Rock Placement), DWG No: BR-167-A-1, Dated 11/28/90 4. U.L.S.I. Pipeline Alignment and Survey, Mississippi River Crossing, Dwg No: BR-179-N-1, Dated: 9/1992

1800

200

Figure 1

WEST BATON ROUGE PARISH

EAST BATON ROUGE PARISH

EXISTING PIPELINE U.L.S.I. SURVEY (08/18/1992) EXISTING PIPELINE FENSTERMAKER SURVEY (07/28/2016)

PROPOSED TEMPORARY PRODUCT PIPE STRINGING AND FABRICATION WORKSPACE (SEE SHEET 2 FOR LAYOUT)

FLOW

EXISTING PIPELINE P&O SURVEY (11/08/1990)

PROPOSED TEMPORARY HDD EXIT WORKSPACE

PROPOSED HDD ENTRY POINT N. 730174.62178 E. 3322260.92777 LAT. N30° 30' 27.8984" LONG. W91° 12' 06.4220" PROPOSED 16" HORIZONTAL DIRECTIONAL DRILL - 2,900'

B-2

B-2A 200'

B-4

100' 150'

B-3 100'

0

B-6

450'

CPT-1

75'

B-5

200'

0

50' 250'

VE R

RO AD

PROPOSED HDD EXIT POINT N. 730163.64854 E. 3325160.90701 LAT. N30° 30' 27.7557" LONG. W91° 11' 33.2712"

115' CPT-2

B-1

MATCH LINE (SEE SHEET 2)

MISSISSIPPI RIVER PROPOSED TEMPORARY HDD ENTRY WORKSPACE

RI

WB HWY 190

EB HWY 190

DATUM: HORIZONTAL: NAD83, LOUISIANA STATE PLANE, SOUTH ZONE, US FOOT VERTICAL: NAVD 88

PROPOSED HDD EXIT POINT

CENTER OF LEVEE

12° GROUND SURFACE (LiDAR) (TYP.)

PROPOSED HDD ENTRY POINT

B-5 LIMESTONE (3.0)

SANDY CLAY W/ GRAVEL

(1.5)

CLAY W/ GRAVEL

LIMESTONE SANDY CLAY W/ CLAY POCKETS CLAYEY SILT

2 4 6

SILTY CLAY W/ FERROUS NODULES

SILTY CLAY

SILT W/ CLAY POCKETS

SILT (0.25) (0.25)

SILTY CLAY SILTY CLAY

(0.2) (0.5)

(3.0) (4.5) 0 (1.75) (0.25) (0.4) (2.0) (0.75) (0.25) (0.5) (0.5) (0.25) (0.25) (0.25)

B-2A 100'

16 26 27 55 34 60 71 65 68 86/11½" 77/11"

SILTY CLAYEY SAND W/ MICA SAND SAND W/ SILTY CLAY & MICA SAND

CPT-1

SAND W/ SILT AND MICA

B-1 250'

CLAY

10°

2 4 6

29'

(0.25) (1.2) (0.3) (0.7) 3 13 14 19 18 32 72 27 23 39 66 48 71 38 57 50/5" 71 93/10" 50/2½" 50/5" 50/5"

TOP OF DECK = 0

28'

SANDY SILTY CLAY W/ ORGANIC MATTER SILT

9 13 19 14 28 42 25 23 38 34 41 34 38 41

SILTY CLAY CLAYEY SILT CLAYEY SAND

SILTY SAND

STABILITY CONTROL LINE

(1.51) SAND

BATHYMETRIC SURFACE (SURVEY)

PT2 (1.84)

1,600 FT R. 1,600 FT R.

34'

(1.25)

50/5½"

PT1

P:\21\21669004\00\CAD\Mississippi River HDD\Drawings\Mississippi River HDD_DRAFT.dwg\TAB:SHEET 1 modified on Oct 18, 2016 - 8:37am

ELEVATION (FT)

ENTRY @ 10°

16+48.02

26.48

PC 1 (10.00° @ 1,600 ft R.)

22+84.20

-85.69

PT1

25+62.03

-110.00

PC 2 (12.00° @ 1,600 FT R.)

35+82.08

-110.00

PT2

39+14.74

-75.04

EXIT @ 12°

45+48.02

59.57

HORIZONTAL DISTANC E = 2,900.00 FT DIREC TIONAL DRILL PIPE LENGTH = 2,927.82 FT

PILOT HOLE ENTRY ANGLE PILOT HOLE ENTRY LOCATION PILOT HOLE EXIT ANGLE PILOT HOLE EXIT LOCATION

PILOT HOLE DEPTH PILOT HOLE ALIGNMENT

TOLERANCE INCREASE ANGLE UP TO 1º (STEEPER), BUT NO DECREASE IN ANGLE ALLOWED. AS PER COORDINATES PROVIDED BY COMPANY WITH NO CHANGES WITHOUT COMPANY APPROVAL. INCREASE ANGLE UP TO 1º (STEEPER) OR DECREASE UP TO 2º (FLATTER). UP TO 20 FEET BEYOND OR 10 FEET SHORT OF THE EXIT STAKE. BETWEEN 5 FEET LEFT AND 5 FEET RIGHT OF CENTERLINE. UP TO 2 FEET ABOVE THE DESIGN DRILL PROFILE ALLOWED. UP TO 10 FEET BELOW THE DESIGN DRILL PROFILE ALLOWED. SHALL REMAIN WITHIN 5 FEET LEFT OR RIGHT OF THE HDD ALIGNMENT.

CLAY W/ SAND

PC2

62

RECOMMENDED TOLERANCES ITEM

STATION * (FT)

(2.69) (3.02)

SAND

PROPOSED 16" HORIZONTAL DIRECTIONAL DRILL PROFILE (REFER TO BASIS OF DESIGN NOTES)

CPT-2

MISSISSIPPI RIVER HDD

CLAY W/ (1.45)

B-3

DIREC TIONAL DRILL DATA

9 (1.34)

PC1 36

63'

EXISTING 16" ENLINK PIPELINE (U.L.S.I. SURVEY 08/18/1992)

51 SAND

TOP OF DECK = 0

SAND W/ SILT

55 SAND W/ SILT

B-2

DESC RIPTION

21 27 5

MISSISSIPPI RIVER (APPROXIMATE WATER LEVEL)

W/ SAND LENSES

B-4

SAND POCKETS

4 2 28 (2.5) (3.5) (4.25) (4.0) (4.0) (4.5) (3.5) (3.0) (3.0) (4.0) (4.5) (3.75) (3.25) (4.5) (4.0) (4.25) (2.0) (1.95) (2.0) (1.65) (1.75) (4.5) (4.0) 59 38 44 92/11" 60 65 80/9" 29 49 93/11" 85/11" 50/6"

21'

SILTY CLAY W/ GRAVEL SAND W/ SILT AND GRAVEL ROCK FRAGMENTS AND GRAVEL SILTY

CLAY

CLAY W/ CALCAREOUS NODULES AND FERROUS STAINS

SILTY CLAY W/ SILT LAYERS

(3.25) (2.0) (2.25) (2.25) (3.25) (2.75) (2.75) (1.25) (4.5) (4.5) (4.5) (4.5) (2.5) (1.5) (3.25) (3.0) (2.25) (4.25) (4.5) (3.25)

CLAY

CLAY W/ FERROUS STAINS CLAY W/ SILT CLAY CLAY W/ SILT CLAY W/ FERROUS STAINS SILTY CLAY W/ FINE SAND CLAY W/ SILT SEAMS AND FERROUS NODULES

SILTY CLAY CLAY

B-6 200'

CLAY

SILTY CLAY W/ CLAY AND SAND POCKETS

CLAY W/ SILTY CLAY POCKETS

SILTY CLAY SILTY SAND W/ MICA CLAY SILTY CLAY W/ FINE SAND SILTY SILTY SAND CLAY W/ CLAY POCKETS AND MICA SILTY SAND W/ CLAY POCKETS AND MICA

LEGEND (SHEAR STRENGTH KSF)

TYPE OF SOIL

SPT (N)

BORING LOCATION MAJOR CONTOUR - 20' INTERVAL MINOR CONTOUR - 5' INTERVAL

CPT LEGEND Sensitive, Fine Grained Soils

Sands-Clean Sand to Silty Sand

Organic Soils, Peats

Gravelly Sand to Sand

Clays-Clay to Silty Clay

Very Stiff Clay to Clayey Sand

Silt Mixtures-Clay Silt to Silty Clay

Very Stiff Fine Grained Soils

Sand Mixtures-Silty Sand to Sandy Silt

©

FINAL

FLOW

MISSISSIPPI RIVER

EXISTING PIPELINE P&O SURVEY (11/08/1990)

115' B-4

PROPOSED TEMPORARY HDD EXIT WORKSPACE PROPOSED HDD EXIT POINT N. 730163.64854 E. 3325160.90701 LAT. N30° 30' 27.7557" LONG. W91° 11' 33.2712"

RAILR OAD TR AC

EXISTING PIPELINE FENSTERMAKER SURVEY (07/28/2016)

KS

MATCH LINE (SEE SHEET 1)

EXISTING PIPELINE U.L.S.I. SURVEY (08/18/1992)

PROPOSED TEMPORARY PRODUCT PIPE STRINGING AND FABRICATION WORKSPACE (50' X 2,565')

3,200 FT R. 100' 150' B-6

0

B-5

75' 200'

WB HWY 190

RAILROAD TRACKS

EB HWY 190

PROPOSED 16" HORIZONTAL DIRECTIONAL DRILL - 2,900'

WEST BATON ROUGE PARISH

EAST BATON ROUGE PARISH

AL CAN

P:\21\21669004\00\CAD\Mississippi River HDD\Drawings\Mississippi River HDD_DRAFT.dwg\TAB:SHEET 2 modified on Oct 18, 2016 - 8:33am

DATUM: HORIZONTAL: NAD83, LOUISIANA STATE PLANE, SOUTH ZONE, US FOOT VERTICAL: NAVD 88

©

LEGEND BORING LOCATION

FINAL

MAJOR CONTOUR - 20' INTERVAL MINOR CONTOUR - 5' INTERVAL

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas