The US Army Corps of Engineers, Omaha District, proposes to reissue Regional General Permit (RGP) 11-01 for activities associated with surface coal mining in the State of North Dakota that have been approved by the North Dakota Public Service Commission (PSC) under Title V of the Surface Mining Control and Reclamation Act of 1977 (SMCRA).

The US Army Corps of Engineers, Omaha District, proposes to reissue Regional General Permit (RGP) 11-01 for activities associated with surface coal mining in the State of North Dakota that have been approved by the North Dakota Public Service Commission (PSC) under Title V of the Surface Mining Control and Reclamation Act of 1977 (SMCRA).

Public Notice Subject:

Proposal to Reissue Regional General Permit 11-01 for Coal Mining in North Dakota

Action ID:

NWO-2011-2288-BIS (RGP 1101-01)

Comment Period: March 30, 2017 ­ May 1, 2017 INTRODUCTION: In accordance with regulations found at 33 CFR § 325.2(e) and 33 CFR § 325.5(c) published November 13, 1986, in the Federal Register, Volume 51, Number 219, the U.S. Army Corps of Engineers (USACE), Omaha District, proposes to reissue Regional General Permit (RGP) 11-01 for activities associated with surface coal mining in the State of North Dakota that have been approved by the North Dakota Public Service Commission (PSC) under Title V of the Surface Mining Control and Reclamation Act of 1977 (SMCRA). AUTHORITY: This RGP is being processed under the provisions of Section 404 of the Clean Water Act (33 USC 1344). The District Commander is authorized to use an alternative procedure for evaluating permit applications for categories of activities that are substantially similar and will cause only minimal individual or cumulative impacts OR to avoid the unnecessary duplication of regulatory control exercised by other government agencies for similar projects that will cause only minimal individual or cumulative impacts. PUBLIC NOTICE: This notice is to inform interested parties of the proposed reissuance and to solicit comments. It may also be viewed at the Corps web site at http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx. Written comments must be postmarked by May 1, 2017 to be considered in the evaluation of this proposal. APPLICANT:

Surface Coal Mining Companies conducting operations in North Dakota.

BACKGROUND INFORMATION: The USACE first implemented the Nationwide Permit (NWP) program in 1977. Every five years USACE reevaluates the NWPs during the reissuance process, and may modify an NWP to address concerns for the aquatic environment and ensure projects authorized result in no more than minimal individual and cumulative adverse environmental effects. In 1982, USACE issued NWP #21 to authorize surface coal mines that had been permitted under SMCRA. NWP #21 has been reissued in some form after each review since. During the 2012 reissuance process, USACE considered several options for NWP #21, including not reissuing. With the uncertainty of the outcome, Omaha District opted to pursue issuance of Regional General Permit 11-01. It has been used to authorize work at three of the active coal mines in the State since its issuance in August 2012. U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street Bismarck, ND 58504-6640 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx.

CENWO-OD-R-ND

Page 2

Action ID: NWO-2011-2288-BIS

During the 2017 reissuance process, USACE again considered several options for NWP #21, including not reissuing. USACE was also considering a policy of not allowing RGPs to be developed for surface coal mines, which would require all mines to undergo the rigors of the Standard Permit (SP) process. One surface coal mine has been authorized by an SP. On March 19, 2017 the NWPs were reissued, including NWP #21. The 2017 NWP #21 prohibits its use to authorize mountain top mining and `valley fills'; and limits permanent impacts to 0.5-acre of waters of the United States (WOUS), which can include up to 300 linear feet of stream. It also allows a waiver of stream length for ephemeral or intermittent streams, provided permanent impacts do not exceed the 0.5-acre limit. The NWP does not allow automatic reauthorization for areas that were initially authorized under the 2007 or 2012 NWPs. The NWPs will remain in effect until March 18, 2022. The USACE acknowledges that the most appropriate agency for regulating surface coal mines is the US Department of the Interior, Office of Surface Mining and Reclamation (OSM), which was established by the Surface Coal Mining and Reclamation Act of 1977 (SMCRA). The Act allows OSM to approve State programs to implement SMCRA regulations, if the State's program is consistent or more stringent than the Federal regulations. In North Dakota, the Public Service Commission (PSC) has implemented SMCRA since 1980. The PSC does an exceptional job in implementation of its rules. The process includes an environmental review of all lands within the mine area and requires inventories of wetlands, waterways, cultural resources, endangered species, hydrology, prime farmland and others, as well as comprehensive mining operation and reclamation plans. Surface mining in the State is an ongoing process of mining and reclamation, as the PSC typically allows no more than four overburden piles to exist at any time. Although it may take several years to completely reestablish surface waters, and they may not be reconstructed exactly as they existed prior to mining activities, the PSC does require bonding and implements a `no net loss' policy. PSC permits are revisited at mid-term or every five years, whichever is less, to ensure compliance with any changes in rules and/or regulations and has a strong compliance program. In addition, sedimentation ponds are one of the first features to be constructed on the landscape and one of the last to be reclaimed. Sedimentation ponds typically function as wetlands for many years before they are reclaimed, which appears would offset temporal wetland losses. JUSTIFICATION FOR RGP REISSUANCE PROPOSAL: Each mine area permitted by the PSC contains 1000s of acres of land, typically with a limited amount of jurisdictional WOUS. The mine plan may include permanent adverse impacts to WOUS; however, the majority of the impacts are temporary (albeit long-term temporary). The limits of the 2017 NWP #21 may be exceeded in some mine areas. The PSC requires reclamation that focuses, in part, on `no net loss' of water resources and maintaining water quality throughout the mining process. In addition, response to the Omaha District's public notice for the SP issued was limited; the conditions of the PSC permit were adopted as they were well written, enforceable, and addressed all aspects of the required evaluation; long-term temporary impacts were offset by the mine's construction of sedimentation ponds, which typically develop wetland characteristics quickly and are one of the last mine features to be reclaimed; all water resources are reconstructed and/or replaced in accordance with a comprehensive reclamation plan; and bonding is required to ensure completion and success of reclamation. There appears to be no clear advantage to the environment realized by requiring mining companies to go through the U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

CENWO-OD-R-ND

Page 3

Action ID: NWO-2011-2288-BIS

SP process. If issued, this RGP would avoid unnecessary duplication of regulatory control. Utilizing an RGP would not obviate the Omaha District's responsibility for compliance with other Federal laws, such as the National Historic Preservation Act or the Endangered Species Act. PROPOSAL: The RGP would authorize discharges of dredged or fill material into WOUS associated with surface coal mining and reclamation operations provided the activities are already authorized, or currently being processed as part of an integrated permit processing procedure, by the PSC. The permittee must submit a pre-construction notification to the Omaha District, North Dakota Regulatory Office (NDRO) and receive written authorization prior to commencing the activity. This RGP would not authorize significant, permanent adverse impacts. PROJECT LOCATION: The RGP would be applicable in all jurisdictional WOUS in the State of North Dakota, except peatlands. REVIEW PROCEDURES: Before any project would be considered under this RGP it must conform to the attached application procedures. Any authorization granted under this RGP would be subject to the attached conditions. Any activity the District Commander determines to have more than minimal adverse environmental effects, individually or cumulatively, or would be contrary to the public interest, may require an individual Department of the Army permit. SECTION 401 OF THE CLEAN WATER ACT (Water Quality Certification): The North Dakota Department of Health, Division of Water Quality, will review the proposed RGP for state water quality certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicants will not result in a violation of applicable water quality standards. If denied, individual water quality certification must be obtained for each mine area proposed to be authorized under this RGP prior to commencement or continuation of mine operations in the case of reauthorizations of current mining areas. The US Environmental Protection Agency, Region 8, is responsible for water quality certification on all Tribal lands. Region 8 will review the proposed RGP for certification. If denied, individual certification will be required for each mining area proposed to be authorized. ENDANGERED SPECIES ACT OF 1973 (ESA): Pursuant to the ESA, projects proposed under this RGP will be reviewed for effects on threatened and/or endangered species and their critical habitat on a case-by-case basis. If an individual activity proposed for authorization by this RGP may affect a species designated as threatened or endangered, or adversely affect critical habitat, the NDRO will consult with the US Fish and Wildlife Service prior to completing a permit determination. NATIONAL HISTORIC PRESERVATION ACT OF 1966 (NHPA): The NDRO will comply with the NHPA and amendments and procedures set forth in 33 CFR Part 325, Appendix C. Activities undertaken pursuant to this RGP will be reviewed individually in accordance with Section 106 of the NHPA. No activity which may affect historic properties listed, or eligible for listing, in the National Register of Historic Places, will be authorized by this RGP until the NDRO has complied with the provisions of Appendix C. U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

CENWO-OD-R-ND

Page 4

Action ID: NWO-2011-2288-BIS

SECTION 404(B)(1) GUIDELINES (Guidelines): These Guidelines are the substantive environmental criteria used in evaluating the discharges of dredged or fill material in waters of the United States under Section 404 of the Clean Water Act and are applicable to all 404 permit decisions. The purpose of these Guidelines is to restore and maintain the chemical, physical, and biological integrity of United States waters through the control of discharges of dredged or fill material. Fundamental to the Guidelines is an understanding that dredge or fill material should not be discharged into such waters unless it is demonstrated that such discharges would not have unacceptable adverse impacts either individually or in combination with existing and/or probable impacts of other activities affecting the environment. PUBLIC INTEREST REVIEW: The public interest review procedures call for weighing the benefits that reasonably may be expected to accrue. These are balanced against its reasonably foreseeable detriments and results in reaching a determination that expresses the public interest. Public interest factors include all factors which may be, or may become, relevant to this project, such as conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The decision whether to issue a permit is based on an evaluation of those factors and the probable impact, including cumulative impacts, and reflects the national concern for both the protection and utilization of important natural resources. SUBMITTING COMMENTS: Written comments, referencing Public Notice NWO-2011-2288BIS must be submitted to the office listed below on or before May 1, 2017. Toni Erhardt, Project Manager US Army Corps of Engineers, Omaha District North Dakota Regulatory Office Email: CENWO-OD-RND@usace.army.mil The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If the Corps determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. Please note that all comment letters received are subject to release to the public through the Freedom of Information Act. If you have questions or need additional information, please contact the applicant or the Corps' project manager Toni Erhardt at (701) 255-0015, extension 2003 or the above email. Request to Postmasters: Please post this notice in a conspicuous place until the expiration date specified at the top of page one.

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

CENWO-OD-R-ND

Page 5

Action ID: NWO-2011-2288-BIS

Notice to Editors: This notice is provided for your use in developing news stories only. No payment for publication will be provided. Attachments: Permit Conditions and Application Procedures

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

RGP 1101-01

PERMIT CONDITIONS

1. The activity must be authorized by the North Dakota Public Service Commission. 2. This RGP is not applicable to activities that involve impacts to peatlands. Definition: Peatlands are permanently or seasonally saturated and inundated wetlands where conditions inhibit organic matter decomposition and allow for the accumulation of peat. Under cool, anaerobic, and acidic conditions, the rate of organic matter accumulation exceeds organic decay. 3. This RGP does not authorize permanent impacts to WOUS associated with infrastructure, or other features, upgraded or constructed in the mine area that will remain on the landscape following reclamation and used for a purpose other than mining coal. Separate authorization is required. 4. No activity is authorized which is likely to jeopardize the continued existence of species, or their critical habitats, designated or proposed for designation as threatened or endangered pursuant to the Endangered Species Act of 1972. Individual applications will be reviewed and consulted on, as appropriate. The Permittee and the Permittee's employees, contractor(s), or any of the employees of contractor(s), shall report any threatened or endangered species in the active mine area to the North Dakota Regulatory Office, by email to CENWO-ODRND@usace.army.mil within 24 hours. 5. No activity is authorized that would adversely impact sites listed, or eligible for listing, on the National Register of Historic Places or the National Register of Natural Landmarks; or any other know historic, cultural or archaeological sites. The District Engineer will comply with the provisions of 33 CFR Part 325, Appendix C, pursuant to the National Historic Preservation Act of 1966. Individual applications will be consulted on, as appropriate. The Permittee and the Permittee's employees, contractor(s), or any of the employees of contractor(s), shall immediately cease work and report the discovery of subsurface features to the North Dakota Regulatory Office, by email to CENWO-OD-RND@usace.army.mil and the North Dakota Historical Society. If on Tribal property, notifications shall be made to the North Dakota Regulatory Office and applicable Tribal Historic Preservation Office. Work shall not resume until notified by the North Dakota Regulatory Office. 6. Adequate pipes shall be installed in temporary crossings to carry normal flows and prevent the restriction of expected high flows. 7. All erosion and sediment control practices shall be in place prior to any disturbance in the area and they shall remain in place and maintained until mining is completed and the area is stabilized. 8. The permittee shall be fully responsible for signage, fencing or other precautions necessary to discourage unauthorized access to the project site and promote public safety. 9. The Corps shall be notified, in writing, of any changes in the project design. No changes in design that impacts wetlands or any waterway shall be undertaken without Corps authorization. 10. The permittee agrees that it will prosecute the work authorized herein in a manner so as to minimize any degradation of water quality. 11. No activity or its operation may impair reserved Tribal rights, including treaty rights, protected tribal resources or tribal lands. 12. Activities in waters of the US that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.

RGP 1101-01

APPLICATION PROCEDURES

All interested parties proposing work under this Regional General Permit (RGP) are required to contact: US Army Corps of Engineers North Dakota Regulatory Office 1513 South 12th Street Bismarck, North Dakota 58504 (701) 255-0015 CENWO-OD-RND@usace.army.mil The following information is required: 1. Name and address of the Mine Company requesting authorization. Also include email address and telephone number of the person responsible for obtaining authorization and ensuring permit compliance. 2. A written legal description of the project location including section, township, range and county. 3. Names, addresses and telephone numbers of adjacent property owners. 4. An aquatic resource delineation for the mine area proposed to be authorized by this RGP. The delineation must meet the Minimum Standards for Acceptance of Aquatic Resources Delineation Reports established by the North Dakota Regulatory Office on 22 August 2016 (copy attached). 5. A copy of the most recent Cultural Resource Inventory Report for the mine area and any `effect' related communications with the North Dakota State Historic Preservation Office. 6. A copy of the most recent Threatened or Endangered Species or Critical Habitat inventories for the mine area and any `effect' related communications with the US Fish and Wildlife Service. 7. A written description of the proposed work, including: 1) purpose and need for the project, 2) construction sequence, 3) location, acreage and depth of sedimentation ponds proposed and how long they are expected to be in place, 3) general description of open pit (dimensions) and area typically mined through per month; 4) listing of aquatic resources permanently filled, dewatered, relocated and/or replaced `out of kind' (The list should include reference number consistent with the aquatic resource delineation required above; acreage and length for linear features; and if proposed to be replaced `out of kind', what type of aquatic resource is anticipated.); and 5) listing of aquatic resources temporarily impacted (including long-term), but reconstructed in place and `in kind' during reclamation. 8. A copy of the North Dakota Public Service Commission coal mining permit, including the wetland and waters final reclamation/restoration plan. Mitigation to offset impacts to wetlands and streams may be required. The North Dakota Regulatory Office will make a case-specific determination during the permit evaluation. No project may proceed until approval has been provided by the North Dakota Regulatory Office that the proposal meets the criteria of the RGP. For your information: This RGP is valid for five years. If work authorized has not been completed by the expiration date of the RGP, the permittee is responsible for contacting the North Dakota Regulatory Office at least 60 days prior to expiration to determine if the RGP is expected to be re-issued or some other type of authorization will be necessary. The permittee will be given six months from the expiration date of the RGP to complete the work, obtain necessary authorization to continue work, or cease work.

MINIMUM STANDARDS FOR ACCEPTANCE OF AQUATIC RESOURCES DELINEATION REPORTS U.S. ARMY CORPS OF ENGINEERS

BUILDING STRONG ®

MINIMUM STANDARDS FOR ACCEPTANCE OF AQUATIC RESOURCES DELINEATION REPORTS 22 August 2016 The U.S Army Corps of Engineers, through its Regulatory Program, regulates certain activities in waters of the United States. Waters of the United States are defined under 33 CFR Part 328. In order for the Corps to determine the amount and extent of waters of the United States at a site, aquatic resources must first be delineated in accordance with established regulatory standards, guidance and protocol, such as the 1987 Corps of Engineers Wetlands Delineation Manual and appropriate regional supplements. Before making any permit decision, the Corps is responsible for conducting or verifying the delineation and determining which of the aquatic resources have the potential to fall under federal jurisdiction. Due to limited staffing and resources, the North Dakota State Regulatory Office recommends permit applicants employ the services of individuals experienced in delineating aquatic resources. Permit applicants are encouraged early in the project planning stages to contact the Corps to determine what level of documentation is required for their project. A permit applicant should submit their aquatic resources delineation, along with a request for a preliminary or approved jurisdictional determination. Early consultation may help identify potential concerns and could result in a more prompt permit decision. The North Dakota Regulatory Office has established minimum standards for delineation reports to insure consistency and accuracy in aquatic resources delineations, which will minimize potential delays. The standards are based on years of experience conducting and verifying delineations, as well as the best practices of environmental consultants. Delineations submitted for verification must follow the standards, unless determined to not be practical on a case-by-case basis. The Corps may determine that a desktop delineation may be appropriate instead of a full field aquatic resource delineation. A desktop delineation includes analysis of an area using current and historical aerial photographs, NRCS Soils Mapping, and NWI maps. We will not accept desktop evaluations where the only reference is NWI maps. These are only to be used as a tool to determine the potential for wetlands on-site and should not replace the use of good aerial photography. Situations where adherence to the standards may not be practical include activities with small permanent or temporary impacts to aquatic resources (under 0.10 acre), applicants with limited financial resources, and emergencies. The ND State Office will notify the requestor for delineation submittals that do not contain enough information to accurately identify the limits of waters of the United States.

Page 2 of 4 An aquatic resources delineation report submitted to the North Dakota Regulatory Office must include the following: A cover letter requesting a jurisdictional determination. The letter must specify whether a preliminary or approved jurisdiction determination is requested. A signed statement from the property owner(s) allowing Corps personnel to enter the property and to collect samples during normal business hours. If the property is land-locked, the owner or proponent must obtain permission from the adjacent property owner(s) to provide access for Corps personnel. A statement that the delineation has been conducted in accordance with the 1987 Corps of Engineers Wetlands Delineation Manual and appropriate regional supplement(s). The regional supplement(s) used must be identified. For ordinary high water mark (OHWM) delineations, a statement identifying the use of the OHWM field guide must be included. Directions to the survey area, and the location of the Access Point of Entry. Contact information for the applicant(s), property owner(s), and agent(s). The total acreage of the survey area. Date(s) field work was completed. A site location map on a 7.5-minute USGS quadrangle. The map must provide the name of the USGS quadrangle, Section, Township, Range, and the latitude and longitude (in decimal degrees). A map of all delineated aquatic resources ("Aquatic Resources Delineation Map") showing the following: All aquatic resources delineated must be clearly shown on the map. Because only the Corps determines the regulatory status of each aquatic resource, the map must not include any labeling about jurisdiction. If the requestor believes one or more aquatic resources are not jurisdictional, the rationale should be included in the delineation report and the resource(s) should be identified on the map. At least one set of paired data points, documented in data forms, for each aquatic resource or complex. The paired data points must be located close to the delineated boundary. Additional data points may be necessary, depending on various factors including the size and shape of the aquatic resource, changes in vegetation communities, and slope. The location of all data points should be shown on the wetland delineation map.

U.S. ARMY CORPS OF ENGINEERS, North Dakota Regulatory Office 1513 S. 12th Street, Bismarck, ND 58504

http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

Page 3 of 4 A reference block that identifies the survey or project name, individual(s) who conducted the delineation, date of the map, and date(s) of any revisions. Digital data for the site, aquatic resource boundaries, and data point locations must be provided in a geographic information system (GIS) format, with ESRI Shape-files being the preferred format. Each GIS data file must be accompanied by a metadata file containing the appropriate geographic coordinate system, projection, and datum. If GIS data is unavailable or otherwise cannot be produced and the Corps determines a site visit is necessary, the aquatic resource boundaries must be physically marked with numbered flags or stakes before the North Dakota Regulatory Office can complete a delineation verification. A table listing all aquatic resources. The table will include the name of each aquatic resource, its Cowardin type, acreage, and location (latitude/longitude, in decimal degrees). For linear features, the table must show both acreage and linear feet. If remote sensing was used in the delineation, provide an explanation of how it was used and include the name, date and source of the tools used and copies of applicable maps/photographs. A narrative describing all aquatic resources at the site and an explanation for the mapped boundaries, especially for resources containing complex transition zones. If the site contains resources that meet one or two wetland criteria or do not exhibit a clear OHWM, describe the rationale for not delineating these features. Examples include erosional features, upland swales, and other upland areas that appear "wet" on satellite or aerial imagery. A description of existing field conditions. The field condition description may include current land use, flood/drought conditions, irrigation practices, and any characteristics considered atypical. A discussion of the hydrology at the site, including all known surface or subsurface sources, drainage gradients, surface water connections to the nearest traditional navigable waterway or interstate water, and any potential influence for manmade water sources, such as irrigation. The discussion should also identify the nearest "blue-line" waterway or other feature found on the most recent USGS map. A discussion of plant communities and habitat types present at the site and a list of the scientific name, common name, and wetland indicator status of all plants. Soil descriptions, soil map(s), and a discussion of hydric soils or soils with hydric inclusions at the site.

U.S. ARMY CORPS OF ENGINEERS, North Dakota Regulatory Office 1513 S. 12th Street, Bismarck, ND 58504

http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

Page 4 of 4 Any observed or documented interstate or foreign commerce associated with aquatic resources found on the site, specifically recreation or other use by interstate or foreign travelers, sale of fish or shellfish in interstate or foreign commerce, and use by industries operating in interstate or foreign commerce. A completed copy of the Aquatic Resources Excel spreadsheet must be submitted. For delineations that include greater than 25 separate waters, the spreadsheet will be required by the ND Regulatory Office. Completed data forms for each sample point including all essential information to make a decision. Often, additional information can expedite the verification of a delineation. Particularly helpful data includes site specific topographic maps, National Wetland Inventory (NWI), Light Detection and Ranging (LIDAR), satellite, aerial and ground photographs, floodplain maps, and related reports. More information regarding aquatic resource delineation, including reference materials, can be found on our website at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

U.S. ARMY CORPS OF ENGINEERS, North Dakota Regulatory Office 1513 S. 12th Street, Bismarck, ND 58504

http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas