The applicant proposes to discharge approximately 60,387 cubic yards of fill material to construct a permanent replacement dam and berm along 21,648 linear feet of the north and west shores of Buckeye Lake in order to bring the dam into compliance with current State of Ohio regulations and dam safety standards as part of the Phase II of the Buckeye Lake Dam Rehabilitation Project.
TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army Permit (DA) under the provisions of Section 404 of the Clean Water Act. This notice serves as the United States Army Corps of Engineers’ (Corps) request to the Ohio Environmental Protection Agency (OEPA) to act on the Section 401 Water Quality Certification for the following Application.
APPLICANT: Ohio Department of Natural Resources (ODNR)
2045 Morse Road, Building E-3
Columbus, Ohio 43229
LOCATION: As depicted on the attached Project Location Map (Sheet 1), the proposed project is located along the west and north banks of the earthen embankment dam structure of Buckeye Lake which extends from Liebs Island to Crane Lake in Walnut Township, Fairfield County and Union Township, Licking County, Ohio (39.905223° N, -82.528775° W).
PROJECT HISTORY: Buckeye Lake is part of the Ohio State Parks System and is managed and operated by the ODNR. The earthen embankment structure stretches approximately 4.1 miles along the north and west bank of Buckeye Lake and has a maximum height of about 15 feet. In March of 2015, it was determined that the Buckeye Lake Dam embankment did not meet dam safety standards and interim risk reduction measures (IRRM) were required to be implemented to mitigate the threat to public safety until a comprehensive repair or replacement of the dam could be completed.
In July of 2015, this office issued a Letter of Permission for emergency authorization to expedite the implementation of a structural IRRM. The structural IRRM consisted of an embankment stabilization berm and a seepage barrier within the lake bed at the winter season level against the upstream face of the entire 4.1-mile long earthen dam. This was considered to be Phase I of the Buckeye Lake Dam Rehabilitation project and resulted in the discharge of approximately 378,315 cubic yards of material below the ordinary high water mark or normal pool elevation of 891.75’ of the lake to improve the structural integrity of the existing dam.
The embankment stability berm stretches along 21,648 linear feet of shoreline along Buckeye Lake and served to stabilize the old dam structure and provide a construction platform. A gabion wall, consisting of 50 cubic yards of rock fill, was constructed along 130 linear feet of the left descending bank of Mingo Run to facilitate construction access. In December of 2016, the previously issued Letter of Permission was modified and the time limit for completing the IRRM was extended an additional year.
DESCRIPTION OF THE PROPOSED WORK: The applicant proposes to discharge approximately 60,387 cubic yards of fill material to construct a permanent replacement dam and berm along 21,648 linear feet of the north and west shores of Buckeye Lake in order to bring the dam into compliance with current State of Ohio regulations and dam safety standards as part of the Phase II of the Buckeye Lake Dam Rehabilitation Project. Fill material would consist of impervious berm material, rip-rap, steel sheet piling, and concrete, as well as placement of fill material for temporary access during construction. Typical design for the replacement dam would consist of rip-rap underlain with geotextile material discharged along the upstream face of the dam in order to armor the shoreline and protect it from wave action and ice scour. Turf would be established in the corridor between the existing soil mix cutoff wall and the rip-rap shoreline.
Areas that deviate from the typical design for the replacement dam and/or include additional proposed work are the Sellers Auxiliary Spillway, Sellers Point, AMIL Gate Spillway, Watkins Island, Crane Lake, and Mud Island. Portions of the existing embankment stability berm may be removed in the previously mentioned areas in favor of steel sheet piling.
Liebs Island would continue to be used as a laydown and staging area for equipment and materials during construction. In addition, fourteen turnarounds would be constructed to provide access and allow for movement of equipment during construction. Three of the fourteen constructed turnaround areas would remain following construction to enhance public access and recreational opportunities along the lake front, while the eleven remaining turnarounds would be removed.
The majority of the fill material discharged as part of the IRRM in Phase I would remain in place. A total of 429,126 cubic yards of fill material would be permanently discharged into Buckeye Lake as a result of the overall Buckeye Lake Dam Rehabilitation project (Phase I-complete and Phase II-proposed).
Plans of the work are attached to this notice (See Sheet 2: Key Plan Drawing and Sheet 3: Typical Cross Sections).
ALTERNATIVE ANALYSIS: A total of 26.6 acres of open water along 21,648 linear feet of Buckeye Lake would be permanently impacted as a result of the overall proposal. No additional wetlands or other special aquatic sites would be affected by the discharge of dredged and/or fill material. The applicant has submitted the required alternatives analysis. A complete copy of the applicant’s alternatives analysis can be reviewed by appointment at the above address. No permitwill be issued until the alternatives analysis demonstrates that upland alternatives are not available to achieve the project purpose.
AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the United States, consideration must be given to avoiding impacts on these sites. If waters of the United States cannot be avoided, then impacts must be minimized. Avoidance and minimization efforts were incorporated into the proposal to reduce the footprint of the proposed project. According to the applicant, alternative plans were considered. The proposed project impacts have been minimized to the fullest extent practicable. The minimization measures proposed specific erosion control measures to reduce runoff and to minimize direct and indirect impacts to surface waters. These erosion control measures would be implemented prior to construction, as well as inspected, maintained, and repaired (if necessary) during construction. Due to the design of the replacement dam structure, any future maintenance work on the structure would be able to be completed without additional impacts to Buckeye Lake. The applicant would be required to obtain stormwater permits and implement stormwater protection plans as needed for site construction following the requirements of the National Pollutant Discharge Elimination System (NPDES) program. Based on the application, the applicant has applied for the required NPDES permit from the OEPA.
COMPENSATORY MITIGATION PLAN: To compensate for the discharge of dredged and/or fill material into 26.6 acres of open water, the applicant proposes to construct three fish habitat enhancement structures along approximately 3,513 linear feet of shoreline. The habitat structures would be constructed by repurposing approximately 30,000 cubic yards of rip-rap and embankment stability berm materials, as well as excess materials used to facilitate the construction of the project. The fish habitat enhancements would cover a total area of 18.57 acres. The fish habitat enhancements along with the 21,648 linear feet of rip rap stone would provide functional fish habitat improvements along the majority of the 4.1 miles of the west and north banks of Buckeye Lake.
WATER QUALITY CERTIFICATION: A Section 401 Water Quality Certification is required for this project. It is the applicant’s responsibility to obtain certification from the OEPA. Based on the application, the applicant has applied to the OEPA for the required individual Section 401 Water Quality Certification.
HISTORIC AND CULTURAL RESOURCES: This project must be reviewed to determine any potential effect to properties that may be eligible for or listed on the National Register of Historic Places (NRHP), in accordance with Section 106 of the National Historic Preservation Act. A Phase I Archaeological Survey for the Buckeye Lake Dam Rehabilitation Project in Walnut Township, Fairfield County, and Union Township, Licking County, Ohio has been performed by Lawhon & Associates, Inc. on behalf of the applicant. Consultation with the Ohio State Historic Preservation Office is ongoing. A copy of this Public Notice will be furnished to the State Historic Preservation Office for their review and comment.
THREATENED & ENDANGERED SPECIES: The project is located within the known or historic range of the following threatened and endangered species: endangered Indiana bat(Myotis sodalis) and the threatened northern long-eared bat (Myotis septentrionalis). The Corps has consulted the most recently available information, and the applicant has agreed to implement
seasonal tree clearing as recommended by the United States Fish and Wildlife Service (USFWS), the project may affect, but is not likely to affect either the Indiana bat or the northern long-eared bat. Based on this information, the proposed project may affect, but is not likely to adversely affect the continued existence of any endangered species or threatened species, or result in the destruction or adverse modification of habitat of such species which has been determined to be critical. This Public Notice serves as a request for concurrence from the USFWS pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended) (USFWS Project Number: TAILS: 03E15000-2015-TA-1447 and TAILS: 03E15000-2015-CPA-1057).
PUBLIC INTEREST REVIEW AND COMMENT: This application will be reviewed in accordance with 33 CFR 320-332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow the guidelines published by the U.S. Environmental Protection Agency pursuant to Section 404(b)(1) of the Clean Water Act (40 CFR 230). The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit that reasonably may be expected to accrue from the proposals must be balanced against their reasonably foreseeable detriments. All factors that may be relevant to the proposals will be considered including the cumulative effects thereof; of those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, the Federal, state, and local agencies and officials, the Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements received in this office on or before the expiration date of this Public Noticewill become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.
CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one of this Public Notice. If no comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to:
United States Army Corps of Engineers
Huntington District
ATTN: CELRH-RD-N (Public Notice No. LRH-2013-257-MUS-Buckeye Lake)
502 Eighth Street
Huntington, West Virginia 25701-2070.
Please note, comments in response to this Public Notice become part of our administrative record and, as such, are available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our Nation's water resources. If you have any questions concerning this public notice, please contact Nicole Marisavljevic at the above address, by telephone at (330) 365-4273, or via email at nicole.marisavljevic@usace.army.mil.