Lancaster County Engineering Department (the applicant) is planning to install three structures within Little Salt Creek and its adjacent wetlands for a transportation improvement project. The proposed project includes the following: (1) Removal of the existing 23-foot, 8-inch by 50-foot deck steel girder bridge and replacing it with a 3-span, 140-foot by 32-foot continuous concrete slab bridge on a 0-degree skew, (2) Installation of a new quad, 48-inch by 70-foot culvert pipe structure on a 30-degree skew, left hand back, placed approximately 690 feet east of the new bridge, (3) Removal of the existing 24-inch by 58-foot roadway pipe and replacing it with a 30-inch by 74-foot round equivalent roadway pipe approximately 870 feet east of the new bridge. The existing 22-foot wide asphalt pavement on Raymond Road will be removed and the roadway embankment will be regraded to current Nebraska roadway design standards. The existing asphalt paving on Raymond road will be replaced with 24-foot wide pavement within 720 feet west of the bridge and 850 feet east of the bridge. Minor grading work will be required at the intersection of Raymond Road and North 1st Street. Permanent and temporary erosion control methods will be utilized during construction. The project is anticipated to take up to eight (8) months to complete, during which time the roadway is proposed to be closed to traffic. Throughout the duration of the roadway closure, a temporary detour will be provided.

Lancaster County Engineering Department (the applicant) is planning to install three structures within Little Salt Creek and its adjacent wetlands for a transportation improvement project. The proposed project includes the following: (1) Removal of the existing 23-foot, 8-inch by 50-foot deck steel girder bridge and replacing it with a 3-span, 140-foot by 32-foot continuous concrete slab bridge on a 0-degree skew, (2) Installation of a new quad, 48-inch by 70-foot culvert pipe structure on a 30-degree skew, left hand back, placed approximately 690 feet east of the new bridge, (3) Removal of the existing 24-inch by 58-foot roadway pipe and replacing it with a 30-inch by 74-foot round equivalent roadway pipe approximately 870 feet east of the new bridge. The existing 22-foot wide asphalt pavement on Raymond Road will be removed and the roadway embankment will be regraded to current Nebraska roadway design standards. The existing asphalt paving on Raymond road will be replaced with 24-foot wide pavement within 720 feet west of the bridge and 850 feet east of the bridge. Minor grading work will be required at the intersection of Raymond Road and North 1st Street. Permanent and temporary erosion control methods will be utilized during construction. The project is anticipated to take up to eight (8) months to complete, during which time the roadway is proposed to be closed to traffic. Throughout the duration of the roadway closure, a temporary detour will be provided.

PUBLIC NOTICE Application No: NWO-2010-01013-WEH Project Name: C005511415, BR-3370(20), Raymond East Applicant: Pamela Dingman-Lancaster County Engineering Waterway: Little Salt Creek and Adjacent Wetlands Issue Date: March 31, 2017 Expiration Date: April 21, 2017

21 DAY NOTICE Reply To: NEBRASKA REGULATORY OFFICE 8901 SOUTH 154TH STREET, SUITE 1, OMAHA, NEBRASKA 68138-3635 JOINT PUBLIC NOTICE: This public notice is issued jointly by the U.S. Army Corps of Engineers (USACE), Omaha District, and the Nebraska Department of Environmental Quality (NDEQ). The NDEQ will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The NDEQ hereby incorporates this public notice as its own public notice and procedures by reference thereto. For the purposes of the NDEQ, their public notice will expire 30 calendar days from the issue date shown above. AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344). APPLICANT: Pamela Dingman, Lancaster County Engineering Department, 444 Cherrycreek Road, Building C, Lincoln, Nebraska 68528 PROJECT LOCATION: West Raymond Road and North 1st Street; Section 3 and 34, Township 11 and 12 North, Range 6 East; Lancaster County, Nebraska; 40.95861° North, -96.72250° West. PROJECT DESCRIPTION: Lancaster County Engineering Department (the applicant) is planning to install three structures within Little Salt Creek and its adjacent wetlands for a transportation improvement project. The proposed project includes the following: (1) Removal of the existing 23-foot, 8-inch by 50-foot deck steel girder bridge and replacing it with a 3-span, 140-foot by 32-foot continuous concrete slab bridge on a 0-degree skew, (2) Installation of a new quad, 48-inch by 70-foot culvert pipe structure on a 30-degree skew, left hand back, placed approximately 690 feet east of the new bridge, (3) Removal of the existing 24-inch by 58-foot roadway pipe and replacing it with a 30-inch by 74-foot round equivalent roadway pipe approximately 870 feet east of the new bridge. The existing 22-foot wide asphalt pavement on Raymond Road will be removed and the roadway embankment will be regraded to current Nebraska roadway design standards. The existing asphalt paving on Raymond road will be replaced with 24-foot wide pavement within 720 feet west of the bridge and 850 feet east of the 1

bridge. Minor grading work will be required at the intersection of Raymond Road and North 1st Street. Permanent and temporary erosion control methods will be utilized during construction. The project is anticipated to take up to eight (8) months to complete, during which time the roadway is proposed to be closed to traffic. Throughout the duration of the roadway closure, a temporary detour will be provided. PROJECT PURPOSE: The applicant's project purpose is stated as follows: "The purpose of this project is to provide a safe and efficient vehicular crossing of Raymond Road over the Little Salt Creek waterway. The structural members of the existing bridge are deteriorated and are nearing the endo of their useful life. Raymond Road, at this location is subjected to frequent roadway overflow. Raymond Road at the existing bridge is also subject to significant `frost upheaval' during the winter months. The existing bridge has a sufficiency rating of 28.3, and is too narrow for the traffic volume it serves. The existing bridge rail is substandard." The basic project purpose, as defined by the USACE, is road construction. The overall project purpose, as defined by the USACE, is to provide a safe and efficient vehicular crossing of Raymond Road over the Little Salt Creek waterway, west of North 1st Street. SPECIAL AQUATIC SITES: The project will permanently impact approximately 1.136 acres of wetlands to include: 0.031 acre of PUB3B3i saline wetlands, 0.588 acre of PEM1F wetlands, 0.517 acre of PEM1C wetlands. The wetlands in the project review area are currently classified as Category I saline wetlands by the Resource Categorization of Nebraska's Eastern Saline Wetlands (1994). The wetland delineation, Cowardin classifications, Nebraska wetland subclasses and saline wetland category have not been verified by the USACE at this time. The wetland delineation will be reviewed further by the USACE during the permit evaluation process. AVOIDANCE, MINIMIZATION, AND MITIGATION: Aside from the applicants preferred alternative, the applicant provided a brief discussion of four alternatives considered for the project: (A) a no build (no action) alternative, (B) Horizontally re-aligning Raymond Road, (C) Construction of a longer bridge, (D) vertical alignment. The applicant described the following avoidance and minimization measures: The applicant has selected a bridge length which allows for the removal and construction of the new structure with little or no impact below the Ordinary High Water Mark (OHWM) of Little Salt Creek. The applicant has agreed to install four (4), 48-inch culverts to minimize the impact of the project on a downstream wetland. The applicant will not allow the installation of a low water crossing/work platform, will not allow work to be done at night and will not allow the use of machinery below the OHWM of Little Salt Creek. Proposed construction will be limited to that which is necessary to complete the project. Compensatory Mitigation: The applicant proposes to purchase wetland mitigation credits from the City of Lincoln's wetland mitigation bank (known as Warner Wetlands) located on North 2

98th Street, north of Highway #6. The USACE will determine if the proposed compensatory mitigation at City of Lincoln's mitigation bank is appropriate. A final mitigation plan completed in accordance with the 2008 Mitigation Rule and the Mitigation Guidelines for Nebraska's Eastern Saline Wetlands will be required to be submitted by the applicant and approved by the USACE prior to any permit issuance. CULTURAL RESOURCES: The USACE, Omaha District will comply with the National Historic Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We have checked the National Register of Historic Places, and any available site database information, and there are no known National Register sites in the vicinity. In consultation between the applicant and SHPO, the Nebraska State Historical Society responded with a letter dated September 6, 2012 stating that "...there will be no historic properties affected by the project as proposed." We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. ENDANGERED SPECIES: The project is within the known range of the threatened Northern Long-Eared Bat (Myotis septentrionalis) and final critical habitat of the endangered Salt Creek Tiger Beetle (Cicindela nevadica lincolniana). In compliance with the Endangered Species Act, a preliminary determination has been made that the described work may affect, but is not likely to adversely affect the Northern Long-Eared Bat, the Salt Creek Tiger Beetle or its critical habitat. A preliminary determination has been made that the described work will not affect the following species designated as threatened or endangered species: Interior Least Tern (Sterna antillarum), Piping Plover (Charadrius melodus), Pallid Sturgeon (Scaphirhynchus albus), Whooping Crane (Grus americana) and Western Prairie Fringed Orchid (Platanthera praeclara). In coordination between the applicant and Nebraska Game and Parks Commission (NGPC), the NGPC responded with a letter dated August 11, 2016 with a determination of "not likely to have an adverse effect on the state-listed Salt Creek Tiger Beetle, or Saltwort, and will have no effect on any other state-listed threatened or endangered species, provided the conditions in the letter to the applicant for NGPC, dated January 25, 2013 are adhered to. In coordination between the applicant and U.S. Fish and Wildlife Service (USFWS), the USFWS responded in a letter dated January 31, 2013 with a determination of, "We do not anticipate any impacts on federally listed species, or their critical habitat." In order to complete our evaluation of this activity, coordination with the U.S. Fish and Wildlife Service and other interested agencies will be completed to determine the effects on the above listed species and/or critical habitat. FLOODPLAIN: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341) requires that all discharges of fill material must be certified by the appropriate state agency as complying with applicable effluent limitations and water quality standards. The discharge must 3

be certified before a Department of the Army permit can be issued. Certification, if issued, expresses the State's opinion that the discharge will not violate applicable water quality standards. It is the responsibility of the applicant to contact Nebraska Department of Environmental Quality as soon as possible in the permitting process to discuss requirements for certification. Please contact: CWA Section 401 Coordinator Water Quality Division, Planning Unit Nebraska Department of Environmental Quality 1200 'N' Street, Suite 400 Lincoln, NE 68509-8922 Phone: 402.471.2875 Fax: 402.471.2909 E-mail: ndeq.401certification@nebraska.gov PUBLIC INTEREST REVIEW: The decision whether to issue the USACE permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed/completed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against their reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). COMMENTS: The USACE is soliciting comments from the public, Federal, State, and Local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity. Anyone whose interests may be affected by the proposed/completed work is invited to submit favorable or unfavorable written comments to the Nebraska Regulatory Office, 8901 South 154th Street, Suite 1, Omaha, NE 68138-3635. The District Engineer is particularly interested in 4

receiving comments related to the proposal's probable impacts on the affected aquatic system's functional values, cumulative and secondary effects and endangered species. All comments received will be considered public information; copies of all comments, including names and addresses of commenters, may be provided to the applicant unless confidentiality is requested. Comments must be submitted on or before the expiration date (located at the top of the first page) of this notice to be considered in the subsequent actions on this application. PUBLIC HEARING: Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state the reason(s) for holding a public hearing. If the District Engineer determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. ADDITIONAL INFORMATION: Additional information about this application may be obtained by writing to Mr. Drew Vlazny at the address shown on page one or by calling (402) 896-0896. You can also e-mail Andrew.J.Vlazny@usace.army.mil. REQUEST TO POSTMASTERS: Please post this notice conspicuously and continuously until the expiration date specified at the top of page one. NOTICE TO EDITORS: This notice is provided as background information for your use in formatting news stories. This notice is not a contract for classified display advertising.

5

LANCASTER COUNTY PLANS FOR CONSTRUCTION

INDEX (... ,.f SHEETS SHEET NO.

I 2· T 2· NI TO 2-Nl 2· L1 TO 2- L2

2- W 3-4 5 6-7 8

9·18 X- 1 TO X- 10

TITLE PAGE TYPICAl CROSS SECTION OF IMPROVEMENT GEhlRAL INFORMATION GEOM£ TRICS WETLANDS Pl.AN AND PROFILE DRAINAGE STRUCTURE CROSS SECTIONS SPECIAL PLAN 1- C, CONCRETE HEAOWAlL FOO OOAD 48" RCP SPECIAL PLAN 2·C, CONCRETE HEAOIAll FOR 30" CUP SPECIAL PLAN NO. 1 BRIDGE PLANS u STA. 158+ 70 CROSS SECTIONS

4

RAYMOND EAST

502-RI 740 743-RI 920· R6

921·R7 922-RIO 923-RI

C-55-C-91

I

t«I.

Cl»Hllll f«l.

· C114TRll l«J.

LANCASTER COUNTY

STA. 1SO+JD.O BEGIN PROJECT BEGIN CONSTRUCTION BEGIN 9" · 24' ASPHAL TIC

THE 2007 l(BRASU STOO~ SP(CIFI CATllJIS All> THE SPt:CIAL PllOVISllJIS APPLY TO THIS PROJECT.

·STA. 168·40.0 END PROJECT

END CONSTRUCTION

END 9"·2~ ' ASPHAL TIC CONCRETE, TYPE "SPR"

STANDARD PLANS 501·R6

SllET f().

Iii.. CU.TR!l

CONCR£T£, TYPE "SPR"

STAtlOARO PLAN NO.

PROJECT NO.

fi

i

fi

fi

"'~

...

"'~

;;;

!!;

!!;

...

C>

:z;

"'...

z :;

z

;;!

!!;

"'....

"'....

z

z

a

N

.."'~

~

"'....

~

DESIGN 0£SICllA11111 2019

'ltAR: ~1=999~ ADY: 1085 OOV:

R 6 E

DESCRIPTION II ASHl.00 RO 13 SHEETS! EROSION CONTROL 12 SHEETS! SILT FENCE DETAILS MIDWEST GUARDRAIL SYSTEM 8RIOOE APPROACH SECTION 14 SHEETS! GUARDRAIL DETAILS wL11ne SALT RO 13 SHEETS! TRAFFIC CONTROL, CONSTRUCTION AND MAINTENANCE 12 SHEETS! TRAFFIC CONTROL, CONSTRUCTION AND UAINTENAHCE TRAFFIC CONTROL FOR ASPHALT SURFACING W ACNEW RO TRAFFIC CONTROL ROAD CLOSURE

·

·

·

""-'--" ·

·

T= " D= _'I.

12

II

·

[(SIGN N.F.C

·

_, 13

·"

~

OTHER ARTERIAL

RIJIAL llAJIJI al.LECTlll

·

W ROCK CAEEK RO

IMK ON THIS PROJECT IN THE VI Cl NI TY CJ STATl lJI 158+70 AUTH(l!IZEO Pll!SUAHT TO THE C(H)I Tl 1J1S Sll PtUTED IN THE ARliY CO!P or ENGi llERS NATI ON Ml0£

II DAVEY RO

·

P£Rlll T IUll[R

·

II 8AANCHEO OAK RD

I·

36

··, 11 RAVt.IONO RD

lf:ETS Cl! EXCEEDS Ill NI llJll [(SJ GN STAICIARDS CJ THE BDAllD CJ POOi.iC ROADS CUSSlflCATIOI AICI STAN!AlmS FIJI NEI AICI AECIJISTRUCTED.

·

.,, ...,

"

···

IUCXXXIUCXXXIUCIUC

·a· 0 Q 0.

000

agneir ~ ssociates9 In.co

IZ

.' 13

·--+I

··

'3821

Iii'

·

· ·,.. ··,.

..

_ i_.

HEif CONTROLLED ACCESS PREVIOUS COHTROLLEO ACCESS

LIMITS

or

CllNSTRIJCTlON

PREVIOUS R.o.w. NEW R.o.w. ExlSTING PERMA!iEHT EASEMENT TEMPORARY EASEMENT EXCESS TAKING PERMANENT EASEMENT

.ili..ili. ...iL..

Ii

!Olm

R.O. W. LEGEND

.·

······ ··· ·

r

==::::===

!

ainellli r~

W MILL All

Ill WAVERI. V RO

GUARDRAIL TRAVELED WAY 011(£ C\A.YEIH POWER POLE TELEPHONE POLE MAILBOX RAILROAD TRACl

i

I '' ·

II

CONVENTIONAL SIGNS FEh'C£ R.a.w. !lll WIRE --><--

· ~ ll

31

Plans b y;

EXISTING RAILROAD EASEMENT NEii RAILROAD PE"MANENT EASEMENT NEW RAILROAO TEMPORARY EAS EMENT

1.;.;.;.;.;.;.;.;.;.;.;.1

V7ZZZZZ4I '· ·· · ····· r

,

k' .·,;t.* . +!

u:r.M1:cm:mm

REFERENCE POST r«l. EXCEPTIONS:

N/A

FROM STA.

TO R£FER£1([ POST Ill. NONE

TO STA.

NIA

_ _ _l_A_N_C_·_S_TE_R_ __

crunv

NONE

~»···-·.-..-.-.-..-.·w

l25MMXX& f!2·f1 ·;1·::-1; ·I

TOTAi. NEl LENGTH

(J

PROJECT:

o.m

lllLES

CllAlllWI IJ BOAllD

DATE

PROJECT NUMBER C-55-X-91

(

(

SHEET NO. 2- T

TYPICAL CROSS SECTION OF IMPROVEMENT j--~

18'-0"

NATURAL\ GROUND \

r

6' - 0"

I

12'-0"

12'-0"

LIMITS OF CONSTRUCTION

·1

6' - 0"

9" · 24' ASPHAL TIC CONCRETE PAVEMENT, TYPE "SPA"

o· ,z

..

0.02'/FT.

"':s

·... ·... ·. -

w

0.06'/FT,

SHALL CONFORM TO FILL SLOPE CRITERIA

STATION

··: ·..::.

TOP OF SUBGRAOE

SUBGRADE PREPARATION

PAVING

r

EOGE OF PAVEMENT

·:..·:.

9 1 -6°

12" CRUSHED ROCK FOUNDATION COURSE ·

TOP OF PAVEMENT BOTTOM OF PAVEMENT

EARTH SHOULDF.R CONSTRUCTION 1TYP. l

9'-6"

HALF CUT SECTION

AS INDICATED BY rH£ TYPICAL SECTION, EMBANKMENT WILL BE REQUIRED TO CONSTRUCT THE EARTH PORTION OF THE SHOULDER, THE CONTRACTOR SHALL FURNISH THE COHESIVE MATERIAL FROM SOURCES OUTSIDE THE PROJECT RIGHT OF WAY,

PROJECT 18'-0"

GRANULAR FILL

SECTION TO

150+30 159+90

STAT!.!lli

HALF FILL SECTION

2" CRUSHED ROCK

157+50 168+40

PERFORATED PIPE UNDERORAIN DETAIL

CEXCEPT AS SHOWN ON CROSS SECTIONS> CONCRETE PAVEMENT SHALL HAVE A LONGITUDINALLY TINED FINISH.

FURNISHING ANO PLACING THE 2" CRUSHED ROCK Will. BE INCLUDED IN THE ITEM "PERFORATED PIPE UNOERDRAIN".

157

160

i159

158

i

t-"--STA. 158·70 · ~ CHANNEL &

EXISTING CHANNEL ------.\ -

~

I

I

I

- - - --CHANNEL I SURVEY I BASELINE

I

------ --- .J. ---

.- C0+30

__ __ ___ __

j-

C0+50 SEC. LINE &. t. PROJECT

I

I

BERM ELEV.

~._, q

I

'{

(.) IUJ Vll/'I VI

CO+OO

I

I

"'....

I

t-STA. 158+ 00.00 ~ ABUT. NO. 1

- 1 I

I

ELEV. = 1168.0

I

I

I

·-I

\. -

I

I

\

I

I"

FOR INFORMATION ONLY EXC, = Xl

STA. 159+40 '- ABUT. NO. 2

.I

=.....1171.0 I I

t BRIDGE

-,_/ I

'/

.

18'- 0".0.

. 1/-l_/o·

43' - 0"A

43' - 0"6

9' - 0".0.

9'-0"A

PROPOSED~ I

18'-011 1:1

C1+45

CHANNEL

I;-

I

.

C1+75

I

L

C2+00

CHANNEL LAYOUT SCALE 1"

TYPICAL CHANNEL SECTION

= 30'

.o. - MEASURED PERPENDICULAR TO CHANNEL SURVEY BASELINE · - MEASURED ALONG CHANNEL SURVEY BASELINE LIMITS OF GRADING THROUGH THE BRIDGE WHICH SHALL BE DONE BY THE GRADING CONTRACTOR BEFORE THE BRIDGE IS BUILT. 1· 70' LT. TO ·75' RT.I

CHANNEL EXCAVATION SHALL BE INCLUDED IN THE ITEM "EARTHWORK MEASURED IN EMBANKMENT", SEE CHANNEL CROSS SECTIONS AND BRIDGE PLANS FOR ADDITIONAL DETAILS.

(

PROJECT NUMBER C-55-C-91

~~©. $3~-1'!l~m~1-oocm~

150

STA. 150·30 TO STA. 158·45.17 REMOVE 1940 SO. VOS. OF ASPHALT SURF ACING.

STA. 150·30 TO STA, 157+50 BUILD 1,920 SO. VOS. OF 9" ASPHAL TIC CONCRETE TYP£ "SPA".

TRACT NO. 1 STA. 154+00, LT. 18"·34' CORA. METAL DR. PIPE. REMOVE LAY 24"· 36' CORRUGATED METAL DRIVEllAY CULVERT PIPE ANO BUILD EAllTH DRIVE 124' WIDE I ON A -6.0'I. GAA!lf FOR 6' THEN ON A -11.4'/. GRADE,

STA. 158·70 BUILD GUAllORAll PROTECTION. 4-llRIDGE APPROAC.H SECTION 4-ENO TREATMENT, TYPE II STANDARD Pl.AN NO, HO ANO 743,

STA, 158·70 BUILD 3·SPAN 140'·0" CONTINUOUS CONCRETE SLAB BRIOGE ON fl o· SKEW 1- 56'·0" AND 2·42'·0" SPANS, 32' CLEAR RDAOtfAY. SPECIAL PLAN NO. I

SECTION LINE & PflOJECT

l

LIMITS OF CONSTRUCTION

-====e:==~«=,r---

OP

- OP LlllJTS

ar

3

160

155 LOT 36 l.T. THE NATURE CONSERVANCY TEMP, EASE. · O. IO ACRES

NESAASKA

STA. 160+37, LT. 24" · 21' CORR. METAL OR. PIPE. REMOVE.

STA, 161·00. LT. z BUILD EARTH DRI VE 124' lllDEI ON A · 6,0'/. CRADE FOR 6' THEN ~ ~ LO_N_A_-_10 _.;.;0_lL_ G_R_ADE_._ _ _ __.

.-

- + - - --~-0-- - - ~-~------"-- - - OP

'l'JDP -

-

STA, 159+40 TO STA 163t00, 12' LT. BUILD 360 LIN. FT. OF 4" PERFORATED PIPE UNOERORAIN.

PAST

l EXISTING ROADllAY

-~------r-

0 1' -J..----"'I."-""----~--~

PAST

CONS TRUCTIOH

or

'- g

STA. 152·00 TO STA I S9·00, 12' LT. BUILD 600 LIN. FT, OF 4" PERFORA TEO PIPE UNDERORAIH,

TIES1

SHEET NO.

,'.

lV

PAST

O·

STA, 140+58. It. Al.UNINUM CAP S ~ CORNER, SEC. 34-Tt2ff-ASE ~E 34. 9' TO '~" REBAR HE 15.l' TO REBAR St 91. 4' TO " REBAll S 50.2' TO " REBAR SW 63.3 TO " REBAR NW H.4' TO " REBAR

I'

QO

STA. 152+00 TO STA 158·00, 12' RT. BUILD 600 LIN, FT, Of 4" PERFORATED PIPE U/olDERORAIH, TEMP, EASE. STA. 193·43,60, 2. TO' LT., ALUMINUM CM' S ~ CORNER, SEC. 35· Tl2N-R6N N 49.9' TO 1" IRON PIPE NE 19,!I' TO %" REBAR SE 68.3' TO %" AEBAll s so.o· TO I" IRON PIPE SI 70. 0 TO %" REBAR NI 64, I' TO %" REBAR

TRACT NO. 2 LOT I, HAWK'S POINT ERIC PAVEY TEUP. EASE. · 0,24 ACllES

STA, 158+l0. 23 1~SPAN 50' STEEL GIRDER BRIDGE W/ CONC. DECK. 25' CLEAR ROADWAY, REMOVE,

"'

STA. 158+70.23 REMOVE 345 LIN. FT. Of W-BEAM GUARDRAIL.

STA, 159+40 TO STA 163·00, 12' RT. BUILD 360 LIN, FT, DF 4" PERFORA TED PIPE UNbERDRAIN.

STA, 158+95.94 10 STA. 163+00.00 REMOVE 951 SO. VOS, QF ASl'llAL T SURF ACING. STA. IS9+9D TO STA, 163·00 OUILO 827 YOS. 9" ASPHALTIC CONCRETE TYPE " SPA",

so.

or

TRACT NO. 3 OUTLOT A, HAlfX'S POINT THOMAS O. & LOIUSE PAVEY TEMP, EASE. · 0, 10 ACRES

1220

1220

1210

1210

1200

1200

1190

1190

1180

118()

mo

1170

1160

1160

1150

1150

~ . ~~ - 'ii''il~IM - !Ri®~

SU, 165+00, 12' l T. TD 38' LT, BUILD 26 WI. FT. OF 4" NON·PE RFDfl ATEO PIPE UNDE RORAIN,

SllEET NO. 4

170

165

STA, 163+00 TO STA 165+00, 12' LT, BUILD 200 LIN. FT, OF 4" PERFORATED PIPE Ut.'DERDRAIN.

PROJECT NUMBER C-55 - C- 91

~ ~© . $~- 'ii'il~IM - lffi®~

STA. 165·60 DUILO OU40 48'x57' ELLIPTICAL REINFORCED CONCRETE PIPE ON A 30" SKEW ILllOI WITH CONC RE TE HEAOllAllS. SEE SPECIAL PLAN 1- C ANO SHEET 5 FOR DETAILS. CONCRETE = 21.8 CU. YDS, STEEL · 1,848 LOS. EXC. = 372 CU, 'lllS. FILL = 3',

STA. 167+38 24" · 59' REINF, CONC. l'IPE WI FLARED END SECTION ON NORTH SIDE. REMOVE.

33'

BUILD JO' ·83' ROUND EQUIVALENT COORUOATEO METAL PIPE ON A o· SKE W WITH A COlfCRETE HEADWALL ON THE llM T, SEE SPECIAL PLAN 2· C AND SHEET 5 FOR DETAILS. CONCRETE · 1. 4 CU. YOS, STEEL · 186 L85, £XC. = IS CU. YOS. fil l = 3'.

n·

PAST

PAST

SECTION LINE & ~ PROJECT

0

"'...,.... "'

SECTION LINE & ( PROJECT

LIMITS OF CONSTRUCTION

. / - - - - ----.,4 - - - -

l EXISTING ROADWAY

-r----- - --- --------

,4--~--

+--- - - - - - - - - - - - - - - - -- - -

- - -- .ti---- -

-----~ - - - - - -?- 1 --

TIES1

- - - -,·OP -- -

OP -

LIMITS OF COHSlRUCTION

- - Of1

.... 'if

.

STA, 163+00 TO STA 165·00, 12' RT, BUILD 200 LIN. FT. OF 4" PERFORATED PIPE lMDERDRAIN,

STA, 193+43,60, 2. TO' LT., ALUMINUM S ~ CORNER, SEC. 35-Tl2N-R6'l N 49,9' TO I" IRON PIPE NE 19.5' TO %" REBAR $E 68,3' TO %" REBAR S ~.O' TD I" IRON PIPE SW TO.O TO %" REBAR NW 64, I' TO %" FIEBAR

· O· ·0

PAST

STA, 140+59, II, ALUMINUM CAP S \4 CORHER, SEC, 34- Tl2H-R6£ lflE 34,9' TOf" REBAR NE es. 7' TO ,, REBAR SE 98.4' TO " REBAR S 50,2' TO " REBAR Sii 63.3 m REBAR NW 66,4' TO " REBAR STA, 167+03.45, ALUMINUM CAP SE COffNER. SEC, 34-T12N·Rt£ N 95,9· TO ~· REBAA NE 64. 7' TO " REBAR ESE es.e· TO " REBAR SSE 99.9' TO I" IRllN Pll>l S 122.5 TO %" REBAR SSW 99.9' TO 1" IRON PIPE NW !OD. I' TO 1" IRON PIPE

OP

STA. 165+00, 12' RT. TC 38' RT. BUILD 26 LIN, FT. or 4" NON- PERFORATED PIPE UNCERDRAIN.

33'

STA. 18T·02.K BUILD 4 WAY INTERSECTION. R=50'. SEE SHEET 2·L2 FOR DETAILS.

STA, 163·00 TD STA, 168+40 REMOVE 1, 774 SO, YQS, OF ASPHALTIC SURFACING !INCLUDES INTERSECTIONI,

OP

-

<1--- -

OP

-r---- --

~ ·------- ----- -

(Jf

.. O·

PAST

e' STA. 163·00 TO STA. 16~ : 4 0 BUILD 1,~40 SO. YDS. OF 9" ASPHAL TIC CONCRET~ , TYPE "SPR". CODES NOT INCLUDE INTERSECTIONI.

1220

1220

1210

1210

1200

1200

1190

1190

1180

UBO

1170

1170

1160

1160

1150

1150

w

z

_.

:::c u

1-

F'EBT

I

METERS.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas