You can copy from here when filling out the rest of the page.
Lancaster County Engineering Department (the applicant) is planning to install three structures within Little Salt Creek and its adjacent wetlands for a transportation improvement project. The proposed project includes the following: (1) Removal of the existing 23-foot, 8-inch by 50-foot deck steel girder bridge and replacing it with a 3-span, 140-foot by 32-foot continuous concrete slab bridge on a 0-degree skew, (2) Installation of a new quad, 48-inch by 70-foot culvert pipe structure on a 30-degree skew, left hand back, placed approximately 690 feet east of the new bridge, (3) Removal of the existing 24-inch by 58-foot roadway pipe and replacing it with a 30-inch by 74-foot round equivalent roadway pipe approximately 870 feet east of the new bridge. The existing 22-foot wide asphalt pavement on Raymond Road will be removed and the roadway embankment will be regraded to current Nebraska roadway design standards. The existing asphalt paving on Raymond road will be replaced with 24-foot wide pavement within 720 feet west of the bridge and 850 feet east of the bridge. Minor grading work will be required at the intersection of Raymond Road and North 1st Street. Permanent and temporary erosion control methods will be utilized during construction. The project is anticipated to take up to eight (8) months to complete, during which time the roadway is proposed to be closed to traffic. Throughout the duration of the roadway closure, a temporary detour will be provided.
Lancaster County Engineering Department (the applicant) is planning to install three structures within Little Salt Creek and its adjacent wetlands for a transportation improvement project. The proposed project includes the following: (1) Removal of the existing 23-foot, 8-inch by 50-foot deck steel girder bridge and replacing it with a 3-span, 140-foot by 32-foot continuous concrete slab bridge on a 0-degree skew, (2) Installation of a new quad, 48-inch by 70-foot culvert pipe structure on a 30-degree skew, left hand back, placed approximately 690 feet east of the new bridge, (3) Removal of the existing 24-inch by 58-foot roadway pipe and replacing it with a 30-inch by 74-foot round equivalent roadway pipe approximately 870 feet east of the new bridge. The existing 22-foot wide asphalt pavement on Raymond Road will be removed and the roadway embankment will be regraded to current Nebraska roadway design standards. The existing asphalt paving on Raymond road will be replaced with 24-foot wide pavement within 720 feet west of the bridge and 850 feet east of the bridge. Minor grading work will be required at the intersection of Raymond Road and North 1st Street. Permanent and temporary erosion control methods will be utilized during construction. The project is anticipated to take up to eight (8) months to complete, during which time the roadway is proposed to be closed to traffic. Throughout the duration of the roadway closure, a temporary detour will be provided.
PUBLIC NOTICE
Application No: NWO-2010-01013-WEH
Project Name: C005511415, BR-3370(20), Raymond East
Applicant: Pamela Dingman-Lancaster County Engineering
Waterway: Little Salt Creek and Adjacent Wetlands
Issue Date: March 31, 2017
Expiration Date: April 21, 2017
21 DAY NOTICE
Reply To:
NEBRASKA REGULATORY OFFICE
8901 SOUTH 154TH STREET, SUITE 1, OMAHA, NEBRASKA 68138-3635
JOINT PUBLIC NOTICE: This public notice is issued jointly by the U.S. Army Corps of
Engineers (USACE), Omaha District, and the Nebraska Department of Environmental Quality
(NDEQ). The NDEQ will review the proposed project for state certification in accordance with
the provisions of Section 401 of the Clean Water Act. The NDEQ hereby incorporates this
public notice as its own public notice and procedures by reference thereto. For the purposes of
the NDEQ, their public notice will expire 30 calendar days from the issue date shown above.
AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344).
APPLICANT: Pamela Dingman, Lancaster County Engineering Department, 444 Cherrycreek
Road, Building C, Lincoln, Nebraska 68528
PROJECT LOCATION: West Raymond Road and North 1st Street; Section 3 and 34, Township
11 and 12 North, Range 6 East; Lancaster County, Nebraska; 40.95861° North, -96.72250° West.
PROJECT DESCRIPTION: Lancaster County Engineering Department (the applicant) is
planning to install three structures within Little Salt Creek and its adjacent wetlands for a
transportation improvement project. The proposed project includes the following: (1) Removal of
the existing 23-foot, 8-inch by 50-foot deck steel girder bridge and replacing it with a 3-span,
140-foot by 32-foot continuous concrete slab bridge on a 0-degree skew, (2) Installation of a new
quad, 48-inch by 70-foot culvert pipe structure on a 30-degree skew, left hand back, placed
approximately 690 feet east of the new bridge, (3) Removal of the existing 24-inch by 58-foot
roadway pipe and replacing it with a 30-inch by 74-foot round equivalent roadway pipe
approximately 870 feet east of the new bridge. The existing 22-foot wide asphalt pavement on
Raymond Road will be removed and the roadway embankment will be regraded to current
Nebraska roadway design standards. The existing asphalt paving on Raymond road will be
replaced with 24-foot wide pavement within 720 feet west of the bridge and 850 feet east of the
1
bridge. Minor grading work will be required at the intersection of Raymond Road and North 1st
Street. Permanent and temporary erosion control methods will be utilized during construction.
The project is anticipated to take up to eight (8) months to complete, during which time the
roadway is proposed to be closed to traffic. Throughout the duration of the roadway closure, a
temporary detour will be provided.
PROJECT PURPOSE: The applicant's project purpose is stated as follows: "The purpose of
this project is to provide a safe and efficient vehicular crossing of Raymond Road over the Little
Salt Creek waterway. The structural members of the existing bridge are deteriorated and are
nearing the endo of their useful life. Raymond Road, at this location is subjected to frequent
roadway overflow. Raymond Road at the existing bridge is also subject to significant `frost
upheaval' during the winter months. The existing bridge has a sufficiency rating of 28.3, and is
too narrow for the traffic volume it serves. The existing bridge rail is substandard."
The basic project purpose, as defined by the USACE, is road construction.
The overall project purpose, as defined by the USACE, is to provide a safe and efficient vehicular
crossing of Raymond Road over the Little Salt Creek waterway, west of North 1st Street.
SPECIAL AQUATIC SITES: The project will permanently impact approximately 1.136 acres
of wetlands to include: 0.031 acre of PUB3B3i saline wetlands, 0.588 acre of PEM1F wetlands,
0.517 acre of PEM1C wetlands. The wetlands in the project review area are currently classified
as Category I saline wetlands by the Resource Categorization of Nebraska's Eastern Saline
Wetlands (1994). The wetland delineation, Cowardin classifications, Nebraska wetland
subclasses and saline wetland category have not been verified by the USACE at this time. The
wetland delineation will be reviewed further by the USACE during the permit evaluation
process.
AVOIDANCE, MINIMIZATION, AND MITIGATION: Aside from the applicants preferred
alternative, the applicant provided a brief discussion of four alternatives considered for the
project: (A) a no build (no action) alternative, (B) Horizontally re-aligning Raymond Road,
(C) Construction of a longer bridge, (D) vertical alignment.
The applicant described the following avoidance and minimization measures: The applicant has
selected a bridge length which allows for the removal and construction of the new structure with
little or no impact below the Ordinary High Water Mark (OHWM) of Little Salt Creek. The
applicant has agreed to install four (4), 48-inch culverts to minimize the impact of the project on
a downstream wetland. The applicant will not allow the installation of a low water crossing/work
platform, will not allow work to be done at night and will not allow the use of machinery below
the OHWM of Little Salt Creek. Proposed construction will be limited to that which is necessary
to complete the project.
Compensatory Mitigation: The applicant proposes to purchase wetland mitigation credits from
the City of Lincoln's wetland mitigation bank (known as Warner Wetlands) located on North
2
98th Street, north of Highway #6. The USACE will determine if the proposed compensatory
mitigation at City of Lincoln's mitigation bank is appropriate. A final mitigation plan completed
in accordance with the 2008 Mitigation Rule and the Mitigation Guidelines for Nebraska's
Eastern Saline Wetlands will be required to be submitted by the applicant and approved by the
USACE prior to any permit issuance.
CULTURAL RESOURCES: The USACE, Omaha District will comply with the National
Historic Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325,
Appendix C. We have checked the National Register of Historic Places, and any available site
database information, and there are no known National Register sites in the vicinity. In
consultation between the applicant and SHPO, the Nebraska State Historical Society responded
with a letter dated September 6, 2012 stating that "...there will be no historic properties affected
by the project as proposed." We will evaluate input by the State Historic Preservation Office,
Tribes, and the public in response to this public notice, and we may conduct or require a survey
of the permit area to check for unknown historic or prehistoric properties, if warranted.
ENDANGERED SPECIES: The project is within the known range of the threatened Northern
Long-Eared Bat (Myotis septentrionalis) and final critical habitat of the endangered Salt Creek
Tiger Beetle (Cicindela nevadica lincolniana). In compliance with the Endangered Species Act,
a preliminary determination has been made that the described work may affect, but is not likely
to adversely affect the Northern Long-Eared Bat, the Salt Creek Tiger Beetle or its critical
habitat. A preliminary determination has been made that the described work will not affect the
following species designated as threatened or endangered species: Interior Least Tern (Sterna
antillarum), Piping Plover (Charadrius melodus), Pallid Sturgeon (Scaphirhynchus albus),
Whooping Crane (Grus americana) and Western Prairie Fringed Orchid (Platanthera
praeclara). In coordination between the applicant and Nebraska Game and Parks Commission
(NGPC), the NGPC responded with a letter dated August 11, 2016 with a determination of "not
likely to have an adverse effect on the state-listed Salt Creek Tiger Beetle, or Saltwort, and will
have no effect on any other state-listed threatened or endangered species, provided the conditions
in the letter to the applicant for NGPC, dated January 25, 2013 are adhered to. In coordination
between the applicant and U.S. Fish and Wildlife Service (USFWS), the USFWS responded in a
letter dated January 31, 2013 with a determination of, "We do not anticipate any impacts on
federally listed species, or their critical habitat." In order to complete our evaluation of this
activity, coordination with the U.S. Fish and Wildlife Service and other interested agencies will
be completed to determine the effects on the above listed species and/or critical habitat.
FLOODPLAIN: This activity is being reviewed in accordance with Executive Order 11988,
Floodplain Management, which discourages direct or indirect support of floodplain development
whenever there is a practicable alternative. By this notice, comments are requested from
individuals and agencies that believe the described work will adversely impact the floodplain.
WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341)
requires that all discharges of fill material must be certified by the appropriate state agency as
complying with applicable effluent limitations and water quality standards. The discharge must
3
be certified before a Department of the Army permit can be issued. Certification, if issued,
expresses the State's opinion that the discharge will not violate applicable water quality
standards. It is the responsibility of the applicant to contact Nebraska Department of
Environmental Quality as soon as possible in the permitting process to discuss
requirements for certification. Please contact:
CWA Section 401 Coordinator
Water Quality Division, Planning Unit
Nebraska Department of Environmental Quality
1200 'N' Street, Suite 400
Lincoln, NE 68509-8922
Phone: 402.471.2875
Fax: 402.471.2909
E-mail: ndeq.401certification@nebraska.gov
PUBLIC INTEREST REVIEW: The decision whether to issue the USACE permit will be
based on an evaluation of the probable impacts including cumulative impacts of the
proposed/completed activity on the public interest. That decision will reflect the national concern
for both protection and utilization of important resources. The benefits, which reasonably may be
expected to accrue from the proposal, must be balanced against their reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply
and conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people. In
addition, the evaluation of the impact of the work on the public interest will include application
of the guidelines promulgated by the Administrator, Environmental Protection Agency, under
authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230).
COMMENTS: The USACE is soliciting comments from the public, Federal, State, and Local
agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate
the impacts of this activity. Any comments received will be considered by the USACE to
determine whether to issue, modify, condition or deny a permit for this project. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
activity.
Anyone whose interests may be affected by the proposed/completed work is invited to submit
favorable or unfavorable written comments to the Nebraska Regulatory Office, 8901 South 154th
Street, Suite 1, Omaha, NE 68138-3635. The District Engineer is particularly interested in
4
receiving comments related to the proposal's probable impacts on the affected aquatic system's
functional values, cumulative and secondary effects and endangered species. All comments
received will be considered public information; copies of all comments, including names and
addresses of commenters, may be provided to the applicant unless confidentiality is requested.
Comments must be submitted on or before the expiration date (located at the top of the first
page) of this notice to be considered in the subsequent actions on this application.
PUBLIC HEARING: Before the expiration date of this notice, anyone may request, in writing,
that a public hearing be held to consider this application. Requests shall specifically state the
reason(s) for holding a public hearing. If the District Engineer determines that the information
received in response to this notice is inadequate for thorough evaluation, a public hearing may be
warranted. If a public hearing is warranted, interested parties will be notified of the time, date,
and location.
ADDITIONAL INFORMATION: Additional information about this application may be
obtained by writing to Mr. Drew Vlazny at the address shown on page one or by calling (402)
896-0896. You can also e-mail Andrew.J.Vlazny@usace.army.mil.
REQUEST TO POSTMASTERS: Please post this notice conspicuously and continuously
until the expiration date specified at the top of page one.
NOTICE TO EDITORS: This notice is provided as background information for your use in
formatting news stories. This notice is not a contract for classified display advertising.
5
LANCASTER COUNTY
PLANS FOR CONSTRUCTION
INDEX (... ,.f SHEETS
SHEET NO.
I
2· T
2· NI TO 2-Nl
2· L1 TO 2- L2
2- W
3-4
5
6-7
8
9·18
X- 1 TO X- 10
TITLE PAGE
TYPICAl CROSS SECTION OF IMPROVEMENT
GEhlRAL INFORMATION
GEOM£ TRICS
WETLANDS
Pl.AN AND PROFILE
DRAINAGE STRUCTURE CROSS SECTIONS
SPECIAL PLAN 1- C, CONCRETE HEAOWAlL FOO OOAD 48" RCP
SPECIAL PLAN 2·C, CONCRETE HEAOIAll FOR 30" CUP
SPECIAL PLAN NO. 1 BRIDGE PLANS u STA. 158+ 70
CROSS SECTIONS
4
RAYMOND EAST
502-RI
740
743-RI
920· R6
921·R7
922-RIO
923-RI
C-55-C-91
I
t«I.
Cl»Hllll f«l.
· C114TRll l«J.
LANCASTER COUNTY
STA. 1SO+JD.O
BEGIN PROJECT
BEGIN CONSTRUCTION
BEGIN 9" · 24' ASPHAL TIC
THE 2007 l(BRASU STOO~ SP(CIFI CATllJIS All>
THE SPt:CIAL PllOVISllJIS APPLY TO THIS PROJECT.
·STA. 168·40.0
END PROJECT
END CONSTRUCTION
END 9"·2~ ' ASPHAL TIC
CONCRETE, TYPE "SPR"
STANDARD PLANS
501·R6
SllET f().
Iii.. CU.TR!l
CONCR£T£, TYPE "SPR"
STAtlOARO PLAN NO.
PROJECT NO.
fi
i
fi
fi
"'~
...
"'~
;;;
!!;
!!;
...
C>
:z;
"'...
z
:;
z
;;!
!!;
"'....
"'....
z
z
a
N
.."'~
~
"'....
~
DESIGN 0£SICllA11111
2019
'ltAR: ~1=999~
ADY:
1085
OOV:
R 6 E
DESCRIPTION
II ASHl.00 RO
13 SHEETS! EROSION CONTROL
12 SHEETS! SILT FENCE DETAILS
MIDWEST GUARDRAIL SYSTEM 8RIOOE APPROACH SECTION
14 SHEETS! GUARDRAIL DETAILS
wL11ne SALT RO
13 SHEETS! TRAFFIC CONTROL, CONSTRUCTION AND MAINTENANCE
12 SHEETS! TRAFFIC CONTROL, CONSTRUCTION AND UAINTENAHCE
TRAFFIC CONTROL FOR ASPHALT SURFACING
W ACNEW RO
TRAFFIC CONTROL ROAD CLOSURE
·
·
·
""-'--"
·
·
T=
"
D= _'I.
12
II
·
[(SIGN
N.F.C
·
_,
13
·"
~
OTHER ARTERIAL
RIJIAL llAJIJI al.LECTlll
·
W ROCK CAEEK RO
IMK ON THIS PROJECT IN THE VI Cl NI TY
CJ STATl lJI 158+70 AUTH(l!IZEO Pll!SUAHT
TO THE C(H)I Tl 1J1S Sll PtUTED IN THE
ARliY CO!P or ENGi llERS NATI ON Ml0£
II DAVEY RO
·
P£Rlll T IUll[R
·
II 8AANCHEO OAK RD
I·
36
··,
11 RAVt.IONO RD
lf:ETS Cl! EXCEEDS Ill NI llJll [(SJ GN
STAICIARDS CJ THE BDAllD CJ POOi.iC
ROADS CUSSlflCATIOI AICI STAN!AlmS
FIJI NEI AICI AECIJISTRUCTED.
·
.,, ...,
"
···
IUCXXXIUCXXXIUCIUC
·a·
0 Q 0.
000
agneir ~
ssociates9 In.co
IZ
.'
13
·--+I
··
'3821
Iii'
·
· ·,.. ··,.
..
_ i_.
HEif CONTROLLED ACCESS
PREVIOUS COHTROLLEO ACCESS
LIMITS
or
CllNSTRIJCTlON
PREVIOUS R.o.w.
NEW R.o.w.
ExlSTING PERMA!iEHT EASEMENT
TEMPORARY EASEMENT
EXCESS TAKING
PERMANENT EASEMENT
.ili..ili. ...iL..
Ii
!Olm
R.O. W. LEGEND
.·
······ ··· ·
r
==::::===
!
ainellli r~
W MILL All
Ill WAVERI. V RO
GUARDRAIL
TRAVELED WAY
011(£
C\A.YEIH
POWER POLE
TELEPHONE POLE
MAILBOX
RAILROAD TRACl
i
I '' ·
II
CONVENTIONAL SIGNS
FEh'C£ R.a.w. !lll WIRE
--><--
· ~ ll
31
Plans b y;
EXISTING RAILROAD EASEMENT
NEii RAILROAD PE"MANENT EASEMENT
NEW RAILROAO TEMPORARY EAS EMENT
1.;.;.;.;.;.;.;.;.;.;.;.1
V7ZZZZZ4I
'· ·· · ····· r
,
k' .·,;t.* . +!
u:r.M1:cm:mm
REFERENCE POST r«l.
EXCEPTIONS:
N/A
FROM STA.
TO R£FER£1([ POST Ill.
NONE
TO STA.
NIA
_ _ _l_A_N_C_·_S_TE_R_ __
crunv
NONE
~»···-·.-..-.-.-..-.·w
l25MMXX&
f!2·f1 ·;1·::-1; ·I
TOTAi. NEl LENGTH
(J
PROJECT:
o.m
lllLES
CllAlllWI IJ BOAllD
DATE
PROJECT NUMBER
C-55-X-91
(
(
SHEET NO.
2- T
TYPICAL CROSS SECTION OF IMPROVEMENT
j--~
18'-0"
NATURAL\
GROUND
\
r
6' - 0"
I
12'-0"
12'-0"
LIMITS OF
CONSTRUCTION
·1
6' - 0"
9" · 24' ASPHAL TIC
CONCRETE PAVEMENT,
TYPE "SPA"
o·
,z
..
0.02'/FT.
"':s
·... ·... ·. -
w
0.06'/FT,
SHALL CONFORM TO FILL
SLOPE CRITERIA
STATION
··: ·..::.
TOP OF
SUBGRAOE
SUBGRADE PREPARATION
PAVING
r
EOGE OF
PAVEMENT
·:..·:.
9 1 -6°
12" CRUSHED ROCK
FOUNDATION COURSE
·
TOP OF
PAVEMENT
BOTTOM OF
PAVEMENT
EARTH SHOULDF.R
CONSTRUCTION 1TYP. l
9'-6"
HALF CUT SECTION
AS INDICATED BY rH£ TYPICAL SECTION,
EMBANKMENT WILL BE REQUIRED TO
CONSTRUCT THE EARTH PORTION OF
THE SHOULDER, THE CONTRACTOR SHALL
FURNISH THE COHESIVE MATERIAL FROM
SOURCES OUTSIDE THE PROJECT RIGHT
OF WAY,
PROJECT
18'-0"
GRANULAR FILL
SECTION
TO
150+30
159+90
STAT!.!lli
HALF FILL SECTION
2" CRUSHED ROCK
157+50
168+40
PERFORATED PIPE UNDERORAIN DETAIL
CEXCEPT AS SHOWN ON CROSS SECTIONS>
CONCRETE PAVEMENT SHALL HAVE
A LONGITUDINALLY TINED FINISH.
FURNISHING ANO PLACING THE 2" CRUSHED ROCK
Will. BE INCLUDED IN THE ITEM "PERFORATED PIPE
UNOERDRAIN".
157
160
i159
158
i
t-"--STA. 158·70
·
~ CHANNEL &
EXISTING CHANNEL ------.\
-
~
I
I
I
- - - --CHANNEL
I
SURVEY
I
BASELINE
I
------ --- .J. ---
.- C0+30
__ __ ___ __
j-
C0+50
SEC. LINE &.
t. PROJECT
I
I
BERM ELEV.
~._,
q
I
'{
(.)
IUJ
Vll/'I VI
CO+OO
I
I
"'....
I
t-STA. 158+ 00.00
~ ABUT. NO. 1
- 1
I
I
ELEV.
= 1168.0
I
I
I
·-I
\. -
I
I
\
I
I"
FOR INFORMATION ONLY
EXC, = XlSTA. 159+40
'- ABUT. NO. 2
.I
=.....1171.0
I
I
t BRIDGE
-,_/ I
'/
.
18'- 0".0.
. 1/-l_/o·
43' - 0"A
43' - 0"6
9' - 0".0.
9'-0"A
PROPOSED~
I
18'-011 1:1
C1+45
CHANNEL
I;-
I
.
C1+75
I
L
C2+00
CHANNEL LAYOUT
SCALE 1"
TYPICAL CHANNEL SECTION
= 30'
.o. - MEASURED PERPENDICULAR TO CHANNEL SURVEY BASELINE
· - MEASURED ALONG CHANNEL SURVEY BASELINE
LIMITS OF GRADING THROUGH THE BRIDGE WHICH SHALL
BE DONE BY THE GRADING CONTRACTOR BEFORE THE
BRIDGE IS BUILT. 1· 70' LT. TO ·75' RT.I
CHANNEL EXCAVATION SHALL BE INCLUDED IN THE ITEM
"EARTHWORK MEASURED IN EMBANKMENT",
SEE CHANNEL CROSS SECTIONS AND BRIDGE PLANS FOR
ADDITIONAL DETAILS.
(
PROJECT NUMBER
C-55-C-91
~~©. $3~-1'!l~m~1-oocm~
150
STA. 150·30 TO
STA. 158·45.17
REMOVE 1940 SO. VOS.
OF ASPHALT SURF ACING.
STA. 150·30 TO
STA, 157+50
BUILD 1,920 SO. VOS. OF 9" ASPHAL TIC
CONCRETE TYP£ "SPA".
TRACT NO. 1
STA. 154+00, LT.
18"·34' CORA. METAL DR. PIPE.
REMOVE
LAY 24"· 36' CORRUGATED METAL
DRIVEllAY CULVERT PIPE ANO
BUILD EAllTH DRIVE 124' WIDE I
ON A -6.0'I. GAA!lf FOR 6' THEN
ON A -11.4'/. GRADE,
STA. 158·70
BUILD GUAllORAll PROTECTION.
4-llRIDGE APPROAC.H SECTION
4-ENO TREATMENT, TYPE II
STANDARD Pl.AN NO, HO ANO 743,
STA, 158·70
BUILD 3·SPAN 140'·0" CONTINUOUS
CONCRETE SLAB BRIOGE ON fl o· SKEW
1- 56'·0" AND 2·42'·0" SPANS,
32' CLEAR RDAOtfAY.
SPECIAL PLAN NO. I
SECTION LINE &
PflOJECT
l
LIMITS OF CONSTRUCTION
-====e:==~«=,r---
OP
- OP LlllJTS
ar
3
160
155
LOT 36 l.T.
THE NATURE CONSERVANCY
TEMP, EASE. · O. IO ACRES
NESAASKA
STA. 160+37, LT.
24" · 21' CORR. METAL OR. PIPE.
REMOVE.
STA, 161·00. LT.
z BUILD EARTH DRI VE 124' lllDEI
ON A · 6,0'/. CRADE FOR 6' THEN
~ ~ LO_N_A_-_10
_.;.;0_lL_
G_R_ADE_._ _ _ __.
.-
- + - - --~-0-- - - ~-~------"-- - - OP
'l'JDP -
-
STA, 159+40 TO STA 163t00, 12' LT.
BUILD 360 LIN. FT. OF 4"
PERFORATED PIPE UNOERORAIN.
PAST
l EXISTING
ROADllAY
-~------r-
0 1' -J..----"'I."-""----~--~
PAST
CONS TRUCTIOH
or
'- g
STA. 152·00 TO STA I S9·00, 12' LT.
BUILD 600 LIN. FT, OF 4"
PERFORA TEO PIPE UNDERORAIH,
TIES1
SHEET NO.
,'.
lV
PAST
O·
STA, 140+58. It. Al.UNINUM CAP
S ~ CORNER, SEC. 34-Tt2ff-ASE
~E 34. 9' TO '~" REBAR
HE 15.l' TO
REBAR
St 91. 4' TO
" REBAll
S 50.2' TO
" REBAR
SW 63.3 TO
" REBAR
NW H.4' TO
" REBAR
I'
QO
STA. 152+00 TO STA 158·00, 12' RT.
BUILD 600 LIN, FT, Of 4"
PERFORATED PIPE U/olDERORAIH,
TEMP,
EASE.
STA. 193·43,60, 2. TO' LT., ALUMINUM CM'
S ~ CORNER, SEC. 35· Tl2N-R6N
N 49.9' TO 1" IRON PIPE
NE 19,!I' TO %" REBAR
SE 68.3' TO %" AEBAll
s so.o· TO I" IRON PIPE
SI 70. 0 TO %" REBAR
NI 64, I' TO %" REBAR
TRACT NO. 2
LOT I, HAWK'S POINT
ERIC PAVEY
TEUP. EASE. · 0,24 ACllES
STA, 158+l0. 23
1~SPAN 50' STEEL GIRDER
BRIDGE W/ CONC. DECK.
25' CLEAR ROADWAY,
REMOVE,
"'
STA. 158+70.23
REMOVE 345 LIN. FT. Of
W-BEAM GUARDRAIL.
STA, 159+40 TO STA 163·00, 12' RT.
BUILD 360 LIN, FT, DF 4"
PERFORA TED PIPE UNbERDRAIN.
STA, 158+95.94 10
STA. 163+00.00
REMOVE 951 SO. VOS,
QF ASl'llAL T SURF ACING.
STA. IS9+9D TO
STA, 163·00
OUILO 827
YOS.
9" ASPHALTIC
CONCRETE TYPE " SPA",
so.
or
TRACT NO. 3
OUTLOT A, HAlfX'S POINT
THOMAS O. & LOIUSE PAVEY
TEMP, EASE. · 0, 10 ACRES
1220
1220
1210
1210
1200
1200
1190
1190
1180
118()
mo
1170
1160
1160
1150
1150
~ . ~~ - 'ii''il~IM - !Ri®~
SU, 165+00, 12' l T. TD 38' LT,
BUILD 26 WI. FT. OF 4"
NON·PE RFDfl ATEO PIPE UNDE RORAIN,
SllEET NO.
4
170
165
STA, 163+00 TO STA 165+00, 12' LT,
BUILD 200 LIN. FT, OF 4"
PERFORATED PIPE Ut.'DERDRAIN.
PROJECT NUMBER
C-55 - C- 91
~ ~© . $~- 'ii'il~IM - lffi®~
STA. 165·60
DUILO OU40 48'x57' ELLIPTICAL REINFORCED
CONCRETE PIPE ON A 30" SKEW ILllOI WITH
CONC RE TE HEAOllAllS.
SEE SPECIAL PLAN 1- C ANO SHEET 5 FOR DETAILS.
CONCRETE = 21.8 CU. YDS, STEEL · 1,848 LOS.
EXC. = 372 CU, 'lllS. FILL = 3',
STA. 167+38
24" · 59' REINF, CONC. l'IPE
WI FLARED END SECTION ON NORTH SIDE.
REMOVE.
33'
BUILD JO' ·83' ROUND EQUIVALENT COORUOATEO
METAL PIPE ON A o· SKE W WITH A COlfCRETE
HEADWALL ON THE llM T,
SEE SPECIAL PLAN 2· C AND SHEET 5 FOR DETAILS.
CONCRETE · 1. 4 CU. YOS, STEEL · 186 L85,
£XC. = IS CU. YOS. fil l = 3'.
n·
PAST
PAST
SECTION LINE &
~ PROJECT
0
"'...,....
"'
SECTION LINE &
( PROJECT
LIMITS OF CONSTRUCTION
. / - - - - ----.,4 - - - -
l EXISTING
ROADWAY
-r----- - --- --------
,4--~--
+--- - - - - - - - - - - - - - - - -- - -
- - -- .ti---- -
-----~ - - - - - -?- 1 --
TIES1
- - - -,·OP -- -
OP -
LIMITS OF
COHSlRUCTION
- - Of1
....
'if
.
STA, 163+00 TO STA 165·00, 12' RT,
BUILD 200 LIN. FT. OF 4"
PERFORATED PIPE lMDERDRAIN,
STA, 193+43,60, 2. TO' LT., ALUMINUM
S ~ CORNER, SEC. 35-Tl2N-R6'l
N 49,9' TO I" IRON PIPE
NE 19.5' TO %" REBAR
$E 68,3' TO %" REBAR
S ~.O' TD I" IRON PIPE
SW TO.O TO %" REBAR
NW 64, I' TO %" FIEBAR
·
O·
·0
PAST
STA, 140+59, II, ALUMINUM CAP
S \4 CORHER, SEC, 34- Tl2H-R6£
lflE
34,9'
TOf"
REBAR
NE es.
7' TO
,, REBAR
SE 98.4' TO " REBAR
S 50,2' TO " REBAR
Sii 63.3 m
REBAR
NW 66,4' TO
" REBAR
STA, 167+03.45, ALUMINUM CAP
SE COffNER. SEC, 34-T12N·Rt£
N 95,9· TO ~· REBAA
NE 64. 7' TO " REBAR
ESE es.e· TO " REBAR
SSE 99.9' TO I" IRllN Pll>l
S 122.5 TO %" REBAR
SSW 99.9' TO 1" IRON PIPE
NW !OD. I' TO 1" IRON PIPE
OP
STA. 165+00, 12' RT. TC 38' RT.
BUILD 26 LIN, FT. or 4"
NON- PERFORATED PIPE UNCERDRAIN.
33'
STA. 18T·02.K
BUILD 4 WAY INTERSECTION. R=50'.
SEE SHEET 2·L2 FOR DETAILS.
STA, 163·00 TD
STA, 168+40
REMOVE 1, 774 SO, YQS,
OF ASPHALTIC SURFACING
!INCLUDES INTERSECTIONI,
OP
-
<1--- -
OP
-r---- --
~ ·------- ----- -
(Jf
..
O·
PAST
e'
STA. 163·00 TO
STA. 16~ : 4 0
BUILD 1,~40 SO. YDS. OF 9" ASPHAL TIC
CONCRET~ , TYPE "SPR".
CODES NOT INCLUDE INTERSECTIONI.