Hillsborough County. Florida Department of Transportation (FDOT) – District 7, Tampa, Florida.
PROJECT PURPOSE:
Basic: The basic project purpose is estuarine and submerged aquatic vegetation (SAV) restoration and enhancement.
Overall: The overall project purpose is to construct a water quality improvement project to restore and enhance estuarine conditions favorable to the growth and expansion of SAV habitat which would benefit the northeast region of the Old Tampa Bay and would be utilized for SAV mitigation credits on future FDOT projects within this watershed.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Florida Department of Transportation (FDOT) – District 7
Attn: Ms. Virginia Creighton
11201 N. McKinley Drive
Tampa, Florida 33612
WATERWAY AND LOCATION: The project would affect waters of the United States associated with Old Tampa Bay. The project site is located at SR 60/Courtney Campbell Causeway (CCC), west of Ben T. Davis Beach, in Sections 11 and 14, Township 29S, Range 17W, Tampa, Hillsborough County, Florida.
Directions to the site are as follows: From I-275, exit 39 toward FL-60 West, merge onto SR 589 (Veterans Expressway)/SR 60/CCC W. Take exit 2A for SR 60/CCC West, proceed approximately 2 miles. The site is just west of the Ben T. Davis Beach on SR 60/CCC West.
APPROXIMATE CENTRAL COORDINATES: Latitude 27.973028°
Longitude -82.586083°
PROJECT PURPOSE:
Basic: The basic project purpose is estuarine and submerged aquatic vegetation (SAV) restoration and enhancement.
Overall: The overall project purpose is to construct a water quality improvement project to restore and enhance estuarine conditions favorable to the growth and expansion of SAV habitat which would benefit the northeast region of the Old Tampa Bay and would be utilized for SAV mitigation credits on future FDOT projects within this watershed.
EXISTING CONDITIONS: The proposed project is located along a segment of the existing CCC, which was built in the 1930s. The CCC is an earthen roadway located directly within the waters of the United States, and the CCC consists of two bridged segments over the Old Tampa Bay. Northeastern Old Tampa Bay, north of the CCC, currently has several small to large water basins flowing into the area. However, connection with Old Tampa Bay is constricted due to the CCC. The applicant evaluated the existing conditions of the area to be directly affected, as well as the surrounding areas. Currently, there is a pattern of seagrass species and presence that occurs north of the CCC that is best explained by the salinity regime that currently occurs in that area. Hydrologic flow and residence times have been altered by the CCC, which has placed stressors on seagrass meadows within the assessment area. The current state of the seagrass resources in the assessment area can be most likely attributed to the lack of tidal flushing causing the differences in seagrass species and abundance. The current community type is best described as unconsolidated substrate, as defined by the Florida Natural Areas Inventory (FNAI) as estuarine unconsolidated substrates, which are mineral and detrital based natural communities, generally characterized as expansive, relatively open areas of subtidal, intertidal, and supratidal zones which lack dense populations of sessile plant and animal species. Unconsolidated substrates are unsolidified material and include mud, mud/sand, sand or shell. The current pattern of seagrasses is such that shoal grass (Halodule wrightii) and widgeon grass (Ruppia maritime) are the dominant species north of the CCC, while mixtures of turtle grass (Thalassia testudinum), shoal grass, and manatee grass (Syringodium filiforme) dominate the seagrass areas south of the CCC. The applicant evaluated and differentiated the site into the following Stratum: Stratum A, which is the area on the north side nearest the existing bridge, is approximately 89 acres; Stratum B, to the east of Stratum A, is approximately 123 acres; and Stratum C, located east of Stratum B and the furthest from the existing bridge, is approximately108 acres. Stratum A has a mix of shoal grass and widgeon grass with the abundance consistently greater than 75 percent. The seagrass abundance in strata C and B was found to be inconsistent with seagrass meadows farther to the west in closer proximity to the existing CCC bridge. The eastern portion of both Stratum C and B were characterized as having similar seagrass coverage; however, they are comprised primarily of widgeongrass, which is an ephemeral species. Therefore, seagrasses within the eastern portions of Stratum C and B, are of reduced persistence. Approximately 58 and 66 acres in strata B and C, respectively, were found to be comprised of 25 percent or less seagrass abundance, again, predominately widgeon grass. The increasing pattern of dominance of widgeon grass in the eastern stratum north of the CCC suggests that salinities are lower and more variable in the areas furthest away from the tidal influences of the open waters of Old Tampa Bay. The sole vegetative community within the permanent and temporary construction zone is drift algae.
PROPOSED WORK: The applicant seeks authorization to impact waters of the United States in order to open a section of the CCC to tidal flushing. The proposed work involves removing an approximate 229-linear-foot segment of the CCC, west of the Ben T. Davis beach, and constructing an approximate 229-linear-foot low-relief bridge in its place. The construction work includes installation of floating turbidity barriers and temporary sheet piles in order to remove approximately 229 linear feet of causeway fill and traverse the new channel with a low level bridge. The proposed project would create waters of the United States in the amount of 0.85 acre under the bridge to assure sufficient tidal exchange through the opening. The project involves 0.54 acre of dredging, permanent placement of 204 cubic yards of riprap within 0.12 acre to stabilize the shoreline in the new channel, and 0.30 acre of temporary fill for installation of sheet piles and placement of fill material behind the sheet pile during construction. No seagrass or wetland impacts are proposed, and at least a 25-foot average buffer would be provided between work limits and established seagrasses south of the proposed bridge. The new channel will provide additional flushing, reduced residence times, provide more appropriate salinity regimes, and provide water quality improvement within approximately 320 acres of estuarine habitat. Other positive effects of improved flushing include restoration of conditions favorable for seagrass regrowth in approximately 81-124 acres (areas with sparse seagrass or with only widgeon grass based on data from SWFWMD and in-water surveys in December 2014 and April 2016), and reduced nitrogen concentrations as Old Tampa Bay is listed as state impaired water body for nitrogen.
The applicant proposes to utilize the identified enhancement areas north of the CCC for seagrass mitigation. Installation of the proposed approximate 229-linear-foot opening will result in immediate physical changes in the movement and exchange of water north and south of the CCC. Following those physical changes, there will be water quality changes resulting in higher, more stable salinity values north of the CCC and reductions in nutrients and chlorophyll-a associated with those salinity changes and increased circulation. The seagrass mitigation area will offset future impacts from other project(s) within the Tampa Bay area. The proposed service area for seagrass mitigation consists of the Tampa Bay and Coastal Areas watershed, with out-of-basin exceptions allowed only in project-specific instances where there is a demonstrated close hydrological and/or ecological connection to this project.
The applicant has provided the following information in support of the proposed mitigation project:
The patterns of seagrass species distribution and salinity north of the CCC are consistent with the assumptions of their conceptual model:
The construction of the CCC reduced the tidal influence in areas north of the causeway.
Reduced tidal influences would be most strongly manifested in areas farthest away from the open waters of OTB (i.e. west to east north of the CCC).
In those areas north of the CCC and farthest away (i.e. east) from tidal influences, the influences of freshwater inflows would be artificially enhanced due to reduced mixing with higher salinity waters of the open bay.
Reduced tidal mixing north of the CCC results in lower and more variable salinities than in areas south of the CCC or in areas north of the CCC but farther to the west.
The resulting alterations to the salinity regime would likely result in the loss of more stenohaline (intolerant of a wide fluctuation in salinity) species of seagrass, i.e. manatee grass.
Alterations to the natural salinity regime would be more strongly manifested in areas farthest removed from tidal influences, i.e. the eastern stratum north of the CCC, resulting in a salinity-mediated filtering that would result in dominance by widgeon grass in areas north of the CCC and farthest away from historical tidal influences (i.e., strata B and C).
The conclusion was that salinity best explains the patterns of seagrass species and lower abundance north of the CCC and the prevalence of impersistent species. Further analysis of other parameters such as nitrogen and chlorophyll-a, found that concentrations were higher north of the CCC; however, the elevated concentration were associated with the altered salinity regime and long residence time rather than pollution. Analysis of the sediments, also, was not supportive of a conclusion that they were grossly polluted, e.g. high H2S, or indicative of nutrient enriched runoff into the area. The sediments were mostly sand with relatively low organic content and sulfide levels that are not considered toxic to seagrasses. Therefore, the current state of the seagrass resources north of the CCC can be most likely attributed to the lack of tidal flushing causing the differences in seagrass species and abundance. Improving tidal flushing through the addition of the approximate 229-linear-foot bridge would improve the conditions for restoration of the seagrass species and abundance north of the CCC. Strata A and B would experience a 80% and 60% reduction in residence time, respectively, while stratum C would experience a 50% reduction with a resulting residence time significantly less than the residence time currently within stratum A. Stratum A totals consists of approximately 89 acres; Stratum B consists of approximately 123 acres; and Stratum C consists of approximately 108 acres. The positive effects of the enhanced flushing caused by the bridge would include improvement of water quality in approximately 320 acres and the restoration of conditions favorable to the growth and expansion of the approximate 124 acres of sparse seagrass in strata B and C.
The applicant has evaluated the project using the Uniform Mitigation Assessment Method (UMAM) determine Functional gain for water quality improvements and seagrass enhancement strata on the north side of the CCC. Three areas are proposed to have only water quality improvements (Stratum A, Stratum B (west), Stratum C (west) resulting in a total function gain of 16.848. Stratum B (east) and Stratum C (east) were determined to have a total functional gain of 3.180 with gains both in the water environment and community structure.
The proposed mitigation plan is included with this public notice.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The project is designed to remove a portion of the CCC within the current footprint and alignment. There will be no impacts to existing seagrass or wetlands as a result of the construction activities and a minimum of a 25 foot construction buffer will be maintained. The sole vegetative community within the permanent and temporary construction zone is drift algae. Impacts during construction will be minimized through a turbidity control and monitoring plan. The modification to the CCC with a structure is designed to increase water circulation in the far eastern side of Causeway, as an alternative to traditional stormwater management facilities. The modification to the Causeway would ameliorate water quality impacts associated with this artificial impediment to water circulation in the northeastern area of Old Tampa Bay. A relief bridge would allow for a more natural movement of water between areas north and south of the Causeway. The project has been designed to minimize impacts to the aquatic environment and is anticipated to result in improvements to the Old Tampa Bay.
COMPENSATORY MITIGATION – The applicant has provided the following explanation why compensatory mitigation should not be required: The project proposes to remove a an approximate 229-linear-foot segment of the causeway and construct an approximate 229-linear-foot bridge in its place in order to allow for the exchange of water flow, thus providing an environmental lift. The project would result in improvements to the aquatic environment and establish an area that would be used as mitigation for FDOT projects that propose to impact seagrasses. Given the above factors, the applicant has determined that the project does not constitute the need for mitigation for impacts associated with traversing the channel with the bridge.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the West Indian manatee (Trichechus manatus latirostris); and swimming sea turtles, to include the loggerhead sea turtle (Caretta caretta), green sea turtle (Chelonia mydas), Kemp’s ridley sea turtle (Lepidochelys kempii); and smalltooth sawfish (Pristis pectinata). The Corps will request U.S. Fish and Wildlife and National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act. Additionally, the project is within the consultation area of the piping plover (Charadrius melodus) and within wood stork (Mycteria americana) nesting colony buffers. The Corps has determined the proposal would have no effect on these species.
West Indian Manatee: The waters adjacent to the area are most likely frequented by the Florida manatee, because the area consists of the combination of freshwater sources and seagrasses within the general vicinity. Therefore, the applicant proposes to adhere to the Florida Fish and Wildlife Conservation Commission Standard Manatee Conditions for In-Water Work. The Corps reviewed the Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, April 2013. The key resulted in the following sequential determination: A > B > C > D > E > F > G > N > O > P > may affect, not likely to adversely affect the West Indian manatee.
Swimming Sea Turtles: The site is accessible to swimming sea turtles, as the project is proposed within waters of the Old Tampa Bay. Therefore, the waters adjacent to the causeway site may be utilized by swimming sea turtles for refuge and foraging. Therefore, the applicant proposes to adhere to the NMFS’s Sea Turtle and Smalltooth Sawfish Construction Conditions. Given this information, the Corps has determined that the project may affect, but is not likely to adversely affect swimming sea turtles.
Smalltooth Sawfish: The smalltooth sawfish inhabits shallow, euryhaline waters and shorelines containing red mangroves. The project proposes to impact mangroves; however, the mangroves that will be affected appear to be above the waterline (growing in the riprap) the vast majority of the time. Although it is unlikely that the smalltooth sawfish would utilize the area on a regular and reoccurring basis, there is a potential that this species may enter into the area occasionally. Therefore, the applicant proposes to adhere to the NMFS’s Sea Turtle and Smalltooth Sawfish Construction Conditions. Given the above information, the Corps has determined that the project may affect, but is not likely to adversely affect the smalltooth sawfish.
Wood Stork: The habitat for this species includes freshwater and estuarine marshes, swamps, lagoons, ponds, flooded fields; and depressions in marshes. Wood storks typically nest colonially in medium to tall trees which occur in stands located in swamps or on islands surrounded by relatively broad expanses of water. The proposed project is located within three wood stork colony buffers, with the nearest colony being approximately 6.60 miles from the proposed project site. The site currently consists of roadway, scattered mangroves present within the riprap adjacent to the roadway along the shoreline, and open tidal waters. There is no wood stork habitat within the proposed project area, as all work is within tidally influenced waters. Additionally, based upon review of the Wood Stork Key for Central and North Peninsular Florida dated September 2008, the proposed project resulted in the following sequential determination: A = no effect on the wood stork.
Piping Plover: This species typically nests and feeds along coastal beaches (barrier beaches) in areas such as wash-over fans, naturally-functioning inlets, and bayside flats. Generally, this species forage for food around the high tide wrack zone and along the water’s edge, consuming insects, marine worms, and small crustaceans. The proposed project site does not contain habitat for this species. In consideration of this information, the Corps has determined that the project would have no effect on the piping plover.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the waters of the Tampa Bay watershed, as the mangroves are located within the riprap and do not provide suitable habitat for the smalltooth sawfish, and there are is no essential fish habitat that was identified that would be impacted. Also, the nature of the project is to restore seagrasses, whereby habitat for species would be established. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer at the Palm Beach Gardens Office, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410-6557 within 30 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Mrs. Tarrie Ostrofsky, in writing at the Palm Beach Gardens Office, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410-6557, by electronic mail at Tarrie.L.Ostrofsky@usace.army.mil, by fax at (561) 626-6971, or by telephone at (561) 472-3519.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
CONSTRUCTION CONTRACT NO. TBD
STATE OF FLORIDA
COMPONENTS OF CONTRACT PLANS SET
CHIPLEY
10
95
75
PERMIT PLANS
TALLAHASSEE
DEPARTMENT OF TRANSPORTATION
PENSACOLA
JACKSONVILLE
10
FORT WALTON
BEACH
295
LAKE
PANAMA
CITY
CITY
ST AUGUSTINE
GAINESVILLE
OCALA
LOCATION OF PROJECT
CONTRACT PLANS
DAYTONA BEACH
DELAND
ORLANDO
4
BEE LINE
EXPRESSWAY
NEW PORT RICHEY
4
FINANCIAL PROJECT ID 439206-1-52-01
A DETAILED INDEX APPEARS ON THE
R
LAKELAND T ID
U
R A'
BARTOW
N S
P
IK
TAMPA
ST PETERSBURG
KEY SHEET OF EACH COMPONENT
275
SARASOTA -
E
FT PIERCE
75
BRADENTON
INDEX OF PERMIT PLANS
MELBOURNE COCOA
F
L
O
75
95
HILLSBOROUGH COUNTY (10140)
SHEET NO.
SHEET DESCRIPTION
1
2
3
4
5-8
9
10
11
12
KEY SHEET
DRAINAGE MAP
TYPICAL SECTION
PLAN AND ELEVATION
STORMWATER POLLUTION PREVENTION PLAN
EROSION CONTROL
CONSTRUCTION IMPACTS
CONSTRUCTION IMPACTS TYPICAL SECTIONS
TEMPORARY FILL IMPACTS TYPICAL SECTIONS
WEST PALM
BEACH
FT MYERS
Do
ub
l
e
19
23
21
20
22
Jct.
MIAMI
KEY WEST
at
Bo
Exit 6A
584
N
ch
Bran
ou
Bay
30
580
pwy
Ex
29
ck
Di
27
26
28
FT LAUDERDALE
75
Exit 6B
24
.
r
C
75
NAPLES
R-18-W
R-17-W
R-17-W
R-16-W
STATE ROAD NO. 60
(COURTNEY CAMPBELL CAUSEWAY)
OLD TAMPA BAY WATER QUALITY IMPROVEMENTS
25
y
bbl
Mo y
Ba
0
1
2
SHAYNE PAYNTER, P.E.
32
STA. 407+95.50
33
36
34
35
4
4030 WEST BOY SCOUT BOULEVARD, SUITE 700
TAMPA, FL 33607
T-29-S
PERMIT PLANS PREPARED BY:
TOLL
1
3
2
589
Do
ub
l
e
Ba
yo
u
5
Ro
ck
y
T-29-S
Miles
T-28-S
Cr
.
T-28-S
ATKINS
Ve
t
e
r
a
n
s
31
Cr.
BEGIN BRIDGE
END BRIDGE
ATKINS, NORTH AMERICA, INC.
Exit 3
STA. 410+24.50
576
10
4030 WEST BOY SCOUT BOULEVARD, SUITE 700
TAMPA, FL 33607
11
P
a
r
k
w
a
y
l
l
e
b
p
m
a
C
12
(813) 282-7275
y
e
n
t
r
u
o
C
CONSULTANT VENDOR NO. F-590-896-138-001
TO
60
FBPE NO. : 24
CLEARWATER
Exit 2A
Rocky
O
L
D
Pt.
.
r
hC
s
i
F
NOTES:
93
BEGIN PROJECT
END PROJECT
STA. 405+20.00
Florida Department of Transportation, 2016 Design Standards and
TO
revised Index Drawings as appended herein, and January 2016 Standard
ST. PETERSBURG
Specifications for Road and Bridge Construction, as amended by
Contract Documents.
For Design Standards click on the "Design Standards" link at the
following web site:
http://www.dot.state.fl.us/rddesign/
MAY HAVE CHANGED DUE TO
REPRODUCTION.
PA
TAM
e
g
d
i
r
dB
n
a
l
k
n
a
r
dF
r
a
w
Ho
GOVERNING STANDARDS AND SPECIFICATIONS:
THE SCALE OF THESE PLANS
STA. 414+00.00
275
VERTICAL DATUM NAVD88
BENCHMARK LOCATION AT
BEN T. DAVIS BEACH
LATITUDE: 27.96961111
LONGITUDE: 82.575805555
For the Standard Specifications for Road and Bridge Construction
click on the "Standard Specifications" link at the following web site:
LENGTH OF PROJECT
http://www.dot.state.fl.us/programmanagement/
PERMIT PLANS
LINEAR FEET
ROADWAY
651
MILES
ENGINEER OF RECORD: SHAYNE PAYNTER, P.E.
0.123
BRIDGES
229
0.043
NET LENGTH OF PROJECT
880
0.167
0.00
0.00
880
0.167
P.E. NO.:58136
FISCAL
EXCEPTIONS
GROSS LENGTH OF PROJECT
FDOT PROJECT MANAGER: DANIEL M. LAURICELLO, P.E.
USER: wild1871
2/21/2017
3:12:41 PM
Z:\CADD\keysrd01.dgn
SHEET
YEAR
NO.
16
1
EXISTING GROUND LINE
0
0
-10
-10
EL. -7.60'
401
402
403
404
405
406
407
SCALE: 1" = 100' HORIZ.
MHW EL +.814'
CHANNEL BOTTOM
SCALE: 1" = 10" VERT.
MLW EL -1.065
408
409
410
411
412
413
414
415
NOTE:
DO NOT USE THE INFORMATION ON THIS SHEET FOR
CONSTRUCTION PURPOSES. THIS SHEET IS IN THE PLANS
UPPER OLD TAMPA BAY
FOR DOCUMENTATION AND TO ASSIST CONSTRUCTION
PERSONNEL WITH DRAINAGE CONCERNS.
AERIAL DATE: JANUARY 2014
EXISTING R/W
N
1320
'
VERTICAL DATUM NAVD88
TOE
4" MANGROVE
4" MANGROVE
4" MANGROVE
4" MANGROVE
6" MANGROVE
ASPHAL
T WAL
K/
BI
KE
BEGIN LEFT BRIDGE
100
Feet
STA. 407+95.50
6" MANGROVE
TOP
0 20
6" MANGROVE 4" MANGROVE(2)
4" MANGROVE
PAT
H
TOE
PVC
PVC
EMERGENCY PARKING
TOE
6" MANGROVE
TOP
6" MANGROVE
TOP
4" MANGROVE
SR 60 WEST
EP
LL
CABLE
WITNESS
END LEFT BRIDGE
LL
TOE
EP
CONC
LL
4
0
5
STA. 410+24.50
TOP
EP
LL
LL
SR 6
0
LL
(
COURTNEY
CAMPBEL
LL
L CAUSE
WAY
)
LL
¡ CONST. SR 60
LL
EP
END PROJECT
LL
LL
EP
LL
EMERGENCY
PARKING
STA. 414+00.00
EMERGENCY PARKING
ASP
HAL
TW
AL
K/
BI
KE
PAT
H
LL
ASPHAL
T WAL
K/
BI
KE PAT
H
410
LL
TO
E
TOP
1'-6 1
2"
BARRIER
EP
SR 60 EAST
TOP
30'-0"
TOP
EP
TOE
TOE
TOP
8" MANGROVE
50 MPH
1320
'
TOP
BEGIN PROJECT
STA. 405+20.00
CABLE
WITNESS
TOE
EP
415
1'-0"
BARRIER
BEGIN RIGHT BRIDGE
STA. 407+95.50
ASP
HAL
TW
AL
K/
BI
KE
PAT
H
UPPER OLD TAMPA BAY
EXISTING R/W
END RIGHT BRIDGE
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
SHEET
DEPARTMENT OF TRANSPORTATION
NO.
TAMPA, FLORIDA 33607
(813) 282-7275
TOP
TOE
STA. 410+24.50
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
DRAINAGE MAP
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
2
2/8/2017
5:58:53 PM
Z:\CADD\DRMPRD01.dgn
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
MTL EL -0.125'
on any electronic copies
10
LOW MEMBER EL. 3.2'
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
10
65'-1" LEFT BRIDGE
72'-1" RIGHT BRIDGE
2'-0"
1'-6½"
16'-0"
TWO BULLET
RAIL POST D
1'-6½"
1'-6½"
1'-6½"
2'-0"
12'-0"
12'-0"
12'-0"
8'-0"
8'-0"
12'-0"
12'-0"
12'-0"
12'-0"
SHLDR.
LANE
LANE
SHLDR.
SHLDR.
LANE
LANE
LANE
SHLDR.
11-0'
BARRIER WALL
INDEX 410
BARRIER WALL
INDEX 410
32" F SHAPE
TRAFFIC
RAILING
INDEX 420
(TYP.)
Sl
o
p
e
:.
0
2 Ft
/
Ft
8½ "
Ft
/
2 Ft
0
:.
e
p
o
Sl
8'-2"
8'-2"
8'-2"
8'-2"
8'-2"
8'-2"
8'-2"
4'-0½"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
4'-0½"
3'-11½"
3'-11½"
36" FLORIDA
I-BEAM (TYP.)
TYPICAL SECTION
(LOOKING EAST)
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
SHEET
DEPARTMENT OF TRANSPORTATION
NO.
TAMPA, FLORIDA 33607
(813) 282-7275
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
TYPICAL SECTION
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
3
2/8/2017
6:00:34 PM
Z:\CADD\TYPSRD01.dgn
on any electronic copies
6"
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
¡ CONST. SR 60
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
137'-8"
BANK AND SHORE RIPRAP
BANK AND SHORE
RIPRAP FOOTER
(SEE ELEVATION
END LEFT BRIDGE
EP
1
2"
-6
1'
BARRIER
LANE
4
1
2
PCC ST
A.4
1
0
+1
8
.
4
3
END APPRH. SLAB
30'
STA. 410+54.50
LANE
APPRH.SL
AB
EP
11'
-0"
END BENT 4
BARRIER
ASPHAL
T WAL
K/
BI
KE PAT
H
1:
3
1:
3
TOP
END RIGHT BRIDGE
1:2
1'
-612"
12'
-0"
90°00'0" (TYP.)
1:2
SH LDR.
PH
50 M
E
TO
PLAN
END BRIDGE STA. 410+24.50
END BENT 1
END BENT 4
30'
20
229' (OVERALL LENGTH OF BRIDGE)
APPRH. SLAB
15
10
30'
APPRH. SLAB
75'
79'
75'
812"
25
*
BEGIN BRIDGE STA. 407+95.50
25
20
15
¡ BENT 2
¡ BENT 3
10
5
5
1:
2
-5
E
36"
0
F
MHW EL +0.814'
0
2
1:
-5
-10
24" SQ. PREST. CONCRETE PILE
2'
-0"
'
20'-0"'
2'
-0"
'
-10
20'-0"'
APPROX. PROPOSED
*NOTE: AL
L EL
EVAT
I
O
N DI
MENSI
O
NS ARE
MEASURED AL
O
NG ¡ CO
NST
.SR 6
0
GROUND LINE
INDEX NO. 206234 (TYP.)
CHANNEL BOTTOM
EL. -7.60'
ELEVATION
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
SHEET
DEPARTMENT OF TRANSPORTATION
NO.
TAMPA, FLORIDA 33607
(813) 282-7275
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
PLAN AND ELEVATION
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
4
2/10/2017
12:55:00 PM
Z:\CADD\B1PlanElev01.dgn
on any electronic copies
END BENT 1
411
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
DI
RECT
I
O
NO
F
I
NCREASI
NG ST
AT
I
O
N
LANE
BEGIN RIGHT BRIDGE
12'
-0" 12'
-0" 12'
-0"
8'
-0"
SH LDR.
APPRH. SLAB
BARRIER
LL
30'
STA. 407+65.50
-0"
2'
LL
32'R
7853.
86
PCC STA. 407+01.
21'R
5123.
LL
BEGIN APPRH. SLAB
EP
STA. 410+54.50
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
410
90°00'0" (TYP.)
EP
LL
END APPRH. SLAB
6990.
62'R
409
408
407
1
2"
PI STA. 408+60.17
END BENT 1
-6
1'
BEGIN LEFT BRIDGE
NG
RKI
Y PA
GENC
R
E
EM
APPRH.SL
AB
BARRIER
LL
1:2
30'
8'
-0"
¡ CONST. SR 60
LANE
EP
LL
LANE
2'
-0"
30'
APPRH. SLAB
12'
-0" 12'
-0"
BEGIN APPRH. SLAB
BARRIER
TOP
STA. 407+65.50
LL
12'
-0"
1:2
SH LDR.
16'
-0"
TOE
716'R
709.
5'R
BENT 2
E
CABL
S
TNES
WI
END BENT 4
BENT 3
700'R
693.
5'R
GUARDRAIL (TYP.)
SH LDR.
-6
1'
1
2"
'
0"
OVE'
ANGR 20
4"M
BARRIER
TOP
1:
3
OVE
OVE
ANGR
ANGR
6"M
6"M
1:
3
VIEW BELOW)
TOE
I. SITE DESCRIPTION
(1) NATURE OF CONSTRUCTION ACTIVITY:
WEIGHTED RUNOFF COEFFICIENT:
THE PROPOSED IMPROVEMENTS TO SR 60 ARE TO BE PERFORMED FROM MP 3.769 TO MP 3.916 IN
BEFORE: Cw (B) = 0.55
AFTER: Cw (A) = 0.98
DURING: Cw (D) = 0.59
THE RUNOFF COEFFICIENT DURING CONSTRUCTION, Cw (D), IS CALCULATED ASSUMING THAT
UPLIFT THAT WOULD SIGNIFICANTLY REDUCE THE STORMWATER WATER QUALITY TREATMENT
THE MAXIMUM ALLOWABLE AREA OF SOIL IS DISTURBED DURING CONSTRUCTION AND THE
REQUIREMENTS FOR PROJECTS WHICH ARE LOCATED IN THE TAMPA BAY WATER SHED.
REMAINING AMOUNT IS THE EXISTING IMPERVIOUS AND GRASSED SHOULDER AREAS.
(2) SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES:
(6) DESCRIPTION OF SOIL OR QUALITY OF DISCHARGE:
A. THE CONTRACTOR SHALL BE REQUIRED TO PREPARE A SITE SPECIFIC EROSION AND
THE SOIL WITHIN THE PROJECT IS MAINLY ST. AUGUSTINE FINE SAND.
SEDIMENT CONTROL PLAN ALONG WITH A DETAILED CONSTRUCTION SCHEDULE TO INDICATE
DATES OF MAJOR GRADING ACTIVITIES AND DETERMINE SEQUENCES OF TEMPORARY AND
SOIL TYPE
HYDROLOGIC GROUP
DEPTH TO SHWE
PERMANENT SOIL DISTURBING ACTIVITIES ON ALL PORTIONS OF THE PROJECT.
1.5' - 3.0'
D
FINE SAND
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
44 - ST. AUGUSTINE
B. THE CONTRACTOR WILL BE REQUIRED TO MODIFY THE PLAN OR MATERIALS TO ADAPT TO
SEASONAL VARIATIONS,CONSTRUCTION ACTIVITY VARIATIONS, OR AS DIRECTED BY THE
ENGINEER.
REFERENCE: USDA SOIL SURVEY OF HILLSBOROUGH COUNTY, FLORIDA
C. APPLICABLE EROSION AND SEDIMENT CONTROL DEVICES AND IMPLEMENTATION PROCEDURES
ARE SUPPLIED IN THE FDOT STANDARD INDEXES AND THE STATE OF FLORIDA EROSION AND
SEDIMENTCONTROL DESIGNER AND REVIEW MANUAL (E&SC MANUAL) LATEST EDITION.
(7) ESTIMATED DRAINAGE FLOW DIRECTION AND AVERAGE SLOPE OF DRAINAGE AREA FOR EACH
OUTFALL:
D. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING IF ANY MODIFICATIONS OR ADDITIONAL
CONTROLS ARE REQUIRED AND TO OBTAIN DEPLOYMENT SCHEDULES FOR THE IMPLEMENTATION
OF ALL ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES FROM THE CONTRACTOR.
A. SITE MAP: INCLUDED WITH THESE SHEETS.
(3) GENERAL NOTES:
(8) RECEIVING WATERS:
A. ALL EROSION AND SEDIMENT CONTROL DEVICES FOR EACH PHASE OF WORK ARE TO BE
INSTALLED PRIOR TO BEGINNING WORK ON THAT PHASE.
OLD TAMPA BAY WATER QUALITY IMPROVEMENT PROJECT
THIS FACILITY DOES DISCHARGE TO WATERS LISTED ON THE EPA APPROVED 303(D) LIST (FOR
B. INSTALL EROSION AND SEDIMENT CONTROL DEVICES WHERE LISTED IN THE CONTRACTOR'S
APPROVED EROSION AND SEDIMENT CONTROL PLAN FOR PERIMETER CONTROLS BEFORE THE
LAND IS DISTURBED.
C. PROVIDE SEDIMENT BARRIERS WHERE LISTED IN THE CONTRACTOR'S APPROVED EROSION AND
SEDIMENT CONTROL PLAN FOR DITCH/SWALE CHECK DAMS DURING CONSTRUCTION.
B.DRAINAGE MAPS OR MAPS WITH APPROPRIATE CONTOURS: INCLUDED WITH THESE SHEETS.
LIST, GO TO: HTTP://FRWEBGATE.ACCESS.GPO.GOV/CGI-BIN/GETDOC.CGI?DBNAME=2000_
REGISTER&DOCID=00-10518-FILED.PDF) FOR IMPAIRMENT DUE TO TOTAL SUSPENDED SOLIDS.
(9) OUTFALL LOCATIONS:
A. BEGIN BRIDGE: MP 3.820, 27°58'22.39" N, 82°35'10.84" W
B.END BRIDGE: MP 3.870, 27°58'22.02" N, 82°35'08.46" W
D. PROVIDE INLET PROTECTION SYSTEMS AT INLET OPENINGS.
(10) WETLAND AND/OR SURFACE WATER IMPACTS ARE LIMITED TO THE AREAS DESCRIBED IN
E. COVER OR STABILIZE DISTURBED AREAS AS SOON AS POSSIBLE.
THE APPROVED PERMITS FOR THE PROJECT.
F. DO NOT DISTURB AN AREA UNTIL IT IS NECESSARY FOR CONSTRUCTION TO PROCEED.
(11) DESCRIPTION OF STORMWATER MANAGEMENT: (EXISTING/PROPOSED)
G. TIME CONSTRUCTION ACTIVITIES TO LIMIT IMPACT FROM SEASONAL CLIMATE CHANGES OR
A. EXISTING DRAINAGE FLOWS ARE TYPICALLY OVER LAND INTO OLD TAMPA BAY. THE PROPOSED
WEATHER EVENTS.
ROADWAY IMPROVEMENTS SHALL NOT MODIFY OR AFFECT THE EXISTING OFFSITE FLOW
PATTERNS.
H. DO NOT REMOVE PERIMETER CONTROLS UNTIL ALL UPSTREAM AREAS ARE FULLY STABILIZED
AND PERMANENT VEGETATION IS ESTABLISHED.
I. THE CONTRACTOR WILL PROVIDE POLLUTION CONTROL BY IMPLEMENTING DUST CONTROL DURING
ALL PHASES OF CONSTRUCTION. THIS WILL BE ACCOMPLISHED BY USING STREET OR VACUUM
SWEEPERS.
B.OFFSITE RUNOFF SHOULD BE DIVERTED AWAY OR THROUGH THE CONSTRUCTION AREA, IF
POSSIBLE. THIS ADDITIONAL FLOW, IF NOT DIVERTED, CAN ADD VOLUME AND SIZE TO
STRUCTURAL PRACTICES, REQUIRING MORE FREQUENT MAINTENANCE AND LIMITING
EFFECTIVENESS OF EROSION AND SEDIMENT CONTROLS.
C. STORMWATER RUNOFF SHALL BE CONVEYED TO EITHER TEMPORARY SEDIMENT BASINS,
CONTAINMENT SYSTEMS AND/OR TO PERMANENT STORMWATER MANAGEMENT FACILITIES
(TREATMENT AND ATTENUATION PONDS). THE PROPOSED SEDIMENT BASINS, CONTAINMENT
(4) PROJECT AREAS:
THE ESTIMATED TOTAL PROJECT AREA IS 4.2 ACRES. THE ESTIMATED AREA TO BE DISTURBED
DURING CONSTRUCTION ACTIVITIES IS 4.2 ACRES.
(5) RUNOFF COEFFICIENTS BEFORE Cw (B), DURING Cw (D) AND AFTER Cw (A) CONSTRUCTION:
RUNOFF COEFFICIENT FOR:
GRASSED SHOULDERS ADJACENT TO ROADWAY: C=0.35
IMPERVIOUS ROADWAYS AND PAVED SHOULDER: C=0.95
SYSTEMS AND/OR STORMWATER MANAGEMENT FACILITIES SHALL BE CONSTRUCTED DURING
THE INITIAL PHASE OF CONSTRUCTION AND USED DURING CONSTRUCTION OF THE ROADWAY.
D.THE CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS TO PREVENT UNAUTHORIZED
MATERIALS FROM ENTERING WETLANDS, WATERWAYS, OTHER SURFACE WATERS OR WATERS
OF THE U.S.
DISTURBED AREAS, EXPOSED SOIL, ETC., DURING CONSTRUCTION: C=0.40
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
DEPARTMENT OF TRANSPORTATION
TAMPA, FLORIDA 33607
(813) 282-7275
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
SHEET
STORMWATER POLLUTION
PREVENTION PLAN (01)
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
2/8/2017
6:01:47 PM
Z:\CADD\SWPPRD01.DGN
NO.
5
on any electronic copies
CONSTRUCT A 220' BRIDGE WEST OF BEN T. DAVIS BEACH TO PROVIDE AN ENVIRONMENTAL
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
HILLSBOROUGH COUNTY. THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PROPOSES TO
II. CONTROLS: SEDIMENT AND EROSION CONTROLS
2) USED FOR EROSION CONTROL THAT FACILITATES PLANT GROWTH WHILE PERMANENT GRASS IS
ESTABLISHED. COULD INCLUDE BIODEGRADABLE EROSION CONTROL BLANKETS INSTALLED ON A
(1) WATER QUALITY MONITORING:
SEEDED AREA, ON FILL SLOPES OR IN DITCHES.
A. WATER QUALITY MONITORING SHALL BE CONDUCTED IN ACCORDANCE WITH THE SPECIAL
3) USED TO STABILIZE DRAINAGE CHANNELS. CONSULT E&SC MANUAL TO DETERMINE CORRECT
CONDITIONS OF ANY ENVIRONMENTAL PERMIT OR BY THE CONTRACTOR UPON THE OBSERVATION
THAT WATER QUALITY STANDARDS MAY BE VIOLATED BY THE CONTRACTOR'S ACTIVITIES.
MONITORING LOCATIONS MAY BE SPECIFIED IN THE ENVIRONMENTAL PERMIT OR MAY BE
PRODUCT TYPE FOR CHANNEL STABILIZATION.
B.RUNOFF CONTROL STRUCTURE (TEMPORARY SLOPE DRAIN) PURPOSE: TO PROTECT HILLSIDE
SURFACES AGAINST EROSION DUE TO CONCENTRATED FLOW OF RUNOFF WATER.
WATER QUALITY STANDARDS AS THEY RELATE TO TURBIDITY (REFER TO 62-302 F.A.C. AND PERMIT
1) USED ON FILL SLOPES AND CUT SLOPES TO REDUCE SEDIMENT TRANSPORT AND COULD INCLUDE
TEMPORARY SLOPE DRAINS, GRASS-LINED CHANNELS, ROCK-LINED CHANNELS AND CHECK DAMS.
INCLUDING EXHIBITS).
2) RUNOFF CONTROL STRUCTURES TYPICALLY DISCHARGE TO A SEDIMENT BASIN.
C. IF WATER QUALITY STANDARDS ARE VIOLATED, CONSTRUCTION SHALL BE STOPPED IMMEDIATELY,
C. SEDIMENT BASIN (CONTAINMENT SYSTEM) PURPOSE: A CONTAINMENT SYSTEM IS DESIGNED TO
DEVICES REEVALUATED AND APPROVED BY THE ENGINEER PRIOR TO ANY CONTINUATION OF
DETAIN AN ADEQUATE VOLUME OF RUNOFF, REDUCE THE VELOCITY OF FLOW THROUGH THE SYSTEM,
ACTIVITY. MONITORING ACTIVITIES AND TURBIDITY READINGS SHALL BE RECORDED ON THE
CONSTRUCTION INSPECTION REPORT AND CONTINUED UNTIL TURBIDITY READINGS FALL BELOW AN
ACCEPTABLE LEVEL (LESS THAN 29 NTU'S ABOVE BACKGROUND OR LESS THAN 0 NTU'S ABOVE
ALLOW FOR SETTLEMENT OF SUSPENDED SOLIDS AND REGULATE THE DISCHARGE RATE FROM THE
SEDIMENT BASIN.
BACKGROUND FOR DIRECT DISCHARGES TO OFW'S).
1) SEDIMENT BASINS MUST BE PLACED IN STRATEGIC LOCATIONS WITHIN THE ACTIVE AREAS OF
CONSTRUCTION. CONTRIBUTING AREA AND SIZE OF TARGET SOIL PARTICLE WILL DICTATE WHETHER
D.WATER QUALITY MONITORING MAY BE CONDUCTED DURING ANY PHASE OF CONSTRUCTION AS
DIRECTED BY THE PROJECT ENGINEER.
THE SEDIMENT BASIN WILL BE TYPE 1, TYPE 2 OR TYPE 3 SYSTEM.
2) THE USE OF SMALLER PRE-SEDIMENTATION BASINS USED IN CONJUNCTION WITH LARGER
PERMANENT RETENTION/DETENTION PONDS ARE EFFECTIVE IN CAPTURING LARGER VOLUMES OF
SEDIMENTS. THIS TECHNIQUE REQUIRES PERIODICALLY SCHEDULED REMOVAL OF THE
ACCUMULATED SEDIMENTS.
(2) STABILIZATION PRACTICES:
A. STABILIZATION MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO MAINTAINING, ESTABLISHING
AND USING VEGETATION, APPLYING MULCHES, SODDING, SEEDING, BMP'S AND THE USE OF ROLLED
EROSION CONTROLLED PRODUCTS. WHEN CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR
D.SEDIMENT BARRIERS (TEMPORARY CONSTRUCTION SITE BMP'S) PURPOSE: SEDIMENT BARRIERS
EITHER OBSTRUCT FLOW OR PREVENT THE PASSAGE OF WATER WHILE CONSTRUCTION ACTIVITIES
PERMANENTLY CEASED, SIDE SLOPES SHALL BE STABILIZED WITH PERFORMANCE SODDING OR
OCCUR. SMALLER SEDIMENT BARRIERS MAY FUNCTION AS A SMALL SEDIMENT CONTAINMENT SYSTEM
SEEDING OR ANY OTHER APPROVED METHOD OF STABILIZATION INCLUDED IN THE STATE OF
FLORIDA EROSION AND SEDIMENT CONTROL DESIGNER AND REVIEW MANUAL (E&SC MANUAL),
LATEST EDITION.
OR AS A METHOD TO REDUCE FLOW VELOCITY.
B.STABILIZATION SHALL TAKE PLACE AS SOON AS PRACTICAL IN PORTIONS OF THE PROJECT WHERE
CONSTRUCTION ACTIVITIES HAVE CEASED, BUT NO LATER THAN 7 DAYS AFTER ANY CONSTRUCTION
ACTIVITY CEASES EITHER TEMPORARILY OR PERMANENTLY.
1) THESE CONSTUCTION BMP'S CAN INCLUDE SYNTHETIC BALES, STAKED SILT FENCE, TURBIDITY
BARRIER, STORM SEWER INLET BARRIERS, ROCK BARRIERS, GEOSYNTHETIC BARRIERS, ETC.
2) APPROPRIATE LOCATIONS INCLUDE SITE PERIMETER, BELOW DISTURBED AREAS SUBJECT TO
SHEET AND RILL EROSION, BELOW THE TOE OF EXPOSED AND ERODIBLE SLOPES, ALONG THE TOE
OF STREAM AND CHANNEL BANKS, AROUND DRAINS AND INLETS LOCATED IN LOWPOINTS OR THE
C. ALL EROSION CONTROL DEVICES SHALL BE INSTALLED ACCORDING TO THE CONTRACT DOCUMENTS,
AND THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN.
DOWNSTREAM EDGE OF AREAS UNDERGOING VERTICAL OR BOX CULVERT CONSTRUCTION ACTIVITIES.
3) INAPPROPRIATE LOCATIONS FOR THESE SAME MEASURES INCLUDE PARALLEL TO A HILLSIDE
D.ANY TEMPORARY MATERIAL USED FOR POLLUTION OR EROSION AND SEDIMENT CONTROL DURING
CONSTRUCTION SHALL BE REMOVED AT THE COMPLETION OF THE PROJECT AND FINAL
STABILIZATION OF THE PROJECT HAS BEEN ACHIEVED.
CONTOUR, IN CHANNELS WITH CONCENTRATED FLOW (UNLESS PROPERLY REINFORCED), UPSTREAM OR
DOWNSTREAM OF CULVERTS WITH CONCENTRATED FLOW, IN FRONT OF OR AROUND INLETS ON A
GRADE WITH CONCENTRATED FLOW OR IN FLOWING STREAMS.
E.SEDIMENT BARRIERS SHOULD BE USED ALONG THE LENGTH OF THE PROJECT WHERE THE
GROUND SLOPES AWAY FROM THE RIGHT OF WAY OR WHERE THERE IS POTENTIAL FOR SEDIMENT
E.FLOATING TURBIDITY BARRIER PURPOSE: USED IN PERMANENT BODIES OF WATER TO RETAIN
SEDIMENT AND FLOATING DEBRIS FROM A CONSTRUCTION AREA SO THAT REMOVAL OR CONTAINMENT
TO BE DIRECTED OFFSITE. PARTICULAR CARE SHOULD BE USED WHEN THERE ARE WETLANDS OR
OF THE MATERIAL IS POSSIBLE. THEY ARE ALSO USED TO CONTROL MIGRATION OF SUSPENDED
WATERS OF THE U.S. ARE INVOLVED. SEDIMENT BARRIERS SHOULD BE USED AROUND THE
SEDIMENTS.
PERIMETER OF STOCKPILE AREAS.
1) TYPE I, LIGHT DUTY, IS USED WHERE THERE IS LITTLE OR NO CURRENT, NO WIND AND NO WAVE
F. SPACING OF SEDIMENT BARRIERS USED AS DITCH OR SWALE CHECKS/DAMS SHOULD BE BASED
ACTION.
UPON THE HEIGHT OF THE BARRIER AND THE SLOPE OF THE DITCH OR SWALE.
2) TYPE II, MODERATE DUTY, IS USED WITH SOME CURRENT (<3.5 FT. PER SECOND) AND SOME
G. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MODIFYING SOIL TRACKING PREVENTION SYSTEMS
OR PROCEDURES AS NEEDED.
EXPOSURE TO WIND.
3) TYPE III, HEAVY DUTY, IS USED WITH GREATER CURRENT (3.5-5.0 FT. PER SECOND), MODERATE
WIND AND WAVE ACTION
(3) STRUCTURAL PRACTICES FOR EROSION AND SEDIMENT CONTROL:
4) BARRIER MUST BE ATTACHED AT BOTH ENDS AND WEIGHTED ON THE BOTTOM.
A. ROLLED EROSION CONTROL PRODUCTS (ARTIFICIAL COVERINGS) PURPOSE: TO PROTECT DISTURBED
SLOPE SURFACES AGAINST EROSION DUE TO RAINFALL OR FLOWING WATER.
5) MULTIPLE LINES OF BARRIER MAY BE USED IN SOME CIRCUMSTANCES FOR ADDITIONAL
PROTECTION.
1) USED FOR PAUSES IN CONSTRUCTION DUE TO INCLEMENT WEATHER OR OTHER CIRCUMSTANCES.
6) STANDARD PANELS FOR WATER DEPTHS ARE 5.0'. ADDITIONAL PANELS CAN BE USED FOR WATER
COULD INCLUDE NATURAL OR SYNTHETIC FIBER MATS, PLASTIC SHEETING OR NETS.
DEPTHS GREATER THAN 5.0'.
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
DEPARTMENT OF TRANSPORTATION
TAMPA, FLORIDA 33607
(813) 282-7275
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
SHEET
STORMWATER POLLUTION
PREVENTION PLAN (02)
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
2/8/2017
6:02:04 PM
Z:\CADD\SWPPRD01.DGN
NO.
6
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
THE ENVIROMENTAL PERMIT CONDITIONS FOLLOWED AND EROSION AND SEDIMENT CONTROL
on any electronic copies
B.THE CONTRACTOR WILL BE RESPONSIBLE FOR MONITORING ANY ACTIVITIES FOR VIOLATION OF
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
DESIGNATED BY THE CONTRACTOR AND APPROVED BY THE PROJECT ADMINISTRATOR.
ENMESHMENT AND ABSORPTION INTO ALUM. COLLECT FLOCS OF SUSPENDED SEDIMENTS IN RUNOFF
PATTERNS.
AND STORE THEM IN SEDIMENT BASINS OR STORMWATER MANAGEMENT FACILITIES.
1) COMMONLY USED IN LAKES AND STREAMS AS A SEDIMENT CONTAINMENT SYSTEM. SHOULD NOT
1) ALUM IS INJECTED INTO THE FLOW STREAM CONTAINING TURBID WATER. INJECTION IS
BE USED WHERE WATER CURRENTS MOVE THE CURTAIN AND DISLODGE COLLECTED SEDIMENTS.
CONTROLLED BY VARIABLE SPEED CHEMICAL PUMP TO FEED ALUM AT MULTIPLE TREATMENT POINTS.
ALUM TREATMENT IS EFFECTIVE IN TREATMENT OF RUNOFF THAT CONTAINS LIMEROCK FROM
2) MAXIMUM DEPTH OF PANEL IS 3'-8''.
UNPAVED SURFACES.
3) POST MUST BE A MINIMUM LENGTH OF 5.0' AND A MINIMUM OF 10" OF FABRIC MUST BE
EMBEDDED IN THE GROUND.
2) ALUM TREATMENT REQUIRES CLOSE MONITORING OF DOSAGE. COMBINATION WITH OTHER
COMPOUNDS MAY VIOLATE TOXICITY REQUIREMENTS AND THE USE OF ALUM MAY LOWER Ph LEVELS.
G. INLET PROTECTION SYSTEM PURPOSE: ANY OF A NUMBER OF SEDIMENT BARRIERS THAT EITHER
PREVENT SEDIMENT FROM ENTERING AN INLET OR TRAP THE SEDIMENTS ONCE THEY ENTER THE
CONTACTING LARRY RITCHIE IN THE STATE CONSTRUCTION OFFICE.
1) TYPICAL APPLICATIONS INCLUDE ROCK BARRIERS, FRAME AND FILTER BARRIERS, CURB INLET
"SUMP" BARRIER, CURB INLET DIVERSION BERM, CURB AND GUTTER SEDIMENT CONTAINMENT
SYSTEM OR CURB INLET INSET.
(5) DEWATERING OPERATIONS (OPTIONAL - BASED ON PROJECT APPLICABILITY):
DESCRIPTION: DEWATERING OPERATIONS ARE PRACTICES THAT MANAGE THE DISCHARGE OF TURBID
WATER WHEN WATERS OTHER THAN STORMWATER AND ACCUMULATED SURFACE WATERS MUST BE
2) SHOULD BE INSTALLED ONLY WHEN CONSTRUCTION ACTIVITIES ARE ON-GOING AND ONLY WHERE
REMOVED FROM A LOCATION SO THAT CONSTRUCTION WORK MAY BE ACCOMPLISHED. THESE WATERS
SUMP CONDITIONS EXIST.
CAN INCLUDE GROUNDWATER, WATER FROM COFFERDAMS, WATER DIVERSIONS AND WATERS USED
DURING CONSTRUCTION THAT MUST BE REMOVED FROM A WORK AREA.
3) SHOULD NOT BE USED WHEN CONSTRUCTION IS COMPLETE AND SHOULD NOT BE USED IN
AREAS WHERE FLOODING COULD ENCROACH INTO THE TRAVEL LANES.
H.SOIL TRACKING PREVENTION DEVICE PURPOSE: TEMPORARY STRUCTURES TO ASSIST WITH THE
REMOVAL OF SOIL MATERIAL CAPTURED ON VEHICLE TIRES BEFORE THE VEHICLES ENTER THE
ROADWAY.
A. ENVIRONMENTAL AGENCIES ARE ESPECIALLY CONCERNED WITH THE PROTECTION OF WETLANDS
FROM DRAWDOWN EFFECTS, PROTECTING RECEIVING BODIES FROM SEDIMENTATION AND POSSIBLE
CAPACITY LIMITATIONS.
B.THREE PRIMARY METHODS OF DEWATERING COMMONLY USED IN FLORIDA ARE RIM-DITCHING,
SOCK/PIPE/HORIZONTAL WELLS AND WELL-POINT SYSTEMS.
1) USE ONE DEVICE PER MILE WITH A MINIMUM OF TWO PER PROJECT.
C. METHODS FOR CONTAINING SEDIMENTATION CAN INCLUDE A COMBINATION OF BMP'S AND SEDIMENT
2) USE ADDITIONAL DEVICES FOR CONSRUCTION AREAS THAT ARE NOT ADJACENT TO THE ROAD
RIGHT OF WAY AND NO ACCESS IS PROVIDED THROUGH A SOIL TRACKING PREVENTION DEVICE.
3) RRR PROJECTS SHOULD BE HANDLED ON A CASE BY CASE BASIS.
TRAPS, SEDIMENT BASINS, GRAVITY BAG FILTERS, WEIR TANKS, DEWATERING TANKS, SAND
MEDIA/PRESSURIZED BAGS AND CHEMICAL TREATMENTS.
(6) COASTAL OPERATIONS:
DESCRIPTION: CONSTRUCTION SITES IN COASTAL AREAS PRESENT UNIQUE CHALLENGES DUE TO
HIGHER WIND SPEEDS, SALINE LADEN AIR MOISTURE AND WAVE ACTION THAT REQUIRE USING
(4) CHEMICAL TREATMENTS FOR EROSION AND SEDIMENT CONTROL:
APPROPRIATE EROSION CONTROL TECHNIQUES THAT CAN WITHSTAND THESE ELEMENTS.
A. CHEMICAL TREATMENT - POLYACRYLAMIDES (PAM AND PAM BLENDS) PURPOSE: REDUCE SOIL
EROSION THROUGH SOIL BINDING, USED AS A WATER TREATMENT ADDITIVE TO REMOVE
SUSPENDED SOLIDS FROM RUNOFF, PROVIDES APPROPRIATE MEDIUM FOR GROWTH OF
VEGETATION FOR STABILIZATION AND INCREASES INFILTRATION BY INCREASING SIZE OF SOIL
PARTICLE.
1) AS AN ADDITIONAL EROSION CONTROL MEASURE, CHEMICAL ADHESIVE STABILIZER
A. PARTICULAR CONCERNS DURING THE DEVELOPMENT OF EROSION CONTROL PLANS IN COASTAL
OPERATIONS CAN INCLUDE THE RESISTANCE OF EROSION CONTROL MATERIALS TO SALT WATER,
HIGH WATER TABLES, SOIL COMPACTION AND SITE DEVELOPMENT DUE TO THE TYPICAL SANDY
SOILS LOCATED IN THESE AREAS AND SOIL STABILIZING VEGETATION MUST BE SALT TOLERANT.
B.HIGH ENERGY ENVIRONMENT SHOULD BE CONSIDERED WHEN SELECTING EROSION CONTROL
(POLYACRYLAMIDE) CAN BE USED WHERE SOIL RUNOFF WILL DRAIN TO WETLANDS OR SURFACE
WATERS. SUCH USAGE SHALL BE LIMITED TO AREAS WHERE VEHICLE TRAFFIC AND OTHER
DEVICES. FREQUENT MAINTENANCE IS NORMALLY REQUIRED FOR EROSION CONTROL DEVICES AND
TIDAL FLUCTUATIONS MUST BE CONSIDERED WHEN SELECTING THE METHODS OF EROSION CONTROL.
DISTURBANCES WILL NOT OCCUR FOR MORE THAN 7 DAYS. POLYACRYLAMIDE CAN BE APPLIED TO
EXPOSED SOILS PRIOR TO PLACEMENT OF ARTIFICIAL COVERINGS AND ROLLED EROSION CONTROL
PRODUCTS. POLYACRYLAMIDE SHALL BE USED TO STABILIZE SOIL STOCKPILES WHEN THE
STOCKPILE WILL REMAIN UNDISTURBED FOR MORE THAN 7 DAYS. POLYACRYLAMIDE SHALL BE
USED IN ACCORDANCE WITH THE MANUFACTURE'S RECOMMENDATIONS.
C. TEMPORARY CONTROL TECHNOLOGIES FOR THE COASTAL ENVIRONMENT COULD INCLUDE THE USE OF
COMPOST/WOOD MULCHING, HYDRAULIC MULCHING, SOIL BINDERS AND TEMPORARY HYDROSEEDING.
D.PERMANENT CONTROLS COULD INCLUDE THE USE OF POLYMER-ENHANCED ARMORING, PRESERVING
2) CAN BE USED ON DISTURBED SOILS. CAN BE USED IN CONJUNCTION WITH OTHER BMP'S TO
ENHANCE PERFORMANCE. CAN BE APPLIED IN DISSOLVED FORM WITH WATER, CAN BE USED AS A
DRY POWDER, CAN BE USED IN GRANULAR FORM OR MAY BE USED IN THE FORM OF FLOC LOGS.
EXISTING VEGETATION WHEN POSSIBLE, ESTABLISHING PERMANENT SALT-TOLERANT VEGETATION,
CONSTRUCTION SITE BARRIERS (SHEET PILES/CONCRETE WALLS/EARTHERN BERMS), NATURAL
/SYNTHETIC GEOTEXTILES, MATS, OR GEOGRIDS.
III. OTHER CONTROLS
3) HIGHER CONCENTRATIONS OF PAM'S DO NOT INCREASE THE EFFECTIVENESS OF THE PRODUCT.
(1) WASTE DISPOSAL:
4) ACTIVELY WORKED AREAS WILL REQUIRE REAPPLICATION TO REMAIN EFFECTIVE.
A. THE CONTRACTOR WILL PROVIDE LITTER CONTROL AND COLLECTION WITHIN THE PROJECT
5) PAM SHOULD NOT BE USED WHERE THE IS A POTENTIAL FOR EQUIPMENT CLOGGING OR
TOXICITY IS A CONCERN.
BOUNDARIES DURING CONSTRUCTION ACTIVITIES.
B.ALL FERTILIZER AND CHEMICAL CONTAINERS SHALL BE DISPOSED OF BY THE CONTRACTOR
ACCORDING TO EPA'S STANDARD PRACTICES AS DETAILED BY THE MANUFACTURER.
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
DEPARTMENT OF TRANSPORTATION
TAMPA, FLORIDA 33607
(813) 282-7275
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
SHEET
STORMWATER POLLUTION
PREVENTION PLAN (03)
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
2/8/2017
6:02:18 PM
Z:\CADD\SWPPRD01.DGN
NO.
7
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
INLET.
NOTE: THIS PAY ITEM IS CONSIDERED A CONTRACTOR'S OPTION FOR SEDIMENT CONTROL ISSUES
THAT ARE PROJECT/SITE SPECIFIC. NOT TO BE USED IN THE DESIGN PROCESS WITHOUT
on any electronic copies
B.CHEMICAL TREATMENT - ALUM PURPOSE: REMOVE SUSPENDED SOLIDS AND POLLUTANTS BY
CONTINUOUS CONSTRUCTION ACTIVITIES CHANGE THE NATURAL CONTOURS AND DRAINAGE RUNOFF
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
F. STAKED TURBIDITY BARRIER PURPOSE: THIS ITEM IS COMMONLY USED IN AREAS WHERE
(2) PREPARATION OF ALL THE CONTRACTOR'S REPORTS OF INSPECTION, MAINTENANCE AND
C. NO SOLID MATERIALS, INCLUDING BUILDING AND CONSTRUCTION MATERIALS, SHALL BE
DISCHARGED TO WETLANDS OR BURIED ON SITE.
REPAIRS REQUIRED FOR THE CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION,
D.ALL SANITARY WASTE WILL BE COLLECTED FROM PORTABLE UNITS BY A LICENSED SANITARY WASTE
MANAGEMENT CONTRACTOR AS REQUIRED BY STATE REGULATIONS.
SHALL BE INCLUDED IN THE INDIVIDUAL COSTS OF THE EROSION AND SEDIMENT CONTROL
DEVICES OR LUMP SUM COST OF THE PROJECT.
(3) THE CONTRACTOR SHALL USE THE SWPPP CONSTRUCTION INSPECTION REPORT FORM
#650-040-03, FOR DAILY INSPECTIONS.
(2) OFFSITE VEHICLE TRACKING - WILL BE CONTROLLED BY THE FOLLOWING METHODS:
A. LOADED HAUL TRUCKS ARE TO BE COVERED BY A TARPAULIN AT ALL TIMES.
PERMITS WILL BE REQUIRED FROM THE FOLLOWING AGENCIES: SWFWMD, USACOE, NPDES, HCPEPC
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
(4) NON-STORMWATER (INCLUDING SPILL REPORTING):
THE CONTRACTOR WILL PROVIDE THE DEPARTMENT WITH AN EROSION AND SEDIMENT CONTROL PLAN
THAT WILL INCLUDE SPILL CONTAINMENT, REPORTING, AND RESPONSES. THE PLAN SHALL SPECIFY
WHAT MANAGEMENT PRACTICES AND CONTAINMENT METHODS WILL BE USED TO PREVENT POTENTIAL
POLLUTANTS (FUEL, LUBRICANTS, HERBICIDES, ETC.) FROM SPILLING ONTO THE SOIL OR INTO THE
SURFACE WATERS. IF A SPILL DOES OCCUR, OR IF CONTAMINATED SOIL OR GROUNDWATER IS
ENCOUNTERED, CONTACT THE DISTRICT CONTAMINATION IMPACT COORDINATOR AT (813) 975-6923.
IV. MAINTENANCE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REPAIRS OF ALL EROSION AND
SEDIMENT CONTROL DEVICES AND REMOVAL OF EROSION AND SEDIMENT CONTROL DEVICES WHEN
NOTICE OF TERMINATION IS MAILED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL
AND PROPER DISPOSAL OF SEDIMENT BUILDUP THROUGH THE LIFE OF THE INSTALLED EROSION AND
SEDIMENT CONTROL DEVICES.
(1) ALL CONTROL MEASURES WILL BE MAINTAINED DAILY BY THE CONTRACTOR AND ALL MEASURES
WILL BE MAINTAINED IN GOOD WORKING ORDER. IF A REPAIR IS NECESSARY, IT WILL BE INITIATED
WITHIN 24 HOURS OF NOTICE.
(2) SODDING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH.
(3) SYNTHETIC BALES SHALL BE MAINTAINED TO ENSURE THEIR USEFULNESS AND NOT BLOCK OR
IMPEDE STORMWATER FLOW OR DRAINAGE.
(4) SOIL TRACKING PREVENTION DEVICES SHALL BE MAINTAINED TO PREVENT CLOGGING OF ROCK
BEDDING WHICH MAY IMPEDE THE USEFULNESS OF THE STRUCTURE.
V. INSPECTION
(1) THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES ON THE PROJECT SITE AND RECORD
WEEKLY RAINFALL IN ACCORDANCE WITH THE NPDES PERMIT.
(2) ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSPECTED DAILY BY CONTRACTOR'S
PERSONNEL WHO ARE F.D.E.P. CERTIFIED STORMWATER MANAGEMENT INSPECTORS.
(3) THE CONTRACTOR SHALL COMPLETE ALL SWPPP INSPECTION REPORT FORMS REQUIRED FOR THE
NPDES PERMIT.
VI. TRACKING AND REPORTING
(1) THE CONTRACTOR SHALL SUBMIT A WEEKLY REPORT TO THE DEPARTMENT DOCUMENTING THE
DAILY INSPECTIONS AND MAINTENANCE OR REPAIRS TO THE EROSION AND SEDIMENT CONTROL
DEVICES. THE CONTRACTOR SHALL MAINTAIN ALL REQUIRED REPORTS AND COMPLETE ALL SWPPP
INSPECTION FORMS.
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
DEPARTMENT OF TRANSPORTATION
TAMPA, FLORIDA 33607
(813) 282-7275
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
SHEET
STORMWATER POLLUTION
PREVENTION PLAN (04)
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
2/8/2017
6:02:31 PM
Z:\CADD\SWPPRD01.DGN
NO.
8
on any electronic copies
(3) STATE AND FEDERAL REGULATIONS:
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
B.EXCESS DIRT ON ROAD WILL BE REMOVED DAILY.
EXISTING R/W
BACKGROUND MONITORING POINT
NOTE: TURBIDITY MONITORING WILL
PRECEDE INSTALLATION OF THE
500 FEET UP CURRENT OF WORK
SHEET PILE WALL, AFTER WHICH IT
(OUTGOING TIDE) (N.T.S.)
WILL NO LONGER BE REQUIRED.
1320'
COMPLIANCE MONITORING POINT
N
200 FEET DOWN CURRENT OF WORK
(INCOMING TIDE) (N.T.S.)
0 20
100
4" MANGROVE
4" MANGROVE
6" MANGROVE
ASPHAL
T WAL
K/
BI
KE
6" MANGROVE
TOP
6" MANGROVE 4" MANGROVE(2)
4" MANGROVE
PAT
H
TOE
PVC
PVC
EMERGENCY PARKING
TOE
6" MANGROVE
TOP
6" MANGROVE
TOP
4" MANGROVE
SR 60 WEST
EP
LL
CABLE
WITNESS
LL
TOE
EP
CONC
LL
4
0
5
TOP
EP
LL
SR 6
0
LL
(
COURTNEY
CAMPBEL
LL
L CAUSE
WAY
)
LL
LL
LL
EP
LL
LL
EP
LL
EMERGENCY
PARKING
EMERGENCY PARKING
ASP
HAL
TW
AL
K/
BI
KE
PAT
H
LL
ASPHAL
T WAL
K/
BI
KE PAT
H
410
LL
EP
TO
E
TOP
1'-6 1
2"
BARRIER
SR 60 EAST
TOP
30'-0"
TOP
EP
TOE
30'-0"
TOE
TOP
8" MANGROVE
50 MPH
TOP
CABLE
WITNESS
TOE
EP
415
BARRIER
1'-0"
¡ CONST. SR 60
ASP
HAL
TW
AL
K/
BI
KE
PAT
H
TOP
TOE
12"
13"
10"
11"
16"
12"
COMPLIANCE MONITORING POINT
LIMITS OF CONSTRUCTION
200 FEET DOWN CURRENT OF
WORK (OUTGOING TIDE) (N.T.S.)
1320'
EXISTING R/W
BACKGROUND MONITORING POINT
LEGEND
500 FEET UP CURRENT OF WORK
(INCOMING TIDE) (N.T.S.)
200 FOOT MIXING ZONE
SEDIMENT BARRIER
FLOATING TURBIDITY BARRIER
TEMP. SHEET PILE WALL
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
SHEET
DEPARTMENT OF TRANSPORTATION
NO.
TAMPA, FLORIDA 33607
(813) 282-7275
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
EROSION CONTROL
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
9
2/8/2017
5:38:28 PM
Z:\CADD\ECPLRD01.DGN
11"
on any electronic copies
4" MANGROVE
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
TOE
4" MANGROVE
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
Feet
EXISTING R/W
100
Feet
WATER EDGE
TEMPORARY CONSTRUCTION
DREDGE IMPACT
AREA = 0.24 AC
TEMPORARY CONSTRUCTION
IMPACTS AREA = 0.08 AC
TOE
4" MANGROVE
4" MANGROVE
4" MANGROVE
4" MANGROVE
6" MANGROVE
ASPHAL
T WAL
K/
BI
KE
6" MANGROVE
TOP
6" MANGROVE 4" MANGROVE(2)
4" MANGROVE
PAT
H
TOE
PVC
PVC
EMERGENCY PARKING
TOE
6" MANGROVE
TOP
6" MANGROVE
TOP
4" MANGROVE
SR 60 WEST
EP
LL
CABLE
WITNESS
LL
TOE
EP
CONC
LL
4
0
5
TOP
EP
LL
LL
LIMITS OF
LL
LL
LL
EP
CONSTRUCTION
LL
LL
LL
EP
LL
EMERGENCY
PARKING
EMERGENCY PARKING
ASP
HAL
TW
AL
K/
BI
KE
PAT
H
LL
ASPHAL
T WAL
K/
BI
KE PAT
H
410
LL
TO
E
TOP
1'
-61 "
2
EP
BARR
IER
SR 60 EAST
TOP
30'-0"
TOP
EP
TOE
TOE
30'-0"
TOP
8" MANGROVE
50 MPH
TOP
WATER EDGE
CABLE
WITNESS
TOE
EP
415
12.
8'
44.
6'
ASP
HAL
TW
AL
K/
BI
KE
PAT
H
TOP
DREDGE IMPACT
IMPACTS AREA = 0.08 AC
AREA = 0.30 AC
TOE
17'
LIMITS OF SEAGRASS
TEMPORARY CONSTRUCTION
SURVEY AREA
12"
13"
10"
11"
16"
1320'
12"
TEMPORARY CONSTRUCTION
IMPACTS AREA = 0.07 AC
RIP RAP
0.12 AC
LEGEND
EXISTING R/W
DREDGE IMPACT AREA
TOTAL AREA: 0.54 AC
TEMPORARY CONSTRUCTION IMPACTS
TOTAL AREA: 0.30 AC
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
TAMPA, FLORIDA 33607
(813) 282-7275
SHEET
DEPARTMENT OF TRANSPORTATION
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
NO.
CONSTRUCTION IMPACTS
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
10
3/10/2017
11:59:24 AM
Z:\CADD\PLPREM01.dgn
11"
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
IMPACTS AREA = 0.07 AC
on any electronic copies
0 20
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
1320'
N
1872 CY
118'
45'
APPROX. SEAGRASS LIM ITS
111'
¡ CONST. SR 60
EXIST. GROUND
DREDGE
IMPACT
19.8 SF
DREDGE
IMPACT
50.5 SF
MHW +0.814
6
1:
1:
6
TEMPORARY
SHEET PILE WALL
TEMPORARY
SHEET PILE WALL
EXCAVATION
CHANNEL BOTTOM -7.60
TYPICAL SECTION AT BRIDGE PIER
148'
15'
APPROX. SEAGRASS LIM ITS
133'
¡ CONST. SR 60
DREDGE
IMPACT
117.7 SF
DREDGE
IMPACT
161.5 SF
TEMPORARY
SHEET PILE WALL
EXIST. GROUND
MHW +0.814
3
1:
1:
4
1:
3
CHANNEL BOTTOM -7.60
5'
5'
TEMPORARY
SHEET PILE
WALL
4
1:
20'
20'
TYPICAL SECTION AT END BENT
1" = 20' HORIZONTAL
1" = 10' VERTICAL
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
DEPARTMENT OF TRANSPORTATION
TAMPA, FLORIDA 33607
(813) 282-7275
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
SHEET
CONSTRUCTION IMPACTS
TYPICAL SECTIONS
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
2/10/2017
2:57:45 PM
Z:\CADD\RDXSEM01.dgn
NO.
11
on any electronic copies
DREDGE IMPACT
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
VOLUME
(APPROX.)
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
PROJECT IMPACTS
1839 CY
118'
45'
APPROX. SEAGRASS LIM ITS
111'
¡ CONST. SR 60
EXIST. GROUND
TEMP. FILL IMPACTS
44.0 SF
TEMP. FILL IMPACTS
40.7 SF
MHW +0.814
6
1:
1:
6
TEMPORARY
SHEET PILE WALL
TEMPORARY
SHEET PILE WALL
CHANNEL BOTTOM -7.60
TYPICAL SECTION AT BRIDGE PIER
148'
15'
APPROX. SEAGRASS LIM ITS
133'
¡ CONST. SR 60
TEMP. FILL IMPACTS
139.1 SF
TEMP. FILL IMPACTS
119.9 SF
TEMPORARY
SHEET PILE
WALL
EXIST. GROUND
MHW +0.814
3
1:
1:
3
CHANNEL BOTTOM -7.60
1:
4
5'
TEMPORARY
SHEET PILE
WALL
4
1:
5'
20'
20'
TYPICAL SECTION AT END BENT
1" = 20' HORIZONTAL
1" = 10' VERTICAL
REVISIONS
DATE
DESCRIPTION
DATE
DESCRIPTION
STATE OF FLORIDA
ATKINS NORTH AMERICA, INC.
4030 WEST BOY SCOUT BLVD., STE. 700
DEPARTMENT OF TRANSPORTATION
TAMPA, FLORIDA 33607
(813) 282-7275
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
HILLSBOROUGH
439206-1-52-01
SHEET
TEMPORARY FILL IMPACTS
TYPICAL SECTIONS
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
SHAYNE PAYNTER, P.E. # 58136
60
USER: wild1871
2/10/2017
2:54:18 PM
Z:\CADD\RDXSEM02.dgn
NO.
12
on any electronic copies
TEMPORARY FILL IMPACTS
XX/XX/XX using a SH A-1 authentication code; Printed copies of this docum ent are not considered signed and sealed and the SH A-1 authentication code m ust be verified
VOLUME
(APPROX.)
Shayne Paynter State of Florida, Professional Engineer, License No.
58136. This item has been electronically signed and sealed by Shayne Paynter,
PE on
PROJECT IMPACTS
OLD TAMPA BAY WATER QUALITY IMPROVEMENT AND SEAGRASS
MITIGATION PLAN
FDOT DISTRICT 7 COMPENSATORY MITIGATION PLAN
February 2017
Table of Contents
1.0 OBJECTIVES ....................................................................................................................................... 3
2.0 SITE SELECTION ............................................................................................................................... 5
3.0 SITE PROTECTION INSTRUMENT................................................................................................ 7
4.0 BASELINE INFORMATION.............................................................................................................. 7
5.0 DETERMINATION OF CREDITS .................................................................................................... 9
7.0 MAINTENANCE PLAN .................................................................................................................... 10
8.0 PERFORMANCE STANDARDS ...................................................................................................... 10
9.0 MONITORING REQUIREMENTS ................................................................................................. 11
10.0 LONG-TERM MANAGEMENT PLAN ....................................................................................... 12
11.0 ADAPTIVE MANAGEMENT PLAN ........................................................................................... 12
12.0 FINANCIAL ASSURANCE............................................................................................................. 13
Figures
Figure 1-1 Proposed Service Area of Mitigation Site............................................................. 4
Figure 2-1: Study Design..............................................................................................6
Figure 9-1 Stratum Locations.......................................................................................12
Tables
Table 2-1: Field-Calibrated Model Results Demonstrating the Reduction in Residence Time ..............6
Appendices
Appendix A
Feasibility Study and Hydrodynamic Modeling Reports
Appendix B
Seagrass Mitigation Plan
Appendix C
Seagrass Maps
Appendix D
UMAM Analysis
Appendix E
Contract Plans
2
1.0 OBJECTIVES1
The objectives of the Old Tampa Bay (OTB) Water Improvement Project are to construct a
regional water quality improvement project benefitting Old Tampa Bay (OTB) and to offset
seagrass impacts associated with Florida Department of Transportation (FDOT) road way
construction projects. The project, consisting of a 220-foot opening in the Courtney Campbell
Causeway (CCC) west of Ben T. Davis Beach, will provide water quality improvement
comparable to treating more than 2,000 acres of roadway runoff via wet detention ponds (FDOT
2016, included in Appendix A-Feasibility Study and Hydrodynamic Modeling). The
improvements are also proposed to provide historical flow patterns and salinity conditions
favorable for the restoration of more persistent seagrass meadows in the areas north of the CCC.
See Appendix B for the Seagrass Mitigation Plan.
FDOT proposes to utilize the areas north of the CCC for seagrass mitigation. The water quality
improvements are anticipated to increase seagrass coverage and diversity by replacing the
currently dominant, ephemeral species with more persistent species. The results of aerial analysis
supplemented by 2014 and 2016 in-water analysis suggest there is a total of approximately 124
acres of bay bottom where the seagrass community is more sparse, mostly ephemeral and almost
entirely monospecific meadow of R. maritima, a species of seagrass that is dominant over other
species in areas that demonstrate low and/or variable salinity. Water quality improvements and
improvement to estuarine habitat are anticipated throughout the 320 acres.
FDOT has identified future bridge-widening projects in this vicinity that will require seagrass
mitigation. The seagrass mitigation from this project will offset future impacts for other projects
within the vicinity. The water quality improvement and seagrass mitigation is proposed to be
suitable compensation for projects located in the Tampa Bay and Coastal Areas watersheds.
Refer to Figure 1-1 below for the watershed areas proposed as suitable for use of the seagrass
mitigation and water quality improvements generated by this project. Projects located outside of
these two watersheds will only be proposed to utilize this mitigation where there is a
demonstrated close hydrological and/or ecological connection, subject to regulatory review and
concurrence.
1A
description of the resource type(s) and amount(s) that will be provided, the method of compensation (i.e., restoration,
establishment, enhancement, and/or preservation), and the manner in which the resource functions of the compensatory
mitigation project will address the needs of the watershed, ecoregion, physiographic province, or other geographic area of
interest.
3
Figure 1-1: Proposed Watershed Areas for Utilization of the Regional Water
Quality Improvement and Seagrass Mitigation
4
2.0 SITE SELECTION2
The FDOT, with the assistance of Atkins and ESA scientists and engineers, identified the area
within OTB north of CCC with declining ecological values from salinity extremes as a result of
obstruction of water circulation due to the CCC built in the 1930s (FDOT 2015, included in
Appendix A). Initial identification of this area occurred through review of Southwest Florida
Water Management District (SWFWMD) seagrass maps, which revealed a lag in seagrass
recovery compared to other portions of Tampa Bay that have rebounded to pre-1950 levels as a
result of other regional water quality improvements. Additional scientific and engineering studies
included on-site analysis of benthic vegetation, sediments, water quality, and near-bottom water
circulation, and field-calibrated hydrodynamic modeling (FDOT 2015 and 2016). These studies
found that areas where seagrass coverage is more sparse and/or dominated by widgeon grass
(Ruppia maritima) are also characterized by significantly higher residence times, lower circulation
and slightly higher concentration of nitrogen. Widgeon grass is tolerant of a wide range of salinity
and only reproduces at relatively low salinity. With no other factors limiting seagrass growth, such
as substrate or water depth, these studies concluded that insufficient tidal flushing (resulting from
CCC construction) is the primary cause of elevated nitrogen concentrations and reduced seagrass
coverage and diversity north of the CCC. Further, the hydrodynamic model demonstrated that a
220-foot opening in the CCC west of Ben T. Davis Beach would significantly increase tidal
flushing north of the CCC in this portion of the OTB. These conclusions are consistent with results
of previous causeway or other water exchange obstruction-removal projects in Florida and
elsewhere. The proposed CCC causeway modification therefore will improve water quality and
provide the necessary conditions for seagrass recovery.
The hydrodynamic model and field review evaluated four representative areas (strata): three to the
north of the CCC and one to the southeast (Figure 2-1). The strata were selected based on available
biannual seagrass maps produced by SWFWMD. Stratum A, which is the area on the north side
nearest the existing bridge, totals 89 acres; Stratum B, to the east of Stratum A, is 123 acres;
Stratum C, located east of Stratum B and therefore the furthest from the existing bridge, is 108
acres. Stratum D is on the south side of CCC, therefore representative of areas with no effect from
tidal restriction, and totals 94 acres. The model predicts that a 220-foot opening would result in an
80% reduction in residence time for Stratum A, 60% reduction in residence time for Stratum B,
and 50% reduction in residence time for Stratum C (Table 2-1).
2A
description of the factors considered during the site selection process. This should include consideration of watershed needs,
onsite alternatives where applicable, and the practicability of accomplishing ecologically self-sustaining aquatic resource
restoration, establishment, enhancement, and/or preservation at the compensatory mitigation project site.
5
Figure 2-1: Study Design
Table 2-1: Field-Calibrated Model Results Demonstrating the Reduction in Residence
Time*
Residence Time (days)
Percent
Location
Acres Existing
With proposed Reduction
conditions (no
220 ft opening
alternative)
Stratum A
80
89
2.25
0.50
Stratum B
60
123
2.75
1.00
Stratum C
50
108
3.25
1.50
*Updated in November 28, 2016 Technical Memorandum (Appendix A)
Other positive effects of improved flushing include restoration of conditions favorable for the
development of a more diverse seagrass meadow in the areas north of the CCC. In the region of
strata B and C, there are approximately 124 acres that are characterized as having sparse and
ephemeral meadows of seagrass that are dominated by Ruppia maritima, based on data from
SWFWMD and in-water surveys in December 2014 and April 2016, Appendix C-Seagrass
Maps). The area of 124 acres is a relatively conservative estimate of the area of improvement in
OTB that would result from construction of a 220-foot opening in CCC, as it refers to those
portions of strata B and C that would experience improved tidal flushing and which are currently
characterized by sparse and/or ephemeral and mostly monospecific meadows of R. maritima. The
hydrodynamic model predicts that an area of approximately 320 acres in total would benefit from
enhanced tidal exchanges associated with the proposed project
Additionally, the seagrass meadows in the area north of the CCC that are the focus of this effort
(strata B and C, in particular) appear to be impacted not by nutrient loads, but by the fact that the
6
CCC likely caused salinities in strata B and C to become lower and more variable than they were
prior to the construction of the CCC. In the area of strata B and C, the "solution" to resolve impacts
to seagrass meadows does not involve reducing nutrient loads, but to restore the prior salinity
regime in those waters; which requires restoring the historical tidal flushing, as much as is possible.
The FDOT proposes the OTB project as a regional solution and is pleased to have obtained support
from SWFWMD and local stakeholders including members of the Tampa Bay Estuary Program
Technical Advisory Committee (TAC) for the project. Initial discussions with SWFWMD staff in
2014 led to a technical evaluation of the area north of CCC, which was then presented to
SWFWMD on January 20, 2015. SWFWMD regulatory staff later discussed this project with
FDEP and other water management districts at an "anti-drift" regulatory meeting in mid-2015, to
determine whether this type of project would be consistent with 373.413(6), F.S. Following the
"anti-drift" meeting, SWFWMD concurred with the FDOT approach to conduct further
measurements and hydrodynamic modeling to better quantify the benefits of an opening in the
CCC. Additional informal discussions and preliminary results of hydrodynamic modeling led to
follow-up presentations to SWFWMD on December 3, 2015 and joint meeting of the Tampa Bay
Regional Planning Council's Agency on Bay Management and the Tampa Bay Estuary Program's
TAC on January 21, 2016. These meetings both concluded with broad support for the OTB project,
as a regional water quality solution.
3.0 SITE PROTECTION INSTRUMENT3
The Mitigation Area is located on submerged lands owned by and under the jurisdiction of the
Tampa Port Authority (TPA). TPA is reviewing the project and will issue a permit and easement
as additional protection on top of their very strict rules. The seagrass-dominant areas areas
proposed for mitigation are shallow so as to preclude most vessels from accessing the mitigation
site, as evidenced by the lack of prop scars. Existing TPA protections and depth restrictions
provide very strong site protection.
4.0 BASELINE INFORMATION4
The current pattern of seagrasses is such that shoal grass (Halodule wrightii) and widgeon grass
are the dominant species north of the CCC, while mixtures of turtle grass (Thalassia testudinum),
shoal grass, and manatee grass (Syringodium filiforme) dominate the seagrass areas south of the
causeway. This was the pattern found in the study design with strata A, B, and C north of the CCC
and stratum D south. Furthermore, the strata north of the CCC also varied in the distribution and
abundance of shoal grass and widgeon grass. Stratum A had a mix of shoal grass and widgeon
grass with the abundance consistently greater than 75 percent. The seagrass abundance in strata B
and C was found to be inconsistent, with the eastern portion of each stratum containing more sparse
seagrass and with the western portion having some areas with 50 percent seagrass coverage,
3A
description of the legal arrangements and instrument, including site ownership, that will be used to ensure the long-term
protection of the compensatory mitigation project site.
4A description of the ecological characteristics of the proposed compensatory mitigation project site and, in the case of an
application for a DA permit, the impact site. This may include descriptions of historic and existing plant communities, historic
and existing hydrology, soil conditions, a map showing the locations of the impact and mitigation site(s) or the geographic
coordinates for those site(s), and other site characteristics appropriate to the type of resource proposed as compensation. The
baseline information should also include a delineation of waters of the United States on the proposed compensatory mitigation
project site. A prospective permittee planning to secure credits from an approved mitigation bank or in-lieu fee program only
needs to provide baseline information about the impact site, not the mitigation bank or in-lieu fee project site.
7
predominately widgeon grass. Approximately 58 and 66 acres in strata B and C, respectively, were
found to be comprised of 25 percent or less seagrass abundance, again, predominately widgeon
grass. The increasing pattern of increasing dominance of widgeon grass in the eastern stratum
north of the CCC is consistent with literature description that suggest that salinities are lower and
more variable in the areas furthest away from the tidal influences of the open waters of OTB. The
analysis of long term water quality data showed that the salinity north of the CCC was both lower
and more variable than the salinity at stations immediately south of the CCC. The patterns of
seagrass species distribution and salinity north of the CCC are consistent with the assumptions of
our conceptual model.
The construction of the CCC reduced the tidal influence in areas north of the causeway.
Reduced tidal influences would be most strongly manifested in areas farthest away from
the open waters of OTB (i.e. west to east north of the CCC).
Reduced tidal mixing north of the CCC results in lower and more variable salinities than
in areas south of the CCC or in areas north of the CCC but farther to the west.
The resulting alterations to the salinity regime would likely result in the loss of more
stenohaline (intolerant of a wide fluctuation in salinity) species of seagrass, i.e. manatee
grass
Alterations to the natural salinity regime would be more strongly manifested in areas
farthest removed from tidal influences, i.e. the eastern stratum north of the CCC, resulting
in a salinity-mediated filtering that would result in dominance by widgeon grass in areas
north of the CCC and farthest away from historical tidal influences, i.e. strata B and C.
The conclusion was that salinity best explains the patterns of seagrass species and abundance north
of the CCC. Further analysis of other parameters such as nitrogen and chlorophyll-a, found that
concentrations were higher north of the CCC; however, the elevated concentration were associated
with the altered salinity regime rather than pollution. Analysis of the sediments, also, was not
supportive of a conclusion that they were grossly polluted, e.g. high H2S, or indicative of nutrientenriched runoff into the area. The sediments were mostly sand with relatively low organic content
and sulfide levels that are not considered toxic to seagrasses.
Therefore, the current state of the seagrass resources north of the CCC can be most likely attributed
to the lack of tidal flushing causing the differences in seagrass species, abundance and persistence.
Improving tidal flushing through the addition of the 220-foot bridge would improve the conditions
for restoration of the seagrass species and an increase in persistent seagrass species north of the
CCC. The hydrodynamic model used to analyze the bridge addition estimated reductions in the
residence time within the stratum (Table 2-1). Strata A and B would experience a 80% and 60%
reduction, respectively, while stratum C would experience a 50% reduction with a resulting
residence time significantly less than the residence time currently within stratum A.
Stratum A totals 89 acres; Stratum B is 123 acres; and Stratum C is 108 acres. The positive effects
of the enhanced flushing caused by the bridge would include the restoration of conditions favorable
to the conversion of the approximately 124 acres of sparse or ephemeral seagrass species to
persistent seagrass species in strata B and C as well as an improvement in water quality and salinity
regime over the entire 320 acres.
8
5.0 DETERMINATION OF CREDITS5
The functional gain obtained by seagrass habitat enhancement is calculated by applying rules for
Uniform Mitigation Assessment Method (UMAM) pursuant to Chapter 62-345, Florida
Administrative Code. A UMAM analysis was conducted for the project (see attached UMAM
Analysis in Appendix D). A UMAM Functional gain was calculated for the water quality
improvements and seagrass enhancement strata identified north of the Courtney Campbell
Causeway in OTB. As shown in Appendix D, two types of areas were evaluated using UMAM.
Three areas are proposed to have only water quality improvements (Stratum A, Stratum B (west),
Stratum C (west) resulting in a total function gain of 16.216. Stratum B (east) and Stratum C
(east) were determined to have a total functional gain of 4.282 with gains both in the water
environment and community structure.
Key components of this mitigation evaluation taken from the UMAM datasheets included as
Appendix D. The justification for functional gain in each UMAM scoring criteria is explained
below.
Location & Landscape
The current site conditions are a causeway that has severed the hydrologic flow. The mitigation
project restores historic and natural conditions to the area, allowing the seagrass to recover. The
"with" project location and landscape support score rose to account for the benefit for aquatic
wildlife movement once the flushing cut is constructed and hydrologic flow restored. Stratum A
did not receive a lift in Location & Landscape score due to its proximity to the existing hydrologic
connection to the west of that stratum.
Water Environment
Current conditions included ephemeral seagrass, low dissolved oxygen levels, higher than normal
temperatures, and poor water quality. With the project, the water environment will significantly
improve. Flushing will occur under the bridge and dramatically improve the water environmental
for vegetation and wildlife in the assessment area. Water quality improves significantly benefit
seagrass recovery and in turn fish and marine invertebrate populations.
Community Structure
In strata in which lift was given for community structure, current conditions in the assessment area
included seagrass beds in which ephemeral species are dominant due to salinity conditions and for
5A
description of the number of credits to be provided, including a brief explanation of the rationale for this determination. (See
§ 332.3(f).)
(i) For permittee-responsible mitigation, this should include an explanation of how the compensatory mitigation project will
provide the required compensation for unavoidable impacts to aquatic resources resulting from the permitted activity.
(ii) For permittees intending to secure credits from an approved mitigation bank or in-lieu fee program, it should include the
number and resource type of credits to be secured and how these were determined.
9
areas in which coverage was sparse or patchy. The mitigation project will restore historic and
salinity regimes to the area, allowing for persistent seagrasses to grow. The "with" project score
is based on the increase in seagrass density in the sparse areas and the conversion of ephemeral
seagrass meadows to meadows comprised of persistent species. Additional benefits associated
with seagrass recovery include healthier fish and marine invertebrate populations.
6.0 MITIGATION WORK PLAN6
The immediate objective of the Old Tampa Bay Water Improvement Project is to reestablish the
tidal connection north and south of the Courtney Campbell Causeway (SR 60). For detailed
construction drawings of the mitigation, please see Appendix E. This exhibit shows the
construction of a 220' opening in the Courtney Campbell Causeway, just west of Ben T. Davis
Beach.
7.0 MAINTENANCE PLAN7
Maintenance of the seagrass beds is not necessary and specific success criteria are not proposed
since restoration of the tidal recirculation is anticipated to occur soon as the bridge is
constructed. However, periodic monitoring will be conducted by the FDOT for five years to
evaluate the seagrass health and for 2 years to evaluate water quality conditions. Additionally,
there are boating restriction zones and seagrass caution zones at the mitigation area which will be
demarcated by buoys (Appendix B).
8.0 PERFORMANCE STANDARDS8
The assessment for the water quality improvements are contained within a 2year monitoring
program with success criteria based upon achieving some level of equilibrium between the water
bodies north and south of the CCC through improved tidal exchange and flushing. The seagrass
enhancement is not anticipated to respond as quickly as the physical and water quality
parameters; therefore, monitoring of sea grass health fois proposed for 5 years.
Seagrass enhancement success will be based upon monitoring within Stratum C and Stratum B and
monitoring within a reference site (Stratum A). Stratum A would be used as the reference site due to
its seagrass abundance and appropriate species richness. Monitoring data would be collected as total
percent coverage and species richness within random sample plots for both the mitigation site and the
reference site. Success will be determined based on a percent similarity/agreement between the
reference site and the mitigation site.
6
Detailed written specifications and work descriptions for the compensatory mitigation project, including, but not limited to, the
geographic boundaries of the project; construction methods, timing, and sequence; source(s) of water, including connections to
existing waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the
proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For
stream compensatory mitigation projects, the mitigation work plan may also include other relevant information, such as planform
geometry, channel form (e.g., typical channel cross-sections), watershed size, design discharge, and riparian area plantings.
7 A description and schedule of maintenance requirements to ensure the continued viability of the resource once initial
construction is completed.
8Ecologically-based standards that will be used to determine whether the compensatory mitigation project is achieving its
objectives.
10
9.0 MONITORING REQUIREMENTS9
In South Florida, a similar project was conducted, where the 100 year old causeway across Lake
Surprise, in Key Largo, was removed. Prior to the removal of the causeway, a monitoring program
was developed to document the system response(s) to the project and to ensure that the anticipated
benefits to the water quality and benthic resources of Lake Surprise actually occurred.
The proposed monitoring program outlined below is based on that approach, which is summarized
in a report to FDOT (PBS&J 2009). As in Tampa Bay, local stakeholders were very interested in
the causeway removal project in Key Largo, and a statistically robust and experimentally sound
monitoring program was warranted.
The proposed monitoring and assessment approach for the CCC modification project would
incorporate a number of integrated tasks.
A detailed Before and After, Control and Impact (BACI) monitoring and assessment
program developed and implemented for determining potential impacts of various
construction activities.
An assessment of potential nutrient benefits and/or impacts associated with CCC
modification activities.
A proactive public education and outreach program.
Task 1 Development and implementation of a detailed BACI monitoring and assessment program
Existing reports and data sets will be used to develop a detailed BACI experimental design for
detecting changes (if any) in the water quality and natural resources in the areas expected to benefit
from modification of the CCC. A BACI approach will be used, as there is a need to differentiate
between regional and/or climatic changes in water quality and natural communities, as opposed to
changes associated with the causeway removal itself.
The basic layout of a BACI experimental design is to collect monitoring data prior to the initiation
of any potentially impacting activities, and simultaneously collect the same data set at a nearby
site not expected to be impacted by these same activities. The collection of data at both impacted
and non-impacted sites allows for the differentiation between changes due to the modification of
the CCC. As an example, if baseline water quality and seagrass coverage data provide evidence
of an improvement in water quality and expansion of seagrass meadows in the areas influenced by
a new hydrologic connection, but no such change in the control sites, then the positive changes are
due to the project rather than due to climatic factors or overall improvement in bay-wide
conditions. Conversely, if water quality improvements and seagrass expansion occurred at similar
rates in both the areas newly influenced by a new hydrologic connection as well as within the
control site, then the improvement due the project may be secondary to an overall improvement in
water quality in the bay.
9A
description of parameters to be monitored in order to determine if the compensatory mitigation project is on track to meet
performance standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring results to
the district engineer must be included.
11
For this project, data would be collected prior to, during, and after the modification of the CCC,
from the previously used Strata of A, B, C and D (see image below). Stratum C is the location
where it is anticipated that the greatest benefit would occur, in terms of both water quality benefits
and seagrass recovery. Benefits would also be expected to occur in Stratum B, particularly on the
east side of Stratum B. Stratum A would act as a control for water quality and seagrass coverage
in areas north of the CCC. While useful as a control for areas south of the CCC, it is not anticipated
that Stratum D would be part of the proposed BACI design for monitoring.
Figure 9-1. Stratum Locations
Proposed Bridge
Opening
10.0 LONG-TERM MANAGEMENT PLAN10
As indicated above, this Mitigation Area is located on submerged lands owned by the Tampa
Port Authority. Long-term protection of the Mitigation Area is provided by its existing status as
a Sovereign Submerged Land (SSL) under the jurisdiction of the TPA. Further restrictions are
anticipated via the permit which will be issued by the TPA following their review of the project.
This submerged land will be managed by the Tampa Port Authority in perpetuity. Buoys will
be placed to demarcate the seagrass beds as a further precaution.
11.0 ADAPTIVE MANAGEMENT PLAN11
No specific adaptive management plan has been created for this project as unforeseen changes
in site conditions are unlikely. The opening which allows for the hydrological improvements is a
10
A description of how the compensatory mitigation project will be managed after performance standards have been achieved to
ensure the long-term sustainability of the resource, including long-term financing mechanisms and the party responsible for
longterm management.
11 A management strategy to address unforeseen changes in site conditions or other components of the compensatory mitigation
project, including the party or parties responsible for implementing adaptive management measures. The adaptive management
plan will guide decisions for revising compensatory mitigation plans and implementing measures to address both foreseeable
and unforeseen circumstances that adversely affect compensatory mitigation success.
12
permanent structure and will be maintained, as it located within the Courtney Campbell Causeway,
a major state-owned transportation corridor. Due to the contiguous nature of the Mitigation Area
to Old Tampa Bay, the most likely change in site conditions that would have a significant impact
the Mitigation Area is a change in water quality or direct impacts such as prop dredging.
12.0 FINANCIAL ASSURANCE12
This mitigation project is being funded through the FDOT. As FDOT roadway projects for which
this project will serve as mitigation are permitted, credits will be deducted from the site which is
proposed as advanced mitigation. The project is currently listed in the FDOT Five Year Work
Program.
12A
description of financial assurances that will be provided and how they are sufficient to ensure a high level of confidence that
the compensatory mitigation project will be successfully completed, in accordance with its performance standards.
13
Appendix A
Feasibility Study and
Hydrodynamic Modeling
Reports
14
Old Tampa Bay Water
Quality Improvements
Phase I: Feasibility Study
Florida Department of Transportation District 7
February 2015
Draft
Old Tampa Bay Water Quality Improvements
Executive Summary
The Florida Department of Transportation (FDOT) District Seven is anticipating significant
right-of-way costs associated with multiple upcoming projects, including work on the
Interstate 275 / State Road 60 interchange, the Howard Frankland Bridge, and various
projects associated with Interstate 275 in Pinellas County. All of these transportation projects
are occurring within the watershed of Old Tampa Bay.
In 1998, the Florida Department of Environmental Protection (FDEP) placed Old Tampa Bay
on its list of impaired water bodies, in accordance with Section 303(d) of the Federal Clean
Water Act. Applications for environmental resource permits (ERP) that deal with stormwater
are required to address the water quality goal of the Clean Water Act, i.e. "not cause or
contribute to exceedance of water quality standards" particularly for waterbodies on the
303(d) list. In 2009, FDEP approved a Reasonable Assurance Plan (RAP) for restoring water
quality in all of Tampa Bay. The RAP is a "hold the line" strategy for nutrient loads, and
stormwater permits are to consider that new or expanded nutrient loads (specifically for
nitrogen) should not offset the intent of the RAP.
The most widely adopted stormwater treatment system in Florida, wet detention ponds, only
remove about 30 to 40 percent of incoming nitrogen loads from stormwater, which makes
"holding the line" impossible to achieve with their use alone. Dry retention ponds have
nitrogen removal efficiencies in excess of 90 percent, but they often require much larger
construction costs or areas of land to meet design standards. However, in 2012 the Florida
legislature passed HB 559 which included direction to the water management districts and
FDEP to "...allow alternatives to onsite treatment, including, but not limited to (emphasis
added) regional stormwater treatment systems." Upon the Governor's signature, this
provision was enacted into law as Section 373.413(6), Florida Statutes (F.S.). Additionally,
Section 4.0 of the Southwest Florida Water Management District (SWFWMD) Applicant's
Handbook Volume II (AH Vol II) states that "The applicant may also provide reasonable
assurance of compliance with state water quality standards by the use of alternative methods
that will provide treatment equivalent (emphasis added) to systems designed using the
criteria specified in this section."
One such alternative treatment system that has been proposed for consideration involves the
Courtney Campbell Causeway (CCC). The CCC was constructed in the early 1930's during a
time when Old Tampa Bay was considered to have good water quality. Aerial photographs
show evidence of extensive seagrass meadows in most of Old Tampa Bay in 1948.
However, the shallow waters of Old Tampa Bay north of the CCC at its eastern terminus
appear to be devoid of seagrass in 1948. These findings indicate that the construction of the
CCC changed the environment to the extent that seagrass could not grow in that area, even
while adjacent waters supported extensive meadows of these underwater plants.
This study was initiated to evaluate if the replacement of a portion of the CCC with a
conveyance structure such as a bridge would likely bring about an ecological response in Old
Tampa Bay similar or greater than that which would be expected to occur by treating
stormwater runoff alone. The removal or modifications of causeways such as the CCC has
been promoted worldwide as an environmental restoration tool, and ecological responses to
Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft | January 2015
i
Old Tampa Bay Water Quality Improvements
causeway removal have benefited water quality over areas in the range of hundreds of acres,
based on monitoring system responses to completed projects in the Florida Keys and Tampa
Bay.
This report summarizes findings associated with the collection, analysis, and interpretation of
data on the species composition, location, depth distributions and likely causes of spatial
differences in seagrass in a part of Old Tampa Bay north of the CCC north and east of Rocky
Point. Samples of both water and sediments were also collected, analysed and interpreted.
Based on this data collection and analysis effort, the primary cause of impacts to seagrass
resources north of the CCC north and east of Rocky Point appears to be artificially lower and
more variable salinities, compared to conditions that existed prior to the construction of the
causeway. The restoration of water quality necessary for recovery of seagrass meadows to
their historical condition in this area is thus dependent upon the restoration of the historical
salinity regime, which is in turn dependent upon the ability to restore historical tidal
influences. Our results, when compared to results from other causeway-removal projects in
Florida suggest that restoration of water quality conditions through improved circulation would
result in recovery of perhaps 81 acres of seagrass.
Based on an examination of trends in seagrass coverage and various nitrogen load reduction
projects in the Tampa Bay watershed during the last 13 years, the amount of nitrogen load
reduction required to bring about an 81 acre increase in seagrass coverage would be
approximately 10,568 pounds, or more than 5 tons of nitrogen. This reduction in nitrogen is
equivalent to the expected performance of more than 100 of the typical stormwater ponds
constructed by FDOT. In addition, FDOT is normally required to treat only the nitrogen
created that is over and above the existing loading, hence, the 100 ponds noted would not
actually result in any reduction in nitrogen to the bay if constructed through the typical
permitting process. Put another way, the restoration of historical circulation patterns via a
bridge or culverts through the CCC, would provide a vastly greater benefit to Old Tampa Bay
than the construction of 100 stormwater treatment ponds. This provides the basis for CCC
modification as a regional water quality project in lieu of on-site stormwater ponds, pursuant
to 373.413(6), F.S.
Using results from a standard approach to modelling stormwater, it appears that more than
2,000 acres of roadway runoff would have to be routed into wet detention ponds to bring
about a nitrogen load reduction of 10,568 pounds per year, due to the low published loading
rates for elevated highways with limited or no offsite influences. This acreage greatly
exceeds the amount of new impervious area to be added with the Interstate 275 / State Road
60 interchange as well as other area projects. In order to address other pollutants of
concern, smaller ponds that reduce suspended solids and metals, and with oil and grease
separation baffles, would still be necessary and included, as no direct discharge to receiving
waters is contemplated or recommended
In summary, the modification of the CCC to allow for the restoration of lost historical tidal
influences in northeastern Old Tampa Bay is likely to result in an ecological response greater
in magnitude than that which could be provided with treating stormwater runoff with traditional
treatment systems. Further, the proposed project is consistent with language within FS
373.413(6) and AH Vol II, both of which allow for alternative methods to address water quality
Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft | January 2015
ii
Old Tampa Bay Water Quality Improvements
issues, as long as the benefit would be equivalent (in this case it would be far greater) than
that which would be expected with traditional stormwater treatment systems.
Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft | January 2015
iii
Old Tampa Bay Water Quality Improvements
Table of contents
Chapter
Pages
Executive Summary
i
1.
1.1.
1.2.
1.3.
1.4.
1.5.
Introduction
Project purpose
Transportation projects in the Tampa Bay region
Regulatory programs and stormwater treatment
Influence of factors other than nutrients on ecosystem health in Tampa Bay
Purpose of Study
1
1
1
2
4
9
2.
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
Methods
Site selection
Seagrass and macroalgal presence and abundance
Depth of the deep edge of seagrass meadows
Surface and near bottom water quality
Sediment characterization
Flora and Fauna observations
10
10
11
16
17
18
18
3.
3.1.
3.2.
3.3.
19
19
25
26
3.4.
3.5.
Results
Seagrass and macroalgal presence and abundance
Depth of the deep edge of seagrass meadows
Surface and near bottom water quality
33
Sediment characterization
Flora and Fauna
4.
4.1.
4.2.
4.3.
Discussion
Distribution and abundance of seagrass
Basis for observed patterns of seagrass distribution and abundance
Development of a "nutrient-equivalency" estimate for seagrass restoration
36
36
37
39
5.
Conclusions
44
6.
Recommendations
46
7.
Literature Cited
48
34
35
Appendix A. Data sheets
A.1. Seagrass and Macroalgae assessment
A.2. Sediment and Water Quality Characterization
51
51
52
Appendix B. Representative Photographs
53
B.1. Stratum A. Photos represent seagrass and macroalgae as quantified in example
10 cm2 sampling grids.
53
Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft | January 2015
i
Old Tampa Bay Water Quality Improvements
B.2.
B.3.
B.4.
Stratum B. Photos represent seagrass and macroalgae as quantified in example
10 cm2 sampling grids.
57
Stratum C. Photos represent seagrass, macroalgae and bare areas as quantified
in example 10 cm2 sampling grids.
60
Stratum D. Photos represent seagrass and macroalgae as quantified in example
10 cm2 sampling grids from above and below the water surface.
64
Appendix C. Laboratory Results
C.1. Surface and Bottom water quality as provided by Benchmark Environmental
Analytical, LLC
C.2. Sediment data as provided by MOTE Marine Laboratory
Tables
Table 1
Table 2
Table 3
Table 4
Table 5
Table 6
Table 7
Table 8
Table 9
Figures
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
66
66
67
Scale used to assign Braun-blanquet scores for each determination of
seagrass and macroalgal abundance. ........................................................... 14
Parameters and analytical method used to analyze surface and near-bottom
water samples. .............................................................................................. 17
Parameters and analytical method used to analyze the collected sediment
samples. ........................................................................................................ 18
Estimation of seagrass abundance in Strata B and C.................................... 20
Stratum summary statistics for depth of the deep edge for the seagrass
meadows. ...................................................................................................... 25
Summary statistics of surface and bottom water quality samples. ................. 27
Summary statistics of surface and bottom in situ parameters. ....................... 28
Summary statistics of sediment parameters. ................................................. 34
List of flora and fauna identified within the study area. .................................. 35
Map of Tampa Bay showing main transportation features and the watersheds
of coastal drainage to Old Tampa Bay, the Hillsborough River, the Alafia
River, and coastal drainage to Hillsborough Bay. ............................................ 2
Aerial photograph from 1948 showing extensive seagrass meadows in Old
TampaBay. Area shown is north of the CCC, west of the eastern terminus of
the causeway. .................................................................................................. 6
Aerial photograph from 1948 showing extensive seagrass meadows in Old
Tampa Bay. Area shown is south of the CCC, below the eastern terminus of
the causeway. .................................................................................................. 7
Aerial photograph from 1948 showing apparent impacts to seagrass meadows
north of the CCC at the eastern terminus of the causeway. The red arrow
indicates the photographic signature of shallow areas devoid of seagrass. .... 8
Experimental design layout with the four strata delineations. ........................ 11
Randomly selected sites within Stratum A. .................................................... 12
Randomly selected sites within Stratum B. .................................................... 12
Randomly selected sites within Stratum C..................................................... 13
Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft | January 2015
ii
Old Tampa Bay Water Quality Improvements
Figure 9
Figure 10
Figure 11
Figure 12
Figure 13
Figure 14
Figure 15
Figure 16
Figure 17
Figure 18
Figure 19
Figure 20
Figure 21
Figure 22
Figure 23
Figure 24
Figure 25
Figure 26
Figure 27
Figure 28
Figure 29
Figure 30
Figure 31
Figure 32
Randomly selected sites within Stratum D..................................................... 13
Scientist counting cells which contain seagrass or macroaglae. ................... 14
Graphic depicting distance from sampling sites to nearest "open water". ...... 16
Sampling sites for determining the depth of the deep edge of seagrass. ...... 17
Seagrass species observed within each stratum. .......................................... 19
Average percentage of seagrass coverage at each sampling site. ................ 20
Average percentage of seagrass coverage in Stratum B and estimated portion
of the stratum with less than 25 percent seagrass abundance. ..................... 21
Average percentage of seagrass coverage in Stratum C and estimated portion
of the stratum with less than 25 percent seagrass abundance. ..................... 21
Seagrass abundance compared to the calculated distance from open water.22
Mann-Whitney U-test comparing seagrass abundance greater than and less
than 8,000 feet from open water. ................................................................... 23
Macroaglal genera observed within each stratum. ........................................ 24
Photograph of four of the five genera of macroalgae identified within the study
area (Laurencia, Ulva, Enteromorpha and Gracilaria, respectively, clockwise
from top right corner). .................................................................................... 24
Average percentage of macroalgal coverage at each sampling site. ............. 25
Median water depth (meters) of the seagrass meadow deep edge for each
Stratum. ......................................................................................................... 26
Location of supplemental water quality sites sampled by Hillsborough County .
...................................................................................................................... 30
Comparison of average salinity north and south of the CCC over the period of
1983 to 2013. ................................................................................................. 30
Comparison of annual average coefficient of variation of salinity north and
south of the CCC over the period of 1983 to 2013. ....................................... 31
Comparison of average chlorophyll-a concentrations north and south of the
CCC over the period of 1983 to 2013. ........................................................... 32
Comparison of average total nitrogen concentrations north and south of the
CCC over the period of 1983 to 2013. ........................................................... 32
Comparison of salinity: nitrogen distribution in area north (Stratum C) and
south of CCC. ................................................................................................ 33
Comparison of average total phosphorus concentrations north and south of
the CCC over the period of 1983 to 2013. ..................................................... 33
Seagrass acreage from 1950 to 2012. Data from SWFWMD. Line is best-fit
line of polynomial equation, for illustrative purposes only. ............................. 40
Seagrass acreage from 2002 to 2012. Data from SWFWMD. Line is best-fit
line of linear regression, used to derive annual average increase over this time
period............................................................................................................. 41
Nitrogen load reductions documented in the Reasonable Assurance Plan
update to FDEP (TBEP 2012). ...................................................................... 42
Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft | January 2015
iii
Old Tampa Bay Water Quality Improvements
1.
Introduction
1.1.
Project purpose
The Florida Department of Transportation (FDOT) District Seven contracted with Atkins to
evaluate the feasibility of adding a conveyance mechanism through the Courtney
Campbell Causeway (CCC) in order to improve water quality and thus re-establish
seagrass meadows in a portion of Old Tampa Bay where seagrass meadows had been
likely impacted by reduced tidal circulation. Seagrass meadows are the primary biological
indicator of water quality in Tampa Bay, and the spatial extent of these underwater plants
is the metric by which the bay's health is monitored. The traditional approach to managing
water quality in Tampa Bay is to focus on reducing pollutant loads from wastewater and
stormwater. The pollutant of greatest concern in the Tampa Bay watershed is nitrogen,
due to the adverse effect of nitrogen on water quality, and the link between water quality
and seagrass coverage.
In 1998, the Florida Department of Environmental Protection (FDEP) placed Old Tampa
Bay on its list of impaired water bodies, in accordance with Section 303(d) of the Clean
Water Act. Applications for stormwater permits are typically required to demonstrate that
proposed projects do not result in an increase in nitrogen loads, although new guidance
from the Florida Legislature allows for alternative approaches to meet the intent of
stormwater reductions. Treating stormwater in urbanized locations can be extremely
difficult and expensive, especially where available open land for stormwater ponds is
limited or non-existent. More importantly, nitrogen loads from highways are relatively low
and the FDOT is not required to reduce nitrogen loads, only to not exceed the existing
condition.
This report evaluates baseline data from an intensive field study with the intent to identify
any fatal flaws and to determine if the potential enhancements that might be achieved by
an additional conveyance mechanism through the CCC could improve water quality as a
compensatory water quality treatment. In particular, this report determines whether (and
by how much) additional conveyance through the CCC would improve water quality and
seagrass coverage, as a regional alternative to onsite treatment in accordance with
Section 373.413(6), Florida Statutes (F.S.). In addition to establishing viability of the
conveyance approach, the study established a link between improved water quality
conditions for seagrass expansion as a result of the conveyance mechanism. The
expected ecosystem response to improving water quality via restoration of historical tidal
influences was then compared to more traditional management actions to determine the
amount of stormwater treatment that would be required to bring about an equivalent
response.
1.2.
Transportation projects in the Tampa Bay region
FDOT is anticipating significant right-of-way costs associated with multiple upcoming road
projects, including the Interstate 275 (I-275) / State Road 60 interchange, modifications to
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
1
Old Tampa Bay Water Quality Improvements
the Howard Frankland Bridge, and various projects associated with I-275 in Pinellas
County. All of these projects are located within the portion of the Tampa Bay watershed
that drains to Old Tampa Bay (Figure 1). Typically, FDOT's road projects will result in an
increase in impervious area, which will, unless offset in some manner, increase stormwater
loads of various pollutants to nearby waterbodies.
Figure 1
Map of Tampa Bay showing main transportation features and the
watersheds of coastal drainage to Old Tampa Bay, the Hillsborough
River, the Alafia River, and coastal drainage to Hillsborough Bay.
In 1998, the FDEP placed Old Tampa Bay on its list of officially "impaired waters" known
as the 303(d) list, as required in Section 303(d) of the Federal Clean Water Act. The 1998
303(d) list remains the Federally-recognized guidance document for Old Tampa Bay
(FDEP 2010). Old Tampa Bay was identified by the Tampa Bay Estuary Program (TBEP)
as an area of special concern due to intermittent conditions of poor water quality, an
uneven pace of seagrass recovery (compared to other bay segments) and the presence of
nuisance algal blooms in 2008 and 2009 (TBEP 2010).
1.3.
Regulatory programs and stormwater treatment
For waterbodies categorized as having impaired water quality, the typical management
approach has been to transition towards the development of a Total Maximum Daily Load
(TMDL) which is defined in the Code of Federal Regulations sections 130.2 and 130.70 as
"...the sum of the individual waste load allocations (WLAs) for point sources and load
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
2
Old Tampa Bay Water Quality Improvements
allocations (LAs) for nonpoint sources" that, if exceeded, would be expected to result in
the non-attainment of water quality standards. Discharges from Municipal Separate Storm
Sewer Systems (MS4s) are included as part of the waste load allocations. A MS4 that
contributes a pollutant of concern to an impaired waterbody or a waterbody with an
approved TMDL is assigned a WLA to reduce pollutant loads and thus help to meet the
TMDL. The MS4 program is implemented under the National Pollutant Discharge
Elimination System (NPDES) stormwater permitting program.
Rather than waiting for FDEP to produce a TMDL for Tampa Bay, local governments, state
agencies (including FDOT, FDEP and the Southwest Florida Water Management District
[SWFWMD]) and various other stakeholders joined forces to produce a Reasonable
Assurance Plan (RAP) to guide the management of water quality in Tampa Bay. The RAP
for Tampa Bay is a "hold the line" strategy, intended to maintain its current water quality,
which was determined to be sufficient to allow for the continued recovery of those
resources that are most sensitive to water quality (TBEP 2010). A hold the line strategy,
however, means that projects must be developed to offset the impacts of pollutant loads to
the bay associated with anticipated population growth in the bay's watershed, which
requires an estimated 85 tons of additional nitrogen load reduction projects for each 5-year
planning period (equal to a 17 ton per year reduction). The RAP for Tampa Bay focuses
on nitrogen loads, based on the following management paradigm:
Increases in nitrogen loads increase phytoplankton levels
Increases in phytoplankton levels decrease water clarity
Decreases in water clarity reduce the amount of bay bottom that can be occupied by
seagrass
As outlined by both the State of Florida and the Federal Government, the explicit approach
to restoring water quality is that resources should be directed at reducing the external
loads of nutrients to impaired waterbodies through MS4 permits and other stormwaterrelated regulatory programs. Applications for environmental resource permits (ERP) that
deal with stormwater are required to address the water quality goal of the Clean Water Act,
i.e. "not cause or contribute to exceedance of water quality standards." Addressing water
quality issues through stormwater treatment alone can be extremely difficult and expensive
in an urban setting such as Tampa, where available open land for stormwater ponds is
limited or non-existent. In addition, external nutrient loads are not always the primary
stressor to water quality in Florida (e.g., Swart et al. 1996, Terrell et al. 2000).
The most common stormwater treatment system in Florida is via the use of wet detention
ponds. While wet detention ponds are extremely effective at reducing toxic compounds
such as metals, their documented load reduction efficiency for nitrogen is less than 40
percent (Harper and Baker 2007). Increasing the size of wet detention ponds to increase
their residence times does not appear to bring about further increases in nitrogen removal
(Harper and Baker 2007). In contrast, dry retention ponds may be able to reduce nitrogen
loads by perhaps 90 percent (Harper and Baker 2007) which suggests that they could be
used to adopt a "hold the line" approach to nitrogen loads from stormwater. Unfortunately,
dry retention ponds require a one to three foot separation between the bottom of the pond
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
3
Old Tampa Bay Water Quality Improvements
and the seasonal high water table (Harper and Baker 2007). This design feature for dry
retention ponds requires significant site modifications and/or pumping of stormwater up
into elevated ponds in locations where the groundwater table is close to the surface, such
as along the shoreline of Old Tampa Bay.
However, in 2012 the Florida legislature passed HB 559 which included direction to the
water management districts and Florida Department of Environmental Protection (FDEP)
to "allow alternatives to onsite treatment, including, but not limited to, regional stormwater
treatment systems." Upon the Governor's signature, this provision was enacted into law
as Section 373.413(6), Florida Statutes (F.S.)., Furthermore, it should be noted that the
SWFWMD ERP Applicant's Handbook II, Section 2.7 indicates "The applicant may also
provide reasonable assurance of compliance with state water quality standards by the use
of alternative methods that will provide treatment equivalent to systems designed using the
criteria specified in this section." As a result, FDOT may meet ERP criteria by
implementing projects with a greater regional benefit and lower cost than onsite
stormwater ponds.
1.4.
Influence of factors other than nutrients on ecosystem
health in Tampa Bay
Tampa Bay suffered significant declines in seagrass coverage between 1950 and 1980,
but these initial losses have been followed by substantial increases in recent years (i.e.,
Johansson 1991, Johansson and Greening 1999, Tomasko et al. 2005, Greening and
Janicki 2006). Initial declines in seagrass coverage have been attributed to pollutionrelated decreases in water quality throughout the bay, as well as physical alterations to the
bay due to the construction of causeways, channel dredging and other aspects of coastal
development (i.e., Johansson 1991, Johansson and Greening 1999).
Recent improvements in the health of Tampa Bay have been attributed to management
activities that have decreased wastewater and stormwater loads to the bay, as well as
decreases in the amount of shoreline impacts (Johansson 1991, Johansson and Greening
1999, Tomasko et al. 2005, Greening and Janicki 2006, Greening et al. 2011). Thus,
managing seagrass resources in Tampa Bay includes acting on issues other than nutrients
and nutrient loading alone. In recognition of this, the TBEP produced a publication titled
"Seagrass Management in Tampa Bay: It's Not Just Nutrients!" (TBEP 2000).
The removal or modification of causeways (as opposed to bridges) has been promoted
worldwide as an environmental restoration tool. Examples include Cockburn Sound,
Australia (Cockburn Sound Management Council 2003), Fidalgo Bay, Washington State
(Samish Indian Nation, 2007), Lake Victoria, Kenya (Patrick et al. 2005), and Missisquoi
Bay, Vermont (Mendelsohn et al., 1997). In Tampa Bay, the removal of the 50 year old
causeway leading to Ft. Desoto Park was completed in 2004, restoring tidal flow between
two lagoons in this high profile public park. The removal of the causeway and its
replacement with a bridge appears to have helped improve water quality over an area in
excess of 1,000 acres (NOAA 2006). The extensive causeways associated with the
construction of the portion of the Flagler railroad from Miami to Key West have significantly
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
4
Old Tampa Bay Water Quality Improvements
impacted water quality in Florida Bay by restricting the exchange of water between Florida
Bay and the Atlantic Ocean (Swart et al. 1996). The removal or modification of the
causeways associated with Flagler's Railroad is expected to be able to "...significantly
improve water quality, benthic floral and faunal communities, and larval distribution of both
recreational and commercial species (e.g. spiny lobster) in the nearshore waters in the
vicinity of these restoration sites" (USACOE and SFWMD 2002). After the removal of the
100-year old causeway across Lake Surprise, which was part of Flagler's railroad, water
quality improved over an area in excess of 300 acres (PBS&J 2009).
In Old Tampa Bay, the Courtney Campbell Causeway (CCC) represents a potentially
significant impact to seagrass resources. The CCC was constructed during the Great
Depression and was completed in the early 1930s, during a time when Tampa Bay as a
whole, and Old Tampa Bay as well, is considered to have had good water quality, based
on photographic evidence of extensive seagrass resources. Aerial photography from 1948
shows evidence of extensive seagrass meadows in the nearshore waters of Old Tampa
Bay west of the eastern terminus of the CCC (Figure 2) and also to the south of the CCC
along Rocky Point (Figure 3).
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
5
Old Tampa Bay Water Quality Improvements
Figure 2
Aerial photograph from 1948 showing extensive seagrass meadows in
Old Tampa Bay. Area shown is north of the CCC, west of the eastern
terminus of the causeway.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
6
Old Tampa Bay Water Quality Improvements
Figure 3
Aerial photograph from 1948 showing extensive seagrass meadows in
Old Tampa Bay. Area shown is south of the CCC, below the eastern
terminus of the causeway.
However, in the area north of the CCC shown in Figure 4, the photographic signature of
seagrass meadows found in areas to the west and south is reduced or absent. While no
ground-truthed data are available, it would appear that seagrass meadows were already
impacted in the areas shown in Figure 3 at least as far back as 1948.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
7
Old Tampa Bay Water Quality Improvements
Figure 4
Aerial photograph from 1948 showing apparent impacts to seagrass
meadows north of the CCC at the eastern terminus of the causeway.
The red arrow indicates the photographic signature of shallow areas
devoid of seagrass.
Evidence of degraded seagrass resources in Figure 4 suggest that impacts were not likely
due to elevated nutrient loads, as the watershed was not highly developed, and adjacent
areas of Old Tampa Bay still had healthy seagrass meadows. The more likely reason for
seagrass loss is through a combination of direct and indirect impacts due to the
construction of the CCC, rather than the more common scenario where increased nutrient
loads stimulate phytoplankton levels, which then reduce water clarity, resulting in reduced
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
8
Old Tampa Bay Water Quality Improvements
seagrass coverage. Consequently, if the site-specific impacts to seagrass meadows that
occurred as a result of the construction of the CCC not addressed, it is not likely that
recovery of seagrass resources in this part of Old Tampa Bay could be accomplished via
focusing on stormwater alone, as seagrass was already absent during a time (the 1940s)
when nutrient levels and water clarity supported seagrass in adjacent waters.
1.5.
Purpose of Study
The study carried out here was focused on determining if the construction of the CCC had
adversely affected water quality, impacting seagrass resources in that portion of Old
Tampa Bay north of the CCC, at its easternmost terminus. This was accomplished via an
intensive data gathering effort, described below. Results from the study were then
compared to concurrently collected sediment and water quality, as well as historical water
quality data from stations sampled by staff from Hillsborough County in order to determine
whether the absence of seagrass was due to factors associated with the CCC, or other
limiting factors such as sediment type, contamination or water depth. Data on seagrass,
macroalgae, water quality and sediment quality were then interpreted to determine if
results would suggest impacts associated with the CCC. Findings were then compared to
other studies on the environmental benefits associated with causeway removal or
modification in other locations. Finally, the potential benefits of modifications to the CCC
were then compared to the benefits, if any, that might be brought about via treatment of
stormwater runoff.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
9
Old Tampa Bay Water Quality Improvements
2.
Methods
A comprehensive data collection effort was completed to characterize the study area north
and south of the CCC. Data was collected over the period of December 5, 2014 to
December 17, 2014. This time period was chosen to be consistent with the November to
March timeframe during which the SWFWMD conducts its bi-annual seagrass mapping
efforts. While this period does not coincide with the maximum productivity of seagrass
meadows, seagrass meadows are present year round in Tampa Bay, which allows for
aerial photography and mapping during this time of the year. The data collection effort
conducted here consisted of the following parameters for each of the four strata:
Seagrass and macroalgal presence and abundance
Depth of the deep edge of seagrass meadows
Surface and near bottom water quality
Sediment characterization
Flora and fauna observations
2.1.
Site selection
Four representative areas (strata) were identified: three to the north of the causeway and
one to the southeast (Figure 5). The strata were selected based on available biannual
seagrass maps produced by SWFWMD. Seagrass layers were downloaded from the
SWFWMD Shapefile Library (http://www.swfwmd.state.fl.us/data/gis/layer_library/). The
seagrass layers for the area of study were available for the following years: 1988, 1990,
1992, 1994, 1996, 1999, 2001, 2004, 2006, 2008, 2010, and 2012. Two areas identified
with extensive mapped seagrass (Strata A and D) and two areas identified without
extensive mapped seagrass (Strata B and C) were delineated through interpretation of
aerial photography.
Randomly selected sites were generated in GIS, using a random number generating
algorithm applied to a grid-based overlay of each stratum. The Create Random Points
tool in ArcGIS was used to create 40 sampling points (30 primary and 10 secondary) for
each stratum. The tool was run for each stratum separately, constraining the points to be
generated within the boundaries of the stratum polygon. Additionally, a distance of 10
meters was assigned as the minimum distance allowed between generated points. The
first 30 points generated were designated as primary sampling points, with the remaining
10 points designated as secondary points. The secondary points could have been
necessary if one or more primary sampling points were inaccessible.
During field observations, samples were taken as close to the generated coordinates as
possible. GPS points with sub-meter accuracy were taken during sampling to ensure the
exact location of sampling was known. These coordinates were used to generate a layer
of actual sampled points to be used for the remaining analyses.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
10
Old Tampa Bay Water Quality Improvements
Figure 5
2.2.
Experimental design layout with the four strata delineations.
Seagrass and macroalgal presence and abundance
The presence and abundance of seagrass and macroalgae were quantified at 30
randomly chosen sites within each stratum (Figures 6 to 9). Presence and abundance of
seagrass were quantified at each location using a 1 meter square quadrat divided into 100
cells, each 10 cm by 10 cm. The presence of seagrass or macroalgae within each cell
was counted, thereby, providing the percentage of cells in which seagrass or macroalgae
was found (Figure 10). The evaluation of seagrass or macroalgal coverage was
completed three times at each site. Braun-Blanquet (cover-abundance) scores could thus
be derived for each replicate (Table 1). Additionally, the species composition within each
quadrat was reported.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
11
Old Tampa Bay Water Quality Improvements
Figure 6
Randomly selected sites within Stratum A.
Figure 7
Randomly selected sites within Stratum B.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
12
Old Tampa Bay Water Quality Improvements
Figure 8
Randomly selected sites within Stratum C.
Figure 9
Randomly selected sites within Stratum D.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
13
Old Tampa Bay Water Quality Improvements
Figure 10
Scientist counting cells which contain seagrass or macroaglae.
Table 1
Scale used to assign Braun-blanquet scores for each determination of
seagrass and macroalgal abundance.
Seagrass
Percent coverage
Macroalgae
Braun-Blanquet Percent Coverage
Score
0
Braun-Blanquet
Score
0
0
0
1 shoot*
0.1
-
-
<5 shoots*
0.5
1
0.5
>5 shoots and <5%
1
2- <5
1
5-25
2
5-25
2
>25-50
3
>25-50
3
>50-75
4
>50-75
4
>75
5
>75
5
*Categories were not necessary.
2.2.1.
Estimated percent seagrass coverage
Within Strata B and C, an estimate of the area with less than 5% and 5 25% seagrass
abundance was delineated. For Stratum B, polygons were digitized such that points
where seagrass was not detected or observed at less than 5% were within the polygon for
coverage of less than 5%. Likewise, points with observations of 5% - 25% coverage were
enclosed with another polygon for that coverage. As it was not possible to tell from the
points alone where the boundary of the polygons should fall, the SWFWMD seagrass
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
14
Old Tampa Bay Water Quality Improvements
layers were used as a guide, using best scientific judgment (based on how often seagrass
was seen in certain areas) to determine the extent of seagrass (patchy versus
continuous), and how frequently seagrass was mapped. While there were two points in
Stratum B with observations less than 5% to the east, they were included in the 5% - 25%
coverage polygon due to the presence of three 5% - 25% observations near the point to
the southeast and the abundance of historical seagrass in that same region.
For Stratum C, a similar approach was used. There were two points within the 5% - 25%
range that fell within the <5% polygon. Two of these points had very low coverage (one at
5% and one at 9%). The point to the northeast was observed at over 22%. However, due
to the presence of nearby points showing coverage of less than 5% or none detected at
all, along with the lack of historical observations in that area, it was presumed this was an
isolated patch, and it was included in the low abundance polygon. Since much of the area
between very high coverage (75% - 100%) and very low coverage (<5%) had no sampling
points to show the transition, historical data and scientific judgment was again used to
determine which areas were likely to have coverage of 5% - 25%.
2.2.2.
Distance to open water
In addition to evaluating the presence and absence of seagrass within each stratum, the
distance from each sampling site to open water was calculated as a surrogate for tidal
influences, to see if "distance" correlated with indicators of ecosystem health. A topobathic
raster dataset for Tampa Bay was downloaded from the USGS topobathy viewer
(http://topotools.cr.usgs.gov/topobathy_viewer/). This topobathic layer is a combination of
topographic (land elevation) and bathymetric (water depth) layers. The topobathic
dataset, in raster format, was modified to determine the areas of "open water." For the
purposes of this study, "open water" was defined as areas with a water depth of six feet or
greater and located 500 feet or more from land or other structures.
The first step was to create a layer showing areas with water depths of six feet or greater.
The original topobathy raster was copied, and then reclassified such that any cells with a
value of -6 feet or less were assigned a value of 1, and all other cells were assigned a
value of zero. The Raster to Polygon tool was then used to create a polygon showing the
areas of Tampa Bay with a water depth greater than or equal to 6 feet.
A similar technique was used to create a polygon showing land and other structures, with
any cells with positive elevation values classified as land. A buffer of 500 feet was applied
to this land polygon. The resulting land polygon with the 500 foot buffer was used within
the Erase tool against the polygon of water depths of 6 feet or greater.
A line shapefile was then generated, snapping the ends of each line to the points and the
edges of the open water. To ensure consistency, when drawing each line for the points
taking the easterly route for Stratum C, all lines were snapped from each point to a
common entrance point to the canal, and then followed the same exact route to open
water from there. The lengths of each line were calculated and assigned to the points from
which they were measured in order to show the distance of each sampling point to open
water (Figure 11).
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
15
Old Tampa Bay Water Quality Improvements
Figure 11
2.3.
Graphic depicting distance from sampling sites to nearest "open water".
Depth of the deep edge of seagrass meadows
The depth to which seagrass grows was documented at ten locations for each stratum
(Figure 12). The depth to which seagrass beds grow were quantified as in Tomasko and
Keenan (2010). The deep edge of the seagrass meadows was operationally defined as
that point at which less than 10 percent of the bottom is occupied by seagrass. Prior work
in Sarasota Bay (Tomasko and Keenan 2010) has shown that this coverage level is a
more precise (and deeper) estimate of seagrass depth penetration than the offshore edge
of seagrass meadows as determined via aerial photography and subsequent
photointerpretation. In an area with reduced water clarity inhibiting aerial photography
interpretation, such as this portion of Old Tampa Bay, this approach is warranted. Water
depth at the deep edge was determined at 10 locations for each of the strata being
assessed. Depth measurements were made using a customized staff gauge designed to
reduce errors associated with the anticipated soft substrate. Weather conditions were
recorded to quantify any introduced errors associated with fetch and chop, which were
minimized by collecting data during calm conditions (e.g., wind less than 10 knots, wave
height less than 10 cm). The GPS coordinates were recorded for each station using a
WAAS (Wide Area Augmentation System) enabled Garmin GPSmap 60CSx) or similar.
The water depth data were corrected for tide and referenced to Mean Sea Level (MSL).
The 6-minute verified water level data from the Old Port Tampa, Fl (8726607) tide station
was used to model the tide for Old Tampa Bay locations, as in Tomasko and Keenan
(2010).
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
16
Old Tampa Bay Water Quality Improvements
Figure 12
2.4.
Sampling sites for determining the depth of the deep edge of seagrass.
Surface and near bottom water quality
Surface and near-bottom water quality samples were collected at the first 3 of the 30
randomly selected sites within each stratum (e.g., A1, A2 and A3; Figures 5 to 8). Water
quality samples were collected and immediately iced in a cooler and analyzed using
standard technique related to collection, transport and analysis. Surface and bottom water
samples were assessed by Benchmark EnviroAnalytical, with the analysed parameters
shown in Table 2. A YSI© 6250 water quality probe was used to measure in situ water
temperature, dissolved oxygen, salinity and conductivity.
Table 2
Parameters and analytical method used to analyze surface and nearbottom water samples.
Parameter
Method
Chlorophyll-a
445.0
Ammonia Nitrogen
350.1
Nitrate+Nitrite
353.2
Ortho-Phosphorus
365.3
Total Kjeldahl Nitrogen
351.2
Total Nitrogen
351.2+353.2
Total Phosphorus
365.3
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
17
Old Tampa Bay Water Quality Improvements
2.5.
Sediment characterization
Sediment characterization was conducted at the first 10 of the 30 randomly selected sites
within each stratum. At each of the 10 sites, color, texture, sediment grain size, organic
content, hydrogen sulfide, nitrogen and phosphorus concentration were quantified.
Sediment samples were collected and immediately iced in a cooler and analyzed using
standard technique related to collection, transport and analysis. The sediment samples
were assessed by Mote Marine Laboratory, and the list of parameters analyzed is provided
in Table 3.
During the collection of the sediment samples, a universal percussion corer was used to
extract sediments. The device consists of a thin-walled, clear polycarbonate core barrel
which is attached to a valve assembly with an internal check valve that creates flushing of
the water and a positive vacuum when pushed into the sediment. This device was
inserted approximately 2"-3" into the sediment bottom and extracted to collect the surficial
sediments needed at each of the 10 stations within the 4 strata for further physical and
chemical analyses. Field observations on each sediment sample were logged for Munsell
Color (hue, value, and chroma), texture, and odor.
Table 3
Parameters and analytical method used to analyze the collected
sediment samples.
Parameter
Method
Color
2.6.
Grain size
ASTM D-4464-85
Percent organic content
SM 2540G
Hydrogen sulfide
Colorimetric test kit
Total Kjeldahl Nitrogen
351.2
Total Phosphorus
365.4
Flora and Fauna observations
In addition to the seagrass and macroalgal evaluation, the field scientists noted observed
flora and fauna within each stratum.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
18
Old Tampa Bay Water Quality Improvements
3.
Results
The results of the comprehensive data collection effort completed north and south of the
CCC are presented in the section below. The results were analyzed to determine if there
were statistical differences in the data on seagrass, marcoalgae, and water or sediment
quality between each stratum.
3.1.
Seagrass and macroalgal presence and abundance
3.1.1.
Seagrass
Four species of seagrass were identified within the overall study area: Halodule wrightii,
Ruppia maritima, Syringodium filiforme, and Thalassia testudinum (Figure 13). The
dominant seagrass species identified in Strata A, B and C was R. maritime, with reduced
coverage of H. wrightii in Strata A and B. While H. wrightii was identified in Stratum C, it
was very sparse there. In contrast, T. testudinum was the dominant seagrass species
identified in Stratum D following by H. wrightii. Syringodium filiforme was identified at one
location in Stratum D, but R. maritima was not present. A copy of the datasheets
completed during the field effort is available in Appendix A. Appendix B provides
representative photographs of the seagrass abundance found within each stratum.
Figure 13
Seagrass species observed within each stratum.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
19
Old Tampa Bay Water Quality Improvements
In regards to seagrass abundance, the average percentage of seagrass coverage in
Strata B and C was inconsistent (Figure 14). The eastern portion of each stratum was
devoid of seagrass compared to the western portion in which seagrass coverage of
greater than 50 percent was common. It is estimated that there are approximately 58 and
66 acres within Strata B and C, respectively, which are comprised of 25 percent or less
seagrass abundance (Table 4, Figures 15 and 16). The abundance of seagrass in Strata
A and D were consistently greater than 50 and 75 percent, respectively, throughout the
strata.
Figure 14
Average percentage of seagrass coverage at each sampling site.
Table 4
Estimation of seagrass abundance in Strata B and C.
Stratum
Area with
<5% Coverage
(Acres)
Area with
5% - 25%
Coverage
(Acres)
Total 25% and
below
(Acres)
B
23.8
33.9
57.7
C
57.0
9.3
66.3
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
20
Old Tampa Bay Water Quality Improvements
Figure 2
Average percentage of seagrass coverage in Stratum B and estimated
portion of the stratum with less than 25 percent seagrass abundance.
Figure 16
Average percentage of seagrass coverage in Stratum C and estimated
portion of the stratum with less than 25 percent seagrass abundance.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
21
Old Tampa Bay Water Quality Improvements
In order to ascertain if distance to open water correlated with ecosystem health (or
seagrass abundance), the relationship between seagrass abundance and the calculated
distance to open water was evaluated (Figure 17). Due to the non-normal distribution and
unequal variances of the dataset, all data were log10 transformed. A step-change was
observed at about a log-10 value of 3.9 (ca. 8,000 feet) from open water. Based on the
observed step-change, a Mann-Whitney U-test comparison of the average percent
coverage was performed for stations located greater than and less than 8,000 feet from
open water. The average seagrass abundance observed less than 8,000 feet from open
water (81 percent) was found to be significantly greater than the abundance (36
percent)for locations greater than 8,000 feet from open water (Figure 18; p<0.01).
The results shown in Figures 17 and 18 strongly suggest that artificially reduced tidal
influences and/or increased residence times are important stressors to seagrass health in
this region of Old Tampa Bay, as areas farthest removed from tidal influences (i.e., those
farthest from open water) are the areas with the lowest probability of occurrence and
abundance.
Figure 17
Seagrass abundance compared to the calculated distance from open
water.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
22
Old Tampa Bay Water Quality Improvements
Figure 18
3.1.2.
Mann-Whitney U-test comparing seagrass abundance greater than and
less than 8,000 feet from open water.
Macroalgae
Five genera of macroalgae were identified within the overall study area: Entermorpha,
Gracilaria, Hypnea, Laurencia and Uva (Figures 19 and 20). The dominant macroalgal
genera identified in Strata A, B and C were Gracilaria and Laurencia. Laurencia was
found almost exclusively in Stratum D, with only one site having Gracilaria as well. A copy
of the datasheets completed during the field effort is available in Appendix A.
The average percentage of macrogalgae coverage throughout the study area was less
than 50 percent (Figure 21). There were a few sites where 50 to 100 percent of the area
was covered by macroalgae. However, there were more sites in which no macroaglae
were reported at all, particularly in Stratum D.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
23
Old Tampa Bay Water Quality Improvements
Figure 19
Macroaglal genera observed within each stratum.
Figure 20
Photograph of four of the five genera of macroalgae identified within the
study area (Laurencia, Ulva, Enteromorpha and Gracilaria, respectively,
clockwise from top right corner).
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
24
Old Tampa Bay Water Quality Improvements
Figure 21
3.2.
Average percentage of macroalgal coverage at each sampling site.
Depth of the deep edge of seagrass meadows
The offshore edge of seagrass meadows was located in deeper waters within Stratum D
compared to the areas north of the CCC (p<0.001; Strata A, B and C; Figure 22). The
median water depth at the deep edge was 1.34 meters below MSL in Stratum D compared
to 0.45 meters below MSL in Stratum C (Table 5). This discrepancy indicates that
seagrasses grow to a deeper water depth in Stratum D than elsewhere.
Table 5
Stratum summary statistics for depth of the deep edge for the seagrass
meadows.
Strata
Count
Average
Median
Minimum
Maximum
A
10
1.03
1.02
0.93
1.15
B
10
0.70
0.74
0.32
1.04
C
10
0.45
0.48
0.21
0.56
D
10
1.30
1.34
0.87
1.81
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
25
Old Tampa Bay Water Quality Improvements
Figure 22
3.3.
Median water depth (meters) of the seagrass meadow deep edge for
each Stratum.
Surface and near bottom water quality
Summary statistics are provided in Tables 6 and 7 for the in situ and laboratory surface
and bottom water samples collected. Appendix C contains the laboratory data for water
quality, as provided by Benchmark Environanalytical. The chlorophyll-a concentrations for
each site (respectively) were compared to the guidance provided in the RAP and are
within the range of values that would not cause concern. Total nitrogen and phosphorus
criteria in the RAP (TBEP 2010) are based on loads, not concentrations
In addition to the one-time grab samples collected within the study area, multiple long-term
surface water monitoring locations were identified within the area of interest. These data
represent monitoring efforts conducted for more than 30 years by the Hillsborough County
Environmental Protection Commission (Figure 23). These stations provide a long-term
dataset from 1972 to the present. Data from stations 62 (North of CCC) and 63 (South of
CCC) were compared to identify if there are discernable differences in water quality
between the two locations.
The data analyzed were restricted to the period of 1983 to 2013 as this corresponds to the
period after which a flap gate was installed in the area east of Rocky Point, thus allowing
for (potentially) increased exchange of water above and below the Causeway. The
average salinity north of the CCC has significantly lower salinity, 10 percent lower, than
the area directly south of the CCC (p<0.001; Figure 24). Additionally, the annual average
coefficient of variation of salinity is statistically greater (more variable) north of the CCC
than south of the CCC (p<0.003; Figure 25). This finding shows that there is greater
variation in salinity north of the CCC (36 percent more variable) than south of the CCC.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
26
Old Tampa Bay Water Quality Improvements
Table 6
Summary statistics of surface and bottom water quality samples.
Parameter
Chlorophyll a,
corrected (ug/L)
Ammonia
Nitrogen (mg/L)
Nitrate+Nitrite
(mg/L)
Total Kjeldahl
Nitrogen
(mg/L)
Total Nitrogen
(mg/L)
Stratum
Depth
Count
Average
Median
Minimum
Maximum
A
Bottom
3
1.90
2.02
1.56
2.12
A
Surface
3
1.86
1.71
1.53
2.35
B
Bottom
3
2.16
2.06
1.60
2.81
B
Surface
3
2.87
3.14
1.94
3.52
C
Bottom
3
8.69
6.75
3.22
16.10
C
Surface
3
3.36
2.97
2.49
4.63
D
Bottom
3
3.37
3.46
2.90
3.76
D
Surface
3
2.96
3.34
2.16
3.38
A
Bottom
3
0.008
0.008
0.008
0.008
A
Surface
3
0.008
0.008
0.008
0.008
B
Bottom
3
0.008
0.008
0.008
0.008
B
Surface
3
0.008
0.008
0.008
0.008
C
Bottom
3
0.008
0.008
0.008
0.008
C
Surface
3
0.008
0.008
0.008
0.008
D
Bottom
3
0.0127
0.01
0.008
0.02
D
Surface
3
0.0163
0.02
0.008
0.021
A
Bottom
3
0.004
0.004
0.004
0.004
A
Surface
3
0.004
0.004
0.004
0.004
B
Bottom
3
0.004
0.004
0.004
0.004
B
Surface
3
0.005
0.004
0.004
0.008
C
Bottom
3
0.005
0.004
0.004
0.008
C
Surface
3
0.005
0.004
0.004
0.008
D
Bottom
3
0.004
0.004
0.004
0.004
D
Surface
3
0.004
0.004
0.004
0.004
A
Bottom
3
0.500
0.470
0.469
0.560
A
Surface
3
0.543
0.531
0.512
0.585
B
Bottom
3
0.529
0.542
0.495
0.549
B
Surface
3
0.527
0.525
0.500
0.556
C
Bottom
3
0.541
0.536
0.500
0.588
C
Surface
3
0.519
0.512
0.483
0.561
D
Bottom
3
0.405
0.399
0.371
0.445
D
Surface
3
0.347
0.340
0.339
0.363
A
Bottom
3
0.500
0.470
0.469
0.560
A
Surface
3
0.543
0.531
0.512
0.585
B
Bottom
3
0.529
0.542
0.495
0.549
B
Surface
3
0.530
0.525
0.508
0.556
C
Bottom
3
0.544
0.544
0.500
0.588
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
27
Old Tampa Bay Water Quality Improvements
Parameter
Orthophosphorus
(mg/L)
Total Phosphorus
(mg/L)
Table 7
Stratum
Depth
Count
Average
Median
Minimum
Maximum
C
Surface
3
0.521
0.512
0.483
0.569
D
Bottom
3
0.405
0.399
0.371
0.445
D
Surface
3
0.347
0.340
0.339
0.363
A
Bottom
3
0.048
0.047
0.042
0.055
A
Surface
3
0.050
0.047
0.047
0.055
B
Bottom
3
0.050
0.051
0.048
0.051
B
Surface
3
0.048
0.049
0.047
0.049
C
Bottom
3
0.055
0.054
0.051
0.061
C
Surface
3
0.052
0.051
0.049
0.055
D
Bottom
3
0.056
0.057
0.049
0.061
D
Surface
3
0.056
0.058
0.052
0.059
A
Bottom
3
0.145
0.143
0.129
0.162
A
Surface
3
0.156
0.152
0.151
0.165
B
Bottom
3
0.151
0.152
0.147
0.155
B
Surface
3
0.143
0.158
0.113
0.159
C
Bottom
3
0.127
0.128
0.109
0.145
C
Surface
3
0.088
0.086
0.083
0.094
D
Bottom
3
0.093
0.089
0.089
0.101
D
Surface
3
0.087
0.087
0.085
0.089
Summary statistics of surface and bottom in situ parameters.
Parameter
Conductivity
(us/cm)
Dissolved
Oxygen (mg/L)
Depth
Stratum
Count
Average
Median
Minimum Maximum
Bottom
A
6
32357
32229
31231
33936
Surface
A
10
30843
31757
20524
33911
Bottom
B
10
32848
32933
32208
33700
Surface
B
10
32738
32614
32275
33720
Bottom
C
10
32606
32540
31030
33986
Surface
C
10
32329
32074
31063
33832
Bottom
D
9
35329
35307
35237
35486
Surface
D
10
35317
35306
35238
35463
Bottom
A
6
8.33
8.61
7.12
9.03
Surface
A
10
7.95
7.72
6.91
9.01
Bottom
B
10
7.44
7.50
6.81
7.90
Surface
B
10
7.51
7.61
6.81
8.02
Bottom
C
10
7.86
7.89
6.66
9.05
Surface
C
10
7.84
7.91
6.65
8.79
Bottom
D
9
9.20
9.25
8.17
9.93
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
28
Old Tampa Bay Water Quality Improvements
Dissolved
Oxygen
Saturation (%)
Salinity
Temperature ©
Surface
D
10
9.41
9.49
8.33
10.14
Bottom
A
6
98.1
101.7
81.4
106.6
Surface
A
10
93.6
90.7
81.2
106.0
Bottom
B
10
86.3
87.2
77.5
92.8
Surface
B
10
87.0
87.8
77.6
94.0
Bottom
C
10
90.4
91.3
74.4
103.7
Surface
C
10
89.8
90.7
74.3
101.0
Bottom
D
9
112.5
113.4
99.3
121.5
Surface
D
10
114.6
114.3
100.4
124.4
Bottom
A
6
20.3
20.2
19.5
21.4
Surface
A
10
19.8
19.8
17.6
21.3
Bottom
B
10
20.6
20.7
20.2
21.2
Surface
B
10
20.5
20.4
20.2
21.2
Bottom
C
10
20.4
20.3
19.3
21.4
Surface
C
10
20.2
19.9
19.4
21.3
Bottom
D
9
22.3
22.3
22.3
22.4
Surface
D
10
22.3
22.3
22.3
22.4
Bottom
A
6
17.4
17.4
17.1
17.8
Surface
A
10
17.6
17.5
17.1
18.1
Bottom
B
10
16.4
16.5
15.8
16.9
Surface
B
10
16.4
16.4
15.8
16.9
Bottom
C
10
16.0
16.2
14.9
16.6
Surface
C
10
16.0
16.1
14.9
16.5
Bottom
D
9
18.5
18.5
17.9
19.4
Surface
D
10
18.5
18.5
17.9
19.4
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
29
Old Tampa Bay Water Quality Improvements
Figure 23
County
Location of supplemental water quality sites sampled by Hillsborough
30
Average salinity (ppt)
25
20
15
10
North of CCC
South of CCC
5
0
Figure 24
Comparison of average salinity north and south of the CCC over the
period of 1983 to 2013.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
30
Annual average coefficient of variation of salinity (percent)
Old Tampa Bay Water Quality Improvements
Figure 25
25
20
15
10
North of CCC
South of CCC
5
0
Comparison of annual average coefficient of variation of salinity north
and south of the CCC over the period of 1983 to 2013.
Chlorophyll-a, a measure of phytoplankton production, and nutrient concentrations were
also compared for stations north and south of the CCC. Chlorophyll-a concentrations were
significantly higher north of the CCC (43 percent higher) when compared to south of the
CCC (p<0.001; Figure 26). Total nitrogen concentrations were 23 percent higher north of
the CCC compared to south of the CCC (p<0.001; Figure 27). While there is a significant
difference in nitrogen concentrations north and south of the CCC, when normalized for
salinity, nitrogen concentrations are similar at both locations (Figure 28). There was not a
significant difference in total phosphorus concentrations between the samples north and
south of the CCC (Figure 29).
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
31
Old Tampa Bay Water Quality Improvements
Average chlorophyll-a (ug / L; 1983 to 2013)
25
20
15
10
North of CCC
South of CCC
5
0
Figure 26
Comparison of average chlorophyll-a concentrations north and south
of the CCC over the period of 1983 to 2013.
Average TN (mg/L; 1983 to 2013)
1.4
1.2
1.0
0.8
0.6
North of CCC
South of CCC
0.4
0.2
0.0
Figure 27
Comparison of average total nitrogen concentrations north and south
of the CCC over the period of 1983 to 2013.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
32
Old Tampa Bay Water Quality Improvements
Figure 28
Comparison of salinity: nitrogen distribution in area north (Stratum C)
and south of CCC.
Average TP (mg/L; 1983 to 2013)
0.5
0.4
0.3
0.2
North of CCC
South of CCC
0.1
0.0
Figure 3
Comparison of average total phosphorus concentrations north and
south of the CCC over the period of 1983 to 2013.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
33
Old Tampa Bay Water Quality Improvements
3.4.
Sediment characterization
A table of summary statistics are provided in Table 8 for the sediment samples collected.
Appendix C contains the sediment data as provided by Mote Marine Laboratory. There
was not a discernible difference in nutrient concentrations or composition (grain size,
solids, etc) for the sediments collected within each different stratum. Hydrogen sulfide
concentrations were below that which would be considered toxic to seagrass (i.e., Calleja
et al. 2007). Elevated levels of hydrogen sulfide (H2S) have been identified as a stressor to
seagrass growth when porewater concentrations exceed ca. 10 µM H2S (e.g., Calleja et al.
2007). A H2S concentration of 10 µM equals a sulfide concentration of 0.32 mg H 2S-S/L,
and none of the 10 sites sampled in Stratum C had H2S-S concentrations higher than 0.32
mg/L. Therefore, H2S-S concentration does not preclude seagrass growth in this area.
Table 8
Summary statistics of sediment parameters.
Parameter
Hydrogen sulfide (mg/L)
Total Kjeldahl Nitrogen
(mg/kg Dry Wt)
Total Phosphorus
(mg/kg Dry Wt)
Percent Solids
Percent Moisture
Percent Organic Matter
Grain Size (µm)
Stratum
Count
Average
Median
Minimum
Maximum
A
10
0.1
0.1
0.1
0.2
B
10
0.3
0.2
0.1
1.9
C
10
0.2
0.2
0.1
0.2
D
10
0.5
0.2
0.1
2.2
A
10
411
448
186
808
B
10
340
276
140
702
C
10
379
407
95
723
D
10
481
443
365
702
A
10
168
178
97
293
B
10
154
129
74
277
C
10
168
174
46
265
D
10
193
177
122
305
A
10
74.8
73.7
65.6
79.5
B
10
76.3
77.8
67.4
80.6
C
10
76.3
76.7
66.5
82.1
D
10
72.4
72.0
66.2
78.5
A
10
25.2
26.4
20.5
34.4
B
10
23.7
22.3
19.4
32.6
C
10
23.7
23.3
17.9
33.5
D
10
27.6
28.0
21.5
33.8
A
10
1.0
1.0
0.5
2.0
B
10
0.8
0.7
0.5
1.5
C
10
1.0
0.9
0.5
1.7
D
10
1.0
1.0
0.7
1.4
A
10
109.5
97.6
79.8
138.0
B
10
132.6
131.0
80.7
170.0
C
10
126.6
116.5
88.6
195.0
D
10
104.9
102.4
75.5
142.0
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
34
Old Tampa Bay Water Quality Improvements
3.5.
Flora and Fauna
In addition to the seagrass and macroalgae identified previously, the table below provides
a summary of the flora and fauna observed during the course of the seagrass, water and
sediment sampling effort (Table 9). A variety of birds, fish, mammals and invertebrates
were identified throughout the study area.
Table 9
List of flora and fauna identified within the study area.
Organism
Stratum A
Stratum B
Stratum C
Barnacles
X
Bivalves (clams and oysters)
X
Black mangrove
Stratum D
X
Blue crab
X
X
Brown Pelican
X
X
X
X
Comb jelly
X
X
X
X
Crown conch
X
Dolphin
X
X
Fish
X
X
Forster's and/or Royal Tern
Gastropod
X
X
X
X
X
X
X
X
X
Great Blue Heron
X
X
X
X
Hermit crab
X
Heron species
X
Horseshoe crab and/or evidence by
molts
X
X
X
Laughing and/or Ring-billed Gull
X
X
X
X
Little Blue Heron
Osprey
X
X
X
Oysters**
Polychaetes and/or their tubes
X
X
Quahog
X
X
X
X
Red mangrove
Roseate Spoonbill
X
X
X
X
X
X
X
X
Spartina
Spider crab
Sponge
X
X
Stingray
X
X
X
X
X
Stone crab
X
Turkey Vulture
X
Urchin
X
White Ibis
X
X
X
Wood Stork
Yellow-crowned Night Heron
X
X
*X indicates the organism was seen in the stratum. Shading indicates the organism was not observed.
**Oysters were noted along the mangrove shoreline of all strata.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
35
Old Tampa Bay Water Quality Improvements
4.
Discussion
4.1.
Distribution and abundance of seagrass
The species of seagrass found varied between the different strata. At Stratum D, located
south of the CCC, the seagrass meadow was dominated by turtle grass (T. testudinum),
with shoal grass (H. wrightii) found in the shallower waters closest to shore (Figure 13).
Manatee grass (S. filiforme) was found at one station, but was abundant farther offshore of
the outer edge of the stratum. Turtle grass and manatee grass are increasingly abundant
in those portions of Tampa Bay closer to the Gulf of Mexico, where water quality is
considered more conducive to seagrass growth (Avery and Johansson 2001). North of the
causeway, neither turtle grass nor manatee grass was found, even in the area closest to
the open waters of Old Tampa Bay (Stratum A). North of the CCC, the only species
encountered were shoal grass and widgeon grass (Ruppia maritima). In the areas closest
to the open waters of Old Tampa Bay, shoal grass and widgeon grass were both equally
likely to be encountered, but widgeon grass became the dominant species farther away
from open water (i.e., Stratum C).
In addition to changes in species composition, the abundance of seagrass, when
encountered, reflects the influence of lost tidal connections. Although the relationship was
non-linear (Figure 17) those portions of the bay bottom located more than 8,000 feet from
the open waters of Old Tampa Bay were less than half as dense, on average, than
meadows located closer to open water (Figure 18).
In addition to changes in species composition and density, seagrass meadows were
restricted to shallower portions of the bay bottom in those strata that were located farthest
away from the open waters of Old Tampa Bay (Figure 22). The reduced depth distribution
of seagrass meadows in areas with the least amount of tidal influence likely is related to
reduced water clarity in those same areas, although light limits vary by species (and the
species of seagrass themselves vary between strata). However, water clarity is difficult to
quantify in shallow areas such as those sampled here; specialized approaches outside of
the scope of this effort would be required to determine if this is the actual basis for this
difference in depth distribution patterns.
Combined, the results of the field data collection effort suggests that those portions of Old
Tampa Bay north of the CCC that are less than 8,000 feet from open water (as described
above) have a greater diversity of species of seagrass, the seagrass meadows grow to
deeper depths and are more likely to be encountered, and they have higher densities,
when found. In contrast, areas father than 8,000 feet from open water have a lower
diversity of species of seagrass, with an increased dominance by the euryhaline (adapted
to a wide range of salinities) and more ephemeral species of widgeon grass. Seagrass
meadows in these areas are less commonly encountered, are restricted to shallower
waters, and have lower densities, when present.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
36
Old Tampa Bay Water Quality Improvements
4.2.
Basis for observed patterns of seagrass distribution and
abundance
The pattern of distribution of seagrass species can help establish the basis for such
observations. For example, Zieman (1985) postulated that historical alterations in salinity
were responsible for changes in the distribution patterns of seagrass in Florida Bay. In
particular, it was noted that lower salinities favored the establishment of shoal grass, while
higher salinities favored turtle grass. Montague and Ley (1993) found a similar pattern in
northeast Florida Bay, where turtle grass was restricted to those areas where the salinities
were highest and most stable. In areas where salinities were lower and more variable,
overall seagrass biomass decreased, and species composition shifted towards dominance
by shoal grass and then widgeon grass (Montague and Ley 1993). In Texas, Dunton
(1990) found that the shoal grass flourished in the shallow waters of the Nueces estuary,
which is characterized by higher and less variable salinities, compared to the Guadalupe
estuary. In the Guadalupe estuary, salinities were lower and more variable, and the
seagrass meadows were solely comprised of widgeon grass (Dunton 1990).
The basis for the increased dominance by widgeon grass in areas with lower and more
variable salinity is likely associated with the broad salinity tolerance range of this species
(Lazar and Dawes 1981). Widgeon grass collected from two locations within Tampa Bay
was able to continue to grow in both freshwater and full-strength seawater, a tolerance
unmatched by other species (Lazar and Dawes 1981). Widgeon grass has been classified
by the US Fish and Wildlife Service as having the widest salinity tolerance range of any
species of submerged aquatic vegetation (Kantrud 1991).
The increasing dominance of widgeon grass in the eastern portions of the area north of
the CCC is thus consistent with patterns found in Florida Bay and elsewhere, suggesting
that salinities would likely be both lower and more variable in those areas farthest away
from the tidal influences of the open waters of Old Tampa Bay. When the long-term water
quality data from stations located just north and south of the CCC are compared, the
salinity north of the CCC is both lower (Figure 24) and more variable (Figure 25) than in
waters just south of the CCC. The patterns of species distribution and the long-term
salinity data are thus consistent with the following conceptual model:
Construction of the CCC reduced the tidal influence in areas north of the causeway
Reduced tidal influences would be most strongly manifested in areas farthest away
from the open waters of Old Tampa Bay
In those areas north of the CCC and farthest away from tidal influences, the
influences of freshwater inflows would be artificially enhanced due to reduced
mixing with higher salinity waters of the open bay
Reduced tidal mixing results in lower and more variable salinities than in areas
south of the causeway or in areas north of the causeway but farther to the west
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
37
Old Tampa Bay Water Quality Improvements
The resulting alterations to the salinity regime would likely result in the loss of more
stenohaline (intolerant of a wide fluctuation in salinity) species of seagrass such as
turtle grass and manatee grass
Alterations to the natural salinity regime would be more strongly manifested in areas
farthest removed from tidal influences, resulting in a salinity-mediated filtering that
would result in dominance by widgeon grass in areas north of the CCC and farthest
away from historical tidal influences
The water quality parameter that best explains the patterns of species distribution in areas
north of the CCC is thus salinity, both its absolute value and the associated variability.
While nitrogen and chlorophyll-a concentrations are higher in waters north of the CCC
(Figures 26 and 27, respectively) those differences appear to be related to the altered
salinity regime, rather than the presence of a more "polluting" watershed (Figure 28).
In addition to water quality, the quality of sediments can adversely impact seagrass
meadows, as sediments integrate conditions over a longer time interval than a grab
sample from the water column. Previous researchers have found that the nutrient and
organic contents of sediments can sometimes reach levels sufficiently high that seagrass
growth is impaired through various processes. In particular, elevated levels of hydrogen
sulfide (H2S) have been identified as a stressor to seagrass growth when porewater
concentrations exceed ca. 10 µM H2S (e.g., Calleja et al. 2007). A H2S concentration of
10 µM equals a sulfide concentration of 0.32 mg H2S-S / liter. As none of the 10 sites
sampled in Stratum C had H2S-S concentrations higher than 0.32 mg / liter (Table 8;
Appendix B.1) sulfide toxicity is not likely the reason for the reduced abundance and
density of seagrass in that area. The surface sediments at all strata were dominated by
sand, rather than silt or clay, and the percent organic content of sediments averaged less
than 2 percent of dry weight in Stratum C, which likely explains the low sulfide levels in the
porewaters there (Table 8; Appendix B.1).
These results are not supportive of a conclusion that sediments in the area north of the
CCC are grossly polluted or indicative of nutrient-enriched runoff. Instead, the sediments
are mostly sand, the organic contents are not excessive, and sulfide levels are not toxic.
When all available data are combined and interpreted along with the wider body of peerreviewed scientific literature, the conclusion reached here is that impacts to seagrass
resources north of the CCC are most likely due to changes in tidal flushing that resulted in
lower and more variable salinities than what existed historically. This then suggests that
improving circulation patterns to be more in-line with their historical condition would be the
most appropriate way to restore the seagrass meadows to their historical species
composition, distribution patterns and abundance. Furthermore, traditional stormwater
ponds would be incapable of improving either tidal flushing or salinity variability.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
38
Old Tampa Bay Water Quality Improvements
4.3.
Development of a "nutrient-equivalency" estimate for
seagrass restoration
The results of data collection and interpretation conducted in this study indicate that the
construction of the CCC brought about changes in tidal flushing that caused salinities to
become lower and more variable in areas north of the causeway than their historical
condition. The altered salinity regime then brought about a change in seagrass meadows
such that the only species that could survive under those conditions was widgeon grass.
Prior to the construction of the CCC, it is likely that the seagrass meadows north of the
causeway were similar to those now found in Stratum D, where lush meadows of turtle
grass and shoal grass cover shallower areas closer to the shore, along with an offshore
component where manatee grass becomes increasingly dominant. The restoration of
water quality necessary for recovery of seagrass meadows to their historical condition
north of the CCC is thus dependent upon the restoration of the historical salinity regime,
which would in turn depend upon the ability to restore the historical tidal influences to
areas north of the causeway.
However, regulatory programs that are intended to assist in the recovery of Tampa Bay
are mostly focused on the goal of reducing pollutant loads to nearby waters. For Tampa
Bay as a whole, the focus on reducing nitrogen loads has been a successful way to bring
about restoration of water quality and increase seagrass resources. Yet the portion of Old
Tampa Bay north of the CCC at its eastern terminus appears to have already lost most of
its seagrass coverage by 1948, when adjacent areas had lush seagrass meadows (See
Figures 2 to 4). Also, the results collected in this study point to altered salinity as the
more likely cause of this localized seagrass loss. Therefore, the most effective water
quality treatment technique to improve Old Tampa Bay is one that remediates altered
salinity, rather than a focus on nutrient loads. To try and align the likely project outcome
with the intent of regulatory programs focusing on stormwater treatment, the following
approach was developed:
The area north of the CCC that could potentially benefit from increased tidal flushing
was estimated using GIS and results from site visits
o Estimates were based on those portions of Strata B and C that had less than 5
percent seagrass coverage in waters less than the deep edge at Stratum D
The annual increase in seagrass coverage for Tampa Bay as a whole was derived from
mapping data from SWFWMD
o The time interval of 2002 to 2012 was used to determine average annual increases
Documentation from the TBEP's Reasonable Assurance Plan (RAP) and RAP update
was used to determine the amount of nitrogen load reduction that had occurred over
the same period of time as the documented seagrass increase
Based on the relationship between seagrass increase and nitrogen load reduction, the
amount of nitrogen load reduction required to bring about a seagrass increase of
similar acreage as the potential restoration via tidal restoration was developed
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
39
Old Tampa Bay Water Quality Improvements
The amount of bay bottom that could support seagrass growth, if tidal influences were to
be re-established, is shown for Strata B and C in Figures 14 and 15, respectively.
Combined, these results suggest that there are 81 acres in Strata B and C (combined)
where seagrass is either absent or where the coverage is less than 5 percent of the bay
bottom. In addition, there is an additional 43 acres where seagrass coverage is greater
than 5 percent, but less than 25 percent. To be conservative with our estimates, we used
81 acres as the amount of seagrass that could potentially become re-established through
the restoration of historical tidal influences in the area north of the CCC.
For Tampa Bay as a whole, the pattern of seagrass coverage over time is shown in Figure
30. As has been shown previously, the pattern of seagrass coverage in Tampa Bay is that
of an overall decline from the 1950s (actually 1948) to the early 1980s, followed by a
pattern of increased coverage. With the exception of a decline in 1999 that has been
attributed to the 1997 to 1998 El Niño event, seagrass coverage has increased for every
sampling event since 1982. For the period of 2002 to 2012, seagrass coverage has
increased at a rate of approximately 883 acres per year (Figure 31).
Figure 30
Seagrass acreage from 1950 to 2012. Data from SWFWMD. Line is bestfit line of polynomial equation, for illustrative purposes only.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
40
Old Tampa Bay Water Quality Improvements
Figure 31
Seagrass acreage from 2002 to 2012. Data from SWFWMD. Line is bestfit line of linear regression, used to derive annual average increase over
this time period.
The management approach employed to bring about bay-wide recovery in water quality
and seagrass resources has been the implementation of a "hold the line" strategy on
nitrogen loads, which is intended to maintain the bay's current water quality, which was
determined to be sufficient to allow for the continued recovery of those resources that are
most sensitive to water quality (TBEP 2010). A hold the line strategy, however, means
that projects must be developed to offset the impacts of pollutant loads to the bay
associated with anticipated population growth in the bay's watershed, which requires an
estimated 85 tons of additional nitrogen load reduction projects for each 5-year planning
period (equal to a 17 ton per year reduction in nitrogen loads).
However, the nitrogen load reduction projects that have been implemented in the Tampa
Bay watershed have far exceeded 85 tons every 5 years (Figure 32) based on data
submitted to FDEP by the TBEP (2012).
The results shown in Figure 32 show that watershed-wide nitrogen loads have been
reduced by amounts in excess of the "hold the line" quantity of 17 tons per year (or 85 tons
per 5 year planning period) since at least 1995. Over the period of 2002 to 2012, the
average nitrogen load reduction, bay-wide, averaged 57.6 tons of total nitrogen per year, a
value more than three times the 17 tons per year goal.
When nitrogen load quantities per year are compared to seagrass increases per year,
using the 2002 to 2012 time period, the average rate of 57.6 tons of nitrogen load
reduction per year is associated with an average rate of seagrass increase of 883 acres
per year. Based on this relationship, 115,200 pounds of nitrogen reduction is associated
with 883 acres of seagrass increase, or approximately 130 pounds of nitrogen load
reduction is associated with each acre of increase.
The estimated amount of seagrass increase that could be accomplished with the
restoration of historical tidal influences is approximately 81 acres, based on those portions
of Strata B and C that are in shallow enough water to support seagrass, but where
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
41
Old Tampa Bay Water Quality Improvements
seagrass is either absent or is found at less than 5 percent coverage. The amount of
nitrogen load reduction that would be required to bring about an 81 acre increase in
seagrass coverage (based on the relationships described above) is 10,568 pounds of
nitrogen, or more than 5 tons of nitrogen.
Figure 32
Nitrogen load reductions documented in the Reasonable Assurance
Plan update to FDEP (TBEP 2012).
Associated with their various road construction projects, FDOT has significant experience
in the design, modeling, permitting, construction and monitoring of stormwater treatment
systems. Wet detention ponds do not eliminate nutrient loads, as they remove only about
40 percent of the nitrogen load that enters them (Harper and Baker 2007). As well, the
typical wet detention pond for FDOT projects removes much less than 100 pounds of
nitrogen per year. Consequently, for FDOT to bring about a seagrass increase of 81
acres (the conservatively estimated outcome of restoring tidal influences in the region
north of the CCC) not only would FDOT have to ensure no increase at all from their future
road projects, but they would also have to construct perhaps 100 additional ponds to treat
existing loads from other sources. The "100 pond scenario" would have to occur in
addition to the pond infrastructure needed to "hold the line" on loads from expanded road
surfaces.
Not only is it unlikely that FDOT could construct sufficient stormwater treatment systems to
be able to bring about the level of seagrass recovery as that which could be accomplished
with the restoration of tidal influences north of the CCC, it also appears that the primary
reason for seagrass impacts in that area are due to alterations in salinity regimes, not
increased nutrient loads. Nonetheless the amount of seagrass restoration possible is
"equivalent" to that which would require a reduction in nitrogen loads to Tampa Bay in
excess of 10,000 pounds per year.
Using an assumed nutrient load reduction efficiency of 37 percent for wet detention ponds
(i.e., Harper and Baker 2007) the nutrient load entering wet detention ponds would have to
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
42
Old Tampa Bay Water Quality Improvements
exceed 27,000 pounds of nitrogen from stormwater runoff to result in a reduction of loads
equivalent to 10,000 pounds. Based on equations found in Harper and Baker (2007) and
elsewhere, the amount of road runoff required to generate 27,000 pounds of nitrogen per
year is in excess of 2,000 acres. The amount of newly created impervious area
associated with the I-275 / State Road 60 project as well as other area projects for FDOT
is much smaller than 2,000 acres. Consequently, the proposed project involving improving
tidal connections severed by the construction of the CCC is far in excess of the benefits to
the bay that would occur with a traditional regulatory focus on treating stormwater runoff.
Managing water quality and seagrass resources in Tampa Bay includes acting on issues
other than nutrients and nutrient loading alone, as revealed by the title of the publication
"Seagrass Management in Tampa Bay: It's Not Just Nutrients!" (TBEP 2000). In 2012, the
Florida legislature passed HB 559 which included direction to the water management
districts FDEP to "...allow alternatives to onsite treatment, including, but not limited to,
regional stormwater treatment systems." This guidance was enacted into law as Section
373.413(6), Florida Statutes (F.S.), and is incorporated via citation within the SWFWMD
ERP Applicant's Handbook II, Section 2.7. As a result, FDOT may meet ERP criteria by
implementing projects with a greater regional benefit and lower cost than onsite
stormwater ponds; projects such as the restoration of lost tidal connections.
The removal or modification of causeways has been promoted in Cockburn Sound,
Australia (Cockburn Sound Management Council 2003), Fidalgo Bay, Washington State
(Samish Indian Nation, 2007), Lake Victoria, Kenya (Patrick et al. 2005), and Missisquoi
Bay, Vermont (Mendelsohn et al., 1997). In Tampa Bay, the removal of the 50-year old
causeway leading to Ft. DeSoto Park was completed in 2004, and its replacement with a
bridge improved water quality over an area in excess of 1,000 acres (NOAA 2006).
Similarly, the removal of the 100-year old causeway across Lake Surprise, in Key Largo,
resulted in an improvement in water quality over an area of approximately 300 acres
(PBS&J 2009). Both of these completed projects suggest that the spatial extent of water
quality restoration required here (ca. 81 acres) has already been documented in other
locations where causeway removal (Lake Surprise) or the replacement of a causeway with
a bridge (Ft. DeSoto) was accomplished.
An initial positive ecological response would be expected to occur within the first year of
implementing an ecosystem restoration project such the restoration of the historical tidal
connection severed by the construction of the CCC (e.g., Vose and Bell 1994, Zajach and
Whitlach 2001, Raposa 2002, Roman et al. 2002, NOAA 2006, Thielen and Thiet 2008,
PBS&J 2009, Marcus 2010). Of the studies listed above, all eight of them documented at
least initial recovery of either water quality or benthic resources within the first year after
project completion. Within three years at the latest, all eight tidal restoration studies used
words such as "substantial", "significant" or "noticeable" to portray the level of benthic
community or fish community responses to the restoration of historical tidal connections.
The studies listed above include assessments of four tidal restoration projects in Florida
(Vose and Bell 1994, NOAA 2006, PBS&J 2009, Marcus 2010) of which two are from tidal
restoration projects in Tampa Bay (Vose and Bell 1994, NOAA 2006). One of the studies
documented the ecological response after the restoration of tidal connections in
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
43
Old Tampa Bay Water Quality Improvements
Cabbagehead Bayou, north of the CCC and only three miles from the areas of interest for
this potential project (Vose and Bell 1994).
5.
Conclusions
FDOT District Seven is anticipating significant right-of-way costs associated with multiple
upcoming projects within the watershed of Old Tampa Bay. As Old Tampa Bay is listed as
an "impaired" waterbody by FDEP, applications for environmental resource permits (ERP)
are required to "not cause or contribute to exceedance of water quality standards". The
2009 Reasonable Assurance Plan (RAP) for Tampa Bay is intended to guide resource
managers in terms of water quality issues, by providing guidance to help "hold the line" for
nutrient loads. Stormwater permits are to consider that new or expanded nutrient loads
(specifically for nitrogen) should not offset the intent of the RAP.
Land use changes associated with transportation projects will increase impervious area,
which would increase nutrient loads if left untreated. However, the most widely adopted
stormwater treatment system in Florida, wet detention ponds, only remove about 30 to 40
percent of incoming nitrogen loads from stormwater, which makes "holding the line"
impossible to achieve with their use alone. Dry retention ponds have nitrogen removal
efficiencies in excess of 90 percent, but they often require much larger construction costs
or areas of land to meet design standards. However, in 2012 the Florida legislature
passed HB 559 which included direction to the water management districts and FDEP to
"...allow alternatives to onsite treatment, including, but not limited to (emphasis added)
regional stormwater treatment systems." Upon the Governor's signature, this provision
was enacted into law as Section 373.413(6), Florida Statutes (F.S.). Additionally, Section
5.1 of the Southwest Florida Water Management District (SWFWMD) ERP Basis of
Review (BOR.) states that "The applicant may also provide reasonable assurance of
compliance with state water quality standards by the use of alternative methods that will
provide treatment equivalent (emphasis added) to systems designed using the criteria
specified in this section."
To mitigate for water quality impacts associated with FDOT's future projects in the Old
Tampa Bay watershed, an alternative method is proposed here for consideration. This
alternative method involves both an onsite and offsite component. The onsite component
consists of treating the first flush of stormwater runoff though the use of oil and grease
separators and capturing trash via baffle boxes. Although most projects draining to the bay
have tidal outfalls and attenuation is not required, in areas upstream of constrictions or
significantly upstream of the tidal outfall, water quantity will be evaluated and mitigated for.
The offsite component will consist of improving seagrass coverage through the restoration
of the historical tidal connection that was lost upon the construction of the Courtney
Campbell Causeway (CCC). The CCC was constructed in the early 1930's during a time
when Old Tampa Bay was considered to have good water quality, and findings of this
study indicate that the construction of the CCC changed the environment to the extent that
seagrass could not grow in that area, even while adjacent waters supported extensive
meadows of these underwater plants.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
44
Old Tampa Bay Water Quality Improvements
This study determined that the replacement of a portion of the CCC with a conveyance
structure such as a bridge would likely bring about an ecological response in Old Tampa
Bay much greater than that which would be expected to occur by treating stormwater
runoff alone as the primary cause of impacts to seagrass resources north of the CCC north
and east of Rocky Point appears to be artificially lower and more variable salinities,
compared to conditions that existed prior to the construction of the causeway. Stormwater
ponds have little to no impact on salinity variability. The restoration of water quality
necessary for recovery of seagrass meadows to their historical condition in this area is
thus dependent upon the restoration of the historical salinity regime, which is in turn
dependent upon the ability to restore historical tidal influences. Our results, when
compared to results from other causeway-removal projects in Florida suggest that
restoration of water quality conditions through improved circulation would result in recovery
of perhaps 81 acres of seagrass.
To gain a similar bay-wide ecological response by acting on stormwater runoff alone,
FDOT would have to construct more than 100 typical stormwater ponds sufficient to elicit
10,586 pounds per year reduction in nitrogen. As FDOT is normally required to treat only
the nitrogen created that is over and above the existing loading, hence, the 100 ponds
noted would not actually result in any reduction in nitrogen to the bay if constructed
through the typical permitting process. The potential ecological response associated with
restoring the historical circulation patterns through the CCC thus would provide a greater
benefit to Old Tampa Bay than the construction of 100 stormwater treatment ponds, which
provides the basis for CCC modification as a regional water quality project in lieu of on-site
stormwater ponds, pursuant to 373.413(6), F.S.
Using results from a standard approach to modelling stormwater, it appears that more than
2,000 acres of roadway runoff would have to be routed into wet detention ponds to bring
about a nitrogen load reduction of 10,568 pounds per year, due to the low published
loading rates for elevated highways with limited or no offsite influences. This acreage
greatly exceeds the amount of new impervious area to be added with the Interstate 275 /
State Road 60 interchange as well as other area projects.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
45
Old Tampa Bay Water Quality Improvements
6.
Recommendations
Based on this initial assessment, it appears that re-establishing the historical tidal
influence in this portion of Old Tampa Bay could result in the reestablishment of seagrass
over an area of 81 acres. Additional benefits would likely occur in areas that have
seagrass meadows, but where the meadows are sparse and/or where they are more
transient. Preliminary assessments suggest that the water quality improvement and
increased seagrass coverage likely to occur with the reestablishment of historical tidal
circulation is far greater than the benefits that would occur with any combination of
stormwater treatment ponds that FDOT could construct in this region of Old Tampa Bay.
Therefore, in accordance with 373.413(6), F.S, reestablishment of historical tidal
circulation is recommended as a regional water quality improvement project as an
alternative to on-site treatment ponds remediating nutrients. However, in order to address
other pollutants of concern, smaller ponds that reduce suspended solids, and with and oil
and grease separation baffles, would still be necessary. No direct discharge to receiving
waters is contemplated or recommended.
It is our recommendation that a drainage cost-benefit analysis of several FDOT projects
that drain to Tampa Bay be completed. The natural resources of Old Tampa Bay could be
impacted by major revisions to the SR 60/275 interchange as well other portions of I-275
on both sides of the bay.
Additionally, the evaluation of an additional crossing under the CCC to improve circulation
and ultimately seagrass growth north of the Causeway is recommended. It is our
recommendation that the development of hydrodynamic model to evaluate velocities and
flushing rates for up to four (4) causeway modification scenarios be conducted. The
hydrodynamic model should be supplemented with the collection of data on cross sections
of the existing and potential future channel configurations, as well as data on water levels,
and existing current velocities throughout the area of interest.
The results of the calibrated hydrodynamic model could be integrated with data collection
in existing seagrass meadows to develop a calibrated residence time estimate for the
entire region, through the paired deployment of current meters and blocks of plaster of
Paris. Dissolution rates of plaster of Paris have been used by NOAA and others as a
surrogate for water circulation in prior environmental studies, allowing for increased
confidence
in
spatial
displays
of
model
output.
http://oceanexplorer.noaa.gov/technology/tools/clodcards/clodcards.html
Upon completion and review of the hydrodynamic model, if feasible, it is recommended
that a conceptual or a construction-level permit is prepared based on the results of the
model for predicting the appropriate bridge design. It is important that at a minimum the
following regulatory agencies, SWFWMD, , the USACE, National Marine Fisheries Service
and the US Coast Guard (USCG), are included in the permit process to determine if there
are "fatal flaws" that would preclude the granting of a permit that would allow for the
modification of the causeway to allow increased tidal exchange. In addition, some level of
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
46
Old Tampa Bay Water Quality Improvements
coordination with the Tampa Bay Estuary Program, Agency on Bay Management, Tampa
Bay Watch and local neighborhood groups should be performed. The development of the
conceptual permit would benefit from coordination not only with SWFWMD but also with
the Hillsborough County Environmental Protection Commission and the USCG to obtain
concurrence for the project as future compensatory water quality treatment and seagrass
mitigation.
If the hydrodynamic model demonstrates benefit, during the permitting process, it is
anticipated that an initial allotment of equivalent pavement sufficient to offset the cost of
design and construction of an adequately sized conveyance through the CCC would be
granted. A water quality and seagrass monitoring program and performance criteria would
be tied to scheduled release of the full allotment of equivalent pavement treated.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
47
Old Tampa Bay Water Quality Improvements
7.
Literature Cited
Avery, W.M. and J.O.R. Johansson. 2001. Tampa Bay Interagency Seagrass Monitoring
Program: Seagrass Species Distribution and Coverage Along Fixed Transects
1997-2000. Report to Tampa Bay Estuary Program, St. Petersburg, FL. 95 pp.
Calleja, M.L., N. Marba, and C.M. Duarte. 2007. The relationship between seagrass
(Posidona oceanica) decline and pore-water sulfide pools in carbonate
sediments. Estuarine Coastal and Shelf Science 73: 583-588.
Cockburn Sound Management Council. 2003. Influence of the Garden Island Causeway
on Mangles Bay, Cockburn Sound. Community Summary Paper for: Cockburn
Sound Management Council. Rockingham, Western Australia. 8 pp.
Dunton, K.H. 1990. Production ecology of Ruppia maritima L. s.l. and Halodule wrightii
Ashers. in two subtropical estuaries. Journal of Experimental Marine Biology and
Ecology 143: 147-164.
Greening, H.S. and A. Janicki. 2006. Toward reversal of eutrophic conditions in a
subtropical estuary: Water quality and seagrass response to nitrogen loading
reductions in Tampa Bay, Florida, USA. Environmental Management. 38:163
178.
Greening, H.S., Cross, L.M. and E.T. Sherwood. 2011. A multiscale approach to seagrass
recovery in Tampa Bay, Florida. Ecological Restoration. 29: 82-93.
Harper, H. and D. Baker. 2007. Evaluation of Current Stormwater Design Criteria within
the State of Florida. Final Report to FDEP. 327 pp.
Johansson, J.O.R. 1991. Long-term trends in nitrogen loading, water quality and biological
indicators in Hillsborough Bay, Florida, p. 157176. In S. F. Treat and P. A.
Clark (eds.), Proceedings, Tampa Bay Area Scientific Information Symposium 2.
Tampa Bay Regional Planning Council, St. Petersburg, Florida.
Johansson, J.O.R. and H.S. Greening. 1999. Seagrass restoration in Tampa Bay: A
resource-based approach to estuarine management, p. 279293. In S. A.
Bortone (ed.), Seagrasses: Monitoring, Ecology, Physiology, and Management.
CRC Press, Boca Raton, Florida.
Kantrud, H.A. 1991. Widgeongrass (Ruppia maritima L.): A Literature Review. US Fish and
Wildlife Service Research 10,58.
Lazar, A.C. and C.J. Dawes. 1991. A seasonal study of the seagrass Ruppia maritima L. in
Tampa Bay, Florida: Organic constituents and tolerances to salinity and
temperature. Botanica Marina 34: 265-269.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
48
Old Tampa Bay Water Quality Improvements
Marcus, J. 2010. Seagrass Recruitment 15 Months After the Removal of the Lake Surprise
Causeway. Poster presentation at: Linking Science to Management: A
Conference & Workshop on the Florida Keys Marine Ecosystem. Hawks Cay,
Florida. October 2010.
PBS&J 2009. Responses of Water Quality and Seagrass Coverage to the Removal of the
Lake Surprise Causeway. Final Report to the Florida Department of
Transportation. 34 pp.Mendelsohn, D.L., H.R. Hines and T. Isaji. 1997.
Missiquoi Bay Field Study and Hydrodynamic Model Verification. Final Report
to: Vermont Geological Survey, Waterbury, VT.
Montague, C.L. and J.A. Ley. 1993. A possible effect of salinity fluctuation on abundance
of benthic vegetation and associated fauna in northeastern Florida Bay.
Estuaries 18: 703-717.
National Oceanic and Atmospheric Administration. 2006. Fort DeSoto Tidal Hydrology
Restoration Project, Fort DeSoto Park, Pinellas County, Fl. Pp. 110-115. In:
Returning the Tide: Tidal Hydrology Restoration Guidance Manual. NOAA
Restoration Center and NOAA Coastal Services Center Report.
Patrick, K., Romero, J.R., Imberger, J., Ewing, T., Antenucci, J., Nijuguna, H., and J.
Okungu. 2005. The effect of the Mbita Causeway on water currents in the region
of Rusinga Channel, Winam Gulf, Lake Victoria: a 3D modelling study with
ELCOM. Report to: Centre for Water Research for the Kenya Agricultural
Research Institute and the Lake Victoria Environmental Management Project.
Kisumu, Kenya. 5pp.
PBS&J. 2009. Responses of Water Quality and Seagrass Coverage to the Removal of the
Lake Surprise Causeway. Report to FDOT District 6, Miami, FL. 34 pp.
Raposa, K. 2002. Early responses of fishes and crustaceans to restoration of a tidally
restricted New England salt marsh. Restoration Ecology 10: 665-676.
Roman, C.T., Raposa, K.B., Adamowicz, S.C., James-Pirri, M.J., and J.G. Catena. 2002.
Quantifying vegetation and nekton response to tidal restoration of a New
England salt marsh. Restoration Ecology 10: 450-460
Samish Indian Nation. 2007. Fidalgo Bay Causeway Feasibility Study. Anacortes, WA. 14
pp.
Swart, P.K., G.F. Healy, R.E. Dodge, P. Kramer, J.H. Hudson, R.B. Halley, and M.B.
Robblee. 1996. The stable oxygen and carbon isotope record from a coral
growing in Florida Bay: a 160 year record of climatic and anthropogenic
influence. Palaeo. 123: 219-237.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
49
Old Tampa Bay Water Quality Improvements
Tampa Bay Estuary Program. 2000. Seagrass Management: It's not just nutrients! Tampa
Bay Estuary Program Technical Publication # 04-02. Tampa Bay Estuary
Program, St. Petersburg, FL. 257 pp.
Tampa Bay Estuary Program. 2010. Tampa Bay Nitrogen Management Consortium
Partnership for Progress: Final 2009 Reasonable Assurance Addendum:
Allocation & Assessment Report. Tampa Bay Estuary Program, St. Petersburg,
FL. 441 pp.
Tampa Bay Estuary Program. 2012. Tampa Bay Nitrogen Management Strategy 2012
Reasonable Assurance Update Document. Tampa Bay Estuary Program, St.
Petersburg, FL. 55 pp.
Terrell, J.B., D.L. Watson, M.V. Hoyer, M.S. Allen and D.E. Canfield, Jr. 2000. Temporal
water chemistry trends (1967-1997) for a sample (127) of Florida waterbodies.
Lake and Reservoir Management 16(3): 177-194.
Thelen, B.A., and R.K. Thiet. 2008. Molluscan community recovery following partial tidal
restoration of a New England estuary, USA. Restoration Ecology 17: 695703.Tomasko, D.A., Corbett, C.A., Greening, H.S., Raulerson, G.E., 2005.
Spatial and temporal variation in seagrass coverage in southwest Florida:
assessing the relative effects of anthropogenic nutrient load reduction and
rainfall in four contiguous estuaries. Marine Pollution Bulletin. 50: 797805.
Tomasko, D.A. and E.H. Keenan. 2010. Potential impacts of sea level rise on Sarasota
Bay seagrasses. Pp. 463-477. In: S.T. Cooper (ed.). Proceedings, Tampa Bay
Area Scientific Information Symposium, BASIS 5. October 20-23 2009. St.
Petersburg, Florida. 538 pp.
US Army Corps of Engineers and South Florida Water Management District. 2002. Central
and Southern Florida Project Comprehensive Everglades Restoration Plan:
Project Management Plan Florida Keys Tidal Restoration Project. 104 pp.
Vose, F.E., and S.S. Bell. 1994. Resident fishes and macrobenthos in mangrove-rimmed
habitats: evaluation of habitat restoration by hydrologic modification. Estuaries
17: 585-596.
Zajac, R.N. and R.B. Whitlatch. 2001. Response of macrobenthic communities to
restoration efforts in a New England estuary. Estuaries 24: 167-183.Zieman,
J.C. 1985. The Ecology of the Seagrasses of South Florida: A Community
Profile. Report No. FWS/OBS-82/85. Bureau of Land Management, Fish and
Wildlife Service, US Department of the Interior.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
50
Old Tampa Bay Water Quality Improvements
Appendix A. Data sheets
A.1.
Seagrass and Macroalgae assessment
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
51
Old Tampa Bay Water Quality Improvements
A.2.
Sediment and Water Quality Characterization
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
52
Old Tampa Bay Water Quality Improvements
Appendix B. Representative Photographs
B.1.
Stratum A. Photos represent seagrass and macroalgae as
quantified in example 10 cm2 sampling grids.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
53
Old Tampa Bay Water Quality Improvements
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
54
Old Tampa Bay Water Quality Improvements
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
55
Old Tampa Bay Water Quality Improvements
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
56
Old Tampa Bay Water Quality Improvements
B.2.
Stratum B. Photos represent seagrass and macroalgae as
quantified in example 10 cm2 sampling grids.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
57
Old Tampa Bay Water Quality Improvements
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
58
Old Tampa Bay Water Quality Improvements
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
59
Old Tampa Bay Water Quality Improvements
B.3.
Stratum C. Photos represent seagrass, macroalgae and
bare areas as quantified in example 10 cm2 sampling grids.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
60
Old Tampa Bay Water Quality Improvements
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
61
Old Tampa Bay Water Quality Improvements
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
62
Old Tampa Bay Water Quality Improvements
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
63
Old Tampa Bay Water Quality Improvements
B.4.
Stratum D. Photos represent seagrass and macroalgae as
quantified in example 10 cm2 sampling grids from above
and below the water surface.
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
64
Old Tampa Bay Water Quality Improvements
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
65
Old Tampa Bay Water Quality Improvements
Appendix C. Laboratory Results
C.1.
Surface and Bottom water quality as provided by
Benchmark Environmental Analytical, LLC
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
66
Old Tampa Bay Water Quality Improvements
C.2.
Sediment data as provided by MOTE Marine Laboratory
Atkins Old Tampa Bay Water Quality Improvements Phase 1 Feasibility Study | Draft |
January 2015
67
Shayne Paynter
Atkins
4030 West Boy Scout Boulevard
Suite 700
Tampa
FL 33607
shayne.paynter@atkinsglobal.com
813.281.8225
Old Tampa Bay Water
Quality Improvements
Phase II: Hydrodynamic Modeling Report
Florida Department of Transportation District 7
March 2016
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Table of contents
Chapter
Pages
Executive summary
4
1.
1.1.
1.2.
1.3.
1.4.
Introduction
Overview
Proposed solution
Purpose and methodology
Related studies
5
5
5
6
7
2.
2.1.
2.2.
2.3.
Data Collection
Currents and water levels
Bathymetry and topography
Dissolution rate experiment
7
7
9
9
3.
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
Model Development
Overview
Model grids
Boundary conditions and subgrid structures
Running the model
Validation with field data
Configuration alternatives
11
11
11
14
15
15
24
4.
4.1.
4.2.
4.3.
4.4.
Model Results
Water levels
Current magnitudes
Residence time and flushing (tracer dispersal)
Discussion and conclusions
27
28
33
38
50
5.
5.1.
Other Considerations
Flap gate removal
52
52
6.
References
53
Appendix A.
Surveyor Report, Cumbey & Fair, Inc.
54
Tables
Table 2-1
Table 3-1
Table 3-2
Table 3-3
Table 4-1
Table 4-2
Water level and current gauge positions. ............................................................................... 8
Longitude, Latitude, and Depth at the tidal boundary corners from the OSU TMD. ............... 15
Water level correction values for comparing modeled to measured data. ............................. 15
Parameters for the four initial model runs. ........................................................................... 25
Modeled tracer dispersal data for select locations in OTB. ................................................... 50
Summary of modeled residence time for Strata A, B, and C................................................. 51
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
2
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figures
Figure 1-1
Figure 1-2
Figure 2-1
Figure 2-2
Figure 2-3
Figure 2-4
Figure 2-5
Figure 2-6
Figure 3-1
Figure 3-2
Figure 3-3
Figure 3-4
Figure 3-5
Figure 3-6
Figure 3-7
Figure 3-8
Figure 3-9
Figure 3-10
Figure 3-11
Figure 3-12
Figure 3-13
Figure 3-14
Figure 4-1
Figure 4-2
Figure 4-3
Figure 4-4
Figure 4-5
Figure 4-6
Figure 4-7
Figure 4-8
Figure 4-9
Figure 4-10
Figure 4-11
Figure 4-12
Figure 4-13
Figure 4-14
Figure 4-15
Figure 4-16
Figure 4-17
Figure 4-18
Figure 4-19
Figure 4-20
Figure 4-21
Figure 4-22
Figure 4-23
Figure 4-24
Figure 4-25
Figure 4-26
Area of interest within OTB.................................................................................................... 6
Tide flap gates at incoming (high) tide. .................................................................................. 7
Location of water level and current measurements. ............................................................... 8
Solinst Levelogger (indicated by red arrow) attached to concrete base. ................................. 9
Nortek Aquadopp ADCP (Nortek USA). ................................................................................. 9
Block of plaster of Paris on scale showing hardware used for deployment. .......................... 10
Block of plaster of Paris deployed in the water column. ....................................................... 10
Average dissolution rates for block of plaster of Paris deployed in the water column. ........... 11
Tampa Bay (black) and nested (red) model domains. .......................................................... 12
Bathymetric contours for the Tampa Bay model domain. ..................................................... 13
Bathymetric contours for the nested model domain. ............................................................ 14
Predicted and observed water levels at NOAA Station 8726607. ......................................... 16
Measured versus modeled water levels; station ADCP-1. .................................................... 17
Measured versus modeled water levels; station ADCP-2. .................................................... 18
Measured versus modeled water levels; station WL-1. ........................................................ 19
Measured versus modeled water levels; station WL-2. ........................................................ 20
Measured versus modeled water levels; station WL-3. ........................................................ 21
Measured versus modeled water levels; station WL-4. ........................................................ 22
Measured versus modeled depth-averaged currents; station ADCP-1. ................................ 23
Measured versus modeled depth-averaged currents; station ADCP-2. ................................ 24
Model bathymetry around eastern CCC; existing conditions. ............................................... 25
Model bathymetry around eastern CCC; proposed 200 ft opening. ...................................... 26
Tracer, water level, and current monitoring stations within the model. .................................. 27
Water level time series for the four alternatives; ADCP-1. .................................................... 28
Water level time series for the four alternatives; ADCP-2. .................................................... 29
Water level time series for the four alternatives; WL-1. ........................................................ 30
Water level time series for the four alternatives; WL-2. ........................................................ 31
Water level time series for the four alternatives; WL-3. ........................................................ 32
Water level time series for the four alternatives; WL-4. ........................................................ 33
Current velocity magnitude time series for the four alternatives; A-4. ................................... 34
Current velocity magnitude time series for the four alternatives; ADCP-1. ............................ 35
Current velocity magnitude time series for the four alternatives; C-5. ................................... 36
Current velocity magnitude time series for the four alternatives; ChannelD. ......................... 37
Current velocity magnitude time series for the four alternatives; CutCN. .............................. 38
Initial tracer concentration; all scenarios. ............................................................................. 39
Tracer concentration after 7 days; existing conditions. ......................................................... 40
Tracer concentration after 7 days; existing conditions with 2-way flap gate. ......................... 40
Tracer concentration after 7 days; 200 ft opening. ............................................................... 41
Tracer concentration after 7 days; 200 ft opening with 2-way flap gate. ............................... 41
Tracer concentration time series; location SR60 Bridge. ...................................................... 42
Tracer concentration time series; location WL-1. ................................................................. 43
Tracer concentration time series; location A-4. .................................................................... 44
Tracer concentration time series; location B-1. .................................................................... 45
Tracer concentration time series; location ADCP-2. ............................................................. 46
Tracer concentration time series; location C-5. .................................................................... 47
Tracer concentration time series; location ChannelD. .......................................................... 48
Tracer concentration time series; location D-1. .................................................................... 49
Seagrass strata (FDOT 2015). ............................................................................................ 51
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
3
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Executive summary
The Florida Department of Transportation (FDOT) District Seven is anticipating significant right-of-way costs
associated with multiple upcoming projects, including work on the Interstate 275 / State Road 60
interchange, the Howard Frankland Bridge, and various projects associated with Interstate 275 in Pinellas
County. All of these transportation projects are occurring within the watershed of Old Tampa Bay (OTB). In
1998, the Florida Department of Environmental Protection (FDEP) placed Old Tampa Bay on its list of
impaired water bodies, in accordance with Section 303(d) of the Federal Clean Water Act.
The most widely adopted stormwater treatment system in Florida, wet detention ponds, only remove about
30 to 40 percent of incoming nitrogen loads from stormwater. Dry retention ponds have nitrogen removal
efficiencies in excess of 90 percent, but they often require much larger construction costs or areas of land to
meet design standards. However, in 2012 the Florida legislature passed HB 599 which included direction to
the water management districts and FDEP to "...allow alternatives to onsite treatment, including, but not
limited to (emphasis added) regional stormwater treatment systems."
One such alternative treatment system that has been proposed for consideration involves the Courtney
Campbell Causeway (CCC). The CCC was constructed in the early 1930's during a time when Old Tampa
Bay was considered to have good water quality. Aerial photographs show evidence of extensive seagrass
meadows in most of Old Tampa Bay in 1948. However, the shallow waters of Old Tampa Bay north of the
CCC at its eastern terminus appear to be devoid of seagrass in 1948. These findings indicate that the
construction of the CCC changed the environment to the extent that seagrass could not grow in that area,
even while adjacent waters supported extensive meadows of these underwater plants.
Phase I of this study was initiated to evaluate if the replacement of a portion of the CCC with a conveyance
structure such as a bridge would likely bring about an ecological response in Old Tampa Bay similar or
greater than that which would be expected to occur by treating stormwater runoff alone. Atkins' study
concluded that the modification of the CCC to allow for the restoration of lost historical tidal influences in
northeastern Old Tampa Bay is likely to result in an ecological response greater in magnitude than that
which could be provided with treating stormwater runoff with traditional treatment systems. Further, the
proposed project is consistent with language within FS 373.413(6) and AH Vol II, both of which allow for
alternative methods to address water quality issues, as long as the benefit would be equivalent (in this case
it would be far greater) than that which would be expected with traditional stormwater treatment systems.
Phase II of this study involves the development and application of a hydrodynamic numerical model to
quantitatively evaluate how circulation within the portion of OTB northeast of the CCC is altered and
improved by the addition of a conceptual bridge opening and/or modification to the flap gate system east of
Rocky Point. Of particular interest is the notion of flushing and residence time, and to what degree potential
modifications to the system can increase water exchange with greater OTB, reduce residence time, and, by
extension, improve water quality and seagrass suitability.
Model results indicate that within the area of concern, a 200 ft bridge opening through the CCC reduces
residence time (defined at time to reach 50% of initial concentration) of the northeast portion of OTB from
about 3 days to about 1 day, location dependent. After 7 days, the peak concentrations in the area of
concern are about 50% lower with the 200 ft opening versus without. Increased tidal flushing in the areas
north of the CCC is expected to improve the conditions that have likely caused the reduction of seagrass
meadows in that area.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
4
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
1.
Introduction
1.1.
Overview
The Florida Department of Transportation (FDOT) District Seven is anticipating significant right-of-way costs
associated with multiple upcoming projects, including work on the Interstate 275 / State Road 60
interchange, the Howard Frankland Bridge, and various projects associated with Interstate 275 in Pinellas
County. All of these transportation projects are occurring within the watershed of Old Tampa Bay (OTB). In
1998, the Florida Department of Environmental Protection (FDEP) placed OTB on its list of impaired water
bodies, in accordance with Section 303(d) of the Federal Clean Water Act. Applications for environmental
resource permits (ERP) that deal with stormwater are required to address the water quality goal of the Clean
Water Act, i.e. "not cause or contribute to exceedance of water quality standards" particularly for waterbodies
on the 303(d) list. In 2009, FDEP approved a Reasonable Assurance Plan (RAP) for restoring water quality
in all of Tampa Bay. The RAP is a "hold the line" strategy for nutrient loads, and stormwater permits are to
consider that new or expanded nutrient loads (specifically for nitrogen) should not offset the intent of the
RAP.
The most widely adopted stormwater treatment system in Florida, wet detention ponds, only remove about
30 to 40 percent of incoming nitrogen loads from stormwater, which makes "holding the line" impossible to
achieve with their use alone. Dry retention ponds have nitrogen removal efficiencies in excess of 90 percent,
but they often require much larger construction costs or areas of land to meet design standards. However, in
2012 the Florida legislature passed HB 599 which included direction to the water management districts and
FDEP to "...allow alternatives to onsite treatment, including, but not limited to regional stormwater treatment
systems." Upon the Governor's signature, this provision was enacted into law as Section 373.413(6), Florida
Statutes (F.S.). Additionally, Part IV of the Southwest Florida Water Management District (SWFWMD)
Applicant's Handbook Volume II (AH Vol II) states that "The applicant may also provide reasonable
assurance of compliance with state water quality standards by the use of alternative methods that will
provide treatment equivalent (emphasis added) to systems designed using the criteria specified in this
section."
1.2.
Proposed solution
One such alternative treatment system that has been proposed for consideration involves the Courtney
Campbell Causeway (CCC). The CCC was constructed in the early 1930's during a time when OTB was
considered to have good water quality. Aerial photographs show evidence of extensive seagrass meadows
in most of OTB in 1948. However, the shallow waters of OTB north of the CCC at its eastern terminus
appear to be devoid of seagrass in 1948. These findings indicate that the construction of the CCC changed
the environment to the extent that seagrass could not grow in that area, even while adjacent waters
supported extensive meadows of these underwater plants. Figure 1-1 illustrates the approximate area of
interest within OTB outlined in orange.
Phase I of this study (FDOT 2015) was initiated to evaluate if the replacement of a portion of the CCC with a
conveyance structure such as a bridge would likely bring about an ecological response in OTB similar or
greater than that which would be expected to occur by treating stormwater runoff alone. The removal or
modifications of causeways such as the CCC has been promoted worldwide as an environmental restoration
tool, and ecological responses to causeway removal have benefited water quality over areas in the range of
hundreds of acres, based on monitoring system responses to completed projects in the Florida Keys and
Tampa Bay.
Atkins' study concluded that the modification of the CCC to allow for the restoration of lost historical tidal
influences in northeastern OTB is likely to result in an ecological response greater in magnitude than that
which could be provided with treating stormwater runoff with traditional treatment systems. Further, the
proposed project is consistent with language within FS 373.413(6) and AH Vol II, both of which allow for
alternative methods to address water quality issues regionally, as long as the benefit would be equivalent (in
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
5
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
this case it would be far greater) than that which would be expected with traditional stormwater treatment
systems.
Figure 1-1
1.3.
Area of interest within OTB.
Purpose and methodology
Phase II of this study involves the development and application of a hydrodynamic numerical model to
quantitatively evaluate how circulation within the portion of OTB northeast of the CCC is altered and
improved by the addition of a conceptual bridge opening and/or modification to the flap gate system east of
Rocky Point. Of particular interest is the notion of flushing and residence time, and to what degree potential
modifications to the system can increase water exchange with greater OTB, reduce residence time, and, by
extension, improve water quality and seagrass suitability.
The hydrodynamic model utilized in this effort was the Delft3D model, a widely-used and validated numerical
model which incorporates the effects of astronomic tides, wind, waves, and meteorological forces to simulate
time-varying hydrodynamics in two or three dimensions. Delft3D supports subgrid flow structures such as
culverts and weirs, as well as the nesting of successively more refined modeling domains, allowing for the
modeling of large- and small-scale domains at appropriate spatial resolution and optimizing run time. It has
the capability to model the dispersion and transport of temperature, salinity, and conservative constituents,
which were used as tracers to simulate the movement of water from the area of interest to greater OTB and
estimate residence time for the modeled scenarios.
To support the modeling effort, a field effort was undertaken to collect water level and current data within and
adjacent to the area of interest during August and September 2015. This data was used to validate and
ground check the hydrodynamic output of the model.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
6
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
1.4.
Related studies
Relatively long and highly variable residence times in OTB have been associated with the causeways
(Janicki et al. 2012). The CCC model prepared by Atkins offers a closer look at one proposed solution
(causeway openings) from the OTB Comprehensive Model effort (Janicki et al. 2015) and refines it on a
smaller scale. This project was focused on the immediate area around Rocky Point, which correlates to
Directed Area #2 in the OTB model. At this time FDOT is in the process of designing the Rocky Point section
of the causeway only.
The spatial resolution of the OTB model (Janicki et al. 2015) is 75 to 200 m, whereas Atkins' CCC model grid
is approximately 10 m; the grid scale is important because the tide flap gate area (Figure 1-2) is about 15 m
wide and the proposed CCC opening size is around 60 m. Also, many of the channels in the project area
are only 10 to 30 m wide. The OTB model used two (2) validation points for current and water level (CCC
and Safety Harbor). The CCC model has (5) validation points, all in the project area east of the main
opening in the causeway. With regard to the effects of the tide flap gates and the proposed opening
dimensions, the CCC model incorporates existing data north and south of the causeway over the same time
period to examine tidal lag and determine how much of a barrier the causeway is to flow in its current
configuration. Local validation data is necessary in order to focus in on the area of concern.
Figure 1-2
Tide flap gates at incoming (high) tide.
2.
Data Collection
2.1.
Currents and water levels
Five (5) Solinst Levelogger pressure gauges and two (2) Nortek Aquadopp Acoustic Doppler Current
Profilers (ADCP) were deployed north and south of the CCC for a period of two weeks between August 18
and September 3, 2015 to record water levels and current velocities. Surveyors from Cumbey & Fair, Inc.,
along with Atkins personnel, double-shot the gauges using RTK-GPS survey equipment to determine their
elevation and position. Table 2-1 outlines the gauge types and coordinates; Figure 2-1 illustrates the
locations where the recording instruments were deployed.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
7
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Table 2-1
Water level and current gauge positions.
Northing
(FL State Plane W, ft)
Easting
(FL State Plane W, ft)
Elevation
(ft NAVD88)
Gauge ID
Type
1324283.7
457641.2
-5.45
WL-1
Water level
1322465.6
471842.9
-3.74
WL-2
Water level
1321095.7
474575.0
-5.57
WL-3
Water level
1321472.4
474713.5
-3.82
WL-4
Water level
1323620.7
467180.3
-3.62
ADCP-1
Water level / velocity
1322971.8
466613.2
-3.94
ADCP-2
Water level / velocity
Figure 2-1
Location of water level and current measurements.
The gauge locations were chosen to monitor the location of the existing tide flap gates (WL-3, WL-4), the
location of the proposed opening (ADCP-1, ADCP-2), and the areas of constriction between OTB, the areas
of potential seagrass restoration, and the canals northeast of Rocky Point. The Levelogger, shown in Figure
2-2, is a pressure sensor that was set to record the water pressure in decibars every hour. The Leveloggers
were attached to concrete bases and set on the bottom. Once the bases were recovered, the data were
adjusted for fluctuations in air pressure and elevated by reference to local survey benchmarks (NAVD88),
resulting in a time series of water level fluctuations over the deployment period. The Aquadopp (Figure 2-3)
has a pressure sensor to collect water levels and three (3) Doppler sensors which record current magnitude
and direction. The two Aquadopps were attached to PVC pipe and water-jetted into place to ensure a clear
area for sampling above the sensors. The Aquadopp instruments were set to record the water level and
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
8
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
current data every 10 minutes. The Leveloggers and Aquadopps were successfully retrieved, and data were
downloaded and corrected using the RTK GPS elevations provided by Cumbey and Fair surveyors
(Appendix A). Data were recovered for the entire 17-day period. The tidal lag between the north and south
side of the causeway was recorded to be one hour at most.
Figure 2-2
Solinst Levelogger (indicated by red arrow) attached to concrete base.
Figure 2-3
Nortek Aquadopp ADCP (Nortek USA).
2.2.
Bathymetry and topography
Detailed elevation data for use in developing the model domain was obtained online from USGS (Tyler et al.
2007). This data set is a merged collection of the National Elevation Dataset (NED) topography and NOAA's
GEOphysical DAta System (GEODAS) bathymetry. Certain areas, such as the canals northeast of Rocky
Point, had to be manually refined in the model grid.
2.3.
Dissolution rate experiment
More than 50 years ago, the rate of dissolution of various compounds had been used as an indicator of
relative water motion (McConnel and Siegler 1959 as cited in Jokiel and Morrissey 1993). In marine waters,
the rate of dissolution of blocks of plaster of Paris has previously been found to correlate in a linear fashion
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
9
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
with current velocity, showing that this technique had directly applicable value in terms of indicating relative
water motion (Jokiel and Morrissey 1993).
In their work, Jokiel and Morrissey (1993) compared dissolution rates of blocks of plaster of Paris at various
locations along a portion of the Great Barrier Reef (Australia) and found that coverage of different coral types
correlated with weight loss of deployed materials. Using a variation of the same technique, ESA scientists
deployed blocks of plaster of Paris at five locations in Strata A, B, and C, to determine if patterns of seagrass
abundance would correlate with a physical measurement indicative of water movement. Blocks of plaster of
Paris were constructed as per directions on boxes of this material, and these blocks were then modified to
include a rod, washer and hook assembly so that they could be deployed in the water column (Figure 2-4).
Figure 2-4
Block of plaster of Paris on scale showing hardware used for deployment.
These blocks were then deployed at five randomly-selected locations in Strata A, B, and C at a depth
approximating the top of the canopy of any nearby seagrass beds (Figure 2-5).
Figure 2-5
Block of plaster of Paris deployed in the water column.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
10
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Initial experiments found that dissolution rates were sufficiently rapid that the experimental duration would be
a few days, rather than weeks. This is likely due to the fact that water temperatures in OTB were in excess
of 90oF during September 2015 (Tomasko, personal observation). Prior work had shown that dissolution
rates of plaster of Paris increase linearly with water temperature (Jokiel and Morrissey 1993). Two and three
days after deployment, blocks were re-weighed, and the rate of loss of material was converted to an average
rate of loss of material for the individual strata (based on n=5 samples per strata).
Results shown in Figure 2-6 illustrate that the rate of dissolution of suspended blocks of plaster of Paris were
greatest in Strata A and B, with lower rates in Stratum C. These results indicate that net water movement is
greatest in those areas north of the CCC that are farthest west, and that net water movement decreases in
areas farther to the east.
Figure 2-6
Average dissolution rates for block of plaster of Paris deployed in the water column.
3.
Model Development
3.1.
Overview
The hydrodynamic model utilized in this effort was the Delft3D model (Deltares 2011), a widely-used and
validated numerical model which incorporates the effects of astronomic tides, wind, waves, and
meteorological forces to simulate time-varying hydrodynamics in two or three dimensions. Delft3D supports
subgrid flow structures such as culverts and weirs, as well as the nesting of successively more refined
modeling domains, allowing for the modeling of large- and small-scale domains at appropriate spatial
resolution and optimizing run time. It has the capability to model the dispersion and transport of
temperature, salinity, and conservative constituents, which were used as tracers to simulate the movement
of water from the area of interest to greater OTB and estimate residence time for the modeled scenarios.
3.2.
Model grids
Two model domains were developed in order to properly simulate the circulation within OTB and resolve the
spatial details in the vicinity of the eastern CCC. The larger Tampa Bay model domain in this study
encompasses the entirety of Tampa Bay and extends outward into the Gulf of Mexico to a maximum depth of
about 30 m. The northern and southern ends of the Gulf domain, respectively, are Clearwater, FL and
Venice, FL. This model domain was adapted from the Regional Ocean Modeling System (ROMS) model
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
11
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
used for NOAA's Tampa Bay Operational Forecast System (NOAA 2015a), with grid resolution varying from
100 m to 1.2 km. The nested model, which is driven by the results of the main model, encompasses the
areas immediately surrounding the eastern side of the CCC, where the proposed circulation enhancements
would be located. This grid has a uniform spatial resolution of about 10 m. Both grids are referenced to
spherical geographic coordinates. Figure 3-1 shows the extent of both grids, with the nested grid outlined in
red. Figure 3-2 and Figure 3-3, respectively, illustrate the bathymetric contours for the Tampa Bay and
nested domains.
Figure 3-1
Tampa Bay (black) and nested (red) model domains.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
12
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-2
Bathymetric contours for the Tampa Bay model domain.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
13
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-3
3.3.
Bathymetric contours for the nested model domain.
Boundary conditions and subgrid structures
For the simulations of existing conditions and proposed alternatives, the time period of August 12. 2015
through September 3, 2015 was chosen; this is concurrent with the field data collection period described in
Section 2.1. Both models were driven by tides, wind, and precipitation, and the nested domain included a
conservative tracer to simulate residence time in the area of interest. Salinity was uniform at 31 ppt.
Precipitation varied daily and was uniform over both domains, based on data from Tampa International
Airport (KTPA) archived by NOAA (NOAA 2015b). Wind speed and direction, uniform over the domains with
a 6-minute time interval, was based on measured data at NOAA Station 8726607, Old Port Tampa, FL
(Reference 0).
The Tampa Bay model domain was forced by a spatially-varying water level time series along the Gulf of
Mexico boundary. This boundary was created using the Oregon State University (OSU) Tidal Model Driver
(TMD) (Egbert and Erofeeva, 2002). A time series of water levels at 15-minute intervals at each corner of
the offshore arc was constructed based on the main tidal harmonic constituents (M2, S2, N2, K2, K1, O1,
P1, Q1) at that location and for the time period of interest. Along the arc, the water level was interpolated
from one time series to the other. Table 3-1 shows the latitude, longitude, and depth at the two tide
extraction points.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
14
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Table 3-1
Longitude, Latitude, and Depth at the tidal boundary corners from the OSU TMD.
Location
Longitude (deg W)
Latitude (deg N)
Depth (m)
North (Clearwater)
-82.85
27.983
7
South (Venice)
-82.49
27.087
12
The flap gate system east of Rocky Point was simulated in the nested domain by means of a one- or twoway culvert, depending on the alternative. In Delft3D, a culvert is defined as a separate, subgrid structure
apart from the model domain and bathymetry so that its characteristics are independent of grid resolution
and can be easily modified. The Tampa Bay model used a calculation time step of 1 minute, while the
nested domain required a time step of 6 seconds to adequately resolve flow through the flap gates.
3.4.
Running the model
The first step in using the coarse-nested model framework is to run the full Tampa Bay model domain with
the boundary forcing conditions as described in Section 3.3. This only needs to be done when running a
new set of large-scale forcing conditions; small changes in the nested domain can be based off the same
coarse model results. Within the output of the Tampa Bay model are points which are then used to develop
boundary conditions at the edge of the nested model; this is handled by utilities in the Delft3D package.
From here, the nested model can be run with the appropriate boundary conditions without having to rerun
the Tampa Bay model for each alternative configuration.
3.5.
Validation with field data
After running the nested model for the time period of the field data collection, the measured and modeled
data were compared to assess the proficiency of the model in replicating the circulation within OTB. The late
summer and early fall of 2015, including the data collection period, was notable in the Tampa Bay area for
excessive rainfall, flooding, and elevated water levels due to runoff. The Delft3D model cannot account for
runoff, and as such the measured water levels were significantly higher than modeled values. To account for
this, the modeled water levels were adjusted by the difference between the average measured and modeled
levels during the modeled time period. Table 3-2 presents these adjustment values for each location. In
support of this, gauge data at NOAA Station 8726607 (Old Port Tampa, FL) was examined for the difference
between predicted and observed water levels; see Figure 3-4. There is a largely consistent underprediction
during the modeled time period on the same order as the adjustments made to the modeled water levels.
Table 3-2
Water level correction values for comparing modeled to measured data.
Location
Water level correction (m)
WL-1
0.1656
WL-2
0.1140
WL-3
0.1990
WL-4
0.1497
ADCP-1
0.2730
ADCP-2
0.3023
Average
0.2006
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
15
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-4
Predicted and observed water levels at NOAA Station 8726607.
After correcting the modeled data to reflect the elevated water levels due to the excessive rainfall, model
data compares very well with the measured data in phase and amplitude. With confidence in the model's
ability to simulate circulation conditions in OTB for the existing conditions, the modeling of alternatives can
proceed. See Figure 3-5 through Figure 3-10 for the measured-modeled water level comparisons; station
locations are shown in Figure 2-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
16
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-5
Measured versus modeled water levels; station ADCP-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
17
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-6
Measured versus modeled water levels; station ADCP-2.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
18
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-7
Measured versus modeled water levels; station WL-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
19
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-8
Measured versus modeled water levels; station WL-2.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
20
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-9
Measured versus modeled water levels; station WL-3.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
21
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-10
Measured versus modeled water levels; station WL-4.
The largest difference in modeled vs. measured water levels is on the order of 0.1 m (4 in), and comparisons
improved towards the end of the run when the model was `spun up' to the applied forcing. In addition to
water levels, the measured and modeled current velocities at the two ADCP locations were compared.
Figure 3-11 and Figure 3-12, respectively, illustrate the measured and modeled depth-averaged current
magnitudes at ADCP-1 and ADCP-2 during the data collection period. While not as close a comparison as
the water levels, the measured and modeled current magnitudes are reasonably aligned in magnitude and
phasing. Due to model resolution and depth-averaging of the circulation, even in a detailed model such as
this it can be difficult to precisely match measured currents. In addition, there was over 1 inch of
precipitation measured locally on August 18th, 2015, and 14.6 in during the month up to that date. While the
model included rainfall over the domain, it cannot account for rainfall runoff, and this likely contributed to the
elevated currents measured in the field.
Between the close match in water levels and reasonable representation of current magnitudes, the model is
well-validated with measured data and considered capable of simulating existing conditions and exploring
alternative configurations.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
22
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-11
Measured versus modeled depth-averaged currents; station ADCP-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
23
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-12
3.6.
Measured versus modeled depth-averaged currents; station ADCP-2.
Configuration alternatives
During a field visit measurements were taken of the existing bridge on the west side of the CCC. The total
bridge span is approximately 420 ft long, shoaled in to an effective channel width of 360 ft and an average
depth of 3 ft. The main thalweg channel was approximately 160 ft wide and reached depths of 10 ft. This
was the basis for the decision to have the proposed bridge opening at 200 ft (61 m) and 10 ft (3 m) deep for
the first proposed model run. Using the same 10 m resolution grid, a second depth file was modified to add
the 200 ft / 10 ft deep channel at the proposed location by manually editing the cell depths and connecting to
adjacent deeper waters. Four model simulations were carried out using the environmental conditions during
the field data period. Table 3-3 outlines the varying parameters for each simulation, while Figure 3-13 and
Figure 3-14, respectively, show the model bathymetry at the eastern CCC without and with the proposed 200
ft opening. For each simulation, a 1 kg/m 3 concentration of a generic conservative tracer was added at the
beginning of the simulation for the entire area of OTB north of the eastern side of the CCC. This allowed for
the visualization of differences in flushing and residence time between the alternative configurations
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
24
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Table 3-3
Parameters for the four initial model runs.
Name
Proposed opening
Flap gate condition
Existing conditions
None (no change)
1-way (no change)
Existing conditions w/ flap gate removal
None (no change)
2-way
Alternative 1, 200 ft opening
200 ft width, 10 ft depth
1-way (no change)
Alternative 1, 200 ft opening w/ flap gate removal
200 ft width, 10 ft depth
2-way
Figure 3-13
Model bathymetry around eastern CCC; existing conditions.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
25
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 3-14
Model bathymetry around eastern CCC; proposed 200 ft opening.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
26
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
4.
Model Results
Each of the four alternatives were run for a 7-day period from August 17, 2015 through August 23, 2015.
Figure 4-1 illustrates a selection of the model monitoring stations where water levels, currents, and tracer
concentrations were compared between alternatives.
Figure 4-1
Tracer, water level, and current monitoring stations within the model.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
27
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
4.1.
Water levels
Water levels at the six gauge locations were examined for the four alternatives to determine the difference
that each configuration makes with regard to tide levels. At locations ADCP-2 and WL-1, outside of the area
of concern, there were no appreciable differences in water levels between configurations. At ADCP-1 and
WL-2, within the area of concern, introducing the 200 ft cut resulted in slightly lower water levels; just over an
inch at most. The 1- or 2-way flow at the flap gates made little to no difference. At WL-3 and WL-4, adjacent
to the flap gates, again there was a reduction in water level around 1 inch at most, but the flap gates made
little difference. Figure 4-2 through Figure 4-7 illustrate the water level comparisons at the six gauge
locations.
Figure 4-2
Water level time series for the four alternatives; ADCP-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
28
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-3
Water level time series for the four alternatives; ADCP-2.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
29
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-4
Water level time series for the four alternatives; WL-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
30
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-5
Water level time series for the four alternatives; WL-2.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
31
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-6
Water level time series for the four alternatives; WL-3.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
32
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-7
4.2.
Water level time series for the four alternatives; WL-4.
Current magnitudes
At location A-4, adding the 200 ft channel reduced peak velocity magnitudes from 0.6 ft/s to 0.3 ft/s. At
ADCP-1, peak velocities increased from 0.7 ft/s to 1.1 ft/s. At location C-5, velocities were largely
unchanged between scenarios. At ChannelD within the canal system, peak velocities changed little
with/without the opening, but making the flap gates 2-way increased peak velocities from about 0.2 ft/s to
0.4 ft/s. Finally, inside the channel cut at CutCN, velocity magnitudes peaked at around 2-2.5 ft/s
(approximately 1.5 knots). Figure 4-8 through Figure 4-12 illustrate the velocity magnitude time series at
these locations.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
33
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-8
Current velocity magnitude time series for the four alternatives; A-4.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
34
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-9
Current velocity magnitude time series for the four alternatives; ADCP-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
35
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-10
Current velocity magnitude time series for the four alternatives; C-5.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
36
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-11
Current velocity magnitude time series for the four alternatives; ChannelD.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
37
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-12
4.3.
Current velocity magnitude time series for the four alternatives; CutCN.
Residence time and flushing (tracer dispersal)
Figure 4-13 illustrates the initial distribution of the 1 kg/m 3 concentration of the conservative tracer. This
distribution is identical for all 4 model simulations. Figure 4-14 through Figure 4-17 illustrate the final tracer
concentration for each scenario at the end of the 7-day model run. Both the opening and the 2-way flow at
the flap gates serve to increase the exchange between the area of concern and greater OTB, with the
opening having a more significant effect. After 7 days, the highest concentration in the area of concern is
0.25 kg/m3 under existing conditions, 0.2 kg/m 3 with 2-way flap gates but no opening, 0.15 kg/m 3 with the
200 ft opening, and less than 0.1 kg/m3 with the opening and 2-way flow at the flap gates.
At the SR60 Bridge, the opening reduces the peak concentration, but is below 0.02 kg/m 3 in all cases. At
WL-1, the opening reduces the peak concentration by 75% and cuts the flushing time approximately in half.
At A-4, a 50% reduction in initial concentration is reached in 2.5 days with existing conditions and less than 1
day with the 200 ft opening. At location B-1, the concentration decreases over 2 times as quickly with the
opening versus without. At ADCP-2, the concentration with the opening quickly increases from 0 to 0.4
kg/m3, but is reduced to half that within a day and continues to decrease afterwards.
At C-5, the concentration decreases about 1.5 times as quickly with the opening in place. At ChannelD and
in the canals in general, the opening has little effect or somewhat slows down the tracer dispersal, but the 2way flap gates increase the rate of dispersion. At D-1, 2-way flap gates cause the tracer to reach a peak of
0.1 kg/m3 which reduces to half that in about 3 days. Figure 4-18 through Figure 4-25 illustrate the tracer
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
38
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
concentration time series at these locations. Table 4-1 presents the dispersal time to reach 50% of initial or
peak concentration for select locations. Within the area of concern, adding the 200 ft opening reduces
residence time (defined at time to reach 50% of initial concentration) from about 3 days to about 1 day,
location dependent.
Figure 4-13
Initial tracer concentration; all scenarios.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
39
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-14
Tracer concentration after 7 days; existing conditions.
Figure 4-15
Tracer concentration after 7 days; existing conditions with 2-way flap gate.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
40
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-16
Tracer concentration after 7 days; 200 ft opening.
Figure 4-17
Tracer concentration after 7 days; 200 ft opening with 2-way flap gate.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
41
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-18
Tracer concentration time series; location SR60 Bridge.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
42
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-19
Tracer concentration time series; location WL-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
43
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-20
Tracer concentration time series; location A-4.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
44
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-21
Tracer concentration time series; location B-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
45
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-22
Tracer concentration time series; location ADCP-2.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
46
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-23
Tracer concentration time series; location C-5.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
47
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-24
Tracer concentration time series; location ChannelD.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
48
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-25
Tracer concentration time series; location D-1.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
49
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Table 4-1
Modeled tracer dispersal data for select locations in OTB.
Location
Initial
concentration
(kg/m3)
Scenario*
E1 E2 A1 A2 E1
SR60
0.0 0.0 0.0 0.0 0.03 0.03 0.01 0.01 0.00 0.00 0.00 0.00 < 1 < 1 < 1 < 1
WL-1
0.0 0.0 0.0 0.0 0.20 0.20 0.07 0.07 0.05 0.03 trace trace
A-4
1.0 1.0 1.0 1.0 1.0
1.0
1.0
1.0
0.23 0.17 0.04 0.01 < 3 < 2 < 1 < 1
B-1
1.0 1.0 1.0 1.0 1.0
1.0
1.0
1.0
0.25 0.15 0.05 0.02 < 3 < 3 < 1 < 1
ADCP-1
1.0 1.0 1.0 1.0 1.0
1.0
1.0
1.0
0.23 0.18 0.10 0.03 < 3 < 3 < 1 < 1
ADCP-2
0.0 0.0 0.0 0.0 0.0
0.0
0.4
0.4
0.20 0.10 0.00 0.00 ---
C-5
1.0 1.0 1.0 1.0 1.0
1.0
1.0
1.0
0.22 0.18 0.14 0.06 < 3 < 3 < 2 < 2
ChannelD
1.0 1.0 1.0 1.0 1.0
1.0
1.0
1.0
0.18 0.16 0.17 0.11 < 3 < 3 < 3 < 3
CanalG
1.0 1.0 1.0 1.0 1.0
1.0
1.0
1.0
0.30 0.26 0.30 0.21 < 5
D-1
0.0 0.0 0.0 0.0 0.0
0.1
0.0
0.1
0.00 0.03 0.00 0.02 ---
Peak concentration
(kg/m3)
E2
A1
A2
Final concentration
after 7 days (kg/m3)
Time to reach
50% of initial or
peak
concentration
(days)
E1
E1 E2 A1 A2
E2
A1
A2
3
<3
---
1
1
<1 <1
4 <5
< 5 ---
4
<5
*E1: existing
E2: existing w/ 2-way flap gate
A1: 200 ft opening
A2: 200 ft opening w/ 2-way flap gate
4.4.
Discussion and conclusions
With regard to water levels, adding the 200 ft opening lowers water levels north of the CCC by, at most, 1
inch, while the direction of flow at the flap gates has negligible effect. The addition of the 200 ft opening
generally decreases peak velocities to the north of CCC compared to existing conditions except in the
immediate vicinity of the opening, while the opening itself experiences a peak depth-averaged velocity of 2.5
ft/s. Making the flap gates flow in both directions has a negligible effect on currents in most of the area
except for in the vicinity of the gates themselves, where velocities increase somewhat. Both the opening and
the 2-way flow at the flap gates serve to increase the exchange between the area of concern and greater
OTB, with the opening having a more significant effect. Within the area of concern, adding the 200 ft
opening reduces residence time (defined as the time to reach 50% of initial concentration of tracers) from
about 3 days to about 1 day, location dependent. After 7 days, the peak concentrations in the area of
concern are about 50% lower with the 200 ft opening versus without.
The four seagrass areas (strata) as defined in FDOT 2015 are shown in Figure 4-26. Comparing the results
the bridge opening has on the tracer concentration in Figure 4-21 (Station B-1) and Figure 4-23
(Station C-5), the modeled tracer concentration at C-5 with the 200-foot opening closely resembles that of
B-1 under the existing conditions. Therefore, it is expected that flushing rates and net water movement in
Stratum C would become more like those currently found in Stratum B. Similarly, Figure 4-19 (Station WL-1)
and Figure 4-20 (Station A-4) indicate that flushing rates and net water movement in Stratum B would
become similar to the existing conditions in Stratum A with a 200-foot opening in the location indicated.
Figure 4-19 also shows that the flushing rate at WL-1 (Stratum A) will improve by approximately 70% on
average. Table 4-2 summarizes the modeled residence times with and without the proposed opening.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
50
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Figure 4-26
Seagrass strata (FDOT 2015).
Increased tidal flushing in the areas north of the CCC is expected to improve the conditions that have likely
impact on seagrass meadows in that area. As was documented in a prior report (FDOT 2015), seagrass
meadows in Strata B and C are sparser, they grow to shallower depths, they are less persistent over time,
and become, increasingly, a monoculture of Widgeon grass (Ruppia maritima) in the eastern portions of the
area considered. The major impact to these seagrass meadows is thought to be artificially low and variable
salinities due to the construction of the causeway, and that if historical tidal influences could be partially or
wholly restored, then the seagrass meadows would be expected to recover over time to conditions
similar to those found in areas farther west (FDOT 2015). The recovery of seagrass meadows to their
historical condition in this area is thus dependent upon the restoration of the historical salinity regime, which
is in turn dependent upon the ability to restore historical tidal influences. Our results, when compared to
results from other causeway-removal projects in Florida suggest that restoration of water quality conditions
through improved circulation could potentially result in the improvement and/or recovery of seagrass
resources over an area that could reach 81 acres in size (FDOT 2015). It should be kept in mind, however,
that regional changes in water quality due to elevated rainfall, droughts, tropical storms or El Niño events
would likely complicate the interpretation of recovery, and that a carefully designed Before and After, Control
and Impact experimental design would be useful to document recovery, or the need to take additional steps
to initiate or accelerate the expected recovery of seagrass resources.
Table 4-2
Location
Summary of modeled residence time for Strata A, B, and C.
Residence time (days)
Existing conditions (no alternative)
With proposed 200 ft opening
Stratum A
2.50
0.50
Stratum B
2.75
0.50
Stratum C
3.00
1.50
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
51
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Based on an examination of trends in seagrass coverage and various nitrogen load reduction projects in the
Tampa Bay watershed during the last 13 years, the amount of nitrogen load reduction required to bring about
an 81 acre increase in seagrass coverage would be approximately 10,568 pounds, or more than 5 tons of
nitrogen (FDOT 2015). This reduction in nitrogen is equivalent to the expected performance of more than
100 of the typical stormwater ponds constructed by FDOT. As such, the restoration of historical circulation
patterns via a 200-foot wide bridge would be expected to bring about an ecological uplift in this portion of
OTB greater than that which would occur with the construction of 100 typical stormwater treatment ponds.
This provides the basis for CCC modification as a regional water quality project in lieu of on-site stormwater
ponds, pursuant to 373.413(6), F.S.
Using results from a standard approach to modelling stormwater, it appears that more than 2,000 acres of
roadway runoff would have to be routed into wet detention ponds to bring about a nitrogen load reduction of
10,568 pounds per year, due to the low published loading rates for elevated highways with limited or no
offsite influences (FDOT 2015). This acreage greatly exceeds the amount of new impervious area to be
added with the Interstate 275 / State Road 60 interchange as well as other area projects (FDOT 2015).
5.
Other Considerations
5.1.
Flap gate removal
The flap gate removal was simulated in the model as a two-way gate. The model showed a reduction in the
concentration at the ChannelD and CanalG locations primarily. The results in Table 4-1 show that if the flap
gates were removed (Scenario E2), the improvement would primarily be localized to the canals. While any
improvement in water quality appears to be a benefit for the ecosystem as a whole, more study is
recommended, focusing on the areas immediately north and south of the flap gates, prior to confirming
recommendation for removal. The area north of the flap gates is predominantly deep-water canal and may
not have significant areas where seagrass meadows could grow with any potential improvement in water
quality. Also, the portions of OTB south of the flap gate currently have some of the most diverse and
productive seagrass meadows in OTB, where seagrass meadows are more persistent than in any of the
areas examined north of the causeway (FDOT 2015). Due to the high quality of the habitats south of the
existing flap gates, their removal or modification to a two-way flow should be done with caution. If removal or
modification was contemplated, it might be useful to conduct a pilot study to temporarily allow water to pass
both directions through the gates by fixing the gates open without completely removing them. Then
weekly/monthly monitoring of the effect (if any) that the change has on the north and south sides of the
causeway and its associated seagrass resources would be conducted. If the results are positive for both
areas during both the wet and dry seasons, then complete removal of the gates could be contemplated.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
52
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
6.
References
Deltares. 2011. Simulation of multi-dimensional hydrodynamic flows and transport phenomena, including
sediments; User Manual. Version 3.15, Revision 18392. September 7, 2011.
Egbert, Gary D. and S. Y. Erofeeva, 2002: Efficient Inverse Modeling of Barotropic Ocean Tides. J. Atmos.
Oceanic Technol., 19, 183204.
doi: http://dx.doi.org/10.1175/1520-0426(2002)019<0183:EIMOBO>2.0.CO;2
FDOT. 2015. Old Tampa Bay Water Quality Improvements; Phase I: Feasibility Study. Report to the
Florida Department of Transportation District 7, prepared by Atkins North America.
Janicki, et al. 2012. Old Tampa Bay Model Development Project, Task 1. Report to Tampa Bay Estuary
Program, pg 7 June 18, 2012
Jokiel, P., and J. Morrissey. 1993. Water motion on coral reefs: evaluation of the "clod card" technique.
Marine Ecology Progress Series. 93: 175-181.
NOAA. 2015a. Tampa Bay Operational Forecast System.
http://tidesandcurrents.noaa.gov/ofs/dev/tbofs/tbofs_info.html
NOAA. 2015b. Climate Data Online, Daily Summaries, KTPA.
http://www.ncdc.noaa.gov/cdo-web/datasets/GHCND/stations/GHCND:USW00012842/detail
NOAA Tides & Currents. 2015. Meteorological Observations, Station 8726607, Old Port Tampa, FL.
https://tidesandcurrents.noaa.gov/met.html?id=8726607
Tyler, D., Zawada, D.G., Nayegandhi, A., Brock, J.C., Crane, M.P., Yates, K.K., and Smith, K.E.L., 2007,
Topobathymetric data for Tampa Bay, Florida: U.S. Geological Survey Open-File Report 2007-1051
(revised). http://pubs.usgs.gov/of/2007/1051/
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
53
Old Tampa Bay Water Quality Improvements
Phase II: Hydrodynamic Modeling Report
Appendix A. Surveyor Report, Cumbey &
Fair, Inc.
Atkins Phase II: Hydrodynamic Modeling Report | Version 1.0 | March 21 2016 | 100040858
54
APPENDIX "C"
APPENDIX "C"
APPENDIX "C"
ABBREVIATION LEGEND
#
A
A/C
ACP
APPROX
ASPH
BCATV
BE
BFP
BIP
BLDG
BOB
BOC
BT
BTF
C
CALC
CATV
CFP
CH
CHB
CIP
CL
CLF
CNTY
COE
COMM
CONC
CSH
CSL
DBC
DIA
DIP
DIR
DIST
DWY
EDO
ELEC
ELEV
EOD
EOP
ERCP
ESMT
EXP
FBK
FBL
FCIR
FCM
FCP
FDOT
FGT
FIP
FIR
FL
FM
FN&D
FND
FOC
FOP
FPC
Delta
Number
Arc or Area
Air Conditioner
Asbestos Cement Pipe (Transite)
Approximate
Asphalt
Buried Cable Television
Buried Electric
Backflow Preventor
Black Iron Pipe
Building
Bottom Of Bank
Back of Curb
Buried Telephone Cable
Back To Field
Chord
Calculated
Television Cable
Corrugated Flex Pipe
Chord length
Chord Bearing
Cast Iron Pipe
Center Line
Chain Link Fence
County
Center Of Excavation
Communication or Committee
Concrete
Core Sample Hole
Concrete Slab
Direct Buried Cable
Diameter
Ductile Iron Pipe
Direction
Distance or District
Driveway
Electronic Designation Only
Electric
Elevation
End of Designation
Edge Of Pavement
Elliptical Reinforced Concrete Pi
Easement
Exposed
Field Book
Fiber Light
Found Capped Iron Rod
Found Concrete Monument
Fiber Conduit Pipe
Florida Department of Transport
Florida Gas Transmission
Found Iron Pin
Found Iron Rod
Flow Line
Force Main
Found Nail & Disk
Found
Fiber Optic Cable
Found Open Pipe
Florida Power Corporation
FPID
FPKN
FPL
FPP
FRD
FS
GALV
GAS
GPR
GPS
GSP
GSS
GYA
HCAA
HDPE
ID
INV
IRR
ITS
L
LB
LP
LS
LT
M
MD
MEAS
MES
MH
MHWL
MISC
MULTI
MW
N/A
NAD
NAVD
NFV
NGS
NGVD
No.
NPW
NTS
NUF
O/S
OCC
OHL
P
(P)
PAVMT
PB
PC
PCC
PCCP
PCP
PE
PED
PET
PG
PI
PID
PK
Financial Project Identification
Found PK Nail
Florida Power and Light Inc.
Found Pinched Iron Pipe
Found Rivet & Disk
Florida Statute
Galvanized
Gas Line
Ground Penetrating Radar
Global Positioning System
Galvanized Steel Pipe
Gravity Sanitary Sewer
Guy Anchor
Hillsborough County Aviation Aut
High Density Poly-Ethylene
Inside Diameter or Identification
Invert Elevation
Irrigation System
Intelligent Transportation Syste
Length
Licensed Business
Light Pole
Land Surveyor
Left
Meters
Measure Down
Measured
Mitered End Section
Manhole Cover
Mean High Water Line
Miscellaneous
Multiple
Water Meter
Not Available or Not Applicable
North American Datum
North American Vertical Datum
Not Field Verified
National Geodetic Survey
National Geodetic Vertical Datum
Number
Non-Potable Water
Not To Scale
No Utility Found
Offset
Occupation
Overhead Line
Point
Plat Data
Pavement
Plat Book
Point Of Curvature
Point Of Compound Curvature
Precast Concrete Pipe
Permanent Control Point
Progress Energy
Pedestrian or Pedestal
Petroleum Pipeline
Page
Point of Intersection
Permanent Identifier
Parker-Kalon Nail
PKND
PLS
POLY
POSS
PP
PPC
PRC
PRM
PSM
PVC
R
R/W
RCP
RCW
RNG
ROW
RT
RTK
SAN
SCM
SEC
SEW
SHP
SIR
SLC
SND
SOP
SR
SRD
SRP
ST
STA
STMD
STORM
SUE
SWK
TBM
TECO
TEL
TEMP
TH
TOB
TOP
TP
TRAFF
TRANS.
TRNF
TV
TWP
UAO
UNK
VCP
VCW
VVH
VZ
WDL
WF
WL
WM
WPP
WV
PK Nail and Disk
Professional Land Surveyor
Polyethylene
Possible
Power Pole
Portland Cement Concrete
Point Of Reverse Curvature
Permanent Reference Monument
Professional Surveyor and Mapp
Polyvinyl Chloride
Record or Radius
Right of Way
Reinforced Concrete Pipe
Reclaimed Water Main
Range
Right of Way
Right
Real Time Kinematic
Sanitary
Set Concrete Monument
Section
Sewer
Shared Pole
Set Iron Rod
Street Light Conduit
Set Nail Disk
Shot On Pipe
State Road
Set Rivet and Disk
Spiral Ribbed Pipe
Street
Station
Stamped Disk
Storm Drainage
Subsurface Utility Engineering
Sidewalk
Temporary Bench Mark
Tampa Electric Company
Telephone
Temporary
Test Hole
Top Of Bank
Top of Utility Elevation
Traverse Point or Turning Point
Traffic Signalization Line
Transmission
Transformer
Television
Township
Utility Agency Owner
Unknown
Vitrified Clay Pipe
Valve Cover Water
Verified Vertical and Horizontal
Verizon Telephone
Woods Line
Wood Fence
Water Line
Water Main
Wooden Power Pole
Water Valve
PAGE 3 OF 3
Old Tampa Bay Residence Time
Project:
100040858 - Old Tampa Bay WQ
To:
Shayne Paynter, Ph.D., P.E., P.G.
Subject:
Residence time mapping
From:
Todd DeMunda, P.E.
Date:
Nov 28, 2016
cc:
The Delft3D model from the Phase II (Atkins 2016) study was used to map residence times in Seagrass
Strata A, B, and C for existing and proposed conditions. Residence time was quantified as the amount of
time necessary for a conservative tracer to reach 50% of its initial concentration at a given location.
Table 1 presents a summary of the residence times in each of the three seagrass strata with and without the
proposed opening. Figure 1 illustrates the residence time in the entire area north of the eastern CCC for
existing conditions, while Figure 2 shows the residence time with the proposed 200 ft opening in place.
Figure 3 shows the change in residence time (in days) with the proposed opening versus existing conditions.
Figure 4 illustrates the change in residence time as a percentage relative to the existing conditions. A
negative value in Figure 3 and Figure 4 indicates a reduction in residence time and an increase in flushing.
Table 1.
Summary of residence times.
Location
Residence time (days)
Existing conditions
Proposed conditions
Stratum A
2.25
0.50
Stratum B
2.75
1.00
Stratum C
3.25
1.50
Under existing conditions, residence time ranges from 2.25 days in the western part of Stratum A to 3.25
days in the center of Stratum C. With the 200 ft opening, residence times in Stratum A are reduced to about
0.5 days, and reach a maximum of 1.5 days in the eastern part of Stratum C. In all three seagrass Strata,
the addition of the 200 ft bridge opening resulted in a reduction in residence time for the modeled tracer. In
Stratum A, this amounts to an 80% reduction in residence time. In Strata B and C, the residence time
reductions are on the order of 60% and 50%, respectively. In general, the magnitude of the reduction in
residence time decreases from west to east. Refer to Figure 4 for a more detailed picture of the changes.
References
Atkins, prepared for FDOT. 2016. Old Tampa Bay Water Quality Improvements, Phase II.
OTB_ResTime_20161128.docx
1
Old Tampa Bay Residence Time
Stratum A
Stratum B
Stratum C
Figure 1.
Existing condition residence time.
Stratum A
Stratum B
Stratum C
Figure 2.
Proposed condition residence time.
OTB_ResTime_20161128.docx
2
Old Tampa Bay Residence Time
Stratum A
Stratum B
Stratum C
Figure 3.
Change in residence time (days), proposed vs. existing conditions.
Stratum A
Stratum B
Stratum C
Figure 4.
Change in residence time (percent), proposed vs. existing conditions.
OTB_ResTime_20161128.docx
3
Appendix B
Seagrass Mitigation Plan
15
Seagrass Mitigation Plan Old
Tampa Bay North of the
Courtney Campbell Causeway
October 2016 (Rev. January 2017)
1.0 Introduction
The Old Tampa Bay Water Quality Improvements, Project Overview (Florida Department of
Transportation, District 7 2016 = FDOT 2016) explains the current distribution of seagrasses north and
south of the Courtney Campbell Causeway (CCC) and how the proposed 220 foot opening will bring
positive change in water quality to the area. The current pattern of seagrasses is such that shoal grass
(Halodule wrightii) and widgeon grass (Ruppia maritima) are the dominant species north of the CCC,
while mixtures of turtle grass (Thalassia testudinum), shoal grass, and manatee grass (Syringodium
filiforme) dominate the seagrass areas south. This was the pattern found in the study design (Figure 1)
Figure 1. Project study design (FDOT 2016)
with strata A, B, and C north of the CCC and stratum D south. Furthermore, the stratums north of the
CCC also varied in the distribution and abundance of shoal grass and widgeon grass. Stratum A had a
mix of shoal grass and widgeon grass with the abundance consistently greater than 75 percent. The
seagrass abundance in strata B and C was found to be inconsistent with the eastern portion of each
stratum devoid of seagrass and with the western portion having some areas with 50 percent seagrass
coverage, predominately widgeon grass. Approximately 58 and 66 acres in strata B and C, respectively,
were found to be comprised of 25 percent or less seagrass abundance, again, predominately widgeon
grass (an ephemeral species)The increasing pattern of increasing dominance of widgeon grass in the
eastern stratum north of the CCC is consistent with literature description that suggest that salinities are
lower and more variable in the areas furthest away from the tidal influences of the open waters of Old
Tampa Bay (OTB). The analysis of long term water quality data showed that the salinity north of the CCC
was both lower and more variable than the salinity at station immediately south of the CCC.
The patterns of seagrass species distribution and salinity north of the CCC are consistent with the
assumptions of our conceptual model.
The construction of the CCC reduced the tidal influence in areas north of the causeway.
2
Reduced tidal influences would be most strongly manifested in areas farthest away from the
open waters of OTB (i.e. west to east north of the CCC).
In those areas north of the CCC and farthest away (i.e. east) from tidal influences, the influences
of freshwater inflows would be artificially enhanced due to reduced mixing with higher salinity
waters of the open bay.
Reduced tidal mixing north of the CCC results in lower and more variable salinities than in areas
south of the CCC or in areas north of the CCC but farther to the west.
The resulting alterations to the salinity regime would likely result in the loss of more stenohaline
(intolerant of a wide fluctuation in salinity) species of seagrass, i.e. turtle grass and manatee grass
Alterations to the natural salinity regime would be more strongly manifested in areas farthest
removed from tidal influences, i.e. the eastern stratum north of the CCC, resulting in a salinity
mediated filtering that would result in dominance by widgeon grass in areas north of the CCC
and farthest away from historical tidal influences, i.e. strata B and C.
The conclusion was that salinity best explains the patterns of seagrass species and abundance north of
the CCC. Further analysis of other parameters such as nitrogen and chlorophylla, found that
concentrations were higher north of the CCC; however, the elevated concentration were associated with
the altered salinity regime rather than pollution. Analysis of the sediments, also, was not supportive of
a conclusion that they were grossly polluted, e.g. high H2S, or indicative of nutrientenriched runoff into
the area. The sediments were mostly sand with relatively low organic content and sulfide levels that are
not considered toxic to seagrasses.
Therefore, the current state of the seagrass resources north of the CCC can be most likely attributed to
the lack of tidal flushing causing the differences in seagrass species and abundance. Improving tidal
flushing through the addition of the 220 foot opening would improve the conditions for restoration of
the seagrass species and abundance north of the CCC.
3
2.0 Seagrass Mitigation
The hydrodynamic model used to analyze the bridge addition estimated reductions in the residence time
within the stratum (Table 1). Strata A and B would experience a 80% and 60% reduction,respectively
while stratum C would experience a 50% reduction with a resulting residence time significantly less than
the residence time currently within stratum A.
Table 1. Fieldcalibrated hydrodynamic model results demonstrating a reduction in residence time due to
the addition of the bridge in the Courtney Campbell Causeway.
Residence time (days)
Percent
reduction
Location
Acres
Stratum A
89
2.50
0.50
80
Stratum B
123
2.75
1.00
60
Stratum C
108
3.25
1.50
50
Existing conditions
(no alternative)
With proposed
220 ft opening
Stratum A totals 89 acres; Stratum B is 123 acres; and Stratum C is 108 acres. The positive effects of the
enhanced flushing caused by the bridge would include the restoration of conditions favorable to the
growth and expansion of seagrass within approximately up to 320 acres in strata A, B and C [estimated
in the most recent documents as between 81124 acres based upon sparse areas with only widgeon
grass based on data from the Southwest Florida Water Management District (SWFWMD) and inwater
surveys in December 2014 and April 2016, FDOT 2016].
Installation of the proposed 220 foot opening will result in immediate physical changes in the movement
and exchange of water north and south of the CCC. Following those physical changes, there will be water
quality changes resulting in higher, more stable salinity values north of the CCC and reductions in
nutrients and chlorophyll-a. These are the "initial positive ecological response" that "would be expected
to occur within the first year of implementing" (FDOT 2016) the restoration project. The habitat changes
resulting from these water exchange and water quality improvements will take significantly longer to
occur.
The proposal for creating seagrass habitat mitigation within the strata north of the CCC is to select an
area that currently and historically has shown lower percent coverage, lower diversity of species, and
reduced persistence. The mitigation areas selected within Stratum C and eastern portions of Stratum B
currently and historically have been comprised of a monoculture of Ruppia, which is an ephemeral
species. This proposed mitigation area, therefore, has an excellent chance to improve in seagrass
species distribution, abundance and persistence after installation of the bridge and improved water
exchange. Figure 2 provides the distribution of seagrass species in strata A, B, and C and shows that
shoal grass becomes less prevalent and eventually does not exist going west to east away from the
existing source of OTB waters. That distribution is anticipated to eventually change
4
Figure 2. Mitigation area (Strata A, B, and C) with seagrass species distribution from April 2016 survey.
with shoal grass eventually occupying the western areas of stratum B and areas of Stratum C along with
widgeon grass.
Figure 3 provides the abundance of seagrasses in strata B and C derived from 13 separate SWFWMD
seagrass mapping events.
5
2.3
Monitoring
The monitoring and assessment for the water quality describes a 2year monitoring program with
success criteria based upon achieving some level of equilibrium between the water bodies north and
south of the CCC through improved tidal exchange and flushing. As expressed in the Introduction, the
habitat parameters including the seagrass enhancement will not respond as quickly as the physical and
water quality parameters; however, determination of success should occur in that time frame.
Seagrass enhancement success will be based upon a 5- year monitoring program within Stratum C and
Stratum B and monitoring within a reference site (Stratum A). Stratum A would be used as the reference
site due to its seagrass abundance and appropriate species richness. Monitoring data would be collected as
total percent coverage and species richness within random sample plots for both the mitigation site and the
reference site. Success will be determined based on a percent similarity/agreement between the reference
site and the mitigation site.
3.0 References
Florida Department of Transportation, District 7. 2016. Old Tampa Bay Water Quality Improvements,
Project Overview. 9 p + Appendices.
Fonseca, M.S., W.J. Kenworthy, F.X. Courtney. 1996. Development of planted seagrass beds in Tampa
Bay, Florida, USA. I. Plant components. Mar. Eco. Prog. Ser., Vol. 132: 127139.
Fonseca, M.S., W.J. Kenworthy, G.W. Thayer. 1998. Guidelines for the Conservation and Restoration of
Seagrasses in the United States and Adjacent Waters. NOAA Coastal Ocean Program. Decision
Analysis Series No. 12. 222 p.
6
Appendix C
Seagrass Maps
16
Average Percentage of Seagrass Coverage
< 5%
5 - 25%
25 - 50%
50 - 75%
75 - 100%
D
Not Detected
D
Stratum A
Stratum B
D
D
D
D
D
D
Stratum C
Project Location Map
_
^
Sources: Esri, SWFWMD, ESA, Atkins
Courtney Campbell Causeway/Old Tampa Bay
Seagrass Abundance, December 2014
0
750
±
1,500
Feet
3,000
Average Percentage of Seagrass Coverage
< 5%
5 - 25%
25 - 50%
Stratum A
Stratum B
50 - 75%
75 - 100%
D
Not Detected
D
D
D
D
D
D
Stratum C
Project Location Map
_
^
Sources: Esri, SWFWMD, ESA, Atkins
Courtney Campbell Causeway/Old Tampa Bay
Seagrass Abundance, April 2016
0
750
±
1,500
Feet
3,000
Seagrass Species Observations
Halodule
Ruppia
D
Stratum A
Not Detected
Stratum B
Stratum C
Project Location Map
_
^
Sources: Esri, SWFWMD, ESA, Atkins
Courtney Campbell Causeway/Old Tampa Bay
Seagrass Diversity, December 2014
0
750
±
1,500
Feet
3,000
Seagrass Species Observations
Halodule
Ruppia
D
Stratum A
Not Detected
Stratum B
Stratum C
Project Location Map
_
^
Sources: Esri, SWFWMD, ESA, Atkins
Courtney Campbell Causeway/Old Tampa Bay
Seagrass Diversity, April 2016
0
750
±
1,500
Feet
3,000
Appendix D
UMAM Analysis
17
Uniform Mitigation Assessment Method Summary
Application Number:
Site/Project Name:
Date:
OTB Hydrologic Restoration Project
December 16, 2016
Impact Summary
Location and Landscape
Support
Assessment Area
1
2
3
4
5
6
-
Impact Type
-
Water Environment
Community Structure
Current
w/Impact
Current
w/Impact
Current
-
-
-
-
-
Impact Delta
Acres
Functional Loss
Direct
w/Impact
TOTAL
-
0.00
Secondary
0.000
Mitigation Summary
Location and Landscape
Support
1
2
3
4
5
6
Assessment Area
Stratum A (Water Quality)
Stratum B West (Water Quality)
Stratum B East (Water Quality and Seagrass)
Stratum C West (Water Quality)
Stratum C East (Water Quality and Seagrass)
-
Mitigation Type
Enhancement
Enhancement
Enhancement
Enhancement
Enhancement
-
Water Environment
Community Structure
w/o Mit
w/Mit
w/o Mit
w/Mit
w/o Mit
w/Mit
6
6
5
5
5
-
6
7
6
6
6
-
6
6
5
5
5
-
8
8
6
6
6
-
6
6
5
5
5
-
6
6
6
5
6
-
TOTALS
Impacts
Direct Impacts
Secondary Impacts
Total Impacts
Mitigation Delta
Time Lag
Risk
PAF
0.07
0.10
0.10
0.07
0.10
-
1.00
1.00
1.03
1.00
1.03
-
1.25
1.25
1.25
1.25
1.25
-
n/a
n/a
n/a
n/a
n/a
-
Acres Mitigation - Upland
0.00
0.00
0.00
Restoration
Enhancement
Preservation
Total Upland Mitigation
RFG
0.053
0.080
0.078
0.053
0.078
TOTAL
Acres
Functional Gain
90.88
89.80
32.96
86.31
21.94
321.89
4.817
7.184
2.571
4.574
1.711
20.857
Acres Mitigation - Wetland
Creation
0.00 Restoration
0.00 Enhancement
0.00 Preservation
0.00
Total Wetland Mitigation
Acres
0.00
0.00
321.89
0.00
321.89
Total Functional Loss
Total Functional Gain
Excess Mitigation
0.000
20.857
20.857
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART I - MIT/PRES
Form 62-345.900(2), F.A.C. (See Sections 62-345.400 F.A.C.)
Site/Project Name
Application Number
Assessment Area Name or Number
Courtney Campbell Causeway
Stratum A (Water Quality)
Further classification (optional)
FLUCCs code
9113
Basin/Watershed Name/Number
Mitigation Type
vegetated submerged bottom
Affected Waterbody (Class)
Assessment Area Size
Enhancement
90.88
Acres
Special Classification (i.e.OFW, AP, other local/state/federal designation of importance)
Northern Old Tampa Bay - 1507,
Class III
1507A, 1513E, 1569
Geographic relationship to and hydrologic connection with wetlands, other surface water, uplands
NA
The proposed mitigation area that historically and currently has existed as seagrass meadows containing a mixture of Halodule and
widgeongrass.
Assessment area description
The assessment area currently exists as Estuarine Seagrass Beds north of the CCC. Stratum A has a mix of shoal grass and widgeon
grass with the abundance consistently greater than 75 percent. Reduced tidal mixing north of the CCC results in lower and more
variable salinities than in areas south of the CCC or in areas north of the CCC but farther to the west. The current state of the seagrass
resources north of the CCC can be most likely attributed to the lack of tidal flushing causing the differences in seagrass species and
abundance. Improving tidal flushing through the addition of the 220 foot bridge would reduce residence time and therefore improve
water quality and estuarine habitat in this area.
Uniqueness (considering the relative rarity in relation to the regional
landscape.)
In 1998, the FDEP placed Old Tampa Bay on its list of officially
In Old Tampa Bay, the Courtney Campbell Causeway (CCC)
"impaired waters" known as the 303(d) list, as required in Section
represents a potentially significant impact to seagrass
303(d) of the Federal Clean Water Act. The 1998 303(d) list remains the resources. The CCC was constructed during the Great
Functions
Mitigation for previous permit/other historic use
Significant nearby features
Anticipated Utilization by Listed Species (List species, their legal
Anticipated Wildlife Utilization Based on Literature Review (List of species
that are representative of the assessment area and reasonably expected to classification (E, T, SSC), type of use, and intensity of use of the
be found )
assessment area)
A variety of birds, fish, mammals, and invertebrates were identified
throughout the strata.
Heron spp.
Observed Evidence of Wildlife Utilization (List species directly observed, or other signs such as tracks, droppings, casings, nests, etc.):
This area is most likely used by the Florida manatee because it has the combination of freshwater sources and seagrasses. Improving
water quality condiitons as well as seagrasses would improve the attractiveness of the habitat to this species.
Additional relevant factors:
Assessment conducted by:
Assessment date(s):
Atkins
11/15/2016
Form 62-345.900(1), F.A.C. [ effective date 02/04/2004 ]
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART II - MITIGATION/PRESERVATION
Form 62-345.900(2), F.A.C. (See Sections 62-345.500 and .600, F.A.C.)
Site/Project Name:
Application Number:
Assessment Area Name or Number:
Courtney Campbell Causeway
-
Stratum A (Water Quality)
Assessment Conducted by:
Impact or Mitigation:
Atkins
Mitigation
Scoring Guidance
Assessment Date:
Optimal (10)
The scoring of each indicator is based on what Condition is optimal and fully
supports wetland/surface water
would be suitable for the type of wetland or
functions
surface water assessed
11/15/16
Moderate(7)
Minimal (4)
Not Present (0)
Condition is less than optimal, but sufficient to
maintain most wetland/surface waterfunctions
Minimal level of support of
wetland/surface water functions
Condition is insufficient to provide
wetland/surface water functions
Enter Notes below (do NOT score each subcategory individually)
possible minor improvement
b. Invasive plant species in proximity to AA.
Current
habitat support somewhat limited due
to causeway only access to the west
NA
c. Wildlife access to and from AA (proximity and barriers).
wildlife access impeded by causeway
no demonstrable change
currently impeded by causeway
opened by bridge
a. Quality and quantity of habitat support outside of AA.
.500(6)(a) Location and Landscape Support
d. Downstream benefits provided to fish and wildlife.
e. Adverse impacts to wildlife in AA from land uses outside of AA.
f. Hydrologic impediments and flow restrictions.
NA
surrounding area is urbanized
no change
causeway is the restriction
no demonstrable change
g. Dependency of downstream habitats on quantity or quality of discharges.
h. Protection of wetland functions provided by uplands (upland AAs only).
With Mitigation
Current
With Mitigation
NA
NA
NA
NA
Additional
Notes:
6
6
Current
tidal exchange is limited
and residence time
NA
a. Appropriateness of water levels and flows.
b. Reliability of water level indicators.
c. Appropriateness of soil moisture.
d. Flow rates/points of discharge.
.500(6)(b)Water Environment
(leave blank for uplands)
e. Fire history (frequency/severity).
f. Appropriate vegetative and/or benthic zonation.
g. Hydrologic stress on vegetation.
h. Use by animals with hydrologic requirements.
i. Plant community composition associated with water quality (i.e., plants tolerant of poor WQ).
j. Water quality of standing water by observation (I.e., discoloration, turbidity).
k. Water quality data for the type of community.
Current
With Mitigation
l. Water depth, wave energy, and currents.
Additional
Notes:
With Mitigation
residence time
decreased by opening
NA
NA
NA
decreased residence
long residence time
time
NA
NA
substrate is appropriate
improvement in water
for seagrass but
quality and
estuarine
reduced
residence
time
long residence time
in
animal use somwhat
useand
by improvement
animals improved
restricted
to the south
mixture
of halodule
and through additional access
no demonstrable change
widgeongrass
NA
NA
not appropriate created
reduced residence time
by tidal regime
no change
appropriate
Hydrologic flow and residence times have been altered by the causeway, which has placed stressors on seagrass meadows within the
assessment area. The causeway cut will provide additional flushing, reduced residence times of 80%, provide more appropriate salinity
regimes, and will therefore promote the growth/recruitment of more appropriate seagrass species.
8
6
.500(6)(c)Community structure
x
Current
With Mitigation
I. Appropriate/desirable species
mixture of seagrasses present
no change
II. Invasive/exotic plant species
III. Regeneration/recruitment
NA
NA
mixture of Halodule and
widgeongrass
NA
NA
NA
no change
seagrasses in good condition
no change
NA
IV. Age, size distribution.
Vegetation
V. Snags, dens, cavity, etc.
NA
Benthic
VI. Plants' condition.
VII. Land management practices.
NA
Both
VIII. Topographic features (refugia, channels, hummocks).
NA
NA
seagrasses in good condition
no change
urbanized
no change
IX. Submerged vegetation (only score if present).
Current
With Mitigation
6
6
X. Upland assessment area
Additional
Notes:
Additional Notes:
Raw Score = Sum of above scores/30
(if uplands, divide by 20)
-
-
0.6
0.66666667
Temporal Lag Factor (TLF) =
(see Temporal Lag Table above)
Risk Factor (RF) =
[1=no risk, 2=mod risk, 3=hi risk, on 0.25 increments)
1.00
1.25
Relative Functional Gain (RFG) =
MD/(TLF x RF) =
0.053
Mitigation Area Size (acres)
90.88
Functional Gain (FG) (RFG x MIT AREA)
(should balance with Functional Loss)
4.817
FOR PRESERVATION ONLY:
Mitigation Delta (MD)
w/Mitigation - Current
0.06666667
Not Applicable
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART I - MIT/PRES
Form 62-345.900(2), F.A.C. (See Sections 62-345.400 F.A.C.)
Site/Project Name
Application Number
Assessment Area Name or Number
Courtney Campbell Causeway
Stratum B West (Water Quality)
Further classification (optional)
FLUCCs code
9113
Basin/Watershed Name/Number
Mitigation Type
vegetated submerged bottom
Affected Waterbody (Class)
Assessment Area Size
Enhancement
89.80
Acres
Special Classification (i.e.OFW, AP, other local/state/federal designation of importance)
Northern Old Tampa Bay - 1507,
Class III
1507A, 1513E, 1569
Geographic relationship to and hydrologic connection with wetlands, other surface water, uplands
NA
The proposed mitigation area that historically and currently has existed as seagrass meadows containing a mixture of Halodule and
widgeongrass.
Assessment area description
The assessment area currently exists as Estuarine Seagrass Beds north of the CCC. The western portion of Stratum B has a mix of
shoal grass and widgeon grass with the abundance consistently greater than 50 percent. Reduced tidal mixing north of the CCC
results in lower and more variable salinities than in areas south of the CCC or in areas north of the CCC but farther to the west. The
current state of the seagrass resources north of the CCC can be most likely attributed to the lack of tidal flushing causing the
differences in seagrass species and abundance. Improving tidal flushing through the addition of the 220 foot bridge would reduce
residence time and therefore improve water quality and estuarine habitat in this area.
Uniqueness (considering the relative rarity in relation to the regional
landscape.)
In Old Tampa Bay, the Courtney Campbell Causeway (CCC)
In 1998, the FDEP placed Old Tampa Bay on its list of officially
represents a potentially significant impact to seagrass
"impaired waters" known as the 303(d) list, as required in Section
303(d) of the Federal Clean Water Act. The 1998 303(d) list remains the resources. The CCC was constructed during the Great
Functions
Mitigation for previous permit/other historic use
The current state of the seagrass resources in assessment area can
be most likely attributed to the lack of tidal flushing causing the
none found
differences in seagrass species and abundance. Improving tidal
Anticipated Wildlife Utilization Based on Literature Review (List of species Anticipated Utilization by Listed Species (List species, their legal
that are representative of the assessment area and reasonably expected to classification (E, T, SSC), type of use, and intensity of use of the
assessment area)
be found )
Significant nearby features
A variety of fish, invertebrate, and mammal species are anticipated to
Trichechus manatus (T)
utilize beds within the reference community.
Observed Evidence of Wildlife Utilization (List species directly observed, or other signs such as tracks, droppings, casings, nests, etc.):
This area is most likely used by the Florida manatee and anadromous fish species because it has the combination of freshwater
sources and seagrasses. Improving water quality condiitons as well as seagrasses would improve the attractiveness of the habitat to
these species.
Additional relevant factors:
Assessment conducted by:
Assessment date(s):
Atkins
11/15/2016
Form 62-345.900(1), F.A.C. [ effective date 02/04/2004 ]
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART II - MITIGATION/PRESERVATION
Form 62-345.900(2), F.A.C. (See Sections 62-345.500 and .600, F.A.C.)
Site/Project Name:
Application Number:
Assessment Area Name or Number:
Courtney Campbell Causeway
-
Stratum B West (Water Quality)
Assessment Conducted by:
Impact or Mitigation:
Mitigation
Assessment Date:
Atkins
11/15/16
Scoring Guidance
Optimal (10)
Moderate(7)
Minimal (4)
Not Present (0)
The scoring of each indicator is based on what
would be suitable for the type of wetland or
surface water assessed
Condition is optimal and fully
supports wetland/surface water
functions
Condition is less than optimal, but sufficient to
maintain most wetland/surface waterfunctions
Minimal level of support of
wetland/surface water functions
Condition is insufficient to provide
wetland/surface water functions
Enter Notes below (do NOT score each subcategory individually)
Current
seagrass bed species richness and
abundance reduced due to water
NA
With Mitigation
removal of portion of causeway will
allow additional flushing and will
NA
additional wildlife access will provided
access limited by location of causeway
through removal of section of
ability to provide downstream benefits
downstream benefits increased by
has been impeded by location of
removal of section of causeway
adjacent to roadway and residential
no change
development
flow will be improved and will allow
flow is reduced due to causeway
decrease in residence times
NA
NA
a. Quality and quantity of habitat support outside of AA.
b. Invasive plant species.
c. Wildlife access to and from AA (proximity and barriers).
.500(6)(a) Location and Landscape Support
d. Downstream benefits provided to fish and wildlife.
e. Adverse impacts to wildlife in AA from land uses outside of AA.
f. Hydrologic connectivity (impediments and flow restrictions).
g. Dependency of downstream habitats on quantity or quality of discharges.
Current
With Mitigation
NA
h. Protection of wetland functions provided by uplands (upland AAs only).
NA
Additional Removal of a section of the causeway will alllow for greater hydrologic flow, lead to lower residence times, and will improve the overall water
Notes:
quality and landscape support within the assessment area.
7
6
Current
water levels and flows
have been restricted by
NA
a. Appropriateness of water levels and flows.
b. Reliability of water level indicators.
NA
NA
flows in the section of old
flow rates will improve
tampa bay have been
due to causeway cut and
NA
NA
curerntly reduced
water quality
coverage
of appropriate
improvements
willreduce
allow
long
residence
times and causeway
cut will
low salinity
levelsis
residence
and
wildlife
utilization
causeway
cuttimes
will improve
c. Appropriateness of soil moisture.
d. Flow rates/points of discharge.
.500(6)(b)Water Environment
(leave blank for uplands)
e. Fire frequency/severity.
f. Type of vegetation.
g. Hydrologic stress on vegetation.
h. Use by animals with hydrologic requirements.
i. Plant community composition associated with water quality (i.e., plants tolerant of poor WQ).
j. Water quality of standing water by observation (I.e., discoloration, turbidity).
k. Water quality data for the type of community.
Current
With Mitigation
l. Water depth, wave energy, and currents.
Additional
Notes:
With Mitigation
causeway cut will improve
flows
NA
reduced coverage
due to flow
reduced
of
appropriate seagrass
NA
seagrass species have
beenappropriate
affected byfor
salinity
hydrology
and therefore
salinity regime
will
improve and allow for
NA
seagrass species
composition will improve
no change
seagrasses
Hydrologic flow and residence times have been altered by the causeway, which has placed stressors on seagrass meadows within the
assessment area. The causeway cut will provide additional flushing, reduced residence times of 60%, provide more appropriate salinity
regimes, and will therefore promote the growth/recruitment of more appropriate seagrass species.
8
6
Current
currently minimal desirable
species
NA
growth and recruitment has
been reduced by inappropriate
NA
I. Appropriate/desirable species
.500(6)(c)Community structure
II. Invasive/exotic plant species
III. Regeneration/recruitment
x
IV. Age, size distribution.
Vegetation
NA
Seagrass abundance and
richness
has
been
reducedtodue
development adjacent
V. Snags, dens, cavity, etc.
VI. Plants' condition.
Benthic
VII. Land management practices.
mitigation area
adjacent channels
seagrass beds with reduced
abundance and coverage
urbanized
VIII. Topographic features (refugia, channels, hummocks).
Both
IX. Submerged vegetation (only score if present).
X. Upland assessment area
With Mitigation Additional
Notes:
Current
With Mitigation
no change
NA
no change
NA
NA
no change
no change
no change
no change
no change
6
6
Additional Notes:
Raw Score = Sum of above scores/30
uplands, divide by 20)
(if
Water quality improvements are expected to occur within 2 years
of the completion of the construction.
-
-
0.6
0.7
Temporal Lag Factor (TLF) =
Temporal Lag Table above)
Risk Factor (RF) =
[1=no risk, 2=mod risk, 3=hi risk, on 0.25 increments)
(see
1.00
1.25
Relative Functional Gain (RFG) =
MD/(TLF x RF) =
0.080
Mitigation Area Size (acres)
89.80
Functional Gain (FG) (RFG x MIT AREA)
(should balance with Functional Loss)
7.184
FOR PRESERVATION ONLY:
Mitigation Delta (MD)
w/Mitigation - Current
Not Applicable
0.1
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART I - MIT/PRES
Form 62-345.900(2), F.A.C. (See Sections 62-345.400 F.A.C.)
Site/Project Name
Application Number
Assessment Area Name or Number
Stratum B East (Water Quality and
Seagrass)
OTB Hydrologic Restoration Project
FLUCCs code
Further classification (optional)
Mitigation Type
Enhancement
Basin/Watershed Name/Number
Affected Waterbody (Class)
Assessment Area Size
32.96
Acres
Special Classification (i.e.OFW, AP, other local/state/federal designation of importance)
Geographic relationship to and hydrologic connection with wetlands, other surface water, uplands
The proposed mitigation area that historically and currently has existed as seagrass meadows containing predominantly widgeongrass
- a species tolerant of low salinities.
Assessment area description
The assessment area currently exists as Estuarine Seagrass Beds north of the CCC. The eastern portion of Stratum B has a mix of
shoal grass and widgeon grass with the abundance consistently around 50-75 percent. Reduced tidal mixing north of the CCC results
in lower and more variable salinities than in areas south of the CCC or in areas north of the CCC but farther to the west. The current
state of the seagrass resources north of the CCC can be most likely attributed to the lack of tidal flushing causing the differences in
seagrass species and abundance. Improving tidal flushing through the addition of the 220 foot bridge would reduce residence time and
therefore improve water quality and estuarine habitat in this area.
Uniqueness (considering the relative rarity in relation to the regional
landscape.)
In Old Tampa Bay, the Courtney Campbell Causeway (CCC)
In 1998, the FDEP placed Old Tampa Bay on its list of officially
represents a potentially significant impact to seagrass
"impaired waters" known as the 303(d) list, as required in Section
303(d) of the Federal Clean Water Act. The 1998 303(d) list remains the resources. The CCC was constructed during the Great
Functions
Mitigation for previous permit/other historic use
The current state of the seagrass resources in assessment area can
be most likely attributed to the lack of tidal flushing causing the
none found
differences in seagrass species and abundance. Improving tidal
Anticipated Wildlife Utilization Based on Literature Review (List of species Anticipated Utilization by Listed Species (List species, their legal
that are representative of the assessment area and reasonably expected to classification (E, T, SSC), type of use, and intensity of use of the
assessment area)
be found )
Significant nearby features
A variety of fish, invertebrate, and mammal species are anticipated to
manatee
utilize beds within the reference community.
Observed Evidence of Wildlife Utilization (List species directly observed, or other signs such as tracks, droppings, casings, nests, etc.):
This area is most likely used by the Florida manatee and anadromous fish species because it has the combination of freshwater
sources and seagrasses. Improving water quality condiitons as well as seagrasses would improve the attractiveness of the habitat to
these species.
Additional relevant factors:
Assessment conducted by:
Assessment date(s):
Atkins
11/15/2016
Form 62-345.900(1), F.A.C. [ effective date 02/04/2004 ]
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART II - MITIGATION/PRESERVATION
Form 62-345.900(2), F.A.C. (See Sections 62-345.500 and .600, F.A.C.)
Site/Project Name:
Application Number:
Assessment Area Name or Number:
OTB Hydrologic Restoration Project
-
Stratum B East (Water Quality and Seagrass)
Assessment Conducted by:
Impact or Mitigation:
Mitigation
Assessment Date:
Atkins
11/15/16
Scoring Guidance
Optimal (10)
Moderate(7)
Minimal (4)
Not Present (0)
The scoring of each indicator is based on what
would be suitable for the type of wetland or
surface water assessed
Condition is optimal and fully
supports wetland/surface water
functions
Condition is less than optimal, but sufficient to
maintain most wetland/surface waterfunctions
Minimal level of support of
wetland/surface water functions
Condition is insufficient to provide
wetland/surface water functions
Enter Notes below (do NOT score each subcategory individually)
Current
seagrass bed species richness and
abundance reduced due to water
NA
With Mitigation
removal of portion of causeway will
allow additional flushing and will
NA
opening will allow greater wildlife
wildlife access impeded by causeway
access
additional connection provided for fish
currently impeded by causeway
and wildlife
surrounding area is urbanized
no change
opening will allow improved tidal
causeway is restriction
exchange and physical connection
NA
NA
a. Quality and quantity of habitat support outside of AA.
b. Invasive plant species.
c. Wildlife access to and from AA (proximity and barriers).
.500(6)(a) Location and Landscape Support
d. Downstream benefits provided to fish and wildlife.
e. Adverse impacts to wildlife in AA from land uses outside of AA.
f. Hydrologic connectivity (impediments and flow restrictions).
g. Dependency of downstream habitats on quantity or quality of discharges.
Current
With Mitigation
NA
h. Protection of wetland functions provided by uplands (upland AAs only).
NA
Additional Assessment area is located immediately adjacent to the proposed project. The proposed opening will allow greater location and landscape
Notes:
support via physical connection for anadramous fish species and mammals.
6
5
a. Appropriateness of water levels and flows.
b. Reliability of water level indicators.
c. Appropriateness of soil moisture.
d. Flow rates/points of discharge.
.500(6)(b)Water Environment
(leave blank for uplands)
e. Fire frequency/severity.
f. Type of vegetation.
g. Hydrologic stress on vegetation.
h. Use by animals with hydrologic requirements.
i. Plant community composition associated with water quality (i.e., plants tolerant of poor WQ).
j. Water quality of standing water by observation (I.e., discoloration, turbidity).
k. Water quality data for the type of community.
Current
With Mitigation
l. Water depth, wave energy, and currents.
Additional
Notes:
Current
Tidal exchange is
restriced by the causeway
NA
With Mitigation
tidal exchange will be
open
NA
NA
residence time is long
because of causeway
NA
monculture of transient
seagrass
reduced
tidalspecies
exchange
NA
opening will reduce
residence time and
NA
improved residence time
and
waterwill
quality
will
opening
reduce
and increased
residence
residence
and
animal
use is restricted
by
opening
willtime
provide
causeway by
physical/hydrologic
predominated
improved
residence time
inappropriate transent
and water quality will
NA
NA
water quality affected by
opening will reduce
variable salinity and high
residence time and
appropriate for seagrass appropriate for seagrass
Hydrologic flow and residence times have been altered by the causeway, which has placed stressors on seagrass meadows within the
assessment area. The causeway cut will provide additional flushing, reduced residence times of 60%, provide more appropriate salinity
regimes, improved estuarine habitat and will therefore promote the growth/recruitment of more appropriate seagrass species.
6
5
Current
With Mitigation
monoculture of impersistent
opening will reduce residence
species tolerant of inappropriate time and improve water quality
NA
NA
opening will allow for
current no recruitment
appropriate salinity and
monoculture of impersistent
opening will improve
species tolerant of inappropriate
NA
NA
coverage of appropriate
impersistent species
species
urbanized
no change
I. Appropriate/desirable species
.500(6)(c)Community structure
II. Invasive/exotic plant species
III. Regeneration/recruitment
x
IV. Age, size distribution.
Vegetation
V. Snags, dens, cavity, etc.
Benthic
VI. Plants' condition.
Both
VIII. Topographic features (refugia, channels, hummocks).
VII. Land management practices.
NA
NA
seagrass beds comprised of
increased seagrass coverage
impersistent species
and recruitment of appropriate
X. Upland assessment area
NA
NA
With Mitigation Additional
Opening will allow for appropriate salinity and residence times and recruitment of appropriate seagrass species as well as infaunal species
Notes:
IX. Submerged vegetation (only score if present).
Current
6
5
Additional Notes:
Raw Score = Sum of above scores/30
uplands, divide by 20)
(if
-
-
0.5
0.6
Temporal Lag Factor (TLF) =
Temporal Lag Table above)
Risk Factor (RF) =
[1=no risk, 2=mod risk, 3=hi risk, on 0.25 increments)
(see
1.03
1.25
Relative Functional Gain (RFG) =
MD/(TLF x RF) =
0.078
Mitigation Area Size (acres)
32.96
Functional Gain (FG) (RFG x MIT AREA)
(should balance with Functional Loss)
2.571
FOR PRESERVATION ONLY:
Mitigation Delta (MD)
w/Mitigation - Current
Not Applicable
0.1
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART I - MIT/PRES
Form 62-345.900(2), F.A.C. (See Sections 62-345.400 F.A.C.)
Site/Project Name
Application Number
Assessment Area Name or Number
OTB Hydrologic Restoration Project
Stratum C West (Water Quality)
Further classification (optional)
FLUCCs code
9113
Basin/Watershed Name/Number
Mitigation Type
vegetated submerged bottom
Affected Waterbody (Class)
Assessment Area Size
Enhancement
86.31
Acres
Special Classification (i.e.OFW, AP, other local/state/federal designation of importance)
Northern Old Tampa Bay - 1507,
Class III
1507A, 1513E, 1569
Geographic relationship to and hydrologic connection with wetlands, other surface water, uplands
NA
The proposed mitigation area that historically and currently has existed as seagrass meadows containing a mixture of Halodule and
widgeongrass.
Assessment area description
The assessment area currently exists as Estuarine Seagrass Beds north of the CCC. The western portion of Stratum C has a mix of
shoal grass and widgeon grass with the abundance consistently around 25 percent. Reduced tidal mixing north of the CCC results in
lower and more variable salinities than in areas south of the CCC or in areas north of the CCC but farther to the west. The current state
of the seagrass resources north of the CCC can be most likely attributed to the lack of tidal flushing causing the differences in
seagrass species and abundance. Improving tidal flushing through the addition of the 220 foot bridge would reduce residence time and
therefore improve water quality and estuarine habitat in this area.
Uniqueness (considering the relative rarity in relation to the regional
landscape.)
In Old Tampa Bay, the Courtney Campbell Causeway (CCC)
In 1998, the FDEP placed Old Tampa Bay on its list of officially
represents a potentially significant impact to seagrass
"impaired waters" known as the 303(d) list, as required in Section
303(d) of the Federal Clean Water Act. The 1998 303(d) list remains the resources. The CCC was constructed during the Great
Functions
Mitigation for previous permit/other historic use
The current state of the seagrass resources in assessment area can
be most likely attributed to the lack of tidal flushing causing the
none found
differences in seagrass species and abundance. Improving tidal
Anticipated Wildlife Utilization Based on Literature Review (List of species Anticipated Utilization by Listed Species (List species, their legal
that are representative of the assessment area and reasonably expected to classification (E, T, SSC), type of use, and intensity of use of the
assessment area)
be found )
Significant nearby features
A variety of fish, invertebrate, and mammal species are anticipated to
manatee and anadromous fish species
utilize beds within the reference community.
Observed Evidence of Wildlife Utilization (List species directly observed, or other signs such as tracks, droppings, casings, nests, etc.):
This area is most likely used by the Florida manatee and anadromous fish species because it has the combination of freshwater
sources and seagrasses. Improving water quality condiitons as well as seagrasses would improve the attractiveness of the habitat to
these species.
Additional relevant factors:
Assessment conducted by:
Assessment date(s):
Atkins
11/15/2016
Form 62-345.900(1), F.A.C. [ effective date 02/04/2004 ]
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART II - MITIGATION/PRESERVATION
Form 62-345.900(2), F.A.C. (See Sections 62-345.500 and .600, F.A.C.)
Site/Project Name:
Application Number:
Assessment Area Name or Number:
OTB Hydrologic Restoration Project
-
Stratum C West (Water Quality)
Assessment Conducted by:
Impact or Mitigation:
Mitigation
Assessment Date:
Atkins
11/15/16
Scoring Guidance
Optimal (10)
Moderate(7)
Minimal (4)
Not Present (0)
The scoring of each indicator is based on what
would be suitable for the type of wetland or
surface water assessed
Condition is optimal and fully
supports wetland/surface water
functions
Condition is less than optimal, but sufficient to
maintain most wetland/surface waterfunctions
Minimal level of support of
wetland/surface water functions
Condition is insufficient to provide
wetland/surface water functions
Enter Notes below (do NOT score each subcategory individually)
Current
habitat support outside of AA is
reduced due to causeway
NA
urbanized
With Mitigation
opening will provide greater habitat
support via enhanced connection to
NA
enhanced wildlife access due to
opening
opening will allow access to fish and
wildlife
no change
flow impeded by causeway
flow improved via causeway opening
g. Dependency of downstream habitats on quantity or quality of discharges.
NA
NA
h. Protection of wetland functions provided by uplands (upland AAs only).
NA
NA
a. Quality and quantity of habitat support outside of AA.
b. Invasive plant species.
Access is limited due to causeway
c. Wildlife access to and from AA (proximity and barriers).
.500(6)(a) Location and Landscape Support
reduced due to causeway
d. Downstream benefits provided to fish and wildlife.
e. Adverse impacts to wildlife in AA from land uses outside of AA.
f. Hydrologic connectivity (impediments and flow restrictions).
Current
With Mitigation
Additional Removal of a section of the causeway will alllow for greater hydrologic flow, lead to lower residence times, and will improve the overall water
Notes:
quality and landscape support within the assessment area.
6
5
Current
flows have been
restricted due to
NA
a. Appropriateness of water levels and flows.
b. Reliability of water level indicators.
c. Appropriateness of soil moisture.
d. Flow rates/points of discharge.
.500(6)(b)Water Environment
(leave blank for uplands)
e. Fire frequency/severity.
f. Type of vegetation.
g. Hydrologic stress on vegetation.
h. Use by animals with hydrologic requirements.
i. Plant community composition associated with water quality (i.e., plants tolerant of poor WQ).
j. Water quality of standing water by observation (I.e., discoloration, turbidity).
k. Water quality data for the type of community.
Current
With Mitigation
l. Water depth, wave energy, and currents.
Additional
Notes:
With Mitigation
flows improved via
enhanced connection to
NA
NA
NA
flows in this section of Old
flow rates improved
Tampa Bay have been
through increased
NA
NA
monoculture of
recruitment of appropriate
impersistence
species
species with
improved
monoculture
of of recruitment
of appropriate
impersistence species of
species
openingwith
will improved
allow for
restricted by causeway
increased
use
by fish
reduced coverage of
salinity regime
willand
appropriate seagrass
improve and allow for
NA
NA
seagrass species have
seagrass species
been affected by salinity composition will improve
appropriate for seagrass
no change
Hydrologic flow and residence times have been altered by the causeway, which has placed stressors on seagrass meadows within the
assessment area. The causeway cut will provide additional flushing, reduced residence times of 50%, provide more appropriate salinity
regimes, improved estuarine habitat and will therefore promote the growth/recruitment of more appropriate seagrass species.
6
5
I. Appropriate/desirable species
.500(6)(c)Community structure
II. Invasive/exotic plant species
III. Regeneration/recruitment
x
IV. Age, size distribution.
Vegetation
V. Snags, dens, cavity, etc.
VI. Plants' condition.
Benthic
VII. Land management practices.
VIII. Topographic features (refugia, channels, hummocks).
Both
IX. Submerged vegetation (only score if present).
X. Upland assessment area
With Mitigation Additional
Notes:
Current
Current
monoculture of impersistent
species tolerant of inappropriate
NA
With Mitigation
current no recruitment
monoculture of impersistent
species tolerant of inappropriate
NA
monoculture of impersistent
species tolerant of inappropriate
NA
no change
NA
monoculture of impersistent
species tolerant of inappropriate
NA
NA
no change
NA
no change
NA
no change
NA
no change
NA
5
5
Additional Notes:
Raw Score = Sum of above scores/30
uplands, divide by 20)
(if
-
-
0.5
0.56666667
Temporal Lag Factor (TLF) =
Temporal Lag Table above)
Risk Factor (RF) =
[1=no risk, 2=mod risk, 3=hi risk, on 0.25 increments)
(see
1.00
1.25
Relative Functional Gain (RFG) =
MD/(TLF x RF) =
0.053
Mitigation Area Size (acres)
86.31
Functional Gain (FG) (RFG x MIT AREA)
(should balance with Functional Loss)
4.574
FOR PRESERVATION ONLY:
Mitigation Delta (MD)
w/Mitigation - Current
0.06666667
Not Applicable
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART I - MIT/PRES
Form 62-345.900(2), F.A.C. (See Sections 62-345.400 F.A.C.)
Site/Project Name
Application Number
Assessment Area Name or Number
Stratum C East (Water Quality and
Seagrass)
OTB Hydrologic Restoration Project
Further classification (optional)
FLUCCs code
9113
Basin/Watershed Name/Number
Mitigation Type
vegetated submerged bottom
Affected Waterbody (Class)
Assessment Area Size
Enhancement
21.94
Acres
Special Classification (i.e.OFW, AP, other local/state/federal designation of importance)
Northern Old Tampa Bay - 1507,
Class III
1507A, 1513E, 1569
Geographic relationship to and hydrologic connection with wetlands, other surface water, uplands
NA
The proposed mitigation area that historically and currently has existed as seagrass meadows containing primarily widgeongrass - an
impersistent species tolerant of lower salinities and higher residence times.
Assessment area description
The assessment area currently exists as Estuarine Seagrass Beds north of the CCC. Stratum C is comprised of a monoculture of
widgeon grass with impersistent coverage. Coverage during the 2016 surveys was around 25 percent. Reduced tidal mixing north of
the CCC results in lower and more variable salinities than in areas south of the CCC or in areas north of the CCC but farther to the
west. The current state of the seagrass resources north of the CCC can be most likely attributed to the lack of tidal flushing causing the
differences in seagrass species and abundance. Improving tidal flushing through the addition of the 220 foot bridge would reduce
residence time and therefore improve water quality and estuarine habitat in this area.
Uniqueness (considering the relative rarity in relation to the regional
landscape.)
In Old Tampa Bay, the Courtney Campbell Causeway (CCC)
In 1998, the FDEP placed Old Tampa Bay on its list of officially
represents a potentially significant impact to seagrass
"impaired waters" known as the 303(d) list, as required in Section
303(d) of the Federal Clean Water Act. The 1998 303(d) list remains the resources. The CCC was constructed during the Great
Functions
Mitigation for previous permit/other historic use
The current state of the seagrass resources in assessment area can
be most likely attributed to the lack of tidal flushing causing the
none found
differences in seagrass species and abundance. Improving tidal
Anticipated Wildlife Utilization Based on Literature Review (List of species Anticipated Utilization by Listed Species (List species, their legal
that are representative of the assessment area and reasonably expected to classification (E, T, SSC), type of use, and intensity of use of the
assessment area)
be found )
Significant nearby features
A variety of fish, invertebrate, and mammal species are anticipated to
manatee
utilize beds within the reference community.
Observed Evidence of Wildlife Utilization (List species directly observed, or other signs such as tracks, droppings, casings, nests, etc.):
This area is most likely used by the Florida manatee and anadromous fish species because it has the combination of freshwater
sources and seagrasses. Improving water quality condiitons as well as seagrasses would improve the attractiveness of the habitat to
these species.
Additional relevant factors:
Assessment conducted by:
Assessment date(s):
Atkins
11/15/2016
Form 62-345.900(1), F.A.C. [ effective date 02/04/2004 ]
UNIFORM WETLAND MITIGATION ASSESSMENT WORKSHEET - PART II - MITIGATION/PRESERVATION
Form 62-345.900(2), F.A.C. (See Sections 62-345.500 and .600, F.A.C.)
Site/Project Name:
Application Number:
Assessment Area Name or Number:
OTB Hydrologic Restoration Project
-
Stratum C East (Water Quality and Seagrass)
Assessment Conducted by:
Impact or Mitigation:
Mitigation
Assessment Date:
Atkins
11/15/16
Scoring Guidance
Optimal (10)
Moderate(7)
Minimal (4)
Not Present (0)
The scoring of each indicator is based on what
would be suitable for the type of wetland or
surface water assessed
Condition is optimal and fully
supports wetland/surface water
functions
Condition is less than optimal, but sufficient to
maintain most wetland/surface waterfunctions
Minimal level of support of
wetland/surface water functions
Condition is insufficient to provide
wetland/surface water functions
Enter Notes below (do NOT score each subcategory individually)
Current
seagrass bed species richness and
abundance reduced due to water
NA
With Mitigation
removal of portion of causeway will
allow additional flushing and will
NA
wildlife access improved through
widllife access impeded by causeway
connection
additional connection provided for fish
currently impeded by causeway
and wildlife
urbanized
no change
hydrologic connection improved with
causeway is restriction
opening
NA
NA
a. Quality and quantity of habitat support outside of AA.
b. Invasive plant species.
c. Wildlife access to and from AA (proximity and barriers).
.500(6)(a) Location and Landscape Support
d. Downstream benefits provided to fish and wildlife.
e. Adverse impacts to wildlife in AA from land uses outside of AA.
f. Hydrologic connectivity (impediments and flow restrictions).
g. Dependency of downstream habitats on quantity or quality of discharges.
Current
With Mitigation
NA
h. Protection of wetland functions provided by uplands (upland AAs only).
NA
Additional Assessment area is located immediately adjacent to the proposed project. The proposed opening will allow greater location and landscape
Notes:
support via physical connection for anadramous fish species and mammals.
6
5
a. Appropriateness of water levels and flows.
b. Reliability of water level indicators.
c. Appropriateness of soil moisture.
d. Flow rates/points of discharge.
.500(6)(b)Water Environment
(leave blank for uplands)
e. Fire frequency/severity.
f. Type of vegetation.
g. Hydrologic stress on vegetation.
h. Use by animals with hydrologic requirements.
i. Plant community composition associated with water quality (i.e., plants tolerant of poor WQ).
j. Water quality of standing water by observation (I.e., discoloration, turbidity).
k. Water quality data for the type of community.
Current
With Mitigation
l. Water depth, wave energy, and currents.
Additional
Notes:
Current
Tidal exchange is
restriced by the causeway
NA
With Mitigation
tidal exchange will be
open
NA
NA
flow impeded by
causeway
NA
monculture of transient
seagrass
reduced
tidalspecies
exchange
NA
flow will be improved
through additional
NA
improved residence time
and
waterwill
quality
will
opening
reduce
and increased
residence
residence
and
animal
use is restricted
by
opening
willtime
provide
causeway by
physical/hydrologic
predominated
improved
residence time
inappropriate transent
and water quality will
NA
NA
water quality affected by
opening will reduce
variable salinity and high
residence time and
suitable for seagrass
no change
Hydrologic flow and residence times have been altered by the causeway, which has placed stressors on seagrass meadows within the
assessment area. The causeway cut will provide additional flushing, reduced residence times of 60%, provide more appropriate salinity
regimes, improve estuarine habitat and will therefore promote the growth/recruitment of more appropriate seagrass species.
6
5
Current
With Mitigation
monoculture of impersistent
opening will reduce residence
species tolerant of inappropriate time and improve water quality
NA
NA
opening will allow for
no current recruitment
appropriate salinity and
monoculture of impersistent
opening will improve
species tolerant of inappropriate
NA
NA
recruitment of appropriate
impersistent species
persistent seagrass species
NA
NA
I. Appropriate/desirable species
.500(6)(c)Community structure
II. Invasive/exotic plant species
III. Regeneration/recruitment
x
IV. Age, size distribution.
Vegetation
V. Snags, dens, cavity, etc.
Benthic
VI. Plants' condition.
Both
VIII. Topographic features (refugia, channels, hummocks).
VII. Land management practices.
NA
NA
seagrass beds comprised of
opening will allow for
impersistent species
appropriate salinity and
X. Upland assessment area
NA
NA
With Mitigation Additional
Opening will allow for appropriate salinity and residence times and recruitment of appropriate seagrass species as well as infaunal species
Notes:
IX. Submerged vegetation (only score if present).
Current
6
5
Additional Notes:
Raw Score = Sum of above scores/30
uplands, divide by 20)
(if
-
-
0.5
0.6
Temporal Lag Factor (TLF) =
Temporal Lag Table above)
Risk Factor (RF) =
[1=no risk, 2=mod risk, 3=hi risk, on 0.25 increments)
(see
1.03
1.25
Relative Functional Gain (RFG) =
MD/(TLF x RF) =
0.078
Mitigation Area Size (acres)
21.94
Functional Gain (FG) (RFG x MIT AREA)
(should balance with Functional Loss)
1.711
FOR PRESERVATION ONLY:
Mitigation Delta (MD)
w/Mitigation - Current
Not Applicable
0.1
Appendix E
Contract Plans
(Refer to Sheets 1 through 12 of this document)
18