City of Orange stream burial

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes re-grading, concrete lining and planting of a portion of the riparian buffers along 8,433 linear feet of stream

Full Public Notice Project Plans The project consists of re-grading, concrete lining and planting of a portion of the riparian buffers along 8,433 linear feet of stream. The bottom width will vary between 36’ wide and 6’ wide with varying side slopes. The existing earthen stream will be cleared of debris, re-graded and then lined with concrete. The purpose of this project is to protect the existing stream banks from additional erosion, improve the conveyance of storm water during and after storm events, reduce the risk of flooding of adjacent properties lining the stream right of way during significant rain events, and ease maintenance.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas