NAME OF APPLICANT: Louisiana Department of Wildlife and Fisheries, Artificial Reef Program, Post Office Box 98000, Baton Rouge, Louisiana 70808
LOCATION OF WORK: In the Gulf of Mexico, Eugene Island 276, off the coast of St. Mary Parish, Louisiana, as shown on the attached drawings.
CHARACTER OF WORK: Deploy Fieldwood Energy’s, Eugene Island 281 “A” jacket in the Eugene Island 276 artificial reef site to provide structural habitat for the purpose of enhancing fishing opportunities in the Gulf of Mexico. Clearance from the top of the deployed platform jacket to the water surface will be approximately 96.7 feet. This request is pursuant to Act 100, 1986 Louisiana Legislature and the National Fishing Enhancement Act of 1984.
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LOUISIANA 70118
April 17, 2017
REPLY TO
ATTENTION OF:
Operations Division
Western Evaluation Section
Project Manager
Darlene Herman
(504) 862-2287
Darlene.C.Herman@usace.army.mil
SUBJECT: MVN 2008-2095 WB
PUBLIC NOTICE
Interested parties are hereby notified that an application has been received by the District engineer for a
Department of the Army permit to authorize the following pursuant to (X) Section 10 of the Rivers and Harbors
Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or () Section 404 of the Clean Water Act (86 Stat. 816;
33 USC 1344).
ARTIFICIAL REEF IN THE GULF OF MEXICO
NAME OF APPLICANT: Louisiana Department of Wildlife and Fisheries, Artificial Reef Program, Post
Office Box 98000, Baton Rouge, Louisiana 70808.
LOCATION OF WORK: In the Gulf of Mexico, Eugene Island 276, off the coast of St. Mary Parish,
Louisiana, as shown on the attached drawings.
CHARACTER OF WORK: Deploy Fieldwood Energy's, Eugene Island 281 "A" jacket in the Eugene Island
276 artificial reef site to provide structural habitat for the purpose of enhancing fishing opportunities in the Gulf
of Mexico. Clearance from the top of the deployed platform jacket to the water surface will be approximately
96.7 feet. This request is pursuant to Act 100, 1986 Louisiana Legislature and the National Fishing
Enhancement Act of 1984.
The comment period for the Department of the Army Permit will close 15 days from the date of this joint
public notice. Written comments, including suggestions for modifications or objections to the proposed work,
stating reasons thereof, are being solicited from anyone having interest in this permit and must be submitted so
as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers
permit application must reference the applicant's name and the Permit Application Number, and be forwarded to
the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH.
The decision whether to issue a permit will be based on an evaluation of the probable impact including
cumulative impacts of the proposed activity on the public interest. That decision will reflect the national
concern for both protection and utilization of important resources. The benefit which reasonably may be
expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. all factors
which may be relevant to the proposal will be considered including the cumulative effects thereof; among those
are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production,
mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this
proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether
to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general environmental effects, and the
other public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the overall public interest
of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic Places near the
proposed work. The possibility exists that the proposed work may damage or destroy presently unknown
archeological, scientific, prehistorical, historical sites, or data. Copies of this notice is being forwarded to the
State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as endangered by the
U.S. Department of Interior nor affect any habitat designated as critical to the survival and recovery of any
endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnus-Stevens
Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or
alteration of 0 acre(s) of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial
determination is that the proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the
probable impacts will include the application of guidelines established by the Administrator of the
Environmental Protection Agency and certification that the proposed activity will not violate applicable water
quality standards will be required from the Louisiana Department of Environmental Quality, Office of
Environmental Services, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing
be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for
holding a public hearing.
You are requested to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application complies with and will be
conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the
Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by
the Department of Natural Resources.
Attachments
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Louisiana Artificial Reef Planning Areas
Louisiana
New Orleans
Cameron
Morgan City
Cocodrie
Leeville
Venice
8
Fourchon
7
6
3
9
2
4
1
5
0
12.5
25
50
75
100
Nautical Miles
Planning Areas
Planning Areas
Fairways
OCS Blocks
1. West Cameron Planning Area
2. East Cameron Planning Area
3. South Marsh Island (76) Planning Area
4. South Marsh Island (146) Planning Area
5. Eugene Island Planning Area
6. South Timbalier Planning Area
7. West Delta Planning Area
8. Main Pass Planning Area
9. Ship Shoal Planning Area
µ
Louisiana Artificial Reef Program
Ship Shoal Planning Area
[Dulac
EI18
EI33
EI35
EI34
EI38
Cocodrie
[
EI40
EI39
EI55
EI56
EI57
EI62
EI61
EI60
EI59
SS10
EI77
EI78
EI79
EI80
SS11
SS12
SS8
SS13
SS14
EI84
EI83
EI82
EI81
SS31
SS30
SS29
SS28
SS27
SS26
EI99
EI100
EI101
EI102
SS32
SS33
SS34
SS35
SS36
SS37
EI106
EI105
EI104
EI103
SS55
SS54
SS53
SS52
SS51
SS50
EI119
EI120
EI121
EI122
EI126
EI125
EI124
EI123
EI141
EI142
EI143
EI144
EI148
EI147
EI146
EI145
EI163
EI164
EI165
EI166
EI170
EI169
EI168
EI167
EI186
EI187
EI188
EI189
EI193
EI192
EI191
EI190
EI208
EI209
EI210
EI211
EI215
EI214
EI213
EI212
EI230
EI231
EI232
EI233
EI237
EI236
EI235
EI234
EI37
EI58
SS2
SS56
SS9
SS57
SS58
SS59
SS15
SS60
SS16
SS61
SS25
SS24
SS38
SS49
SS62
SS63
SS64
PL1
ST10
ST11
PL2
ST9
PL3
PL4
PL5
SS79
SS78
SS77
SS76
SS75
SS74
SS73
SS72
SS71
SS65
SS70
SS66
SS69
SS67
SS68
SS80
SS81
SS82
SS83
SS84
SS85
SS86
SS87
SS88
SS89
SS90
SS91
PL11
PL12
PL13
PL14
PL15
SS103
SS102
SS101
SS100
SS99
SS98
SS97
SS96
SS95
SS94
SS93
SS92
PL20
PL19
PL18
PL17
PL16
SS104
SS105
SS106
SS107
SS108
SS109
SS110
SS111
SS112
SS113
SS114
SS115
PL21
PL22
PL23
PL24
PL25
SS127
SS126
SS125
SS124
SS123
SS122
SS121
SS120
SS119
SS118
SS117
SS116
ST74
ST73
ST72
ST71
ST70
SS128
SS129
SS130
SS131
SS132
SS133
SS134
SS135
SS136
SS137
SS138
SS139
ST75
ST76
ST77
ST78
ST79
SS151
SS150
SS149
SS148
SS147
SS146
SS145
SS144
SS143
SS142
SS141
SS140
ST98
ST97
ST96
ST95
ST94
SS152
SS153
SS154
SS155
SS156
SS157
SS158
SS159
SS160
SS161
SS162
SS163
ST99
ST100
ST101
ST102
ST103
SS175
SS174
SS173
SS172
SS171
SS170
SS169
SS168
SS167
SS166
SS165
SS164
ST112
ST111
ST110
ST109
ST108
SS176
SS177
SS178
SS179
SS180
SS181
SS182
SS183
SS184
SS185
SS186
SS187
ST141
ST142
ST143
ST144
ST145
SS199
SS198
SS197
SS196
SS195
SS194
SS193
SS192
SS191
SS190
SS189
SS188
ST168
ST167
ST166
ST165
ST164
SS200
SS201
SS202
SS203
SS204
SS205
SS206
SS207
SS208
SS209
SS210
SS211
ST169
ST170
ST171
ST172
ST173
SS223
SS222
SS221
SS220
SS219
SS218
SS217
SS216
SS215
SS214
SS213
SS212
ST196
ST195
ST194
ST193
ST192
SS224
SS225
SS226
SS227
SS228
SS229
SS230
SS231
SS232
SS233
SS234
SS235
ST197
ST198
ST199
ST200
ST201
SS247
SS246
SS245
SS244
SS243
SS242
SS241
SS240
SS239
SS238
SS237
SS236
ST215
ST214
ST213
ST212
ST211
SS248
SS249
SS250
SS251
SS252
SS253
SS254
SS255
SS256
SS257
SS258
SS259
ST216
ST217
ST218
ST219
ST220
SS271
SS270
SS269
SS268
SS267
SS266
SS265
SS264
SS263
SS262
SS261
SS260
ST243
ST242
ST241
ST240
ST239
PL10
PL9
PL8
PL7
PL6
EI253
EI254
EI255
EI256
EI260
EI259
EI258
EI257
EI275
EI276
EI277
EI278
EI282
EI281
EI280
EI279
EI297
EI298
EI299
EI300
EI304
EI303
EI302
EI301
SS272
SS273
SS274
SS275
SS276
SS277
SS278
SS279
SS280
SS281
SS282
SS283
ST244
ST245
ST246
ST247
ST248
EI319
EI320
EI321
EI322
SS295
SS294
SS293
SS292
SS291
SS290
SS289
SS288
SS287
SS286
SS285
SS284
ST271
ST270
ST269
ST268
ST267
2.5
5
Planning Area
Fairways
OCS Blocks
0
Ship Shoal
10
15
20
Nautical Miles
Eugene Island 276 D Vicinity Map
Proposed Reef
µ
SUBMA
R
MATS
SUBM
AR
MATS
SUBMA
R
MATS
SUBMA
R
MATS
SUBM
AR
MATS
SUBM
AR
MATS
Un
6"
S-
4"
S
-17
15
al
66
07
Unoc
Unoc al 6" S-1
7
al 4"
S-17 105
106
Un
oc
al
Unocal 6" S-15619
Unocal 4" S-18045
Unocal 4" S-1716
Unocal 4" S-1717
oc
EI276
SUBMAR
MAT
OCS-G-00989
Arena
MUDLINE
-180'
B
A
F1
C
D
E
F
F
CRANE
G
H
CELLAR
DECK
10 RISER
6 RISER
+55'
+80'
6 RISER
6 RISER
DECK
8 RISER
MAIN
BOOM
VENT
HELIPORT
1
F
2
+100'
5
08
-19 107
S
6" 19
na " SAre na 6
Are
A
EI23
EI231
09 D
SS2
EI324 B
209
4
10
0" -17
1
al
"S
oc
l6
n
a
U
oc
Un
EI324
SS
03
71
R300'
D
3
B
Unocal 8" S-11648
EI276 REEF
7
EI281-A Jacket
in Proposed Reef Position
(Orientation field determined)
NAD27 Louisiana South Feet
X:
1,958,810.00
Y:
-86,662.00
Lat :
28°25'41.9317"N
Lon :
91°27'41.1882"W
NAD83 Louisiana South Feet
X:
3,239,611.05
Y:
-25,961.14
Lat :
28°25'42.8066"N
Lon :
91°27'41.5597"W
500' OFFSET
6
EI256 A
EI256 A
500' OFFSET
4
3
GRID NORTH
TOPPLED
500' OFFSET
4 RISER 4 RISER
4 RISER
DECK
MUDLINE
EI281 A
PROPOSED REEF
11
EI281 A
9
10
12
2
1
EI302 A
6
8
5
3
EI302 A
D
7
MT
SS224 PP
D
HELIPORT
TOPPLED
1A
SS224
PP
6
6
27
EI
Unocal 4" S-1716
1
S-
EI275
500' OFFSET
27
EI
K
8
NOTES
ARTIFICIAL REEF BOUNDARY
1. THIS PLAT WAS PREPARED FOR PERMIT
PURPOSES ONLY, AND IS NOT A PROPERTY
BOUNDARY SURVEY, AND AS SUCH DOES
NOT COMPLY WITH THE "STANDARDS OF
PRACTICE FOR BOUNDARY SURVEYS" AS
ADOPTED BY THE LOUISIANA PROFESSIONAL
ENGINEERING AND LAND SURVEYING
BOARD.
TX
Tie
MS
L O U I S I A N A
Lake
Charles
Lafayette
Cameron
SABINE
PASS
(LA)
CHAND.
SOUND
Morgan
City
Amelia
Fresh
Water
City
WEST
EAST VERMILION SOUTH
CAMERON
MARSH
ISLAND
EUGENE
ISLAND
Grand
Isle
Fourchon
GARDEN BANKS
CHAND.
VICINITY MAP
SCALE IN MILES
GREEN CANYON
2
1,959,762.40
-85,919.02
28°25'49.2963"N
91°27'30.5337"W
3
1,959,762.40
-88,919.02
28°25'19.6014"N
91°27'30.4970"W
4
1,956,762.40
-88,919.02
28°25'19.5677"N
Latitude
91°28'04.0847"W
AL
EUGENE ISLAND 281 "A"
PROPOSED REEF POSITION
VIOSCA KNOLL
WEST
DELTA
BLOCK 276
EUGENE ISLAND AREA
GULF OF MEXICO
SOUTH
PASS
MISSISSIPPI CANYON
Geodetic Datum:
NAD27
Projection:LOUISIANA SOUTH
Grid Units:US SURVEY FEET
SCALE
EWING BANK
0
91°28'04.1241"W
VIOSCA KNOLL
SOUTH
TIMBALIER
PROJECT
LOCATION
28°25'49.2627"N
Venice
S.
BAY
PELT. MARCH. GR.
ISLE
SHIP SHOAL
-85,919.02
MAIN PASS
Dulac
HIGH CAMERON
ISLAND
1,956,762.40
BRETON
SOUND
Houma
Cocodrie
1
MOBILE
CHAND.
SND.ADDN.
New Orleans
Grand
Cheniere
Y Coordinate
Pascagoula MOBILE
Gulfport Biloxi
BAY
MISS. SOUND
Baton Rouge
Intracoastal
City
Mobile
Longitude
X Coordinate
1:12000
100
Job No.: 1700142
ATWATER VALLEY
FUGRO USA MARINE, INC.
200 Dulles Drive
Lafayette, Louisiana 70506
(337) 237-1300
1000
0
FEET
Date: 2/28/2017
Drwn: BCN
DWG File: H:\2017\1700142\GIS\...\EI276_EI281-A_REEF_PROPO...
Chart:
1
Of:
3
2/28/2017
E
AR
FL
G
F
D
B
A
2°
32
C
.
Az
E
'
46
14.5'
A
56' x 48'
'
80
+
0'±
CK
DE -20
IN NE
MA DLI
MU
TOP OF JACKET
WATER LINE (MLLW)
PLAN
200'
PROFILE
MUD LINE (ELEV. -200')
117' x 66'
EUGENE ISLAND 281 "A"
TO BE REEFED
BLOCK 276
EUGENE ISLAND AREA
GULF OF MEXICO
SCALE
0
Job No.: 1700142
60'
FUGRO USA MARINE, INC.
200 Dulles Drive
Lafayette, Louisiana 70506
(337) 237-1300
FEET
Date: 2/28/2017
Drwn: BCN
DWG File: H:\2017\1700142\GIS\...\EI276_EI281-A_REEF_PROPO...
Chart:
2
Of:
3
2/28/2017
APPROX. 96.7' CLEARANCE
83.3'
Proposed structure clearance: 96-ft
65.4'
APPROX. 114.6' CLEARANCE
Established and Charted Reef
Clearance: 85-ft
WATER LINE (MLLW)
MUD LINE (ELEV. -180')
215.3'
PROFILE
NOTES
1. THIS PLAT WAS PREPARED FOR PERMIT
PURPOSES ONLY, AND IS NOT A PROPERTY
BOUNDARY SURVEY, AND AS SUCH DOES
NOT COMPLY WITH THE "STANDARDS OF
PRACTICE FOR BOUNDARY SURVEYS" AS
ADOPTED BY THE LOUISIANA PROFESSIONAL
ENGINEERING AND LAND SURVEYING
BOARD.
2. 32.95 MILES TO NEAREST SHIPPING
FAIRWAY.
3. CLEARANCES BASED ON CONSTRUCTION
DRAWINGS.
EUGENE ISLAND 281 "A"
PROPOSED REEF POSITION
BLOCK 276
EUGENE ISLAND AREA
GULF OF MEXICO
SCALE
0
Job No.: 1700142
60'
FUGRO USA MARINE, INC.
200 Dulles Drive
Lafayette, Louisiana 70506
(337) 237-1300
FEET
Date: 2/28/2017
Drwn: BCN
DWG File: H:\2017\1700142\GIS\...\EI276_EI281-A_REEF_PROPO...
Chart:
3
Of:
3
2/28/2017