Lake Okeechobee and the Okeechobee Waterway, State of Florida
Minor activities in Lake Okeechobee and the Okeechobee Waterway
Re-administration of the PGP SAJ-67
Upon recommendation from the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act, general authority is hereby given to the Operations Division of the Jacksonville District, U.S. Army Corps of Engineers, to administer this Programmatic General Permit (PGP). The list of minor activities that would be covered under this PGP include the following:
1. placement of riprap revetments,
2. maintenance dredging,
3. maintenance of boat slips,
boat ramps, and construction of bulkheads,
4. installation and/or maintenance of aerial and subaqueous transmission lines,
5. construction of minor structures,
6. construction and/or maintenance of single-family mooring facilities (i.e., docks and
piers), and
7. construction and/or maintenance of private multi-family mooring facilities (docks and
piers) having a surface area of 1,000 square feet or less.
The project area subject to this PGP includes Federally maintained, navigable waters of Lake Okeechobee and the Okeechobee Waterway, between the St. Lucie Lock in Martin County and W.P. Franklin Lock in Lee County, Florida. All projects must adhere to the terms and conditions stipulated in the latest version of the Lake Okeechobee and Okeechobee Waterway Shoreline Management Plan (SMP) and the Special Conditions.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
P.O. BOX 4970
JACKSONVILLE, FLORIDA 32232-0019
REPLY TO ATTENTION OF
Regulatory Division
April 24, 2017
DEPARTMENT OF THE ARMY PERMIT
PROGRAMMATIC GENERAL PERMIT SAJ-67
SAJ-2006-05506 (DEB)
LIMITED MINOR ACTIVITIES IN LAKE OKEECHOBEE AND THE OKEECHOBEE
WATERWAY
Upon recommendation from the Chief of Engineers, pursuant to Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of the Clean Water Act, general
authority is hereby given to the Operations Division of the Jacksonville District, U.S. Army
Corps of Engineers, to administer this Programmatic General Permit (PGP). The list of
minor activities that would be covered under this PGP include the following:
1. placement of riprap revetments,
2. maintenance dredging,
3. maintenance of boat slips, boat ramps, and construction of bulkheads,
4. installation and/or maintenance of aerial and subaqueous transmission lines,
5. construction of minor structures,
6. construction and/or maintenance of single-family mooring facilities (i.e., docks and
piers), and
7. construction and/or maintenance of private multi-family mooring facilities (docks and
piers) having a surface area of 1,000 square feet or less.
The proj ect area subj ect to t hi s P GP i nclude s Federal l y m ai nt ained, navi gabl e
wat ers of Lake Okeechobee and the Okeechobee Waterway, between t h e St. Lucie Lock in
Martin County and W.P. Franklin Lock in Lee County, Florida. All projects must adhere to the
terms and conditions stipulated in the latest version of the Lake Okeechobee and Okeechobee
Waterway Shoreline Management Plan (S M P ) and to the following Special Conditions:
A. SPECIAL CONDITIONS FOR RIPRAP REVETMENTS:
1. The work authorized herein includes the installation and repair of unconsolidated riprap
revetments.
2. The revetment shall not exceed 150 feet in length and not exceed 1 cubic yard per running
foot, including any backfill below the plane of the ordinary high water line.
3. Rip-rap revetments requests shall be accompanied by certified drawings and/or plans.
1
4. Rip-rap revetment installation will be allowed only under the following conditions:
a) When new work joins adjacent, authorized, rip-rap revetments or seawalls, and
b) construction creates a continuous and uniform line, or Landowner can demonstrate
significant erosion.
5. Rip-rap construction material shall consist of stones weighing from 20 to 200 pounds,
suitable to withstand a large boat wake. The revetment shall be constructed at a 3:1 slope.
6. A suitable filter material shall be installed to maintain the stability of all fill and rip rap
material.
7. Turbidity control measures will be used to control water quality and the work must be in
accordance with State Water Quality Standards in Chapter 62-302, and sections 62-4.242 and
62-4.244 in the Florida Administrative Code. Turbidity control measures may include turbidity
control curtains or any other technique necessary to reduce turbidity to no more than
background turbidity. The Florida Department of Environmental Protection (DEP) may require
the applicant to submit a daily turbidity report which may be verified by state or local
government inspectors.
B. SPECIAL CONDITIONS FOR MAINTENANCE DREDGING:
1. This permit does not authorize the removal of plugs or the connection of any canal to
navigable waters of the United States or to any other waters.
2. Dredging activities; including maintenance dredging of a previously dredged area, except
for the Federal channel, shall not exceed the previously permitted depth.
3. Turbidity control measures will be used to control water quality and the work must be in
accordance with State Water Quality Standards in Chapter 62-302, and sections 62-4.242 and
62-4.244 in the Florida Administrative Code. Turbidity control measures may include but are
not limited to, turbidity control curtains, the exclusive use of suction dredging or closed "clam
shell" dredging, or any other technique necessary to reduce turbidity to no more than
background turbidity. The Florida Department of Environmental Protection (DEP) may
require the applicant to submit a daily turbidity report which may be verified by state or local
government inspectors.
4. Excavated dredged material shall be deposited at self-contained upland areas that will
prevent spoil material and/or return water from re-entering any water of the United States or
interfering with natural drainage.
5. Excavation of wetlands contiguous or adjacent to navigable waters, and/or areas
containing submerged aquatic vegetation is not authorized by this general permit.
C. SPECIAL CONDITIONS FOR MAINTENANCE OF BOAT SLIPS:
2
1. The work authorized herein includes the maintenance of boat slips and appurtenant
structures such as bulkheads, catwalks, etc. The appurtenant structures shall not exceed a
total of 50 linear feet in either direction of the boat slip.
2. Dimensions of the boat slip shall not exceed 50 linear feet and the depth of the boat
slip shall not exceed the outlying control contours of the water body or in no case be
greater than -5 feet ordinary low water.
3. Turbidity control measures will be used to control water quality and the work must be
in accordance with State Water Quality Standards in Chapter 62-302, and sections 62-4.242
and 62-4.244 in the Florida Administrative Code. Turbidity control measures may include
but are not limited to, turbidity control curtains, the exclusive use of suction dredging or
closed "clam shell" dredging, or any other technique necessary to reduce turbidity to no
more than background turbidity. The Florida Department of Environmental Protection
(DEP) may require the applicant to submit a daily turbidity report which may be verified
by state or local government inspectors.
4. New construction of canals and access channels are specifically excluded from this
authorization.
D. SPECIAL CONDITIONS FOR M AINTENANCE OF BOAT RAMPS AND
CONSTRUCTION OF BULKHEADS:
1. The work authorized herein includes the maintenance of boat ramps, including
appurtenant structures (bulkheads, rub-rails, tie-up piers) requiring less than 100 cubic yards of
fill material.
2. Where practical, bulkheads should extend no further than 1 to 2 feet waterward of the
ordinary high water line, but in no case shall they exceed 5 feet waterward of the ordinary high
water line. Tie-up piers shall not exceed: (a) the length of the boat ramp; (b) a width of 6 feet;
and may have a single catwalk or "L" not to exceed 20 feet in length and 4 feet in width.
3. Navigational access to navigable waters of the United States must already exist. No
dredging of navigational access channels is permitted under SAJ-67.
4. Turbidity control measures will be used to control water quality and the work must be in
accordance with State Water Quality Standards in Chapter 62-302, and sections 62-4.242 and
62-4.244 in the Florida Administrative Code. Turbidity control measures may include turbidity
control curtains or any other technique necessary to reduce turbidity to no more than
background turbidity. The Florida Department of Environmental Protection (DEP) may require
the applicant to submit a daily turbidity report which may be verified by state or local
government inspectors.
5. Prior to the initiation of any work authorized by this permit, the Permittee shall install
erosion control measures along the perimeter of all work areas to prevent the displacement of
fill material outside the work area. Immediately after completion of the final grading of the
land surface, all slopes, land surfaces, and filled areas shall be stabilized using sod, degradable
3
mats, barriers, or a combination of similar stabilizing materials to prevent erosion. The erosion
control measures shall remain in place and be maintained until all authorized work has been
completed and the site has been stabilized.
E. SPECIAL CONDITIONS FOR INSTALLATION AND/OR MAINTENANCE OF
AERIAL TRANSMISSION LINES:
1. The work authorized herein includes the installation of aerial transmission lines and
associated structures.
2. The aerial transmission lines must meet the U.S. Army Corps of Engineers clearance
criteria as described in 33 CFR, Part 322.5(i)(l), (2), (3), and (4).
3. No dredging or filling of navigable waters or waters of the United States is authorized
under this portion of this general permit.
4. Where the proposed aerial transmission line is to be installed in navigable waters of the
United States, at least two weeks prior to the start of the authorized work, the permittee must
notify the National Oceanic and Atmospheric Administration (NOAA) and the Corps' office in
writing that the work is commencing, and again upon completion of the work. The permittee
shall notify the District Engineer at the letterhead address, to the attention of Regulatory
Division, and also notify NOAA, at the Nautical Data Branch N/CS26, Station 7317, 1315
East-West Highway, Silver Spring, MD 20910-3282. This notification will certify that the
project is constructed as authorized, and must include a drawing that certifies the location and
configuration of the completed activity.
5. The permittee shall hold the U.S. Government harmless from any and all claims by
reason of the placement and installation of the transmission lines authorized by this permit.
6. In order to assure that activities authorized by SAJ-67 do not impair the usefulness of
existing Corps projects and are not injurious to the public, the following special conditions have
been added to this permit:
a)
All transmission poles, guy-wire anchoring, junction boxes, pads, or other associated
structures must be a minimum of 50 feet from the dam toe, 15 feet from the levee toe, and 15 feet
from the canal top of bank of any existing Corps project.
b)
The minimum clearance for aerial communication lines as noted in special condition
9, below.
c)
On navigable waters of the US, including all federal navigation projects, where there
is no bridge for reference for minimum clearance, the proposed project will need to be reviewed
by the Corps in order to determine the minimum clearance between the line and mean high water
necessary to protect navigational interests.
d)
All projects over a Federal flood control or navigation channel (either federally or
ocally maintained) shall, upon completion of work, provide an as-built survey showing the
4
horizontal and vertical location (X-Y-Z coordinates in NAO 83 and NAVD 88) of the object
above the channel as it enters and exits the design edges of the authorized width of the channel.
e)
Any activity within a Federal Right of Way shall require the permittee to enter into a
consent-to-easement with the Real Estate Division, U.S. Army Corps of Engineers, Jacksonville
District, as appropriate, prior to the commencement of any construction activity.
7. All transmission poles, guy-wire anchoring, junction boxes, pads, or other associated
structures must be a minimum of 50 feet from the dam toe, 15 feet from the levee toe, and 15 feet
from the canal top of bank of any existing Corps project.
8. The minimum clearance1 for aerial communication lines, or any lines not transmitting
electrical power, will be ten (10) feet above the clearance required for nearby stationary bridges as
established by the U.S. Coast Guard (USCG). In the event the USCG has not established a bridge
clearance, minimum vertical clearances for power and aerial lines will not be less than required by
Section 23, Rule 232, of the latest revision of the National Electrical Safety Code (ANSI C2).
Clearances will not be less than shown in Table 232-1, Item 7, ANSI C2.
9. The minimum clearance for an aerial line, transmitting electrical power, is based on the
low point of the line under conditions that produce the greatest sag, taking into consideration
temperature, load, wind, length or span and the type of supports. The minimum clearance for an
aerial electrical power transmission line crossing navigable waters of the US shall be governed by
the system voltage, as indicated below:
Nominal System
Voltage, (kv)
115 and below
138
161
230
350
500
700
750-765
Minimum Clearance
Above Bridge Clearance 1
(As Established by the
USCG) (ft)
20
22
24
26
30
35
42
45
1Bridge
clearance is the distance measured between the lowest point of a stationary bridge, including any infrastructure attached to
underside of the bridge, and the mean high water of the navigable waters of the US beneath the bridge.
10. On navigable waters of the US, including all federal navigation projects, where there is no
bridge for reference for minimum clearance, the proposed project will need to be reviewed by the
Corps in order to determine the minimum clearance between the line and mean high water
necessary to protect navigational interests.
5
F. SPECIAL CONDITIONS FOR INSTALLATION AND/OR MAINTENANCE OF
SUBAQUEOUS UTILITY AND TRANSMISSION LINES:
1. The work authorized herein includes the installation and maintenance of subaqueous
utility and transmission lines laid on or embedded in the bottom of navigable waters of the
United States in the State of Florida.
2. All subaqueous utility and/or transmission lines, cables, conduits, pipes, etc.,
authorized by this general permit must be installed (i.e., trenching or horizontal direction drilling
(HDD)) a minimum of 14 feet below the authorized depth of the Okeechobee Waterway. The
14-foot criterion applies to the entire authorized width of the channel, plus a minimum of 25
feet outside the channel edges to allow for maintenance of the side slopes.
3. No utility and/or transmission lines will be embedded in the bottom of State Class I or
Class II waters, aquatic preserves, or in areas of submerged aquatic vegetation.
4. Dredged or fill material placed as backfill or bedding for subaqueous utility and
transmission lines must not change the preconstruction bottom contours. Excess material must
be removed to an upland disposal area.
5. The permittee shall install signs at the shoreline to notify navigational interests of the
location of subaqueous utility and transmission lines.
6. Upon completion of placement of a subaqueous line in a Federal Channel, the permittee
shall provide the Corps with an as-built survey showing the horizontal location (XY
coordinates in NAD 83) of the object below the channel as it enters and exits the design edges
of the project. The survey shall be accurate to within +/- 3 feet horizontal.
7. Where the proposed subaqueous utility or transmission line is to be installed in navigable
waters of the United States, at least two weeks prior to the start of the authorized work, the
permittee must notify the NOAA and the Corps' office in writing that the work is commencing,
and again upon completion of the work. The permittee shall notify the District Engineer at the
letterhead address, attention Regulatory Division, and NOAA, at Nautical Data Branch
N/CS26, Station 7317, 1315 East-West Highway, Silver Spring, MD 20910-3282. This
notification will certify that the project is constructed as authorized, and must include a
drawing that certifies the location and configuration of the completed activity.
8. The permittee shall hold the U.S. Government harmless from any and all claims by
reason of the placement and installation of the transmission lines authorized by this permit.
9. Directional boring vaults, junction boxes, and/or pads will not be constructed within 50 feet
of the top of the bank of waterways (rivers/streams). Horizontal directional drilling pilot,
entrance, and exit holes must be the minimum diameter necessary; and, must be set back from the
waterway (river/stream) bank by a minimum of 50 feet. Excavated materials and drilling mud
must be stockpiled on non-wetland areas, where available. Appropriate fabric must be placed
beneath all materials stockpiled in wetlands.
6
10. Except as otherwise noted in the Special Conditions, herein, all subaqueous utility and/or
transmission lines authorized by this regional general permit must be installed a minimum of 6
feet below the bottom contour of any other water of the United States. The 6-foot criterion applies
to the entire authorized width of the crossing, plus a minimum of 10 feet on each side of the
crossing.
11. All subaqueous utility and/or transmission lines authorized by this regional general permit
must be installed a minimum of 14 feet below the authorized depth of any federally-maintained
shallow-draft navigation channel it crosses. The 14-foot criterion applies to the entire authorized
width of the channel, plus a minimum of 25 feet outside the channel edges to allow for
maintenance of the side slopes. Any activity within Federal rights-of- way shall require the
permittee to enter into a consent-to-easement with the Real Estate Division,
U.S. Army Corps of Engineers, Jacksonville District, as appropriate, prior to the commencement
of any construction activity.
12. All subaqueous transmission lines crossing over, under, or in flood control channels/canals
in Federal projects (either federally or locally maintained) which are installed with horizontal
direction drilling (HDD) shall ensure the top of the HDD boring is a minimum of 10 feet beneath
the bottom of the channel plus a minimum 25 feet outside the channel edges and the estimated
total drilling fluid pressure is less than 10 psi. Projects not in compliance with these criteria shall
not be eligible for authorization under SAJ-67 until case specific review has been completed by
the Jacksonville District Engineering Division in accordance with 33 U.S.C. 408 and the project
has received approval from the Jacksonville District Commander.
13. All projects beneath a Federal flood control or navigation channel (either federally or
locally maintained) shall, upon completion of work, provide an as-built survey showing the
horizontal and vertical location (X-Y-Z coordinates in NAD 83 and NAVD
88) of the object below the channel as it enters and exits the design edges of the authorized width
of the channel, plus a minimum of 25 feet outside the channel edges.
14. Material resulting from trench excavation may be temporarily sidecast (up to three
months) into waters of the United States, provided that the material is not placed in such a manner
that it is dispersed by currents or other forces. The District Engineer may extend the period of
temporary side casting not to exceed a total of 180 days, where appropriate. The top 6- 12 inches
of the trench should normally be backfilled with topsoil from the trench. Furthermore, the trench
cannot be constructed in such a manner as to drain waters of the United States (e.g., backfilling
with extensive gravel layers, creating a French drain effect). For example, utility line trenches can
be backfilled with clay blocks to ensure that the trench does not drain the waters of the United
States through which the utility line is installed. Any exposed slopes and stream banks must be
stabilized immediately upon completion of the utility line crossing of each waterbody.
15. Any activity within a Federal Right of Way shall require the permittee to enter into a
consent-to-easement with the Real Estate Division, U.S. Army Corps of Engineers, Jacksonville
District, as appropriate, prior to the commencement of any construction activity.
7
G. SPECIAL CONDITIONS FOR MINOR STRUCTURES:
1. The work authorized herein will be for minor structures to include:
a)
b)
c)
d)
e)
Single mooring pilings.
Small mooring dolphins (limited to 1 cluster of 4 or fewer pilings).
Non-commercial information signage.
Boat lifts, hoists, davits.
Other minor structures that would have less environmental impact than a small dock.
2. Where practicable, unless sealed or wrapped, the use of CCA-treated wood should be
avoided.
H. SPECIAL CONDITIONS FOR CONSTRUCTION AND/OR MAINTENANCE OF
SINGLE-FAMILY AND PRIVATE MULTI-FAMILY MOORING FACILITIES (DOCKS
and PIERS) AND APPURTENANT STRUCTURES:
1. Structures authorized under this general permit are limited to mooring facilities (i.e.,
docks and piers). These mooring facilities/structures shall not exceed 1000 square feet in area.
In addition to mooring facilities, this permit authorizes appurtenant structures which
may include, but not be limited to, the following: boat hoists, boat shelters with open sides,
stairways, walkways, mooring pilings, roofs, and dolphins. Authorized mooring structures and
appurtenant features may be maintained or replaced as needed.
2. No living, fueling, or storage facilities over navigable waters of the United States are
authorized under this general permit
3. Adverse impacts to submerged aquatic vegetation from dock construction may be
ameliorated by adherence to the attached joint U.S. Army Corps of Engineers'/National Marine
Fisheries Service's "Construction Guidelines in Florida for Minor Piling-Supported Structures
Constructed in or over Submerged Aquatic Vegetation (SAV), Marsh or Mangrove Habitat U.S. Army Corps of Engineers/National Marine Fisheries Service - August 2001." (See
http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/other_permitting_factors/
DockGuidelines2008_Revised.pdf). Dock construction in submerged aquatic vegetation which
does not adhere to these guidelines cannot be authorized by SAJ-67. Note: The Construction
Guidelines may be subject to revision at any time. It is our intention that the most recent
version of this technical tool will be utilized during the evaluation of the permit application.
4. Where practicable, unless sealed or wrapped, the use of chromated copper arsenate CCAtreated wood should be avoided.
I. SPECIAL CONDITIONS FOR ALL WORK:
1. The work authorized herein is limited to those navigable waters located between St. Lucie
Lock in Martin County and W.P. Franklin Lock in Lee County, Florida, which are regulated
under the Lake Okeechobee and Okeechobee Waterway Shoreline Management Plan.
8
2. No work shall be authorized that does not comply with the latest version of the (attached)
SMP. As of the date of this PGP, the latest SMP is dated August 1, 2004.
3. Upland cut basins, typically used for mooring vessels or as boat ramps, are not authorized by
this PGP.
4. No work shall be performed until the applicant submits satisfactory plans for the
proposed activity and receives written authorization from the District Engineer.
5. No structure, including mooring piles, shall be located within the established "arrival
points" or operational staging areas of all Lake Okeechobee and Okeechobee Waterway locks
and dams.
6. No activity shall be authorized under this general permit which may adversely affect
water quality, fish and wildlife habitat, o r wetlands. Filling of wetland areas is not authorized
by this general permit.
7. No work shall be performed until after the permittee provides notification to the owner(s)
or operator(s) of any marked utilities in the work area.
8. No structure or work shall adversely affect or disturb properties listed in the National
Register of Historic Places or those eligible for inclusion in the National Register. Prior to the
start of work, the Applicant or other party on the Applicant's behalf, shall conduct a search of
known historical properties by contracting a professional archaeologist, contacting the Florida
Master File Office by telephoning at 850-245-6440, or requesting a temporary password from
the Florida Master Site files for access to state site forms. Access may also be requested by
emailing at fmsfile@dos.state.fl.us or going to the FMSF website at
http://dos.myflorida.com/historical/preservation/master -site-file. The Permittee can
also research sites in the National Register Information System (NRIS). Information can be
found at: http://npgallery.nps.gov/nrhp/Download.
9. If, during the initial ground disturbing activities and construction work, there are
archaeological/cultural materials unearthed (which shall include, but not be limited to: pottery,
modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout
canoes or any other physical remains that could be associated with Native American cultures or
early colonial or American settlement), the permittee shall immediately stop all work in the
vicinity and notify the State Archaeologist and the Corps Regulatory Project Manager to assess
the significance of the discovery and devise appropriate actions, including salvage operations.
Based, on the circumstances of the discovery, equity to all parties, and considerations of the
public interest, the Corps may modify, suspend or revoke the permit in accordance with 33
CFR Part 325.7.
10. In the unlikely event that human remains are identified, they will be treated in
accordance with Florida State Regulation 872.05; all work in the vicinity shall immediately
cease and the State Archaeologist, Corps Regulatory Project Manager, and local authorities
shall immediately be notified. Such activity shall not resume unless specifically authorized by
the State Archaeologist and the Corps.
9
11. Conformance with descriptions and quantities contained herein does not necessarily
guarantee authorization under this general permit.
12. The District Engineer reserves the right to require that any request for authorization
under this general permit be evaluated as an Individual Permit.
13. Prior to verification of authorization, the dichotomous key titled, "The Corps of
Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the
Manatee in Florida, March 2011,"
(http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered_species/Manat
ee/2013_FINAL_ManateeKey.pdf) will be used to determine potential manatee impacts.
Those determined to be a "may affect" to the manatee will not be authorized until consultation
on the project has been reinitiated and concluded with the U.S. Fish and Wildlife Service in
accordance with the Endangered Species Act.. Additionally, depending on the location of the
project, some projects determined to be "may affect, not likely to adversely affect" will not be
authorized until consultation on the project has been re-initiated and concluded. Note: The
manatee key may be subject to revision at any time. It is our intention that the most recent
version of this technical tool will be utilized during the evaluation of the permit application.
14. For projects in, over, and/or under waters accessible to manatees, the permittee will
utilize the "Standard Manatee Conditions for In-Water Work-2011,"
(http://www.saj.usace.army.mil/Portals/44/docs/regulatory/sourcebook/endangered_species/Manat
ee/2011_StandardConditionsForIn-waterWork.pdf ) and/or requirements, as appropriate for the
proposed activity. Note: The manatee conditions may be subject to revision at any time. It is
our intention that the most recent version of these conditions will be utilized during the
evaluation of the permit application.
15. In accordance with Section 7 of the Endangered Species Act, projects proposed within
designated critical habitat, Priority Management Zones (PMZs), or the 150 meter radius "noentry" and 500 meter radius "limited activity" active nest buffer zones for the Everglade snail
kite (see attached map) cannot be authorized until consultation on the project has been
reinitiated and concluded with the U.S. Fish and Wildlife Service. Note: The PMZs and the
"no-entry" and "limited activity" buffer zones may be subject to revision at any time. The Corps
shall request an updated PMZ and buffer zone map during September of each year so that the
most recent version of these zones is utilized during the evaluation of the permit application.
16. No activity shall be authorized under this general permit which is likely to adversely
affect any other Federally listed threatened or endangered species or a species proposed for
such designation, or destroy or adversely modify its designated critical habitat.
17. Activities qualifying for this PGP must be authorized by the applicable permit or
exemption under Part IV of Chapter 373, F.S., and by any authorization required to use or
occupy state-owned submerged lands (SSL) under Chapter 253, F.S., and, as applicable,
Chapter 258, F.S. Such permit, issued by the Department of Environmental Protection, a
water management district under s. 373.069, F.S., or a local government with delegated
authority under s. 373.441, F.S., will provide the applicable Water Quality Certification
10
(WQC) or waiver thereto, and Coastal Zone Consistency Concurrence (CZCC). WQC is
waived for activities authorized under this PGP that qualify for an exemption under s.
403.813(1) or 373.406, F.S., or the rules of the Florida Administrative Code (F.A.C.) adopted
under Part IV of Chapter 373, F.S. The Corps, or any designated Federal, State or local agency
administering general permits on behalf of the Corps under 33 C.F.R. ยง 325.2(b)(2) may
presume CZCC for the above exempt activities by operation of s. 380.23(7), F.S., provided the
activity receives the applicable authorization to use and occupy SSL under Chapter 253, F.S.,
and, as applicable, Chapter 258, F.S., and the rules of the F.A.C. adopted thereunder. The
Corps or any designated Federal, State or local agency administering general permits on behalf
of the Corps shall not be precluded from acting on a request to use this PGP before the
applicable SSL authorization is granted.
18. In the Okeechobee Waterway, all structures including mooring piles, authorized under this
general permit shall comply with the Setback Guidance dated December 2013. The established
setback is 100 feet calculated from the near design edge of the Federal channel although a
variance may be granted based on site specific information. Under no circumstances shall any
structure be closer to the near design edge of the Federal channel than the absolute minimum, 26'.
In oxbows, no structure may extend more than 1/4 of the width of the oxbow at normal pool
elevation
19. Any activity within a Federal right-of-way will require the permittee to enter into a
consent-to-easement with the Real Estate Division, U.S. Army Corps of Engineers, Jacksonville
District, prior to the commencement of any construction activity. The mailing address for the
Real Estate Division is P.O. Box 4970, Jacksonville, Florida 32232.
20. The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structures or work herein authorized,
or if, in the opinion of the Secretary of the Army or his authorized representative, said structure
or work shall cause unreasonable obstruction to the free navigation of the navigable waters
and/or interfere with the function of Central and South Florida Flood Control projects, the
permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate,
or alter the structural work or obstructions caused thereby, without expense to the United
States. No claim shall be made against the United States on account of any such removal or
alteration.
21. If fill material is used, the fill must be from upland sources and consist of suitable
material. The fill material shall be free from items such as trash, debris, automotive parts,
asphalt, construction materials, concrete block with exposed reinforcement bars, and soils
contaminated with any toxic substance, in toxic amounts in accordance with Section 307 of the
Clean Water Act.
22. SAJ-67 shall be valid for a period of 5 years from the date of issuance unless suspended
or revoked by issuance of a public notice by the District Engineer. The Corps will conduct
periodic reviews to determine if continuation of the permit is not contrary to the public interest.
23. If SAJ-67 expires or is revoked prior to completion of the authorized work,
authorization of activities that have commenced or are under contract to commence in reliance
11
on SAJ-67 will remain in effect provided the activity is completed within 12 months of the
date SAJ-67 expired or was revoked.
24. The permittee shall perform all work in accordance with the attached general conditions.
25. No structure shall be constructed using chromated copper arsenate (CCA)-treated wood,
unless the wood is wrapped.
26. Prior to the initiation of any work authorized by this permit, the Permittee shall install
erosion control measures along the perimeter of all work areas to prevent the displacement of fill
material outside the work area into waters of the United States. Immediately after completion of
the final grading of the land surface, all slopes, land surfaces, and filled areas shall be stabilized
using sod, degradable mats, barriers, or a combination of similar, approved, stabilizing materials
to prevent erosion. The erosion control measures shall remain in place and be maintained until all
authorized work is completed and the work areas are stabilized.
27. Maintenance and/or repair of previously authorized structures is allowed as long as the
work complies with the conditions of this permit and those of the SMP. New work in or over
navigable waters must receive authorization from the Corps of Engineers prior to construction.
BY AUTHORITY OF THE SECRETARY OF THE ARMY
for Jason A. Kirk
Colonel, U.S. Army
District Engineer
12
GENERAL CONDITIONS FOR DEPARTMENT OF THE ARMY GENERAL
PERMITS
1. The time limit for completing the work authorized ends on April 24, 2022.
2. You must maintain the activity authorized by this permit in good condition and in
conformance with the terms and conditions of this permit. You are not relieved of this
requirement if you abandon the permitted activity, although you may make a good faith
transfer to a third party in compliance with General Condition 4 below. Should you wish to
cease to maintain the authorized activity or should you desire to abandon it without a good
faith transfer, you must obtain a modification of this permit from this office, which may
require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this office
of what you have found. We will initiate the Federal and State coordination required to
determine if the remains warrant a recovery effort or if the site is eligible for listing in the
National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature and
mailing address of the new owner in the space provided below and forward a copy of the
permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must
comply with the conditions specified in the certification as special conditions to this permit.
6. You must allow representatives from this office to inspect the authorized activity at any
time deemed necessary to ensure that it is being or has been accomplished in accordance with
the terms and conditions of your permit.
Further Information:
1. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local
authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal
projects.
2. Limits of Federal Liability. In issuing this permit, the Federal Government does not
assume any liability for the following:
13
a. Damages to the permitted project or uses thereof as a result of other permitted or
unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or structures
caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of
this permit.
3. Reliance on Applicant's Data: The determination of this office that issuance of this
permit is not contrary to the public interest was made in reliance on the information you
provided.
4. Reevaluation of Permit Decision: This office may reevaluate its decision on this
permit at any time the circumstances warrant. Circumstances that could require a
reevaluation include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to
have been false, incomplete, or inaccurate (see 3 above).
c. Significant new information surfaces which this office did not consider in
reaching the original public interest decision.
5. Such a reevaluation may result in a determination that it is appropriate to use the
suspension, modification, and revocation procedures contained in 33 CFR 325.7 or
enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The
referenced enforcement procedures provide for the issuance of an administrative order
requiring you comply with the terms and conditions of your permit and for the initiation
of legal action where appropriate. You will be required to pay for any corrective
measures ordered by this office, and if you fail to comply with such directive, this
office may in certain situations (such as those specified in 33 CFR 209.170) accomplish
the corrective measures by contract or otherwise and bill you for the cost.
GENERAL PERMIT (SAJ-67)
14
6. When the structures or work authorized by this permit are still in existence at the
time the property is transferred , the terms and conditions of this permit will continue to
be binding on the new owner(s) of the property. To validate the transfer of this permit
and the associated liabilities associated with compliance with its terms and conditions,
have the transferee sign and date below.
(TRANSFEREE-SIGNATURE)
(DATE)
(NAME-PRINTED)
(ADDRESS)
15