Ducks Unlimited, Inc. (DU) has submitted a prospectus for establishment of a statewide mitigation banking program. The program would provide an additional third-party mitigation option to satisfy compensatory mitigation requirements for Department of the Army permits, but may also be used to satisfy other Federal, state and local regulatory requirements related to impacts to aquatic resources and/or species conservation. DU has also provided a site plan for the Starkweather Mitigation Bank (Lat: 48.554468° N, Long: -98.802172° W], which would be the first site proposed to be developed in accordance with this instrument. It would provide mitigation credits in the Devils Lake Basin Regional Service Area. No funds acquired through the DU In-Lieu-Fee Program will be utilized to establish bank sites under this program.
Ducks Unlimited, Inc. (DU) has submitted a prospectus for establishment of a statewide mitigation banking program. The program would provide an additional third-party mitigation option to satisfy compensatory mitigation requirements for Department of the Army permits, but may also be used to satisfy other Federal, state and local regulatory requirements related to impacts to aquatic resources and/or species conservation. DU has also provided a site plan for the Starkweather Mitigation Bank (Lat: 48.554468° N, Long: -98.802172° W], which would be the first site proposed to be developed in accordance with this instrument. It would provide mitigation credits in the Devils Lake Basin Regional Service Area. No funds acquired through the DU In-Lieu-Fee Program will be utilized to establish bank sites under this program.
Public Notice
Subject:
Action ID:
Umbrella Mitigation Banking Program in North Dakota
Being Proposed by Ducks Unlimited, Inc.
NWO-2017-0429-BIS
Comment Period: April 28, 2017 May 28, 2017
INTRODUCTION: The U.S. Army Corps of Engineers (USACE), Omaha District, North Dakota
Regulatory Office (NDRO) has received a prospectus from Ducks Unlimited, Inc. (DU), for an
umbrella mitigation banking instrument with the purpose of establishing mitigation bank sites
throughout North Dakota. The mitigation program would provide a third-party mitigation option
to satisfy compensatory mitigation requirements for Department of the Army (DA) permits, but
may also be used to satisfy other Federal, state and local regulatory program requirements
related to impacts to aquatic resources and/or species conservation. DU has provided a site
plan for the Starkweather Mitigation Bank, which would be the first site proposed to be
developed in accordance with this instrument. It would provide mitigation credits in the Devils
Lake Basin Regional Service Area (RSA).
INFORMATION ON MITIGATION PROGRAMS IN NORTH DAKOTA: To date, there are two
approved mitigation programs operating in the State. The North Dakota Department of
Transportation (NDDOT) Umbrella Mitigation Banking Instrument was approved on June 24,
2013. The NDDOT Program is statewide and was developed specifically to offset wetland
impacts associated with NDDOT infrastructure projects.
On March 5, 2014 the USACE approved the Ducks Unlimited, Inc. North Dakota Aquatic
Resource In-Lieu Fee Program Instrument (DU-ILF). The DU-ILF is statewide and provides a
third-party compensatory mitigation option for DA permits. In-lieu fee programs provide for
limited credit sales up to three years in advance of mitigation site selection and development.
No funds generated from DU-ILF may be used to develop mitigation sites in conjunction with
the proposed Umbrella Mitigation Bank Program.
AUTHORITY: Section 10 of the Rivers and Harbors Act of 1899 [33 USC 403] (Section 10)
Section 404 of the Clean Water Act [33 USC 1344] (Section 404)
PUBLIC NOTICE: This notice is to inform interested parties of the proposed establishment of
an umbrella mitigation banking program and to solicit comments. The prospectus may be
viewed in its entirety on the NDRO website at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx
If you do not have access to the internet or wish to obtain a printed copy of the
prospectus, please contact the project manager listed below.
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office
1513 South 12th Street
Bismarck, ND 58504-6640
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx.
CENWO-OD-R-ND
Page 2
Action ID: NWO-2017-0429-BIS
In addition, DU has provided a site plan for the Starkweather Mitigation Site, which will provide
credits in the Devils Lake RSA. Details of the proposed site plan can be viewed and
downloaded from the NDRO web site at:
http://www.nwo.usace.army.milMissions/RegulatoryProgram/NorthDakota/PublicNotices.aspx
If you do not have access to the internet or wish to obtain a printed copy of the site
plan, please contact the project manager listed below.
If this prospectus is determined to be sufficient, DU may proceed with the development of a
banking instrument in accordance with the Corps `Mitigation Rule', 33 CFR 332, Compensatory
Mitigation for Losses of Aquatic Resources. [Note: The Rule requires a mitigation bank site to
be included in the initial banking instrument.] Participation is encouraged so that the NDRO is
better able to complete a more thorough public interest review. Comments assist the District
Engineer in making a reasonable decision based on public interest factors. Written comments
must be postmarked by May 28, 2017 to be considered in the evaluation of this proposal.
SPONSOR:
Ducks Unlimited, Inc., Great Plains Regional Office, 2525 River Road,
Bismarck, North Dakota 58503. Point-of-Contact: Trent Hieb (701) 355-3573
PROSPECTUS ACTIVITY & PURPOSE: To establish guidelines, responsibilities, and
standards for carrying out third party compensatory mitigation requirements necessary for
compliance with DA permits. Mitigation credits may also be used for other agency aquatic
resource or species conservation requirements.
PROJECT LOCATION: Throughout North Dakota in any of the six previously established
RSAs. See attached map.
STARKWEATHER MITIGATION SITE: The proposed mitigation site is located 6 miles north,
2 miles east, 1 mile north, and 1½ miles east of Starkweather, North Dakota. The legal
description for the property is the NE¼ of Section 32, Township 159 North, Range 63 West,
Cavalier County, North Dakota. [Lat: 48.554468 ° N, Long: -98.802172° W] Credits
established will be used to offset wetland impacts in the Devils Lake Basin RSA. Ratios
contained in the Wetland Mitigation Banking in North Dakota Interagency Guidance for
Mitigation Bank Sponsors were used to estimate the number of credits the site will yield upon
plan implementation. DU estimates the 160 acre site will yield 29.89 credits.
SECTION 401 OF THE CLEAN WATER ACT (Water Quality Certification): Establishment of a
mitigation banking program does not authorize any work requiring water quality certification.
Individual site plans will be reviewed and submitted to the North Dakota Department of Health,
Division of Water Quality, and/or the US Environmental Protection Agency for review as
appropriate.
The Starkweather Site Plan, as currently proposed, appears to meet the terms and conditions
of Nationwide Permit No. 27 (NWP27). No classified rivers, streams or lakes are proposed to
be impacted; therefore, blanket certification from the North Dakota Department of Health would
apply. Final determination of applicability of NWP27 will be made upon Site Plan approval.
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office
1513 South 12th Street, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx
CENWO-OD-R-ND
Page 3
Action ID: NWO-2017-0429-BIS
ENDANGERED SPECIES ACT OF 1973 (ESA): Establishment of a mitigation banking
program does not authorize any work; therefore, there would be `no effect' on threatened
and/or endangered species or designated critical habitat. Individual site plans will be reviewed
and coordinated with the U.S. Fish and Wildlife Service (FWS). Consultation under Section 7,
if necessary, would be completed prior to completing a permit determination.
The Starkweather Site is located in Cavalier County, which is within the known historic ranges
of the endangered Whooping crane (Grus americanis) and Gray wolf (Canis lupus); and the
threatened Northern long-eared bat (Myotis septentrionalis). No critical habitat has been
identified in the County. The Site is located east of the main migration corridor of the
Whooping Crane and does not contain desirable habitat for either the Gray wolf or the
Northern long-eared bat, a preliminary `No Effect' determination has been made pursuant the
ESA. Final effects determination will be made upon Site Plan approval. Consultation with the
FWS will occur, if necessary.
NATIONAL HISTORIC PRESERVATION ACT OF 1966 (NHPA): The NDRO will comply with
the NHPA and amendments and procedures set forth in 33 CFR Part 325, Appendix C.
Establishment of a mitigation banking program does not authorize any work; therefore, no
effect determination must be made at this time. Individual mitigation sites undertaken pursuant
to this banking program will be reviewed individually in accordance with Section 106 of the
NHPA. No activity which may affect historic properties listed, or eligible for listing, in the
National Register of Historic Places, will be approved until the NDRO has complied with the
provisions of Appendix C.
No sites at or near the Starkweather Site are listed on the National Register. The majority of
the Site is cropped annually. Our preliminary determination is the project has `little likelihood to
cause effect'. The NDRO will comply with the NHPA and amendments and the procedures set
forth in 33 CFR, Appendix C if the site is approved. We will evaluate input by Indian Tribes,
the North Dakota State Historical Society and any interested parties in response to this public
notice.
PUBLIC INTEREST REVIEW: The public interest review procedures call for weighing the
benefits that reasonably may be expected to accrue. These are balanced against its
reasonably foreseeable detriments and results in reaching a determination that expresses the
public interest. Public interest factors include all factors which may be, or may become,
relevant to this project, such as conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The decision whether to issue a permit is based on an evaluation of those factors and the
probable impact, including cumulative impacts, and reflects the national concern for both the
protection and utilization of important natural resources.
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office
1513 South 12th Street, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx
CENWO-OD-R-ND
Page 4
Action ID: NWO-2017-0429-BIS
SUBMITTING COMMENTS: Written comments, referencing Public Notice NWO-2017-0429BIS must be submitted to the office listed below on or before May 28, 2017.
Toni Erhardt, Project Manager
US Army Corps of Engineers, Omaha District
North Dakota Regulatory Office
Email: CENWO-OD-RND@usace.army.mil
The Corps is particularly interested in receiving comments related to the proposal's probable
impacts on the affected aquatic environment and the secondary and cumulative effects.
Anyone may request, in writing, that a public hearing be held to consider this application.
Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If
the Corps determines that the information received in response to this notice is inadequate for
thorough evaluation, a public hearing may be warranted. If a public hearing is warranted,
interested parties will be notified of the time, date, and location. Please note that all comment
letters received are subject to release to the public through the Freedom of Information Act. If
you have questions or need additional information, please contact the applicant or the NDRO
project manager Toni Erhardt at (701) 255-0015, extension 2003 or the above email.
Request to Postmasters: Please post this notice in a conspicuous place until the
expiration date specified at the top of page one.
Notice to Editors: This notice is provided for your use in developing news stories only.
No payment for publication will be provided.
Attachments: RSA Map and Excerpts from the Prospectus and Site Plan
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office
1513 South 12th Street, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx
NORTH DAKOTA UMBRELLA
WETLAND MITIGATION BANK
PROSPECTUS
Prepared For:
UNITED STATES ARMY CORPS OF ENGINEERS, et al.
Prepared by:
DUCKS UNLIMITED, INC.
Great Plains Regional Office
Bismarck, ND
March 3, 2017
INTRODUCTION
Ducks Unlimited (DU) is proposing an Umbrella Wetland Mitigation Banking Instrument
(Umbrella Instrument) for the purpose of establishing wetland mitigation banks
throughout the State of North Dakota. As potential projects are found and secured, the
Umbrella Instrument will provide the guidelines for the development of the project into a
successful wetland mitigation bank. In addition, each new mitigation project will have a
Mitigation Plan submitted for review by the US Army Corps of Engineers (Corps) and
the North Dakota Interagency Review Team (NDIRT). An example project and
mitigation plan can be found in Appendix A.
PROSPECTUS
The prospectus must provide a summary of the information regarding the proposed
mitigation bank, at a sufficient level of detail to support informed public and NDIRT
comment. The review process begins when the sponsor submits a complete prospectus to
the district engineer. The district engineer must notify the sponsor within 30 days whether
or not a submitted prospectus is complete. A complete prospectus includes the following
information:
1.) The objectives of the proposed mitigation bank.
The objectives of the mitigation bank are to provide a third-party compensatory
mitigation option for unavoidable impacts to waters of the United States approved by the
Army Corps of Engineers under Section 404 of the Clean Water Act (CWA) and section
10 of the Rivers and Harbors Act.
Ducks Unlimited mitigation banks may be used to satisfy other federal, state and local
regulatory program requirements related to impacts to aquatic resources including
enforcement actions. This instrument addresses the required elements for establishing and
operating a mitigation bank under the federal 2008 mitigation rule (33 CFR Part 332).
2.) How the mitigation bank will be established and operated.
DU or its authorized agents will provide the necessary personnel, equipment, and,
materials to implement all wetland mitigation projects.
DU has full-time staff appropriated for the purpose of locating potential mitigation
projects throughout North Dakota. In addition, DU will work with federal and state
agencies and conservation partners to identify project sites suitable for wetland mitigation
projects. DU will seek feedback from NDIRT and the Corps concerning potential
restoration sites prior to developing a mitigation plan. Along with staff locating projects,
DU employs full-time engineers, surveyors and construction managers to develop and
construct a restoration plan suitable to provide mitigation credits. Once a project is
located, a mitigation plan will be developed for each mitigation project and is subject to
approval by the Corps and NDIRT for Corps permitted impacts. For non-jurisdictional
impacts regulated by the United States Fish and Wildlife Service (USFWS) or Natural
Resources Conservation Service (NRCS), the mitigation plan will require approval by the
appropriate representatives of these agencies. Mitigation plans will be developed and
implemented in accordance with 33 CFR 332.4 and will include the following required
twelve elements:
1.
2.
3.
4.
5.
6.
Project objectives
7. Maintenance plan
Site selection criteria
8. Performance standards
Site protection instruments
9. Monitoring requirements
Baseline information
10. Long-term management plan
Credit determination methodology 11. Adaptive management plan
Work plan
12. Financial Assurances
With each wetland mitigation project, DU will evaluate the appropriate amount of
buffer(s) for the project site based on site specific conditions. For example, if a mitigation
project site is adjacent to state protected land or a conservation easement, a buffer may
not be required.
3.) Proposed Service Areas
a.) Provide a map identifying the proposed service area of the bank.
The map below, developed by NDIRT, shows the approved service areas for the
State of North Dakota.
Map developed by NDIRT and provided courtesy of Wetland Mitigation
Banking in North Dakota Interagency Guidance for Mitigation Bank
Sponsors. Map can be found at
http://www.environment.fhwa.dot.gov/ecosystems/eei/11nd.asp
January, 2015
b.) Provide a rationale for determining the limits of the proposed service area.
The proposed service areas have been identified and approved by the Corps of
Engineers and NDIRT. The State of North Dakota has been divided into six (6)
proposed service areas. The proposed service areas are defined using 8-digit
HUCs.
Missouri River Northern Zone
8 Digit HUC
Name
10060005
Charlie-Little Muddy Creek
10060006
Big Muddy
10060007
Brush Lake Closed Basin
10110101
Lake Sakakawea
10110102
Little Muddy
Missouri River Southern Zone
8 Digit HUC
Name
10130101
Painted Woods-Square Butte Creek
10130102
Upper Lake Oahe
10130103
Apple Creek/Long Lake
10130104
Beaver Creek (Lake Oahe)
10130106
West Missouri Coteau
10160001
James River Headwaters
10160002
Pipestem River
10160003
Upper James River
10160004
Elm-Maple River
Southwest Slope
8 Digit HUC
10100004
10110101
10110201
10110202
10110203
10110204
10110205
10130101
10130102
10130201
10130202
10130203
10130204
10130205
10130206
10130301
10130303
Name
Lower Yellowstone River
Lake Sakakawea
Upper Little Missouri River
Boxelder Creek
Middle Little Missouri River
Beaver Creek (Little Missouri)
Lower Little Missouri River
Painted Woods-Square Butte
Upper Lake Oahe
Knife River
Upper Heart River
Lower Heart River
Upper Cannonball River
Cedar Creek
Lower Cannonball River
North Fork Grand River
Grand River
8 Digit HUC
09010001
09010002
09010003
09010004
09010005
Souris River Basin
Name
Upper Souris River
Des Lacs River
Lower Souris River
Willow Creek
Deep River
Devils Lake Basin
8 Digit HUC
09020201
Name
Devils Lake
Red River Basin
8 Digit HUC
09020101
09020104
09020105
09020107
09020109
09020202
09020203
09020204
09020205
09020301
09020306
09020307
09020308
09020310
09020311
09020313
Name
Bois De Sioux
Upper Red River
Western Wild Rice River
Elm-Marsh River
Goose River
Upper Sheyenne River
Middle Sheyenne River
Lower Sheyenne River
Maple River
Sandhill-Wilson River
Grand Marias-Red River
Turtle River
Forest River
Park River
Lower Red River
Pembina River
Each proposed mitigation bank will be evaluated to determine the appropriate
service area. The map and service areas listed above will provide the basis for
determining the appropriate service area. Any justification to use the mitigation
bank for impacts outside the pre-determined service areas will be approved by the
Corps of Engineers and the NDIRT. Factors that may justify expanding a service
area include but are not limited to, the location of the mitigation within the service
area, similar eco-regions across service areas and uniqueness of the mitigation
bank.
4.) The general need for and technical feasibility of the proposed mitigation bank.
Ducks Unlimited has an established In-Lieu Fee (ILF) program in the state that has been
operating since 2014. The ILF program has shown its value by selling credits in all
watersheds within the first 3 years of operation. Strong demand throughout the state has
shown the need for additional banks to compliment DU's ILF program on a strategic
basis.
ILF credit sales have been from wide ranging sources. Approximately 93 credits have
been purchased through DU since 2014 due to infrastructure needs associated with
energy development, transportation expansion, various public works water projects, and
municipal development, among others.
In general, mitigation banks will only be established after Corps and NDIRT
consultations, in watersheds where a need has been identified and can aid DU in
providing quality mitigation for impactors across all regulatory jurisdictions.
5.) The proposed ownership arrangements and long-term management strategy for
the mitigation bank.
In general, mitigation banks will be sponsored by Ducks Unlimited and developed on
property owned by private individuals. An easement or other restrictive covenant will be
placed on the property and will transfer with ownership of the property.
As the sponsor, Ducks Unlimited will also retain long-term management unless property
ownership or management duties are transferred to an approved entity.
6.) The qualifications of the sponsor to successfully complete the type(s) of
mitigation project(s) proposed, including information describing any past such
activities by the sponsor.
Ducks Unlimited is recognized as the world's largest private wetlands conservation
organization and has over 80 years of experience restoring and protecting aquatic habitat.
DU's wetland mitigation program is backed by the same science-based research and
expertise that guides our conservation work. The mission of Ducks Unlimited is to
conserve, restore, and manage wetlands and associated habitats for North America's
waterfowl. These habitats also benefit other wildlife and people. Founded in 1937 during
the Dust Bowl drought, DU has gone on to conserve more than 13.5 million acres of
habitat across North America. DU has notably developed wetland projects in every U.S.
state, Canadian province, and throughout Mexico. These efforts, along with our vast
network of volunteers and partners, have propelled DU to becoming the world leader in
wetland conservation. Our mission has a singleness of purpose that, in addition to
providing waterfowl habitat, provides ecosystem services for our growing population by
filtering pollutants from surface water, replenishing groundwater supplies, and increasing
flood storage capacity during storm events. With a multi-disciplinary staff of
professionals, DU has been restoring, enhancing, and protecting North America's vital
wetlands for over 8 decades using sound science and engineering principles.
North Dakota is one of the most important duck production areas in North America.
Although it is considered a Central Flyway state, North Dakota produces ducks that
migrate continent-wide. The glaciated, eastern part of the state contains some of the
highest wetland densities and breeding duck populations in the world. The portion of
North Dakota west of the Missouri River is considered "unglaciated," so the relatively
few wetlands in this area consist mostly of impoundments used to water livestock.
Nonetheless, duck production and recruitment in this landscape is high.
Comprehensive knowledge of wetland restorations and a full suite of engineering
capabilities also uniquely positions DU to provide full-scale wetland mitigation services.
DU's experience and expertise working with complex land and water resource issues
gives our clients and partners the confidence that our mitigation wetlands perform as
designed to achieve regulatory compliance in perpetuity. Although DU believes
avoidance and minimization should be part of any wetland mitigation strategy, some
impacts are unavoidable. DU has developed a significant capabilities in wetland
restoration through our conservation work throughout North America. DU believes that
by developing compensatory mitigation projects that create quality habitat and additional
revenue, we can leverage our technical proficiencies to further our conservation mission.
7.) For a proposed mitigation bank, the prospectus must also address:
a.) The ecological suitability of the site to achieve the objectives of the proposed
mitigation bank, including the physical, chemical and biological
characteristics of the bank site and how that site will support the planned
types of aquatic resources and functions.
As stated previously, DU will work with numerous conservation partners to
identify project sites suitable for wetland projects. DU will seek feedback from
the Corps and NDIRT concerning potential restoration sites prior to developing a
mitigation plan.
Site selection will take into account:
i.) Habitat Improvement: Sites will be evaluated based on their potential to
address multiple functions and services, which may include improvement of
fish and wildlife habitat, support for rare or endangered species, flood
attenuation, water quality improvement and recreation values.
ii.) Site conditions: DU will evaluate the hydrology, soils, native vegetation
and other conditions conducive to aquatic resource development. Projects with
greater aquatic resource functional gain per dollar will be given preference.
All wetland mitigation banks will be evaluated and restored using sound
biological and engineering practices. These practices are very typical and have
been used by DU to restore wetland basins for many years.
b.) Assurance of sufficient water rights to support the long-term sustainability of
the mitigation bank.
Proposed wetland mitigation banks may include investigations for water budget
and hydrologic analysis to ensure adequate water supply for the mitigation
project. In addition, when required, the North Dakota State Water Commission
will be notified of the project and their approval will be obtained prior to
construction of the project.
APPENDIX A
STARKWEATHER MITIGATION BANK
STARKWEATHER MITIGATION BANK
WETLAND MITIGATION PLAN
Prepared by:
Ducks Unlimited, Inc.
2525 River Road
Bismarck, ND 58503
Date Submitted:
March 3, 2017
Table of Contents
1. Project Objectives
1
2. Site Selection Criteria
2
3. Site Protection
4
4. Baseline Information
4
5. Credit Determination Methodology
8
6. Credit Release Schedule
10
7. Work Plan
10
8. Maintenance Plan
11
9. Performance Standards
11
10. Monitoring Requirements
12
11. Long-Term Management Plan
12
12. Site Protection Instruments
13
13. Financial Assurances
13
Tables
Table 1 Credit Determinations
Table 2 Credit Release Schedule
Figures
Figure 1 Location Map
Figure 2 Watershed Map
Figure 3 Land Cover
Figure 4 Easement Boundary
Figure 5 Drainage Ditch Locations
Figure 6 Wetland Delineation
Figure 7 Acreage Estimations
Appendices
Appendix B Wetland Delineation Report
1.) OBJECTIVES
Ducks Unlimited (DU) is proposing the Starkweather Mitigation Bank, which will restore
several drained wetland basins on a portion of privately owned land in Cavalier County,
ND. The Starkweather project will be developed as a wetland mitigation bank project,
based on the pending framework in the DU Umbrella Mitigation Banking Prospectus. As
shown in Figure 1 below, the property is located approximately 6 miles north, 2 miles
east, 1 mile north, and 1½ miles east of Starkweather, ND. The legal description for the
property is the NE ¼ of Section 32, Township 159 North, Range 63 West, and located at
48.554468 degrees Latitude, -98.802172 degrees Longitude. Furthermore, as shown in
Figure 2, the project is located in the Devils Lake watershed (HUC 09020201).
The wetland basins have been previously drained by a man-made ditch to promote
agricultural use. Restoration of the drained wetland basin will be used to provide wetland
mitigation banking credits to offset impacts to wetlands within the Devils Lake
Watershed.
Figure 1: Location Map
1
Figure 2: Watershed Map
STARKWEATHER
MITIGATION BANK
2.) SITE SELECTION
DU performed an extensive search for appropriate properties within the watershed. The
Starkweather property presented an opportunity to restore several drained prairie pothole
wetland basins. In addition to restoring the wetland basins, the easement parcel is large
enough to re-establish a portion of previous cropland to upland native grass community
to surround and protect the wetland basins. By choosing existing basins that have been
drained and used for agriculture, the opportunity for a successful restoration of the
wetland basins is increased.
As shown in Figure 3 below, many of the adjacent properties remain in a grassland
setting and have existing wetlands including the properties directly south and northeast of
the project area. The Starkweather Mitigation Project will have shallow, temporary and
seasonal wetlands which will add diversity in the immediate vicinity of the sparsely
located seasonal wetlands, dugouts, and intermittent stream systems. It will also expand a
larger contiguous piece of grassland while enhancing the wetland complex.
2
Figure 3: Land Cover
3
3.) SITE PROTECTION INSTRUMENTS
As shown in Figure 4, the proposed mitigation parcel is 160 acres. The proposed site
protection mechanism would be enrollment of the site into a perpetual conservation
easement. The easement would protect against disturbance to the site by restricting land
use. For example, crop farming, drainage, or development of any kind would not be
allowed on any portion of the property under easement. Haying and grazing would be
allowed as management tools. The conservation easement would be held by a third party
or Ducks Unlimited. All future activities on the property would be required to preserve
and protect wildlife habitat.
4.) BASELINE INFORMATION
The site is currently being used for agricultural row crop production. There are nine
individual wetlands that have been drained or partially drained with excavated ditches
and will be restored for mitigation credits (Figure 5). There are also four wetland basins
which exist in their natural state. Additionally, there exists two low lying areas deemed
suitable for wetland creation. These lowlands, although not containing hydric soil, do
contain wetland vegetation, hydrology, and are listed as drained through the National
Wetland Inventory.
The main ditch enters the property from the north and exits at the southwest corner of the
property. Connected to the main drain is a network of smaller ditches draining the
majority of the wetlands on the property. The main ditch drains southwest and
immediately into Starkweather Coulee, which continues southwest towards, and
eventually into Lake Alice. No records could be obtained pertaining to the installation of
these ditches, although it is speculated that the ditches were installed as far back as the
1960's. Neither the private landowner nor a DU records search were able locate
information regarding the drainage installation and it is believed it has been many
decades since they were created.
Figure 6 shows wetland basins identified through wetland delineation, scope and effect,
extensive document research, and multiple site visits. An official wetland delineation and
scope and effect analysis was completed in September 2016 by Carlson McCain.
4
Figure 4: Easement Boundary
5
Figure 5: Drainage Ditch Location
6
Figure 6: Wetland Delineation
7
5.) CREDIT DETERMINATION METHODOLOGY
Credits will be determined using the guidelines stated in the Wetland Mitigation Banking in
North Dakota Interagency Guidance for Mitigation Bank Sponsors. Wetlands will be restored
on the property by plugging the existing drainage ditches to restore hydrology within the
wetland basins. Refer to Table 1 and Figure 7 for the credit determination details.
For determining possible credits, scope and effect wetland acreages are currently
presented. Based on field observations, the basins were judged to be fully drained and are
therefore calculated with a 1:1 restoration ratio. On wetlands 1 and 2, drainage has not
impacted hydrology. Enhancement of vegetative buffer and site preservation will be used
to tabulate credits on these basins. Preservation will be calculated at 10:1.
Enhancement credits will be determined by placing a 50-foot buffer surrounding the
wetland boundaries and reestablishing wetland species around the drained basins. A 5:1
ratio will be applied to the area of the 50-foot wetland buffer. Further enhancement
credits will be sought by applying a 20:1 credit ratio to the remaining upland areas
outside the 50-foot buffer zone.
Table 1: Credit Determination
Wetland 1
Wetland 2
Wetland 3
Wetland 4
Wetland 5
Wetland 6
Wetland 7
Wetland 7
Wetland 8
Wetland 9
Wetland 10
Wetland 11
Wetland 12
Wetland 13
Wetland 14
Wetland 15
50' Upland Buffer
Upland Buffer >50'
ACRES
1.00
0.47
0.96
1.44
0.29
5.59
0.89
0.79
0.15
3.01
0.60
0.58
1.48
4.64
5.39
6.17
21.29
105.47
METHOD
Restoration
Preservation
Restoration
Restoration
Restoration
Preservation
Restoration
Enhancement
Preservation
Restoration
Restoration
Restoration
Preservation
Restoration
Creation
Creation
Enhancement
Enhancement
RATIO
1:1
10:1
1:1
1:1
1:1
10:1
1:1
2:1
10:1
1:1
1:1
1:1
10:1
1:1
2:1
2:1
5:1
20:1
Total =
CREDITS
1.000
0.047
0.960
1.440
0.290
0.559
0.890
0.395
0.015
3.010
0.600
0.580
0.148
4.640
2.695
3.085
4.258
5.274
29.89
8
The credit determination reflects the likelihood of success based upon the best available
information at the time. However, the credit releases will be based upon the monitoring
results and conclusions. The final credit determination table will reflect the actual
wetland acres developed as determined by the monitoring process. Any changes to the
credit determination, increases or decreases, will be discussed and approved with the
Corps of Engineers and the NDIRT as needed.
Figure 7: Acreage Estimations
9
6.) CREDIT RELEASE SCHEDULE
Wetland credits will be released based on Table 2 shown below. The percent approved
through monitoring years 1-5 is based upon realistic estimates of wetland development.
However, the percent approved will be based upon the monitoring results and successful
development of the project.
The first 30% of the credits will be released upon approval of the Mitigation Plan,
recording of the Site Specific Agreement, establishment of the financial account and
construction and seeding of the restoration project. The Site Specific Agreement will be
recorded in the Cavalier County Courthouse upon project completion. The Mitigation
Plan will be submitted in March 2017 for approval with an expected construction of the
project in the fall of 2017. Upon completion of the construction, the first 30% or 8.97
credits shall be released.
The remainder of the credits will be released in stages based upon monitoring results for
the given year. Releases may be pro-rated to address partial success in meeting the
required performance standards. In addition, credits can be released at an earlier date
should monitoring show performance standards have been met for two consecutive years.
Any changes to the credit release schedule will be discussed and approved with the Corps
of Engineers and the NDIRT.
Table 2: Credit Release Schedule
Success Criteria
% Approved # Credits
Mit. Plan approved, Site
15%
4.48
Specific Agreements recorded,
financial account established
Construction Complete
15%
4.48
st
1 year Monitoring
10%
2.99
nd
2 Year Monitoring
15%
4.48
3rd Year Monitoring
20%
5.98
th
4 Year Monitoring
10%
2.99
5th Year Monitoring
15%
4.48
Total Credits
4.48
8.97
11.96
16.44
22.42
25.41
29.89
% Complete
15%
30%
40%
55%
75%
85%
100%
7.) WORK PLAN
Construction of the project, including fill material removal and ditch fill construction,
will be determined by the contractor in association with a DU construction manager but
will be typical of equipment used for this type of project. Typical equipment could
include scrapers, bulldozers, trucks and compaction equipment.
10
DU is planning for fall of 2017 construction of the project. This allows for drier
conditions which are more favorable for removal of fill material and construction of
earthen ditch plugs and ditch fills.
The primary source of water for the wetlands will be surface water runoff. This is typical
of the prairie pothole region. Depending on the hydrologic cycle, the wetlands will vary
between wet and dry allowing for the typical wetland cycle.
Revegetation of the wetlands will occur naturally and will be based on the natural
hydrologic cycle. If deemed necessary, a water shed analysis may be conducted to
determine if adequate hydrology is present to successfully restore historic and created
basins. As these are existing wetlands that have been previously drained, the wetland
seedbank likely still exists. Created basins and upland areas associated with the project
will be seeded with appropriate native species mix indigenous to the region.
Invasive species will be controlled in the disturbed areas by the use of standard weed
control methods. These methods may include spraying or mowing to ensure the best
vegetative response. DU will work closely with the county weed district and landowners
to determine the best methods for weed control.
8.) MAINTENANCE PLAN
Due to the nature of the project restoring drained wetland basins with earthen ditch plugs
and fills, it is anticipated the site will require minimal future maintenance. The wetland
basins are very shallow in nature and should typically be very well vegetated. This
reduces the impacts of erosion due to wave action, etc. Constructed ditch restorations will
have flatter slopes to minimize erosion due to moving water. If applicable, and as
determined in the final design plans, erosion control blankets will be installed to
minimize erosion until vegetative cover can be established on all spillways. DU will
monitor the site to determine if maintenance is required and the maintenance plan will be
implemented to correct any issues.
9.) PERFORMANCE STANDARDS
Historical wetland basins as delineated by Carlson McCain that are restored within the
project area should meet the criteria of soils, hydrology and vegetation as found in the
1987 Corps of Engineers Wetland Delineation Manual.
Created basins within the project area must also meet the criteria of the 1987 Corps of
Engineers Wetland Delineation manual, except for the soils evaluation, as hydric soil
indicators may not be present due to the short timeframe. Therefore, created wetlands
will be creditable based on hydrology and vegetation, assuming hydric soils will
eventually form.
11
The wetland complex within this project will consist of several shallow basins. Depths
range from less than 6" to 4'. Based on these depths, the wetland fringe should be
expected to be seasonal in nature while the deeper interior could be considered more
semi-permanent. The shallower portions could be expected to develop emergent and
possibly some submerged vegetation while the deeper portion may stay partially open
water and develop submerged aquatic vegetation. Of course, the condition of the
wetlands will be based entirely on the hydro-period. Given the dynamic nature of the
North Dakota climate with dramatic swings from extremely wet to extremely dry, it
should be expected these wetlands follow the typical wetland cycle based on the given
climatic conditions at the time.
The 50' upland buffer should meet a minimum 90% canopy cover. The remaining upland
cover outside the buffer zone but within the easement boundary shall exceed a 70%
canopy cover.
The easement area could be hayed after July 15 or grazed as management tools, in
accordance with the conservation easement guidelines. In addition, all noxious weeds
within the easement area will be in compliance of the policy set forth by the Cavalier
County Weed Control Board.
10.) MONITORING REQUIREMENTS
DU is proposing to monitor the easement area for a period of five (5) years starting the
first growing season after completion of construction. Monitoring will consist of
delineating wetland boundaries based on the 1987 Corps of Engineers Wetland
Delineation Manual. In addition, transects will be established to monitor vegetative
development and diversity. Finally, photo points with compass bearings will be
established to show vegetative development throughout the monitoring period. Written
monitoring reports will be prepared and submitted to the Corps of Engineers Bismarck,
ND office by January 31st of the following year. The report will include the information
from each year's monitoring in order to show development of the wetland project. Along
with the data from the monitoring, the report will include a map of the transect locations,
the delineated wetland boundary, photo points and azimuth angles, areas of concern such
as location of noxious weed infestations, erosion, etc. If applicable, yearly aerial
photographs will be included. Access to conduct monitoring or any future work
pertaining to the project is laid out in the landowner Site Specific Agreement.
11.) LONG-TERM MANAGEMENT PLAN
Long-term management and maintenance will be provided by DU, its heirs, assigns or
successors; unless the easement lands are transferred to a state or federal resource
management agency or this responsibility is contractually conveyed to another person,
subject to approval by the Corps, in consultation with the NDIRT.
12
In addition, if a USFWS wetland and grassland easement will be placed on the property,
the USFWS will have authority to monitor and maintain the integrity of the easement
under their easement program guidelines.
The DU Long-Term Management Plan shall be initiated upon closure of the ILF project.
The goal of the long-term management is to continue to foster the viability of the
project's wetlands and upland habitats. The long-term manager shall conduct annual
inspections of the property during the growing season to ensure the property is
functioning as expected and determine any needs of the project. Should needs arise, the
long-term manager shall take corrective actions to rectify the needs of the wetland
project. Long-term objectives include maintaining the native plant vegetation. This may
include assessment and recommendations for improving the upland and wetland habitats
within the easement. In order to minimize the spread of invasive species such as noxious
weeds, the long-term manager shall identify and control any infestations as discovered.
The long-term manager shall also assess the stability and structural integrity of any
constructed ditch plugs or primary spillways and make recommendations for any
maintenance of such structures due to erosion or other causes.
12.) ADAPTIVE MANAGEMENT PLAN
An adaptive management plan will be established and carried out by DU should
corrective actions be deemed necessary. Actions will be determined in cooperation with
the Corps and NDIRT to maintain the success and viability of the wetland mitigation site.
13.) FINANCIAL ASSURANCES
DU is committed to funding the development of the project, including monitoring and
maintenance, with financial assurances. The financial assurances also include a
commitment to an endowment fund suitable in size to ensure the future viability of the
site which would be dedicated for long term management of the Starkweather Mitigation
Bank Project. The endowment would be held by Ducks Unlimited in an interest bearing
account. The project development costs, including the contingency and long-term
management fund endowment, would be funded by credit sales from the Devils Lake
Basin service area.
13