Ducks Unlimited, Inc. (DU) has submitted a prospectus for establishment of a statewide mitigation banking program. The program would provide an additional third-party mitigation option to satisfy compensatory mitigation requirements for Department of the Army permits, but may also be used to satisfy other Federal, state and local regulatory requirements related to impacts to aquatic resources and/or species conservation. DU has also provided a site plan for the Starkweather Mitigation Bank (Lat: 48.554468° N, Long: -98.802172° W], which would be the first site proposed to be developed in accordance with this instrument. It would provide mitigation credits in the Devils Lake Basin Regional Service Area. No funds acquired through the DU In-Lieu-Fee Program will be utilized to establish bank sites under this program.

Ducks Unlimited, Inc. (DU) has submitted a prospectus for establishment of a statewide mitigation banking program. The program would provide an additional third-party mitigation option to satisfy compensatory mitigation requirements for Department of the Army permits, but may also be used to satisfy other Federal, state and local regulatory requirements related to impacts to aquatic resources and/or species conservation. DU has also provided a site plan for the Starkweather Mitigation Bank (Lat: 48.554468° N, Long: -98.802172° W], which would be the first site proposed to be developed in accordance with this instrument. It would provide mitigation credits in the Devils Lake Basin Regional Service Area. No funds acquired through the DU In-Lieu-Fee Program will be utilized to establish bank sites under this program.

Public Notice Subject:

Action ID:

Umbrella Mitigation Banking Program in North Dakota Being Proposed by Ducks Unlimited, Inc. NWO-2017-0429-BIS

Comment Period: April 28, 2017 ­ May 28, 2017 INTRODUCTION: The U.S. Army Corps of Engineers (USACE), Omaha District, North Dakota Regulatory Office (NDRO) has received a prospectus from Ducks Unlimited, Inc. (DU), for an umbrella mitigation banking instrument with the purpose of establishing mitigation bank sites throughout North Dakota. The mitigation program would provide a third-party mitigation option to satisfy compensatory mitigation requirements for Department of the Army (DA) permits, but may also be used to satisfy other Federal, state and local regulatory program requirements related to impacts to aquatic resources and/or species conservation. DU has provided a site plan for the Starkweather Mitigation Bank, which would be the first site proposed to be developed in accordance with this instrument. It would provide mitigation credits in the Devils Lake Basin Regional Service Area (RSA). INFORMATION ON MITIGATION PROGRAMS IN NORTH DAKOTA: To date, there are two approved mitigation programs operating in the State. The North Dakota Department of Transportation (NDDOT) Umbrella Mitigation Banking Instrument was approved on June 24, 2013. The NDDOT Program is statewide and was developed specifically to offset wetland impacts associated with NDDOT infrastructure projects. On March 5, 2014 the USACE approved the Ducks Unlimited, Inc. North Dakota Aquatic Resource In-Lieu Fee Program Instrument (DU-ILF). The DU-ILF is statewide and provides a third-party compensatory mitigation option for DA permits. In-lieu fee programs provide for limited credit sales up to three years in advance of mitigation site selection and development. No funds generated from DU-ILF may be used to develop mitigation sites in conjunction with the proposed Umbrella Mitigation Bank Program. AUTHORITY: Section 10 of the Rivers and Harbors Act of 1899 [33 USC 403] (Section 10) Section 404 of the Clean Water Act [33 USC 1344] (Section 404) PUBLIC NOTICE: This notice is to inform interested parties of the proposed establishment of an umbrella mitigation banking program and to solicit comments. The prospectus may be viewed in its entirety on the NDRO website at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx If you do not have access to the internet or wish to obtain a printed copy of the prospectus, please contact the project manager listed below.

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street Bismarck, ND 58504-6640 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx.

CENWO-OD-R-ND

Page 2

Action ID: NWO-2017-0429-BIS

In addition, DU has provided a site plan for the Starkweather Mitigation Site, which will provide credits in the Devils Lake RSA. Details of the proposed site plan can be viewed and downloaded from the NDRO web site at: http://www.nwo.usace.army.milMissions/RegulatoryProgram/NorthDakota/PublicNotices.aspx If you do not have access to the internet or wish to obtain a printed copy of the site plan, please contact the project manager listed below. If this prospectus is determined to be sufficient, DU may proceed with the development of a banking instrument in accordance with the Corps `Mitigation Rule', 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources. [Note: The Rule requires a mitigation bank site to be included in the initial banking instrument.] Participation is encouraged so that the NDRO is better able to complete a more thorough public interest review. Comments assist the District Engineer in making a reasonable decision based on public interest factors. Written comments must be postmarked by May 28, 2017 to be considered in the evaluation of this proposal. SPONSOR: Ducks Unlimited, Inc., Great Plains Regional Office, 2525 River Road, Bismarck, North Dakota 58503. Point-of-Contact: Trent Hieb (701) 355-3573 PROSPECTUS ACTIVITY & PURPOSE: To establish guidelines, responsibilities, and standards for carrying out third party compensatory mitigation requirements necessary for compliance with DA permits. Mitigation credits may also be used for other agency aquatic resource or species conservation requirements. PROJECT LOCATION: Throughout North Dakota in any of the six previously established RSAs. See attached map. STARKWEATHER MITIGATION SITE: The proposed mitigation site is located 6 miles north, 2 miles east, 1 mile north, and 1½ miles east of Starkweather, North Dakota. The legal description for the property is the NE¼ of Section 32, Township 159 North, Range 63 West, Cavalier County, North Dakota. [Lat: 48.554468 ° N, Long: -98.802172° W] Credits established will be used to offset wetland impacts in the Devils Lake Basin RSA. Ratios contained in the Wetland Mitigation Banking in North Dakota ­ Interagency Guidance for Mitigation Bank Sponsors were used to estimate the number of credits the site will yield upon plan implementation. DU estimates the 160 acre site will yield 29.89 credits. SECTION 401 OF THE CLEAN WATER ACT (Water Quality Certification): Establishment of a mitigation banking program does not authorize any work requiring water quality certification. Individual site plans will be reviewed and submitted to the North Dakota Department of Health, Division of Water Quality, and/or the US Environmental Protection Agency for review as appropriate. The Starkweather Site Plan, as currently proposed, appears to meet the terms and conditions of Nationwide Permit No. 27 (NWP27). No classified rivers, streams or lakes are proposed to be impacted; therefore, blanket certification from the North Dakota Department of Health would apply. Final determination of applicability of NWP27 will be made upon Site Plan approval. U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

CENWO-OD-R-ND

Page 3

Action ID: NWO-2017-0429-BIS

ENDANGERED SPECIES ACT OF 1973 (ESA): Establishment of a mitigation banking program does not authorize any work; therefore, there would be `no effect' on threatened and/or endangered species or designated critical habitat. Individual site plans will be reviewed and coordinated with the U.S. Fish and Wildlife Service (FWS). Consultation under Section 7, if necessary, would be completed prior to completing a permit determination. The Starkweather Site is located in Cavalier County, which is within the known historic ranges of the endangered Whooping crane (Grus americanis) and Gray wolf (Canis lupus); and the threatened Northern long-eared bat (Myotis septentrionalis). No critical habitat has been identified in the County. The Site is located east of the main migration corridor of the Whooping Crane and does not contain desirable habitat for either the Gray wolf or the Northern long-eared bat, a preliminary `No Effect' determination has been made pursuant the ESA. Final effects determination will be made upon Site Plan approval. Consultation with the FWS will occur, if necessary. NATIONAL HISTORIC PRESERVATION ACT OF 1966 (NHPA): The NDRO will comply with the NHPA and amendments and procedures set forth in 33 CFR Part 325, Appendix C. Establishment of a mitigation banking program does not authorize any work; therefore, no effect determination must be made at this time. Individual mitigation sites undertaken pursuant to this banking program will be reviewed individually in accordance with Section 106 of the NHPA. No activity which may affect historic properties listed, or eligible for listing, in the National Register of Historic Places, will be approved until the NDRO has complied with the provisions of Appendix C. No sites at or near the Starkweather Site are listed on the National Register. The majority of the Site is cropped annually. Our preliminary determination is the project has `little likelihood to cause effect'. The NDRO will comply with the NHPA and amendments and the procedures set forth in 33 CFR, Appendix C if the site is approved. We will evaluate input by Indian Tribes, the North Dakota State Historical Society and any interested parties in response to this public notice. PUBLIC INTEREST REVIEW: The public interest review procedures call for weighing the benefits that reasonably may be expected to accrue. These are balanced against its reasonably foreseeable detriments and results in reaching a determination that expresses the public interest. Public interest factors include all factors which may be, or may become, relevant to this project, such as conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The decision whether to issue a permit is based on an evaluation of those factors and the probable impact, including cumulative impacts, and reflects the national concern for both the protection and utilization of important natural resources.

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

CENWO-OD-R-ND

Page 4

Action ID: NWO-2017-0429-BIS

SUBMITTING COMMENTS: Written comments, referencing Public Notice NWO-2017-0429BIS must be submitted to the office listed below on or before May 28, 2017. Toni Erhardt, Project Manager US Army Corps of Engineers, Omaha District North Dakota Regulatory Office Email: CENWO-OD-RND@usace.army.mil The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If the Corps determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. Please note that all comment letters received are subject to release to the public through the Freedom of Information Act. If you have questions or need additional information, please contact the applicant or the NDRO project manager Toni Erhardt at (701) 255-0015, extension 2003 or the above email. Request to Postmasters: Please post this notice in a conspicuous place until the expiration date specified at the top of page one. Notice to Editors: This notice is provided for your use in developing news stories only. No payment for publication will be provided. Attachments: RSA Map and Excerpts from the Prospectus and Site Plan

U.S. ARMY CORPS OF ENGINEERS ­ Omaha District North Dakota Regulatory Office 1513 South 12th Street, Bismarck, North Dakota 58504 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota.aspx

NORTH DAKOTA UMBRELLA WETLAND MITIGATION BANK

PROSPECTUS

Prepared For:

UNITED STATES ARMY CORPS OF ENGINEERS, et al. Prepared by:

DUCKS UNLIMITED, INC. Great Plains Regional Office Bismarck, ND

March 3, 2017

INTRODUCTION Ducks Unlimited (DU) is proposing an Umbrella Wetland Mitigation Banking Instrument (Umbrella Instrument) for the purpose of establishing wetland mitigation banks throughout the State of North Dakota. As potential projects are found and secured, the Umbrella Instrument will provide the guidelines for the development of the project into a successful wetland mitigation bank. In addition, each new mitigation project will have a Mitigation Plan submitted for review by the US Army Corps of Engineers (Corps) and the North Dakota Interagency Review Team (NDIRT). An example project and mitigation plan can be found in Appendix A. PROSPECTUS The prospectus must provide a summary of the information regarding the proposed mitigation bank, at a sufficient level of detail to support informed public and NDIRT comment. The review process begins when the sponsor submits a complete prospectus to the district engineer. The district engineer must notify the sponsor within 30 days whether or not a submitted prospectus is complete. A complete prospectus includes the following information: 1.) The objectives of the proposed mitigation bank. The objectives of the mitigation bank are to provide a third-party compensatory mitigation option for unavoidable impacts to waters of the United States approved by the Army Corps of Engineers under Section 404 of the Clean Water Act (CWA) and section 10 of the Rivers and Harbors Act. Ducks Unlimited mitigation banks may be used to satisfy other federal, state and local regulatory program requirements related to impacts to aquatic resources including enforcement actions. This instrument addresses the required elements for establishing and operating a mitigation bank under the federal 2008 mitigation rule (33 CFR Part 332). 2.) How the mitigation bank will be established and operated. DU or its authorized agents will provide the necessary personnel, equipment, and, materials to implement all wetland mitigation projects. DU has full-time staff appropriated for the purpose of locating potential mitigation projects throughout North Dakota. In addition, DU will work with federal and state agencies and conservation partners to identify project sites suitable for wetland mitigation projects. DU will seek feedback from NDIRT and the Corps concerning potential restoration sites prior to developing a mitigation plan. Along with staff locating projects, DU employs full-time engineers, surveyors and construction managers to develop and construct a restoration plan suitable to provide mitigation credits. Once a project is located, a mitigation plan will be developed for each mitigation project and is subject to approval by the Corps and NDIRT for Corps permitted impacts. For non-jurisdictional

impacts regulated by the United States Fish and Wildlife Service (USFWS) or Natural Resources Conservation Service (NRCS), the mitigation plan will require approval by the appropriate representatives of these agencies. Mitigation plans will be developed and implemented in accordance with 33 CFR 332.4 and will include the following required twelve elements: 1. 2. 3. 4. 5. 6.

Project objectives 7. Maintenance plan Site selection criteria 8. Performance standards Site protection instruments 9. Monitoring requirements Baseline information 10. Long-term management plan Credit determination methodology 11. Adaptive management plan Work plan 12. Financial Assurances

With each wetland mitigation project, DU will evaluate the appropriate amount of buffer(s) for the project site based on site specific conditions. For example, if a mitigation project site is adjacent to state protected land or a conservation easement, a buffer may not be required. 3.) Proposed Service Areas a.) Provide a map identifying the proposed service area of the bank. The map below, developed by NDIRT, shows the approved service areas for the State of North Dakota.

Map developed by NDIRT and provided courtesy of Wetland Mitigation Banking in North Dakota Interagency Guidance for Mitigation Bank Sponsors. Map can be found at http://www.environment.fhwa.dot.gov/ecosystems/eei/11nd.asp January, 2015

b.) Provide a rationale for determining the limits of the proposed service area.

The proposed service areas have been identified and approved by the Corps of Engineers and NDIRT. The State of North Dakota has been divided into six (6) proposed service areas. The proposed service areas are defined using 8-digit HUCs. Missouri River Northern Zone 8 Digit HUC Name 10060005 Charlie-Little Muddy Creek 10060006 Big Muddy 10060007 Brush Lake Closed Basin 10110101 Lake Sakakawea 10110102 Little Muddy Missouri River Southern Zone 8 Digit HUC Name 10130101 Painted Woods-Square Butte Creek 10130102 Upper Lake Oahe 10130103 Apple Creek/Long Lake 10130104 Beaver Creek (Lake Oahe) 10130106 West Missouri Coteau 10160001 James River Headwaters 10160002 Pipestem River 10160003 Upper James River 10160004 Elm-Maple River Southwest Slope 8 Digit HUC 10100004 10110101 10110201 10110202 10110203 10110204 10110205 10130101 10130102 10130201 10130202 10130203 10130204 10130205 10130206 10130301 10130303

Name Lower Yellowstone River Lake Sakakawea Upper Little Missouri River Boxelder Creek Middle Little Missouri River Beaver Creek (Little Missouri) Lower Little Missouri River Painted Woods-Square Butte Upper Lake Oahe Knife River Upper Heart River Lower Heart River Upper Cannonball River Cedar Creek Lower Cannonball River North Fork Grand River Grand River

8 Digit HUC 09010001 09010002 09010003 09010004 09010005

Souris River Basin Name Upper Souris River Des Lacs River Lower Souris River Willow Creek Deep River Devils Lake Basin

8 Digit HUC 09020201

Name Devils Lake Red River Basin

8 Digit HUC 09020101 09020104 09020105 09020107 09020109 09020202 09020203 09020204 09020205 09020301 09020306 09020307 09020308 09020310 09020311 09020313

Name Bois De Sioux Upper Red River Western Wild Rice River Elm-Marsh River Goose River Upper Sheyenne River Middle Sheyenne River Lower Sheyenne River Maple River Sandhill-Wilson River Grand Marias-Red River Turtle River Forest River Park River Lower Red River Pembina River

Each proposed mitigation bank will be evaluated to determine the appropriate service area. The map and service areas listed above will provide the basis for determining the appropriate service area. Any justification to use the mitigation bank for impacts outside the pre-determined service areas will be approved by the Corps of Engineers and the NDIRT. Factors that may justify expanding a service area include but are not limited to, the location of the mitigation within the service area, similar eco-regions across service areas and uniqueness of the mitigation bank.

4.) The general need for and technical feasibility of the proposed mitigation bank.

Ducks Unlimited has an established In-Lieu Fee (ILF) program in the state that has been operating since 2014. The ILF program has shown its value by selling credits in all watersheds within the first 3 years of operation. Strong demand throughout the state has shown the need for additional banks to compliment DU's ILF program on a strategic basis. ILF credit sales have been from wide ranging sources. Approximately 93 credits have been purchased through DU since 2014 due to infrastructure needs associated with energy development, transportation expansion, various public works water projects, and municipal development, among others. In general, mitigation banks will only be established after Corps and NDIRT consultations, in watersheds where a need has been identified and can aid DU in providing quality mitigation for impactors across all regulatory jurisdictions. 5.) The proposed ownership arrangements and long-term management strategy for the mitigation bank. In general, mitigation banks will be sponsored by Ducks Unlimited and developed on property owned by private individuals. An easement or other restrictive covenant will be placed on the property and will transfer with ownership of the property. As the sponsor, Ducks Unlimited will also retain long-term management unless property ownership or management duties are transferred to an approved entity. 6.) The qualifications of the sponsor to successfully complete the type(s) of mitigation project(s) proposed, including information describing any past such activities by the sponsor. Ducks Unlimited is recognized as the world's largest private wetlands conservation organization and has over 80 years of experience restoring and protecting aquatic habitat. DU's wetland mitigation program is backed by the same science-based research and expertise that guides our conservation work. The mission of Ducks Unlimited is to conserve, restore, and manage wetlands and associated habitats for North America's waterfowl. These habitats also benefit other wildlife and people. Founded in 1937 during the Dust Bowl drought, DU has gone on to conserve more than 13.5 million acres of habitat across North America. DU has notably developed wetland projects in every U.S. state, Canadian province, and throughout Mexico. These efforts, along with our vast network of volunteers and partners, have propelled DU to becoming the world leader in wetland conservation. Our mission has a singleness of purpose that, in addition to providing waterfowl habitat, provides ecosystem services for our growing population by filtering pollutants from surface water, replenishing groundwater supplies, and increasing flood storage capacity during storm events. With a multi-disciplinary staff of professionals, DU has been restoring, enhancing, and protecting North America's vital wetlands for over 8 decades using sound science and engineering principles.

North Dakota is one of the most important duck production areas in North America. Although it is considered a Central Flyway state, North Dakota produces ducks that migrate continent-wide. The glaciated, eastern part of the state contains some of the highest wetland densities and breeding duck populations in the world. The portion of North Dakota west of the Missouri River is considered "unglaciated," so the relatively few wetlands in this area consist mostly of impoundments used to water livestock. Nonetheless, duck production and recruitment in this landscape is high. Comprehensive knowledge of wetland restorations and a full suite of engineering capabilities also uniquely positions DU to provide full-scale wetland mitigation services. DU's experience and expertise working with complex land and water resource issues gives our clients and partners the confidence that our mitigation wetlands perform as designed to achieve regulatory compliance in perpetuity. Although DU believes avoidance and minimization should be part of any wetland mitigation strategy, some impacts are unavoidable. DU has developed a significant capabilities in wetland restoration through our conservation work throughout North America. DU believes that by developing compensatory mitigation projects that create quality habitat and additional revenue, we can leverage our technical proficiencies to further our conservation mission. 7.) For a proposed mitigation bank, the prospectus must also address: a.) The ecological suitability of the site to achieve the objectives of the proposed mitigation bank, including the physical, chemical and biological characteristics of the bank site and how that site will support the planned types of aquatic resources and functions. As stated previously, DU will work with numerous conservation partners to identify project sites suitable for wetland projects. DU will seek feedback from the Corps and NDIRT concerning potential restoration sites prior to developing a mitigation plan. Site selection will take into account: i.) Habitat Improvement: Sites will be evaluated based on their potential to address multiple functions and services, which may include improvement of fish and wildlife habitat, support for rare or endangered species, flood attenuation, water quality improvement and recreation values. ii.) Site conditions: DU will evaluate the hydrology, soils, native vegetation and other conditions conducive to aquatic resource development. Projects with greater aquatic resource functional gain per dollar will be given preference. All wetland mitigation banks will be evaluated and restored using sound biological and engineering practices. These practices are very typical and have been used by DU to restore wetland basins for many years.

b.) Assurance of sufficient water rights to support the long-term sustainability of the mitigation bank. Proposed wetland mitigation banks may include investigations for water budget and hydrologic analysis to ensure adequate water supply for the mitigation project. In addition, when required, the North Dakota State Water Commission will be notified of the project and their approval will be obtained prior to construction of the project.

APPENDIX A

STARKWEATHER MITIGATION BANK

STARKWEATHER MITIGATION BANK

WETLAND MITIGATION PLAN

Prepared by:

Ducks Unlimited, Inc. 2525 River Road Bismarck, ND 58503

Date Submitted:

March 3, 2017

Table of Contents 1. Project Objectives

1

2. Site Selection Criteria

2

3. Site Protection

4

4. Baseline Information

4

5. Credit Determination Methodology

8

6. Credit Release Schedule

10

7. Work Plan

10

8. Maintenance Plan

11

9. Performance Standards

11

10. Monitoring Requirements

12

11. Long-Term Management Plan

12

12. Site Protection Instruments

13

13. Financial Assurances

13

Tables Table 1 ­ Credit Determinations Table 2 ­ Credit Release Schedule Figures Figure 1 ­ Location Map Figure 2 ­ Watershed Map Figure 3 ­ Land Cover Figure 4 ­ Easement Boundary Figure 5 ­ Drainage Ditch Locations Figure 6 ­ Wetland Delineation Figure 7 ­ Acreage Estimations Appendices Appendix B ­ Wetland Delineation Report

1.) OBJECTIVES Ducks Unlimited (DU) is proposing the Starkweather Mitigation Bank, which will restore several drained wetland basins on a portion of privately owned land in Cavalier County, ND. The Starkweather project will be developed as a wetland mitigation bank project, based on the pending framework in the DU Umbrella Mitigation Banking Prospectus. As shown in Figure 1 below, the property is located approximately 6 miles north, 2 miles east, 1 mile north, and 1½ miles east of Starkweather, ND. The legal description for the property is the NE ¼ of Section 32, Township 159 North, Range 63 West, and located at 48.554468 degrees Latitude, -98.802172 degrees Longitude. Furthermore, as shown in Figure 2, the project is located in the Devils Lake watershed (HUC 09020201). The wetland basins have been previously drained by a man-made ditch to promote agricultural use. Restoration of the drained wetland basin will be used to provide wetland mitigation banking credits to offset impacts to wetlands within the Devils Lake Watershed. Figure 1: Location Map

1

Figure 2: Watershed Map

STARKWEATHER MITIGATION BANK

2.) SITE SELECTION DU performed an extensive search for appropriate properties within the watershed. The Starkweather property presented an opportunity to restore several drained prairie pothole wetland basins. In addition to restoring the wetland basins, the easement parcel is large enough to re-establish a portion of previous cropland to upland native grass community to surround and protect the wetland basins. By choosing existing basins that have been drained and used for agriculture, the opportunity for a successful restoration of the wetland basins is increased. As shown in Figure 3 below, many of the adjacent properties remain in a grassland setting and have existing wetlands including the properties directly south and northeast of the project area. The Starkweather Mitigation Project will have shallow, temporary and seasonal wetlands which will add diversity in the immediate vicinity of the sparsely located seasonal wetlands, dugouts, and intermittent stream systems. It will also expand a larger contiguous piece of grassland while enhancing the wetland complex.

2

Figure 3: Land Cover

3

3.) SITE PROTECTION INSTRUMENTS As shown in Figure 4, the proposed mitigation parcel is 160 acres. The proposed site protection mechanism would be enrollment of the site into a perpetual conservation easement. The easement would protect against disturbance to the site by restricting land use. For example, crop farming, drainage, or development of any kind would not be allowed on any portion of the property under easement. Haying and grazing would be allowed as management tools. The conservation easement would be held by a third party or Ducks Unlimited. All future activities on the property would be required to preserve and protect wildlife habitat.

4.) BASELINE INFORMATION The site is currently being used for agricultural row crop production. There are nine individual wetlands that have been drained or partially drained with excavated ditches and will be restored for mitigation credits (Figure 5). There are also four wetland basins which exist in their natural state. Additionally, there exists two low lying areas deemed suitable for wetland creation. These lowlands, although not containing hydric soil, do contain wetland vegetation, hydrology, and are listed as drained through the National Wetland Inventory. The main ditch enters the property from the north and exits at the southwest corner of the property. Connected to the main drain is a network of smaller ditches draining the majority of the wetlands on the property. The main ditch drains southwest and immediately into Starkweather Coulee, which continues southwest towards, and eventually into Lake Alice. No records could be obtained pertaining to the installation of these ditches, although it is speculated that the ditches were installed as far back as the 1960's. Neither the private landowner nor a DU records search were able locate information regarding the drainage installation and it is believed it has been many decades since they were created. Figure 6 shows wetland basins identified through wetland delineation, scope and effect, extensive document research, and multiple site visits. An official wetland delineation and scope and effect analysis was completed in September 2016 by Carlson McCain.

4

Figure 4: Easement Boundary

5

Figure 5: Drainage Ditch Location

6

Figure 6: Wetland Delineation

7

5.) CREDIT DETERMINATION METHODOLOGY Credits will be determined using the guidelines stated in the Wetland Mitigation Banking in North Dakota Interagency Guidance for Mitigation Bank Sponsors. Wetlands will be restored on the property by plugging the existing drainage ditches to restore hydrology within the wetland basins. Refer to Table 1 and Figure 7 for the credit determination details. For determining possible credits, scope and effect wetland acreages are currently presented. Based on field observations, the basins were judged to be fully drained and are therefore calculated with a 1:1 restoration ratio. On wetlands 1 and 2, drainage has not impacted hydrology. Enhancement of vegetative buffer and site preservation will be used to tabulate credits on these basins. Preservation will be calculated at 10:1. Enhancement credits will be determined by placing a 50-foot buffer surrounding the wetland boundaries and reestablishing wetland species around the drained basins. A 5:1 ratio will be applied to the area of the 50-foot wetland buffer. Further enhancement credits will be sought by applying a 20:1 credit ratio to the remaining upland areas outside the 50-foot buffer zone. Table 1: Credit Determination Wetland 1 Wetland 2 Wetland 3 Wetland 4 Wetland 5 Wetland 6 Wetland 7 Wetland 7 Wetland 8 Wetland 9 Wetland 10 Wetland 11 Wetland 12 Wetland 13 Wetland 14 Wetland 15 50' Upland Buffer Upland Buffer >50'

ACRES 1.00 0.47 0.96 1.44 0.29 5.59 0.89 0.79 0.15 3.01 0.60 0.58 1.48 4.64 5.39 6.17 21.29 105.47

METHOD Restoration Preservation Restoration Restoration Restoration Preservation Restoration Enhancement Preservation Restoration Restoration Restoration Preservation Restoration Creation Creation Enhancement Enhancement

RATIO 1:1 10:1 1:1 1:1 1:1 10:1 1:1 2:1 10:1 1:1 1:1 1:1 10:1 1:1 2:1 2:1 5:1 20:1 Total =

CREDITS 1.000 0.047 0.960 1.440 0.290 0.559 0.890 0.395 0.015 3.010 0.600 0.580 0.148 4.640 2.695 3.085 4.258 5.274 29.89

8

The credit determination reflects the likelihood of success based upon the best available information at the time. However, the credit releases will be based upon the monitoring results and conclusions. The final credit determination table will reflect the actual wetland acres developed as determined by the monitoring process. Any changes to the credit determination, increases or decreases, will be discussed and approved with the Corps of Engineers and the NDIRT as needed. Figure 7: Acreage Estimations

9

6.) CREDIT RELEASE SCHEDULE Wetland credits will be released based on Table 2 shown below. The percent approved through monitoring years 1-5 is based upon realistic estimates of wetland development. However, the percent approved will be based upon the monitoring results and successful development of the project. The first 30% of the credits will be released upon approval of the Mitigation Plan, recording of the Site Specific Agreement, establishment of the financial account and construction and seeding of the restoration project. The Site Specific Agreement will be recorded in the Cavalier County Courthouse upon project completion. The Mitigation Plan will be submitted in March 2017 for approval with an expected construction of the project in the fall of 2017. Upon completion of the construction, the first 30% or 8.97 credits shall be released. The remainder of the credits will be released in stages based upon monitoring results for the given year. Releases may be pro-rated to address partial success in meeting the required performance standards. In addition, credits can be released at an earlier date should monitoring show performance standards have been met for two consecutive years. Any changes to the credit release schedule will be discussed and approved with the Corps of Engineers and the NDIRT. Table 2: Credit Release Schedule Success Criteria % Approved # Credits Mit. Plan approved, Site 15% 4.48 Specific Agreements recorded, financial account established Construction Complete 15% 4.48 st 1 year Monitoring 10% 2.99 nd 2 Year Monitoring 15% 4.48 3rd Year Monitoring 20% 5.98 th 4 Year Monitoring 10% 2.99 5th Year Monitoring 15% 4.48

Total Credits 4.48

8.97 11.96 16.44 22.42 25.41 29.89

% Complete 15%

30% 40% 55% 75% 85% 100%

7.) WORK PLAN Construction of the project, including fill material removal and ditch fill construction, will be determined by the contractor in association with a DU construction manager but will be typical of equipment used for this type of project. Typical equipment could include scrapers, bulldozers, trucks and compaction equipment.

10

DU is planning for fall of 2017 construction of the project. This allows for drier conditions which are more favorable for removal of fill material and construction of earthen ditch plugs and ditch fills. The primary source of water for the wetlands will be surface water runoff. This is typical of the prairie pothole region. Depending on the hydrologic cycle, the wetlands will vary between wet and dry allowing for the typical wetland cycle. Revegetation of the wetlands will occur naturally and will be based on the natural hydrologic cycle. If deemed necessary, a water shed analysis may be conducted to determine if adequate hydrology is present to successfully restore historic and created basins. As these are existing wetlands that have been previously drained, the wetland seedbank likely still exists. Created basins and upland areas associated with the project will be seeded with appropriate native species mix indigenous to the region. Invasive species will be controlled in the disturbed areas by the use of standard weed control methods. These methods may include spraying or mowing to ensure the best vegetative response. DU will work closely with the county weed district and landowners to determine the best methods for weed control.

8.) MAINTENANCE PLAN Due to the nature of the project restoring drained wetland basins with earthen ditch plugs and fills, it is anticipated the site will require minimal future maintenance. The wetland basins are very shallow in nature and should typically be very well vegetated. This reduces the impacts of erosion due to wave action, etc. Constructed ditch restorations will have flatter slopes to minimize erosion due to moving water. If applicable, and as determined in the final design plans, erosion control blankets will be installed to minimize erosion until vegetative cover can be established on all spillways. DU will monitor the site to determine if maintenance is required and the maintenance plan will be implemented to correct any issues.

9.) PERFORMANCE STANDARDS Historical wetland basins as delineated by Carlson McCain that are restored within the project area should meet the criteria of soils, hydrology and vegetation as found in the 1987 Corps of Engineers Wetland Delineation Manual. Created basins within the project area must also meet the criteria of the 1987 Corps of Engineers Wetland Delineation manual, except for the soils evaluation, as hydric soil indicators may not be present due to the short timeframe. Therefore, created wetlands will be creditable based on hydrology and vegetation, assuming hydric soils will eventually form.

11

The wetland complex within this project will consist of several shallow basins. Depths range from less than 6" to 4'. Based on these depths, the wetland fringe should be expected to be seasonal in nature while the deeper interior could be considered more semi-permanent. The shallower portions could be expected to develop emergent and possibly some submerged vegetation while the deeper portion may stay partially open water and develop submerged aquatic vegetation. Of course, the condition of the wetlands will be based entirely on the hydro-period. Given the dynamic nature of the North Dakota climate with dramatic swings from extremely wet to extremely dry, it should be expected these wetlands follow the typical wetland cycle based on the given climatic conditions at the time. The 50' upland buffer should meet a minimum 90% canopy cover. The remaining upland cover outside the buffer zone but within the easement boundary shall exceed a 70% canopy cover. The easement area could be hayed after July 15 or grazed as management tools, in accordance with the conservation easement guidelines. In addition, all noxious weeds within the easement area will be in compliance of the policy set forth by the Cavalier County Weed Control Board.

10.) MONITORING REQUIREMENTS DU is proposing to monitor the easement area for a period of five (5) years starting the first growing season after completion of construction. Monitoring will consist of delineating wetland boundaries based on the 1987 Corps of Engineers Wetland Delineation Manual. In addition, transects will be established to monitor vegetative development and diversity. Finally, photo points with compass bearings will be established to show vegetative development throughout the monitoring period. Written monitoring reports will be prepared and submitted to the Corps of Engineers Bismarck, ND office by January 31st of the following year. The report will include the information from each year's monitoring in order to show development of the wetland project. Along with the data from the monitoring, the report will include a map of the transect locations, the delineated wetland boundary, photo points and azimuth angles, areas of concern such as location of noxious weed infestations, erosion, etc. If applicable, yearly aerial photographs will be included. Access to conduct monitoring or any future work pertaining to the project is laid out in the landowner Site Specific Agreement.

11.) LONG-TERM MANAGEMENT PLAN Long-term management and maintenance will be provided by DU, its heirs, assigns or successors; unless the easement lands are transferred to a state or federal resource management agency or this responsibility is contractually conveyed to another person, subject to approval by the Corps, in consultation with the NDIRT.

12

In addition, if a USFWS wetland and grassland easement will be placed on the property, the USFWS will have authority to monitor and maintain the integrity of the easement under their easement program guidelines. The DU Long-Term Management Plan shall be initiated upon closure of the ILF project. The goal of the long-term management is to continue to foster the viability of the project's wetlands and upland habitats. The long-term manager shall conduct annual inspections of the property during the growing season to ensure the property is functioning as expected and determine any needs of the project. Should needs arise, the long-term manager shall take corrective actions to rectify the needs of the wetland project. Long-term objectives include maintaining the native plant vegetation. This may include assessment and recommendations for improving the upland and wetland habitats within the easement. In order to minimize the spread of invasive species such as noxious weeds, the long-term manager shall identify and control any infestations as discovered. The long-term manager shall also assess the stability and structural integrity of any constructed ditch plugs or primary spillways and make recommendations for any maintenance of such structures due to erosion or other causes.

12.) ADAPTIVE MANAGEMENT PLAN An adaptive management plan will be established and carried out by DU should corrective actions be deemed necessary. Actions will be determined in cooperation with the Corps and NDIRT to maintain the success and viability of the wetland mitigation site.

13.) FINANCIAL ASSURANCES DU is committed to funding the development of the project, including monitoring and maintenance, with financial assurances. The financial assurances also include a commitment to an endowment fund suitable in size to ensure the future viability of the site which would be dedicated for long term management of the Starkweather Mitigation Bank Project. The endowment would be held by Ducks Unlimited in an interest bearing account. The project development costs, including the contingency and long-term management fund endowment, would be funded by credit sales from the Devils Lake Basin service area.

13

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas