The Papio-Missouri River Natural Resources District is proposing the construction of two flood control structures and recreational reservoirs within the West Papillion Creek Watershed. WP-6—The dam structure is an earthen embankment approximately 990 feet in length and 50 feet in height above the channel bottom. The structure would require 107,000 cubic yards of clean earth fill material. The dam would create a reservoir with a permanent pool of approximately 35 acres at an elevation of 1,064 ft. The dam has approximately 1,015 acre feet of flood storage capacity. A water quality basin is also proposed to be constructed upstream of the reservoir. WP-7—The dam structure is an earthen embankment approximately 960 feet in length and 40 feet in height above the channel bottom. The structure would require 86,000 cubic yards of clean earth fill material. The dam would create a reservoir with a permanent pool of approximately 12.5 acres at an elevation of 1,056 feet. The dam has approximately 380 acre feet of flood storage capacity. A water quality basin is also proposed to be constructed upstream of the reservoir.

The Papio-Missouri River Natural Resources District is proposing the construction of two flood control structures and recreational reservoirs within the West Papillion Creek Watershed. WP-6—The dam structure is an earthen embankment approximately 990 feet in length and 50 feet in height above the channel bottom. The structure would require 107,000 cubic yards of clean earth fill material. The dam would create a reservoir with a permanent pool of approximately 35 acres at an elevation of 1,064 ft. The dam has approximately 1,015 acre feet of flood storage capacity. A water quality basin is also proposed to be constructed upstream of the reservoir. WP-7—The dam structure is an earthen embankment approximately 960 feet in length and 40 feet in height above the channel bottom. The structure would require 86,000 cubic yards of clean earth fill material. The dam would create a reservoir with a permanent pool of approximately 12.5 acres at an elevation of 1,056 feet. The dam has approximately 380 acre feet of flood storage capacity. A water quality basin is also proposed to be constructed upstream of the reservoir.

PUBLIC NOTICE Application No: 2015-01301-WEH Applicant: Papio-Missouri River Natural Resources District Waterway: Unnamed Tributary to West Papillion Creek Issue Date: April 28, 2017 Expiration Date: May 16, 2017

21 DAY NOTICE Reply To: NEBRASKA REGULATORY OFFICE 8901 SOUTH 154TH STREET, SUITE 1, OMAHA, NEBRASKA 68138-3635 JOINT PUBLIC NOTICE: This public notice is issued jointly by the U.S. Army Corps of Engineers (Corps), Omaha District, and the Nebraska Department of Environmental Quality (NDEQ). NDEQ will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. NDEQ hereby incorporates this public notice as its own public notice and procedures by reference thereto. For the purposes of the NDEQ, their public notice will expire 30 days from the issue date shown above. AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344). APPLICANT: Amanda Grint, Papio-Missouri River Natural Resources District, 8901 South 154th Street, Omaha, Nebraska 68138. PROJECT LOCATION: The project has two locations. WP-6 is located in SW ¼ of Section 20, Township 14 North, Range 12 East, Sarpy County, Nebraska, 41.165228o, -96.092016o. WP-7 is located in the NW ¼ of Section 28, Township 14 North, Range 12 East, Sarpy County, Nebraska, 41.161704o, -96.078984o. PROJECT DESCRIPTION: The Papio-Missouri River Natural Resources District is proposing the construction of two flood control structures and recreational reservoirs within the West Papillion Creek Watershed. WP-6--The dam structure is an earthen embankment approximately 990 feet in length and 50 feet in height above the channel bottom. The structure would require 107,000 cubic yards of clean earth fill material. The dam would create a reservoir with a permanent pool of approximately 35 acres at an elevation of 1,064 ft. The dam has approximately 1,015 acre feet of flood storage capacity. A water quality basin is also proposed to be constructed upstream of the reservoir. 1

WP-7--The dam structure is an earthen embankment approximately 960 feet in length and 40 feet in height above the channel bottom. The structure would require 86,000 cubic yards of clean earth fill material. The dam would create a reservoir with a permanent pool of approximately 12.5 acres at an elevation of 1,056 feet. The dam has approximately 380 acre feet of flood storage capacity. A water quality basin is also proposed to be constructed upstream of the reservoir. PROJECT PURPOSE: The applicant's project purpose, as identified by the applicant, is to provide upstream flood control to reduce the 100-year peak flow in the West Papillion Creek sub-watershed and ultimately to reduce the area of the 100-year floodplain under the full build-out scenario and to provide lake based aquatic habitat and recreation. The basic project purpose, as defined by the Corps, is flood control and water based recreation. The overall project purpose, as defined by the Corps, is flood control in the West Papillion Creek Watershed and water based recreation within Douglas and Sarpy Counties, Nebraska. SPECIAL AQUATIC SITES: WP-6--The construction of WP-6 dam and spillway will fill 0.02 acres of PEMA/C riverine channel wetlands, inundate 0.77 acres of PEMA/C riverine channel wetlands, and fill 456 linear feet of the unnamed tributary to West Papillion Creek. The construction of the water quality basin will fill 0.01 acres of PEMA/C riverine channel wetlands and fill 112 linear feet of the unnamed tributary to West Papillion Creek. A total of 6,388 linear feet of the Unnamed Tributary to West Papillion Creek will be inundated. WP-7--The construction of WP-7 dam and spillway will fill 0.01 acres of PEMA/C riverine channel wetlands, inundate 0.07 acres of PEMA/C riverine wetlands, and fill 540 linear feet of the unnamed tributary to West Papillion Creek. The construction of the water quality basin will fill 239 linear feet of the unnamed tributary and will not impact any wetlands. A total of 2,156 linear feet of the Unnamed Tributary to West Papillion Creek will be inundated. AVOIDANCE, MINIMIZATION, AND MITIGATION: This project is located in the Big Papillion-Mosquito 8-digit HUC, 10230006. Information was provided in the application for the Corps to review during a permit decision for compliance with the 404(b)(1) guidelines, including avoidance and minimization. The applicant provided stream functional assessments for the impacts to the Unnamed Tributary to West Papillion Creek. The applicant is considering alternatives that would avoid, minimize, and mitigate impacts to waters of the United States, including wetlands. The alternatives for the flood control purpose include no-build, conservation measures, wetland storage areas, zoning, floodplain acquisition, conveyance/construction of levees and raising existing bridges, stream restoration, floodplain connectivity, and dry dam. The alternatives for the water based recreation purpose include new lake construction with a primary stream fed water source, new lake construction with a groundwater source, rehabilitation of existing closed sand and gravel pits, expansion of existing sand and gravel pits, and Missouri River oxbow restoration.

2

The applicant is proposing to mitigate the wetland impacts below and above the normal pool elevation of the lake. The mitigation is on-site and is proposed at a 4:1 ratio for being out-of-kind for Nebraska wetland subclass (riverine channel to lacustrine fringe). This would require the applicant to create 3.56 acres of PEMA lacustrine fringe wetlands. The applicant is proposing to mitigate the stream impacts through stream channel improvements within the tributaries upstream of the WP-6 structure. These areas will be identified based on their existing stream features, a pre-project functional assessment, design details on how the function will be improved, and a predicted post-project functional score. All stream mitigation areas will be protected with minimum 50-foot wide buffer strip on both sides. The applicant will be required to prepare and submit a draft mitigation plan in accordance with the 12 components of the Mitigation Rule 33 CFR part 332.4(c)(2) through (c)(14). After addressing comments provided, the applicant must prepare a final mitigation plan, which must be approved by the Corps prior to issuing the individual permit. The approved final mitigation plan will be incorporated into the individual permit by reference. CULTURAL RESOURCES: The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We have checked the National Register of Historic Places, and any available site database information, and there are no known National Register sites in the vicinity. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. The applicant received a letter dated September 15, 2015 from Nebraska State Historical Society. In that letter, Nebraska State Historical Society believed that the determination of "no historic properties affected" is appropriate for this undertaking. ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not affect the following species designated as threatened or endangered or adversely affect critical habitat; Interior least tern (Sternula antillarum athalassos), Piping plover (Charadrius melodus), Pallid Sturgeon (Scaphirhynchus albus), and Western prairie fringed orchid (Platanthera praeclara). A preliminary determination has been made that the described work may affect, not likely to adversely affect the following species designated as threatened or endangered or adversely affect critical habitat: Northern long-eared bat (NLEB) (Myotis septentrionalis). The following conservation measures will be adopted as special conditions in a permit decision. 1) Tree removal will NOT occur from June 1st through July 31st. If the permittee proposes to schedule tree removal during this time period, the permittee must submit a request to the Nebraska Regulatory Office (NRO). The NRO will coordinate this request with the USFWS for concurrence and NLEB surveys may be required. 2) Tree removal will NOT occur within 1/4 mile of any NLEB hibernacula at any time of the year. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service, Nebraska Game and Parks Commission, and other interested agencies and individuals. 3

FLOODPLAIN: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341) requires that all discharges of fill material must be certified by the appropriate state agency as complying with applicable effluent limitations and water quality standards. The discharge must be certified before a Department of the Army permit can be issued. Certification, if issued, expresses the State's opinion that the discharge will not violate applicable water quality standards. It is the responsibility of the applicant to contact Nebraska Department of Environmental Quality as soon as possible in the permitting process to discuss requirements for certification. Please contact: CWA Section 401 Coordinator Water Quality Division, Planning Unit Nebraska Department of Environmental Quality 1200 'N' Street, Suite 400 Lincoln, NE 68509-8922 Phone: 402.471.2875 Fax: 402.471.2909 E-mail: ndeq.401certification@nebraska.gov PUBLIC INTEREST REVIEW: The decision whether to issue the Corps' permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed/completed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against their reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). COMMENTS: The Corps of Engineers is soliciting comments from the public, Federal, State, and Local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental 4

Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity. Anyone whose interests may be affected by the proposed/completed work is invited to submit favorable or unfavorable written comments to the Nebraska Regulatory Office, 8901 South 154th Street, Suite 1, Omaha, NE 68138-3635. The District Engineer is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic system's functional values, cumulative and secondary effects and endangered species. All comments received will be considered public information; copies of all comments, including names and addresses of commentors, may be provided to the applicant unless confidentiality is requested. Comments must be submitted on or before the expiration date (located at the top of the first page) of this notice to be considered in the subsequent actions on this application. PUBLIC HEARING: Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state the reason(s) for holding a public hearing. If the District Engineer determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. ADDITIONAL INFORMATION: Additional information about this application may be obtained by writing to Matt Wray at the address shown on page one or by calling him at (402) 896-0896. You can also e-mail him at matt.t.wray@usace.army.mil. REQUEST TO POSTMASTERS: Please post this notice conspicuously and continuously until the expiration date specified at the top of page one. NOTICE TO EDITORS: This notice is provided as background information for your use in formatting news stories. This notice is not a contract for classified display advertising.

5

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits