You can copy from here when filling out the rest of the page.
Permit Modification: Marina Expansion in Grand Isle, Louisiana
NAME OF APPLICANT: Grand Isle Acquisitions, LLC, ℅ SPEC, LLC, Attn: Robert Potier, Post Office Box 80594, Lafayette, Louisiana 70598.
LOCATION OF WORK: Near Caminada Bay within a vacant lot at 1851 Louisiana Highway 1, Grand Isle, Louisiana in Jefferson Parish, as shown on the enclosed drawings.
Latitude: 29.210797, Longitude: -90.032711
Hydrologic Unit Code: 08090301 – Lower Mississippi Region
CHARACTER OF WORK: The applicant proposes to expand “Hurricane Hole Marina” which would include dredging and filling activities to accommodate land reclamation, 51 boat slips, and piers/wharves. Project construction would result in dredging approximately 3.2 acres of non-vegetated waterbottoms (22,962 cubic yards) within the project footprint. The dredged material, along with 1,000 cubic yards of crushed stone would be deposited within 1.3 acres of tidal wetlands for land reclamation.
The applicant proposes to purchase 1.7 acres of compensatory mitigation credits from the Chef Menteur Mitigation Bank in order to offset the unavoidable impacts to jurisdictional wetlands associated with the proposed project. The applicant utilized the Louisiana Wetlands Rapid Assessment Method (LRAM). The LRAM is the New Orleans District of the U.S. Army Corps of Engineers’ compensatory mitigation calculation model. The applicant’s proposed mitigation plan willonly be considered after the sequence of mitigation (avoidance, minimization, compensation) is followed as directed in the Section 404(b)(1) guidelines.
JOINT PUBLIC NOTICE
May 1, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch, OD-SE
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2225
Brad.LaBorde@usace.army.mil
Project Manager
Brad LaBorde
Permit Application Number
MVN 1997-0169 EOO
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 160831-03
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
Permit Modification: Marina Expansion in Grand Isle, Louisiana
NAME OF APPLICANT: Grand Isle Acquisitions, LLC, SPEC, LLC, Attn: Robert Potier, Post Office
Box 80594, Lafayette, Louisiana 70598.
LOCATION OF WORK: Near Caminada Bay within a vacant lot at 1851 Louisiana Highway 1, Grand
Isle, Louisiana in Jefferson Parish, as shown on the enclosed drawings.
Latitude: 29.210797, Longitude: -90.032711
Hydrologic Unit Code: 08090301 Lower Mississippi Region
CHARACTER OF WORK: The applicant proposes to expand "Hurricane Hole Marina" which would
include dredging and filling activities to accommodate land reclamation, 51 boat slips, and
piers/wharves. Project construction would result in dredging approximately 3.2 acres of nonvegetated waterbottoms (22,962 cubic yards) within the project footprint. The dredged material,
along with 1,000 cubic yards of crushed stone would be deposited within 1.3 acres of tidal wetlands
for land reclamation.
The applicant proposes to purchase 1.7 acres of compensatory mitigation credits from the Chef
Menteur Mitigation Bank in order to offset the unavoidable impacts to jurisdictional wetlands
associated with the proposed project. The applicant utilized the Louisiana Wetlands Rapid
Assessment Method (LRAM). The LRAM is the New Orleans District of the U.S. Army Corps of
Engineers' compensatory mitigation calculation model. The applicant's proposed mitigation plan will
-2only be considered after the sequence of mitigation (avoidance, minimization, compensation) is
followed as directed in the Section 404(b)(1) guidelines.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time
in which to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively supportive of
the requested extension, and received by this office prior to the end of the initial comment
period. The Section Chief will review the request and the requestor will be promptly notified of
the decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a total
of 30 calendar days. Similar letters concerning the Water Quality Certification must reference the
applicant's name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
-3this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
The New Orleans District has determined that the project area is located within waters known to
be utilized by the West Indian Manatee (Trichechus manatus). It was initially determined that this
action is "not likely to adversely affect" the West Indian Manatee based on the Standard Local
Operating Procedure for Endangered Species of Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service,
Ecological Services Office. If issued, the "Standard Manatee Conditions for In-Water Activities" will
be made part of the permit conditions.
Our initial finding is that the proposed work would neither affect any species listed as endangered
by the U.S. Department of Commerce, nor affect any habitat designated as critical to the
survival and recovery of those species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 4.5 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosure
SECTION B
80.60'
205.66'
MLW
Exist.
Bulkhead
299.34'
Exist.Concrete
Pad
SECTION C
SECTION A
SECTION C
240.21'
1935
Shore
Line
MHW
Exist.
Shoreline
SECTION A
76.50'
CL CHANNEL
533.92'
Exist.
Rock Levee
SECTION B
540.00'
Exist.
Pier
153.00'
Exist.
Rock
Berm
SPEC LLC
3/22/17
Proposed Pier
492'
SECTION B
20'
28.70'
Proposed Warf
2.50'
SECTION A
12'
1935
Shore
Line
Exist.
Bulkhead
48.52'
Exist.Concrete
Pad
MLW
2.50'
40'
24'
12'
FILL AREA
TOP ELEV. = 5.40'
Exist.
Shoreline
SECTION C
Proposed Warf
66'
86.45'
Proposed Pier
20'
145.94'
4'
211.45'
SECTION C
(18) - 24' SLIPS
24'
(24)-12' SLIPS
(6)-10' SLIPS
MHW
25'
Proposed Pier
498'
22.70'
SECTION A
Proposed Warf
SECTION B
76.50'
CL CHANNEL
Exist.
ROCK
BERM
SPEC LLC
3/22/17
3/22/14
MHW
MLW
EXIST. BOTTOM
PROPOSED DREDGE
EXIST. BOTTOM
SLOPE MIN 1.0%
PROPOSED WATER BOTTOM
EXIST. SHORE LINE
TOP DOCK = 3.5'
MHW
MLW
EXIST. BOTTOM
SLOPE MIN 1.0%
RIP/RAP FOR
EROSION
CONTROL
PROPOSED WATER BOTTOM
PROPOSED DREDGE
3/22/17
EXIST. SHORE LINE
EXIST. NATURAL GROUND
TOP OF DREDGE
FILL PLACEMENT = 5.40'
EXIST. LIMESTONE PARKING
TOP OF DREDGE
FILL PLACEMENT = 5.40'
EXIST. LIMESTONE PARKING
3/22/14