Home

St. Paul District

Run scraper

2017 Nationwide Permits: Final regional conditions

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

2017 Nationwide Permits: Final regional conditions, water quality certification and coastal zone concurrence for nationwide permits in the states of Minnesota and Wisconsin.

2017 Nationwide Permits: Final regional conditions, water quality certification and coastal zone concurrence for nationwide permits in the states of Minnesota and Wisconsin.

PUBLIC NOTICE 2017 NATIONWIDE PERMITS Date: May 2, 2017

FINAL REGIONAL CONDITIONS, WATER QUALITY CERTIFICATION AND COASTAL ZONE CONCURRENCE FOR NATIONWIDE PERMITS IN THE STATES OF MINNESOTA AND WISCONSIN On January 6, 2017, the U.S. Army Corps of Engineers (Corps) published a notice in the Federal Register (82 FR 1860) announcing the reissuance of all 50 existing nationwide permits (NWPs), general conditions, and definitions with some modifications. The Corps also issued two new NWPs, one new general condition, and five new definitions. After the publication of the Federal Register notice, the St. Paul District assessed which NWPs will be issued in the district and which will be revoked, and began finalizing its regional conditions. The St. Paul District determined to regionally issue 42 of those NWPs and revoke 10 of the NWPs. A list of NWPs available in Minnesota and Wisconsin is below. The St. Paul District began using the 2017 NWPs on April 24, 2017. The 2017 NWPs will expire on March 18, 2022. NWPs will largely replace regional general permits to authorize activities in waters with no more than minimal adverse effects in the St. Paul District. Three public notices dated April 25, 2017, clarify what regional general permit categories of RGP-003-MN, RGP-002-WI, RGP-004-WI the District has suspended, and what categories are proposed to be modified or revoked in Minnesota and Wisconsin. Activities in waters associated with linear utility projects and linear transportation projects will continue to be authorized using current regional general permits or through an individual permit process. Regional conditions provide additional protection for the aquatic environment by ensuring that the NWPs authorize only those activities with minimal adverse effects on the aquatic environment. Regional conditions will also help ensure protection of high value waters within the St. Paul District. On March 16, 2017, the Mississippi Valley Division Engineer approved regional conditions for the NWPs in Minnesota and Wisconsin, including within the exterior boundaries of federally recognized Indian reservations. Of the 30 regional conditions, 23 apply to all activities authorized by the NWPs and seven apply to specific NWPs. The regional conditions for the NWPs are included in this notice and are available at the web page listed below. These regional conditions and the conditions discussed below were effective as of April 24, 2017. All activities authorized by the NWPs under Section 404 of the Clean Water Act require 401 Water Quality Certification (WQC) from the applicable state agency, tribe or the United States Environmental Protection Agency (EPA). For each NWP, the applicable agency or tribe may issue the WQC with no conditions, issue the WQC with conditions, deny the WQC, or waive the WQC. Below is a discussion of the status of all WQC decisions by responsible agencies and tribes: The Minnesota Pollution Control Agency, Grand Portage Band of Lake Superior Chippewa, and Fond du Lac Band of Lake Superior Chippewa have issued conditional WQC for Section 404 NWP activities in Minnesota. Those agencies or tribes have also denied without prejudice WQC for some NWP activities or activities in certain aquatic resources. The Sokaogon Chippewa Community in Wisconsin has issued WQC for NWPs 20, 37 and 38 and has denied without prejudice WQC for all other Section 404 NWP activities. The Lac du Flambeau Band of Lake Superior Chippewa Indians has denied without prejudice, all NWP activities on their reservation.

The EPA has denied without prejudice 401 WQC for all NWP activities on the Red Cliff Tribe of Lake Superior Chippewa's reservation. For all other NWP activities occurring in Indian Country within the states of Minnesota and Wisconsin, with the exception of the reservations previously discussed, the EPA has issued WQC. 1 These reservations include: Bois Forte Band of Chippewa, Mille Lacs Band of Chippewa, Prairie Island Community, Red Lake Band of Chippewa, Leech Lake Band of Ojibwe, Shakopee Mdewakanton Sioux Community, Upper Sioux Community, Lower Sioux Community, White Earth Band of Chippewa, Minnesota Chippewa Tribe, Forest Country Potawatomi Community, Ho-Chunk Nation, Lac Courte Oreilles Band of Ojibwe, Menominee Indian Tribe of Wisconsin, Oneida Tribe of Wisconsin, St. Croix Chippewa Indians of Wisconsin and the Stockbridge-Munsee Community. The St. Paul District has determined that the WQC conditions received from the Wisconsin Department of Natural Resources (DNR) are not enforceable by the Corps and are therefore considered denied without prejudice. If the status of the Wisconsin DNR WQC changes, as is expected, a new public notice will be issued describing the change. For all instances where WQC has been denied by a water quality certifying agency or tribe, applicants must receive an individual WQC decision from the State, EPA or Tribe before activities authorized by a NWP can commence. Contact information for all 401 certifying agencies and tribes is available on the website listed below. 401 Water Quality Certification Summary Table Location State of Minnesota Grand Portage Reservation

Certified, with conditions Certified, with conditions

Fond du Lac Reservation

Certified, with conditions

All federally-recognized American Indian reservations in Minnesota and Wisconsin not listed in table1 State of Wisconsin Red Cliff Reservation Lac du Flambeau Reservation Sokaogon (Mole Lake) Reservation

Additional 401 WQC needed from agency/tribe?

Status

Certified

No, unless conditions are not followed. No, unless conditions are not followed. Tribal notification required. No, unless conditions are not followed. Tribal notification required. No.

Denied without prejudice Denied Denied Denied with exception of NWPs 20, 37, and 38

Yes, from WI DNR. Yes, from US EPA. Yes, from Lac du Flambeau. Yes, from Sokaogon (unless NWPs 20, 37, or 38).

Coastal Zone Management Act (CZMA) consistency concurrence was provided by the Minnesota Department of Natural Resources for activities in the coastal zone of Lake Superior in Minnesota. CZMA consistency concurrence from the Wisconsin Department of Administration is presumed in the coastal zones of Lake Superior and Lake Michigan in Wisconsin. All WQCs, WQC denials and CZMA determinations have been incorporated into the attached NWPs and copies of the certification letters are available at the website listed below. Information concerning the nationwide permits and conditions may be found on the St. Paul District's web page located at: www.mvp.usace.army.mil/Missions/Regulatory/Permitting-Process-Procedures/. Questions concerning implementation of the NWPs and conditions or the regional conditions within the St. Paul District can be directed to Jill Bathke (651) 290-5697 or at jill.c.bathke@usace.army.mil.

1

With the exception of the Bad River Band of Lake Superior Chippewa.

2017 Nationwide Permits Issued in the States of Minnesota and Wisconsin 1. Aids to Navigation 2. Structures in Artificial Canals 3. Maintenance 4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities 5. Scientific Measurement Devices 6. Survey Activities 7. Outfall Structures and Associated Intake Structures 9. Structures in Fleeting and Anchorage Areas 10. Mooring Buoys 11. Temporary Recreational Structures 13. Bank Stabilization 16. Return Water From Upland Contained Disposal Areas 17. Hydropower Projects 18. Minor Discharges 19. Minor Dredging 20. Response Operations for Oil or Hazardous Substances 22. Removal of Vessels 25. Structural Discharges 27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities 28. Modifications of Existing Marinas 29. Residential Developments

30. Moist Soil Management for Wildlife 31. Maintenance of Existing Flood Control Facilities 32. Completed Enforcement Actions 33. Temporary Construction, Access, and Dewatering 35. Maintenance Dredging of Existing Basins 36. Boat Ramps 37. Emergency Watershed Protection and Rehabilitation 38. Cleanup of Hazardous and Toxic Waste 39. Commercial and Institutional Developments 40. Agricultural Activities 41. Reshaping Existing Drainage Ditches 42. Recreational Facilities 43. Stormwater Management Facilities 44. Mining Activities 45. Repair of Uplands Damaged by Discrete Events 46. Discharges in Ditches 48. Commercial Shellfish Aquaculture Activities 51. Land-Based Renewable Energy Generation Facilities 52. Water-Based Renewable Energy Generation Pilot Projects 53. Removal of Low-Head Dams 54. Living Shoreline

2017 Nationwide Permits Revoked in the States of Minnesota and Wisconsin (These activities will be reviewed using an individual permit process or other applicable general permit) 8. Oil and Gas Structures on the Outer Continental Shelf 12. Utility Line Activities 14. Linear Transportation Projects 15. U.S. Coast Guard Approved Bridges 21. Surface Coal Mining Activities

23. Approved Categorical Exclusions 24. Indian Tribe or State Administered Section 404 Programs 34. Cranberry Production Activities 49. Coal Remining Activities 50. Underground Coal Mining Activities

NOTICE TO EDITORS: This notice is provided as background information for your use in formatting news stories. This notice is not a contract for classified display advertising. For more information call the St. Paul District Public Affairs Office, 3091794-5274.

2017 Nationwide Permits St. Paul District Regional Conditions To qualify for NWP authorization, the prospective permittee must comply with the following regional conditions, as applicable, in addition to any regional or case specific conditions imposed by the division engineer or district engineer. Prospective permittees should also contact the appropriate Corps district office to determine the status of Clean Water Act Section 401 water quality certification and/or Coastal Zone Management Act consistency for an NWP. Every person who may wish to obtain permit authorization under one or more NWPs, or who is currently relying on an existing or prior permit authorization under one or more NWPs, has been and is on notice that all of the provisions of 33 CFR 330.1 through 330.6 apply to every NWP authorization. Note especially 33 CFR 330.5 relating to the modification, suspension, or revocation of any NWP authorization.

The following Regional Conditions are applicable to all NWPs: Nationwide Permit (NWP) Limitations: A. B.

C. D. E. F. G. H.

Discretionary authority: As allowed under 33 CFR 330.1(d), the District retains discretionary authority to require an individual permit of any activity eligible for authorization by a NWP based on concern for the aquatic environment or for any other factor of the public interest. Limit on Tributary Impacts: Any regulated activity that would result in the loss of greater than 500 linear feet of a tributary in a single location is not authorized by a NWP with the exception of projects verified by NWPs 13, 27, 32, 37, 53 or 54 where the permanent alteration would have an overall beneficial effect on the aquatic ecosystem associated with discharges proposed. A waiver from the specifications in this Regional Condition may be requested in writing. The waiver will only be issued if it can be demonstrated that permanent alteration of the tributary would have an overall beneficial effect on the aquatic ecosystem associated with the discharges proposed. This regional condition does not expand the limitations of a specific NWP where that NWP is more restrictive. Linear Projects: No linear utility or linear transportation projects are eligible for authorization by NWPs. These projects will be reviewed for authorization under the St. Paul District's regional or programmatic general permits or an individual permit. Great Lakes Compact: No project or part of a project that would divert more than 10,000 gallons per day of surface or ground water into or out of the Great Lakes Basin is authorized by NWPs. Tribal Rights: As stated in General Condition 17 of the NWPs, no activity may impair tribal rights, including treaty rights, protected tribal resources or tribal lands. Areas under a Special Area Management Plan: Regulated activities located within an area eligible for authorization under a valid Special Area Management Plan with an associated programmatic general permit are ineligible for authorization by NWPs. Designated Critical Resource Water: The Lake Superior National Estuarine Research Reserve is a designated critical resource water and is subject to the NWP limitations and PCN requirements described in General Condition #22 of the NWPs. Calcareous fens: WISCONSIN: No work in a calcareous fen is authorized by a NWP unless the Wisconsin Department of Natural Resources (WI DNR) has approved an individual permit for the proposed regulated activity. Project proponents must provide evidence of an approved individual permit to the District. MINNESOTA: No work in a calcareous fen is authorized by a NWP unless the Minnesota Department of Natural Resources (MN DNR) has approved a calcareous fen management plan specific to a project that otherwise qualifies for authorization by a NWP. Project proponents must provide evidence of an approved fen management plan to the District. A list of known Minnesota calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf .

Pre-Construction Notification (PCN) Requirements for Specific Water/Places I.

PCNs for Special Aquatic Resources: A project proponent must notify the District by submitting a PCN if a regulated activity would occur in any of the following aquatic resources. Prior to beginning work in these waters, a District NWP verification letter must be received. PROJECTS IN WISCONSIN: (6) fens; and (1) state-designated wild rice waters (7) wetland sites designated of international importance (https://data.glifwc.org/manoomin.harvest.info); (2) coastal plain marshes; under the Ramsar Convention, including: the Horicon Marsh, (3) bog wetland plant communities; Upper Mississippi River Floodplain Wetland, Kakagon and (4) interdunal wetlands; Bad River Slough, Door Peninsula Coastal Wetlands, (5) Great Lakes ridge and swale complexes; Chiwaukee Illinois Beach Lake Plain. The complete Ramsar list is available at (https://rsis.ramsar.org/). More information about plant community types 2-5 listed above, may be obtained from the Wisconsin Department of Natural Resources website at: http://dnr.wi.gov/topic/EndangeredResources/Communities.asp?mode=group&Type=Wetland. Additional information on identifying bog and fen communities can be found at: http://www.mvp.usace.army.mil/Missions/Regulatory.aspx. PROJECTS IN MINNESOTA: (1) wild rice waters listed in Appendix A of these conditions (2) bog wetland plant communities; and (3) fens. and identified in Minn. R. 7050.0470, subpart 1; Additional information on identifying bog and fen communities can be found at: http://www.mvp.usace.army.mil/Missions/Regulatory.aspx and at the MN DNR's Native Plant Community Classification's website: http://www.dnr.state.mn.us/npc/classification.html. J. PCNs for Bridges, Structures, and Vessels more than 50 years old: A project proponent must notify the District by submitting a PCN if work or fill requiring District authorization would affect a bridge, structure or permanently moored or sunken vessels more than 50 years old. K. PCNs for Suspected Sediment or Soil Contamination: A project proponent must notify the District by submitting a PCN if any regulated activity would occur in areas of known or suspected sediment or soil contamination, including but not limited to Superfund sites. Superfund sites in Minnesota or Wisconsin can be located by searching the EPA's website: https://www.epa.gov/superfund/search-superfund-sites-where-youlive. This condition does not apply to NWP 20. Response Operations for Oil or Hazardous Substances. L. PCNs for the Apostle Islands National Lakeshore and Madeline Island: A project proponent must notify the District by submitting a PCN if the regulated activity would result in the work, fill or placement of a structure within the boundaries of the Apostle Islands National Lakeshore or Madeline Island in Wisconsin. Prior to beginning regulated activities in these waters, a District NWP verification letter must be received. M. PCNs for Temporary Impacts: A project proponent must notify the District by submitting a PCN if temporary impacts would remain in place for longer than 90 days between May 15 and November 15. The PCN must specify how long the temporary impact will remain and include a restoration plan showing how all temporary fills and structures will be removed and the area restored to pre-project conditions. See also Regional Condition Q.

Mitigation Requirements N.

Compensatory Mitigation: Proposed projects that require a PCN must include a statement describing how permanent and temporary impacts to waters of the U.S. would be avoided and minimized. The PCN must also include either: (a) a statement describing how impacts to waters of the U.S. would be compensated in accordance with the Federal Mitigation Rule (33 CFR Part 332) and the current St Paul District Policies for Compensatory Mitigation or (b) a statement explaining why compensatory mitigation should not be required for the proposed impacts.

Page 1 of 2

Site Protection O. P.

Q.

R.

S.

T.

U.

V. W.

Site Inspection: The permittee shall allow representatives from the District to inspect the proposed project site and the authorized activity to ensure that it is being, or has been, constructed and maintained in accordance with the NWP authorization. Restoration for Temporary Impacts: All temporary impacts in waters of the U.S., including wetlands, that occur as a result of the regulated activity must be fully contained with appropriate erosion control or containment methods, be restored to preconstruction contours and elevations, and revegetated with native, non-invasive vegetation. A project proponent may request, in writing, a waiver from this condition from the District. An acceptable reason for a waiver to this condition may include, but is not limited to, the District allowing natural restoration of the site when the resulting grade and existing seed bank are sufficient for the site to restore to pre-construction conditions. Duration of Temporary Impacts: Temporary impacts in waters of the U.S., including wetlands, must be avoided and limited to the smallest area and the shortest duration required to accomplish the project purpose. PART A, ACTIVITIES WITHOUT PCN REQUIREMENTS: Temporary impacts may not remain in place longer than 90 days between May 15 and November 15. Before those 90 days have lapsed all temporary discharges must be removed in their entirety. If the temporary impacts would remain in place for longer than 90 days between May 15 and November 15, a PCN is required and the activity is subject to the requirements and limitations described in part B of this regional condition. PART B, ACTIVITIES WITH PCN REQUIREMENTS: The PCN must specify how long the temporary impact will remain and include a restoration plan showing how all temporary fills and structures will be removed and the area restored to pre-project conditions. Temporary impacts are allowed to stay in place as long as specified in the PCN unless otherwise conditioned in a Corps NWP verification. All temporary impacts must be removed in their entirety in accordance with the plan described in the PCN unless otherwise conditioned in a NWP verification provided by the District. Culverts and Crossings: Unless a NWP verification authorizes otherwise, replacement and installation of culverts or crossings authorized by a NWP are to follow (or be restored to) the natural alignment and profile of the tributary. The culvert(s) or bridge(s) must adequately pass bedload, sediment load, and provide site-appropriate fish and wildlife passage. Example design elements include recessing single culverts to accommodate natural bankfull width and adjusting additional culvert inverts at an elevation higher than the bankfull elevation. Best Management Practices: To minimize adverse effects from soil loss and/or sediment transport that may occur as a result of the authorized discharge and associated earth work, appropriate best management practices shall be maintained and remain in place until the affected area is stabilized with vegetation or ground cover. Riprap: For all NWPs that allow for the use of riprap material for bank stabilization, only rock shall be used and it must be of a size sufficient to prevent its movement from the authorized alignment by natural forces under normal or high flows. A project proponent may request from the District, in writing, approval to use alternative riprap materials. Pollutant or Hazardous Waste Spills: If a spill of any potential pollutant or hazardous waste occurs, it is the responsibility of the permittee to immediately notify the National Response Center at 1-800-424-8802 or www.nrc.uscg.mil AND IN WISCONSIN: the Wisconsin Department of Natural Resources' Spills Team at 1-800-943-0003 IN MINNESOTA: the Minnesota State Duty Officer at 1-800-422-0798. The permittee is responsible for removing such pollutants and hazardous materials and for minimizing any contamination resulting from a spill in accordance with state and federal laws. Clean Construction Equipment: All construction equipment must be clean prior to entering and before leaving the work site in order to prevent the spread of invasive species. Compliance: The permittee is responsible for ensuring that whoever performs, supervises or oversees any portion of the physical work associated with the construction of the project has a copy of and is familiar with all the terms and conditions of the NWP and any special conditions included in any written verification letter from the District. The permittee is ultimately responsible for ensuring that all the terms and conditions of the NWPs are complied with.

The following Regional Conditions are applicable to a specific NWP: NWP 3. Maintenance: The project proponent must notify the District Engineer by submitting a PCN if (1) loss of waters of the U.S., including wetlands, exceed 1/10 acre, beyond the footprint of the existing structure or project; or (2) temporary impacts from flooding, filling, excavating, drainage, or mechanized land-clearing to waters of the U.S., including wetlands, exceeds 1/2 acre, beyond the footprint of the existing structure or project. This notification requirement is in addition to the notification criteria listed for this NWP. This regional condition applies to paragraphs a and c of NWP 3. NWP 25. Structural Discharges: The project proponent must notify the District Engineer by submitting a PCN if loss to waters of the US, including wetlands, exceeds 400 square feet. NWP 27. Aquatic Habitat Restoration, Establishment and Enhancement Activities: This NWP does not authorize the permanent conversion of forested, bog, fen, sedge meadow, or shrub-carr wetlands to other plant communities. A project proponent may request, in writing, a waiver from this condition from the District. The waiver will only be issued if it can be demonstrated that the conversion would restore wetland plant communities to the pre-settlement condition or a watershed approach and that the current landscape and hydrologic conditions would sustain the targeted community. NWP 33. Temporary Construction, Access and Dewatering: The project proponent must notify the District Engineer by submitting a PCN if the temporary impacts from flooding, filling, excavating, drainage, or mechanized land-clearing: (1) would impact 1/2 acre or greater of waters of the U.S., including wetlands; or (2) would impact greater than 300 linear feet of a tributary. This notification requirement is in addition to the notification criteria listed for this NWP. The PCN must include a restoration plan showing how all temporary fills and structures will be removed and the area restored to pre-project condition NWP 40. Agricultural Activities: Drainage tile outlets installed or replaced must be protected to limit erosion to the receiving water. This protection may include rock riprap, vegetation, or other measures. Erosion protection measures must be specified by the applicant in a PCN. NWP 41. Reshaping Ditches: The project proponent must notify the District Engineer by submitting a PCN if the regulated activity proposed would result in: (1) reshaping of more than 300 linear feet of a ditch or (2) if excavated material would be placed into a water of the U.S., including wetlands. The PCN must include an explanation how water quality goals will be accomplished and original, as-built specifications of the ditch. NWP 46. Discharges in Ditches: The discharge must not cause the loss of greater than 1/2-acre of waters of the U.S., including wetlands. NWP 52. Water-Based Renewable Energy Generation Pilot Projects: NWP 52 does not authorize structures or work in Lake Michigan and Lake Superior within the geographic regulatory boundaries of the St. Paul District.

Page 2 of 2

Appendix A

Minnesota Wild Rice Waters

Ü Swamp River Reservoir Northern Light Lake

Cook County

Moore Lake Marsh Lake Rice Lake Fourmile Lake

Round Island Lake

Hay Lake

Lake County Seven Beaver Lake Stone Lake

White Pine Lake

Christine Lake

Caribou Lake

Bluebill Lake

Cabin Lake

Round Lake

Butterball (Long) Lake St. Louis County St. Louis River (headwaters) Breda Lake Stone Lake

Stone (Tommila) Lake

Papoose Lake

Map Location

Lieuna (Lieung Lake)

Artichoke Lake 0

5

10

20 Miles

© OpenStreetMap (and) contributors, CC-BY-SA, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors, and the GIS user community

401 Water Quality Conditional Certification for the State of Minnesota Issued by the Minnesota Pollution Control Agency

2017 Nationwide Permits St. Paul District Regional Conditions

401 Water Quality Certification For: · · · · · · · · · · · · · · · · ·

Bois Forte Band of Chippewa, MN Mille Lacs Band of Chippewa, MN Prairie Island Community, MN Red Lake Band of Chippewa, MN Leech Lake Band of Ojibwe, MN Shakopee Mdewakanton Sioux Community, MN Upper Sioux Community, MN Lower Sioux Community, MN White Earth Band of Chippewa, MN Minnesota Chippewa Tribe Forest Country Potawatomi Community, WI Ho-Chunk Nation, WI Lac Courte Oreilles Band of Ojibwe, WI Menominee Indian Tribe of Wisconsin Oneida Tribe of Wisconsin St. Croix Chippewa Indians of Wisconsin Stockbridge-Munsee Community, WI

AND 401 Water Quality Certification DENIAL for the Red Cliff Band of Lake Superior Chippewa, Wisconsin Issued by the US Environmental Protection Agency, Region 5 2017 Nationwide Permits St. Paul District Regional Conditions

UN ITED STATES ENVIRONMENTAL PROTECTION AGE NCY REG IONAL ADMINISTRATOR 77 WEST JACl60604-3590

APR 2 4 2017 REPLY TO THE ATTENTION OF:

WW-1 6J

Colonel Sam Calkins District Engineer St. Paul Distri ct, Corps of Engineers 180 5th Street East, Suite 700 St. Paul, Minnesota 55 101 Re: Clean Water Act Section 40 I Certification Decis ion for the 20 17 Nationwide Penni ts and General Perm it-15-R as Appli ed on Indian Reservations in Miru1esota and Wisconsin Dear Colonel Calkins: The U.S. Environmental Protecti on Agency, Region 5 (EPA) has reviewed the Nati onwide Permits (NWPs) published in the Federal Register on January 6, 2017. The Corps of Engineers, SL Paul District (District), will reissue 42 of the N WPs for use in Minnesota and Wisconsi n and revoke 10 other N WPs in both states. EPA has also reviewed General Permit- 15-R (GP) as described in a Public Notice dated December 27, 20 16, which the District will issue for use in Minnesota and Wisconsin. EPA has reviewed the N WPs and GP as they appl y within the exteri or boundaries ofJndi an reservations in Miru1esota and Wisconsin, in accordance with Section 40 1 of the Clean Water Act (33 USC § 1341 ). EPA has detennined that the requirements for ce11ification have been met, and hereby grants Section 40 l certification with no conditions withi n the exterior boundaries of the follo\\ring reservations: Bois Forte Band of Chippewa Mille Lacs Band of Chippewa Prairie Island Commun ity Red Lake Band of Chipp ewa Leech Lake Band of Ojibwe Shakopee Mdewakanton Sioux Community Upper Sioux Community Lm:ver Sioux Conrnmnity White Earth Band of Chippewa M innesota Chippewa Tribe Forest Country Potawatomi Community Ho-Chunk Nation Lac Courte Oreilles Band of Ojibwe

Recyc led/Recyclable · Printed with Vegetable Oil Based Inks on 100% Recycled Paper (100% Post-Consumer)

Menominee lndian Tribe of Wisconsin Oneida Tribe of Wisconsin St. Croix Chippewa Indians of \Visconsin Stockbridge-Munsee Community Section 401 certification is hereby denied within the exterior boundaries of the following reservation, pending EPA's consultation with the tribe to consider any information regarding conditions which may be needed to achieve compliance with the pmvose of the Act: Red Cliff Band of Lake Superior Chippewa

If you have any questions, or if we can be of fm1her assistance, please contact Janice Cheng of my staff at (312) 353-6424 or cheng.janice@epa.gov. Sincerely,

C2· Zfll Christopher Korleski Director, Water Division

cc: Bi II Baer, St. Paul District, Corps of Engineers Jill Bathke, St. Paul District, Corps of Engineers

2

401 Water Quality Conditional Certification for the Fond du Lac Band of Lake Superior Chippewa in Minnesota Issued by the Fond du Lac Band

2017 Nationwide Permits St. Paul District Regional Conditions

401 Water Quality Conditional Certification for the Grand Portage Band of Lake Superior Chippewa in Minnesota Issued by the Grand Portage Band

2017 Nationwide Permits St. Paul District Regional Conditions

GRAND PORTAGE RESERVATION TRIBAL COUNCIL Norman W. Deschampe- Chairman · Marie Spry- Vice Chair · Dennis B. Morrison- Secretary!Treasurer John Morrin- Councilman · Rob Hull- Counci lman

RESOLUTION N 0.

07-17

GRANTING CONDITIONAL 401 CERTIFICATION FOR THE US ARMY CORPS OF ENGINEERS NATIONWIDE GENERAL PERMITS

The Grand Portage Reservation Tribal Council, on behalf of the Grand Portage Band of Chippewa, enacts the following resolution:

WHEREAS, the governing body of the Grand Portage Band of the Minnesota Chippewa Tribe is the Reservation Business Committee (also known as the Reservation Tribal Council ("RTC")) pursuant to Article III, Section 2 of the Minnesota Chippewa Tribe Constitution; and WHEREAS, the Grand Portage Band of the Minnesota Chippewa Tribe ("Band") is a federally recognized Indian tribe possessing the inherent sovereign authority of an independent government; and WHEREAS, the R TC has determined that water pollution endangers the health and welfare of Grand Portage members and residents of the Grand Portage Reservation, and adversely impacts tribal treaty fishing rights as well as cultural, religious, domestic, recreational, agricultural and other uses of the Reservation water resources; WHEREAS, as an exercise of the Band's inherent authority, the RTC enacted the Grand Portage Band of Chippewa Water Resources Ordinance ("Ordinance") on July 25, 2001 and amended it on January 15, 2004 to protect the waters of the Grand Portage Reservation; and WHEREAS, under the Ordinance, the RTC is empowered to act as the Water Resources Board ("Board") created by the Ordinance; and WHEREAS, in its capacity as Board, the RTC has taken all steps required under the Ordinance and federal law to grant conditional 401 certification for the Nationwide General Permits ("NWPs"), a copy of which is attached to this Resolution; and

P.O. Box 428 Grand Portage, Minnesota 55605 (218) 475-2277 or 475-2239 Fax: (218) 475-2284

Page2

®

GRAND PORTAGE R. T. C.

WHEREAS, in its capacity as Board, and after consultation with the Band's Environmental Department, the RTC finds that conditional certification of the NWPs is necessary to protect (a) the public health and welfare of the Band, its members, and others living on its Reservation, and; (b) the present and future use of Reservation waters for public and private water supplies; propagation of fish and aquatic life and wildlife; domestic and recreational purposes and agricultural; cultural, religious, commercial, industrial and other legitimate uses; and

NOW, THEREFORE, BE IT RESOLVED, that the RTC, in its capacity as Board, adopts the attached conditional certification of the NWPs, and directs the Environmental Department to submit the conditional certification to the U.S. Army Corps ofEngineers for inclusion in the fmal permit in accordance with the Federal Clean Water Act.

CERTIFICATION

We do hereby certify that the foregoing resolutiqn .was dul,)l adopted by a vote of 0_ for, 0 against, 0 silent, at a (j/)f!C({J..L l)leeting o~ Reservation Tribal Council, a quorum present, helflon thecJ5 7.ilJ day of ' · 1 , 2017. ........, ~

L.

(.

iU~\j

GRAND PORTAGE CONDITIONAL CERTIFICATION OF U.S. ARMY CORPS OF ENGINEERS NATIONWIDE PERMITS In accordance with the Clean Water Act, 33 U.S.C. § 1344, the U.S. Army Corps of Engineers ("US ACE") on January 6, 2017 publicly noticed its revision and renewal of certain nationwide permits ("NWPs") necessary for work in streams, wetlands and other waters of the United States under Section 404 of the Clean Water Act. The new NWPs will take effect March 19, 2017, and replace the existing permits, which expire on March 18, 2017. The Grand Portage Band of Lake Superior Chippewa (the "Band") is a federally recognized Indian tribe and has Treatment-in-the-same-Manner- As-a-State ("TAS") for purposes of enforcement of federal water quality standards on the Band's Reservation in northern Minnesota. Therefore, in accordance with Section 401 of the Clean Water Act, the Grand Portage Water Quality Standards ("Water Quality Standards") and the Grand Portage Water Resources Ordinance (as amended in 2004, the "Water Resources Ordinance"), the Grand Portage Environmental Resources Board ("Board") has examined the proposed NWPs. The Board has determined that there is reasonable assurance that the discharges authorized under the NWPs will not violate the Water Quality Standards. The Water Quality Standards and Water Resources Ordinance can be obtained at the email listed below or at: www.1854treatyauthority.org/grand-portage.html The Board has also determined that certain additional conditions are necessary to protect the following: (a) the public health and welfare of the Band, its members, and others living on the Band's Reservation; and (b) the present and future use of Reservation Waters for public and private water supplies; propagation of fish, aquatic life, and wildlife; domestic and recreational purposes; and for agricultural, cultural, religious, commercial, industrial, and other legitimate uses. Accordingly, the following conditions apply to all NWPs which authorize the discharge of dredge or fill material into the waters of the Grand Portage Reservation (as defined in the Water Resources Ordinance). Except as otherwise provided by federal law, this certification is valid until the NWPs expire on March 18, 2022: 1. This certification applies only to those activities specifically authorized by the NWPs, as limited by Regional Conditions. These include but are not limited to the following: a. In accordance with Regional Condition C, no linear utility or linear transportation projects are eligible for authorization under the NWPs. b. In accordance with Regional Condition I, a pre-construction notification to the US ACE is required for projects that would impact bogs or fens, wild rice waters. c. In accordance with Regional Conditions M and Q, pre-construction notification ("PCN") is required for temporary impacts to Waters of the Reservation (as defined in the Water Resources Ordinance) that would remain in place for more than 90 days. 2. All discharges of dredged and/or fill material authorized by the NWPs must comply with the Water Quality Standards and Water Resources Ordinance, as well as Applicable Federal Standards (as defined in the Water Resources Ordinance). 3. Grand Portage is responsible for interpretation of the requirements of these conditions. 4. All appropriate steps must be taken to ensure that petroleum products or other chemical pollutants are prevented from entering the Waters of the Reservation. All spills must be reported to the appropriate emergency-management agency, and measures must be taken to prevent the pollution of the Waters of the Reservation, including groundwater. 5. In situations where an applicant is required to submit a pre-construction notification ("PCN") to the US ACE, the Band requires that a copy of the PCN be submitted to the Board at least 30 days in advance of sending the notification to the US ACE. Once the applicant receives written confirmation from the US ACE that the project is

authorized under this NWP, the applicant must provide a copy of the confirmation to the Board. The PCN and US ACE confirmation should be sent in hard copy and via email to: Grand Portage Environmental Resources Board P.O. Box 428 Grand Portage, MN 55605 Email: mwatkins@grandportage.com 6. The burden is on the applicant to demonstrate compliance with the Water Quality Standards, the Water Resources Ordinance, and Applicable Federal Standards whether or not the application is ultimately eligible for an NWP. 7. The Board retains full authority to ensure compliance with and to enforce the provisions of the Water Resource Ordinance and Water Quality Standards, Applicable Federal Standards, and these Certification conditions. Nothing herein affects the scope or applicability of other controlling tribal or federal requirements, including but not limited to impacts to cultural, historical, or archeological features or sites, or properties that may be eligible for listing on the National Register of Historic Places under the National Historic Preservation Act, 54 U.S.C. §§ 300101 et seq. 8. Appeals related to Board actions taken in accordance with any of the preceding conditions may be heard by the Grand Portage Tribal Court. As provided by the Water Resources Ordinance, any interested party may request that a public hearing be scheduled regarding the Board's decision to grant conditional certification to the NWPs. Such a request must be directed to the following address within 30 days of this notice: Grand Portage Environmental Resources Board P.O. Box 428 Grand Portage, MN 55605 Electronic versions of the proposed NWPs are available at the US ACE's Web site at: http://www.mvp.usace.army.mil/Portals/57/docs/regulatory/Special%20Notices/Final%202017%20Nationwide%20Per mit%20Issuance.pdf. Questions regarding the NWPs can be directed to the US ACE District Office at Department of the Army, St. Paul District, Corps of Engineers, 180 5th St. East, Ste. 700, St. Paul, MN 55101-1678. The US ACE St.Paul District contact for the NWPs is Jill Bathke at telephone number (651) 290-5697 or e-mail at Jill.C.Bathke@usace.army.mil. Published March 4, 11, 18, and 25, 2017

401 Water Quality DENIAL for the Lac du Flambeau Band of Lake Superior Chippewa in Wisconsin Issued by the Lac du Flambeau Band

2017 Nationwide Permits St. Paul District Regional Conditions

Coastal Zone Consistency Determination for Activities in and along the coast of Lake Superior in Minnesota Issued by the Minnesota Department of Natural Resources

2017 Nationwide Permits St. Paul District Regional Conditions

401 Water Quality Certification DENIAL for the Sokaogon Chippewa Community Reservation in Wisconsin AND 401 Water Quality Certification for NWPs 20, 37 and 38 (only) on the Sokaogon Chippewa Community Reservation in Wisconsin Issued by the Sokaogon Chippewa Community

2017 Nationwide Permits St. Paul District Regional Conditions

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas