BUNCHS CREEK MITIGATION BANK IN ALLEN PARISH

NAME OF APPLICANT: Eight Louisiana Resource, L.L.C., c/o: Resource Environmental Solutions, L.L.C., 412 N. Fourth Street, Suite 300, Baton Rouge, Louisiana 70802. LOCATION OF WORK: The site is located in western Allen Parish, four miles north of Leblanc, Louisiana, as shown on enclosed drawings (Latitude: 30.57502 N, Longitude:–92.96238 W). The Project is located within the Calcasieu River Basin. CHARACTER OF WORK: Eight Louisiana Resource, L.L.C. proposes to conduct vegetative plantings, degrade and fill multiple agricultural levees, cross-disk multiple small field drains, plug and fill additional drains, remove ditches, and restore the natural elevations of the site. These activities are to be conducted for the purpose of enhancing and restoring traditional surface hydrology in the e of a bottomland hardwood and pine flatwoods/savannah mitigation bank.

JOINT PUBLIC NOTICE May 8, 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, LA. 70118

State of Louisiana Department of Environmental Quality Post Office Box 4313 Baton Rouge, La. 70821-4313 Attn: Water Quality Certifications

(504) 862-1280/ FAX (504) 862-2574 Brandon.D.Gaspard@usace.army.mil Project Manager Brandon Gaspard Permit Application Number MVN-2015-01820-MG

(225) 219-3225/FAX (225) 325-8250 elizabeth.hill@la.gov Project Manager Elizabeth Hill WQC Application Number WQC # 170501-01

Interested parties are hereby notified that a prospectus and permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [ X ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, for a Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of Section 401 of the Clean Water Act (P.L.95-17). BUNCHS CREEK MITIGATION BANK IN ALLEN PARISH NAME OF APPLICANT: Eight Louisiana Resource, L.L.C., c/o: Resource Environmental Solutions, L.L.C., 412 N. Fourth Street, Suite 300, Baton Rouge, Louisiana 70802. LOCATION OF WORK: The site is located in western Allen Parish, four miles north of Leblanc, Louisiana, as shown on enclosed drawings (Latitude: 30.57502 N, Longitude:­92.96238 W). The Project is located within the Calcasieu River Basin. CHARACTER OF WORK: Eight Louisiana Resource, L.L.C. proposes to conduct vegetative plantings, degrade and fill multiple agricultural levees, cross-disk multiple small field drains, plug and fill additional drains, remove ditches, and restore the natural elevations of the site. These activities are to be conducted for the purpose of enhancing and restoring traditional surface hydrology in the e of a bottomland hardwood and pine flatwoods/savannah mitigation bank. The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 30 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the

-2-

Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this public notice will be forwarded to the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources. Our initial finding is that the proposed work will have no effect any species listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES) dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that the proposed activity would have no effect on any listed species. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of N/A acre(s) of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a

-3-

substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interested in the matter.

Martin S. Mayer Chief, Regulatory Branch Enclosure

Prospectus Bunchs Creek Mitigation Bank Allen Parish, Louisiana MVN 2015-01820-MG PREPARED FOR U.S. Army Corps of Engineers, New Orleans District

PREPARED AND SUBMITTED BY Eighth Louisiana Resource, LLC c/o Resource Environmental Solutions, LLC 412 N. Fourth Street, Suite 300 Baton Rouge, Louisiana 70802

DATE: April 20, 2017

Table of Contents 1

2

3

INTRODUCTION .............................................................................................................. 1 1.1

PROJECT DESCRITPION ..................................................................................................... 1

1.2

SITE LOCATION ................................................................................................................. 2

PROJECT GOALS AND OBJECTIVES ................................................................................... 2 2.1

GOALS ............................................................................................................................... 2

2.2

OBJECTIVES ....................................................................................................................... 3

ECOLOGICAL SUITABILITY OF THE BANK SITE ................................................................... 3 3.1

HISTORICAL ECOLOGICAL CHARCTERISTICS OF THE SITE ................................................. 3

3.2

CURRENT ECOLOGICAL CHARCTERISTICS OF THE SITE .................................................... 4

3.2.1

PARISH CLIMATE DATA.......................................................................................................... 5

3.2.2

PHYSICAL SUITABILITY OF THE SITE ....................................................................................... 5

3.2.3

SOIL SURVEY .......................................................................................................................... 5

3.2.4

VEGETATION SURVEY ............................................................................................................ 6

3.2.5

CHEMICAL SUITABILITY OF THE BANK ................................................................................... 7

3.2.6

BIOLOGICAL SUITABILITY OF THE BANK ................................................................................ 7

3.2.7

ENDANGERED AND THREATENED SPECIES AND HABITATS .................................................. 8

3.2.8

PRELIMINARY JURISDICTIONAL DETERMINATION ................................................................ 8

3.3

GENERAL NEED FOR THE PROJECT IN THIS AREA ............................................................ 8

3.3.1

4

WATERSHED AND RECOVERY PLANS THE BANK WILL ACCOMMODATE .............................. 9

3.4

TECHNICAL FEASIBILITY .................................................................................................. 10

3.5

CULTURAL RESOURCES ................................................................................................... 10

3.6

PROPERTY CONSTRAINTS ............................................................................................... 10

3.7

ZONING AND ADJACENT PROPERTY DEVELOPMENT ..................................................... 10

ESTABLISHMENT OF THE MITIGATION BANK ................................................................. 10 4.1

SITE RESTORATION PLAN ............................................................................................... 11

4.1.1

REMOVAL OF HYDROLOGICAL IMPEDIMENTS .................................................................... 11

4.1.2

SOIL PREPARATION ............................................................................................................. 12

4.1.3

VEGETATIVE PLANTINGS ..................................................................................................... 12

4.1.4

INVASIVE/NOXIOUS PLANT CONTROL................................................................................. 13

4.1.5

MONITORING ...................................................................................................................... 13

4.2

5

4.2.1

THREATS WITHIN THE BANK ............................................................................................... 13

4.2.2

RESOURCES THE BANK PROVIDES TO OFFSET THE THREATS .............................................. 14

4.2.3

ENCUMBRANCES ................................................................................................................. 14

4.2.4

ZONING AND PROPOSED DEVELOPMENT ........................................................................... 14

4.3

LONG-TERM SUSTAINABILITY OF THE SITE .................................................................... 14

4.4

ASSURANCE OF WATER RIGHTS ..................................................................................... 15

PROPOSED SERVICE AREA ............................................................................................. 15 5.1

6

7

CURRENT SITE RISKS ....................................................................................................... 13

RATIONALE FOR SERVICE AREA DETERMINATION ......................................................... 15

OPERATION OF THE MITIGATION BANK ........................................................................ 16 6.1

PROJECT REPRESENTATIVES ........................................................................................... 16

6.2

QUALIFICATIONS OF THE SPONSOR ............................................................................... 16

6.3

PROPOSED LONG-TERM OWNERSHIP AND MANAGEMENT REPRESENTATIVES ........... 16

6.4

SITE PROTECTION ........................................................................................................... 17

6.5

LONG-TERM STRATEGY .................................................................................................. 17

REFERENCES ................................................................................................................. 18

ii

List of Tables Table 1: Proposed Mitigation Bank Habitats....................................................................................... 2 Table 2: Existing Land Cover and Land Use of the Bank..................................................................... 4 Table 3: Representative Bottomland Hardwood Species Suitable for the Bank........................... 12 Table 4: Representative Pine Savannah Species Suitable for the Bank.......................................... 13

List of Figures Figure 1: Vicinity Map Figure 2: U.S.G.S. 24k Quad Topo Map Figure 3: Land Cover / Land Use within a 10-mile Radius Site Map Figure 4: Proposed Mitigation Habitat Type Map Figure 5: 1952 Aerial and Historical Land Cover Map Figure 6: 1954 Aerial Figure 7: 1978 Aerial Figure 8: 1985 Aerial Figure 9: 1998 Aerial Figure 10: 2004 Aerial Figure 11: 2015 Aerial Figure 12: Existing Land Cover / Land Use Map Figure 13: Historical / Existing Drainage Area Map Figure 14: Site Elevation Map Figure 15: Site Soils Map Figure 16: Proximity to Waterbodies Map Figure 17: Louisiana Department of Environmental Quality Subsegment and Site Map Figure 18: Plan View and Hydrologic Improvements Map Figure 18A: Cross-section of Interior Levee to be Degraded and Filled Figure 18B: Cross-section of Field Drains to be Removed and Plugged Figure 18C: Cross-section of Ditches to be Removed and Backfilled Figure 19: Oil & Gas and Water Well Sites Map Figure 20: Service Area Map APPENDIX A: Preliminary Jurisdictional Determination iii

Bunchs Creek Prospectus

1 INTRODUCTION Eighth Louisiana Resource, LLC (hereinafter the Sponsor) has prepared this prospectus for submittal to the U.S. Army Corps of Engineers ­ New Orleans District (USACE) and Interagency Review Team (IRT) to provide an overview of the establishment and operation of the Bunchs Creek Mitigation Bank (the "Bank"). The details pertaining to the use of this site as a mitigation bank shall be specified in the subsequent Mitigation Banking Instrument (MBI).

1.1

PROJECT DESCRITPION

The Bank is identified as having the potential to help meet the compensatory mitigation requirements for bottomland hardwood (BLH) and pine savannah (PS) impacts in the 8-digit hydrologic unit code (HUC) 08080203, within the Calcasieu watershed, located in Allen Parish, Louisiana. According to the Natural Resources Conservation Service (NRCS), the Bank is located in the West Gulf Coastal Plain Section of the Coastal Plain Province of the Atlantic Plain. Water diverted from the Sabine, Calcasieu, and Mermentau Rivers is used for irrigating rice, for cooling thermoelectric power plants, and for industrial purposes in the suburbs of Lake Charles, Louisiana. Because of high levels of fecal coliform bacteria, the Calcasieu River is one of Louisiana's most polluted rivers (2006). The predominate existing land use and land covers are fallow idle croplands, grass/pasture, woody wetlands and shrubland with a small mix of evergreen forest according to the U.S. Department of Agriculture's 2015 Cropland Data Layers (CDL). There are small water systems (e.g. ponds) within the Bank and one named stream, Bunchs Creek, and numerous unnamed streams. According to the U.S. Geological Survey's (USGS) National Hydrograph Dataset (NHD), the streams within the Bank are defined as intermittent. Historically, the Bank contained BLH forest on the flood plain with PS on the lower terrace. Site conditions are such that make restoration of the site very practical using commonly employed restoration methods (i.e. tree planting, removal of hydrologic impediments and back filling of ditches). Given these activities coupled with the size of the project, these restoration efforts shall require little long-term management or maintenance, which creates a self-sustainable aquatic resource. The cumulative re-establishment, rehabilitation, enhancement or preservation of BLH and PS is 609.2 acres with 12.7 acres of non-mitigation features comprised of a pipeline right-of-way (ROW), access roads and open water equating to a 621.9-acre Bank site. Specifically, the Bank shall provide 231.4 acres of re-established, 3.0 acres of enhanced and 80.0 acres of preserved BLH forest. Additionally, the Bank shall provide 32.9 acres of re-established, 245.4 acres of rehabilitated and 16.5 acres of enhanced PS (Figure 4). The ecological benefits to the watershed provided by the Bank will be extensive. The Bank proposes to protect the water quality downstream by enhancing various biogeochemical cycles and improving sediment retention, while providing habitat and refuge to wildlife. Furthermore, it shall establish a dynamically stable BLH and PS habitat resistant and resilient to disturbance events. The longevity and function of the system shall be ensured through long-term conservation measures. Furthermore, the

1

Bunchs Creek Prospectus

Bank shall provide flexible and economically efficient mitigation opportunities to compensate for losses in the aquatic resource functionality resulting from unavoidable impacts within the watershed.

1.2

SITE LOCATION

The proposed bank is located on a tract which the Sponsor owns in western Allen Parish, four (4) miles north of Leblanc, Louisiana (Figures 1 and 2). The 621.9-acre tract is located approximately 5 miles East of Louisiana Highway 113, 4 miles north of Louisiana Highway 190 and 1 mile west of the Whisky Chitto Creek, and is centered on the point 30 34' 30.05'' N, -92 57' 44.55'' W, within Township 5 South, Range 6 West, Sections 34 and 35. The Bank is bound to the north, east, and south primarily by Loblolly Pine (Pinus taeda) planted for silviculture, with some remnant BLH interspersed throughout. The western boundary is a combination of BLH and shrub/scrub forest with adjacent pasture and agricultural fields. Expanding a 10-mile radius around the Bank reveals that the existing predominate land covers are evergreen forest (30.5 percent) and woody wetlands (21.5 percent) with the predominate land use being shrubland (27.2 percent), in culmination these account for 79.2 percent of the land cover and land use surrounding of the Bank (Figure 3).

2 PROJECT GOALS AND OBJECTIVES The Bank proposes to enhance, preserve and re-establish BLH habitat, as well as enhance, re-establish and rehabilitate PS within the Upper Calcasieu watershed. Access roads, oil and gas ROW and Bunchs Creek shall be maintained as non-mitigation acreage within the Bank. The purpose of these features are to provide access points and facilitate monitoring and maintenance activities associated with Bank establishment and long-term management. The Bank shall provide additional BLH and PS functions and values not currently recognized under existing conditions and land use, as well as enhance these values in portions of the Bank where these habitats currently exist.

2.1

GOALS

The primary goals of the Bank are to enhance and rejuvenate the native vegetative community and restore the topography and natural hydrology to the Bank. The secondary goal of the Bank is to enhance various biogeochemical cycles, improve sediment retention and reduce non-point source pollution. The tertiary goal of the Bank is to provide habitat and refuge to wildlife. With the holistic goal of establishing a self-sustaining BLH and PS habitat resistant and resilient to disturbance events that shall maintain, restore, preserve or enhance aquatic ecosystem function and water quality within the catchment. Based on the historical land use, soils data and current vegetation within the Bank. The Bank proposes to enhance, preserve and re-establish 314.4 acres of BLH habitat and enhance, re-establish and rehabilitate 294.8 acres of PS habitat (Table 1 and Figure 4).

2

Bunchs Creek Prospectus

the Bank site to pasture/agriculture. This Bank is comprised primarily of Caddo soils, which, in this area, typically have a seasonal high water table between the surface and two (2) feet below the surface during the months of December and April. 3.2.1 PARISH CLIMATE DATA Southwest Louisiana has a warm, humid, subtropical climate characterized by relatively high rainfall. For Allen Parish, Louisiana, the average annual precipitation is 59.1 inches, with 213 sunny days per year and with a growing season about 257 days. December is the wettest month with an average rainfall of 6.3 inches, while August is the driest month with an average rainfall of 4.1 inches. 3.2.2 PHYSICAL SUITABILITY OF THE SITE The Bank's physical properties (topographic, geologic and hydrologic) are optimal to support enhancement, preservation, re-establishment and rehabilitation efforts, as historic anthropogenic manipulation has altered and degraded the ecological and hydrological functionality of the Bank. By restoring the native vegetative communities and natural hydroperiods of the degraded floodplain and lower terrace the benefit to local flora and fauna shall be enhanced, along with water quality and biogeochemical cycling. Consequently, benefiting HUC 08080203 and the regional watershed. Drainage area of the Bank was estimated using topographic layers and the national hydrography dataset (NHD) in ArcGIS. Flow directional arrows were added to the NHD flowlines to identify which water features flowed into the Bank. Based on this dataset the historic and current drainage area is estimated to be 8.4 square miles or 5,376 acres (Figure 13). The historic and current drainage area is considered the same due to the fact that natural ridges exist or are in very close proximity to the perimeter of the Bank site and there are no major modifications to the landscape to alter the drainage pattern that could be discerned using ArcGIS. The drainage from the Bank currently flows south to Bunchs Creek (1) by sheetflow, (2) through a series of natural forested and non-forested wetlands/sloughs, and (3) through man-made ditches, which were constructed to maintain the property in its pastoral state. Waters from the Bank flow through agricultural ditches into Bunchs Creek south of the project area, continuing south eventually discharging into the Calcasieu River approximately seven (7) miles south of the Bank. Topography of the Bank shall allow for restoration of the Bank with minimal impact to the site. According to the USGS DRG24K data the land is fairly homogenous with elevations ranging from approximately 50 to 58 feet, gently sloping to the southwest quadrant of the Bank. This slopes towards wetlands that are located due south of the Bank (Figure 14). 3.2.3 SOIL SURVEY The Bank is in the southwest region of Louisiana in Allen Parish within the south-central plains flatwood ecoregion of the state. The NRCS maps the Bank's soils as 43 percent Caddo-Messer complex (Cd), 30 percent Guyton silt loam (Go), 25 percent Glenmora silt loam (Ge), and less than 1 percent CahabaBienville-Guyton complex, gently undulating (Ck), and Guyton and Cascilla soils (GY). Figure 15 presents the locations of soil types within the Bank. All the soils falling within the Bank are listed on the national

5

Bunchs Creek Prospectus

hydric soils list by NRCS. Although some of these soil types have non-hydric components, a site visit with Brad Guarisco from the USACE on 10/6/2016 revealed that all areas of the Bank were classified as wet. The Cd series consists of very deep, poorly drained soils. These nearly level soils formed in fluviomarine deposits derived from the Intermediate Terraces Formation of Pleistocene age. Slope ranges from 0 to 1 percent. The Go series consists of very deep, poorly drained and very poorly drained, slowly permeable soils that formed in thick loamy sediments and occasionally flooded. These soils are on Coastal Plain local stream flood plains and in depressional areas on late Pleistocene age terraces. Slopes range from 0 to 1 percent. The Ge series consists of very deep, moderately well drained, slowly permeable soils that formed in loamy fluviomarine deposits of Pleistocene age. These nearly level to gently sloping soils occur on high terraces of river valleys on coastal plains. Slope ranges from 1 to 3 percent. The Ck series consists of very deep, well drained, moderately permeable soils on nearly level to sloping large stream and river terraces in the Lower part of the Southern Coastal Plain. They formed in loamy and sandy alluvium. Slopes range from 0 to 12 percent. The Gy series consists of deep, well drained, moderately permeable soils and frequently flooded. They formed in silty alluvium. These soils are on natural levees of flood plains of major streams that drain areas of the Southern Mississippi Valley Silty Uplands Major Land Resource Area. Slopes range from 0 to 2 percent. 3.2.4 VEGETATION SURVEY The Bank is comprised of several different habitat types, which include mature wetland and upland BLH forest, wetland and upland cattle pasture, and scrub/shrub vegetated drainage ditches through the property. The vegetation growing within the overstory of the upland BLH forests is dominated by water oak (Quercus nigra), willow oak (Quercus phellos), and cherry-bark oak (Quercus pagoda) and contains a small percentage of loblolly pine (Pinus taeda), chinese tallow (Triadica sebifera), common persimmon (Diospyros virginiana), and sweetgum (Liquidambar styraciflua). The sapling and shrub layer in the forested upland habitat is dominated by the aforementioned species as well as american beauty-berry (Callicarpa americana) and tree sparkle-berry (Vaccinium arboreum). The dominant species in the herbaceous layer include saw-tooth blackberry (Rubus argutus), eastern poison ivy (Toxicodendron radicans), muscadine (Vitis rotundifolia), virginia-creeper (Parthenocissus quinquefolia), and japanese climbing fern (Lygodium japonicum). The dominant vegetation growing in the overstory of the wetland BLH forest consists primarily of laurel oak (Quercus laurifolia), sweet gum, texas red oak (Quercus texana), drummond red maple (Acer rubrum var. drummondii), swamp tupelo (Nyssa biflora), and Chinese tallow. The sapling and shrub layer consist of the aforementioned species as well as green ash, groundseltree, american elm (Ulmus americana), and deciduous holly (Ilex decidua). The dominant species within the herbaceous layer include poison ivy,

6

Bunchs Creek Prospectus

lamp rush (Juncus effusus), greater bladder sedge (Carex intumescens), laurel-leaf greenbrier (Smilax laurifolia), hop sedge (Carex lupulina), and cherokee sedge (Carex cherokeensis). The vegetation found along drainages through the property is dominated by Chinese tallow. A small percentage of scrub/shrub species such as yaupon (Ilex vomitoria) and deciduous holly also exist. The herbaceous layer along the drainages is comprised of several species including dog-fennel (Eupatorium capillifolium), japanese climbing fern, cuban-jute (Sida rhombifolia), maiden-cane (Panicum hemitomon), bahia grass (Paspalum notatum), laurel-leaf greenbrier, virginia-creeper, and saw-tooth blackberry. The herbaceous communities found in the wetland pasture portions of the property are dominated by rice cut grass (Leersia oryzoides), knotty-leaf rush (Juncus acuminatus), clasping-leaf st. John's-wort (Hypericum gymnanthum), lamp rush (Juncus effusus), round-head rush (Juncus validus), dotted smartweed (Persicaria punctata), little-head spike-rush (Eleocharis parvula), common spike-rush (Eleocharis palustris), vasey's grass (Paspalum urvillei), alligator-weed (Alternanthera philoxeroides), brownish beak sedge (Rhynchospora capitellata), bushy bluestem (Andropogon glomeratus), broom rosette grass (Dichanthelium scoparium), and virginia buttonweed (Diodia virginiana). Herbaceous communities found in the upland pasture portions of the property are dominated by bahia grass, bermuda grass (Cynodon dactylon), dog-fennel, cuban-jute, annual ragweed (Ambrosia artemisiifolia), and hogwort (Croton capitatus). 3.2.5 CHEMICAL SUITABILITY OF THE BANK The Bank shall be a suitable option for the restoration of the chemical processes within the watershed. Spatial and temporal hydrologic enhancements shall allow for an improvement in the natural chemical processes associated with wetlands, floodplains and naturally buffered stream systems. Long-term protection for the quality of the waters of the State shall be gained through improved chemical processes from re-established hydric soil conditions, nutrient retention, sequestration, and reduced aquatic and terrestrial impairments from surface water runoff through improvements to the floodplain and lower terrace areas of the Bank. The Bank shall provide treatment to existing waters through the restoration, enhancement and preservation of BLH and PS habitats. These shall be restored to their natural ecological condition of predominantly soft- and hard- wood vegetation, including a diversity of gap phase conditions consisting of early successional species in a seedling, scrub and sapling state. Site-specific restoration treatments to rehabilitate these hydrologic conditions and ecological planned communities shall be addressed in more detail in the Mitigation Plan of the draft MBI. Re-establishment, preservation, rehabilitation or enhancement is planned for all the BLH and PS on site. 3.2.6 BIOLOGICAL SUITABILITY OF THE BANK The Bank is suitable to provide biological enhancements to habitat and utilization for the aquatic, herpetofauna and terrestrial communities. As discussed in the Physical Suitability of the Bank section, the regionality of the aforementioned areas shall increase the opportunities for native fauna to rest, nest, forage and breed.

7

Bunchs Creek Prospectus

Louisiana's Natural and Scenic River Systems was developed for the purpose of preserving, protecting, developing, reclaiming, and enhancing the wilderness qualities, scenic beauties and ecological regimes of Scenic Rivers, according to the Louisiana Department of Wildlife and Fisheries. The Bank, is located within one (1) mile of a designated Scenic River, the Whisky Chitto Creek. Therefore, it is imperative the Bank is restored to its native state and allowed to function as such into perpetuity due to its proximity to Whisky Chitto Creek thus offering an additional buffer to one of the State's Natural and Scenic Rivers (Figure 16). 3.2.7 ENDANGERED AND THREATENED SPECIES AND HABITATS Plants and animals with a federal classification of endangered or threatened are protected under provisions of sections 7 and 9 of the Endangered Species Act of 1973, as amended. The U.S. Fish and Wildlife Service (USFWS) database listed two (2) species as endangered for Allen parish. The American chaffseed (Schwalbea americana), which is listed as G21 and S12 and the red-cockaded woodpecker (Picoides borealis), which is listed as G33 and S24. Additionally, the western acidic longleaf PS occurs within one (1) mile of the Bank boundaries and this forest type is considered imperiled globally and in the State of Louisiana with a G2G3/S1S2 ranking. The proposed project may offer some potential to improve or create suitable habitat for species of concern. Habitat may be improved or created for species that require wetland habitat by improving water quality, in- and near-stream forage, and providing stable conditions not subject to regular maintenance. The decision phase shall include USFWS coordination to confirm these findings. 3.2.8 PRELIMINARY JURISDICTIONAL DETERMINATION The site was delineated in July 2015 by Resource Environmental Solutions, LLC. A preliminary jurisdictional determination was issued by the New Orleans District on November 3, 2016. The Corps identification number is MVN-2015-01820-MG (Appendix A).

3.3 GENERAL NEED FOR THE PROJECT IN THIS AREA Louisiana Department of Environment (LDEQ) has designated the waters of subsegment 030103 as impaired according to the 2016 Integrated Report (IR), which identifies the status of all State waterbodies as fully or not fully supporting their designated use (Figure 17). The subsegment, which contains the Bank site is impaired for total dissolved solids (TDS) as it is not achieving the State's associated water quality standard. Cessation of agricultural activities and hydrological restoration shall reduce TDS to the surrounding waters, reducing nonpoint source pollution to the watershed.

1

G2 means critically imperiled globally because of extreme rarity (5 or fewer known extant populations) or because of some factor(s) making it especially vulnerable to extinction. 2 S1 means critically imperiled in Louisiana because of extreme rarity (5 or fewer known extant populations) or because of some factor(s) making it especially vulnerable to extirpation. 3 G3 means either very rare and local throughout its range or found locally (even abundantly at some of its locations) in a restricted range (e.g., a single physiographic region) or because of other factors making it vulnerable to extinction throughout its range (21 to 100 known extant populations). 4 S2 means imperiled in Louisiana because of rarity (6 to 20 known extant populations) or because of some factor(s) making it very vulnerable to extirpation.

8

Bunchs Creek Prospectus

Additionally, BLH habitats are important for a variety of fauna, maintenance of water quality and important in regulating flooding and stream recharge. BLH forest loss is estimated to be 50 to 75 percent of the original pre-settlement acreage (LNHP, 2009). PS habitat provides critical habitat for many animal and plant species. This longleaf pine habitat type has been reduced by an alarming 95 to 99 percent of its original extent (LNHP, 2009). Therefore, the Bank shall protect both habitats by adding to its diminishing acreage, reintroducing the natural hydrologic regime, and native vegetation in perpetuity. Lastly, the Bank is needed to allow for mitigation to offset population growth, oil and gas exploration, including a recent rapid expansion of pipelines and refinery structures, and due to the fact that there are seven (7) mitigation banks in the area and four (4) mitigation banks no longer have credits available. 3.3.1 WATERSHED AND RECOVERY PLANS THE BANK WILL ACCOMMODATE Louisiana's Nutrient Management Strategy (LNMS) the May 2014 Edition, was developed as a concerted effort between numerous state and federal agencies and through engagement with stakeholders within Louisiana, for the purpose of managing nutrients (nitrogen and phosphorus) to protect, improve and restore water quality in Louisiana's inland and coastal waters. The vision is to manage nutrient levels in Louisiana to ensure the support of healthy aquatic communities, clean water for public, agricultural and industrial use, to engage stakeholders at the local level and to actively support water quality protection, improvement and restoration. Additionally, it is stated these protection, improvement and restoration strategies at the local level may have a cumulative and positive impact on the health of the receiving waterbodies both within the State and Gulf of Mexico. This Bank accomplishes all aspects of the vision for the LNMS by reducing agricultural impacts and enhancing, preserving, re-establishing and rehabilitating BLH and PS, which shall increase the efficiency of biogeochemical cycling within the Bank, reducing nutrients in the receiving watersheds and transition the anthropogenically impacted area back to its native state. Louisiana's Nonpoint Source Management Plan (NPSMP) is prepared by LDEQ and numerous state and federal partners. The NPSMP has a plan for the Calcasieu River Basin, which encompasses the project area. The goal of NPSMP is to reduce nonpoint source pollution in urban and rural areas. The Bank shall return the anthropogenically impacted site back into its native state of BLH and PS, reducing nonpoint source pollution from agricultural practices within the Bank and receiving basins, thus improving water quality. Louisiana's 2016 IR is a list that identifies the State's waterbodies and their associated water quality status (i.e. fully or not fully supporting the State's water quality standard). The IR is developed by LDEQ every even numbered year. According to the IR, subsegment 030103, which contains the Bank is impaired for mercury and TDS. While the Bank does not address mercury it can improve TDS through restoring the natural functioning of the land by returning it to its native state, topographically and hydrologically. Red-cockaded Wood Pecker Recovery Plan was prepared by the U.S. Fish and Wildlife Service and an Interagency Red-cockaded Woodpecker Recovery Team in 1985. The primary actions needed according to the plan for delisting and interim recovery goals that the Bank shall deliver are 1) application of 9

Bunchs Creek Prospectus

frequent fire to both clusters and foraging habitat, 2) protection and development of large, mature pine throughout the landscape, 3) protection of existing cavities, and will aid in 4) restoration of sufficient habitat quality and quantity to support populations in order for recovery.

3.4

TECHNICAL FEASIBILITY

Construction work required to develop the Bank is routine and based on currently-accepted restoration methods and technically feasible. The mitigation activities are 1) site preparation, 2) vegetation planting and 3) monitoring. The presence of hydric soils and relatively low relief of the Bank indicate that minimal soil work shall be required for the successful restoration of BLH and PS habitat. Existence of BLH and PS adjacent to the Bank indicate a high potential for successful restoration. Drainage modifications shall provide for a natural and historic water regime creating a more self-sustaining Bank. Furthermore, the Bank's conservation objective shall be achieved through preservation of the Bank site from future development activities through legal documentation (e.g. conservation easements).

3.5

CULTURAL RESOURCES

Agricultural activity has occurred within the Bank site since at least 1954, since that time the land has been severely impacted by those agricultural practices. Agricultural practices would be considered more impactful to the site than the activities proposed for the Bank site. However, if any archeological objects are discovered during the course of this process, the Sponsor will disseminate any and all information to the State Historic Preservation Office for further review.

3.6 PROPERTY CONSTRAINTS The Bank includes a cumulative of 12.7 acres of non-mitigation features. Specifically, the non-mitigation features are access roads, pipeline ROWs, and open water. The Bank is otherwise free of encumbrances.

3.7

ZONING AND ADJACENT PROPERTY DEVELOPMENT

The Bank and adjacent property is within unincorporated land and is absent of zoning regulations.

4 ESTABLISHMENT OF THE MITIGATION BANK Establishment of the mitigation bank is described below along with the technical feasibility of the proposed mitigation bank and the assurance of water rights to support the long-term sustainability of the mitigation bank. Additionally, a summary of the work necessary to accomplish restoration/enhancement, a description of how the proposed bank shall meet the goals and objectives, and any temporary or long-term structural management are described. The establishment of the Bank incorporated a tiered approach to provide the most effective and efficient methodologies to identify and evaluate the most-suitable bank sites, which shall provide the highest yields of ecological functional gain. Those tiers are listed below. Tier 1: A landscape-level geographic information system (GIS) evaluation and technical evaluations (soils, hydrology, fauna\flora community assessments, rare and endangered species, critical habitat, etc.) were performed to determine site selection and potential feasibility;

10

Bunchs Creek Prospectus

Tier 2: After the potential site was identified, an in-depth analysis was performed to determine the Banks restoration, re-establishment, enhancement and preservation potential; Tier 3: Once the site is determined as a feasible option and the Prospectus approved, development of a Mitigation Plan and conceptual design shall occur and a draft MBI shall be submitted to the IRT for review and approval; Tier 4: After the review process, the Final Mitigation Plan, completed design and the MBI shall be submitted to the USACE and IRT; and Tier 5: Is the implementation of the Mitigation Plan design and MBI, including long-term monitoring and future credit release.

4.1

SITE RESTORATION PLAN

The site restoration plan section summarizes the work necessary to accomplish the proposed work needed to meet the goals and objectives of the Bank and the temporary or long-term management requirements need to assure hydrologic and vegetation restoration. Details for the site restoration plan measures are described in the subsections below. 4.1.1 REMOVAL OF HYDROLOGICAL IMPEDIMENTS During the process of converting the native habitat to agricultural land, certain hydrological modifications were put in place to control site hydrology using anthropogenic methods. To restore the Bank to a natural hydrologic state and meet the objectives of the Bank, those modifications shall be removed to restore sheet flow. Impediments to be removed are as follows:

Interior levees throughout the property shall be degraded and filled to the maximum extent practicable. There are 25,832 linear feet of interior levees to degrade within the Bank (Figures 18 and 18A).

Twenty-five small field drains shall be cross-disked with a tractor to reduce their functionality; these drains shall also be plugged where they empty into a larger drain (Figures 18 and 18B).

Ditches shall be removed and backfilled. Ditches located in natural sloughs or swales shall be removed and the natural contour of the slough or swale shall be restored in their place. There are 8,181 linear feet of ditches to remove and backfill within the Bank (Figures 18 and 18C).

After hydrological restoration, the Bank's hydrology shall be primarily driven by precipitation, run off and high water tables. Bank objectives achieved by removal of hydrological impediments shall restore natural sheetflow across the property and flow through natural sloughs. Water currently routed through man-made ditches shall again sheetflow across the property and flow through natural sloughs, thereby retaining surface water and upper soil saturation as it did historically. Hydrologic restoration achieves many objectives by improving water quality, biogeochemical cycling and the hydrologic cycling, which shall inundate soils and restore them to their native historic hydric processes.

11

Bunchs Creek Prospectus

habitat. Silviculture and agricultural practices increase non-point source pollution to the watershed and degrade habitat for local fauna, as well as migratory birds that utilize the area. 4.2.2 RESOURCES THE BANK PROVIDES TO OFFSET THE THREATS Resources the Bank intends to provide to offset the aforementioned threats within the Bank is the cessation of silvicultural and agricultural activities and to protect the Bank into perpetuity with a conservation easement. As a result, activities causing direct impacts or destruction of the habitats including construction of roads, pipelines or utilities, conversion to slash or loblolly pine plantations, and residential development, shall cease and the Bank seeks to restore the natural habitat types and maintain the natural species composition to the maximum extent practical. Habitat degradation or disturbance caused by the maintenance of existing roads, pipelines and utilities, physical damage from timber harvesting and planting activities, hydrological alterations, contamination by chemicals (herbicides, fertilizers), and off-road vehicle use, shall cease, except where necessary as allocated by the conservation easement. Alteration of natural community composition and structure had occurred with fire exclusion or inappropriate fire regime, use of chemical herbicides or fertilizers, and introduction of invasive or exotic species in the PS habitats, the Bank shall cease these inhibitions and reinstate a fire regime to be detailed in the MBI. 4.2.3 ENCUMBRANCES There is one (1) 20' pipeline ROW that is 11,779 linear feet within the Bank site. Additionally, there are four (4) plugged and abandoned oil and gas wells on site. They were plugged in 2014, 2007, 1976 and 1957. Furthermore, there are four (4) water well registrations on site. Three (3) have been removed and one (1) is active, but capped (Figure 19). Otherwise, the Bank is free of encumbrances. 4.2.4 ZONING AND PROPOSED DEVELOPMENT There are no zoning or existing ordinances in place that affect the Bank. There is no proposed development adjacent to the Bank, this is highly rural area. The MBI will contain a final survey plat of the proposed conservation servitude area, a metes, bounds description and title opinion.

4.3 LONG-TERM SUSTAINABILITY OF THE SITE The Bank Sponsor shall be the responsible agent for the long-term management of the Bank, unless a third-party entity is established and given authority to maintain the Bank in perpetuity through approval by the IRT. The primary long-term strategy of the Bank is self-sustaining with relatively low maintenance. This management strategy is linked to the development stage of the mitigation banking process, particularly in the design and establishment of the Bank. Native planting plans and increased natural flood attenuation shall provide these ecological benefits with minimal routine maintenance or attention after establishment. However, if the Bank is underperforming and not meeting the proposed performance standards, the Bank Sponsor shall provide additional management designs to address the ecological benefit. These methodologies may include prescribed burn management or easement enforcement actions. The strategies shall be tailored to specific disturbances in order to achieve optimal results. Therefore, Adaptive Management Plans shall be derived at the time of the disturbance and based on the

14

Bunchs Creek Prospectus

analysis of the data collected at the time. Work plans shall be submitted to the IRT for commentary and guidance before implementation. Prior to final release and in accordance with the timelines established in the final MBI, the Bank Sponsor shall establish a non-wasting endowment supporting the Bank's long-term maintenance plan. As previously stated, the Bank Sponsor shall be the long-term manager of the Bank property. Any expenditure must be related to the maintenance of the Bank and be approved by the USACE.

4.4 ASSURANCE OF WATER RIGHTS Louisiana Civil Code, Article 490, treats water resources under the theory of absolute ownership and rule of capture, provided capture does not result in harm to neighbors. The Bank shall depend primarily on precipitation, runoff from surround areas and high water tables. Therefore, long-term hydrology maintenance shall not be dependent upon the utilization of water captured from irrigation wells. As a result, sufficient water rights are ensured. The Sponsor does not foresee any adverse impacts on neighboring properties due to this project.

5 PROPOSED SERVICE AREA This section identifies the proposed services areas as stated in 33 CFR § 332.8(d) (2) and the general need for the proposed mitigation bank in this areas as stated in 33 CFR § 332.8(d)(2)(iv).

5.1 RATIONALE FOR SERVICE AREA DETERMINATION The Geographic Service Areas were determined utilizing the watershed approach combined with ecological, hydrological and finally, economic considerations for compensatory mitigation. The following is the rationale for determination of the service area for the Bank:

A watershed approach used to determine all service areas (Figure 20). o The service area is the Calcasieu Basin, use beyond this area shall be determined on caseby-case basis as deemed appropriate by the USACE. o Hydrologic connectivity exists within the proposed service areas. Proposed service area is based on the needs within the watershed. o Provide mitigation for activities associated with continued population growth. o Provide mitigation for the area, which has a history of oil and gas exploration and production, including a recent rapid expansion of pipelines and refinery structures. o Improve water quality in a State designated impaired watershed. o Increase habitat for the endangered Red-Cockaded Woodpecker. o To provide compensatory mitigation for the USACE New Orleans District approved projects within the Calcasieu Basin. o Currently, there are seven (7) mitigation banks within HUC 0808203; however, four (4) mitigation banks no longer have available credits. Proposed service area is necessary for the economic viability of the Bank.

15

Bunchs Creek Prospectus

6 OPERATION OF THE MITIGATION BANK The Bank shall be established and operated by the Sponsor in accordance with all rules and regulations of 33 CFR § 332.8. Operation details of the Bank shall be further described in the Draft MBI per the rules outlined in 33 CFR § 332.8. The Bank shall be protected by a Conservational Servitude, which shall prohibit harmful activities that inhibit the long-term survival of the mitigation bank.

6.1

PROJECT REPRESENTATIVES

Sponsor/Landowner/Operations Manager: Eighth Louisiana Resource, LLC Point of Contact: David Hill c/o Resource Environmental Solutions Email: david@res.us 412 N. Fourth Street, Suite 300 Phone Number: (225) 372-6114 Baton Rouge, Louisiana 70802 Agent: Resource Environmental Solutions 412 N. Fourth Street, Suite 300 Baton Rouge, Louisiana 70802

Point of Contact: Richard Greig Email: rgreig@res.us Phone Number: (337) 443-6933

6.2 QUALIFICATIONS OF THE SPONSOR Eighth Louisiana Resource, LLC is managed by Resource Environmental Solutions, LLC (RES), which shall be the entity responsible for bank land management and administration. RES has restored, preserved, and/or enhanced over 40,400 acres of wetlands and over 180 miles of streams across nine (9) states and has 225 mitigation sites completed or in progress. RES has rehabilitated and/or preserved over 3,700 acres of endangered species habitats, as well as planted over 10,000,000 trees across all operating regions. RES works with 15 U.S. Army Corps of Engineer districts and more than 78 regulatory agencies across the country. A company profile may be viewed at www.res.us.

6.3

PROPOSED LONG-TERM OWNERSHIP AND MANAGEMENT REPRESENTATIVES

The Bank Sponsor shall establish a Conservation Easement. The Mitigation Plan provides detailed information regarding bank operation, including long-term management and annual monitoring activities, for review and approval by the IRT. Upon approval of the sites by IRT, the site shall be transferred to a long-term land steward (to be determined by the Mitigation Plan). The long-term steward shall be responsible for periodic inspection of the site to ensure that restrictions required in the Conservation Easement of the deed restriction document(s) are upheld. Endowment funds required to uphold easement and deed restrictions shall be negotiated prior to site transfer to the responsible party. The Bank Sponsor shall ensure the Conservation Easement allows for the implementation of an initial monitoring phase, which shall be developed during the design phase and conducted by the Bank Sponsor. The Conservation Easement shall allow for annual monitoring and, if necessary, maintenance of the Bank during the initial monitoring phase. These activities shall be conducted in accordance with the terms and conditions of the Bunchs Creek Mitigation Bank made and entered in to by Eighth Louisiana Resource, USACE and other IRT agencies.

16

Bunchs Creek Prospectus

Long-Term Ownership and Management: Eighth Louisiana Resource, LLC Point of Contact: Richard Greig c/o Resource Environmental Solutions Email: rgreig@res.us 412 N. Fourth Street, Suite 300 Phone Number: (337) 443-6933 Baton Rouge, Louisiana 70802

6.4

SITE PROTECTION

The Bank shall be protected in perpetuity by Conservation Servitude, pursuant to Louisiana Revised Statute 9:1271 et seq. The Conservation Servitude shall be held by a conservation-oriented 501(c)(3) organization to be determined, and shall inure and run with the property title. The Conservation Servitude shall prohibit activities, such as clear cutting, fill discharges, cattle grazing, or other commercial surface development that would diminish the quality or quantity of restored wetlands. Additionally, the servitude shall specify permissive activities such as hunting, fishing and recreational use and mineral exploration given the activity does not negatively impact the functions and values of the rehabilitated, re-established, enhanced and preserved BLH and PS.

6.5

LONG-TERM STRATEGY

A long-term maintenance and protection escrow account shall provide funding for long-term maintenance and site protection, in accordance with 33 CFR § 332.7 in perpetuity. Long-term maintenance and site protection activities shall be conducted by the Sponsor. The Sponsor shall ensure long-term success and sustainability of the Bank through mechanisms including vegetative and hydrologic maintenance as necessary, site monitoring, invasive species management, establishment of financial assurances and protection in perpetuity by conservation servitude. The conservation servitude shall protect the Bank from any activities that would diminish the quality of the restored Bank lands. No structures are proposed or would be necessary to assure hydrologic or vegetation restoration. A longterm management plan shall be included in the MBI.

17

Bunchs Creek Prospectus

7 REFERENCES Code of Federal Regulations, Title 33, Parts 325 and 332 and Title 40, Part 230, as published on pages 19594-19704 in the Federal Register dated 10 April 2008. Louisiana Nutrient Management Strategy Interagency Team. 2014. Louisiana Nutrient Management Strategy: Protection, Improvement, and Restoration of Water Quality in Louisiana's Water Bodies. Coastal Protection and Restoration Authority of Louisiana, Louisiana Department of Agriculture and Forestry, Louisiana Department of Environmental Quality, and Louisiana Department of Natural Resources. May 2014. Baton Rouge, LA. Louisiana Department of Environmental Quality.2012. Louisiana's Nonpoint Source Management Plan. November 2012. Baton Rouge, Louisiana. Louisiana Wildlife and Fisheries Louisiana Natural Heritage Program. Updated 2009. The Natural Communities of Louisiana. Accessed October 31, 2016. http://www.wlf.louisiana.gov/sites/default/files/pdf/page wildlife/6776Rare%20Natural%20Communities/LA NAT COM.pdf United States Department of Agriculture ­ Natural Resources Conservation Service, Web Soil Survey, Allen Parish, Louisiana, Retrieved August 2015. http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx United States Department of Agriculture ­ Natural Resources Conservation Service, PLANTS Database ­ USDA PLANTS, Retrieved August 2015. http://plants.usda.gov/ United States Department of Agriculture ­ Natural Resources Conservation Service, Land Resource Regions and Major Land Resource Areas of the United States, the Caribbean, and the Pacific Basin, USDA Handbook 296; Issued 2006. United States Army Corps of Engineers - New Orleans District. List of Approved Mitigation Banks within the New Orleans District, Retrieved August 2015. United States Department of Agriculture - Soil Conservation Service, Allen Parish, 1980, (SCS 1980)

18

Bunchs Creek Prospectus

Figures Figure 1: Vicinity Map Figure 2: U.S.G.S. 24k Quad Topo Map Figure 3: Land Cover / Land Use within a 10-mile Radius Site Map Figure 4: Proposed Mitigation Habitat Type Map Figure 5: 1952 Aerial and Historical Land Cover Map Figure 6 1954 Aerial Figure 7: 1978 Aerial Figure 8: 1985 Aerial Figure 9: 1998 Aerial Figure 10: 2004 Aerial Figure 11: 2015 Aerial Figure 12: Existing Land Cover / Land Use Map Figure 13: Historical / Existing Drainage Area Map Figure 14: Site Elevation Map Figure 15: Site Soils Map Figure 16: Proximity to Waterbodies Map Figure 17: Louisiana Department of Environmental Quality Subsegment and Site Map Figure 18: Plan View and Hydrologic Improvements Map Figure 18A: Cross-section of Interior Levee to be Degraded and Filled Figure 18B: Cross-section of Field Drains to be Removed and Plugged Figure 18C: Cross-section of Ditches to be Removed and Backfilled Figure 19: Oil & Gas and Water Well Sites Map Figure 20: Service Area Map

19

Bunchs Creek Prospectus

APPENDIX A: PRELIMINARY JURISDICTIONAL DETERMINATION

20

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas