The McKenzie County Commission is seeking authorization of a road reconstruction project on Route 34, which is located 9 miles South of Watford City, North Dakota. The reconstruction starts at US Highway 85 and proceeds east and south for 5.25-miles. The road will be widened, with larger horizontal curves and flatter vertical curves to improve sight distance. The bridge crossing Spring Creek will be replaced with a culvert. The Corps is also evaluating unauthorized work, including an extensive channel change, completed in 1999-2000. To offset wetland impacts the County has offered to create wetlands on-site. They have also offered to re-establish flow through some of the cutoff channel. Right-of-way runs through Sections 30-34, Township 149 North, Range 98 West; Section 5-6, Township 148 North, Range 98 West; and Section 1, Township 149 North, Range 99 West, McKenzie County, North Dakota. [Lat: 47.677377° N, Long: -103.248734° W]

The McKenzie County Commission is seeking authorization of a road reconstruction project on Route 34, which is located 9 miles South of Watford City, North Dakota. The reconstruction starts at US Highway 85 and proceeds east and south for 5.25-miles. The road will be widened, with larger horizontal curves and flatter vertical curves to improve sight distance. The bridge crossing Spring Creek will be replaced with a culvert. The Corps is also evaluating unauthorized work, including an extensive channel change, completed in 1999-2000. To offset wetland impacts the County has offered to create wetlands on-site. They have also offered to re-establish flow through some of the cutoff channel. Right-of-way runs through Sections 30-34, Township 149 North, Range 98 West; Section 5-6, Township 148 North, Range 98 West; and Section 1, Township 149 North, Range 99 West, McKenzie County, North Dakota. [Lat: 47.677377° N, Long: -103.248734° W]

PUBLIC NOTICE US Army Corps of Engineers Omaha District

Application No: Applicant: Waterway: Activity: Issue Date: Expiration Date:

North Dakota Regulatory Office

NWO-2017-0229-BIS McKenzie County Commission Spring Creek Route 34 Roadway Reconstruction Project 9 Miles South of Watford City, North Dakota May 3, 2017 May 24, 2017

1513 South 12th Street NOTICE OF PENDING PERMIT EVALUATION

21 Day Notice Bismarck ND 58504

Introduction. The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the Army (DA) permit application from Brosz Engineering on behalf of McKenzie County Commission to reconstruct 5 miles of the existing Route 34 roadway embankment by installing various additional fills on both sides of the embankment, removing and replacing an existing bridge with a culverted crossing, and obtaining After-theFact permitting for roadway construction impacts to jurisdictional aquatic resources that were completed in 1999-2000 without prior authorization. The current proposal is to provide compensatory mitigation for the current proposed impacts and for the past impacts in 19992000 that were never authorized. The application is being evaluated under Section 404 of the Clean Water Act [33 USC 1344, et seq.]. Section 404 regulates the discharge of dredged or fill material in the Nation's waters. The proposed project will result in the discharge of dredged and fill material into waters of the United States. · PUBLIC NOTICE. The purpose of this public notice is to inform the public; Indian Tribes; Federal, state and local agencies/officials; and other interested parties of a 21-day comment period in which written comments in conjunction with the applicant's project may be submitted to the US Army Corps of Engineers (Corps). Solicitation of comments regarding impacts to endangered species, historic properties, water quality, general environmental concerns and other public interest factors are discussed herein. Written comments must be postmarked by May 24, 2017, prior to closure of the public notice administrative record. · PUBLIC HEARING. Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state the reason(s) for holding a public hearing. The District Engineer shall determine whether a hearing is necessary to obtain additional public interest information. If a public hearing is warranted, interested parties will be notified of the time, date, and location. Project Information. APPLICATION. Sufficient information to issue a public notice was received on April 21, 2017. The DA permit application has been determined to be incomplete due to insufficient information concerning Section 106 of the NHPA. A Class III Cultural Report is being conducted and will be submitted, reviewed and coordinated with ND SHPO office prior to a permit decision. Additional project information concerning an alternatives analysis and a 12-component mitigation plan will also be submitted during the permit review process.

PUBLIC NOTICE NWO-2017-0229-BIS

McKenzie County, Route 34 Reconstruction

PROJECT LOCATION. The project is located within a 5.25 mile stretch of the existing McKenzie County Route 34 road right-of-way, beginning at the intersection of US Highway 85 and McKenzie County Route 34, and proceeding East and South along Route 34 for 5 miles, in McKenzie County, North Dakota. The right-of-way runs through Sections 30-34, Township 149 North, Range 98 West, Sections 5-6, Township 148 North, Range 98 West, and Section 1, Township 149 North, Range 99 West, in McKenzie County, North Dakota, and is centrally located at Latitude 47.677377 degrees North, Longitude (minus) -103.248734 degrees West. PROJECT PURPOSE. The project purpose, as stated by the applicant, is "to reconstruct the road to provide a widened roadway with larger horizontal curves and flatter vertical curves to improve the sight distance over the hills. The project is proposed to enhance the safety of the traveling public and provide better access for agricultural producers to transport equipment and produce from field to field and to the market". The proposed mitigation also addresses compensatory mitigation for un-permitted road impacts that was done in 1999-2000. The Corps has determined the project purpose to be road embankment improvements for road embankment integrity and safety, and additional proposed mitigation to address past road impacts into jurisdictional aquatic resources. This serves to bring the entire 5.25 roadway into compliance with Section 404 of the CWA. PROJECT DESCRIPTION. McKenzie County is proposing to widen and improve a 5 mile stretch of the Route 34 road embankment within its existing right-of-way, by installation of various fills along both sides of the road embankment, removal of a bridge, and the installation of culverts to re-connect 2,253 feet of Spring Creek that was previously cut-off by past road embankment fills and stream channel re-routing. The applicant is also proposing to excavate and create 2.07 acres of on-site wetland mitigation to address current and past un-avoidable impacts into the aquatic resource. Impacts were minimized by restricting in slopes to be no flatter than necessary and protect pipe culverts. Current construction will result in permanent loss of 1.47 acres of jurisdictional water. Past un-permitted construction resulted in the permanent loss of 0.988 acres of jurisdictional waters and severance of approximately 3,355 feet of Spring Creek channel from the main stream flows. The current project application is proposing mitigation to off-set these past un-permitted impacts. CONSTRUCTION METHODS. Use of typical heavy equipment (dozers, scrapers, dump trucks, compactors, graders, etc.) and methods for large scale construction is anticipated. ANTICIPATED ENVIRONMENTAL IMPACTS: · Wetlands and Other Waters of the United States. The project would result in permanent and temporary impacts into jurisdictional waters of the United States. The project will result in the permanent loss of 1.47 acres of wetlands from the placement of 19, 634 cubic yards of various fill materials. Temporary impacts consist of fill impacts into 0.43 acres of wetlands along Spring Creek. · Past Impacts to Wetlands and Other Waters of the United States. Past unpermitted impacts from a previous un-permitted road project into jurisdictional waters of the United States, to include the permanent impact of 11, 741 cubic yards of fill materials into approximately 1, 102 feet and 0.988 acres of Spring Creek and adjacent wetlands and the severance of approximately 3,355 feet of Spring Creek from the main creek channel 2

PUBLIC NOTICE NWO-2017-0229-BIS

McKenzie County, Route 34 Reconstruction

flows. These impacts occurred approximately 17 years ago in 1999-2000, and the applicant is seeking to bring the entire 5.25 miles of roadway into permitting compliance. ALTERNATIVES. A specific alternatives analysis was not submitted with the application, but will be provided prior to a permit decision being made. The application does discuss how the proposed project was kept to the smallest footprint possible for the embankment widening project. Additionally, the majority of temporary impacts, will be kept to upland areas within the existing road right-of-way to the greatest extent possible. As submitted, there appear to be two feasible alternatives identified in the submitted application, including the No Action Alternative and the Proposed Road Widening Alternative described in this public notice. The No Action alternative would not resolve the existing traffic safety issues on the roadway, which McKenzie County has identified as being a road safety issue for the users of this roadway. COMPENSATORY MITIGATION. Mitigation is required to offset the 1.47 acres of unavoidable impacts of the current proposed road reconstruction project, and to off-set the past un-permitted 0.56 acre fill impacts and the severance of 3,355 feet of Spring Creek channel from the main creek channel flows. An 885 foot creek channel was created in 1999-2000 during the unpermitted roadway alterations, which has served as the main Spring Creek channel since then. The applicant is proposing to offset the currently proposed and past impacts with the on-site creation of 2.07 acres of wetlands on-site within the existing road right-of-way, and to install two (2) 60 inch culverts under the existing roadway crossings to re-connect the old Spring Creek channel that was severed in 1999-2000 and restore water flows through 2,253 feet of the old creek channel that still exists (see sheets 1-7 & exhibit 4). National Environmental Policy Act of 1969 ["NEPA"] (42 USC 4321 et seq.; Public Law 91190) NEPA Statement: NEPA is the Nation's basic charter for protection of the environment. NEPA is to provide decision-makers and the public full disclosure of the environmental consequences of taking an action so they can make informed decisions. NEPA itself does not impose substantive duties mandating particular results, but prescribes the necessary process for preventing uninformed agency action. At this time, the Corps anticipates completion of an Environmental Assessment will achieve the appropriate level of NEPA compliance for this project. National Historic Preservation Act of 1966 ["NHPA"] (80 Stat 915; 16 USC 470a, et seq.) and amendments, including the 1992 amendments (PL 89-665 and PL 96-515). Cultural Resources Statement: The Omaha District will comply with the NHPA and amendments and the procedures set forth in 33 CFR, Appendix C. We will evaluate input by Indian Tribes, the North Dakota State Historic Preservation Officer (SHPO), and any interested parties in response to this public notice. The existing roadway and bridge being reconstructed was constructed in 1958, and the relocated portions of the roadway were constructed in 2000. There are eight former and listed properties on the National Register of Historic Places in McKenzie and Dunn Counties, with the closest site located about 20 miles from the proposed project. The Corps' initial review was that the project would not affect properties listed on the National Register of Historic Places. However, the bridge proposed for removal is of sufficient age to be considered eligible for possible listing on the National Register, and the Class III Cultural Survey that was completed and submitted did not address this bridge structure. Subsequently, the agent for the 3

PUBLIC NOTICE NWO-2017-0229-BIS

McKenzie County, Route 34 Reconstruction

applicant has been informed that a Class III Cultural Survey is required for the proposed project, to include the proposed removal of the existing bridge, and for any proposed impacts outside of the previously disturbed, existing road right-of-way alignment. A Class III Cultural Survey is currently being re-done for submission to the Corps for review and coordination with ND SHPO office. Section 404(b)(1) Guidelines ["Guidelines"] (40 CFR 230 Subpart B): These Guidelines are the substantive environmental criteria used in evaluating the discharges of dredged or fill material in waters of the United States under Section 404 of the Clean Water Act and are applicable to all 404 permit decisions. The purpose of these Guidelines is to restore and maintain the chemical, physical, and biological integrity of United States waters through the control of discharges of dredged or fill material. Fundamental to the Guidelines is an understanding that dredge or fill material should not be discharged into such waters unless it is demonstrated that such discharges would not have unacceptable adverse impacts either individually or in combination with existing and/or probable impacts of other activities affecting the environment. Section 401 of the Clean Water Act ["Water Quality Certification"] (33 USC Section 1341) Water Quality Certification Statement: The North Dakota Department of Health, Division of Water Quality, 918 East Divide Avenue, Bismarck, North Dakota 58501-1947 will review the proposed project for State certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the project will not result in a violation of applicable water quality standards. Although water quality certification is a prerequisite for issuance of a DA permit, certification alone does not guarantee a DA permit will be issued for the project. Endangered Species Act of 1973 ["ESA"] (16 USC 1531, et seq.) This project is within the known range of the endangered Whooping crane (Grus americanis), Interior Least Tern (Sterna antillarum), Pallid Sturgeon (Scaphirhynchus albus), Black Footed Ferret (Mustela nigripes), and the Gray wolf (Canis lupus), as well as the threatened Piping plover (Charadrius melodus), Red Knot (Calidris canutus rufa), Dakota Skipper (Hesperia dacotae), and the Northern Long-eared Bat (Myotis septentrionalis) No critical habitat for any of these species has been identified within the proposed project area. Pursuant to the Endangered Species Act, the proposed project has been reviewed for potential impacts to threatened and endangered species. The Corps has made a `No Effect' determination for all species identified. This determination is based only on the current proposed work and the confinement of this work to the existing right-of-way and the parallel alignment with existing road, and with the current use and disturbance associated with traffic operations on the existing roadway. Public Interest Review [33 CFR 325.3(c)(1)]: The public interest review procedures call for weighing the benefits that reasonably may be expected to accrue. These are balanced against its reasonably foreseeable detriments and results in reaching a determination that expresses the public interest. Public interest factors include all factors which may be, or may become, relevant to this project, such as conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, 4

PUBLIC NOTICE NWO-2017-0229-BIS

McKenzie County, Route 34 Reconstruction

water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The decision whether to issue a permit is based on an evaluation of those factors and the probable impact, including cumulative impacts, and reflects the national concern for both the protection and utilization of important natural resources. The 404(b)(1) Guidelines and the Public Interest Review are both administrative processes required as part of the Regulatory Program, but they are independent of each other. A project must be in compliance with the Guidelines and must not be contrary to the public interest in order to be permitted by the Army Corps of Engineers. Anyone whose interests may be affected by the applicant's proposal is invited to submit favorable or unfavorable written comments to the U.S. Army Corps of Engineers [Omaha District] North Dakota Regulatory Office, 1513 South 12th Street, Bismarck, North Dakota 58504. Comments must be submitted on or before the date on the front of this notice to be considered in subsequent actions on this application. For additional information, you may contact Mr. Garth Zimbelman, Project Manager by e-mail at garth.a.zimbelman@usace.army.mil, at telephone number (701) 255-0015, extension 2009, or by visiting the North Dakota Regulatory Office in Bismarck, North Dakota. Request to Postmasters: Please post this notice in a conspicuous place until the expiration date specified at the top of page one. Notice to Editors: This notice is provided for your use in developing news stories only. No payment for publication will be provided. ATTACHMENTS

5

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.