Home

Galveston District

Run scraper

USA Rail Terminals

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct a railroad spur and side rails that will connect to an existing railroad.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to construct a railroad spur and side rails that will connect to an existing railroad. The newly constructed facilities will include 21 rail siding lines, varying from 2,580 to 3,507 feet in length and a 1.03-mile emergency vehicle access road, at the project site. Fill will be permanently placed in jurisdictional waters to build the railway and access-road beds. A total of 1.25 acres of jurisdictional wetlands will be permanently impacted by this project. Two types of waters will be affected, palustrine shrub/scrub wetland (0.16 acres) and palustrine emergent wetland (1.09 acres).

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas