Public notice for the Willow Creek Bank Stabilization Individual Permit from Southeast Metro Stormwater Authority (SEMSWA), c/o ERO Resources, Attn: Esa Crumb, 1842 Clarkson Street, Denver, CO 80128.
SEMSWA is proposing channel improvements along Willow Creek. Concurrent with channel improvements, SEMSWA is also proposing to realign a nearly 90-degree channel bend integrating the creation of an in-channel wetland and a secondary channel.
PUBLIC NOTICE
US Army Corps
of Engineers
Omaha District
REPLY TO:
U.S. Army Corps of Engineers
Denver Regulatory Office
9307 South Wadsworth Blvd
Littleton, CO 80128-6901
ellison.a.koonce@usace.army.mil
Application No:
Project:
Applicant:
Waterway:
Issue Date:
Expiration Date:
NWO-2017-00786-DEN
Willow Creek Bank Stabilization
Southeast Metro Stormwater Authority
Willow Creek
May 17, 2017
June 16, 2017
30 DAY NOTICE
PUBLIC NOTICE
FOR SECTION 404 PERMIT APPLICATION SUBMITTED TO
U.S. ARMY CORPS OF ENGINEERS
The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department
of the Army permit application from Southeast Metro Stormwater Authority (SEMSWA), c/o ERO
Resources, Attn: Esa Crumb, 1842 Clarkson Street, Denver, CO 80128. Permits are issued under
Section 404 of the Clean Water Act (Section 404) which regulates the placement of dredged or fill material
in the nation's waters.
Summary
SEMSWA is proposing channel improvements along Willow Creek. Concurrent with channel
improvements, SEMSWA is also proposing to realign a nearly 90-degree channel bend integrating the
creation of an in-channel wetland and a secondary channel.
Location
The project area includes Willow Creek and its adjacent wetlands, located at approximately
39.579860oN, -104.907696oW, in Section 32, Township 5 South, Range 67 West, of the 6th Principal
Meridian, in Centennial, in Arapahoe County, Colorado.
Description of work
The proposed project would consist of stream channel improvement activities to stabilize the
Willow Creek channel and prevent further down cutting and erosion. The proposed project involves the
construction of two grade-control structures to reestablish a stable channel invert and raise the channel
1
Project: Willow Creek Bank Stabilization
Waterway: Willow Creek
Corps File No: NWO-2017-00786-DEN
Applicant: SEMSWA
bottom close to the historic elevation. The channel would be regraded at a 0.2 percent slope, a low
gradient to reduce channel velocities and reduce erosive forces. The height of the drop structures were set
to maintain the 0.2 percent longitudinal channel slope along the channel reach, provide soil cover over the
sanitary sewer line crossings, and reduce the height of the eroded channel banks. The average channel
bottom width throughout the reach would be about 10 feet and the average water depth would be 1 foot.
Channel realignments are also proposed where necessary to reduce severe meandering at select
bend locations where severe channel bank erosion has occurred. Bank stabilization would include
regrading to create lower gradient slopes to reduce erosion and reduce unstable vertical banks. Channel
realignment activities would result in a reduction in the overall channel length. To offset the reduced
channel length, a secondary channel is proposed near a realigned bend to provide additional channel
length. The secondary channel bottom width would be about 5 feet wide and 0.5 feet higher than the
main channel. A small island with wetland vegetation would be created between the two channels.
Channel Regrading/Grade-Control Structures: The channel bottom would be regraded to
promote reestablishment of a stable channel invert, provide soil cover over the sewer line crossings,
reduce the height within the channel banks, and restore the channel invert close to the historic elevation.
The gradient of the proposed Willow Creek channel bed would be 0.2 percent, a relatively low gradient
that prevents the generation of additional erosive forces and allows flexibility to allow for even flatter
slopes as the channel fills in upstream of the drop structures.
Bank Stabilization: Bank stabilization would include regrading to create lower gradient bank
slopes, eliminating unstable vertical banks, and providing riprap toe reinforcement as a safeguard against
future erosion. When possible, slopes would be regraded to a 3:1 to 4:1 gradient. Where riprap is used,
the slopes may be graded as steep as 2.5:1. Buried soil riprap on the banks would be 1.5 feet thick and
constructed using Type L riprap. About 6 inches of clean topsoil would be placed on top of the placed
riprap.
In addition to the regrading of steep slopes, the project includes installation of boulder edge
structures and the use of large boulders. When possible, boulders measuring 3 feet or more in diameter
would be used rather than smaller boulders (e.g., 18 inches in diameter). Riprap would be sized
according to UDFCD guidelines. In general, riprap would be located in areas where laying back the slope
is ill-advised, such as near property boundaries or near trees to be preserved.
Buried riprap bank stabilization is typically proposed on the outside of bends where higher
velocities and erosion tend to occur and at transitional areas to reduce the potential for further bank
erosion and to protect an existing tree.
Channel Realignment: The proposed project includes realigning the nearly 90-degree channel
bend to provide a more hydraulically smooth bend in the low-flow channel. The channel realignment
would also integrate the creation of an in-channel wetland island and secondary channel. In addition to
the bend, other minor channel realignments are proposed to regrade eroded channel banks and protect
existing trees on both sides of the channel and on the south side of the channel.
Sanitary Sewer Line Improvements: In coordination with SEMSWA's Willow Creek
Stabilization Phase 2 drainage improvements, Southgate Sanitation District is replacing the existing
sanitary sewer line within Dry Creek Road and the open space adjacent to Willow Creek. Work for this
project would include installation of approximately 1,560 linear feet of 24-inch PVC pipe, approximately
320 linear feet of 8-inch PVC pipe, 6 new manholes, and connections to 3 existing manholes. Trench
2
Project: Willow Creek Bank Stabilization
Waterway: Willow Creek
Corps File No: NWO-2017-00786-DEN
Applicant: SEMSWA
widths for the proposed installation would range from 3 to 4 feet for the 8-inch sanitary sewer line and 5
to 6 feet for the 24-inch sanitary sewer line.
The existing sanitary sewer line crosses Willow Creek in two locations. Although these crossings
are encased with concrete, both crossings are in danger of damage from creek flow. The creek flows
under the existing sanitary sewer line at the downstream crossing and bank erosion has exposed uncased
sanitary sewer line at the upstream crossing. The proposed sanitary sewer line improvements include
steel and concrete encasements to protect the new line.
Purpose
For purposes of definition under Section 404, the basic project purpose is channel stabilization. The
overall project purpose is to implement channel improvements within Willow Creek and upgrades to the
existing sanitary sewer lines to reduce public safety concerns and improve habitat quality.
Impacts and Mitigation
The project would result in permanent impacts along approximately 1,235 linear feet of Willow
Creek and 0.034 acre of wetland fringe. Compensatory mitigation for permanent wetland impacts is
proposed at a 1:1 ratio, on-site, and in-kind to result in the creation of 0.034 acre of wetlands. The loss of 45
linear feet of stream channel from realignment of Willow Creek will be mitigated for by constructing 105
linear feet of a secondary channel.
*********************
The Colorado Department of Public Health and Environment, WQCD-GWPS-B2, 4300 Cherry
Creek Drive South, Denver, Colorado 80222-1530, will review the proposed project for state certification in
accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will
express the State's opinion that the operations undertaken by the applicant will not result in a violation of
applicable water quality standards. For further information, please contact the Colorado Water Quality
Control Division, (303) 692-3500.
In compliance with the Endangered Species Act, a preliminary determination has been made that
the described work will not adversely affect species designated as threatened or endangered or adversely
affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the
U.S. Fish and Wildlife Service and other interested agencies and individuals.
The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act
of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We will evaluate input
by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we
may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if
warranted.
The decision whether to issue a permit will be based on an evaluation of the probable impacts
including cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefits which reasonably
may be expected to accrue from the proposal must be balanced against the reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, wetlands, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the
3
Project: Willow Creek Bank Stabilization
Waterway: Willow Creek
Corps File No: NWO-2017-00786-DEN
Applicant: SEMSWA
impact of the work on the public interest will include application of the guidelines promulgated by the
Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act
(40 C.F.R. Part 230).
The Corps of Engineers is soliciting written comments from the public; Federal, state and local
agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used in the preparation
of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National
Environmental Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
Comments, both favorable and unfavorable, will be accepted, made a part of the record and will
receive full consideration in subsequent actions on this application. Any agency or individual having an
objection to the work should identify it as an objection with clear and specific reasons. All replies to the
public notice should be sent to the U. S. Army Corps of Engineers, Denver Regulatory Office, 9307
South Wadsworth Blvd, Littleton, Colorado 80128-6901. For additional information please contact
Ellison Koonce at (303) 979-4120 or by email at ellison.a.koonce@usace.army.mil or visit the Denver
Regulatory Office web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx
The District Engineer will consider requests for holding a public hearing, for the purpose of
gathering additional information. Before the expiration date of this notice, anyone may request, in writing,
that a public hearing be held. Requests for a public hearing should state specifically the reasons for holding
a public hearing, and what additional information would be obtained. Should the District Engineer decide
that additional information is required and a public hearing should be held, interested parties will be notified
of the date, time and location.
Comments received after the close of business on the expiration date of this public notice will
not be considered.
4
Project: Willow Creek Bank Stabilization
Waterway: Willow Creek
Corps File No: NWO-2017-00786-DEN
Applicant: SEMSWA