The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a request by MARS, Inc. (MARS) to add an In Lieu Fee (ILF) mitigation site to their Program’s Instrument. MARS, Inc. established their Program in January 2013. This proposed mitigation site would cover the Lower Yellowstone watershed (#15). MARS’ objective is to restore a side channel of Fox Creek, a tributary to the Yellowstone River, in order to restore connectivity of the site channel to Fox Creek. The restoration will be accomplished by removing fill and widening the lower part of the channel, planting riparian vegetation in the riparian buffer, spraying noxious weeds, and ensuring site protections through an existing easement.

The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a request by MARS, Inc. (MARS) to add an In Lieu Fee (ILF) mitigation site to their Program’s Instrument. MARS, Inc. established their Program in January 2013. This proposed mitigation site would cover the Lower Yellowstone watershed (#15). MARS’ objective is to restore a side channel of Fox Creek, a tributary to the Yellowstone River, in order to restore connectivity of the site channel to Fox Creek. The restoration will be accomplished by removing fill and widening the lower part of the channel, planting riparian vegetation in the riparian buffer, spraying noxious weeds, and ensuring site protections through an existing easement.

PUBLIC NOTICE Omaha District

Application No: NWO-2011-01760-MTH Applicant: Montana Aquatic Resource Services (MARS) Waterway: Fox Creek Side Channel Issue Date: May 24, 2017 Expiration Date: June 23, 2017 30 DAY NOTICE

Helena Regulatory Office 10 West 15th Street, Suite 2200 Helena, MT 59626-9705

PUBLIC NOTICE FOR MARS' IN LIEU FEE MITIGATION SITE SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS, in cooperation with the Interagency Review Team (IRT)

SUBJECT: The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a request by MARS, Inc. (MARS) to add an In Lieu Fee (ILF) mitigation site to their Program's Instrument. MARS Inc. established in January 2013. This proposed mitigation site would cover the Lower Yellowstone Watershed (#15). This notice may also be viewed at the Corps web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx

Description of Proposed Project: The main objective of this project is to restore a side channel of Fox Creek, a tributary of the Yellowstone River, in order to create habitat for native warm water fish species. The Fox Creek side channel is located approximately 1,600 feet upstream from Fox Creek's confluence with the Yellowstone River. The side channel is an historic channel of Fox Creek that originates as an artesian spring and travels approximately 1,400 feet before it drains into Fox Creek. The lower portion of the Fox Creek side channel was either filled intentionally or sloughed due to over irrigation, and is too narrow and shallow to permit fish to access the channel in its current state. MARS proposes to restore connectivity of this side channel to Fox Creek by removing fill and widening the lower part of the side channel, planting riparian vegetation in the riparian buffer, spraying noxious weeds, and ensuring site protection through an existing conservation easement. The proposed Fox Creek side channel restoration would generate 9,065 stream credits. Location: The proposed activity is located on land owned by Maryellen Navratil within Section 19, Township 22 North, Range 59 East, Richland County, Montana (near Latitude: 47.651, Longitude: -104.186)

Purpose: The purpose of the proposed project is to create a compensatory mitigation site for use by the MARS' In Lieu Fee Program. Background: The Corps requires compensatory mitigation as a permit condition for stream or wetland losses that are determined to have greater than minimal adverse effects. The goal of mitigation is to replace the physical, chemical, and biological functions of these waters of the U.S. The mitigation banking and In Lieu Fee concepts were established to provide alternatives to applicant-provided mitigation and ease the regulatory burden of mitigating permitted impacts to waters of the U.S. Mitigation: This will be a compensatory mitigation site that will help offset impacts from projects authorized by the Corps. 401 Water Quality Certification: The execution of the easement will not require 401 water quality certification. Further activities requiring a Section 404 or Section 10 Permit would require 401 certification. Cultural Resources: The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act of 1966, as amended. We have checked the National Register of Historic Places and its current supplements, and there are no known National Register sites in the vicinity; however, we will evaluate input by the State Historic Preservation Office and the public in response to this public notice, and we may conduct or require a reconnaissance survey of the permit area to check for unknown historic or prehistoric properties, if warranted. Threatened / Endangered Species: In compliance with the Endangered Species Act, a determination of effect will be made for the described action. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals which also make up the Interagency Review Team. Evaluation Factors: The decision whether to approve the proposal will be based on an evaluation of the overall proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposed activity must be balanced against any reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered. This Public Notice allows the public to provide comments or concerns about the project which will be considered before a final decision is made. Comments: The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to approve, modify, or deny this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other

2

public interest factors. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. All Public Notice comments will be considered public information and will be subject to review by the applicant. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and what additional information would be obtained. The request for public hearing must be submitted in writing to the U.S. Army Corps of Engineers, 10 West 15th Street, Suite 2200, Helena, Montana 59626-9705. If it is decided that additional information is required and that a public hearing should be held, interested parties will be notified of the date, time and location. Any interested party (particularly officials of any town, city, county, state, or Federal agency; Indian tribe; or local association whose interests may be affected by the work) is invited to submit to this office written facts, arguments, or objections on or before the expiration date listed on the front of this notice. Any agency or individual having an objection to the proposal should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this proposal. All replies to the public notice should be addressed to the U.S. Army Corps of Engineers, 10 West 15th Street, Suite 2200, Helena, Montana 59626-9705. Please reference the Application Number found on the first page of this notice in any correspondence. Robert Cole, telephone number (406) 441-1363, may be contacted for additional information. You may e-mail comments to: Robert.H.Cole@usace.army.mil . Comments postmarked after the expiration date of this Public Notice, or received by fax or email after the expiration date of this Public Notice, will not be considered. Comments left on our voicemail system will not be considered. Statutory Authorities: This proposal is intended to provide compensatory mitigation opportunities for Department of Army permits issued under the provisions of Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act. Enclosure: Proposed Site Plan

3

Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan Fox Creek Side Channel Restoration Project MARS Yellowstone River Site RI-06 Richland County, Montana

Lower Yellowstone Watershed (#15) May 2017

Prepared for: U.S. Army Corps of Engineers Regulatory Program Omaha District Headquarters 1616 Capitol Ave., Ste. 9000 Omaha, NE 68102 Prepared by: Montana Aquatic Resources Services, Inc. Statewide In-Lieu Fee Mitigation Program P.O. 1289 Bozeman, MT 59771-1289

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

(1) Background Modification of an approved Instrument, including the addition and approval of new in-lieu fee (ILF) project sites or expansions of previously approved ILF project sites, must follow the appropriate Instrument amendment procedure outlined in Section 332.4 and Section 230 of the Army Corps of Engineers (Army Corps) and Environmental Protection Agency (EPA) 2008 Final Compensatory Mitigation Rule. This amendment proposal is submitted to the Army Corps District Engineer following the outline and requirements of the 2008 Final Rule at Sections 332.4(c)(2) through (14). As stated, the ILF program sponsor must prepare and obtain Army Corps approval for a mitigation plan including items in paragraphs (c)(2) through (c)(14) of that section for each new compensatory mitigation project site, and submit an Instrument amendment proposal for the new mitigation site. (2) Objectives The objectives of this project are to use mitigation fees resulting from the sale of 3,371 advance stream credits to Burlington-Northern Santa Fe Railway (Army Corps authorization #NWO-2011-01103-MTB) on October 20, 2014 for a stream restoration project in the Lower Yellowstone Watershed (#15). Permit #NWO-2011-01103-MTB was issued to BNSF for 2011 Emergency 404 activities along BNSF's main rail line when flooding caused damages to the river. The main objective of this project is to restore a side channel of Fox Creek, a tributary of the Yellowstone River, in order to create habitat for native warm water fish species. The Fox Creek side channel is located approximately 1,600 feet upstream from Fox Creek's confluence with the Yellowstone River. The side channel is an historic channel of Fox Creek that originates as an artesian spring and travels approximately 1,400 feet before it drains into Fox Creek. The lower portion of the Fox Creek side channel was either filled intentionally or sloughed due to over irrigation, and is too narrow and shallow to permit fish to access the channel in its current state. We propose to restore connectivity of this side channel to Fox Creek by removing fill and widening the lower part of the side channel, planting riparian vegetation in the riparian buffer, spraying noxious weeds, and ensuring site protection through an existing conservation easement. The proposed Fox Creek side channel restoration would generate 9,065 stream credits (see Table 1 and Section 6. Determination of Credits). (3) Site selection MARS' approved Lower Yellowstone Service Area Compensation Planning Framework (CPF) identifies threats, stressors, and drivers of degradation in this watershed. According to the CPF, one of the major threats to this landscape is the physical alteration of wetlands, streams, and riparian areas. The Army Corps and Yellowstone River Conservation District Council's 2015 Yellowstone River Cumulative Effects Analysis (CEA) 1 found that bank armoring and blocked side channels are contributing to the decline in the Yellowstone River ecosystem's health. The CEA reported that as of 2011, 90 miles of side channels have been blocked by dykes, and over 22,000 of acres of floodplain have been isolated due to modifications for agriculture and infrastructure. In the Lower Yellowstone Watershed alone, there are U.S. Army Corps of Engineers and Yellowstone River Conservation District Council. 2015. Yellowstone River Cumulative Effects Analysis. U.S. Army Corps of Engineers Omaha District. Omaha, NE. 1

Page 2 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15) 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

over 14 miles of modified and altered riverbank (e.g., constructed stream deflectors, riprap, transportation encroachment) 2. Bank armoring reduces natural processes of channel avulsion, erosion, deposition, and island formation. It also reduces riparian connectivity by severing the river's ability to access its side channels, tributaries, and floodplain. The lower Yellowstone River is a sediment-rich reach that supports pallid sturgeon, paddlefish, sturgeon chub, shovelnose sturgeon and other native warm water fish species including emerald shiners, fathead minnow, flathead and creek chub, western silvery/plains minnow, goldeye, white sucker, river carpsucker, sauger, and stonecat. The river is also habitat for non-native game fish including northern pike, walleye, and black bullhead. Side channels are important refugia for fish during high water events because they have warmer water temperatures and slower current. Side channels can also provide year-round habitat for small-bodied species. However, bank armoring and irrigation withdrawals has reduced the number of side channels that fish species are able to access. We selected this project because it addresses one of the major threats to this watershed (i.e., a loss of side channel habitat), and because we believe that the project has high ecological value and a high likelihood of success. Figure 1 (location within the state's watersheds) shows the location of the proposed mitigation project in the Lower Yellowstone Watershed, about 5 miles upriver from Sidney. The site is located at 47.651N latitude and -104.186W longitude. The property is privately owned and operated by a family actively engaged in hay production (Figure 2). Figure 3 shows the Fox Creek side channel that we propose to restore. The Montana Fisheries Information System ranks Fox Creek near the confluence as a substantial fisheries resource. 3 High water events in 2011 and 2014 caused 1,200 feet of Fox Creek and 13 acres of adjacent riparian forest to erode, and an upstream structure limits fish passage to the first 3,000 feet of Fox Creek (Figure 4). Reactivating floodplain connectivity and restoring a side channel of the Yellowstone will significantly increase habitat availability for fish species as a result of the restoration we propose.

Yellowstone River Clearinghouse: http://geoinfo.msl.mt.gov/Home/data/yellowstone_river_corridor_resource_clearinghouse 3 http://fwp.mt.gov/fishing/mFish 2

Page 3 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15) 71

Figure 1. Location of proposed project in Lower Yellowstone Watershed (#15)

Page 4 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)

Figure 2. Location of Fox Creek side channel restoration project in Richland County (approximately 5 miles upstream from Sidney, MT)

Page 5 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)

Figure 3. Fox Creek Side channel restoration located along the southern border of landowner's property

Page 6 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)

Figure 4. Current extent of fish passage with modeled 2-year inundation under current conditions 4 (note: upstream extent of Fox Creek is on a neighbor's property, who is not interested in working with MARS to remove the fish passage barrier)

U.S. Army Corps of Engineers and Yellowstone River Conservation District Council. 2015. Yellowstone River Cumulative Effects Analysis. U.S. Army Corps of Engineers Omaha District. Omaha, NE.

44

Page 7 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15) 72 73 74 75 76 77 78 79 80

(4) Site protection instrument Prior to initiating this ILF project, the landowner placed a Channel Migration Easement (CME) on the property in April 2016. The CME was secured with funds from the Western Area Power Administration, Upper Basin Pallid Sturgeon Governing Board, and Montana Fish Wildlife and Parks. The CME is held by the Montana Land Reliance. The CME currently protects the Channel Migration Zone, which is a buffer zone approximately 3,570 feet wide, as well as a 30-acre parcel west of the Channel Migration zone (Figure 5). MARS claims no credit from the investments by MARS, FWP, MLR or others associated with the CME, but the easement will ensure the restoration project will be protected in perpetuity.

Page 8 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15) 81

82 83 84 85

Figure 5. Location of side channel restoration where a pre-existing conservation easement (Channel Migration Easement, executed in April 2016) will protect the restoration project in perpetuity

Page 9 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15) 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129

(5) Baseline information The lower Yellowstone River has an active floodplain and a large channel migration zone. Due to the dynamic nature of the river, nearly 14 miles of bankline in this reach of the Yellowstone have been modified or altered in this reach in an attempt to control bankline migration. Development and irrigation withdrawals for agriculture have reduced the low flow volume of the river by at least 42% in this reach of the river 5. Federally listed species (Pallid Sturgeon) and Montana Species of Concern (Paddlefish) use the lower Yellowstone River as habitat. This portion of the river is also important habitat for a number of small bodied prairie fish species, including emerald shiners, fathead minnow, flathead and creek chub, western silvery/plains minnow (Hybognathus), goldeye, white sucker, river carpsucker, sauger, and stonecat. The lower Yellowstone supports non-native game fish, such as northern pike, walleye, and black bullhead. The Lower Yellowstone Watershed is also important avian habitat. This reach of river was surveyed as part of the Cumulative Effects Analysis and identified 39 species of birds, including the red-headed woodpecker (a Montana Species of Concern)4. The Fox Creek side channel project area is surrounded by alfalfa hay fields that are flood irrigated and harvested 1-3 times every year. The riparian buffer contains a sparsely vegetated zone consisting of snowberry, woods rose, chokecherry, green ash, and noxious weeds such as Canada thistle and spotted knapweed. The upstream portion of the side channel is approximately 10 feet wide, with slow moving water that flows year round from an artesian well. There are stretches with cattails and reed canary grass that are habitat for red winged blackbirds, wood ducks, and mallards. However, the side channel was filled at its confluence with Fox Creek, restricting the ability of the channel to backwater or allow fish passage. The last 150 feet are only 1-2 feet wide. After MARS receives approval from the Corps to begin development of a Mitigation Site Plan for the project, more baseline information will be gathered and included in the draft and final plans. (6) Determination of Credits MARS used the Army Corps' Montana Stream Mitigation Procedure to estimate that this project will generate approximately 9,065 credits (Table 1) from removing fill, restoring the connectivity of the Fox Creek side channel to Fox Creek and to the Yellowstone River, grading and contouring the confluence of the side channel to Fox Creek, vegetating over 1,000 feet of the riparian buffer with native woody vegetation, and removing noxious weeds. If the Army Corps approves this Proposed Site Plan, MARS will conduct additional baseline environmental surveys and functional assessments to further refine these credit estimates in the Draft and Final Mitigation Site Plans. Any additional stream credits above those required to offset MARS current obligation in the Watershed from the sale to BNSF Railway for the permit referenced above are suggested to be certified by the Corps and available for MARS to use for additional sales in the watershed as certified stream credits to be sold at a 1:1 ratio.

http://ftp.geoinfo.msl.mt.gov/Documents/Projects/Yellowstone_River_Clearinghouse/Yellowstone_Reach_Narrat ives_2015.pdf

5

Page 10 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15) 130 131 132 133 134 135 136

The Draft Mitigation Plan will include the credit release schedule. The schedule will define success criteria with quantitative thresholds. The scheduled release of credits will correspond to the approval of the Final Mitigation Site Plan, completion of restoration activities, and annual performance monitoring for five years, or until the project is deemed successful by the Corps and all credits are released. Table 1. Stream Mitigation Procedure for Bank Destabilization & Side Channel Restoration FACTORS

Reach 1 /Side A (Fox Creek Side Channel Restoration)

Reach 1 /Side B (Fox Creek Side Channel Restoration)

a

Buffer Width

0.00

0.00

b

Remove Disturbance to Riparian Buffer

0.00

0.00

c

Fence around Buffer

0.00

0.00

d

Re-vegetate Riparian Buffer

0.54

0.29

716 feet (54%) of the left bank and 381 feet (29%) of right bank planted with shrubs and trees for shading, erosion control, and nutrient uptake

e

Micro Topography in Floodplain

0.50

0.50

Reshape confluence of Fox Creek side channel

f

Addition of Woody Debris in Floodplain

0.00

0.00

0.50

0.50

0.00

0.00

1.00

1.00

Restoration of Channel Morphology

1.00

1.00

Total Sum of Factors (SFm) a-j

3.54

3.29

Linear Feet Impact* (LFm)

1,328.00

1,328.00

4,700.00

4,365.00 9,065.00

g h

i

j

Management of Invasive Species Removal of Riprap below ordinary High Water Removal of Floodplain Fill (Berms or Impervious Materials)

SFm x LFm

NOTES

Spray Canada thistle and spotted knapweed

Remove fill from lower portion of channel to allow backwatering and fish passage Restore connectivity to Fox Creek by removing fill, grading, and planting side channel

Page 11 of 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15) 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182

(7) Mitigation work plan The Draft Mitigation Site Plan will include a schedule and a plan for the design of the side channel restoration (e.g., quantity of excavation required to reconnect the side channel to Fox Creek), the permits and surveys required, and the quantities of woody riparian shrubs and trees that will be planted in the riparian buffer. MARS proposes to use contractors to design the project and reconnect the side channel and hopes to complete the project during low water in the fall of 2017. (8) Maintenance plan The project is currently located within a Channel Migration Easement held by Montana Land Reliance. MLR will conduct annual site visits in perpetuity to ensure that the terms of the easement are upheld. MLR will work with the land owner to take corrective actions if necessary. If MLR's reports indicate that the mitigation project requires stewardship, MARS will use Long-Term Management funds to pay for these activities. (9) Performance standards If the Army Corps approves this Proposed Site Plan, MARS will develop detailed five-year performance standards related to the buffer condition, native plant species richness, and instream habitat quality. These performance standards will increase in rigor over the five years of the performance monitoring period to allow for natural successional processes and adaptive management to occur. MARS will include these performance standards in the Draft Mitigation Site Plan. (10) Monitoring requirements MARS will conduct the five-year performance monitoring and submit annual monitoring reports to the Army Corps. (11) Long-term management plan The MARS Final Instrument requires that 17% and 13% of the fees collected for this project be dedicated to contingency and long-term management, respectively. MARS will retain responsibility for the Fox Creek side channel restoration and use the above mentioned funds to pay for stewardship actions. (12) Adaptive management plan If the five-year performance monitoring indicates that the project is not meeting its performance standards, MARS will take corrective actions. Other specific steps to be taken in the event of the need for adaptive management will be identified in the Draft Mitigation Plan. (13) Financial assurances The MARS Statewide ILF Instrument requires that 17% and 13%, respectively, of the ILF fees collected for its compensatory mitigation projects be dedicated to Contingency and Long Term Management of ILF projects in that service area. Page 12 of 12

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas