The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a request by MARS, Inc. (MARS) to add an In Lieu Fee (ILF) mitigation site to their Program’s Instrument. MARS, Inc. established their Program in January 2013. This proposed mitigation site would cover the Lower Yellowstone watershed (#15). MARS’ objective is to restore a side channel of Fox Creek, a tributary to the Yellowstone River, in order to restore connectivity of the site channel to Fox Creek. The restoration will be accomplished by removing fill and widening the lower part of the channel, planting riparian vegetation in the riparian buffer, spraying noxious weeds, and ensuring site protections through an existing easement.
The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a request by MARS, Inc. (MARS) to add an In Lieu Fee (ILF) mitigation site to their Program’s Instrument. MARS, Inc. established their Program in January 2013. This proposed mitigation site would cover the Lower Yellowstone watershed (#15). MARS’ objective is to restore a side channel of Fox Creek, a tributary to the Yellowstone River, in order to restore connectivity of the site channel to Fox Creek. The restoration will be accomplished by removing fill and widening the lower part of the channel, planting riparian vegetation in the riparian buffer, spraying noxious weeds, and ensuring site protections through an existing easement.
PUBLIC NOTICE
Omaha District
Application No: NWO-2011-01760-MTH
Applicant: Montana Aquatic Resource Services (MARS)
Waterway: Fox Creek Side Channel
Issue Date: May 24, 2017
Expiration Date: June 23, 2017
30 DAY NOTICE
Helena Regulatory Office 10 West 15th Street, Suite 2200 Helena, MT 59626-9705
PUBLIC NOTICE
FOR MARS' IN LIEU FEE MITIGATION SITE SUBMITTED TO
U.S. ARMY CORPS OF ENGINEERS,
in cooperation with the Interagency Review Team (IRT)
SUBJECT: The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a
request by MARS, Inc. (MARS) to add an In Lieu Fee (ILF) mitigation site to their
Program's Instrument. MARS Inc. established in January 2013. This proposed
mitigation site would cover the Lower Yellowstone Watershed (#15). This notice may
also be viewed at the Corps web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx
Description of Proposed Project: The main objective of this project is to restore a side
channel of Fox Creek, a tributary of the Yellowstone River, in order to create habitat for
native warm water fish species. The Fox Creek side channel is located approximately
1,600 feet upstream from Fox Creek's confluence with the Yellowstone River. The side
channel is an historic channel of Fox Creek that originates as an artesian spring and
travels approximately 1,400 feet before it drains into Fox Creek. The lower portion of the
Fox Creek side channel was either filled intentionally or sloughed due to over irrigation,
and is too narrow and shallow to permit fish to access the channel in its current state.
MARS proposes to restore connectivity of this side channel to Fox Creek by removing fill
and widening the lower part of the side channel, planting riparian vegetation in the
riparian buffer, spraying noxious weeds, and ensuring site protection through an existing
conservation easement. The proposed Fox Creek side channel restoration would
generate 9,065 stream credits.
Location: The proposed activity is located on land owned by Maryellen Navratil within
Section 19, Township 22 North, Range 59 East, Richland County, Montana (near
Latitude: 47.651, Longitude: -104.186)
Purpose: The purpose of the proposed project is to create a compensatory mitigation
site for use by the MARS' In Lieu Fee Program.
Background: The Corps requires compensatory mitigation as a permit condition for
stream or wetland losses that are determined to have greater than minimal adverse
effects. The goal of mitigation is to replace the physical, chemical, and biological
functions of these waters of the U.S. The mitigation banking and In Lieu Fee concepts
were established to provide alternatives to applicant-provided mitigation and ease the
regulatory burden of mitigating permitted impacts to waters of the U.S.
Mitigation: This will be a compensatory mitigation site that will help offset impacts
from projects authorized by the Corps.
401 Water Quality Certification: The execution of the easement will not require 401
water quality certification. Further activities requiring a Section 404 or Section 10 Permit
would require 401 certification.
Cultural Resources: The Corps of Engineers, Omaha District will comply with the
National Historic Preservation Act of 1966, as amended. We have checked the National
Register of Historic Places and its current supplements, and there are no known National
Register sites in the vicinity; however, we will evaluate input by the State Historic
Preservation Office and the public in response to this public notice, and we may conduct
or require a reconnaissance survey of the permit area to check for unknown historic or
prehistoric properties, if warranted.
Threatened / Endangered Species: In compliance with the Endangered Species Act, a
determination of effect will be made for the described action. In order to complete our
evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service
and other interested agencies and individuals which also make up the Interagency
Review Team.
Evaluation Factors: The decision whether to approve the proposal will be based on an
evaluation of the overall proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The
benefits which reasonably may be expected to accrue from the proposed activity must be
balanced against any reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered. This Public Notice allows the public to
provide comments or concerns about the project which will be considered before a final
decision is made.
Comments: The Corps of Engineers is soliciting comments from the public; Federal,
state, and local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments received
will be considered by the Corps to determine whether to approve, modify, or deny this
proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and the other
2
public interest factors. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity. All Public
Notice comments will be considered public information and will be subject to review by
the applicant.
Any person may request, in writing and within the comment period specified in this notice,
that a public hearing be held for the purpose of gathering additional information.
Requests for public hearings must be identified as such and shall state specifically the
reasons for holding a public hearing and what additional information would be obtained.
The request for public hearing must be submitted in writing to the U.S. Army Corps of
Engineers, 10 West 15th Street, Suite 2200, Helena, Montana 59626-9705. If it is
decided that additional information is required and that a public hearing should be held,
interested parties will be notified of the date, time and location.
Any interested party (particularly officials of any town, city, county, state, or Federal
agency; Indian tribe; or local association whose interests may be affected by the work) is
invited to submit to this office written facts, arguments, or objections on or before the
expiration date listed on the front of this notice. Any agency or individual having an
objection to the proposal should specifically identify it as an objection with clear and
specific reasons. Comments, both favorable and unfavorable, will be accepted, made a
part of the record and will receive full consideration in subsequent actions on this
proposal. All replies to the public notice should be addressed to the U.S. Army Corps of
Engineers, 10 West 15th Street, Suite 2200, Helena, Montana 59626-9705. Please
reference the Application Number found on the first page of this notice in any
correspondence. Robert Cole, telephone number (406) 441-1363, may be contacted
for additional information. You may e-mail comments to:
Robert.H.Cole@usace.army.mil .
Comments postmarked after the expiration date of this Public Notice, or received by fax
or email after the expiration date of this Public Notice, will not be considered. Comments
left on our voicemail system will not be considered.
Statutory Authorities: This proposal is intended to provide compensatory mitigation
opportunities for Department of Army permits issued under the provisions of Section 404
of the Clean Water Act and Section 10 of the Rivers and Harbors Act.
Enclosure: Proposed Site Plan
3
Proposal for Modification of In-Lieu Fee Program Instrument
Proposed Site Plan
Fox Creek Side Channel Restoration Project
MARS Yellowstone River Site RI-06
Richland County, Montana
Lower Yellowstone Watershed (#15)
May 2017
Prepared for:
U.S. Army Corps of Engineers
Regulatory Program
Omaha District Headquarters
1616 Capitol Ave., Ste. 9000
Omaha, NE 68102
Prepared by:
Montana Aquatic Resources Services, Inc.
Statewide In-Lieu Fee Mitigation Program
P.O. 1289
Bozeman, MT 59771-1289
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
(1) Background
Modification of an approved Instrument, including the addition and approval of new in-lieu fee (ILF)
project sites or expansions of previously approved ILF project sites, must follow the appropriate
Instrument amendment procedure outlined in Section 332.4 and Section 230 of the Army Corps of
Engineers (Army Corps) and Environmental Protection Agency (EPA) 2008 Final Compensatory
Mitigation Rule.
This amendment proposal is submitted to the Army Corps District Engineer following the outline and
requirements of the 2008 Final Rule at Sections 332.4(c)(2) through (14). As stated, the ILF program
sponsor must prepare and obtain Army Corps approval for a mitigation plan including items in
paragraphs (c)(2) through (c)(14) of that section for each new compensatory mitigation project site, and
submit an Instrument amendment proposal for the new mitigation site.
(2) Objectives
The objectives of this project are to use mitigation fees resulting from the sale of 3,371 advance stream
credits to Burlington-Northern Santa Fe Railway (Army Corps authorization #NWO-2011-01103-MTB) on
October 20, 2014 for a stream restoration project in the Lower Yellowstone Watershed (#15). Permit
#NWO-2011-01103-MTB was issued to BNSF for 2011 Emergency 404 activities along BNSF's main rail line
when flooding caused damages to the river.
The main objective of this project is to restore a side channel of Fox Creek, a tributary of the
Yellowstone River, in order to create habitat for native warm water fish species. The Fox Creek side
channel is located approximately 1,600 feet upstream from Fox Creek's confluence with the Yellowstone
River. The side channel is an historic channel of Fox Creek that originates as an artesian spring and
travels approximately 1,400 feet before it drains into Fox Creek. The lower portion of the Fox Creek side
channel was either filled intentionally or sloughed due to over irrigation, and is too narrow and shallow
to permit fish to access the channel in its current state. We propose to restore connectivity of this side
channel to Fox Creek by removing fill and widening the lower part of the side channel, planting riparian
vegetation in the riparian buffer, spraying noxious weeds, and ensuring site protection through an
existing conservation easement. The proposed Fox Creek side channel restoration would generate
9,065 stream credits (see Table 1 and Section 6. Determination of Credits).
(3) Site selection
MARS' approved Lower Yellowstone Service Area Compensation Planning Framework (CPF) identifies
threats, stressors, and drivers of degradation in this watershed. According to the CPF, one of the major
threats to this landscape is the physical alteration of wetlands, streams, and riparian areas. The Army
Corps and Yellowstone River Conservation District Council's 2015 Yellowstone River Cumulative Effects
Analysis (CEA) 1 found that bank armoring and blocked side channels are contributing to the decline in
the Yellowstone River ecosystem's health. The CEA reported that as of 2011, 90 miles of side channels
have been blocked by dykes, and over 22,000 of acres of floodplain have been isolated due to
modifications for agriculture and infrastructure. In the Lower Yellowstone Watershed alone, there are
U.S. Army Corps of Engineers and Yellowstone River Conservation District Council. 2015. Yellowstone River
Cumulative Effects Analysis. U.S. Army Corps of Engineers Omaha District. Omaha, NE.
1
Page 2 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
over 14 miles of modified and altered riverbank (e.g., constructed stream deflectors, riprap,
transportation encroachment) 2. Bank armoring reduces natural processes of channel avulsion, erosion,
deposition, and island formation. It also reduces riparian connectivity by severing the river's ability to
access its side channels, tributaries, and floodplain.
The lower Yellowstone River is a sediment-rich reach that supports pallid sturgeon, paddlefish, sturgeon
chub, shovelnose sturgeon and other native warm water fish species including emerald shiners, fathead
minnow, flathead and creek chub, western silvery/plains minnow, goldeye, white sucker, river
carpsucker, sauger, and stonecat. The river is also habitat for non-native game fish including northern
pike, walleye, and black bullhead. Side channels are important refugia for fish during high water events
because they have warmer water temperatures and slower current. Side channels can also provide
year-round habitat for small-bodied species. However, bank armoring and irrigation withdrawals has
reduced the number of side channels that fish species are able to access.
We selected this project because it addresses one of the major threats to this watershed (i.e., a loss of
side channel habitat), and because we believe that the project has high ecological value and a high
likelihood of success. Figure 1 (location within the state's watersheds) shows the location of the
proposed mitigation project in the Lower Yellowstone Watershed, about 5 miles upriver from Sidney.
The site is located at 47.651N latitude and -104.186W longitude. The property is privately owned and
operated by a family actively engaged in hay production (Figure 2). Figure 3 shows the Fox Creek side
channel that we propose to restore. The Montana Fisheries Information System ranks Fox Creek near
the confluence as a substantial fisheries resource. 3 High water events in 2011 and 2014 caused 1,200
feet of Fox Creek and 13 acres of adjacent riparian forest to erode, and an upstream structure limits fish
passage to the first 3,000 feet of Fox Creek (Figure 4). Reactivating floodplain connectivity and restoring
a side channel of the Yellowstone will significantly increase habitat availability for fish species as a result
of the restoration we propose.
Yellowstone River Clearinghouse:
http://geoinfo.msl.mt.gov/Home/data/yellowstone_river_corridor_resource_clearinghouse
3
http://fwp.mt.gov/fishing/mFish
2
Page 3 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
71
Figure 1. Location of proposed project in Lower Yellowstone Watershed (#15)
Page 4 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
Figure 2. Location of Fox Creek side channel restoration project in Richland County (approximately 5 miles upstream from
Sidney, MT)
Page 5 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
Figure 3. Fox Creek Side channel restoration located along the southern border of landowner's property
Page 6 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
Figure 4. Current extent of fish passage with modeled 2-year inundation under current conditions 4 (note: upstream extent
of Fox Creek is on a neighbor's property, who is not interested in working with MARS to remove the fish passage barrier)
U.S. Army Corps of Engineers and Yellowstone River Conservation District Council. 2015. Yellowstone River Cumulative Effects Analysis. U.S. Army Corps
of Engineers Omaha District. Omaha, NE.
44
Page 7 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
72
73
74
75
76
77
78
79
80
(4) Site protection instrument
Prior to initiating this ILF project, the landowner placed a Channel Migration Easement (CME) on the
property in April 2016. The CME was secured with funds from the Western Area Power Administration,
Upper Basin Pallid Sturgeon Governing Board, and Montana Fish Wildlife and Parks. The CME is held by
the Montana Land Reliance. The CME currently protects the Channel Migration Zone, which is a buffer
zone approximately 3,570 feet wide, as well as a 30-acre parcel west of the Channel Migration zone
(Figure 5). MARS claims no credit from the investments by MARS, FWP, MLR or others associated with
the CME, but the easement will ensure the restoration project will be protected in perpetuity.
Page 8 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
81
82
83
84
85
Figure 5. Location of side channel restoration where a pre-existing conservation easement (Channel Migration Easement, executed in April
2016) will protect the restoration project in perpetuity
Page 9 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
(5) Baseline information
The lower Yellowstone River has an active floodplain and a large channel migration zone. Due to the
dynamic nature of the river, nearly 14 miles of bankline in this reach of the Yellowstone have been
modified or altered in this reach in an attempt to control bankline migration. Development and
irrigation withdrawals for agriculture have reduced the low flow volume of the river by at least 42% in
this reach of the river 5.
Federally listed species (Pallid Sturgeon) and Montana Species of Concern (Paddlefish) use the lower
Yellowstone River as habitat. This portion of the river is also important habitat for a number of small
bodied prairie fish species, including emerald shiners, fathead minnow, flathead and creek chub,
western silvery/plains minnow (Hybognathus), goldeye, white sucker, river carpsucker, sauger, and
stonecat. The lower Yellowstone supports non-native game fish, such as northern pike, walleye, and
black bullhead. The Lower Yellowstone Watershed is also important avian habitat. This reach of river
was surveyed as part of the Cumulative Effects Analysis and identified 39 species of birds, including the
red-headed woodpecker (a Montana Species of Concern)4.
The Fox Creek side channel project area is surrounded by alfalfa hay fields that are flood irrigated and
harvested 1-3 times every year. The riparian buffer contains a sparsely vegetated zone consisting of
snowberry, woods rose, chokecherry, green ash, and noxious weeds such as Canada thistle and spotted
knapweed. The upstream portion of the side channel is approximately 10 feet wide, with slow moving
water that flows year round from an artesian well. There are stretches with cattails and reed canary
grass that are habitat for red winged blackbirds, wood ducks, and mallards. However, the side channel
was filled at its confluence with Fox Creek, restricting the ability of the channel to backwater or allow
fish passage. The last 150 feet are only 1-2 feet wide.
After MARS receives approval from the Corps to begin development of a Mitigation Site Plan for the
project, more baseline information will be gathered and included in the draft and final plans.
(6) Determination of Credits
MARS used the Army Corps' Montana Stream Mitigation Procedure to estimate that this project will
generate approximately 9,065 credits (Table 1) from removing fill, restoring the connectivity of the Fox
Creek side channel to Fox Creek and to the Yellowstone River, grading and contouring the confluence of
the side channel to Fox Creek, vegetating over 1,000 feet of the riparian buffer with native woody
vegetation, and removing noxious weeds. If the Army Corps approves this Proposed Site Plan, MARS will
conduct additional baseline environmental surveys and functional assessments to further refine these
credit estimates in the Draft and Final Mitigation Site Plans.
Any additional stream credits above those required to offset MARS current obligation in the Watershed
from the sale to BNSF Railway for the permit referenced above are suggested to be certified by the
Corps and available for MARS to use for additional sales in the watershed as certified stream credits to
be sold at a 1:1 ratio.
http://ftp.geoinfo.msl.mt.gov/Documents/Projects/Yellowstone_River_Clearinghouse/Yellowstone_Reach_Narrat
ives_2015.pdf
5
Page 10 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
130
131
132
133
134
135
136
The Draft Mitigation Plan will include the credit release schedule. The schedule will define success
criteria with quantitative thresholds. The scheduled release of credits will correspond to the approval of
the Final Mitigation Site Plan, completion of restoration activities, and annual performance monitoring
for five years, or until the project is deemed successful by the Corps and all credits are released.
Table 1. Stream Mitigation Procedure for Bank Destabilization & Side Channel Restoration
FACTORS
Reach 1
/Side A
(Fox Creek Side
Channel
Restoration)
Reach 1
/Side B
(Fox Creek Side
Channel
Restoration)
a
Buffer Width
0.00
0.00
b
Remove Disturbance to
Riparian Buffer
0.00
0.00
c
Fence around Buffer
0.00
0.00
d
Re-vegetate Riparian
Buffer
0.54
0.29
716 feet (54%) of the left bank and 381
feet (29%) of right bank planted with
shrubs and trees for shading, erosion
control, and nutrient uptake
e
Micro Topography in
Floodplain
0.50
0.50
Reshape confluence of Fox Creek side
channel
f
Addition of Woody
Debris in Floodplain
0.00
0.00
0.50
0.50
0.00
0.00
1.00
1.00
Restoration of Channel
Morphology
1.00
1.00
Total Sum of Factors
(SFm) a-j
3.54
3.29
Linear Feet Impact*
(LFm)
1,328.00
1,328.00
4,700.00
4,365.00
9,065.00
g
h
i
j
Management of
Invasive Species
Removal of Riprap
below ordinary High
Water
Removal of Floodplain
Fill (Berms or
Impervious Materials)
SFm x LFm
NOTES
Spray Canada thistle and spotted
knapweed
Remove fill from lower portion of
channel to allow backwatering and fish
passage
Restore connectivity to Fox Creek by
removing fill, grading, and planting side
channel
Page 11 of 12
Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan
Fox Creek Side Channel Restoration in Lower Yellowstone Watershed (#15)
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
(7) Mitigation work plan
The Draft Mitigation Site Plan will include a schedule and a plan for the design of the side channel
restoration (e.g., quantity of excavation required to reconnect the side channel to Fox Creek), the
permits and surveys required, and the quantities of woody riparian shrubs and trees that will be planted
in the riparian buffer. MARS proposes to use contractors to design the project and reconnect the side
channel and hopes to complete the project during low water in the fall of 2017.
(8) Maintenance plan
The project is currently located within a Channel Migration Easement held by Montana Land Reliance.
MLR will conduct annual site visits in perpetuity to ensure that the terms of the easement are upheld.
MLR will work with the land owner to take corrective actions if necessary. If MLR's reports indicate that
the mitigation project requires stewardship, MARS will use Long-Term Management funds to pay for
these activities.
(9) Performance standards
If the Army Corps approves this Proposed Site Plan, MARS will develop detailed five-year performance
standards related to the buffer condition, native plant species richness, and instream habitat quality.
These performance standards will increase in rigor over the five years of the performance monitoring
period to allow for natural successional processes and adaptive management to occur. MARS will
include these performance standards in the Draft Mitigation Site Plan.
(10) Monitoring requirements
MARS will conduct the five-year performance monitoring and submit annual monitoring reports to the
Army Corps.
(11) Long-term management plan
The MARS Final Instrument requires that 17% and 13% of the fees collected for this project be dedicated
to contingency and long-term management, respectively. MARS will retain responsibility for the Fox
Creek side channel restoration and use the above mentioned funds to pay for stewardship actions.
(12) Adaptive management plan
If the five-year performance monitoring indicates that the project is not meeting its performance
standards, MARS will take corrective actions. Other specific steps to be taken in the event of the need
for adaptive management will be identified in the Draft Mitigation Plan.
(13) Financial assurances
The MARS Statewide ILF Instrument requires that 17% and 13%, respectively, of the ILF fees collected
for its compensatory mitigation projects be dedicated to Contingency and Long Term Management of
ILF projects in that service area.